Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu |
Pengadaan Langsung | 920 | 90.514.297.981 | 11 | 1.156.495.000 | 920 | 90.514.297.981 | 0 | 0 |
Penunjukan Langsung | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 920 | 90.514.297.981 | 11 | 1.156.495.000 | 920 | 90.514.297.981 | 0 | 0 |
Persentase | 1.2 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing RT.03 Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1282 | 35681150 | APBD | 36,700,000 | 36,700,000 | 36,520,000 | 36,520,000 | 36,408,000 | 36,408,000 | 0 | 36,408,000 | 2022-05-13 | 2022-05-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 180,000 | 0.49 % | |
2 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang Batung dan Jasa Konsultansi Perencanaan Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2282 | 35679861 | APBD | 34,400,000 | 34,400,000 | 34,202,420 | 34,202,420 | 34,077,000 | 34,077,000 | 34,077,000 | 34,077,000 | 2022-06-17 | 2022-06-23 | cv.airlangga konsultan | 03.122.016.3-732.000 | 197,580 | 0.57 % | |
3 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Perencanaan Normalisasi Sungai Tabuk Desa Tamiyang Kec. Sungai Raya, Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hamalau Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Normalisasi Sungai Buluh Padang Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 7282 | 35680289 | APBD | 73,000,000 | 73,000,000 | 72,600,000 | 72,600,000 | 72,483,000 | 72,483,000 | 72,483,000 | 72,483,000 | 2022-06-16 | 2022-06-22 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 400,000 | 0.55 % | |
4 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Sungai Alimin Desa Baru Kec. Daha Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau lama Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 8282 | 35729911 | APBD | 39,000,000 | 39,000,000 | 38,833,350 | 38,833,350 | 38,761,200 | 38,761,200 | 38,761,200 | 38,761,200 | 2022-06-16 | 2022-06-22 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 166,650 | 0.43 % | |
5 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Baru Kec. Daha Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10282 | 35730000 | APBD | 40,000,000 | 40,000,000 | 39,763,551 | 39,763,551 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2022-06-23 | 2022-06-30 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 236,449 | 0.59 % | |
6 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jaranih Desa Mandala Kec. Telaga Langsat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 13282 | 35679997 | APBD | 33,500,000 | 33,500,000 | 33,386,540 | 33,386,540 | 33,322,200 | 33,322,200 | 33,322,200 | 33,322,200 | 2022-06-03 | 2022-06-09 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 113,460 | 0.34 % | |
7 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Bayanan - Habirau Tengah (Jl. Inpres) Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 14282 | 35445844 | APBD | 45,000,000 | 44,802,752 | 44,655,300 | 44,655,300 | 44,557,000 | 44,557,000 | 0 | 0 | 2022-04-26 | 2022-05-09 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 344,700 | 0.77 % | |
8 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi Hilir mesjid Kec.Padang Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 20282 | 31455552 | APBD | 16,000,000 | 16,000,000 | 15,952,920 | 15,952,920 | 15,917,400 | 15,917,400 | 15,917,400 | 15,917,400 | 2022-06-23 | 2022-06-30 | Wing Rastafarindo | 03.282.590.3-732.000 | 47,080 | 0.29 % | |
9 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 23282 | 31456876 | APBD | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-06-03 | 2022-06-09 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 20,000 | 0.1 % | |
10 | 2022 | Dinas Pendidikan dan Kebudayaan | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | Pengadaan Langsung | Pengadaan Barang | 25282 | 31631779 | APBD | 99,676,500 | 99,676,335 | 99,253,980 | 99,253,980 | 99,199,000 | 99,199,000 | 0 | 99,199,000 | 2022-05-23 | 2022-05-31 | CV. An-Nidha | 02.675.485.3-733.000 | 422,520 | 0.42 % | |
11 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Sungai Simpang Tanjung Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 26282 | 31456820 | APBD | 15,500,000 | 15,500,000 | 15,318,000 | 15,318,000 | 15,251,400 | 15,251,400 | 15,251,400 | 15,251,400 | 2022-06-16 | 2022-06-22 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 182,000 | 1.17 % | |
12 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Marta Jiwa Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 27282 | 31632238 | APBD | 198,500,000 | 198,471,858 | 197,265,843 | 197,265,843 | 197,197,000 | 197,197,000 | 0 | 197,197,000 | 2022-05-26 | 2022-06-01 | CV. Cipta Pratama | 02.089.736.9-733.000 | 1,234,157 | 0.62 % | |
13 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung, Jl. Harapan Kel. Kandangan Barat Kec. Kandangan, Jalan HR Sukadani Desa Tabihi rt.03 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 33282 | 31576589 | APBD | 45,000,000 | 44,925,851 | 44,824,020 | 44,824,020 | 44,800,000 | 44,800,000 | 0 | 44,800,000 | 2022-06-13 | 2022-06-17 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 175,980 | 0.39 % | |
14 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Ambarai | Pengadaan Langsung | Pekerjaan Konstruksi | 34282 | 31650072 | APBD | 70,000,000 | 69,993,468 | 69,853,025 | 69,853,025 | 69,797,000 | 69,797,000 | 0 | 69,797,000 | 2022-05-27 | 2022-06-02 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 146,975 | 0.21 % | |
15 | 2022 | Dinas Perikanan | Belanja Natura dan pakan-pakan | Pengadaan Langsung | Pengadaan Barang | 36282 | 35682697 | APBD | 91,872,200 | 91,758,705 | 91,692,105 | 91,692,105 | 91,570,500 | 91,570,500 | 0 | 91,570,500 | 2022-05-18 | 2022-05-24 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 180,095 | 0.2 % | |
16 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 38282 | 32146164 | APBD | 200,000,000 | 199,998,418 | 199,847,738 | 199,847,738 | 199,708,000 | 199,708,000 | 0 | 199,708,000 | 2022-05-13 | 2022-05-19 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 152,262 | 0.08 % | |
17 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kandangan Kota 7 | Pengadaan Langsung | Pekerjaan Konstruksi | 39282 | 31649968 | APBD | 90,000,000 | 89,996,149 | 89,646,448 | 89,646,448 | 89,295,000 | 89,295,000 | 0 | 89,295,000 | 2022-05-23 | 2022-05-31 | CV. SAHABAT SARANA TEKNIK MANDIRI | 94.007.054.3-733.000 | 353,552 | 0.39 % | |
18 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Bumi Thaibah | Pengadaan Langsung | Pekerjaan Konstruksi | 41282 | 31649962 | APBD | 100,000,000 | 99,989,931 | 99,934,431 | 99,934,431 | 99,878,000 | 99,878,000 | 99,878,000 | 99,878,000 | 2022-06-28 | 2022-07-01 | CV.DITA | 02.242.686.0-733.000 | 65,569 | 0.07 % | |
19 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 42282 | 35740370 | APBD | 33,100,000 | 33,100,000 | 32,908,170 | 32,908,170 | 32,811,600 | 32,811,600 | 32,811,600 | 32,811,600 | 2022-06-16 | 2022-06-24 | Wiyasa Drawana | 80.902.072.0-731.000 | 191,830 | 0.58 % | |
20 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing Pulau Nagara RT.02 Kel. Jambu Hilir Kec.Kandangan dan Jasa Konsultansi Perencanaan Perkuatan tebing di Kelurahan jambu hilir RT.11 Kec.Kandangan; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 43282 | 35679796 | APBD | 40,000,000 | 40,000,000 | 39,948,900 | 39,948,900 | 39,871,200 | 39,871,200 | 0 | 39,871,200 | 2022-05-17 | 2022-05-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 51,100 | 0.13 % | |
21 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Biaya Pemeliharaan Rutin PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 52282 | 31832282 | APBD | 150,000,000 | 149,898,424 | 149,542,952 | 149,542,952 | 149,350,000 | 149,350,000 | 0 | 149,350,000 | 2022-05-11 | 2022-05-13 | CV.RIYO JAYA TEHNIK | 03.094.054.8-732.000 | 457,048 | 0.3 % | |
22 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 53282 | 31592321 | APBD | 16,400,000 | 16,400,000 | 16,317,000 | 16,317,000 | 16,261,500 | 16,261,500 | 16,261,500 | 16,261,500 | 2022-05-13 | 2022-05-20 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 83,000 | 0.51 % | |
23 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 61282 | 31457034 | APBD | 16,300,000 | 16,300,000 | 16,260,000 | 16,260,000 | 16,206,000 | 16,206,000 | 16,206,000 | 16,206,000 | 2022-06-02 | 2022-06-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 40,000 | 0.25 % | |
24 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 62282 | 31649743 | APBD | 90,000,000 | 89,972,552 | 89,805,640 | 89,805,640 | 89,764,000 | 89,764,000 | 0 | 89,764,000 | 2022-05-10 | 2022-05-13 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 194,360 | 0.22 % | |
25 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Siring guha Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 63282 | 31456923 | APBD | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,940,600 | 14,940,600 | 14,940,600 | 14,940,600 | 2022-06-02 | 2022-06-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 50,000 | 0.33 % | |
26 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec.Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 64282 | 35732227 | APBD | 91,400,000 | 91,400,000 | 90,998,870 | 90,998,870 | 90,864,600 | 90,864,600 | 90,864,600 | 90,864,600 | 2022-06-03 | 2022-06-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 401,130 | 0.44 % | |
27 | 2022 | Dinas Sosial | Belanja Jasa Konsultant Perencanaan Pembuatan pagar Belakang dan Samping Halaman rumah Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 66282 | 32440495 | APBD | 13,000,000 | 12,994,520 | 12,821,610 | 12,821,610 | 12,765,000 | 12,765,000 | 12,765,000 | 12,765,000 | 2022-05-17 | 2022-05-20 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 178,390 | 1.37 % | |
28 | 2022 | Dinas Pertanian | Pengadaan bahan -bahan bibit tanaman Belanja Bahan Bibit Tanaman pengembangan padi inbrida | Pengadaan Langsung | Pengadaan Barang | 67282 | 32227874 | APBD | 86,250,000 | 56,925,000 | 56,867,500 | 56,867,500 | 56,695,000 | 56,695,000 | 100 | 56,695,000 | 2022-05-24 | 2022-05-30 | CV. KATIBURA | 53.260.332.1-733.000 | 29,382,500 | 34.07 % | |
29 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 68282 | 31810905 | APBD | 58,600,000 | 58,550,000 | 58,380,000 | 58,380,000 | 58,300,000 | 58,300,000 | 58,300,000 | 58,300,000 | 2022-05-11 | 2022-05-13 | CV. KHALIF | 81.540.809.1-733.000 | 220,000 | 0.38 % | |
30 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 69282 | 31811013 | APBD | 179,279,100 | 179,081,800 | 178,787,700 | 178,787,700 | 178,600,000 | 178,600,000 | 178,600,000 | 178,600,000 | 2022-05-11 | 2022-05-13 | CV. KARYA PUTRA PANDAWA | 31.713.913.7-731.000 | 491,400 | 0.27 % | |
31 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 70282 | 35670568 | APBD | 10,000,000 | 10,000,000 | 9,934,478 | 9,934,478 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-05-11 | 2022-05-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 65,522 | 0.66 % | |
32 | 2022 | Sekretariat Daerah | Konsultan pengawasan rehab gedung PKK HSS, Konsultan pengawasan rehab pagar kantor setda (pagar belakang), Konsultan pengawasan rehab paving blok lapangan tugu,dan Konsultan pengawasan rehab ruang dapur pendopo kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 71282 | 35667017;35667159;35667215;35667267 | APBD | 35,400,000 | 35,382,100 | 35,224,740 | 35,224,740 | 35,224,740 | 0 | 0 | 0 | 2022-05-11 | 2022-05-20 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 175,260 | 0.5 % | |
33 | 2022 | Kecamatan Daha Barat | Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 75282 | 32117656 | APBD | 177,050,000 | 176,922,365 | 176,760,774 | 176,760,774 | 176,600,000 | 176,600,000 | 0 | 176,600,000 | 2022-05-11 | 2022-05-13 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 289,226 | 0.16 % | |
34 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 76282 | 31631646 | APBD | 95,000,000 | 94,944,461 | 94,469,686 | 94,469,686 | 94,444,000 | 94,444,000 | 94,444,000 | 94,444,000 | 2022-05-21 | 2022-05-25 | CV. AISY | 75.132.070.6-733.000 | 530,314 | 0.56 % | |
35 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Jambu Hilir Baluti 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 77282 | 31649956 | APBD | 90,000,000 | 89,986,965 | 89,935,272 | 89,935,272 | 89,809,000 | 89,809,000 | 89,809,000 | 89,809,000 | 2022-05-17 | 2022-05-23 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 64,728 | 0.07 % | |
36 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 78282 | 32117637 | APBD | 10,250,000 | 10,249,000 | 10,200,106 | 10,200,106 | 10,100,000 | 10,100,000 | 0 | 10,100,000 | 2022-05-11 | 2022-05-13 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 49,894 | 0.49 % | |
37 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung,Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Jelatang Kec. Padang Batung,Jasa Konsultansi Perencanaan Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 79282 | 31551771 | APBD | 84,270,000 | 83,919,053 | 82,972,500 | 82,972,500 | 82,939,000 | 82,939,000 | 0 | 82,939,000 | 2022-05-12 | 2022-05-19 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,297,500 | 1.54 % | |
38 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 80282 | 31933448 | APBD | 175,000,000 | 174,564,248 | 174,519,848 | 174,519,848 | 174,450,000 | 174,450,000 | 174,450,000 | 174,450,000 | 2022-06-03 | 2022-06-07 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 480,152 | 0.27 % | |
39 | 2022 | Dinas Perdagangan | Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 85282 | 32562410 | APBD | 198,000,000 | 197,999,953 | 197,894,081 | 197,894,081 | 197,339,000 | 197,339,000 | 100 | 197,339,000 | 2022-05-20 | 2022-05-24 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 105,919 | 0.05 % | |
40 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 89282 | 35778396 | APBD | 18,345,000 | 18,345,000 | 18,310,559 | 18,310,559 | 18,292,800 | 18,292,800 | 18,292,800 | 18,292,800 | 2022-06-03 | 2022-06-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 34,441 | 0.19 % | |
41 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 90282 | 31933434 | APBD | 178,000,000 | 177,765,803 | 177,393,237 | 177,393,237 | 177,300,000 | 177,300,000 | 177,300,000 | 177,300,000 | 2022-06-03 | 2022-06-07 | CV RIZKY BANUA | 02.089.856.5-733.000 | 606,763 | 0.34 % | |
42 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Darul Amin Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 91282 | 31632261 | APBD | 198,500,000 | 198,334,980 | 198,084,864 | 198,084,864 | 198,018,000 | 198,018,000 | 0 | 198,018,000 | 2022-05-23 | 2022-05-27 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 415,137 | 0.21 % | |
43 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Lok Tungin Ds. Bamban Selatan Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 94282 | 32060525 | APBD | 195,000,000 | 195,000,000 | 194,929,177 | 194,929,177 | 194,862,500 | 194,862,500 | 194,862,500 | 194,862,500 | 2022-07-20 | 2022-07-25 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 70,823 | 0.04 % | |
44 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase Jl. Harapan Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 96282 | 31576952 | APBD | 163,950,000 | 163,177,925 | 162,828,176 | 162,828,176 | 162,528,000 | 162,528,000 | 162,528,000 | 162,528,000 | 2022-07-19 | 2022-07-22 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 1,121,825 | 0.68 % | |
45 | 2022 | Dinas Perikanan | Belanja Pembuatan Kolam Budidaya Ikan Gabus Haruan | Pengadaan Langsung | Pekerjaan Konstruksi | 97282 | 32507339 | APBD | 200,000,000 | 199,630,000 | 198,980,307 | 198,980,307 | 198,869,300 | 198,869,300 | 198,869,300 | 198,869,300 | 2022-08-04 | 2022-08-09 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 1,019,693 | 0.51 % | |
46 | 2022 | Dinas Pertanian | Pengawasan Pembangunan/Rehab JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 99282 | 32060498 | APBD | 96,180,000 | 96,180,000 | 95,710,083 | 95,710,083 | 95,593,200 | 95,593,200 | 95,593,200 | 95,593,200 | 2022-07-25 | 2022-08-09 | Wiyasa Drawana | 80.902.072.0-731.000 | 469,917 | 0.49 % | |
47 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Wana Makmur Ds. Lumpangi Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 100282 | 32060580 | APBD | 199,500,000 | 199,500,000 | 199,435,028 | 199,435,028 | 199,284,900 | 199,284,900 | 199,284,900 | 199,284,900 | 2022-08-08 | 2022-08-11 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 64,972 | 0.03 % | |
48 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Swarga Ds. Karang Jawa Muka Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 101282 | 32060568 | APBD | 195,000,000 | 195,000,000 | 194,910,894 | 194,910,894 | 194,730,500 | 194,730,500 | 194,730,500 | 194,730,500 | 2022-08-08 | 2022-08-11 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 89,106 | 0.05 % | |
49 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Al Muttaqin Ds. Amawang Kanan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 102282 | 32060604 | APBD | 198,000,000 | 197,998,000 | 197,866,511 | 197,866,511 | 197,772,500 | 197,772,500 | 197,772,500 | 197,772,500 | 2022-08-03 | 2022-08-08 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 133,489 | 0.07 % | |
50 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Mangupil Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 104282 | 32060540 | APBD | 195,000,000 | 195,000,000 | 194,945,322 | 194,945,322 | 194,760,700 | 194,760,700 | 194,760,700 | 194,760,700 | 2022-07-20 | 2022-07-25 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 54,678 | 0.03 % | |
51 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Padang Parangan Ds. Baru Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 106282 | 32060592 | APBD | 196,500,000 | 196,454,000 | 196,029,230 | 196,029,230 | 193,686,600 | 193,686,600 | 193,686,600 | 193,686,600 | 2022-07-25 | 2022-08-01 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 470,770 | 0.24 % | |
52 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 108282 | 31716441 | APBD | 15,300,000 | 15,300,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 2022-07-20 | 2022-07-25 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.65 % | |
53 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 109282 | 35491099 | APBD | 174,000,000 | 173,999,441 | 173,010,833 | 173,010,833 | 172,989,000 | 172,989,000 | 172,989,000 | 172,989,000 | 2022-08-08 | 2022-08-12 | CV. SHINTA | 01.124.041.3-733.000 | 989,167 | 0.57 % | |
54 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 110282 | 35490080 | APBD | 173,000,000 | 172,978,290 | 172,779,036 | 172,779,036 | 172,712,000 | 172,712,000 | 172,712,000 | 172,712,000 | 2022-08-12 | 2022-08-17 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 220,964 | 0.13 % | |
55 | 2022 | Dinas Kesehatan | Pengadaan bmhp reagen laboratorium pelayanan kesehatan primer (DAK) | Pengadaan Langsung | Pengadaan Barang | 111282 | 35175821 | APBD | 174,600,000 | 173,160,000 | 173,160,000 | 173,160,000 | 173,049,000 | 0 | 0 | 0 | 2022-07-25 | 2022-07-29 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 1,440,000 | 0.82 % | |
56 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Lumpangi | Pengadaan Langsung | Pekerjaan Konstruksi | 113282 | 32385433 | APBD | 180,000,000 | 179,777,313 | 179,572,837 | 179,572,837 | 179,000,000 | 179,000,000 | 179,000,000 | 179,000,000 | 2022-07-25 | 2022-07-27 | CV. AISY | 75.132.070.6-733.000 | 427,163 | 0.24 % | |
57 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 114282 | 31664656 | APBD | 10,000,000 | 9,974,016 | 9,901,200 | 9,901,200 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-07-15 | 2022-07-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 98,800 | 0.99 % | |
58 | 2022 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan RT. 7 | Pengadaan Langsung | Pekerjaan Konstruksi | 117282 | 32727377 | APBD | 75,850,000 | 75,820,000 | 75,614,652 | 75,614,652 | 75,500,000 | 75,500,000 | 75,500,000 | 75,500,000 | 2022-07-19 | 2022-07-21 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 235,348 | 0.31 % | |
59 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 120282 | 35495306 | APBD | 197,000,000 | 196,978,194 | 196,842,093 | 196,842,093 | 196,825,000 | 196,825,000 | 196,825,000 | 196,825,000 | 2022-08-01 | 2022-08-08 | cv. bumi mandiri | 02.089.892.0-733.000 | 157,907 | 0.08 % | |
60 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 121282 | 32146282 | APBD | 173,000,000 | 172,966,337 | 172,458,823 | 172,458,823 | 172,372,000 | 172,372,000 | 172,372,000 | 172,372,000 | 2022-07-20 | 2022-07-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 541,177 | 0.31 % | |
61 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 122282 | 32146175 | APBD | 165,750,000 | 165,743,495 | 165,256,033 | 165,256,033 | 165,165,000 | 165,165,000 | 165,165,000 | 165,165,000 | 2022-07-20 | 2022-07-26 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 493,967 | 0.3 % | |
62 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 125282 | 32146245 | APBD | 13,850,000 | 13,850,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 2022-07-21 | 2022-07-26 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 200,000 | 1.44 % | |
63 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 126282 | 32147158 | APBD | 13,250,000 | 13,250,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 2022-07-21 | 2022-07-26 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 250,000 | 1.89 % | |
64 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Jalan Lingkar RSUD (BLUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 134282 | 36288158 | BLUD | 50,000,000 | 49,429,592 | 49,284,000 | 49,284,000 | 48,800,000 | 48,800,000 | 0 | 48,800,000 | 2022-07-26 | 2022-07-29 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 716,000 | 1.43 % | |
65 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan Gantung Lungau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 139282 | 35497507 | APBD | 187,000,000 | 186,938,849 | 186,677,019 | 186,677,019 | 186,588,000 | 186,588,000 | 186,588,000 | 186,588,000 | 2022-07-21 | 2022-07-27 | CV.Bangun Banua | 93.708.167.7-733.000 | 322,981 | 0.17 % | |
66 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Lama Kec. Daha barat | Pengadaan Langsung | Pekerjaan Konstruksi | 141282 | 31457131 | APBD | 190,000,000 | 189,808,805 | 189,692,503 | 189,692,503 | 189,609,000 | 189,609,000 | 189,609,000 | 189,609,000 | 2022-08-31 | 2022-09-08 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 307,497 | 0.16 % | |
67 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 142282 | 31457229 | APBD | 200,000,000 | 199,911,197 | 199,779,907 | 199,779,907 | 199,729,000 | 199,729,000 | 199,729,000 | 199,729,000 | 2022-07-27 | 2022-08-04 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 220,094 | 0.11 % | |
68 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 143282 | 31457126 | APBD | 200,000,000 | 199,841,018 | 199,761,431 | 199,761,431 | 199,733,000 | 199,733,000 | 199,733,000 | 199,733,000 | 2022-08-31 | 2022-09-08 | CV. JODHA SAE | 94.797.791.4-733.000 | 238,569 | 0.12 % | |
69 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 144282 | 31457078 | APBD | 200,000,000 | 199,826,747 | 199,692,702 | 199,692,702 | 199,631,000 | 199,631,000 | 199,631,000 | 199,631,000 | 2022-08-31 | 2022-09-08 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 307,298 | 0.15 % | |
70 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Baru Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 146282 | 31457162 | APBD | 200,000,000 | 199,877,455 | 199,799,200 | 199,799,200 | 199,743,000 | 199,743,000 | 199,743,000 | 199,743,000 | 2022-08-01 | 2022-08-05 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 200,800 | 0.1 % | |
71 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 147282 | 31457201 | APBD | 175,000,000 | 174,805,558 | 174,653,237 | 174,653,237 | 174,631,000 | 174,631,000 | 0 | 174,631,000 | 2022-08-17 | 2022-08-24 | cv. rukun damai | 01.203.952.5-733.000 | 346,763 | 0.2 % | |
72 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 148282 | 31457156 | APBD | 200,000,000 | 199,913,955 | 199,725,285 | 199,725,285 | 199,697,000 | 199,697,000 | 0 | 199,697,000 | 2022-08-16 | 2022-08-22 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 274,715 | 0.14 % | |
73 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 149282 | 35493534 | APBD | 192,000,000 | 191,953,502 | 191,215,464 | 191,215,464 | 191,151,000 | 191,151,000 | 191,151,000 | 191,151,000 | 2022-09-09 | 2022-09-14 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 784,536 | 0.41 % | |
74 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 150282 | 31457298 | APBD | 163,000,000 | 162,834,755 | 162,657,150 | 162,657,150 | 162,623,000 | 162,623,000 | 0 | 162,623,000 | 2022-08-15 | 2022-08-22 | CV. AMANAH RAYA | 31.714.116.6-733.000 | 342,850 | 0.21 % | |
75 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 151282 | 31457220 | APBD | 200,000,000 | 199,853,577 | 199,711,655 | 199,711,655 | 199,587,000 | 199,587,000 | 199,587,000 | 199,587,000 | 2022-07-28 | 2022-08-04 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 288,345 | 0.14 % | |
76 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 152282 | 31457283 | APBD | 160,000,000 | 159,927,852 | 159,716,948 | 159,716,948 | 159,689,000 | 159,689,000 | 159,689,000 | 159,689,000 | 2022-08-01 | 2022-08-05 | CV.SHOFADINA | 81.484.310.8-733.000 | 283,052 | 0.18 % | |
77 | 2022 | Sekretariat Daerah | Belanja Pemeliharaan Bangunan Gedung Kantor - Rehab WC Bagian PBJ | Pengadaan Langsung | Pekerjaan Konstruksi | 153282 | 32104459 | APBD | 90,000,000 | 55,775,500 | 55,491,238 | 55,491,238 | 55,491,200 | 55,491,200 | 55,491,200 | 55,491,200 | 2022-08-02 | 2022-08-08 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 34,508,762 | 38.34 % | |
78 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Telaga Bahari Ds. Lungau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 154282 | 32060554 | APBD | 195,000,000 | 195,000,000 | 194,800,863 | 194,800,863 | 194,620,400 | 194,620,400 | 194,620,400 | 194,620,400 | 2022-07-25 | 2022-07-28 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 199,137 | 0.1 % | |
79 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 156282 | 31457317 | APBD | 200,000,000 | 199,894,944 | 199,786,748 | 199,786,748 | 199,753,000 | 199,753,000 | 199,753,000 | 199,753,000 | 2022-09-19 | 2022-09-23 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 213,252 | 0.11 % | |
80 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 157282 | 31457213 | APBD | 193,750,000 | 193,570,119 | 193,443,710 | 193,443,710 | 193,393,000 | 193,393,000 | 0 | 193,393,000 | 2022-08-18 | 2022-08-24 | cv. bumi mandiri | 02.089.892.0-733.000 | 306,290 | 0.16 % | |
81 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Siring Guha Desa Gumbil Kec. Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 158282 | 31457088 | APBD | 150,000,000 | 149,829,379 | 149,646,229 | 149,646,229 | 149,618,000 | 149,618,000 | 0 | 149,618,000 | 2022-08-15 | 2022-08-22 | CV.SHOFADINA | 81.484.310.8-733.000 | 353,771 | 0.24 % | |
82 | 2022 | Dinas Perhubungan | Pembangunan Halte Sungai | Pengadaan Langsung | Pekerjaan Konstruksi | 159282 | 36303859 | APBD | 200,000,000 | 196,823,911 | 196,801,544 | 196,801,544 | 196,647,000 | 196,647,000 | 196,647,000 | 196,647,000 | 2022-07-26 | 2022-08-01 | CV. RISNA | 01.214.257.6-733.000 | 3,198,456 | 1.6 % | |
83 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Buluh Padang Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 160282 | 31457253 | APBD | 187,500,000 | 187,416,790 | 187,219,896 | 187,219,896 | 187,108,000 | 187,108,000 | 0 | 187,108,000 | 2022-08-16 | 2022-08-22 | RIKA JAYA, CV | 01.424.626.8-733.000 | 280,104 | 0.15 % | |
84 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 161282 | 31664306 | APBD | 32,500,000 | 32,362,328 | 32,245,500 | 32,245,500 | 32,150,000 | 32,150,000 | 32,150,000 | 32,150,000 | 2022-07-29 | 2022-08-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 254,500 | 0.78 % | |
85 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 162282 | 31457239 | APBD | 170,000,000 | 169,900,093 | 169,683,635 | 169,683,635 | 169,655,000 | 169,655,000 | 169,655,000 | 169,655,000 | 2022-08-01 | 2022-08-05 | CV. AMANAH RAYA | 31.714.116.6-733.000 | 316,365 | 0.19 % | |
86 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Banyu Barau Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 163282 | 31457245 | APBD | 149,700,000 | 149,598,107 | 149,398,307 | 149,398,307 | 149,342,000 | 149,342,000 | 149,342,000 | 149,342,000 | 2022-08-02 | 2022-08-05 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 301,693 | 0.2 % | |
87 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Katilang Desa bago tanggul Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 164282 | 31457067 | APBD | 190,560,000 | 190,455,472 | 190,352,748 | 190,352,748 | 190,324,000 | 190,324,000 | 190,324,000 | 190,324,000 | 2022-09-07 | 2022-09-12 | cv. bumi mandiri | 02.089.892.0-733.000 | 207,252 | 0.11 % | |
88 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tajun Padang Sangkuang Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 165282 | 31457262 | APBD | 170,000,000 | 169,911,233 | 169,700,333 | 169,700,333 | 169,644,000 | 169,644,000 | 169,644,000 | 169,644,000 | 2022-10-10 | 2022-10-14 | cv perintis dua | 01.219.560.8-731.000 | 299,667 | 0.18 % | |
89 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 166282 | 31457207 | APBD | 181,250,000 | 181,142,223 | 181,035,864 | 181,035,864 | 181,002,000 | 181,002,000 | 181,002,000 | 181,002,000 | 2022-09-07 | 2022-09-12 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 214,136 | 0.12 % | |
90 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Simpang Tanjung, Ds.Tambangan Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 167282 | 31457070 | APBD | 157,500,000 | 157,414,231 | 157,292,131 | 157,292,131 | 157,247,000 | 157,247,000 | 157,247,000 | 157,247,000 | 2022-09-06 | 2022-09-12 | CV. JODHA SAE | 94.797.791.4-733.000 | 207,869 | 0.13 % | |
91 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 168282 | 31457170 | APBD | 175,000,000 | 174,912,753 | 174,763,585 | 174,763,585 | 174,708,000 | 174,708,000 | 0 | 174,708,000 | 2022-08-24 | 2022-08-29 | cv. rukun damai | 01.203.952.5-733.000 | 236,415 | 0.14 % | |
92 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 169282 | 31457322 | APBD | 194,000,000 | 193,901,611 | 193,770,722 | 193,770,722 | 193,715,000 | 193,715,000 | 0 | 193,715,000 | 2022-08-23 | 2022-08-29 | cv. bumi mandiri | 02.089.892.0-733.000 | 229,278 | 0.12 % | |
93 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase jalan HR Sukadani Desa Tabihi RT.03 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 171282 | 31576965 | APBD | 176,750,000 | 176,307,078 | 175,315,000 | 175,315,000 | 175,275,000 | 175,275,000 | 175,275,000 | 175,275,000 | 2022-07-29 | 2022-08-03 | CV. @ BUKIDS | 02.300.374.2-733.000 | 1,435,000 | 0.81 % | |
94 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 172282 | 31576938 | APBD | 164,000,000 | 163,980,551 | 162,578,678 | 162,578,678 | 162,562,000 | 162,562,000 | 162,562,000 | 162,562,000 | 2022-07-29 | 2022-08-03 | CV. ALBATROS | 01.222.160.2-733.000 | 1,421,322 | 0.87 % | |
95 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Buluh Hantamangau Desa Garunggang Kec. Simpur (Lanjutan) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanyar Desa Tebing Tinggi Kec. Simpur (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 173282 | 36312493 | APBD | 28,000,000 | 28,000,000 | 27,838,800 | 27,838,800 | 27,794,400 | 27,794,400 | 27,794,400 | 27,794,400 | 2022-09-07 | 2022-09-12 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 161,200 | 0.58 % | |
96 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 174282 | 31456583 | APBD | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-09-20 | 2022-09-23 | cv.airlangga konsultan | 03.122.016.3-732.000 | 50,000 | 0.36 % | |
97 | 2022 | Kecamatan Daha Utara | Pemeliharaan / Rehab Taman Rahimin Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 175282 | 32100690 | APBD | 168,700,000 | 168,700,000 | 168,388,105 | 168,388,105 | 168,250,000 | 168,250,000 | 168,250,000 | 168,250,000 | 2022-07-29 | 2022-08-03 | CV. AL QAWS | 70.619.811.6-733.000 | 311,895 | 0.18 % | |
98 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Badaun Kec. Daha Barat (Lanjutan), Jasa Konsultansi Pengawasan Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat, Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Baru Kec.Daha barat, Jasa Konsultansi Pengwasan Normalisasi Sungai Desa Bajayau lama Kec.Daha barat, dan Jasa Konsultansi Pengawasan Sungai Alimin Desa Baru Kec.Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 176282 | 36312259 | APBD | 69,000,000 | 69,000,000 | 68,995,722 | 68,995,722 | 68,808,900 | 68,808,900 | 68,808,900 | 68,808,900 | 2022-08-29 | 2022-09-06 | Wiyasa Drawana | 80.902.072.0-731.000 | 4,278 | 0.01 % | |
99 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Katilang Desa Bago tanggul Kec. Kalumpang dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Batangkulur Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 177282 | 36312188 | APBD | 23,040,250 | 23,040,250 | 23,000,000 | 23,000,000 | 22,932,600 | 22,932,600 | 22,932,600 | 22,932,600 | 2022-09-07 | 2022-09-12 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 40,250 | 0.17 % | |
100 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Siring guha Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 178282 | 31456705 | APBD | 10,761,250 | 10,761,250 | 10,750,139 | 10,750,139 | 10,689,300 | 10,689,300 | 10,689,300 | 10,689,300 | 2022-08-29 | 2022-09-06 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 11,111 | 0.1 % | |
101 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perngawasan Sungai Muning Dalam Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 179282 | 31456562 | APBD | 32,330,000 | 32,330,000 | 31,845,900 | 31,845,900 | 31,746,000 | 31,746,000 | 31,746,000 | 31,746,000 | 2022-10-12 | 2022-10-20 | Wiyasa Drawana | 80.902.072.0-731.000 | 484,100 | 1.5 % | |
102 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 180282 | 32147207 | APBD | 160,000,000 | 159,555,966 | 159,376,864 | 159,376,864 | 159,159,000 | 159,159,000 | 159,159,000 | 159,159,000 | 2022-09-29 | 2022-10-05 | cv perintis dua | 01.219.560.8-731.000 | 623,136 | 0.39 % | |
103 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 181282 | 32147139 | APBD | 13,000,000 | 13,000,000 | 12,987,000 | 12,987,000 | 12,921,000 | 12,921,000 | 12,921,000 | 12,921,000 | 2022-09-08 | 2022-09-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 13,000 | 0.1 % | |
104 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perngawasan Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 184282 | 31456569 | APBD | 14,000,000 | 14,000,000 | 13,955,000 | 13,955,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-08-17 | 2022-08-24 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 45,000 | 0.32 % | |
105 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Tabuk Desa Tamiyang Kec. Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hamalau Kecamatan Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Buluh Padang di Desa Batang Kulur Kiri Kec.Sungai raya, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Tajun Padang Sangkuang Desa Sungai Raya Utara Kec. Sungai Raya; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 185282 | 36312590 | APBD | 65,680,000 | 65,680,000 | 65,180,000 | 65,180,000 | 65,023,800 | 65,023,800 | 65,023,800 | 65,023,800 | 2022-08-18 | 2022-08-24 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 0.76 % | |
106 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Sekitar Kec. Simpur dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Pantai Ulin Kec. Simpur (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 186282 | 36312181 | APBD | 27,350,000 | 27,350,000 | 27,250,000 | 27,250,000 | 27,195,000 | 27,195,000 | 27,195,000 | 27,195,000 | 2022-08-29 | 2022-09-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 100,000 | 0.37 % | |
107 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaranih Desa Mandala Kec. Telaga Langsat dan Jasa Konsultansi Pengawasan Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 189282 | 36312686 | APBD | 23,450,000 | 23,450,000 | 23,348,850 | 23,348,850 | 23,287,800 | 23,287,800 | 23,287,800 | 23,287,800 | 2022-08-18 | 2022-08-24 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 101,150 | 0.43 % | |
108 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Alimin Desa Baru Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 195282 | 31457045 | APBD | 200,000,000 | 199,826,747 | 199,700,703 | 199,700,703 | 199,670,000 | 199,670,000 | 199,670,000 | 199,670,000 | 2022-09-20 | 2022-09-23 | cv. rukun damai | 01.203.952.5-733.000 | 299,297 | 0.15 % | |
109 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Gambut Desa Karang bulan Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 196282 | 31456783 | APBD | 12,180,000 | 12,180,000 | 12,168,886 | 12,168,886 | 12,132,300 | 12,132,300 | 12,132,300 | 12,132,300 | 2022-09-03 | 2022-09-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 11,114 | 0.09 % | |
110 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 197282 | 32146186 | APBD | 163,000,000 | 162,727,718 | 162,310,239 | 162,310,239 | 162,162,000 | 162,162,000 | 162,162,000 | 162,162,000 | 2022-08-09 | 2022-08-15 | CV. SHINTA | 01.124.041.3-733.000 | 689,761 | 0.42 % | |
111 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Kaliring Kec. Padang batung | Pengadaan Langsung | Pekerjaan Konstruksi | 198282 | 31650492 | APBD | 167,000,000 | 166,936,637 | 166,847,835 | 166,847,835 | 166,770,000 | 166,770,000 | 166,770,000 | 166,770,000 | 2022-10-05 | 2022-10-12 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 152,165 | 0.09 % | |
112 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 199282 | 31650671 | APBD | 130,000,000 | 129,930,820 | 129,753,220 | 129,753,220 | 129,714,000 | 129,714,000 | 129,714,000 | 129,714,000 | 2022-10-15 | 2022-10-21 | cemara indah | 02.090.160.9-731.000 | 246,780 | 0.19 % | |
113 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 200282 | 32146233 | APBD | 15,000,000 | 15,000,000 | 14,965,000 | 14,965,000 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2022-08-31 | 2022-09-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 35,000 | 0.23 % | |
114 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Kelurahan Jambu Hilir RT.11 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 201282 | 31650481 | APBD | 200,000,000 | 199,933,298 | 199,750,148 | 199,750,148 | 199,711,000 | 199,711,000 | 199,711,000 | 199,711,000 | 2022-10-15 | 2022-10-21 | cemara indah | 02.090.160.9-731.000 | 249,852 | 0.12 % | |
115 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang batung dan Jasa Konsultansi pengawasan Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 202282 | 36312144 | APBD | 24,280,000 | 24,280,000 | 24,200,001 | 24,200,001 | 24,131,400 | 24,131,400 | 24,131,400 | 24,131,400 | 2022-09-12 | 2022-09-16 | cv.airlangga konsultan | 03.122.016.3-732.000 | 79,999 | 0.33 % | |
116 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.03 Desa Jambu Hulu Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 203282 | 31650696 | APBD | 200,000,000 | 199,934,920 | 199,739,283 | 199,739,283 | 199,708,000 | 199,708,000 | 199,708,000 | 199,708,000 | 2022-10-15 | 2022-10-21 | cemara indah | 02.090.160.9-731.000 | 260,717 | 0.13 % | |
117 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 204282 | 31593016 | APBD | 199,500,000 | 199,499,446 | 199,029,094 | 199,029,094 | 198,918,000 | 198,918,000 | 80 | 198,918,000 | 2022-08-22 | 2022-08-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 470,906 | 0.24 % | |
118 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 206282 | 31650714 | APBD | 174,000,000 | 173,933,971 | 173,745,271 | 173,745,271 | 173,706,000 | 173,706,000 | 173,706,000 | 173,706,000 | 2022-10-10 | 2022-10-14 | cv perintis dua | 01.219.560.8-731.000 | 254,729 | 0.15 % | |
119 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 207282 | 31551770 | APBD | 15,000,000 | 14,999,430 | 14,952,810 | 14,952,810 | 14,907,300 | 14,907,300 | 0 | 14,907,300 | 2022-08-02 | 2022-08-08 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 47,190 | 0.31 % | |
120 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Jl. Kapten F. Tendean Kelurahan Jambu Hilir Kec. Kandangan (Lanjutan) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Baluti RT.01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 208282 | 36334285 | APBD | 25,400,000 | 25,400,000 | 25,300,001 | 25,300,001 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 2022-09-04 | 2022-09-12 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 99,999 | 0.39 % | |
121 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing di Desa Hulu banyu Kec. Loksado dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 209282 | 36312114 | APBD | 20,300,000 | 20,300,000 | 20,210,000 | 20,210,000 | 20,135,400 | 20,135,400 | 20,135,400 | 20,135,400 | 2022-09-21 | 2022-09-30 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,000 | 0.44 % | |
122 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi Pengukuran Bidang Tanah | Pengadaan Langsung | Jasa Lainnya | 210282 | 32421130 | APBD | 56,100,000 | 51,000,000 | 50,850,000 | 50,850,000 | 50,600,000 | 50,600,000 | 50,600,000 | 50,600,000 | 2022-08-10 | 2022-08-15 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 5,250,000 | 9.36 % | |
123 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengecatan RTH,Rehabilitasi Taman Darmansyah Djauhidie | Pengadaan Langsung | Pekerjaan Konstruksi | 214282 | 31835803;31836294 | APBD | 140,000,000 | 139,006,521 | 138,703,180 | 138,703,180 | 138,550,000 | 138,550,000 | 138,550,000 | 138,550,000 | 2022-08-10 | 2022-08-12 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,296,820 | 0.93 % | |
124 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Jl. Kapten F. Tendean Kelurahan Jambu Hilir Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 216282 | 31650499 | APBD | 154,000,000 | 153,938,443 | 153,767,781 | 153,767,781 | 153,744,000 | 153,744,000 | 153,744,000 | 153,744,000 | 2022-08-29 | 2022-09-05 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 232,219 | 0.15 % | |
125 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 217282 | 31650703 | APBD | 160,000,000 | 159,928,758 | 159,817,758 | 159,817,758 | 159,778,000 | 159,778,000 | 159,778,000 | 159,778,000 | 2022-08-16 | 2022-08-23 | CV. JODHA SAE | 94.797.791.4-733.000 | 182,242 | 0.11 % | |
126 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Pulau Nagara RT.02 Kel. Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 218282 | 31650486 | APBD | 200,000,000 | 199,932,300 | 199,521,579 | 199,521,579 | 199,444,000 | 199,444,000 | 0 | 199,444,000 | 2022-08-15 | 2022-08-22 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 478,421 | 0.24 % | |
127 | 2022 | Dinas Perhubungan | Rehabilitasi WC dan KM Dermaga Negara | Pengadaan Langsung | Pekerjaan Konstruksi | 219282 | 36303852 | APBD | 92,000,000 | 44,095,000 | 44,051,030 | 44,051,030 | 44,051,000 | 44,051,000 | 44,051,000 | 44,051,000 | 2022-08-03 | 2022-08-05 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 47,948,970 | 52.12 % | |
128 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Baluti RT.01 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 221282 | 31650681 | APBD | 200,000,000 | 199,930,824 | 199,631,729 | 199,631,729 | 199,581,000 | 199,581,000 | 199,581,000 | 199,581,000 | 2022-08-29 | 2022-09-05 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 368,271 | 0.18 % | |
129 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 03 Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Kaliring Kec. Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 222282 | 36312394 | APBD | 25,690,000 | 25,690,000 | 25,600,000 | 25,600,000 | 25,496,700 | 25,496,700 | 25,496,700 | 25,496,700 | 2022-10-12 | 2022-10-20 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 90,000 | 0.35 % | |
130 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 223282 | 31650664 | APBD | 184,000,000 | 183,934,415 | 183,632,728 | 183,632,728 | 183,493,000 | 183,493,000 | 183,493,000 | 183,493,000 | 2022-08-21 | 2022-08-26 | FADWI UTAMA | 94.246.044.5-733.000 | 367,272 | 0.2 % | |
131 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Pulau Nagara RT. 02 Kel. Jambu Hilir Kec. Kandangan dan Jasa Konsultansi Pengawasan Perkuatan tebing di Kelurahan jambu hilir RT.11 Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 224282 | 36312485 | APBD | 28,000,000 | 28,000,000 | 27,960,000 | 27,960,000 | 27,927,600 | 27,927,600 | 27,927,600 | 27,927,600 | 2022-09-04 | 2022-09-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 40,000 | 0.14 % | |
132 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 225282 | 35778559 | APBD | 176,000,000 | 175,850,686 | 175,725,062 | 175,725,062 | 175,669,000 | 175,669,000 | 175,669,000 | 175,669,000 | 2022-08-17 | 2022-08-24 | CV. SHINTA | 01.124.041.3-733.000 | 274,938 | 0.16 % | |
133 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 228282 | 31455661 | APBD | 140,000,000 | 139,915,100 | 139,789,157 | 139,789,157 | 139,700,000 | 139,700,000 | 139,700,000 | 139,700,000 | 2022-09-29 | 2022-10-06 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 210,843 | 0.15 % | |
134 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec.Sungai Raya dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 232282 | 36339873 | APBD | 23,800,000 | 23,800,000 | 23,550,000 | 23,550,000 | 23,465,400 | 23,465,400 | 23,465,400 | 23,465,400 | 2022-09-04 | 2022-09-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 250,000 | 1.05 % | |
135 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Batangkulur Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 233282 | 31457180 | APBD | 137,500,000 | 137,423,085 | 137,325,618 | 137,325,618 | 137,297,000 | 137,297,000 | 137,297,000 | 137,297,000 | 2022-09-06 | 2022-09-12 | cv. rukun damai | 01.203.952.5-733.000 | 174,382 | 0.13 % | |
136 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Pembangunan Taman Stadion 2 Desember,Belanja Konsultansi Pengawasan Pemeliharaan Tugu Dodol | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 234282 | 31829850;31829872 | APBD | 37,050,000 | 36,880,860 | 36,774,300 | 36,774,300 | 36,550,000 | 36,550,000 | 36,550,000 | 36,550,000 | 2022-08-10 | 2022-08-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 275,700 | 0.74 % | |
137 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Pengurukan Lahan TPU Daha Selatan Desa Banjarbaru (lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 235282 | 31834189 | APBD | 28,000,000 | 27,845,016 | 27,758,103 | 27,758,103 | 27,700,000 | 27,700,000 | 27,700,000 | 27,700,000 | 2022-08-10 | 2022-08-12 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 241,897 | 0.86 % | |
138 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tabuk Desa Tamiyang Kec.Sungai raya | Pengadaan Langsung | Pekerjaan Konstruksi | 237282 | 31457057 | APBD | 200,000,000 | 199,902,882 | 199,703,082 | 199,703,082 | 199,675,000 | 199,675,000 | 199,675,000 | 199,675,000 | 2022-09-14 | 2022-09-20 | CV.SHOFADINA | 81.484.310.8-733.000 | 296,918 | 0.15 % | |
139 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 239282 | 31455787 | APBD | 200,000,000 | 199,810,632 | 199,738,482 | 199,738,482 | 199,694,000 | 199,694,000 | 199,694,000 | 199,694,000 | 2022-09-02 | 2022-09-08 | CV. JODHA SAE | 94.797.791.4-733.000 | 261,518 | 0.13 % | |
140 | 2022 | Kecamatan Kandangan | Drainase RT.06 | Pengadaan Langsung | Pekerjaan Konstruksi | 240282 | 32128114 | APBD | 71,100,000 | 70,994,000 | 70,883,425 | 70,883,425 | 70,750,000 | 70,750,000 | 70,750,000 | 70,750,000 | 2022-08-10 | 2022-08-12 | Dina utama abadi | 72.168.809.1-735.000 | 216,575 | 0.3 % | |
141 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaranih Desa Mandala Kec.Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 241282 | 31457148 | APBD | 165,000,000 | 164,893,100 | 164,698,892 | 164,698,892 | 164,643,000 | 164,643,000 | 164,643,000 | 164,643,000 | 2022-10-03 | 2022-10-07 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 301,108 | 0.18 % | |
142 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanyar Desa Tebing Tinggi Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 243282 | 31457107 | APBD | 200,000,000 | 199,891,785 | 199,691,985 | 199,691,985 | 199,664,000 | 199,664,000 | 199,664,000 | 199,664,000 | 2022-09-14 | 2022-09-22 | CV. JODHA SAE | 94.797.791.4-733.000 | 308,015 | 0.15 % | |
143 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 244282 | 32146181 | APBD | 175,000,000 | 174,878,657 | 174,717,870 | 174,717,870 | 174,474,000 | 174,474,000 | 174,474,000 | 174,474,000 | 2022-09-19 | 2022-09-23 | cv. akur bersaudara | 02.675.570.2-735.000 | 282,130 | 0.16 % | |
144 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 245282 | 32147144 | APBD | 17,000,000 | 17,000,000 | 16,966,700 | 16,966,700 | 16,916,000 | 16,916,000 | 16,916,000 | 16,916,000 | 2022-08-31 | 2022-09-06 | Wiyasa Drawana | 80.902.072.0-731.000 | 33,300 | 0.2 % | |
145 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Badaun Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 246282 | 31457192 | APBD | 191,100,000 | 191,008,765 | 190,734,319 | 190,734,319 | 190,631,000 | 190,631,000 | 0 | 190,631,000 | 2022-08-16 | 2022-08-22 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 365,681 | 0.19 % | |
146 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Pantai Ulin Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 247282 | 31457289 | APBD | 188,000,000 | 187,916,104 | 187,705,204 | 187,705,204 | 187,694,000 | 187,694,000 | 187,694,000 | 187,694,000 | 2022-09-14 | 2022-09-22 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 294,796 | 0.16 % | |
147 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Kota : Jalan Sudirman Segmen I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 248282 | 31591829 | APBD | 18,000,000 | 18,000,000 | 17,941,000 | 17,941,000 | 17,871,000 | 17,871,000 | 17,871,000 | 17,871,000 | 2022-09-07 | 2022-09-12 | cv.akmalindo | 02.531.482.4-731.000 | 59,000 | 0.33 % | |
148 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Pembuang Irigasi di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 249282 | 31529489 | APBD | 160,800,000 | 160,701,635 | 160,505,879 | 160,505,879 | 160,455,000 | 160,455,000 | 0 | 160,455,000 | 2022-08-17 | 2022-08-24 | CV. ALBATROS | 01.222.160.2-733.000 | 294,121 | 0.18 % | |
149 | 2022 | RSUD Brigjen H. Hasan Basry | Bongkar Hidup dan Service Celling Radiografi IRC50HF | Pengadaan Langsung | Jasa Lainnya | 251282 | 36363905 | BLUD | 200,000,000 | 199,400,000 | 199,400,000 | 199,400,000 | 197,000,000 | 197,000,000 | 197,000,000 | 197,000,000 | 2022-09-23 | 2022-09-30 | Rajawali Nusindo | 01.061.248.9-051.000 | 600,000 | 0.3 % | |
150 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 252282 | 31529488 | APBD | 198,000,000 | 197,953,673 | 197,753,873 | 197,753,873 | 197,715,000 | 197,715,000 | 197,715,000 | 197,715,000 | 2022-10-03 | 2022-10-07 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 246,127 | 0.12 % | |
151 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 254282 | 31457096 | APBD | 200,000,000 | 199,925,610 | 199,720,260 | 199,720,260 | 199,692,000 | 199,692,000 | 199,692,000 | 199,692,000 | 2022-09-14 | 2022-09-20 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 279,740 | 0.14 % | |
152 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Buluh Hantamangau Desa Garunggang Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 255282 | 31457120 | APBD | 200,000,000 | 199,899,641 | 199,610,584 | 199,610,584 | 199,568,000 | 199,568,000 | 199,568,000 | 199,568,000 | 2022-08-29 | 2022-09-05 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 389,416 | 0.19 % | |
153 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi jaringan irigasi Hilir Mesjid Kec.Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 256282 | 31455669 | APBD | 160,000,000 | 159,851,557 | 159,448,755 | 159,448,755 | 159,216,000 | 159,216,000 | 159,216,000 | 159,216,000 | 2022-08-21 | 2022-08-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 551,245 | 0.34 % | |
154 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 257282 | 32146288 | APBD | 170,000,000 | 169,936,177 | 169,666,299 | 169,666,299 | 169,619,000 | 169,619,000 | 169,619,000 | 169,619,000 | 2022-09-08 | 2022-09-14 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 333,701 | 0.2 % | |
155 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 258282 | 32146212 | APBD | 15,300,000 | 15,300,000 | 15,266,700 | 15,266,700 | 15,250,000 | 15,250,000 | 15,250,000 | 15,250,000 | 2022-08-31 | 2022-09-06 | Wiyasa Drawana | 80.902.072.0-731.000 | 33,300 | 0.22 % | |
156 | 2022 | RSUD Brigjen H. Hasan Basry | Renovasi Gedung Panel Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 259282 | 36222959 | BLUD | 200,000,000 | 199,998,897 | 199,845,172 | 199,845,172 | 199,689,000 | 199,689,000 | 199,689,000 | 199,689,000 | 2022-10-06 | 2022-10-13 | cv. akur bersaudara | 02.675.570.2-735.000 | 154,828 | 0.08 % | |
157 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 261282 | 31592332 | APBD | 180,000,000 | 179,951,932 | 179,739,374 | 179,739,374 | 179,679,000 | 179,679,000 | 179,679,000 | 179,679,000 | 2022-09-02 | 2022-09-07 | CV. JODHA SAE | 94.797.791.4-733.000 | 260,626 | 0.14 % | |
158 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Banyu Barau Kel. Kandangan Barat dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 262282 | 36312043 | APBD | 24,800,000 | 24,800,000 | 24,735,000 | 24,735,000 | 24,664,200 | 24,664,200 | 24,664,200 | 24,664,200 | 2022-09-04 | 2022-09-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 65,000 | 0.26 % | |
159 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Jelatang | Pengadaan Langsung | Pekerjaan Konstruksi | 263282 | 32379642 | APBD | 125,000,000 | 124,774,583 | 124,664,600 | 124,664,600 | 123,500,000 | 123,500,000 | 123,500,000 | 123,500,000 | 2022-08-15 | 2022-08-16 | CV. SHINTA | 01.124.041.3-733.000 | 335,400 | 0.27 % | |
160 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 264282 | 31456797 | APBD | 11,410,000 | 11,410,000 | 11,389,999 | 11,389,999 | 11,366,400 | 11,366,400 | 11,366,400 | 11,366,400 | 2022-09-03 | 2022-09-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 20,001 | 0.18 % | |
161 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 265282 | 31593020 | APBD | 199,000,000 | 198,974,355 | 198,717,244 | 198,717,244 | 198,522,000 | 198,522,000 | 0 | 198,522,000 | 2022-08-30 | 2022-09-02 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 282,756 | 0.14 % | |
162 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Penanganan Longsor di Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 266282 | 35494169 | APBD | 173,000,000 | 172,978,752 | 172,868,225 | 172,868,225 | 172,772,000 | 172,772,000 | 172,772,000 | 172,772,000 | 2022-08-15 | 2022-08-19 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 131,775 | 0.08 % | |
163 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Ruas Jalan Simpur - SP.3 Muara Paring Agung, Taal Batang Kulur - SP.3 Muara Paring Agung dan Sungai Raya Selatan - Sarang Halang) | Pengadaan Langsung | Pekerjaan Konstruksi | 267282 | 36367707 | APBD | 107,000,000 | 106,673,406 | 106,645,849 | 106,645,849 | 106,562,000 | 106,562,000 | 106,562,000 | 106,562,000 | 2022-08-22 | 2022-08-30 | CV.SURYA PUTERA | 02.708.747.7-731.000 | 354,151 | 0.33 % | |
164 | 2022 | Dinas Perdagangan | Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 268282 | 32562590 | APBD | 185,000,000 | 184,999,085 | 184,900,295 | 184,900,295 | 184,842,500 | 184,842,500 | 184,842,500 | 184,842,500 | 2022-08-19 | 2022-08-24 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 99,705 | 0.05 % | |
165 | 2022 | RSUD Brigjen H. Hasan Basry | Pembuatan atap parkir karyawan | Pengadaan Langsung | Pekerjaan Konstruksi | 269282 | 35899312 | BLUD | 200,000,000 | 199,993,563 | 199,597,800 | 199,597,800 | 199,399,000 | 199,399,000 | 199,399,000 | 199,399,000 | 2022-09-28 | 2022-10-03 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 402,200 | 0.2 % | |
166 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Pengawasan Pembangunan Saluran Pembuang Irigasi Di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 271282 | 36312419 | APBD | 24,605,000 | 24,605,000 | 24,220,000 | 24,220,000 | 24,198,000 | 24,198,000 | 24,198,000 | 24,198,000 | 2022-09-03 | 2022-09-08 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 385,000 | 1.56 % | |
167 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 272282 | 35778491 | APBD | 12,500,000 | 12,500,000 | 12,496,436 | 12,496,436 | 12,465,300 | 12,465,300 | 12,465,300 | 12,465,300 | 2022-09-02 | 2022-09-08 | Wiyasa Drawana | 80.902.072.0-731.000 | 3,565 | 0.03 % | |
168 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 273282 | 31456620 | APBD | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-09-14 | 2022-09-20 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 50,000 | 0.36 % | |
169 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Hilir Mesjid Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 274282 | 31455638 | APBD | 11,000,000 | 11,000,000 | 10,950,000 | 10,950,000 | 10,933,500 | 10,933,500 | 10,933,500 | 10,933,500 | 2022-09-02 | 2022-09-08 | Wiyasa Drawana | 80.902.072.0-731.000 | 50,000 | 0.45 % | |
170 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 275282 | 31593057 | APBD | 199,850,000 | 199,844,492 | 199,744,593 | 199,744,593 | 199,689,000 | 199,689,000 | 0 | 199,689,000 | 2022-09-01 | 2022-09-07 | CV. PUTERI PERSADA | 02.342.993.9-733.000 | 105,407 | 0.05 % | |
171 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Tugu Dodol Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 276282 | 31835616 | APBD | 150,000,000 | 149,999,700 | 149,688,480 | 149,688,480 | 149,500,000 | 149,500,000 | 149,500,000 | 149,500,000 | 2022-09-02 | 2022-09-06 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 311,520 | 0.21 % | |
172 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Gambut Desa Karang bulan Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 277282 | 31457268 | APBD | 174,000,000 | 173,915,000 | 173,818,398 | 173,818,398 | 173,790,000 | 173,790,000 | 0 | 173,790,000 | 2022-08-21 | 2022-08-26 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 181,602 | 0.1 % | |
173 | 2022 | Dinas Kesehatan | Pemeliharaan Bangunan Puskesmas, Puskesmas pembantu dan Poskesdes (Pemeliharaan Pustu Bayur) | Pengadaan Langsung | Pekerjaan Konstruksi | 278282 | 36414505 | APBD | 100,000,000 | 98,160,531 | 97,996,366 | 97,996,366 | 97,500,000 | 97,500,000 | 97,500,000 | 97,500,000 | 2022-10-31 | 2022-11-03 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 2,003,634 | 2 % | |
174 | 2022 | Dinas Perdagangan | Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 279282 | 32562476 | APBD | 200,000,000 | 199,994,742 | 199,900,026 | 199,900,026 | 199,825,400 | 199,825,400 | 199,825,400 | 199,825,400 | 2022-08-30 | 2022-09-05 | CV.Bangun Banua | 93.708.167.7-733.000 | 99,974 | 0.05 % | |
175 | 2022 | Dinas Perhubungan | Pengawasan Pembangunan Halte Sungai dan Rehabilitasi WC dan KM Dermaga Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 280282 | 32134862 | APBD | 22,500,000 | 22,461,000 | 22,416,062 | 22,416,062 | 22,400,000 | 22,400,000 | 22,400,000 | 22,400,000 | 2022-08-26 | 2022-08-31 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 83,939 | 0.37 % | |
176 | 2022 | RSUD Daha Sejahtera | Perencanaan Urugan Tanah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 282282 | 36390717 | BLUD | 80,000,000 | 75,051,457 | 74,919,450 | 74,919,450 | 74,500,000 | 74,500,000 | 74,500,000 | 74,500,000 | 2022-10-16 | 2022-10-19 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 5,080,550 | 6.35 % | |
177 | 2022 | Dinas Pertanian | Perencanaan Bangunan UPPB dan Laboraturium | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 285282 | 32065032;32066118 | APBD | 12,600,000 | 12,600,000 | 12,526,350 | 12,526,350 | 12,509,700 | 12,509,700 | 12,509,700 | 12,509,700 | 2022-08-30 | 2022-09-05 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 73,650 | 0.58 % | |
178 | 2022 | RSUD Daha Sejahtera | Perencanaan Nurse Station | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 288282 | 36390713 | BLUD | 15,000,000 | 14,999,985 | 14,785,200 | 14,785,200 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2022-10-11 | 2022-10-14 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 214,800 | 1.43 % | |
179 | 2022 | RSUD Daha Sejahtera | Perencanaan Rehabilitasi Gedung Rawat Jalan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 289282 | 36390711 | BLUD | 15,000,000 | 14,999,985 | 14,729,700 | 14,729,700 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2022-10-11 | 2022-10-14 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 270,300 | 1.8 % | |
180 | 2022 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 291282 | 32128364 | APBD | 75,850,000 | 75,845,372 | 75,696,172 | 75,696,172 | 75,600,000 | 75,600,000 | 75,600,000 | 75,600,000 | 2022-09-02 | 2022-09-06 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 153,828 | 0.2 % | |
181 | 2022 | Kecamatan Kandangan | Drainase RT.01 | Pengadaan Langsung | Pekerjaan Konstruksi | 292282 | 32129024 | APBD | 71,100,000 | 71,039,000 | 70,817,270 | 70,817,270 | 70,700,000 | 70,700,000 | 70,700,000 | 70,700,000 | 2022-09-02 | 2022-09-06 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 282,730 | 0.4 % | |
182 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Gedung Serbaguna 2 Desember | Pengadaan Langsung | Pekerjaan Konstruksi | 293282 | 36455312 | APBD | 200,000,000 | 199,954,439 | 199,614,893 | 199,614,893 | 199,503,000 | 199,503,000 | 199,503,000 | 199,503,000 | 2022-09-10 | 2022-09-14 | FADWI UTAMA | 94.246.044.5-733.000 | 385,107 | 0.19 % | |
183 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 297282 | 31592878 | APBD | 17,645,000 | 17,645,000 | 17,550,000 | 17,550,000 | 17,526,900 | 17,526,900 | 0 | 17,526,900 | 2022-09-08 | 2022-09-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 95,000 | 0.54 % | |
184 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 298282 | 31592882 | APBD | 17,710,000 | 17,710,000 | 17,700,000 | 17,700,000 | 17,676,000 | 17,676,000 | 0 | 17,676,000 | 2022-09-09 | 2022-09-14 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 10,000 | 0.06 % | |
185 | 2022 | Kecamatan Daha Barat | Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Pekerjaan Konstruksi | 300282 | 32117680 | APBD | 177,050,000 | 177,035,000 | 176,633,238 | 176,633,238 | 176,500,000 | 176,500,000 | 176,500,000 | 176,500,000 | 2022-09-06 | 2022-09-08 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 416,762 | 0.24 % | |
186 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 301282 | 32117607 | APBD | 10,250,000 | 10,235,000 | 10,202,066 | 10,202,066 | 10,170,000 | 10,170,000 | 10,170,000 | 10,170,000 | 2022-09-06 | 2022-09-08 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 47,935 | 0.47 % | |
187 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 306282 | 31592886 | APBD | 14,954,000 | 14,954,000 | 14,850,001 | 14,850,001 | 14,763,000 | 14,763,000 | 0 | 14,763,000 | 2022-10-12 | 2022-10-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,999 | 0.7 % | |
188 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 307282 | 31592874 | APBD | 17,861,000 | 17,861,000 | 17,800,000 | 17,800,000 | 17,760,000 | 17,760,000 | 0 | 17,760,000 | 2022-09-15 | 2022-09-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 61,000 | 0.34 % | |
189 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec.Daha Selatan, dan Jasa Konsultansi Pengawasan Sungai Simpang Tanjung Desa Tambangan Kec. Daha Selatan; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 308282 | 36312335 | APBD | 75,455,000 | 75,455,000 | 75,335,000 | 75,335,000 | 75,024,900 | 75,024,900 | 75,024,900 | 75,024,900 | 2022-09-12 | 2022-09-16 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 120,000 | 0.16 % | |
190 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 309282 | 31592936 | APBD | 15,988,000 | 15,988,000 | 15,932,500 | 15,932,500 | 15,895,200 | 15,895,200 | 0 | 15,895,200 | 2022-09-15 | 2022-09-20 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 55,500 | 0.35 % | |
191 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 312282 | 31592911 | APBD | 17,800,000 | 17,800,000 | 17,760,000 | 17,760,000 | 17,717,000 | 17,717,000 | 0 | 17,717,000 | 2022-10-05 | 2022-10-10 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 40,000 | 0.22 % | |
192 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 313282 | 31592905 | APBD | 16,220,000 | 16,220,000 | 16,172,700 | 16,172,700 | 16,161,600 | 16,161,600 | 0 | 16,161,600 | 2022-10-07 | 2022-10-12 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 47,300 | 0.29 % | |
193 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan tebing desa amawang kiri (lanjutan) Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 314282 | 31650650 | APBD | 31,700,000 | 31,700,000 | 31,490,700 | 31,490,700 | 31,468,500 | 31,468,500 | 31,468,500 | 31,468,500 | 2022-10-10 | 2022-10-17 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 209,300 | 0.66 % | |
194 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 316282 | 31593012 | APBD | 200,000,000 | 199,997,115 | 199,919,404 | 199,919,404 | 199,863,000 | 199,863,000 | 0 | 199,863,000 | 2022-09-19 | 2022-09-22 | CV. RISNA | 01.214.257.6-733.000 | 80,596 | 0.04 % | |
195 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Panggungan, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 319282 | 31593047 | APBD | 120,000,000 | 119,989,711 | 119,900,680 | 119,900,680 | 119,156,900 | 119,156,900 | 0 | 119,156,900 | 2022-10-14 | 2022-10-19 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 99,320 | 0.08 % | |
196 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 320282 | 31593024 | APBD | 174,600,000 | 174,599,835 | 174,440,162 | 174,440,162 | 174,358,000 | 174,358,000 | 0 | 174,358,000 | 2022-09-28 | 2022-10-03 | cv. akur bersaudara | 02.675.570.2-735.000 | 159,838 | 0.09 % | |
197 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 321282 | 31593043 | APBD | 198,000,000 | 198,000,000 | 197,900,482 | 197,900,482 | 197,777,000 | 197,777,000 | 0 | 197,777,000 | 2022-10-12 | 2022-10-19 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 99,518 | 0.05 % | |
198 | 2022 | Dinas Sosial | Belanja Jasa Konsultant Pengawasan Pembuatan pagar Belakang dan Samping Halaman rumah Singgah,Belanja Jasa Konsultant Pengawasan Pemasangan Paving Blok Halaman rumah Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 322282 | 32439951;32440869 | APBD | 20,000,000 | 20,000,000 | 19,852,350 | 19,852,350 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2022-09-23 | 2022-09-28 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 147,650 | 0.74 % | |
199 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Bumi Berkat, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 323282 | 31593037 | APBD | 100,000,000 | 99,999,962 | 99,949,453 | 99,949,453 | 99,899,000 | 99,899,000 | 0 | 99,899,000 | 2022-11-02 | 2022-11-08 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 50,547 | 0.05 % | |
200 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Pantai Ulin, Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 324282 | 31593033 | APBD | 100,000,000 | 100,000,000 | 99,901,167 | 99,901,167 | 99,890,000 | 99,890,000 | 0 | 99,890,000 | 2022-11-19 | 2022-11-23 | CV. PUTERA MAMA | 02.242.680.3-733.000 | 98,833 | 0.1 % | |
201 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Pekerjaan Konstruksi | 325282 | 31593040 | APBD | 178,000,000 | 177,998,720 | 177,904,370 | 177,904,370 | 177,771,000 | 177,771,000 | 0 | 177,771,000 | 2022-11-19 | 2022-11-23 | CV. PUTERA MAMA | 02.242.680.3-733.000 | 95,630 | 0.05 % | |
202 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Sewa Excavator | Pengadaan Langsung | Jasa Lainnya | 326282 | 31463237 | APBD | 177,270,000 | 177,269,997 | 176,861,850 | 176,861,850 | 176,528,850 | 176,528,850 | 176,528,850 | 176,528,850 | 2022-10-15 | 2022-10-21 | ARJUNA KARYA UTAMA,cv | 01.214.260.0-733.000 | 408,150 | 0.23 % | |
203 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Durian Rabung, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 327282 | 31593050 | APBD | 199,000,000 | 199,000,000 | 198,822,033 | 198,822,033 | 198,487,000 | 198,487,000 | 0 | 198,487,000 | 2022-09-22 | 2022-09-29 | cv. akur bersaudara | 02.675.570.2-735.000 | 177,967 | 0.09 % | |
204 | 2022 | RSUD Daha Sejahtera | Perencanaan Review Masterplan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 333282 | 36657883 | BLUD | 100,000,000 | 99,324,000 | 99,050,000 | 99,050,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 2022-10-16 | 2022-11-14 | PT. CIPTA MATRA HANDASA | 02.332.940.2-429.000 | 950,000 | 0.95 % | |
205 | 2022 | Kecamatan Kandangan | Pembuatan WC untuk Keluarga Pra Sejahtera | Pengadaan Langsung | Pekerjaan Konstruksi | 334282 | 36386562 | APBD | 50,400,000 | 50,400,000 | 50,340,000 | 50,340,000 | 50,250,000 | 50,250,000 | 0 | 50,250,000 | 2022-09-30 | 2022-10-04 | CV. RISNA | 01.214.257.6-733.000 | 60,000 | 0.12 % | |
206 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Pengurugan Oprit Jembatan Menuju Tugu Niih) | Pengadaan Langsung | Pekerjaan Konstruksi | 339282 | 36637859 | APBD | 200,000,000 | 199,868,057 | 199,695,101 | 199,695,101 | 198,751,000 | 198,751,000 | 198,751,000 | 198,751,000 | 2022-10-03 | 2022-10-06 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 304,899 | 0.15 % | |
207 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Gantung Desa Loksado, Kec. Loksado) | Pengadaan Langsung | Pekerjaan Konstruksi | 340282 | 36637936 | APBD | 83,700,000 | 83,641,682 | 83,337,255 | 83,337,255 | 83,226,000 | 83,226,000 | 83,226,000 | 83,226,000 | 2022-10-18 | 2022-10-21 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 362,745 | 0.43 % | |
208 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Pemasangan Bronjong Jembatan Jl. Bayampah Kec. Loksado) | Pengadaan Langsung | Pekerjaan Konstruksi | 342282 | 36636983 | APBD | 200,000,000 | 199,969,189 | 199,754,490 | 199,754,490 | 199,726,740 | 199,726,740 | 199,726,740 | 199,726,740 | 2022-10-06 | 2022-10-11 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 245,510 | 0.12 % | |
209 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bahalayung Desa Lungau Kec. Kandangan untuk Penanggulangan Bencana Banjir (Dana BTT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 343282 | 34294064 | APBD | 80,000,000 | 79,920,000 | 79,906,125 | 79,906,125 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 2022-10-10 | 2022-10-14 | Wiyasa Drawana | 80.902.072.0-731.000 | 93,875 | 0.12 % | |
210 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 346282 | 36724498 | APBDP | 60,000,000 | 59,949,713 | 59,385,000 | 59,385,000 | 59,329,500 | 59,329,500 | 59,329,500 | 59,329,500 | 2022-10-03 | 2022-10-07 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 615,000 | 1.03 % | |
211 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Penggantian Jembatan di Jl. Biti Kec. Kandangan, Jasa Konsultansi Perencanaan Pekerjaan Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 347282 | 36724535 | APBDP | 30,000,000 | 29,933,276 | 29,653,095 | 29,653,095 | 29,603,700 | 29,603,700 | 29,603,700 | 29,603,700 | 2022-10-03 | 2022-10-10 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 346,905 | 1.16 % | |
212 | 2022 | Kecamatan Kandangan | Jasa Konsultasi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Rehab Gedung Kelurahan) / KU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 348282 | 36306958 | APBD | 14,000,000 | 13,976,000 | 13,847,250 | 13,847,250 | 13,750,000 | 13,750,000 | 13,750,000 | 13,750,000 | 2022-09-30 | 2022-10-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 152,750 | 1.09 % | |
213 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Ruas Loklahung - Malaris Kec. Loksado, Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Jalan Duhat Kec. Simpur, Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 349282 | 36714996 | APBDP | 45,000,000 | 44,925,851 | 44,773,515 | 44,773,515 | 44,744,000 | 44,744,000 | 44,744,000 | 44,744,000 | 2022-10-10 | 2022-10-14 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 226,485 | 0.5 % | |
214 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya, Jasa Konsultansi Perencanaan Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 350282 | 36724473 | APBDP | 60,000,000 | 59,949,713 | 59,848,592 | 59,848,592 | 59,699,000 | 59,699,000 | 59,699,000 | 59,699,000 | 2022-10-10 | 2022-10-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 151,409 | 0.25 % | |
215 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya, Jasa Konsultansi Perencanaan Pekerjaan Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung, Jasa Konsultansi Perencanaan Pekerjaan Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 351282 | 36724482 | APBDP | 45,000,000 | 44,925,851 | 44,773,515 | 44,773,515 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 2022-10-10 | 2022-10-14 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 226,485 | 0.5 % | |
216 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 354282 | 36724515 | APBDP | 15,000,000 | 14,985,367 | 14,831,820 | 14,831,820 | 14,785,200 | 14,785,200 | 14,785,200 | 14,785,200 | 2022-10-03 | 2022-10-10 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 168,180 | 1.12 % | |
217 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja-Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 357282 | 36755480 | APBDP | 14,270,000 | 14,269,999 | 14,110,000 | 14,110,000 | 14,041,500 | 14,041,500 | 0 | 14,041,500 | 2022-10-06 | 2022-10-12 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 160,000 | 1.12 % | |
218 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Perencanaan Pemasangan Pagar Lapangan Basket Amandit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 358282 | 36669167 | APBDP | 15,000,000 | 14,969,099 | 14,935,050 | 14,935,050 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-10-13 | 2022-10-19 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 64,950 | 0.43 % | |
219 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Perencanaan Pengurugan Gedung Serbaguna | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 359282 | 36669223 | APBDP | 15,000,000 | 14,969,099 | 14,968,350 | 14,968,350 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-10-06 | 2022-10-12 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 31,650 | 0.21 % | |
220 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Pagar Lapangan Basket Amandit | Pengadaan Langsung | Pekerjaan Konstruksi | 360282 | 36669308 | APBDP | 152,000,000 | 151,986,837 | 151,497,168 | 151,497,168 | 151,364,000 | 151,364,000 | 151,364,000 | 151,364,000 | 2022-10-24 | 2022-10-28 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 502,832 | 0.33 % | |
221 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Konsulidasi Pengawasan Perluasan SPAM Desa Panggungan, Kec. Loksado dan SPAM Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 361282 | 36744556 | APBD | 27,910,000 | 27,910,000 | 27,790,000 | 27,790,000 | 27,770,000 | 27,770,000 | 0 | 27,770,000 | 2022-10-06 | 2022-10-12 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 120,000 | 0.43 % | |
222 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Halaman Polres HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 363282 | 36715966 | APBDP | 90,000,000 | 90,000,000 | 89,855,000 | 89,855,000 | 89,810,000 | 89,810,000 | 89,810,000 | 89,810,000 | 2022-10-10 | 2022-10-14 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 145,000 | 0.16 % | |
223 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Konsulidasi Pengawasan Perluasan SPAM Desa Bumi Berkat Kec. Sungai Raya dan SPAM Desa Pantai Ulin Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 364282 | 36744489 | APBD | 16,800,000 | 16,800,000 | 16,761,000 | 16,761,000 | 16,716,000 | 16,716,000 | 0 | 16,716,000 | 2022-10-04 | 2022-10-10 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 39,000 | 0.23 % | |
224 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 365282 | 36554198 | APBD | 10,000,000 | 10,000,000 | 9,940,050 | 9,940,050 | 9,923,400 | 9,923,400 | 9,923,400 | 9,923,400 | 2022-10-12 | 2022-10-20 | Wing Rastafarindo | 03.282.590.3-732.000 | 59,950 | 0.6 % | |
225 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ni'ih Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 366282 | 36762852 | APBDP | 100,000,000 | 99,645,821 | 99,400,500 | 99,400,500 | 99,299,000 | 99,299,000 | 99,299,000 | 99,299,000 | 2022-11-08 | 2022-11-14 | cv. alfa banua estetika | 81.252.051.8-731.000 | 599,500 | 0.6 % | |
226 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Hamak | Pengadaan Langsung | Pekerjaan Konstruksi | 367282 | 32378995 | APBD | 185,000,000 | 184,912,243 | 184,598,148 | 184,598,148 | 184,000,000 | 184,000,000 | 184,000,000 | 184,000,000 | 2022-10-09 | 2022-10-12 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 401,852 | 0.22 % | |
227 | 2022 | Dinas Kesehatan | Rehabilitasi Pustu Hamak Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 368282 | 36485779 | APBD | 190,000,000 | 189,860,384 | 189,702,863 | 189,702,863 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 2022-10-09 | 2022-10-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 297,137 | 0.16 % | |
228 | 2022 | Dinas Kesehatan | Perencanaan Pagar Puskesmas gambah,Perencanaan Perbaikan Halaman Puskesmas Loksado,Perencanaan Titian Puskesmas Bayanan,Perencanaan Rehabilitasi Ruang Rawat Jalan PKM Angkinang (Konsolidasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 370282 | 36695894;36695961;36696063;36696228 | APBDP | 95,000,000 | 95,000,000 | 94,849,500 | 94,849,500 | 94,500,000 | 94,500,000 | 94,500,000 | 94,500,000 | 2022-10-17 | 2022-10-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 150,500 | 0.16 % | |
229 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 371282 | 36527682 | APBD | 19,000,000 | 19,000,000 | 18,947,700 | 18,947,700 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-10-17 | 2022-10-21 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 52,300 | 0.28 % | |
230 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 372282 | 36553858 | APBD | 18,500,000 | 18,500,000 | 18,459,300 | 18,459,300 | 18,426,000 | 18,426,000 | 18,426,000 | 18,426,000 | 2022-10-13 | 2022-10-21 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 40,700 | 0.22 % | |
231 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 373282 | 36554102 | APBD | 15,000,000 | 15,000,000 | 14,962,800 | 14,962,800 | 14,918,400 | 14,918,400 | 14,918,400 | 14,918,400 | 2022-10-15 | 2022-10-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 37,200 | 0.25 % | |
232 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 374282 | 36554077 | APBD | 17,000,000 | 17,000,000 | 16,960,800 | 16,960,800 | 16,938,600 | 16,938,600 | 16,938,600 | 16,938,600 | 2022-10-17 | 2022-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 39,200 | 0.23 % | |
233 | 2022 | Dinas Perdagangan | Perencanaan Lokasi Parkir Khusus di Los Amandit Lantai II Pasar Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 376282 | 36790912 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,816,750 | 99,816,750 | 99,816,750 | 99,816,750 | 2022-10-10 | 2022-10-13 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.1 % | |
234 | 2022 | Dinas Pertanian | Perencanaan JUT Poktan Pulau Sarindit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 377282 | 36768549 | APBDP | 11,000,000 | 11,000,000 | 10,989,000 | 10,989,000 | 10,966,800 | 10,966,800 | 10,966,800 | 10,966,800 | 2022-10-07 | 2022-10-11 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 11,000 | 0.1 % | |
235 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung, dan Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Karang jawa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 378282 | 36749418 | APBD | 38,000,000 | 38,000,000 | 37,873,200 | 37,873,200 | 37,784,400 | 37,784,400 | 37,784,400 | 37,784,400 | 2022-10-15 | 2022-10-21 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 126,800 | 0.33 % | |
236 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 379282 | 36528342 | APBD | 11,000,000 | 11,000,000 | 10,966,800 | 10,966,800 | 10,922,400 | 10,922,400 | 10,922,400 | 10,922,400 | 2022-10-15 | 2022-10-21 | Wing Rastafarindo | 03.282.590.3-732.000 | 33,200 | 0.3 % | |
237 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Depan Mesjid Al-Hidayah Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 380282 | 36776619 | APBDP | 120,000,000 | 119,879,144 | 119,867,826 | 119,867,826 | 119,699,000 | 119,699,000 | 119,699,000 | 119,699,000 | 2022-10-06 | 2022-10-12 | CV. Haratai Permai | 02.089.737.7-733.000 | 132,174 | 0.11 % | |
238 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Wasah Tengah (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 381282 | 36528715 | APBD | 70,000,000 | 69,999,930 | 69,860,625 | 69,860,625 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-06 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 139,375 | 0.2 % | |
239 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Tawia (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 382282 | 36528642 | APBD | 70,000,000 | 69,999,930 | 69,846,750 | 69,846,750 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | 2022-11-14 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 153,250 | 0.22 % | |
240 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 383282 | 36716188 | APBDP | 18,000,000 | 18,000,000 | 17,968,685 | 17,968,685 | 17,927,000 | 17,927,000 | 17,927,000 | 17,927,000 | 2022-10-14 | 2022-10-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 31,315 | 0.17 % | |
241 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Asam (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 384282 | 36528552 | APBD | 70,000,000 | 69,999,930 | 69,830,100 | 69,830,100 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | 2022-11-14 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 169,900 | 0.24 % | |
242 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 385282 | 36716091 | APBDP | 17,200,000 | 17,200,000 | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,950,000 | 16,950,000 | 2022-10-21 | 2022-10-26 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 200,000 | 1.16 % | |
243 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi DI.Pantai Ulin III Kec.Simpur (PAD), dan Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi DI.Panjampang bahagia Kec.Simpur (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 386282 | 36749386 | APBD | 26,000,000 | 26,000,000 | 25,974,000 | 25,974,000 | 25,929,600 | 25,929,600 | 25,929,600 | 25,929,600 | 2022-10-13 | 2022-10-21 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 26,000 | 0.1 % | |
244 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Tatah di Desa Kayu abang Kec.Angkinang, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Tawia di Desa Tawia Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 388282 | 36749354 | APBD | 35,000,000 | 35,000,000 | 34,876,200 | 34,876,200 | 34,854,000 | 34,854,000 | 34,854,000 | 34,854,000 | 2022-10-13 | 2022-10-21 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 123,800 | 0.35 % | |
245 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 389282 | 36554143 | APBD | 18,500,000 | 18,500,000 | 18,459,300 | 18,459,300 | 18,403,800 | 18,403,800 | 18,403,800 | 18,403,800 | 2022-10-17 | 2022-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 40,700 | 0.22 % | |
246 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL Perkuatan Tebing di Pagar Haur Desa Jelatang RT. 003 Kec. Padang Batung (dekat Majelis Raudatul Firdaus) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 390282 | 36553352 | APBD | 100,000,000 | 99,886,680 | 99,550,350 | 99,550,350 | 99,378,300 | 99,378,300 | 99,378,300 | 99,378,300 | 2022-11-08 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 449,650 | 0.45 % | |
247 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DIR Sungai Kajang Kec. Kandangan (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 391282 | 36528601 | APBD | 70,000,000 | 69,999,930 | 69,819,000 | 69,819,000 | 69,652,500 | 69,652,500 | 69,652,500 | 69,652,500 | 2022-11-07 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 181,000 | 0.26 % | |
248 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 392282 | 36527853 | APBD | 19,000,000 | 19,000,000 | 18,955,359 | 18,955,359 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-10-13 | 2022-10-21 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 44,641 | 0.23 % | |
249 | 2022 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 393282 | 36790931 | APBDP | 15,960,000 | 15,960,000 | 15,850,000 | 15,850,000 | 15,828,600 | 15,828,600 | 15,828,600 | 15,828,600 | 2022-10-10 | 2022-10-13 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 110,000 | 0.69 % | |
250 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan Mal Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 395282 | 36716108 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2022-10-21 | 2022-10-26 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.1 % | |
251 | 2022 | Dinas Perdagangan | Perencanaan Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 396282 | 36791051 | APBDP | 16,000,000 | 16,000,000 | 15,873,000 | 15,873,000 | 15,817,500 | 15,817,500 | 15,817,500 | 15,817,500 | 2022-10-07 | 2022-10-11 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 127,000 | 0.79 % | |
252 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 397282 | 36795310 | APBDP | 15,470,000 | 15,423,839 | 15,207,000 | 15,207,000 | 15,120,000 | 15,120,000 | 100 | 15,120,000 | 2022-10-13 | 2022-10-17 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 263,000 | 1.7 % | |
253 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec.Kalumpang, Jasa Konsultansi Perencanaan Normalisasi Sungai Lintingan di desa Amparaya Kec.Simpur, Jasa Konsultansi Perencanaan Normalisasi Sungai di desa tambingkar Kec.Kalumpang, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Sarang nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 398282 | 36749273 | APBD | 74,000,000 | 74,000,000 | 73,995,542 | 73,995,542 | 73,859,400 | 73,859,400 | 73,859,400 | 73,859,400 | 2022-10-19 | 2022-10-27 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 4,459 | 0.01 % | |
254 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Kuangan (usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 399282 | 36312018 | APBD | 70,000,000 | 69,999,930 | 69,877,275 | 69,877,275 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-08 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 122,725 | 0.18 % | |
255 | 2022 | Dinas Perdagangan | Perencanaan Rehab Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 400282 | 36791432 | APBDP | 19,500,000 | 19,499,999 | 19,400,000 | 19,400,000 | 19,369,500 | 19,369,500 | 19,369,500 | 19,369,500 | 2022-10-12 | 2022-10-17 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.51 % | |
256 | 2022 | Dinas Perdagangan | Perencanaan Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 401282 | 36791495 | APBDP | 15,980,000 | 15,980,000 | 15,850,000 | 15,850,000 | 15,762,000 | 15,762,000 | 15,762,000 | 15,762,000 | 2022-10-12 | 2022-10-17 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 130,000 | 0.81 % | |
257 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Kantor Bappelitbangda Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 402282 | 36716132 | APBDP | 100,000,000 | 100,000,000 | 99,985,392 | 99,985,392 | 99,899,000 | 99,899,000 | 99,899,000 | 99,899,000 | 2022-10-14 | 2022-10-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 14,608 | 0.01 % | |
258 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Pantai Ulin 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 403282 | 36312079 | APBD | 70,000,000 | 69,999,930 | 69,855,075 | 69,855,075 | 69,674,700 | 69,674,700 | 69,674,700 | 69,674,700 | 2022-11-08 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 144,925 | 0.21 % | |
259 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Kawasan Religi Kapuh Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 406282 | 36716276 | APBDP | 100,000,000 | 100,000,000 | 98,734,500 | 98,734,500 | 98,698,000 | 98,698,000 | 98,698,000 | 98,698,000 | 2022-10-29 | 2022-11-02 | CV. GHANI TEKNIK KONSULTAN | 31.696.039.2-731.000 | 1,265,500 | 1.27 % | |
260 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 409282 | 36813052 | APBDP | 11,900,000 | 11,614,020 | 11,540,980 | 11,540,980 | 11,450,000 | 11,450,000 | 11,450,000 | 11,450,000 | 2022-10-13 | 2022-10-17 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 359,020 | 3.02 % | |
261 | 2022 | Dinas Kesehatan | Titian Pustu muning Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 410282 | 36776066 | APBDP | 45,150,000 | 44,699,926 | 44,617,782 | 44,617,782 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2022-10-31 | 2022-11-02 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 532,218 | 1.18 % | |
262 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Wasah Hilir (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 411282 | 36312087 | APBD | 70,000,000 | 69,999,930 | 69,838,425 | 69,838,425 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | 2022-11-14 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 161,575 | 0.23 % | |
263 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 412282 | 36795166;36795241 | APBDP | 26,460,000 | 26,076,398 | 25,985,100 | 25,985,100 | 25,850,100 | 25,850,100 | 100 | 25,850,100 | 2022-10-13 | 2022-10-17 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 474,900 | 1.79 % | |
264 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN),Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota,Konsultan Perencanaan Peningkatan PSU Permukiman Gang Rt 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 414282 | 36803647;36803820;36803906 | APBDP | 38,416,000 | 38,197,043 | 38,098,530 | 38,098,530 | 38,000,000 | 38,000,000 | 100 | 38,000,000 | 2022-10-13 | 2022-10-17 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 317,470 | 0.83 % | |
265 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Rt 1,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 416282 | 36803577;36803699;36803764 | APBDP | 40,250,000 | 39,665,129 | 39,659,190 | 39,659,190 | 39,500,000 | 39,500,000 | 100 | 39,500,000 | 2022-10-13 | 2022-10-18 | cv. vertical project | 03.169.392.2-734.000 | 590,810 | 1.47 % | |
266 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loklahung Rt.001 Kec. Loksado, dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Rt.004 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 417282 | 36749220 | APBD | 38,500,000 | 38,500,000 | 38,472,600 | 38,472,600 | 38,428,200 | 38,428,200 | 38,428,200 | 38,428,200 | 2022-10-19 | 2022-10-27 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 27,400 | 0.07 % | |
267 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I.R. Danau Bangkau (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 418282 | 36312101 | APBD | 70,000,000 | 69,999,930 | 69,852,300 | 69,852,300 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-07 | 2022-11-14 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 147,700 | 0.21 % | |
268 | 2022 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Pertokoan/Koperasi/Pasar | Pengadaan Langsung | Pekerjaan Konstruksi | 420282 | 35984472 | APBD | 200,000,000 | 179,838,461 | 179,532,111 | 179,532,111 | 179,482,000 | 179,482,000 | 179,482,000 | 179,482,000 | 2022-10-17 | 2022-10-20 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 20,467,889 | 10.23 % | |
269 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 421282 | 36554321 | APBD | 20,000,000 | 20,000,000 | 19,952,972 | 19,952,972 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-10-15 | 2022-10-21 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 47,029 | 0.24 % | |
270 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 422282 | 36554447 | APBD | 20,000,000 | 20,000,000 | 19,943,057 | 19,943,057 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-10-15 | 2022-10-21 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 56,943 | 0.28 % | |
271 | 2022 | RSUD Daha Sejahtera | Perencanaan Pembangunan gudang Penyimpanan Limbah RSUD Daha Sejahtera | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 423282 | 36825974 | APBDP | 15,000,000 | 14,999,985 | 14,735,780 | 14,735,780 | 14,696,400 | 14,696,400 | 14,696,400 | 14,696,400 | 2022-10-14 | 2022-10-18 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 264,220 | 1.76 % | |
272 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Penyusunan Peraturan Pedoman Penilaian Kinerja Penyedia Jasa Konstruksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 425282 | 36863037 | APBDP | 100,000,000 | 99,955,000 | 98,851,050 | 98,851,050 | 98,789,000 | 98,789,000 | 98,789,000 | 98,789,000 | 2022-10-28 | 2022-11-02 | SR MANAGEMENT | 60.754.845.0-732.000 | 1,148,950 | 1.15 % | |
273 | 2022 | RSUD Brigjen H. Hasan Basry | Renovasi Guesthouse | Pengadaan Langsung | Pekerjaan Konstruksi | 426282 | 36843355 | BLUD | 200,900,000 | 200,000,000 | 199,857,145 | 199,857,145 | 199,600,600 | 199,600,600 | 199,600,600 | 199,600,600 | 2022-10-14 | 2022-10-19 | cv. rukun damai | 01.203.952.5-733.000 | 1,042,855 | 0.52 % | |
274 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 427282 | 36733488 | APBDP | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,038,500 | 17,038,500 | 0 | 17,038,500 | 2022-10-21 | 2022-10-26 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 106,000 | 0.62 % | |
275 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Ponpes Baladul Amin,Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 428282 | 36734654 | APBDP | 17,200,000 | 17,200,000 | 17,116,200 | 17,116,200 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-26 | 2022-10-31 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 83,800 | 0.49 % | |
276 | 2022 | RSUD Brigjen H. Hasan Basry | Pemasangan Interior Manajemen | Pengadaan Langsung | Pekerjaan Konstruksi | 429282 | 36288330 | BLUD | 100,000,000 | 97,148,865 | 97,004,210 | 97,004,210 | 96,833,300 | 96,833,300 | 96,833,300 | 96,833,300 | 2022-10-14 | 2022-10-19 | CV.KOORI CIPTA KARYA | 84.740.433.2-732.000 | 2,995,790 | 3 % | |
277 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 430282 | 36734639 | APBDP | 17,200,000 | 17,200,000 | 17,135,000 | 17,135,000 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-26 | 2022-10-31 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 65,000 | 0.38 % | |
278 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 431282 | 36554176 | APBD | 100,000,000 | 99,983,250 | 99,816,750 | 99,816,750 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2022-10-17 | 2022-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 183,250 | 0.18 % | |
279 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 432282 | 36733424 | APBDP | 17,200,000 | 17,200,000 | 17,149,500 | 17,149,500 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-21 | 2022-10-26 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 50,500 | 0.29 % | |
280 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Pemeliharaan Gedung dan Bangunan Perbaikan Lantai Balai Penyuluh KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 433282 | 36756235 | APBDP | 22,170,500 | 22,170,030 | 22,088,459 | 22,088,459 | 21,978,000 | 21,978,000 | 0 | 21,978,000 | 2022-10-13 | 2022-10-19 | RIKA JAYA, CV | 01.424.626.8-733.000 | 82,041 | 0.37 % | |
281 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 434282 | 36733458 | APBDP | 17,200,000 | 17,200,000 | 17,153,696 | 17,153,696 | 17,117,000 | 17,117,000 | 0 | 17,117,000 | 2022-10-24 | 2022-10-27 | Wing Rastafarindo | 03.282.590.3-732.000 | 46,304 | 0.27 % | |
282 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 437282 | 36791447 | APBDP | 13,650,000 | 13,650,000 | 13,600,000 | 13,600,000 | 13,597,500 | 13,597,500 | 13,597,500 | 13,597,500 | 2022-11-09 | 2022-11-14 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 50,000 | 0.37 % | |
283 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 438282 | 36733514 | APBDP | 17,200,000 | 17,200,000 | 17,153,696 | 17,153,696 | 17,111,000 | 17,111,000 | 0 | 17,111,000 | 2022-10-24 | 2022-10-27 | Wing Rastafarindo | 03.282.590.3-732.000 | 46,304 | 0.27 % | |
284 | 2022 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 439282 | 36790948 | APBDP | 13,965,000 | 13,965,000 | 13,850,000 | 13,850,000 | 13,819,500 | 13,819,500 | 13,819,500 | 13,819,500 | 2022-11-01 | 2022-11-04 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 115,000 | 0.82 % | |
285 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 440282 | 36733565 | APBDP | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,017,000 | 17,017,000 | 0 | 17,017,000 | 2022-10-24 | 2022-10-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 106,000 | 0.62 % | |
286 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 441282 | 36733601 | APBDP | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,011,000 | 17,011,000 | 0 | 17,011,000 | 2022-10-24 | 2022-10-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 106,000 | 0.62 % | |
287 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Muara Banta Kandangan Hulu,Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 442282 | 36718950 | APBDP | 17,200,000 | 17,200,000 | 17,157,000 | 17,157,000 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-11-01 | 2022-11-04 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 43,000 | 0.25 % | |
288 | 2022 | Dinas Perdagangan | Pengawasan Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 443282 | 36791396 | APBDP | 14,000,000 | 14,000,000 | 13,986,000 | 13,986,000 | 13,924,950 | 13,924,950 | 13,924,950 | 13,924,950 | 2022-10-28 | 2022-11-01 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 14,000 | 0.1 % | |
289 | 2022 | Dinas Perdagangan | Pengawasan Rehab Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 444282 | 36791516 | APBDP | 13,982,500 | 13,982,499 | 13,900,000 | 13,900,000 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-11-01 | 2022-11-04 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 82,500 | 0.59 % | |
290 | 2022 | RSUD Daha Sejahtera | Jasa Apraisal Pembelian Lahan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 445282 | 36825960 | APBDP | 80,000,000 | 79,831,200 | 79,431,600 | 79,431,600 | 79,000,000 | 79,000,000 | 79,000,000 | 79,000,000 | 2022-10-19 | 2022-10-25 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 568,400 | 0.71 % | |
291 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 447282 | 36755463 | APBDP | 172,500,000 | 172,209,540 | 171,988,338 | 171,988,338 | 171,844,000 | 171,844,000 | 100 | 171,844,000 | 2022-10-27 | 2022-11-02 | CV. AISY | 75.132.070.6-733.000 | 511,662 | 0.3 % | |
292 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja-Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 448282 | 36755492 | APBDP | 10,530,000 | 10,529,999 | 10,350,000 | 10,350,000 | 10,300,800 | 10,300,800 | 10,300,800 | 10,300,800 | 2022-10-28 | 2022-11-02 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 180,000 | 1.71 % | |
293 | 2022 | RSUD Daha Sejahtera | Perencanaan Pengadaan Parkir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 450282 | 36926762 | BLUD | 25,000,000 | 25,000,000 | 24,886,200 | 24,886,200 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2022-10-19 | 2022-10-24 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 113,800 | 0.46 % | |
294 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 451282 | 31592304 | APBD | 14,500,000 | 14,500,000 | 14,430,000 | 14,430,000 | 14,374,500 | 14,374,500 | 14,374,500 | 14,374,500 | 2022-10-28 | 2022-11-03 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 70,000 | 0.48 % | |
295 | 2022 | Dinas Perhubungan | Perencanaan pembangunan alat parkir otomatis (portal) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 452282 | 36882218 | APBDP | 25,000,000 | 24,997,936 | 24,986,835 | 24,986,835 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2022-10-17 | 2022-10-21 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 13,165 | 0.05 % | |
296 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Merdeka Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 453282 | 31592316 | APBD | 15,600,000 | 15,600,000 | 15,489,000 | 15,489,000 | 15,429,000 | 15,429,000 | 15,429,000 | 15,429,000 | 2022-11-07 | 2022-11-10 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 111,000 | 0.71 % | |
297 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 455282 | 32147122 | APBD | 14,400,000 | 14,400,000 | 14,294,914 | 14,294,914 | 14,208,000 | 14,208,000 | 14,208,000 | 14,208,000 | 2022-10-31 | 2022-11-03 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 105,086 | 0.73 % | |
298 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM Ponpes Darul Ulum Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 456282 | 32146154 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,929,500 | 14,929,500 | 14,929,500 | 14,929,500 | 2022-11-08 | 2022-11-11 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 15,000 | 0.1 % | |
299 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 457282 | 36718929 | APBDP | 17,200,000 | 17,200,000 | 17,100,000 | 17,100,000 | 17,057,000 | 17,057,000 | 0 | 17,057,000 | 2022-10-31 | 2022-11-03 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.58 % | |
300 | 2022 | Sekretariat Daerah | Belanja Rehab Gudang Peralatan Samping Pendopo | Pengadaan Langsung | Pekerjaan Konstruksi | 459282 | 36834441 | APBDP | 155,000,000 | 154,991,188 | 154,766,868 | 154,766,868 | 154,766,800 | 154,766,800 | 154,766,800 | 154,766,800 | 2022-10-20 | 2022-10-31 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 233,132 | 0.15 % | |
301 | 2022 | Dinas Komunikasi dan Informatika | Perluasan Jaringan Internet Mall Pelayanan Publik | Pengadaan Langsung | Jasa Lainnya | 460282 | 36535685 | APBD | 156,400,000 | 153,282,000 | 152,971,320 | 152,971,320 | 151,950,000 | 151,950,000 | 90 | 151,950,000 | 2022-10-27 | 2022-11-01 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 3,428,680 | 2.19 % | |
302 | 2022 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan Tempat Kerja Kelurahan | Pengadaan Langsung | Pekerjaan Konstruksi | 461282 | 32159074 | APBD | 174,500,000 | 174,497,000 | 174,292,508 | 174,292,508 | 174,150,000 | 174,150,000 | 174,150,000 | 174,150,000 | 2022-10-21 | 2022-10-25 | CV. RISNA | 01.214.257.6-733.000 | 207,492 | 0.12 % | |
303 | 2022 | Kecamatan Kandangan | Jasa Konsultasi Pengawasan Arsitektur (KU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 462282 | 36307043 | APBD | 10,000,000 | 9,999,000 | 9,948,881 | 9,948,881 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 2022-10-21 | 2022-10-25 | Wing Rastafarindo | 03.282.590.3-732.000 | 51,119 | 0.51 % | |
304 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 464282 | 32147192 | APBD | 200,000,000 | 199,903,789 | 199,838,708 | 199,838,708 | 199,730,000 | 199,730,000 | 199,730,000 | 199,730,000 | 2022-10-28 | 2022-11-02 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 161,292 | 0.08 % | |
305 | 2022 | Dinas Perhubungan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 465282 | 36882885 | APBD | 50,000,000 | 49,998,834 | 49,705,218 | 49,705,218 | 49,705,000 | 49,705,000 | 49,705,000 | 49,705,000 | 2022-10-26 | 2022-10-31 | cv.agung perkasa | 02.475.425.1-735.000 | 294,782 | 0.59 % | |
306 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM Ponpes Darul Ulum Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 466282 | 32146169 | APBD | 200,000,000 | 199,992,006 | 199,979,809 | 199,979,809 | 199,864,000 | 199,864,000 | 199,864,000 | 199,864,000 | 2022-11-01 | 2022-11-07 | CV. KHALIF | 81.540.809.1-733.000 | 20,191 | 0.01 % | |
307 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Kota : Jalan Sudirman Segmen I | Pengadaan Langsung | Pekerjaan Konstruksi | 467282 | 31591831 | APBD | 200,000,000 | 199,812,281 | 199,521,093 | 199,521,093 | 198,751,000 | 198,751,000 | 198,751,000 | 198,751,000 | 2022-10-26 | 2022-11-01 | CV.BUMI SAHARA PUTRA | 41.042.955.9-732.000 | 478,907 | 0.24 % | |
308 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Merdeka, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 468282 | 31592337 | APBD | 195,000,000 | 194,981,757 | 194,922,434 | 194,922,434 | 194,662,000 | 194,662,000 | 194,662,000 | 194,662,000 | 2022-11-03 | 2022-11-08 | cv.usah bersama | 75.083.373.3-735.000 | 77,566 | 0.04 % | |
309 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 469282 | 31592340 | APBD | 200,000,000 | 199,794,891 | 199,350,852 | 199,350,852 | 199,256,000 | 199,256,000 | 199,256,000 | 199,256,000 | 2022-10-26 | 2022-11-01 | cv.usah bersama | 75.083.373.3-735.000 | 649,148 | 0.32 % | |
310 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Kelas SDN Hakurung Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 470282 | 36765293 | APBDP | 90,000,000 | 89,971,977 | 89,799,000 | 89,799,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 2022-10-28 | 2022-11-02 | Wing Rastafarindo | 03.282.590.3-732.000 | 201,000 | 0.22 % | |
311 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Rumah Dinas SDN 3 Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 471282 | 36765331 | APBDP | 20,000,000 | 19,982,016 | 19,946,700 | 19,946,700 | 19,891,200 | 19,891,200 | 19,891,200 | 19,891,200 | 2022-10-28 | 2022-11-02 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 53,300 | 0.27 % | |
312 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Pekerjaan Konstruksi | 472282 | 36827940 | APBD | 187,000,000 | 186,994,000 | 186,491,837 | 186,491,837 | 184,410,950 | 184,410,950 | 184,410,950 | 184,410,950 | 2022-11-02 | 2022-11-07 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 508,163 | 0.27 % | |
313 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi WC dan Kamar Ganti di Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Pekerjaan Konstruksi | 473282 | 36827856 | APBD | 75,000,000 | 74,998,000 | 74,795,138 | 74,795,138 | 74,790,000 | 74,790,000 | 74,790,000 | 74,790,000 | 2022-11-02 | 2022-12-01 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 204,862 | 0.27 % | |
314 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing di Desa Padang Batung RT.02 Kec. Padang batung, dan Jasa Konsultansi Perencanaan Perkuatan tebing di Desa Batu bini Kec. Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 475282 | 36749193 | APBD | 39,000,000 | 39,000,000 | 38,872,200 | 38,872,200 | 38,827,800 | 38,827,800 | 38,827,800 | 38,827,800 | 2022-10-24 | 2022-10-28 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 127,800 | 0.33 % | |
315 | 2022 | Dinas Komunikasi dan Informatika | Jaringan Internet Gedung Serba Guna 2 Desember / Ganda | Pengadaan Langsung | Jasa Lainnya | 476282 | 36903986 | APBDP | 99,200,000 | 99,191,709 | 98,912,100 | 98,912,100 | 98,778,000 | 98,778,000 | 90 | 98,778,000 | 2022-11-11 | 2022-11-21 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 287,900 | 0.29 % | |
316 | 2022 | Dinas Pertanian | Pembangunan/Rehabilitasi JUT Poktan Pulau Serindit Desa Bamban Utara Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 477282 | 36768688 | APBDP | 179,000,000 | 178,940,000 | 178,848,681 | 178,848,681 | 178,789,900 | 178,789,900 | 178,789,900 | 178,789,900 | 2022-10-26 | 2022-10-31 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 151,319 | 0.08 % | |
317 | 2022 | Dinas Pertanian | Pengawasan Pemb/Rehab JUTPoktan Pulau Sarindit Ds Bamban Utara Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 478282 | 36768609 | APBDP | 10,000,000 | 10,000,000 | 9,990,000 | 9,990,000 | 9,978,900 | 9,978,900 | 9,978,900 | 9,978,900 | 2022-10-26 | 2022-10-31 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 10,000 | 0.1 % | |
318 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Saluran Pembuangan di Ins.Gizi dan Mesjid RSUD BHHB | Pengadaan Langsung | Pekerjaan Konstruksi | 480282 | 36931340 | BLUD | 200,000,000 | 179,911,713 | 179,716,218 | 179,716,218 | 179,579,000 | 179,579,000 | 179,579,000 | 179,579,000 | 2022-10-26 | 2022-10-31 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | 20,283,782 | 10.14 % | |
319 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Pembangunan Gedung Rawat Inap Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 481282 | 36950515 | BLUD | 150,000,000 | 99,372,750 | 99,000,900 | 99,000,900 | 98,910,000 | 98,910,000 | 98,910,000 | 98,910,000 | 2022-10-25 | 2022-10-31 | CV. Sembilan Dua Teknik Konsultan | 81.763.047.8-731.000 | 50,999,100 | 34 % | |
320 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 483282 | 36716207 | APBDP | 200,000,000 | 199,953,729 | 199,902,349 | 199,902,349 | 199,881,000 | 199,881,000 | 199,881,000 | 199,881,000 | 2022-11-10 | 2022-11-16 | CV. ATIGA MULTI KARYA | 96.038.305.7-733.000 | 97,651 | 0.05 % | |
321 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 484282 | 36804128 | APBDP | 175,122,000 | 174,901,231 | 174,295,474 | 174,295,474 | 174,200,000 | 174,200,000 | 174,200,000 | 174,200,000 | 2022-11-04 | 2022-11-08 | CV. An-Nidha | 02.675.485.3-733.000 | 826,526 | 0.47 % | |
322 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 485282 | 36795548 | APBDP | 182,420,000 | 182,190,215 | 181,968,998 | 181,968,998 | 181,850,000 | 181,850,000 | 100 | 181,850,000 | 2022-11-08 | 2022-11-11 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 451,002 | 0.25 % | |
323 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Pekerjaan Konstruksi | 486282 | 36795630 | APBDP | 193,990,000 | 193,827,057 | 193,707,692 | 193,707,692 | 193,600,000 | 193,600,000 | 100 | 193,600,000 | 2022-11-03 | 2022-11-07 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 282,308 | 0.15 % | |
324 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 487282 | 36716036 | APBDP | 16,000,000 | 16,000,000 | 15,972,395 | 15,972,395 | 15,951,000 | 15,951,000 | 15,951,000 | 15,951,000 | 2022-11-02 | 2022-11-07 | Wing Rastafarindo | 03.282.590.3-732.000 | 27,605 | 0.17 % | |
325 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Halaman Polres HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 488282 | 36715870 | APBDP | 80,000,000 | 80,000,000 | 79,850,000 | 79,850,000 | 79,790,000 | 79,790,000 | 79,790,000 | 79,790,000 | 2022-11-04 | 2022-11-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 150,000 | 0.19 % | |
326 | 2022 | RSUD Daha Sejahtera | Pengadaan Prasarana Penyimpanan Limbah Padat | Pengadaan Langsung | Pekerjaan Konstruksi | 489282 | 36826152 | APBDP | 190,000,000 | 189,860,295 | 189,657,056 | 189,657,056 | 189,490,500 | 189,490,500 | 189,490,500 | 189,490,500 | 2022-10-27 | 2022-11-01 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 342,944 | 0.18 % | |
327 | 2022 | RSUD Daha Sejahtera | Rehabilitasi Nurse Station | Pengadaan Langsung | Pekerjaan Konstruksi | 490282 | 36826130 | APBDP | 198,000,000 | 197,980,271 | 197,717,147 | 197,717,147 | 197,683,800 | 197,683,800 | 197,683,800 | 197,683,800 | 2022-10-27 | 2022-11-01 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 282,853 | 0.14 % | |
328 | 2022 | RSUD Daha Sejahtera | Rehabilitasi Gedung Rawat Jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 491282 | 36826141 | APBDP | 170,000,000 | 167,693,052 | 167,276,995 | 167,276,995 | 167,265,800 | 167,265,800 | 167,265,800 | 167,265,800 | 2022-10-27 | 2022-11-01 | FADWI UTAMA | 94.246.044.5-733.000 | 2,723,005 | 1.6 % | |
329 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loklahung RT. 001 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 493282 | 36862544 | APBDP | 200,000,000 | 199,922,078 | 199,744,478 | 199,744,478 | 199,627,000 | 199,627,000 | 199,627,000 | 199,627,000 | 2022-11-09 | 2022-11-15 | cv.usah bersama | 75.083.373.3-735.000 | 255,522 | 0.13 % | |
330 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loksado RT. 004 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 494282 | 36862872 | APBDP | 192,000,000 | 191,927,017 | 191,821,650 | 191,821,650 | 191,747,000 | 191,747,000 | 191,747,000 | 191,747,000 | 2022-11-06 | 2022-11-11 | CV. RISNA | 01.214.257.6-733.000 | 178,350 | 0.09 % | |
331 | 2022 | Dinas Perdagangan | Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 495282 | 36791412 | APBDP | 200,000,000 | 199,968,220 | 199,750,855 | 199,750,855 | 197,200,400 | 197,200,400 | 197,200,400 | 197,200,400 | 2022-10-28 | 2022-11-01 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 249,145 | 0.12 % | |
332 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Durian Rabung Kec. Padang batung (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 496282 | 36868822 | APBDP | 200,000,000 | 199,930,257 | 199,708,167 | 199,708,167 | 199,638,000 | 199,638,000 | 199,638,000 | 199,638,000 | 2022-10-29 | 2022-11-03 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 291,833 | 0.15 % | |
333 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Jasa Konsultansi Updating Penyusunan Rencana Detail Tata Ruang Kawasan Perkotaan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 497282 | 36869734 | APBDP | 100,000,000 | 99,966,000 | 99,609,180 | 99,609,180 | 99,569,000 | 99,609,180 | 99,609,180 | 99,609,180 | 2022-10-28 | 2022-11-02 | CV. Inditec Consultant | 02.090.318.3-731.000 | 390,820 | 0.39 % | |
334 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Jasa Konsultansi Updating Penyusunan Rencana Detail Tata Ruang Kawasan Perkotaan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 498282 | 36863755 | APBDP | 100,000,000 | 99,966,000 | 99,766,800 | 99,766,800 | 99,699,000 | 99,766,800 | 99,766,800 | 99,766,800 | 2022-10-31 | 2022-11-03 | CV. DIGDAYA MAHARDIKA | 03.242.995.3-731.000 | 233,200 | 0.23 % | |
335 | 2022 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Gabus Haruan di Kolam Tanah | Pengadaan Langsung | Pekerjaan Konstruksi | 499282 | 37129516 | APBDP | 160,000,000 | 159,676,986 | 159,327,336 | 159,327,336 | 159,300,000 | 159,300,000 | 159,300,000 | 159,300,000 | 2022-10-28 | 2022-11-04 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 672,664 | 0.42 % | |
336 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 500282 | 36871215 | APBDP | 198,000,000 | 197,951,633 | 197,195,613 | 197,195,613 | 197,117,000 | 197,117,000 | 197,117,000 | 197,117,000 | 2022-10-29 | 2022-11-07 | CV. RIZKI NOOR FAJAR | 02.300.399.9-735.000 | 804,387 | 0.41 % | |
337 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 502282 | 36871402 | APBDP | 198,000,000 | 197,961,459 | 197,391,219 | 197,391,219 | 197,274,000 | 197,274,000 | 197,274,000 | 197,274,000 | 2022-11-28 | 2022-12-02 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 608,781 | 0.31 % | |
338 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 503282 | 36871583 | APBDP | 198,000,000 | 197,962,479 | 197,821,039 | 197,821,039 | 197,698,000 | 197,698,000 | 197,698,000 | 197,698,000 | 2022-11-09 | 2022-11-15 | CV.AL-FAZZA | 92.913.236.3-735.000 | 178,961 | 0.09 % | |
339 | 2022 | Dinas Perdagangan | Rehab Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 504282 | 36791527 | APBDP | 199,750,000 | 199,746,602 | 199,448,500 | 199,448,500 | 199,359,600 | 199,359,600 | 199,359,600 | 199,359,600 | 2022-11-01 | 2022-11-04 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 301,500 | 0.15 % | |
340 | 2022 | Dinas Perdagangan | Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 505282 | 36791032 | APBDP | 199,500,000 | 199,497,957 | 199,165,318 | 199,165,318 | 199,132,000 | 199,132,000 | 199,132,000 | 199,132,000 | 2022-11-01 | 2022-11-04 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 334,682 | 0.17 % | |
341 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 506282 | 36870346 | APBDP | 187,500,000 | 187,391,827 | 187,125,838 | 187,125,838 | 186,895,000 | 186,895,000 | 186,895,000 | 186,895,000 | 2022-11-14 | 2022-11-18 | FADWI UTAMA | 94.246.044.5-733.000 | 374,162 | 0.2 % | |
342 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 507282 | 36733387 | APBDP | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,100,000 | 15,100,000 | 0 | 15,100,000 | 2022-11-16 | 2022-11-22 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 48,500 | 0.32 % | |
343 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 509282 | 36861976 | APBDP | 192,000,000 | 191,858,858 | 191,686,269 | 191,686,269 | 191,553,000 | 191,553,000 | 191,553,000 | 191,553,000 | 2022-11-13 | 2022-11-17 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 313,731 | 0.16 % | |
344 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 510282 | 36869073 | APBDP | 200,000,000 | 199,905,611 | 199,711,361 | 199,711,361 | 199,600,000 | 199,600,000 | 199,600,000 | 199,600,000 | 2022-12-01 | 2022-12-08 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 288,639 | 0.14 % | |
345 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 511282 | 36734599 | APBDP | 15,200,000 | 15,200,000 | 15,157,050 | 15,157,050 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | 2022-11-30 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 42,950 | 0.28 % | |
346 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Ponpes Baladul Amin, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 512282 | 36734622 | APBDP | 15,200,000 | 15,200,000 | 15,123,750 | 15,123,750 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | 2022-11-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 76,250 | 0.5 % | |
347 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 513282 | 36733158 | APBDP | 15,200,000 | 15,200,000 | 15,185,244 | 15,185,244 | 15,150,000 | 15,150,000 | 0 | 15,150,000 | 2022-11-04 | 2022-11-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 14,756 | 0.1 % | |
348 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 514282 | 36733139 | APBDP | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | 2022-11-30 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 48,500 | 0.32 % | |
349 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 515282 | 36733312 | APBDP | 15,200,000 | 15,200,000 | 15,074,244 | 15,074,244 | 15,015,000 | 15,015,000 | 0 | 15,015,000 | 2022-11-04 | 2022-11-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,756 | 0.83 % | |
350 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 516282 | 36733340 | APBDP | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,101,500 | 15,101,500 | 0 | 15,101,500 | 2022-11-16 | 2022-11-22 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 48,500 | 0.32 % | |
351 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 517282 | 36733269 | APBDP | 15,200,000 | 15,200,000 | 15,096,000 | 15,096,000 | 15,040,500 | 15,040,500 | 0 | 15,040,500 | 2022-11-03 | 2022-11-08 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 104,000 | 0.68 % | |
352 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Muara Banta Kandangan Hulu, Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 518282 | 36718917 | APBDP | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,050,000 | 15,050,000 | 0 | 15,050,000 | 2022-11-21 | 2022-11-24 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 100,000 | 0.66 % | |
353 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 519282 | 36718881 | APBDP | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,051,000 | 15,051,000 | 0 | 15,051,000 | 2022-11-18 | 2022-11-23 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 0.66 % | |
354 | 2022 | RSUD Daha Sejahtera | Pengawasan Rehabilitasi Nurse Station,Pengawasan Rehabilitasi Gedung Rawat Jalan,Pengawasan Pengadaan Prasarana Penyimpanan Limbah Padat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 520282 | 36826135;36826145;36826167 | APBDP | 45,000,000 | 44,999,999 | 44,875,080 | 44,875,080 | 44,844,000 | 44,844,000 | 44,844,000 | 44,844,000 | 2022-10-31 | 2022-11-03 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 124,920 | 0.28 % | |
355 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi WC dan Kamar Ganti di Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 522282 | 36828069 | APBD | 15,000,000 | 15,000,000 | 14,874,000 | 14,874,000 | 14,860,000 | 14,860,000 | 14,860,000 | 14,860,000 | 2022-11-10 | 2022-11-18 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 126,000 | 0.84 % | |
356 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 523282 | 36862212 | APBDP | 104,000,000 | 103,842,848 | 103,643,049 | 103,643,049 | 103,509,000 | 103,509,000 | 103,509,000 | 103,509,000 | 2022-11-06 | 2022-11-11 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 356,951 | 0.34 % | |
357 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 525282 | 36868854 | APBDP | 192,000,000 | 191,901,828 | 191,807,756 | 191,807,756 | 191,685,000 | 191,685,000 | 191,685,000 | 191,685,000 | 2022-11-06 | 2022-11-11 | CV. JODHA SAE | 94.797.791.4-733.000 | 192,244 | 0.1 % | |
358 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Padang Batung RT. 02 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 526282 | 36868747 | APBDP | 200,000,000 | 199,931,021 | 199,797,820 | 199,797,820 | 199,681,000 | 199,681,000 | 199,681,000 | 199,681,000 | 2022-11-09 | 2022-11-15 | cv.usah bersama | 75.083.373.3-735.000 | 202,180 | 0.1 % | |
359 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Tambingkar Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 527282 | 36869330 | APBDP | 200,000,000 | 199,913,186 | 199,633,119 | 199,633,119 | 199,522,000 | 199,522,000 | 199,522,000 | 199,522,000 | 2022-11-28 | 2022-12-02 | cv.usah bersama | 75.083.373.3-735.000 | 366,881 | 0.18 % | |
360 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Sarang Nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 528282 | 36869135 | APBDP | 193,750,000 | 193,661,207 | 193,522,457 | 193,522,457 | 193,383,000 | 193,383,000 | 193,383,000 | 193,383,000 | 2022-11-21 | 2022-11-28 | CV. RAJA WALI | 85.277.425.6-731.000 | 227,543 | 0.12 % | |
361 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Pantai Ulin III Kec. Simpur (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 529282 | 36861836 | APBDP | 152,000,000 | 151,842,764 | 151,637,414 | 151,637,414 | 151,498,000 | 151,498,000 | 151,498,000 | 151,498,000 | 2022-11-21 | 2022-11-28 | cv. bumi mandiri | 02.089.892.0-733.000 | 362,586 | 0.24 % | |
362 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengecatan Lampu Hias Asma'ul Husna | Pengadaan Langsung | Pekerjaan Konstruksi | 530282 | 36810893 | APBD | 175,000,000 | 174,129,197 | 173,274,497 | 173,274,497 | 173,100,000 | 173,100,000 | 173,100,000 | 173,100,000 | 2022-11-01 | 2022-11-02 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 1,725,504 | 0.99 % | |
363 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lintingan di Desa Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 532282 | 36861517 | APBDP | 156,250,000 | 156,172,271 | 155,966,921 | 155,966,921 | 155,855,000 | 155,855,000 | 155,855,000 | 155,855,000 | 2022-11-21 | 2022-11-28 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 283,079 | 0.18 % | |
364 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 533282 | 36658979 | APBDP | 195,800,000 | 195,769,833 | 195,624,756 | 195,624,756 | 195,565,000 | 195,565,000 | 195,565,000 | 195,565,000 | 2022-11-28 | 2022-12-01 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 175,244 | 0.09 % | |
365 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 534282 | 36659167 | APBDP | 190,800,000 | 190,793,905 | 190,640,614 | 190,640,614 | 190,551,000 | 190,551,000 | 190,551,000 | 190,551,000 | 2022-11-28 | 2022-12-01 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 159,386 | 0.08 % | |
366 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 535282 | 36659277 | APBDP | 191,100,000 | 191,093,783 | 190,945,001 | 190,945,001 | 190,890,000 | 190,890,000 | 190,890,000 | 190,890,000 | 2022-11-28 | 2022-11-30 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 154,999 | 0.08 % | |
367 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Ruas Loklahung - Malaris Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 537282 | 36536870 | APBDP | 198,000,000 | 197,995,360 | 197,762,107 | 197,762,107 | 197,691,000 | 197,691,000 | 197,691,000 | 197,691,000 | 2022-11-25 | 2022-11-30 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 237,893 | 0.12 % | |
368 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 538282 | 36716061 | APBDP | 198,600,000 | 198,592,336 | 198,472,536 | 198,472,536 | 198,298,000 | 198,298,000 | 198,298,000 | 198,298,000 | 2022-11-03 | 2022-11-08 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 127,464 | 0.06 % | |
369 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Gedung Sekretariat MUI Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 539282 | 37206031 | APBDP | 200,000,000 | 199,987,705 | 199,765,707 | 199,765,707 | 199,599,000 | 199,599,000 | 199,599,000 | 199,599,000 | 2022-11-07 | 2022-11-23 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 234,293 | 0.12 % | |
370 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 540282 | 36659369 | APBDP | 193,200,000 | 193,187,189 | 193,000,424 | 193,000,424 | 192,885,000 | 192,885,000 | 192,885,000 | 192,885,000 | 2022-11-09 | 2022-11-15 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 199,576 | 0.1 % | |
371 | 2022 | Dinas Kesehatan | Pemeliharaan Rumah Dinas Tenaga Kesehatan | Pengadaan Langsung | Pekerjaan Konstruksi | 541282 | 36860509 | APBD | 50,000,000 | 49,886,920 | 49,726,970 | 49,726,970 | 47,195,000 | 47,195,000 | 47,195,000 | 47,195,000 | 2022-11-01 | 2022-11-03 | CV. AISY | 75.132.070.6-733.000 | 273,030 | 0.55 % | |
372 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 542282 | 36804442 | APBDP | 125,460,000 | 125,306,623 | 125,182,248 | 125,182,248 | 125,100,000 | 125,100,000 | 100 | 125,100,000 | 2022-11-08 | 2022-11-11 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 277,752 | 0.22 % | |
373 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman titian penghubung Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 543282 | 36804398 | APBDP | 177,080,000 | 176,906,462 | 176,895,507 | 176,895,507 | 176,700,000 | 176,700,000 | 100 | 176,700,000 | 2022-11-03 | 2022-11-07 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 184,493 | 0.1 % | |
374 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 544282 | 36871309 | APBDP | 13,000,000 | 13,000,000 | 12,976,000 | 12,976,000 | 12,898,200 | 12,898,200 | 12,898,200 | 12,898,200 | 2022-11-28 | 2022-12-05 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 24,000 | 0.18 % | |
375 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 545282 | 36804343 | APBDP | 147,710,000 | 147,290,305 | 147,086,292 | 147,086,292 | 147,000,000 | 147,000,000 | 147,000,000 | 147,000,000 | 2022-11-07 | 2022-11-09 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 623,708 | 0.42 % | |
376 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 546282 | 36804032 | APBDP | 178,860,000 | 178,104,001 | 178,048,501 | 178,048,501 | 177,950,000 | 177,950,000 | 177,950,000 | 177,950,000 | 2022-11-04 | 2022-11-08 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 811,500 | 0.45 % | |
377 | 2022 | Kecamatan Angkinang | Belanja Tambah Daya Listrik | Pengadaan Langsung | Pekerjaan Konstruksi | 547282 | 32359068 | APBD | 30,000,000 | 29,987,000 | 29,979,990 | 29,979,990 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2022-11-03 | 2022-11-07 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 20,010 | 0.07 % | |
378 | 2022 | Kecamatan Angkinang | Belanja Pemeliharaan Rumah Dinas | Pengadaan Langsung | Pekerjaan Konstruksi | 548282 | 32359945 | APBD | 25,000,000 | 24,996,000 | 24,887,380 | 24,887,380 | 24,850,000 | 24,850,000 | 24,850,000 | 24,850,000 | 2022-11-18 | 2022-11-22 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 112,620 | 0.45 % | |
379 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung, dan Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 550282 | 37018706 | APBDP | 26,000,000 | 26,000,000 | 25,885,200 | 25,885,200 | 25,796,400 | 25,796,400 | 25,796,400 | 25,796,400 | 2022-11-15 | 2022-11-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 114,800 | 0.44 % | |
380 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Pantai Ulin III Kec. Simpur (PAD), dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Panjampang Bahagia Kec. Simpur (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 551282 | 37018433 | APBDP | 18,500,000 | 18,500,000 | 18,470,400 | 18,470,400 | 18,381,600 | 18,381,600 | 18,381,600 | 18,381,600 | 2022-11-22 | 2022-11-28 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 29,600 | 0.16 % | |
381 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 552282 | 36870176 | APBDP | 13,500,000 | 13,500,000 | 13,453,200 | 13,453,200 | 13,408,800 | 13,408,800 | 13,408,800 | 13,408,800 | 2022-11-16 | 2022-11-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 46,800 | 0.35 % | |
382 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Kalumpang, Jasa Konsultansi Pengawasan Normalisasi Sungai Lintingan di Desa Amparaya Kec. Simpur, Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Tambingkar Kec. Kalumpang, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Sarang Nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 553282 | 37017488 | APBDP | 51,650,000 | 51,650,000 | 51,592,800 | 51,592,800 | 51,459,600 | 51,459,600 | 51,300,000 | 51,459,600 | 2022-11-26 | 2022-11-30 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 57,200 | 0.11 % | |
383 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loklahung RT.001 Kec. Loksado dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado RT. 004 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 554282 | 37017056 | APBDP | 26,550,000 | 26,550,000 | 26,400,000 | 26,400,000 | 26,295,900 | 26,295,900 | 26,295,900 | 26,295,900 | 2022-11-16 | 2022-11-23 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 150,000 | 0.56 % | |
384 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 556282 | 36715997 | APBDP | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,051,000 | 15,051,000 | 15,051,000 | 15,051,000 | 2022-11-04 | 2022-11-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 0.66 % | |
385 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung RT. 02 Kec. Padang Batung, Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Durian Rabung Kec. Padang Batung (Lanjutan), dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 558282 | 37017203 | APBDP | 41,800,000 | 41,800,000 | 41,500,000 | 41,500,000 | 41,358,600 | 41,358,600 | 41,358,600 | 41,358,600 | 2022-11-15 | 2022-11-21 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 300,000 | 0.72 % | |
386 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 559282 | 36554060 | APBD | 12,150,000 | 12,150,000 | 12,130,000 | 12,130,000 | 12,099,000 | 12,099,000 | 12,099,000 | 12,099,000 | 2022-11-23 | 2022-11-28 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 20,000 | 0.16 % | |
387 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 560282 | 36658898 | APBDP | 196,600,000 | 196,591,422 | 196,259,032 | 196,259,032 | 195,752,000 | 195,752,000 | 195,752,000 | 195,752,000 | 2022-11-22 | 2022-11-25 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 340,968 | 0.17 % | |
388 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 561282 | 36628356 | APBDP | 193,600,000 | 193,582,964 | 193,363,563 | 193,363,563 | 192,905,000 | 192,905,000 | 192,905,000 | 192,905,000 | 2022-11-08 | 2022-11-11 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 236,437 | 0.12 % | |
389 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Raya Kec. Daha Selatan,Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara,Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman titian penghubung Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 562282 | 36803002;36803174;36803302 | APBDP | 23,000,000 | 22,615,640 | 22,577,400 | 22,577,400 | 22,500,000 | 22,500,000 | 100 | 22,500,000 | 2022-11-09 | 2022-11-11 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 422,600 | 1.84 % | |
390 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN),Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota,Konsultan Pengawas Peningkatan PSU Permukiman Gang Rt 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 563282 | 36803063;36803410;36803479 | APBDP | 21,952,000 | 21,147,554 | 21,062,250 | 21,062,250 | 21,000,000 | 21,000,000 | 100 | 21,000,000 | 2022-11-09 | 2022-11-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 889,750 | 4.05 % | |
391 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 564282 | 36868983 | APBDP | 200,000,000 | 199,859,024 | 199,596,998 | 199,596,998 | 199,485,000 | 199,485,000 | 199,485,000 | 199,485,000 | 2022-11-09 | 2022-11-15 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 403,002 | 0.2 % | |
392 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung dan Jasa Konsultansi Pengawasan Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 565282 | 37241296 | APBDP | 28,000,000 | 28,000,000 | 27,948,024 | 27,948,024 | 27,883,200 | 27,883,200 | 27,883,200 | 27,883,200 | 2022-11-15 | 2022-11-21 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 51,976 | 0.19 % | |
393 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 566282 | 36628567 | APBDP | 191,100,000 | 191,090,057 | 190,927,886 | 190,927,886 | 190,900,000 | 190,900,000 | 190,900,000 | 190,900,000 | 2022-11-28 | 2022-11-30 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 172,114 | 0.09 % | |
394 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 567282 | 36869484 | APBDP | 150,000,000 | 149,915,252 | 149,710,606 | 149,710,606 | 149,577,000 | 149,577,000 | 149,577,000 | 149,577,000 | 2022-11-09 | 2022-11-15 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 289,394 | 0.19 % | |
395 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 568282 | 36815820 | APBDP | 118,200,000 | 118,190,761 | 117,975,928 | 117,975,928 | 117,878,000 | 117,878,000 | 117,878,000 | 117,878,000 | 2022-11-10 | 2022-11-16 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 224,072 | 0.19 % | |
396 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 570282 | 36625442 | APBDP | 189,000,000 | 188,944,604 | 188,599,706 | 188,599,706 | 188,566,000 | 188,566,000 | 188,566,000 | 188,566,000 | 2022-11-15 | 2022-11-21 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 400,294 | 0.21 % | |
397 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 571282 | 36868950 | APBDP | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-11-14 | 2022-11-18 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 50,000 | 0.36 % | |
398 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Duhat Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 573282 | 36543083 | APBDP | 192,500,000 | 192,438,808 | 191,930,194 | 191,930,194 | 191,872,000 | 191,872,000 | 191,872,000 | 191,872,000 | 2022-11-07 | 2022-11-10 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 569,806 | 0.3 % | |
399 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 574282 | 36624567 | APBDP | 193,600,000 | 193,584,866 | 193,400,217 | 193,400,217 | 193,267,000 | 193,267,000 | 193,267,000 | 193,267,000 | 2022-11-07 | 2022-11-10 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 199,783 | 0.1 % | |
400 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 575282 | 36870425 | APBDP | 100,000,000 | 99,932,579 | 99,610,679 | 99,610,679 | 99,555,000 | 99,555,000 | 99,555,000 | 99,555,000 | 2022-11-28 | 2022-12-02 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 389,321 | 0.39 % | |
401 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 576282 | 36812084 | APBDP | 148,600,000 | 148,476,130 | 148,298,530 | 148,298,530 | 148,200,000 | 148,200,000 | 148,200,000 | 148,200,000 | 2022-11-04 | 2022-11-08 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 301,470 | 0.2 % | |
402 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 577282 | 36659473 | APBDP | 200,000,000 | 199,991,009 | 199,890,609 | 199,890,609 | 199,717,000 | 199,717,000 | 199,717,000 | 199,717,000 | 2022-11-09 | 2022-11-15 | CV. LALUNA DANA | 02.237.179.3-733.000 | 109,391 | 0.05 % | |
403 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Jl. Biti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 578282 | 36659601 | APBDP | 198,000,000 | 197,952,619 | 197,640,055 | 197,640,055 | 197,362,000 | 197,362,000 | 197,362,000 | 197,362,000 | 2022-11-07 | 2022-11-10 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 359,945 | 0.18 % | |
404 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 579282 | 36659720 | APBDP | 200,000,000 | 199,733,203 | 199,468,432 | 199,468,432 | 199,399,000 | 199,399,000 | 199,399,000 | 199,399,000 | 2022-11-15 | 2022-11-18 | CV.Bangun Banua | 93.708.167.7-733.000 | 531,568 | 0.27 % | |
405 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tatah di Desa Kayu Abang Kec. Angkinang, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Tawia di Desa Tawia Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 582282 | 37017675 | APBDP | 25,100,000 | 25,100,000 | 25,040,000 | 25,040,000 | 24,952,800 | 24,952,800 | 24,952,800 | 24,952,800 | 2022-11-22 | 2022-11-28 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 60,000 | 0.24 % | |
406 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 583282 | 36654525 | APBDP | 120,000,000 | 119,994,165 | 119,704,329 | 119,704,329 | 119,626,000 | 119,626,000 | 119,626,000 | 119,626,000 | 2022-11-07 | 2022-11-10 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 295,671 | 0.25 % | |
407 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Ruas Loklahung - Malaris Kec. Loksado, Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Jalan Duhat Kec. Simpur, Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 584282 | 36805421 | APBDP | 45,000,000 | 39,967,341 | 39,922,941 | 39,922,941 | 39,899,000 | 39,899,000 | 39,899,000 | 39,899,000 | 2022-12-06 | 2022-12-09 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 5,077,059 | 11.28 % | |
408 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 585282 | 31592308 | APBD | 16,000,000 | 16,000,000 | 15,873,000 | 15,873,000 | 15,817,500 | 15,817,500 | 15,817,500 | 15,817,500 | 2022-11-08 | 2022-11-11 | CV. RAYHANI | 75.410.426.3-733.000 | 127,000 | 0.79 % | |
409 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya, Jasa Konsultansi Pengawasan Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 586282 | 36805464 | APBDP | 60,000,000 | 59,987,854 | 59,843,985 | 59,843,985 | 59,773,500 | 59,773,500 | 59,773,500 | 59,773,500 | 2022-11-11 | 2022-11-16 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 156,015 | 0.26 % | |
410 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya, Jasa Konsultansi Pengawasan Pekerjaan Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung, Jasa Konsultansi Pengawasan Pekerjaan Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 587282 | 36805501 | APBDP | 45,000,000 | 39,967,341 | 39,922,482 | 39,922,482 | 39,900,000 | 39,900,000 | 39,900,000 | 39,900,000 | 2022-11-08 | 2022-11-11 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 5,077,518 | 11.28 % | |
411 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 588282 | 36805546 | APBDP | 60,000,000 | 59,987,854 | 59,761,840 | 59,761,840 | 59,684,700 | 59,684,700 | 59,684,700 | 59,684,700 | 2022-11-14 | 2022-11-17 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 238,160 | 0.4 % | |
412 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Penggantian Jembatan di Jl. Biti Kec. Kandangan, Jasa Konsultansi Pengawasan Pekerjaan Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 589282 | 36805606 | APBDP | 30,000,000 | 29,875,701 | 29,696,940 | 29,696,940 | 29,696,000 | 29,696,000 | 29,696,000 | 29,696,000 | 2022-11-16 | 2022-11-22 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 303,060 | 1.01 % | |
413 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 591282 | 36795429 | APBDP | 130,911,000 | 130,632,701 | 130,151,183 | 130,151,183 | 130,100,000 | 130,100,000 | 100 | 130,100,000 | 2022-11-08 | 2022-11-11 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 759,817 | 0.58 % | |
414 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Gang RT 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 592282 | 36804657 | APBDP | 179,750,000 | 179,569,037 | 179,385,029 | 179,385,029 | 179,250,000 | 179,250,000 | 179,250,000 | 179,250,000 | 2022-11-07 | 2022-11-09 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 364,971 | 0.2 % | |
415 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 596282 | 37342478 | APBDP | 21,000,000 | 21,000,000 | 20,956,400 | 20,956,400 | 20,890,200 | 20,890,200 | 20,890,200 | 20,890,200 | 2022-11-15 | 2022-11-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 43,600 | 0.21 % | |
416 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat,Konsultan Pengawasan Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 597282 | 36794822;36812886 | APBDP | 13,600,000 | 13,119,645 | 13,048,050 | 13,048,050 | 13,000,000 | 13,000,000 | 100 | 13,000,000 | 2022-11-09 | 2022-11-11 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 551,950 | 4.06 % | |
417 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat,Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 598282 | 36794904;36795078 | APBDP | 17,160,000 | 16,789,860 | 16,707,720 | 16,707,720 | 16,670,000 | 16,670,000 | 100 | 16,670,000 | 2022-11-09 | 2022-11-11 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 452,280 | 2.64 % | |
418 | 2022 | Kecamatan Kandangan | Bantuan Hibah Water Closet untuk Warga Tidak Mampu | Pengadaan Langsung | Pekerjaan Konstruksi | 599282 | 32362123 | APBD | 50,000,000 | 49,814,000 | 49,276,140 | 49,276,140 | 49,200,000 | 49,200,000 | 49,200,000 | 49,200,000 | 2022-11-08 | 2022-11-11 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 723,860 | 1.45 % | |
419 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 600282 | 36869194 | APBDP | 200,000,000 | 199,955,219 | 199,755,419 | 199,755,419 | 199,672,000 | 199,672,000 | 199,672,000 | 199,672,000 | 2022-12-01 | 2022-12-08 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 244,581 | 0.12 % | |
420 | 2022 | Dinas Pertanian | Pembangunan UPPB Poktan Pasungguhan Ds. Hamak Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 601282 | 32066085 | APBD | 150,000,000 | 149,967,000 | 149,790,222 | 149,790,222 | 149,734,000 | 149,734,000 | 149,734,000 | 149,734,000 | 2022-11-09 | 2022-11-14 | cv. akur bersaudara | 02.675.570.2-735.000 | 209,778 | 0.14 % | |
421 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 602282 | 36719619 | APBDP | 198,600,000 | 198,594,356 | 198,381,242 | 198,381,242 | 198,381,000 | 198,381,000 | 0 | 198,381,000 | 2022-11-14 | 2022-11-21 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 218,758 | 0.11 % | |
422 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 604282 | 36719697 | APBDP | 198,600,000 | 198,599,421 | 198,549,169 | 198,549,169 | 198,398,000 | 198,398,000 | 0 | 198,398,000 | 2022-11-21 | 2022-11-24 | CV. ALBATROS | 01.222.160.2-733.000 | 50,831 | 0.03 % | |
423 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Tabihi-Gumbil-Longawang Kec.Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 605282 | 37374357 | APBD | 200,000,000 | 184,568,408 | 184,235,408 | 184,235,408 | 184,152,000 | 184,152,000 | 184,152,000 | 184,152,000 | 2022-11-16 | 2022-11-21 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 15,764,592 | 7.88 % | |
424 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 606282 | 36554087 | APBD | 168,750,000 | 95,587,568 | 95,101,218 | 95,101,218 | 94,962,000 | 94,962,000 | 94,962,000 | 94,962,000 | 2022-11-22 | 2022-11-28 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 73,648,782 | 43.64 % | |
425 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 607282 | 37376610 | APBD | 42,300,000 | 42,290,255 | 41,889,005 | 41,889,005 | 41,789,000 | 41,789,000 | 41,789,000 | 41,789,000 | 2022-11-25 | 2022-11-30 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 410,995 | 0.97 % | |
426 | 2022 | Dinas Pertanian | Pembangunan Laboratorium BPP Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 608282 | 32065098 | APBD | 100,000,000 | 99,860,000 | 99,681,132 | 99,681,132 | 99,675,000 | 99,675,000 | 99,675,000 | 99,675,000 | 2022-11-09 | 2022-11-14 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 318,868 | 0.32 % | |
427 | 2022 | Dinas Pertanian | Pengawasan Pembangunan UPPB dan Laboratorium BPP Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 610282 | 32065020;32066100 | APBD | 11,250,000 | 11,250,000 | 11,172,150 | 11,172,150 | 11,155,500 | 11,155,500 | 11,155,500 | 11,155,500 | 2022-11-09 | 2022-11-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 77,850 | 0.69 % | |
428 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Gantung Pantai Ulin Kec. Simpur) | Pengadaan Langsung | Pekerjaan Konstruksi | 611282 | 37383426 | APBD | 145,000,000 | 144,888,143 | 144,658,963 | 144,658,963 | 144,592,000 | 144,592,000 | 144,592,000 | 144,592,000 | 2022-11-24 | 2022-11-29 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 341,037 | 0.24 % | |
429 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 612282 | 37395409 | APBDP | 200,000,000 | 199,996,889 | 199,982,638 | 199,982,638 | 199,816,000 | 199,816,000 | 199,816,000 | 199,816,000 | 2022-11-28 | 2022-12-01 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 17,362 | 0.01 % | |
430 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 613282 | 36719677 | APBDP | 198,600,000 | 198,583,183 | 198,528,102 | 198,528,102 | 198,316,000 | 198,316,000 | 0 | 198,316,000 | 2022-11-11 | 2022-11-22 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 71,898 | 0.04 % | |
431 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Ds. Sirih Kec. Kalumpang) | Pengadaan Langsung | Pekerjaan Konstruksi | 614282 | 37398285 | APBD | 60,150,000 | 60,070,078 | 59,858,970 | 59,858,970 | 59,747,000 | 59,747,000 | 59,747,000 | 59,747,000 | 2022-11-30 | 2022-12-06 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 291,030 | 0.48 % | |
432 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Panjampang Bahagia Kec. Simpur (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 615282 | 36862349 | APBDP | 104,000,000 | 103,851,490 | 103,668,343 | 103,668,343 | 103,557,000 | 103,557,000 | 103,557,000 | 103,557,000 | 2022-12-01 | 2022-12-08 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 331,657 | 0.32 % | |
433 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 616282 | 36554181 | APBD | 200,000,000 | 199,900,599 | 199,567,599 | 199,567,599 | 199,528,000 | 199,528,000 | 199,528,000 | 199,528,000 | 2022-11-13 | 2022-11-17 | CV. LALUNA DANA | 02.237.179.3-733.000 | 432,401 | 0.22 % | |
434 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 617282 | 36719621 | APBDP | 198,600,000 | 198,542,931 | 198,349,349 | 198,349,349 | 198,238,000 | 198,238,000 | 0 | 198,238,000 | 2022-11-11 | 2022-11-16 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 250,651 | 0.13 % | |
435 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Panggung Terbuka dan Kamar Ganti di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pekerjaan Konstruksi | 618282 | 36827900 | APBD | 175,000,000 | 174,973,000 | 174,640,299 | 174,640,299 | 174,573,000 | 174,573,000 | 174,573,000 | 174,573,000 | 2022-11-18 | 2022-11-25 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 359,701 | 0.21 % | |
436 | 2022 | Dinas Kesehatan | Paving dan Pagar Puskesmas Gambah | Pengadaan Langsung | Pekerjaan Konstruksi | 619282 | 36696305 | APBDP | 150,000,000 | 149,995,701 | 149,973,501 | 149,973,501 | 149,500,000 | 149,500,000 | 0 | 149,500,000 | 2022-11-24 | 2022-11-28 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 26,499 | 0.02 % | |
437 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Muara Banta-Kandangan Hulu, Segmen I, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 620282 | 36719004 | APBDP | 198,600,000 | 198,600,000 | 198,245,288 | 198,245,288 | 198,188,000 | 198,188,000 | 0 | 198,188,000 | 2022-11-21 | 2022-11-24 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 354,712 | 0.18 % | |
438 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 621282 | 36718981 | APBDP | 198,600,000 | 198,600,000 | 198,206,366 | 198,206,366 | 198,198,000 | 198,198,000 | 0 | 198,198,000 | 2022-11-18 | 2022-11-23 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 393,634 | 0.2 % | |
439 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Pekerjaan Konstruksi | 622282 | 36827965 | APBD | 116,600,000 | 116,595,000 | 116,543,418 | 116,543,418 | 116,509,000 | 116,509,000 | 116,509,000 | 116,509,000 | 2022-11-18 | 2022-11-25 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 56,582 | 0.05 % | |
440 | 2022 | RSUD Brigjen H. Hasan Basry | Pemasangan mebeleur VIP dan pintu HPL | Pengadaan Langsung | Pekerjaan Konstruksi | 623282 | 36916830 | BLUD | 179,873,297 | 179,796,690 | 179,635,740 | 179,635,740 | 179,579,000 | 179,579,000 | 179,579,000 | 179,579,000 | 2022-11-12 | 2022-11-16 | CV.KOORI CIPTA KARYA | 84.740.433.2-732.000 | 237,557 | 0.13 % | |
441 | 2022 | Dinas Kesehatan | Perencanaan Puskesmas Bamban | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 624282 | 37156855 | APBDP | 84,890,000 | 84,200,000 | 84,027,000 | 84,027,000 | 83,700,000 | 83,700,000 | 0 | 83,700,000 | 2022-11-30 | 2022-12-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 863,000 | 1.02 % | |
442 | 2022 | Sekretariat DPRD | Pembuatan WC Pos Jaga & Kantin | Pengadaan Langsung | Pekerjaan Konstruksi | 625282 | 37432316 | APBD | 157,000,000 | 156,933,051 | 156,772,101 | 156,772,101 | 156,666,000 | 0 | 0 | 0 | 2022-11-15 | 2022-11-18 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 227,899 | 0.15 % | |
443 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 626282 | 36719638 | APBDP | 198,600,000 | 198,600,000 | 198,298,039 | 198,298,039 | 198,198,000 | 198,198,000 | 0 | 198,198,000 | 2022-11-16 | 2022-11-21 | cv. bumi mandiri | 02.089.892.0-733.000 | 301,961 | 0.15 % | |
444 | 2022 | Dinas Perdagangan | Rehab Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Pekerjaan Konstruksi | 627282 | 36791468 | APBDP | 195,000,000 | 194,994,020 | 194,355,609 | 194,355,609 | 194,244,600 | 194,244,600 | 194,244,600 | 194,244,600 | 2022-11-11 | 2022-11-15 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 644,391 | 0.33 % | |
445 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 628282 | 36719576 | APBDP | 198,600,000 | 198,600,000 | 198,317,526 | 198,317,526 | 198,230,000 | 198,230,000 | 0 | 198,230,000 | 2022-11-15 | 2022-11-21 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 282,474 | 0.14 % | |
446 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi Panggung Terbuka dan Kamar Ganti di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 629282 | 36828104 | APBD | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,922,000 | 19,922,000 | 19,922,000 | 19,922,000 | 2022-11-18 | 2022-11-25 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 20,000 | 0.1 % | |
447 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 630282 | 36828175 | APBD | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,948,000 | 19,948,000 | 19,948,000 | 19,948,000 | 2022-11-18 | 2022-11-25 | cv. vertical project | 03.169.392.2-734.000 | 0 | 0 % | |
448 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan,Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 631282 | 36734545 | APBDP | 198,600,000 | 198,600,000 | 198,544,366 | 198,544,366 | 198,447,000 | 198,447,000 | 0 | 198,447,000 | 2022-11-17 | 2022-11-22 | cv. akur bersaudara | 02.675.570.2-735.000 | 55,634 | 0.03 % | |
449 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes Baladul Amin, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 632282 | 36734582 | APBDP | 198,600,000 | 198,600,000 | 198,544,366 | 198,544,366 | 198,280,000 | 198,280,000 | 0 | 198,280,000 | 2022-11-17 | 2022-11-22 | CV. AL QAWS | 70.619.811.6-733.000 | 55,634 | 0.03 % | |
450 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes An Noor Putri, Desa Pihanin Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 633282 | 37205917 | APBDP | 160,000,000 | 160,000,000 | 159,595,800 | 159,595,800 | 159,484,800 | 159,484,800 | 0 | 159,484,800 | 2022-11-17 | 2022-11-22 | CV. AL QAWS | 70.619.811.6-733.000 | 404,200 | 0.25 % | |
451 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes An Noor Putra, Desa Pihanin Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 634282 | 37205868 | APBDP | 200,000,000 | 200,000,000 | 199,400,123 | 199,400,123 | 199,350,000 | 199,350,000 | 0 | 199,350,000 | 2022-11-16 | 2022-11-22 | CV. AL QAWS | 70.619.811.6-733.000 | 599,878 | 0.3 % | |
452 | 2022 | Kecamatan Kandangan | Bantuan Hibah Pemasangan Daya Listrik untuk Warga Tidak Mampu | Pengadaan Langsung | Pekerjaan Konstruksi | 635282 | 32526517 | APBD | 52,000,000 | 51,687,000 | 51,630,540 | 51,630,540 | 51,550,000 | 51,550,000 | 51,550,000 | 51,550,000 | 2022-11-18 | 2022-11-22 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 369,460 | 0.71 % | |
453 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 636282 | 36828058 | APBD | 22,000,000 | 22,000,000 | 21,978,000 | 21,978,000 | 21,926,000 | 21,926,000 | 21,926,000 | 21,926,000 | 2022-11-14 | 2022-11-23 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 22,000 | 0.1 % | |
454 | 2022 | Sekretariat Daerah | konsultan pengawasan rehab gudang peralatan ( samping pendopo Kab) dan Pengawasan Rehab Kantor Setda Kab.HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 637282 | 35667104;35853702 | APBD | 18,200,000 | 17,959,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 2022-11-16 | 2022-11-23 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 351,200 | 1.93 % | |
455 | 2022 | Sekretariat Daerah | Belanja Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 638282 | 36834295 | APBDP | 60,000,000 | 59,967,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 2022-11-16 | 2022-11-23 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 143,250 | 0.24 % | |
456 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tawia di Desa Tawia Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 639282 | 36861303 | APBDP | 197,500,000 | 197,411,918 | 197,123,318 | 197,123,318 | 197,012,000 | 197,012,000 | 197,012,000 | 197,012,000 | 2022-11-21 | 2022-11-28 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 376,682 | 0.19 % | |
457 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Kantor (Rehabilitasi Kantor Setda Kab. HSS) | Pengadaan Langsung | Pekerjaan Konstruksi | 640282 | 37511826 | APBDP | 170,000,000 | 169,996,600 | 169,755,733 | 169,755,733 | 169,755,700 | 169,755,700 | 169,755,700 | 169,755,700 | 2022-11-16 | 2022-11-23 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 244,267 | 0.14 % | |
458 | 2022 | Dinas Kesehatan | Pemeliharaan Bangunan Dinas Kesehatan | Pengadaan Langsung | Pekerjaan Konstruksi | 641282 | 37147229 | APBDP | 75,000,000 | 70,588,000 | 70,427,269 | 70,427,269 | 70,000,000 | 70,000,000 | 0 | 70,000,000 | 2022-11-25 | 2022-11-29 | CV. Jaya Engineering | 02.941.119.6-734.000 | 4,572,731 | 6.1 % | |
459 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pemasangan Turab Baja / Beton Jalan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 642282 | 37106832 | APBDP | 70,000,000 | 69,965,500 | 69,857,850 | 69,857,850 | 69,857,850 | 0 | 0 | 0 | 2022-11-19 | 2022-11-29 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 142,150 | 0.2 % | |
460 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Peninggian Jalan Desa | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 645282 | 37100742 | APBDP | 100,000,000 | 99,706,000 | 99,578,100 | 99,578,100 | 99,578,100 | 0 | 0 | 0 | 2022-11-18 | 2022-11-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 421,900 | 0.42 % | |
461 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 646282 | 36659543 | APBDP | 15,000,000 | 14,971,567 | 14,859,570 | 14,859,570 | 14,848,000 | 14,848,000 | 14,848,000 | 14,848,000 | 2022-11-16 | 2022-11-22 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 140,430 | 0.94 % | |
462 | 2022 | RSUD Daha Sejahtera | Pengadaan Parkir | Pengadaan Langsung | Pekerjaan Konstruksi | 647282 | 36926774 | BLUD | 370,000,000 | 199,996,935 | 199,803,431 | 199,803,431 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-11-25 | 2022-11-29 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 170,196,569 | 46 % | |
463 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pembukaan dan Penutupan PEPARPROV HSS | Pengadaan Langsung | Jasa Lainnya | 648282 | 36793117 | APBDP | 200,000,000 | 199,800,000 | 199,633,500 | 199,633,500 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-11-17 | 2022-11-21 | Mitra Razqa Zolution | 63.995.553.3-731.000 | 366,500 | 0.18 % | |
464 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 649282 | 37307509 | APBDP | 17,500,000 | 17,500,000 | 17,418,173 | 17,418,173 | 17,316,000 | 17,316,000 | 17,316,000 | 17,316,000 | 2022-11-19 | 2022-11-24 | Wiyasa Drawana | 80.902.072.0-731.000 | 81,827 | 0.47 % | |
465 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Pengecatan Gedung 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 650282 | 37105884 | APBDP | 100,000,000 | 99,979,000 | 99,750,288 | 99,750,288 | 99,750,200 | 0 | 0 | 0 | 2022-11-22 | 2022-12-05 | cv. bumi mandiri | 02.089.892.0-733.000 | 249,712 | 0.25 % | |
466 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tatah di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 651282 | 36860919 | APBDP | 152,500,000 | 152,421,310 | 152,215,960 | 152,215,960 | 152,077,000 | 152,077,000 | 152,077,000 | 152,077,000 | 2022-11-21 | 2022-11-25 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 284,040 | 0.19 % | |
467 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 652282 | 36861124 | APBDP | 181,250,000 | 181,160,549 | 180,955,199 | 180,955,199 | 180,816,000 | 180,816,000 | 180,816,000 | 180,816,000 | 2022-11-21 | 2022-11-25 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 294,801 | 0.16 % | |
468 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pembangunan Jembatan Desa Teraban Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 653282 | 37106430 | APBDP | 100,000,000 | 99,986,000 | 99,866,700 | 99,866,700 | 99,866,700 | 0 | 0 | 0 | 2022-11-22 | 2022-11-30 | CV. R-PLAN ARSIMETRIKA | 31.715.969.7-731.000 | 133,300 | 0.13 % | |
469 | 2022 | RSUD Daha Sejahtera | Perencanaan Pembangunan Mushola RSUD Daha Sejahtera,Perencanaan Penataan halaman (pemasangan paving block) halaman RSUD Daha Sejahtera (Konsolidasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 655282 | 36826027;36926869 | APBDP | 55,000,000 | 54,922,236 | 54,792,375 | 54,792,375 | 54,500,000 | 54,500,000 | 54,500,000 | 54,500,000 | 2022-11-30 | 2022-12-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 207,625 | 0.38 % | |
470 | 2022 | RSUD Daha Sejahtera | Pengawasan Pengurugan Lahan RSDS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 656282 | 36825951 | APBDP | 80,000,000 | 79,997,910 | 79,875,600 | 79,875,600 | 79,500,000 | 79,500,000 | 79,500,000 | 79,500,000 | 2022-11-28 | 2022-11-30 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 124,400 | 0.16 % | |
471 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pembangunan Jembatan Desa Batu Tumbuk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 657282 | 37106715 | APBDP | 100,000,000 | 99,986,000 | 99,860,040 | 99,860,040 | 99,860,040 | 0 | 0 | 0 | 2022-11-22 | 2022-11-30 | CV. R-PLAN ARSIMETRIKA | 31.715.969.7-731.000 | 139,960 | 0.14 % | |
472 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 658282 | 36860996 | APBDP | 13,750,000 | 13,750,000 | 13,545,900 | 13,545,900 | 13,497,600 | 13,497,600 | 13,497,600 | 13,497,600 | 2022-11-23 | 2022-11-28 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 204,100 | 1.48 % | |
473 | 2022 | Dinas Kesehatan | Jasa Apraisal | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 659282 | 36775993 | APBDP | 50,000,000 | 49,217,400 | 49,106,400 | 49,106,400 | 49,000,000 | 49,000,000 | 0 | 49,000,000 | 2022-11-25 | 2022-11-29 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 893,600 | 1.79 % | |
474 | 2022 | RSUD Brigjen H. Hasan Basry | Belanja Instalasi Kabel 20kV Panel Induk dan tambahannya | Pengadaan Langsung | Jasa Lainnya | 660282 | 36893158 | BLUD | 284,024,299 | 180,375,000 | 177,799,800 | 177,799,800 | 177,771,000 | 177,771,000 | 177,771,000 | 177,771,000 | 2022-12-01 | 2022-12-07 | PT.Murakata Multi Power | 72.936.620.3-733.000 | 106,224,499 | 37.4 % | |
475 | 2022 | RSUD Daha Sejahtera | Pengawasan Pengadaan Parkir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 661282 | 36926786 | BLUD | 25,000,000 | 24,999,999 | 24,880,650 | 24,880,650 | 24,500,000 | 24,500,000 | 24,500,000 | 24,500,000 | 2022-11-28 | 2022-11-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 119,350 | 0.48 % | |
476 | 2022 | Dinas Kesehatan | Perencanaan Puskesmas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 663282 | 37157022 | APBDP | 95,910,100 | 94,000,000 | 93,906,000 | 93,906,000 | 93,500,000 | 93,500,000 | 0 | 93,500,000 | 2022-11-29 | 2022-11-30 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 2,004,100 | 2.09 % | |
477 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultasi Reviu Perencanaan Asrama Amuk Hantarukung Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 664282 | 36716353 | APBDP | 30,000,000 | 30,000,000 | 29,481,600 | 29,481,600 | 29,429,000 | 29,429,000 | 29,429,000 | 29,429,000 | 2022-12-06 | 2022-12-12 | Wing Rastafarindo | 03.282.590.3-732.000 | 518,400 | 1.73 % | |
478 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Jl. Budi Bakti - 3 Desember Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 665282 | 37906569 | APBD | 140,000,000 | 139,987,627 | 139,932,113 | 139,932,113 | 139,876,000 | 139,876,000 | 139,876,000 | 139,876,000 | 2022-12-06 | 2022-12-13 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 67,887 | 0.05 % | |
479 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Pembangunan Fasilitas Kawasan Objek Wisata Air Panas Tanuhi (dukungan DAK Fisik Pariwisata TA. 2023) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 666282 | 37635619 | APBDP | 30,000,000 | 30,000,000 | 29,863,440 | 29,863,440 | 29,813,000 | 29,813,000 | 29,813,000 | 29,813,000 | 2022-12-06 | 2022-12-09 | cv. vertical project | 03.169.392.2-734.000 | 136,560 | 0.46 % | |
480 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Hamalau - Telaga Bidadari Kec. Sungai Raya) | Pengadaan Langsung | Pekerjaan Konstruksi | 667282 | 37906679 | APBD | 198,100,000 | 198,065,815 | 197,876,077 | 197,876,077 | 197,831,000 | 197,831,000 | 197,831,000 | 197,831,000 | 2022-12-06 | 2022-12-12 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 223,923 | 0.11 % | |
481 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penyediaan Biaya Pemeliharaan Rutin RTH di Seluruh Wilayah Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 668282 | 31836615 | APBD | 150,000,000 | 149,916,000 | 149,644,650 | 149,644,650 | 149,500,000 | 149,500,000 | 149,500,000 | 149,500,000 | 2022-12-07 | 2022-12-09 | CV. Jaya Engineering | 02.941.119.6-734.000 | 355,350 | 0.24 % | |
482 | 2022 | Dinas Perhubungan | Pemeliharaan Rambu Bersuar | Pengadaan Langsung | Jasa Lainnya | 669282 | 37890991 | APBD | 100,000,000 | 96,475,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 2022-12-07 | 2022-12-14 | CV. KATIBURA | 53.260.332.1-733.000 | 3,574,000 | 3.57 % | |
483 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Pendataan dan Pemetaan Rumah Sewa Milik Masyarakat, Rumah Susun dan Rumah Khusus | Pengadaan Langsung | Jasa Lainnya | 670282 | 32398687 | APBD | 40,000,000 | 39,779,070 | 39,557,070 | 39,557,070 | 39,400,000 | 39,400,000 | 39,400,000 | 39,400,000 | 2022-12-07 | 2022-12-12 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 442,930 | 1.11 % | |
484 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Penyusunan Profil Keanekaragaman Hayati (kehati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 671282 | 36810660 | APBD | 85,000,000 | 84,136,000 | 83,282,190 | 83,282,190 | 83,100,000 | 83,100,000 | 83,100,000 | 83,100,000 | 2022-12-07 | 2022-12-12 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 1,717,810 | 2.02 % | |
485 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemutakhiran Data Sungai di Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 672282 | 38057109 | APBD | 100,000,000 | 99,983,250 | 99,977,700 | 99,977,700 | 99,766,800 | 99,766,800 | 99,766,800 | 99,766,800 | 2022-12-09 | 2022-12-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 22,300 | 0.02 % | |
486 | 2022 | Dinas Perdagangan | Pengurugan Pasar Rakyat Terpadu (Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Pertokoan/Koperasi/Pasar) | Pengadaan Langsung | Pekerjaan Konstruksi | 673282 | 38183357 | APBDP | 53,000,000 | 52,996,571 | 52,968,821 | 52,968,821 | 52,952,000 | 52,952,000 | 52,952,000 | 52,952,000 | 2022-12-16 | 2022-12-20 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 31,179 | 0.06 % | |
487 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Penanganan Longsor Ruas Jalan Sp. 4 Lungau Garis Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 676282 | 38339712 | APBD | 171,850,000 | 171,809,452 | 171,698,452 | 171,698,452 | 171,615,000 | 171,615,000 | 171,615,000 | 171,615,000 | 2022-12-26 | 2022-12-27 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 151,548 | 0.09 % | |
488 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Sungai Minting Desa Malutu dan Desa Batu Laki Kec. Padang Batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 678282 | 38552772 | APBDP | 91,500,000 | 91,388,467 | 91,083,159 | 91,083,159 | 90,905,000 | 90,905,000 | 90,905,000 | 90,905,000 | 2022-12-26 | 2022-12-28 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 416,841 | 0.46 % | |
489 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Wasah Tengah (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5794282 | 31455798 | APBD | 60,000,000 | 60,000,000 | 59,900,500 | 59,900,500 | 59,686,000 | 59,686,000 | 0 | 59,686,000 | 2022-03-14 | 2022-03-22 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 99,500 | 0.17 % | |
490 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Rekonstruksi Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5798282 | 31562759 | APBD | 99,650,000 | 99,640,188 | 99,000,900 | 99,000,900 | 0 | 99,000,900 | 0 | 0 | 2022-03-23 | 2022-03-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 649,100 | 0.65 % | |
491 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Rekonstruksi Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5798282 | 31562759 | APBD | 99,650,000 | 99,640,188 | 99,000,900 | 99,000,900 | 0 | 99,000,900 | 0 | 0 | 2022-03-23 | 2022-03-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 649,100 | 0.65 % | |
492 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 5799282 | 31454060 | APBD | 119,700,000 | 119,532,367 | 118,926,819 | 118,927,851 | 118,795,000 | 118,795,000 | 0 | 118,795,000 | 2022-01-27 | 2022-02-02 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 773,181 | 0.65 % | |
493 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 5799282 | 31454060 | APBD | 119,700,000 | 119,532,367 | 118,926,819 | 118,927,851 | 118,795,000 | 118,795,000 | 0 | 0 | 2022-01-27 | 2022-02-02 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 773,181 | 0.65 % | |
494 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5800282 | 31454069 | APBD | 149,700,000 | 149,564,333 | 149,008,750 | 149,008,750 | 148,920,000 | 148,920,000 | 0 | 148,920,000 | 2022-01-27 | 2022-02-02 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 691,250 | 0.46 % | |
495 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5800282 | 31454069 | APBD | 149,700,000 | 149,564,333 | 149,008,750 | 149,008,750 | 148,920,000 | 148,920,000 | 0 | 0 | 2022-01-27 | 2022-02-02 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 691,250 | 0.46 % | |
496 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Penggantian Jembatan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5801282 | 31551911 | APBD | 99,650,000 | 99,645,821 | 99,568,121 | 99,568,121 | 99,483,750 | 99,483,750 | 0 | 0 | 2022-03-22 | 2022-03-29 | Cv.demah adyatma cipta | 94.456.539.9-731.000 | 81,879 | 0.08 % | |
497 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Penggantian Jembatan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5801282 | 31551911 | APBD | 99,650,000 | 99,645,821 | 99,568,121 | 99,568,121 | 99,483,750 | 99,483,750 | 0 | 0 | 2022-03-22 | 2022-03-29 | Cv.demah adyatma cipta | 94.456.539.9-731.000 | 81,879 | 0.08 % | |
498 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Aliyaman (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5802282 | 31455772 | APBD | 60,000,000 | 60,000,000 | 59,950,500 | 59,950,500 | 59,840,500 | 59,840,500 | 0 | 59,840,500 | 2022-02-15 | 2022-02-18 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 49,500 | 0.08 % | |
499 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Bamban Utara 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5803282 | 31455791 | APBD | 60,000,000 | 60,000,000 | 59,969,800 | 59,969,800 | 59,840,000 | 59,840,000 | 0 | 59,840,000 | 2022-03-14 | 2022-03-22 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,200 | 0.05 % | |
500 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Kayu Abang (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5805282 | 31455820 | APBD | 60,000,000 | 60,000,000 | 59,900,000 | 59,900,000 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-15 | 2022-02-18 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.17 % | |
501 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Jarau 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5806282 | 31455804 | APBD | 60,000,000 | 60,000,000 | 59,900,500 | 59,900,500 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-18 | 2022-02-25 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 99,500 | 0.17 % | |
502 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Pemeliharaan Berkala Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5809282 | 31576981 | APBD | 99,650,000 | 99,640,188 | 99,234,000 | 99,234,000 | 99,196,000 | 99,196,000 | 0 | 0 | 2022-03-30 | 2022-04-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 416,000 | 0.42 % | |
503 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Pemeliharaan Berkala Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5809282 | 31576981 | APBD | 99,650,000 | 99,640,188 | 99,234,000 | 99,234,000 | 99,196,000 | 99,196,000 | 0 | 0 | 2022-03-30 | 2022-04-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 416,000 | 0.42 % | |
504 | 2022 | Dinas Ketahanan Pangan | Biaya konsultan perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5810282 | 32068142 | APBD | 10,000,000 | 10,000,000 | 9,982,500 | 9,982,500 | 9,966,000 | 9,966,000 | 0 | 0 | 2022-01-28 | 2022-02-02 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 17,500 | 0.18 % | |
505 | 2022 | Dinas Ketahanan Pangan | Biaya konsultan perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5810282 | 32068142 | APBD | 10,000,000 | 10,000,000 | 9,982,500 | 9,982,500 | 9,966,000 | 9,966,000 | 0 | 0 | 2022-01-28 | 2022-02-02 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 17,500 | 0.18 % | |
506 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5812282 | 32562183 | APBD | 20,000,000 | 20,000,000 | 19,745,000 | 0 | 19,690,000 | 19,690,000 | 19,690,000 | 19,690,000 | 2022-01-31 | 2022-02-03 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 255,000 | 1.28 % | |
507 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5812282 | 32562183 | APBD | 20,000,000 | 20,000,000 | 19,745,000 | 0 | 19,690,000 | 19,690,000 | 0 | 0 | 2022-01-31 | 2022-02-03 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 255,000 | 1.28 % | |
508 | 2022 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Keamanan | Pengadaan Langsung | Jasa Lainnya | 5814282 | 32803943 | BLUD | 200,000,000 | 199,980,000 | 198,664,338 | 198,664,338 | 198,500,000 | 198,500,000 | 198,500,000 | 198,500,000 | 2022-03-05 | 2022-03-11 | PT VISADA PRATAMA INDONESIA | 66.511.969.9-731.000 | 1,335,662 | 0.67 % | |
509 | 2022 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Keamanan | Pengadaan Langsung | Jasa Lainnya | 5814282 | 32803943 | BLUD | 200,000,000 | 199,980,000 | 198,664,338 | 198,664,338 | 198,500,000 | 198,500,000 | 0 | 0 | 2022-03-05 | 2022-03-11 | PT VISADA PRATAMA INDONESIA | 66.511.969.9-731.000 | 1,335,662 | 0.67 % | |
510 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 5816282 | 31454094 | APBD | 164,700,000 | 164,333,612 | 164,058,172 | 164,058,172 | 163,783,000 | 163,783,000 | 0 | 163,783,000 | 2022-02-04 | 2022-02-08 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 641,828 | 0.39 % | |
511 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 5816282 | 31454094 | APBD | 164,700,000 | 164,333,612 | 164,058,172 | 164,058,172 | 163,783,000 | 163,783,000 | 0 | 0 | 2022-02-04 | 2022-02-08 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 641,828 | 0.39 % | |
512 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 5817282 | 31454084 | APBD | 188,850,000 | 188,636,080 | 188,004,130 | 188,004,130 | 187,938,000 | 187,938,000 | 0 | 187,938,000 | 2022-02-04 | 2022-02-09 | CV. Haratai Permai | 02.089.737.7-733.000 | 845,871 | 0.45 % | |
513 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Upacara SMPN 4 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 5820282 | 31634633 | APBD | 150,000,000 | 149,943,857 | 149,150,719 | 149,150,719 | 149,048,933 | 149,048,933 | 0 | 0 | 2022-02-21 | 2022-03-02 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 849,281 | 0.57 % | |
514 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Upacara SMPN 4 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 5820282 | 31634633 | APBD | 150,000,000 | 149,943,857 | 149,150,719 | 149,150,719 | 149,048,933 | 149,048,933 | 0 | 0 | 2022-02-21 | 2022-03-02 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 849,281 | 0.57 % | |
515 | 2022 | RSUD Daha Sejahtera | Belanja Bahan Habis Pakai Kimia Darah dan Hematologi Analyzer 3 Diff | Pengadaan Langsung | Pengadaan Barang | 5825282 | 32680506 | BLUD | 400,000,000 | 188,980,000 | 182,580,500 | 182,580,500 | 182,000,000 | 182,000,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 217,419,500 | 54.35 % | |
516 | 2022 | RSUD Daha Sejahtera | Belanja Bahan Habis Pakai Kimia Darah dan Hematologi Analyzer 3 Diff | Pengadaan Langsung | Pengadaan Barang | 5825282 | 32680506 | BLUD | 400,000,000 | 188,980,000 | 182,580,500 | 182,580,500 | 182,000,000 | 182,000,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 217,419,500 | 54.35 % | |
517 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DIR. Sungai Kajang (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5830282 | 31455826 | APBD | 60,000,000 | 60,000,000 | 59,900,000 | 59,900,000 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-11 | 2022-02-16 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.17 % | |
518 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Tawia (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5831282 | 31455813 | APBD | 60,000,000 | 60,000,000 | 59,950,500 | 59,950,500 | 59,840,000 | 59,840,000 | 0 | 59,840,000 | 2022-02-11 | 2022-02-16 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 49,500 | 0.08 % | |
519 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Alat Test Urine | Pengadaan Langsung | Pengadaan Barang | 5833282 | 32140150 | APBD | 68,500,000 | 68,475,000 | 68,310,000 | 68,310,000 | 68,310,000 | 68,310,000 | 0 | 0 | 2022-02-25 | 2022-03-07 | FADWI UTAMA | 94.246.044.5-733.000 | 190,000 | 0.28 % | |
520 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Alat Test Urine | Pengadaan Langsung | Pengadaan Barang | 5833282 | 32140150 | APBD | 68,500,000 | 68,475,000 | 68,310,000 | 68,310,000 | 68,310,000 | 68,310,000 | 0 | 0 | 2022-02-25 | 2022-03-07 | FADWI UTAMA | 94.246.044.5-733.000 | 190,000 | 0.28 % | |
521 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pada Daerah Kabupaten/ Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5834282 | 31933469 | APBD | 39,150,000 | 38,926,360 | 38,797,000 | 38,797,000 | 38,650,000 | 38,650,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 353,000 | 0.9 % | |
522 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pada Daerah Kabupaten/ Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5834282 | 31933469 | APBD | 39,150,000 | 38,926,360 | 38,797,000 | 38,797,000 | 38,650,000 | 38,650,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 353,000 | 0.9 % | |
523 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5836282 | 31933412 | APBD | 12,200,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 265,000 | 2.17 % | |
524 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5836282 | 31933412 | APBD | 12,200,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 265,000 | 2.17 % | |
525 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5838282 | 31707287 | APBD | 12,300,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 365,000 | 2.97 % | |
526 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5838282 | 31707287 | APBD | 12,300,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 365,000 | 2.97 % | |
527 | 2022 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5839282 | 31840523 | APBD | 100,000,000 | 99,955,625 | 99,495,000 | 99,495,000 | 99,440,000 | 99,440,000 | 0 | 0 | 2022-02-18 | 2022-02-28 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 505,000 | 0.51 % | |
528 | 2022 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5839282 | 31840523 | APBD | 100,000,000 | 99,955,625 | 99,495,000 | 99,495,000 | 99,440,000 | 99,440,000 | 0 | 0 | 2022-02-18 | 2022-02-28 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 505,000 | 0.51 % | |
529 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Pakan Dalam 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 5841282 | 31649599 | APBD | 105,000,000 | 104,823,408 | 104,441,494 | 104,441,494 | 104,325,994 | 104,325,994 | 0 | 0 | 2022-03-15 | 2022-03-22 | CV. KHALIF | 81.540.809.1-733.000 | 558,506 | 0.53 % | |
530 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Pakan Dalam 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 5841282 | 31649599 | APBD | 105,000,000 | 104,823,408 | 104,441,494 | 104,441,494 | 104,325,994 | 104,325,994 | 0 | 0 | 2022-03-15 | 2022-03-22 | CV. KHALIF | 81.540.809.1-733.000 | 558,506 | 0.53 % | |
531 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kantor/ Guru/ Pkg SDN Sungai Raya Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 5842282 | 31649656 | APBD | 125,000,000 | 124,957,246 | 124,818,407 | 124,818,407 | 124,263,000 | 124,263,000 | 0 | 124,263,000 | 2022-04-20 | 2022-04-27 | CV.DITA | 02.242.686.0-733.000 | 181,593 | 0.15 % | |
532 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Stadion dan Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5849282 | 31716547 | APBD | 65,000,000 | 64,935,000 | 63,984,872 | 63,984,872 | 63,963,000 | 63,963,000 | 0 | 0 | 2022-03-25 | 2022-03-31 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,015,128 | 1.56 % | |
533 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Stadion dan Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5849282 | 31716547 | APBD | 65,000,000 | 64,935,000 | 63,984,872 | 63,984,872 | 63,963,000 | 63,963,000 | 0 | 0 | 2022-03-25 | 2022-03-31 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,015,128 | 1.56 % | |
534 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5850282 | 32563078 | APBD | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,690,000 | 19,690,000 | 19,690,000 | 19,690,000 | 2022-03-14 | 2022-03-18 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,000 | 0.28 % | |
535 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5850282 | 32563078 | APBD | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,690,000 | 19,690,000 | 0 | 0 | 2022-03-14 | 2022-03-18 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,000 | 0.28 % | |
536 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMPN 6 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5852282 | 31634623 | APBD | 150,000,000 | 149,946,057 | 149,780,257 | 149,780,257 | 149,710,957 | 149,710,957 | 0 | 0 | 2022-02-22 | 2022-02-28 | FADWI UTAMA | 94.246.044.5-733.000 | 219,743 | 0.15 % | |
537 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMPN 6 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5852282 | 31634623 | APBD | 150,000,000 | 149,946,057 | 149,780,257 | 149,780,257 | 149,710,957 | 149,710,957 | 0 | 0 | 2022-02-22 | 2022-02-28 | FADWI UTAMA | 94.246.044.5-733.000 | 219,743 | 0.15 % | |
538 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5853282 | 32563043 | APBD | 19,875,000 | 19,875,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,400,000 | 19,400,000 | 19,400,000 | 2022-02-24 | 2022-03-02 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 75,000 | 0.38 % | |
539 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5853282 | 32563043 | APBD | 19,875,000 | 19,875,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,400,000 | 0 | 0 | 2022-02-24 | 2022-03-02 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 75,000 | 0.38 % | |
540 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5855282 | 32562634 | APBD | 19,950,000 | 19,950,000 | 19,855,000 | 19,855,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2022-03-08 | 2022-03-14 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 95,000 | 0.48 % | |
541 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5855282 | 32562634 | APBD | 19,950,000 | 19,950,000 | 19,855,000 | 19,855,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2022-03-08 | 2022-03-14 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 95,000 | 0.48 % | |
542 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5856282 | 32563401 | APBD | 18,500,000 | 18,500,000 | 18,370,000 | 18,370,000 | 18,293,000 | 18,293,000 | 18,293,000 | 18,293,000 | 2022-03-02 | 2022-03-07 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 130,000 | 0.7 % | |
543 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5856282 | 32563401 | APBD | 18,500,000 | 18,500,000 | 18,370,000 | 18,370,000 | 18,293,000 | 18,293,000 | 0 | 0 | 2022-03-02 | 2022-03-07 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 130,000 | 0.7 % | |
544 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5857282 | 32562064 | APBD | 17,500,000 | 17,500,000 | 17,275,500 | 17,275,500 | 17,215,000 | 17,215,000 | 17,215,000 | 17,215,000 | 2022-02-24 | 2022-03-02 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 224,500 | 1.28 % | |
545 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5857282 | 32562064 | APBD | 17,500,000 | 17,500,000 | 17,275,500 | 17,275,500 | 17,215,000 | 17,215,000 | 0 | 0 | 2022-02-24 | 2022-03-02 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 224,500 | 1.28 % | |
546 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5858282 | 32563084 | APBD | 20,000,000 | 20,000,000 | 19,910,000 | 19,910,000 | 19,855,000 | 19,855,000 | 19,855,000 | 19,855,000 | 2022-03-08 | 2022-03-14 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 90,000 | 0.45 % | |
547 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5858282 | 32563084 | APBD | 20,000,000 | 20,000,000 | 19,910,000 | 19,910,000 | 19,855,000 | 19,855,000 | 0 | 0 | 2022-03-08 | 2022-03-14 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 90,000 | 0.45 % | |
548 | 2022 | Dinas Perdagangan | Perencanaan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5859282 | 32563071 | APBD | 19,750,000 | 19,750,000 | 19,690,000 | 19,690,000 | 19,635,000 | 19,635,000 | 19,635,000 | 19,635,000 | 2022-03-02 | 2022-03-07 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 60,000 | 0.3 % | |
549 | 2022 | Dinas Perdagangan | Perencanaan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5859282 | 32563071 | APBD | 19,750,000 | 19,750,000 | 19,690,000 | 19,690,000 | 19,635,000 | 19,635,000 | 0 | 0 | 2022-03-02 | 2022-03-07 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 60,000 | 0.3 % | |
550 | 2022 | Dinas Perdagangan | Perencanaan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5860282 | 32563058 | APBD | 18,500,000 | 18,500,000 | 18,452,500 | 18,452,500 | 18,370,000 | 18,370,000 | 18,370,000 | 18,370,000 | 2022-03-02 | 2022-03-07 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 47,500 | 0.26 % | |
551 | 2022 | Dinas Perdagangan | Perencanaan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5860282 | 32563058 | APBD | 18,500,000 | 18,500,000 | 18,452,500 | 18,452,500 | 18,370,000 | 18,370,000 | 0 | 0 | 2022-03-02 | 2022-03-07 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 47,500 | 0.26 % | |
552 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5861282 | 32563048 | APBD | 19,950,000 | 19,950,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,745,000 | 19,745,000 | 2022-02-24 | 2022-03-02 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 150,000 | 0.75 % | |
553 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5861282 | 32563048 | APBD | 19,950,000 | 19,950,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 0 | 0 | 2022-02-24 | 2022-03-02 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 150,000 | 0.75 % | |
554 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Asam (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5862282 | 31455786 | APBD | 60,000,000 | 60,000,000 | 59,969,800 | 59,969,800 | 59,840,000 | 59,840,000 | 59,840,000 | 59,840,000 | 2022-02-18 | 2022-02-24 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,200 | 0.05 % | |
555 | 2022 | Dinas Pendidikan dan Kebudayaan | pengadaan printer + fotokopi | Pengadaan Langsung | Pengadaan Barang | 5863282 | 33866625 | APBD | 70,000,000 | 69,993,000 | 69,931,400 | 69,931,400 | 0 | 69,931,400 | 0 | 0 | 2022-02-22 | 2022-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 68,600 | 0.1 % | |
556 | 2022 | Dinas Pendidikan dan Kebudayaan | pengadaan printer + fotokopi | Pengadaan Langsung | Pengadaan Barang | 5863282 | 33866625 | APBD | 70,000,000 | 69,993,000 | 69,931,400 | 69,931,400 | 0 | 69,931,400 | 0 | 0 | 2022-02-22 | 2022-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 68,600 | 0.1 % | |
557 | 2022 | Dinas Perhubungan | Pengadaan alat Uji Lampu Utama (headlight tester) | Pengadaan Langsung | Pengadaan Barang | 5864282 | 32020581 | APBD | 170,000,000 | 169,950,000 | 169,895,000 | 169,895,000 | 169,840,000 | 0 | 0 | 0 | 2022-02-24 | 2022-03-02 | CV BUANA INTI PERSADA | 31.297.283.9-451.000 | 105,000 | 0.06 % | |
558 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Bakar dan Pelumas | Pengadaan Langsung | Pengadaan Barang | 5865282 | 32180283 | APBD | 129,402,500 | 129,247,250 | 129,100,400 | 129,100,400 | 128,900,000 | 128,900,000 | 0 | 0 | 2022-03-08 | 2022-03-10 | CV. KHALIF | 81.540.809.1-733.000 | 302,100 | 0.23 % | |
559 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Bakar dan Pelumas | Pengadaan Langsung | Pengadaan Barang | 5865282 | 32180283 | APBD | 129,402,500 | 129,247,250 | 129,100,400 | 129,100,400 | 128,900,000 | 128,900,000 | 0 | 0 | 2022-03-08 | 2022-03-10 | CV. KHALIF | 81.540.809.1-733.000 | 302,100 | 0.23 % | |
560 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Peralatan Personal Computer - Pengadaan Scanner | Pengadaan Langsung | Pengadaan Barang | 5866282 | 31981860 | APBD | 77,974,800 | 77,972,000 | 77,820,000 | 77,820,000 | 77,820,000 | 77,820,000 | 0 | 0 | 2022-02-25 | 2022-03-07 | CV. HITRO | 02.918.384.5-733.000 | 154,800 | 0.2 % | |
561 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Peralatan Personal Computer - Pengadaan Scanner | Pengadaan Langsung | Pengadaan Barang | 5866282 | 31981860 | APBD | 77,974,800 | 77,972,000 | 77,820,000 | 77,820,000 | 77,820,000 | 77,820,000 | 0 | 0 | 2022-02-25 | 2022-03-07 | CV. HITRO | 02.918.384.5-733.000 | 154,800 | 0.2 % | |
562 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Semi Indoor Takraw | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5870282 | 31716302 | APBD | 65,000,000 | 64,935,000 | 64,840,650 | 64,840,650 | 64,800,000 | 64,800,000 | 0 | 0 | 2022-03-25 | 2022-03-30 | cv.akmalindo | 02.531.482.4-731.000 | 159,350 | 0.25 % | |
563 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Semi Indoor Takraw | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5870282 | 31716302 | APBD | 65,000,000 | 64,935,000 | 64,840,650 | 64,840,650 | 64,800,000 | 64,800,000 | 0 | 0 | 2022-03-25 | 2022-03-30 | cv.akmalindo | 02.531.482.4-731.000 | 159,350 | 0.25 % | |
564 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Pembangunan RTH Stadion 2 Desember,Belanja Konsultansi Perencanaan Pemeliharaan Tugu Dodol,Belanja Konsultansi Perencanaan Peningkatan Fungsi Hutan Kota Untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Perencanaan Peningkatan TPU Gambah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5873282 | 31818803;31827217;31827252;31827384 | APBD | 58,250,000 | 57,437,160 | 57,315,499 | 57,315,499 | 57,177,000 | 57,177,000 | 0 | 0 | 2022-03-08 | 2022-03-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 934,501 | 1.6 % | |
565 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Pembangunan RTH Stadion 2 Desember,Belanja Konsultansi Perencanaan Pemeliharaan Tugu Dodol,Belanja Konsultansi Perencanaan Peningkatan Fungsi Hutan Kota Untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Perencanaan Peningkatan TPU Gambah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5873282 | 31818803;31827217;31827252;31827384 | APBD | 58,250,000 | 57,437,160 | 57,315,499 | 57,315,499 | 57,177,000 | 57,177,000 | 0 | 0 | 2022-03-08 | 2022-03-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 934,501 | 1.6 % | |
566 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Modal Pengadaan Perlengkapan dan Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 5882282 | 32139954 | APBD | 195,000,000 | 194,997,000 | 194,803,400 | 0 | 194,716,500 | 194,716,500 | 0 | 0 | 2022-03-14 | 2022-03-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 196,600 | 0.1 % | |
567 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Modal Pengadaan Perlengkapan dan Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 5882282 | 32139954 | APBD | 195,000,000 | 194,997,000 | 194,803,400 | 0 | 194,716,500 | 194,716,500 | 0 | 0 | 2022-03-14 | 2022-03-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 196,600 | 0.1 % | |
568 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pekerjaan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5883282 | 31707799 | APBD | 42,000,000 | 41,836,080 | 41,514,000 | 41,514,000 | 41,420,000 | 41,420,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 486,000 | 1.16 % | |
569 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pekerjaan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5883282 | 31707799 | APBD | 42,000,000 | 41,836,080 | 41,514,000 | 41,514,000 | 41,420,000 | 41,420,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 486,000 | 1.16 % | |
570 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5884282 | 31933422 | APBD | 12,250,000 | 12,011,450 | 11,990,000 | 11,990,000 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 260,000 | 2.12 % | |
571 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5884282 | 31933422 | APBD | 12,250,000 | 12,011,450 | 11,990,000 | 11,990,000 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 260,000 | 2.12 % | |
572 | 2022 | Sekretariat Daerah | Cetak Cover LPPD, LKPJ, Resume LKPJ dan SPM serta Penggandaan isi LPPD, LKPJ, Resume LKPJ dan SPM, | Pengadaan Langsung | Jasa Lainnya | 5885282 | 34384370;34384536 | APBD | 77,775,000 | 72,371,000 | 72,355,000 | 0 | 72,355,000 | 0 | 0 | 0 | 2022-03-17 | 2022-03-24 | KARYA DWI CHADE | 75.416.433.3-733.000 | 5,420,000 | 6.97 % | |
573 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5888282 | 31665434 | APBD | 14,000,000 | 13,978,168 | 13,882,000 | 13,882,000 | 13,800,000 | 13,800,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 118,000 | 0.84 % | |
574 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5888282 | 31665434 | APBD | 14,000,000 | 13,978,168 | 13,882,000 | 13,882,000 | 13,800,000 | 13,800,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 118,000 | 0.84 % | |
575 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5889282 | 31665261 | APBD | 45,500,000 | 44,893,943 | 44,770,000 | 44,770,000 | 44,680,000 | 44,680,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 730,000 | 1.6 % | |
576 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5889282 | 31665261 | APBD | 45,500,000 | 44,893,943 | 44,770,000 | 44,770,000 | 44,680,000 | 44,680,000 | 0 | 0 | 2022-03-09 | 2022-03-11 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 730,000 | 1.6 % | |
577 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultan Perencanaan Rehabilitasi Kantor Disporapar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5890282 | 32378040 | APBD | 12,000,000 | 11,999,999 | 11,946,000 | 11,946,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2022-03-22 | 2022-03-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 54,000 | 0.45 % | |
578 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultan Perencanaan Rehabilitasi Kantor Disporapar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5890282 | 32378040 | APBD | 12,000,000 | 11,999,999 | 11,946,000 | 11,946,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2022-03-22 | 2022-03-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 54,000 | 0.45 % | |
579 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5896282 | 31632226 | APBD | 59,550,000 | 59,487,897 | 59,212,950 | 59,212,950 | 59,159,000 | 59,159,000 | 0 | 0 | 2022-03-16 | 2022-03-23 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 337,050 | 0.57 % | |
580 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5896282 | 31632226 | APBD | 59,550,000 | 59,487,897 | 59,212,950 | 59,212,950 | 59,159,000 | 59,159,000 | 0 | 0 | 2022-03-16 | 2022-03-23 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 337,050 | 0.57 % | |
581 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SMPN 6 Daha Selatan, SMPN 4 Daha Utara dan Pengawasan Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5897282 | 34579124 | APBD | 29,000,000 | 28,999,860 | 28,770,090 | 28,770,090 | 28,704,600 | 28,704,600 | 0 | 0 | 2022-03-15 | 2022-03-22 | cv.akmalindo | 02.531.482.4-731.000 | 229,910 | 0.79 % | |
582 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SMPN 6 Daha Selatan, SMPN 4 Daha Utara dan Pengawasan Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5897282 | 34579124 | APBD | 29,000,000 | 28,999,860 | 28,770,090 | 28,770,090 | 28,704,600 | 28,704,600 | 0 | 0 | 2022-03-15 | 2022-03-22 | cv.akmalindo | 02.531.482.4-731.000 | 229,910 | 0.79 % | |
583 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Batang Kulur Kiri 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 5898282 | 31649973 | APBD | 100,000,000 | 99,995,634 | 99,940,180 | 99,940,180 | 99,740,929 | 99,740,929 | 0 | 0 | 2022-03-25 | 2022-03-30 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 59,820 | 0.06 % | |
584 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Batang Kulur Kiri 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 5898282 | 31649973 | APBD | 100,000,000 | 99,995,634 | 99,940,180 | 99,940,180 | 99,740,929 | 99,740,929 | 0 | 0 | 2022-03-25 | 2022-03-30 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 59,820 | 0.06 % | |
585 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Dalam Barat 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 5900282 | 31649965 | APBD | 100,000,000 | 99,991,447 | 99,759,563 | 99,759,563 | 99,610,278 | 99,610,278 | 0 | 0 | 2022-03-25 | 2022-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 240,437 | 0.24 % | |
586 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Dalam Barat 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 5900282 | 31649965 | APBD | 100,000,000 | 99,991,447 | 99,759,563 | 99,759,563 | 99,610,278 | 99,610,278 | 0 | 0 | 2022-03-25 | 2022-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 240,437 | 0.24 % | |
587 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bahalayung Desa Lungau Kec. Kandangan untuk Penanggulangan Bencana Banjir (Dana BTT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5921282 | 34294762 | APBD | 100,000,000 | 100,000,000 | 99,948,840 | 99,948,840 | 99,900,000 | 99,900,000 | 0 | 99,900,000 | 2022-04-25 | 2022-04-28 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 51,160 | 0.05 % | |
588 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehabilitasi Ruangan Stadion 2 Desember,Konsultan Pengawas Rehab Kolam Renang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5924282 | 32542029;32542059 | APBD | 77,093,780 | 77,093,700 | 76,879,710 | 76,879,710 | 76,700,000 | 76,700,000 | 0 | 0 | 2022-04-07 | 2022-04-12 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 214,070 | 0.28 % | |
589 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehabilitasi Ruangan Stadion 2 Desember,Konsultan Pengawas Rehab Kolam Renang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5924282 | 32542029;32542059 | APBD | 77,093,780 | 77,093,700 | 76,879,710 | 76,879,710 | 76,700,000 | 76,700,000 | 0 | 0 | 2022-04-07 | 2022-04-12 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 214,070 | 0.28 % | |
590 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehab Pagar dan Pos Keamanan Gedung GOS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5925282 | 32542034 | APBD | 10,800,000 | 10,799,967 | 10,669,320 | 10,669,320 | 10,500,000 | 10,500,000 | 10,500,000 | 10,500,000 | 2022-04-07 | 2022-04-12 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 130,680 | 1.21 % | |
591 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehab Pagar dan Pos Keamanan Gedung GOS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5925282 | 32542034 | APBD | 10,800,000 | 10,799,967 | 10,669,320 | 10,669,320 | 10,500,000 | 10,500,000 | 0 | 0 | 2022-04-07 | 2022-04-12 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 130,680 | 1.21 % | |
592 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung dan Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5926282 | 34799167 | APBD | 25,000,000 | 24,978,899 | 24,780,750 | 24,780,750 | 24,724,700 | 24,724,700 | 0 | 0 | 2022-03-23 | 2022-03-29 | cv.akmalindo | 02.531.482.4-731.000 | 219,250 | 0.88 % | |
593 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung dan Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5926282 | 34799167 | APBD | 25,000,000 | 24,978,899 | 24,780,750 | 24,780,750 | 24,724,700 | 24,724,700 | 0 | 0 | 2022-03-23 | 2022-03-29 | cv.akmalindo | 02.531.482.4-731.000 | 219,250 | 0.88 % | |
594 | 2022 | Inspektorat Daerah | Perencanaan Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5929282 | 34907354 | APBD | 15,000,000 | 14,985,000 | 14,874,000 | 0 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-03-24 | 2022-03-29 | cv.akmalindo | 02.531.482.4-731.000 | 126,000 | 0.84 % | |
595 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli 2 Desember (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5931282 | 31716564 | APBD | 94,500,000 | 94,500,000 | 93,422,500 | 93,422,500 | 93,393,000 | 93,393,000 | 93,393,000 | 93,393,000 | 2022-04-22 | 2022-04-27 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 1,077,500 | 1.14 % | |
596 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pengaspalan Jalan lingkungan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5933282 | 31571774 | APBD | 100,000,000 | 99,984,288 | 99,786,780 | 99,786,780 | 99,675,780 | 99,675,780 | 99,675,780 | 99,675,780 | 2022-03-29 | 2022-04-05 | Wing Rastafarindo | 03.282.590.3-732.000 | 213,220 | 0.21 % | |
597 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pengaspalan Jalan lingkungan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5933282 | 31571774 | APBD | 100,000,000 | 99,984,288 | 99,786,780 | 99,786,780 | 99,675,780 | 99,675,780 | 0 | 0 | 2022-03-29 | 2022-04-05 | Wing Rastafarindo | 03.282.590.3-732.000 | 213,220 | 0.21 % | |
598 | 2022 | Dinas Pertanian | Perencanaan kegiatan rehab BPP dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5934282 | 34695474 | APBD | 99,805,950 | 99,706,144 | 99,578,100 | 99,578,100 | 99,345,000 | 99,345,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 227,850 | 0.23 % | |
599 | 2022 | Dinas Pertanian | Perencanaan kegiatan rehab BPP dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5934282 | 34695474 | APBD | 99,805,950 | 99,706,144 | 99,578,100 | 99,578,100 | 99,345,000 | 99,345,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 227,850 | 0.23 % | |
600 | 2022 | Dinas Pemberdayaan Masyarakat Dan Desa | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Konstruksi Pondasi serta Struktur Bangunan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5935282 | 32519229 | APBD | 10,000,000 | 9,990,000 | 9,768,000 | 0 | 9,768,000 | 9,768,000 | 100 | 9,768,000 | 2022-04-18 | 2022-04-25 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
601 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan UPS Taurus 40 KVA | Pengadaan Langsung | Jasa Lainnya | 5939282 | 35048146 | BLUD | 100,000,000 | 94,350,000 | 71,928,000 | 71,928,000 | 67,488,000 | 67,488,000 | 67,488,000 | 67,488,000 | 2022-04-06 | 2022-04-12 | PT. VEKTORDAYA MEKATRIKA | 01.755.704.2-038.000 | 28,072,000 | 28.07 % | |
602 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan UPS Taurus 40 KVA | Pengadaan Langsung | Jasa Lainnya | 5939282 | 35048146 | BLUD | 100,000,000 | 94,350,000 | 71,928,000 | 71,928,000 | 67,488,000 | 67,488,000 | 0 | 0 | 2022-04-06 | 2022-04-12 | PT. VEKTORDAYA MEKATRIKA | 01.755.704.2-038.000 | 28,072,000 | 28.07 % | |
603 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5940282 | 32562422 | APBD | 200,000,000 | 199,989,366 | 199,488,476 | 199,488,476 | 199,210,900 | 199,210,900 | 199,210,900 | 199,210,900 | 2022-04-01 | 2022-04-06 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 511,524 | 0.26 % | |
604 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5940282 | 32562422 | APBD | 200,000,000 | 199,989,366 | 199,488,476 | 199,488,476 | 199,210,900 | 199,210,900 | 0 | 0 | 2022-04-01 | 2022-04-06 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 511,524 | 0.26 % | |
605 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5941282 | 31649606 | APBD | 22,400,000 | 22,366,500 | 22,301,676 | 22,301,676 | 22,283,250 | 22,283,250 | 0 | 0 | 2022-04-01 | 2022-04-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,324 | 0.44 % | |
606 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5941282 | 31649606 | APBD | 22,400,000 | 22,366,500 | 22,301,676 | 22,301,676 | 22,283,250 | 22,283,250 | 0 | 0 | 2022-04-01 | 2022-04-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,324 | 0.44 % | |
607 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehab Panggung Terbuka dan Kamar Ganti Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5942282 | 32947902 | APBD | 22,000,000 | 22,000,000 | 21,966,900 | 21,966,900 | 21,700,000 | 21,700,000 | 21,700,000 | 21,700,000 | 2022-03-28 | 2022-04-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 33,100 | 0.15 % | |
608 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehab Panggung Terbuka dan Kamar Ganti Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5942282 | 32947902 | APBD | 22,000,000 | 22,000,000 | 21,966,900 | 21,966,900 | 21,700,000 | 21,700,000 | 0 | 0 | 2022-03-28 | 2022-04-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 33,100 | 0.15 % | |
609 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 5944282 | 31651161 | APBD | 150,000,000 | 149,634,549 | 148,609,797 | 148,609,797 | 148,500,000 | 148,500,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. e_Caracter | 75.998.700.1-733.000 | 1,390,203 | 0.93 % | |
610 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 5944282 | 31651161 | APBD | 150,000,000 | 149,634,549 | 148,609,797 | 148,609,797 | 148,500,000 | 148,500,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. e_Caracter | 75.998.700.1-733.000 | 1,390,203 | 0.93 % | |
611 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5945282 | 32117566 | APBD | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
612 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5945282 | 32117566 | APBD | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
613 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5946282 | 32117511 | APBD | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
614 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5946282 | 32117511 | APBD | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
615 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bajayau | Pengadaan Langsung | Pekerjaan Konstruksi | 5948282 | 31650069 | APBD | 170,000,000 | 169,878,580 | 169,536,730 | 169,536,730 | 169,514,000 | 169,514,000 | 0 | 0 | 2022-03-29 | 2022-04-04 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 463,270 | 0.27 % | |
616 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bajayau | Pengadaan Langsung | Pekerjaan Konstruksi | 5948282 | 31650069 | APBD | 170,000,000 | 169,878,580 | 169,536,730 | 169,536,730 | 169,514,000 | 169,514,000 | 0 | 0 | 2022-03-29 | 2022-04-04 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 463,270 | 0.27 % | |
617 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Perorangan | 5951282 | 32098890 | APBD | 13,480,000 | 13,474,124 | 13,264,500 | 13,264,500 | 13,100,000 | 13,100,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | wahyu abdi maulana | 15.336.879.0-735.000 | 215,500 | 1.6 % | |
618 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Perorangan | 5951282 | 32098890 | APBD | 13,480,000 | 13,474,124 | 13,264,500 | 13,264,500 | 13,100,000 | 13,100,000 | 0 | 0 | 2022-03-29 | 2022-03-31 | wahyu abdi maulana | 15.336.879.0-735.000 | 215,500 | 1.6 % | |
619 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Pemeliharaan Lampu Hias | Pengadaan Langsung | Pengadaan Barang | 5954282 | 31811676 | APBD | 145,000,000 | 144,505,350 | 144,323,865 | 144,323,865 | 144,200,000 | 144,200,000 | 144,200,000 | 144,200,000 | 2022-04-05 | 2022-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 676,135 | 0.47 % | |
620 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Pemeliharaan Lampu Hias | Pengadaan Langsung | Pengadaan Barang | 5954282 | 31811676 | APBD | 145,000,000 | 144,505,350 | 144,323,865 | 144,323,865 | 144,200,000 | 144,200,000 | 0 | 0 | 2022-04-05 | 2022-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 676,135 | 0.47 % | |
621 | 2022 | Dinas Pertanian | Perencanaan Rehab Balai Penyuluh Pertanian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5956282 | 32060994 | APBD | 90,670,125 | 90,579,455 | 90,187,500 | 90,187,500 | 89,910,000 | 89,910,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | cv.akmalindo | 02.531.482.4-731.000 | 482,625 | 0.53 % | |
622 | 2022 | Dinas Pertanian | Perencanaan Rehab Balai Penyuluh Pertanian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5956282 | 32060994 | APBD | 90,670,125 | 90,579,455 | 90,187,500 | 90,187,500 | 89,910,000 | 89,910,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | cv.akmalindo | 02.531.482.4-731.000 | 482,625 | 0.53 % | |
623 | 2022 | Dinas Pertanian | Perencanaan Jalan Usaha Tani | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5957282 | 32060512 | APBD | 99,000,000 | 98,901,000 | 98,512,500 | 98,512,500 | 98,346,000 | 98,346,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 487,500 | 0.49 % | |
624 | 2022 | Dinas Pertanian | Perencanaan Jalan Usaha Tani | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5957282 | 32060512 | APBD | 99,000,000 | 98,901,000 | 98,512,500 | 98,512,500 | 98,346,000 | 98,346,000 | 0 | 0 | 2022-03-30 | 2022-04-04 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 487,500 | 0.49 % | |
625 | 2022 | Sekretariat Daerah | Belanja Barang Promosi Sasirangan | Pengadaan Langsung | Pengadaan Barang | 5959282 | 32045816 | APBD | 74,700,000 | 74,647,500 | 74,536,500 | 0 | 74,536,500 | 74,536,500 | 100 | 74,536,500 | 2022-04-03 | 2022-04-13 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 163,500 | 0.22 % | |
626 | 2022 | Sekretariat Daerah | Belanja Barang Promosi Sasirangan | Pengadaan Langsung | Pengadaan Barang | 5959282 | 32045816 | APBD | 74,700,000 | 74,647,500 | 74,536,500 | 0 | 74,536,500 | 74,536,500 | 0 | 0 | 2022-04-03 | 2022-04-13 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 163,500 | 0.22 % | |
627 | 2022 | Sekretariat Daerah | Belanja Modal Tugu/Tanda Batas Lainnya (Rehab pemasangan Paving Blok Lapangan Tugu) | Pengadaan Langsung | Pekerjaan Konstruksi | 5960282 | 32107775 | APBD | 150,000,000 | 149,999,694 | 149,787,525 | 0 | 149,787,500 | 149,787,500 | 0 | 0 | 2022-04-03 | 2022-04-13 | CV. AISY | 75.132.070.6-733.000 | 212,475 | 0.14 % | |
628 | 2022 | Sekretariat Daerah | Belanja Modal Tugu/Tanda Batas Lainnya (Rehab pemasangan Paving Blok Lapangan Tugu) | Pengadaan Langsung | Pekerjaan Konstruksi | 5960282 | 32107775 | APBD | 150,000,000 | 149,999,694 | 149,787,525 | 0 | 149,787,500 | 149,787,500 | 0 | 0 | 2022-04-03 | 2022-04-13 | CV. AISY | 75.132.070.6-733.000 | 212,475 | 0.14 % | |
629 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5961282 | 31463246 | APBD | 200,000,000 | 199,755,423 | 199,600,023 | 199,600,023 | 199,544,000 | 199,544,000 | 0 | 199,544,000 | 2022-03-31 | 2022-04-06 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 399,977 | 0.2 % | |
630 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Perencanaan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5962282 | 35197004 | APBD | 76,000,000 | 75,971,397 | 75,746,400 | 75,746,400 | 75,702,000 | 75,702,000 | 0 | 0 | 2022-04-04 | 2022-04-07 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 253,600 | 0.33 % | |
631 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Perencanaan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5962282 | 35197004 | APBD | 76,000,000 | 75,971,397 | 75,746,400 | 75,746,400 | 75,702,000 | 75,702,000 | 0 | 0 | 2022-04-04 | 2022-04-07 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 253,600 | 0.33 % | |
632 | 2022 | Dinas Pertanian | Perencanaan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5963282 | 32061879 | APBD | 50,000,000 | 49,950,000 | 49,805,700 | 49,805,700 | 49,672,500 | 49,672,500 | 100 | 49,672,500 | 2022-04-04 | 2022-04-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 194,300 | 0.39 % | |
633 | 2022 | Dinas Pertanian | Perencanaan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5963282 | 32061879 | APBD | 50,000,000 | 49,950,000 | 49,805,700 | 49,805,700 | 49,672,500 | 49,672,500 | 0 | 0 | 2022-04-04 | 2022-04-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 194,300 | 0.39 % | |
634 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5966282 | 32563016 | APBD | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,708,500 | 13,708,500 | 13,708,500 | 13,708,500 | 2022-04-01 | 2022-04-06 | cv.akmalindo | 02.531.482.4-731.000 | 236,000 | 1.69 % | |
635 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5966282 | 32563016 | APBD | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,708,500 | 13,708,500 | 0 | 0 | 2022-04-01 | 2022-04-06 | cv.akmalindo | 02.531.482.4-731.000 | 236,000 | 1.69 % | |
636 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5967282 | 32146199 | APBD | 16,500,000 | 16,500,000 | 16,190,460 | 16,190,460 | 16,095,000 | 16,095,000 | 0 | 0 | 2022-04-13 | 2022-04-20 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 309,540 | 1.88 % | |
637 | 2022 | Sekretariat Daerah | Belanja Modal Pagar (Rehab Pagar Kantor Setda (Pagar belakang) | Pengadaan Langsung | Pekerjaan Konstruksi | 5968282 | 32107545 | APBD | 150,000,000 | 149,985,383 | 149,858,154 | 0 | 149,858,100 | 149,858,100 | 100 | 149,858,100 | 2022-04-03 | 2022-04-13 | CV.DITA | 02.242.686.0-733.000 | 141,846 | 0.09 % | |
638 | 2022 | Dinas Pertanian | Perencanaan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969282 | 32060276 | APBD | 26,200,000 | 24,675,300 | 24,531,000 | 24,531,000 | 24,420,000 | 24,420,000 | 0 | 0 | 2022-04-04 | 2022-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 1,669,000 | 6.37 % | |
639 | 2022 | Dinas Pertanian | Perencanaan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969282 | 32060276 | APBD | 26,200,000 | 24,675,300 | 24,531,000 | 24,531,000 | 24,420,000 | 24,420,000 | 0 | 0 | 2022-04-04 | 2022-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 1,669,000 | 6.37 % | |
640 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5974282 | 35198472 | APBD | 29,200,000 | 29,198,550 | 29,048,700 | 29,048,700 | 29,029,000 | 29,029,000 | 0 | 0 | 2022-04-08 | 2022-04-13 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 151,300 | 0.52 % | |
641 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5974282 | 35198472 | APBD | 29,200,000 | 29,198,550 | 29,048,700 | 29,048,700 | 29,029,000 | 29,029,000 | 0 | 0 | 2022-04-08 | 2022-04-13 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 151,300 | 0.52 % | |
642 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5975282 | 35199059 | APBD | 10,042,700 | 10,039,950 | 9,945,600 | 9,945,600 | 0 | 9,945,600 | 0 | 0 | 2022-04-08 | 2022-04-13 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 97,100 | 0.97 % | |
643 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5975282 | 35199059 | APBD | 10,042,700 | 10,039,950 | 9,945,600 | 9,945,600 | 0 | 9,945,600 | 0 | 0 | 2022-04-08 | 2022-04-13 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 97,100 | 0.97 % | |
644 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman dan Drainase Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5979282 | 31650100 | APBD | 56,500,000 | 56,347,747 | 56,316,738 | 56,316,738 | 56,277,000 | 56,277,000 | 0 | 56,277,000 | 2022-04-25 | 2022-04-28 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 183,262 | 0.32 % | |
645 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5984282 | 32946939 | APBD | 22,000,000 | 22,000,000 | 21,853,680 | 21,853,680 | 21,650,000 | 21,650,000 | 21,650,000 | 21,650,000 | 2022-04-11 | 2022-04-18 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 146,320 | 0.67 % | |
646 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Drainase jalan Tembus Bilui - Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 5987282 | 35472519 | APBD | 199,170,000 | 199,169,404 | 198,999,574 | 198,999,574 | 198,891,000 | 198,891,000 | 0 | 0 | 2022-04-11 | 2022-04-15 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 170,426 | 0.09 % | |
647 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Drainase jalan Tembus Bilui - Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 5987282 | 35472519 | APBD | 199,170,000 | 199,169,404 | 198,999,574 | 198,999,574 | 198,891,000 | 198,891,000 | 0 | 0 | 2022-04-11 | 2022-04-15 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 170,426 | 0.09 % | |
648 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Jl. Bukhari, Jl. Kesehatan, Jl. Ade Irma Nasution, Jl. D.I Panjaitan, Jl. Jend. Sudirman, SMA 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5988282 | 35472360 | APBD | 150,000,000 | 149,999,895 | 149,944,395 | 149,944,395 | 149,900,000 | 149,900,000 | 0 | 149,900,000 | 2022-04-11 | 2022-04-15 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 55,605 | 0.04 % | |
649 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Jl. Bukhari, Jl. Kesehatan, Jl. Ade Irma Nasution, Jl. D.I Panjaitan, Jl. Jend. Sudirman, SMA 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5988282 | 35472360 | APBD | 150,000,000 | 149,999,895 | 149,944,395 | 149,944,395 | 149,900,000 | 149,900,000 | 0 | 0 | 2022-04-11 | 2022-04-15 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 55,605 | 0.04 % | |
650 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 5991282 | 31629864 | APBD | 165,000,000 | 164,896,917 | 164,655,253 | 164,655,253 | 164,646,000 | 164,646,000 | 0 | 164,646,000 | 2022-04-14 | 2022-04-21 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 344,747 | 0.21 % | |
651 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi berat Ruang Aula, selasar SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5992282 | 31634389 | APBD | 190,000,000 | 189,992,627 | 189,754,236 | 189,754,236 | 189,734,000 | 189,734,000 | 0 | 0 | 2022-04-07 | 2022-04-13 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 245,764 | 0.13 % | |
652 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi berat Ruang Aula, selasar SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5992282 | 31634389 | APBD | 190,000,000 | 189,992,627 | 189,754,236 | 189,754,236 | 189,734,000 | 189,734,000 | 0 | 0 | 2022-04-07 | 2022-04-13 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 245,764 | 0.13 % | |
653 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5993282 | 31634354 | APBD | 69,600,000 | 68,998,278 | 68,650,916 | 68,650,916 | 68,617,000 | 68,617,000 | 0 | 0 | 2022-04-07 | 2022-04-13 | CV. AISY | 75.132.070.6-733.000 | 949,084 | 1.36 % | |
654 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5993282 | 31634354 | APBD | 69,600,000 | 68,998,278 | 68,650,916 | 68,650,916 | 68,617,000 | 68,617,000 | 0 | 0 | 2022-04-07 | 2022-04-13 | CV. AISY | 75.132.070.6-733.000 | 949,084 | 1.36 % | |
655 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5994282 | 35446261 | APBD | 50,000,000 | 49,527,870 | 49,472,370 | 49,472,370 | 49,450,000 | 49,450,000 | 0 | 0 | 2022-04-12 | 2022-04-19 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 527,630 | 1.06 % | |
656 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5994282 | 35446261 | APBD | 50,000,000 | 49,527,870 | 49,472,370 | 49,472,370 | 49,450,000 | 49,450,000 | 0 | 0 | 2022-04-12 | 2022-04-19 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 527,630 | 1.06 % | |
657 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5997282 | 35446361 | APBD | 45,000,000 | 44,497,880 | 44,442,380 | 44,442,380 | 44,400,000 | 44,400,000 | 0 | 0 | 2022-04-13 | 2022-04-20 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 557,620 | 1.24 % | |
658 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5997282 | 35446361 | APBD | 45,000,000 | 44,497,880 | 44,442,380 | 44,442,380 | 44,400,000 | 44,400,000 | 0 | 0 | 2022-04-13 | 2022-04-20 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 557,620 | 1.24 % | |
659 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Pandak Daun - Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5998282 | 35446116 | APBD | 45,000,000 | 44,802,752 | 44,629,104 | 44,629,104 | 0 | 44,629,104 | 0 | 0 | 2022-04-12 | 2022-04-19 | Wiyasa Drawana | 80.902.072.0-731.000 | 370,896 | 0.82 % | |
660 | 2022 | Kecamatan Kandangan | Belanja Jasa Perencanaan Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5999282 | 32541992 | APBD | 15,000,000 | 14,999,932 | 14,896,200 | 14,896,200 | 14,800,000 | 14,800,000 | 0 | 0 | 2022-04-08 | 2022-04-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,800 | 0.69 % | |
661 | 2022 | Kecamatan Kandangan | Belanja Jasa Perencanaan Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5999282 | 32541992 | APBD | 15,000,000 | 14,999,932 | 14,896,200 | 14,896,200 | 14,800,000 | 14,800,000 | 0 | 0 | 2022-04-08 | 2022-04-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,800 | 0.69 % | |
662 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado,Jasa Konsultansi Perencanaan Peningkatan Jl. Haratai 2 Kec. Loksado,Jasa Konsultansi Perencanaan Peningkatan Jl. Datar Belimbing Kec. Loksado,Jasa Konsultansi Perencanaan Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6002282 | 31562660;31562673;31562687;31577178 | APBD | 70,800,000 | 70,713,383 | 70,673,700 | 70,673,700 | 70,629,300 | 70,629,300 | 0 | 0 | 2022-04-14 | 2022-04-22 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 126,300 | 0.18 % | |
663 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya,Jasa Konsultansi Perencanaan Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6003282 | 31562649;31576994;31577001;31577014;31577028 | APBD | 83,000,000 | 82,864,553 | 82,540,433 | 82,540,433 | 82,473,000 | 82,473,000 | 0 | 0 | 2022-04-11 | 2022-04-18 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 459,568 | 0.55 % | |
664 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6005282 | 31577038;31577047;31577057;31577065;31577070 | APBD | 84,700,000 | 84,640,553 | 84,471,000 | 84,471,000 | 84,440,000 | 84,440,000 | 0 | 0 | 2022-04-14 | 2022-04-20 | cv.akmalindo | 02.531.482.4-731.000 | 229,000 | 0.27 % | |
665 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Peninggian Jalan Desa Pantai Ulin Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6006282 | 31576563;31577077;31577087;31577100;31577111 | APBD | 84,000,000 | 83,974,553 | 83,922,660 | 83,922,660 | 83,864,000 | 83,864,000 | 0 | 0 | 2022-04-26 | 2022-05-09 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 77,340 | 0.09 % | |
666 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan),Jasa Konsultansi Perencanaan Siring Pasangan Batu Jalan Balanti Kec. Kalumpang,Jasa Konsultansi Perencanaan Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6008282 | 31577121;31577133;31577205;31577219;31577229 | APBD | 91,700,000 | 91,594,592 | 90,570,450 | 90,570,450 | 90,520,500 | 90,520,500 | 0 | 0 | 2022-04-19 | 2022-04-25 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,129,550 | 1.23 % | |
667 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perbaikan Jembatan Gantung Lungau Kec. Kandangan,Jasa Konsultansi Perencanaan Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6009282 | 31551908;35396510 | APBD | 20,400,000 | 20,364,877 | 19,995,540 | 19,995,540 | 19,980,000 | 19,980,000 | 0 | 19,980,000 | 2022-04-26 | 2022-05-17 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 404,460 | 1.98 % | |
668 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PERENCANAAN DAK (Kandangan,Angkinang,Loksado,Sungai Raya) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6012282 | 35058875 | APBD | 77,000,000 | 76,998,881 | 76,925,997 | 76,925,997 | 76,845,300 | 76,845,300 | 0 | 76,845,300 | 2022-04-21 | 2022-04-27 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 74,003 | 0.1 % | |
669 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana, Prasarana dan Utilitas Sekolah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6016282 | 31634318 | APBD | 49,108,600 | 49,006,206 | 48,801,150 | 48,801,150 | 48,751,200 | 48,751,200 | 0 | 0 | 2022-04-14 | 2022-04-20 | cv.akmalindo | 02.531.482.4-731.000 | 307,450 | 0.63 % | |
670 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana, Prasarana dan Utilitas Sekolah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6016282 | 31634318 | APBD | 49,108,600 | 49,006,206 | 48,801,150 | 48,801,150 | 48,751,200 | 48,751,200 | 0 | 0 | 2022-04-14 | 2022-04-20 | cv.akmalindo | 02.531.482.4-731.000 | 307,450 | 0.63 % | |
671 | 2022 | Kecamatan Kandangan | Pekerjaan Rehab JUT dan Jembatan JUT Telaga Sasanting RT.005 dan Rehab JUT Jalan Tembus Pondok Pertanian RT.009 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6019282 | 32540907;32540998 | APBD | 150,000,000 | 149,941,058 | 149,845,087 | 149,845,087 | 149,750,000 | 149,750,000 | 0 | 0 | 2022-04-12 | 2022-04-14 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 154,913 | 0.1 % | |
672 | 2022 | Kecamatan Kandangan | Pekerjaan Rehab JUT dan Jembatan JUT Telaga Sasanting RT.005 dan Rehab JUT Jalan Tembus Pondok Pertanian RT.009 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6019282 | 32540907;32540998 | APBD | 150,000,000 | 149,941,058 | 149,845,087 | 149,845,087 | 149,750,000 | 149,750,000 | 0 | 0 | 2022-04-12 | 2022-04-14 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 154,913 | 0.1 % | |
673 | 2022 | Sekretariat DPRD | Konsultan Pengawas Pembangunan Rumah Jabatan Ketua DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6021282 | 33555400 | APBD | 80,000,000 | 79,969,121 | 79,830,371 | 79,830,371 | 79,799,000 | 79,799,000 | 79,799,000 | 79,799,000 | 2022-04-14 | 2022-04-20 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 169,629 | 0.21 % | |
674 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya - Rehab Gedung PKK Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6028282 | 35052943 | APBD | 130,000,000 | 129,960,896 | 129,636,122 | 129,636,122 | 129,636,100 | 129,636,100 | 100 | 129,636,100 | 2022-04-18 | 2022-04-28 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 363,878 | 0.28 % | |
675 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Pertemuan (Rehabilitasi Ruang Dapur Pendopo Kab.HSS) | Pengadaan Langsung | Pekerjaan Konstruksi | 6029282 | 32107077 | APBD | 160,000,000 | 159,985,744 | 159,879,408 | 0 | 159,879,400 | 159,879,400 | 100 | 159,879,400 | 2022-04-18 | 2022-04-28 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,592 | 0.08 % | |
676 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehabilitasi WC dan Kamar Ganti Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6038282 | 32948599 | APBD | 18,000,000 | 18,000,000 | 17,926,500 | 17,926,500 | 17,750,000 | 17,750,000 | 17,750,000 | 17,750,000 | 2022-04-18 | 2022-04-20 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 73,500 | 0.41 % | |
677 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pondok nginap Pesantren Abdul Karim Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6042282 | 31633016 | APBD | 185,500,000 | 184,916,047 | 184,602,173 | 184,602,173 | 184,526,000 | 184,526,000 | 0 | 184,526,000 | 2022-04-20 | 2022-04-25 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 897,827 | 0.48 % | |
678 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Bangkau | Pengadaan Langsung | Pekerjaan Konstruksi | 6045282 | 31649950 | APBD | 115,000,000 | 114,968,821 | 114,859,455 | 114,859,455 | 114,648,000 | 114,648,000 | 0 | 114,648,000 | 2022-04-21 | 2022-04-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 140,545 | 0.12 % | |
679 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PERENCANAAN DAK ( Daha Selatan,Daha Utara) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6051282 | 35058772 | APBD | 65,800,000 | 65,788,691 | 65,750,073 | 65,750,073 | 65,689,800 | 65,689,800 | 0 | 65,689,800 | 2022-04-25 | 2022-04-28 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 49,927 | 0.08 % | |
680 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6052282 | 31592942 | APBD | 20,000,000 | 20,000,000 | 19,988,900 | 19,988,900 | 19,924,500 | 19,924,500 | 80 | 19,924,500 | 2022-07-21 | 2022-07-27 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 11,100 | 0.06 % | |
681 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Balap Sepeda Malutu (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6053282 | 35445286 | APBD | 25,550,000 | 25,550,000 | 25,457,850 | 25,457,850 | 25,425,000 | 25,425,000 | 25,425,000 | 25,425,000 | 2022-05-18 | 2022-05-25 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 92,150 | 0.36 % | |
682 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6054282 | 31592968 | APBD | 18,120,000 | 18,120,000 | 17,926,500 | 17,926,500 | 17,871,000 | 17,871,000 | 80 | 17,871,000 | 2022-05-30 | 2022-06-03 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 193,500 | 1.07 % | |
683 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6055282 | 31592984 | APBD | 17,500,000 | 17,500,000 | 17,427,000 | 17,427,000 | 17,371,500 | 17,371,500 | 80 | 17,371,500 | 2022-06-27 | 2022-07-07 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 73,000 | 0.42 % | |
684 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6056282 | 31593008 | APBD | 17,986,500 | 17,986,500 | 17,958,750 | 17,958,750 | 17,898,750 | 17,898,750 | 80 | 17,898,750 | 2022-07-13 | 2022-07-19 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 27,750 | 0.15 % | |
685 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6057282 | 31592947 | APBD | 20,160,000 | 20,160,000 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 80 | 19,980,000 | 2022-07-13 | 2022-07-19 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 160,000 | 0.79 % | |
686 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Panggungan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6058282 | 31592994 | APBD | 13,000,000 | 13,000,000 | 12,953,700 | 12,953,700 | 12,945,000 | 12,945,000 | 80 | 12,945,000 | 2022-06-21 | 2022-06-27 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 46,300 | 0.36 % | |
687 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Durian Rabung, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6059282 | 31592999 | APBD | 19,500,000 | 19,500,000 | 19,420,000 | 19,420,000 | 19,399,000 | 19,399,000 | 80 | 19,399,000 | 2022-06-21 | 2022-06-27 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 80,000 | 0.41 % | |
688 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado, Pengawasan Rehabilitasi Sedang/Berat Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6060282 | 35782648 | APBD | 16,750,000 | 16,708,381 | 16,630,575 | 16,630,575 | 16,616,100 | 16,616,100 | 0 | 16,616,100 | 2022-05-17 | 2022-05-23 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 119,425 | 0.71 % | |
689 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6061282 | 31632214 | APBD | 39,135,000 | 39,105,584 | 38,921,595 | 38,921,595 | 38,888,000 | 38,888,000 | 0 | 38,888,000 | 2022-05-17 | 2022-05-23 | cv.akmalindo | 02.531.482.4-731.000 | 213,405 | 0.55 % | |
690 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6063282 | 31592988 | APBD | 19,720,000 | 19,720,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 80 | 19,647,000 | 2022-06-21 | 2022-06-24 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 73,000 | 0.37 % | |
691 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6064282 | 31592962 | APBD | 20,000,000 | 20,000,000 | 19,991,871 | 19,991,871 | 19,919,000 | 19,919,000 | 80 | 19,919,000 | 2022-06-06 | 2022-06-10 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 8,129 | 0.04 % | |
692 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Bumi Berkat, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6065282 | 31592981 | APBD | 10,500,000 | 10,500,000 | 10,480,000 | 10,480,000 | 10,450,000 | 10,450,000 | 80 | 10,450,000 | 2022-06-10 | 2022-06-15 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 20,000 | 0.19 % | |
693 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Pantai Ulin, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6066282 | 31592976 | APBD | 10,500,000 | 10,500,000 | 10,479,000 | 10,479,000 | 10,449,000 | 10,449,000 | 80 | 10,449,000 | 2022-06-10 | 2022-06-15 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 21,000 | 0.2 % | |
694 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Pengawas Kegiatan Kontraktual (Reguler) - (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6067282 | 35477258 | APBD | 100,000,000 | 100,000,000 | 99,944,500 | 99,944,500 | 99,899,000 | 99,899,000 | 99,899,000 | 99,899,000 | 2022-06-03 | 2022-06-08 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 55,500 | 0.06 % | |
695 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan + Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6068282 | 35776295 | APBD | 100,000,000 | 99,792,427 | 99,622,500 | 99,622,500 | 99,567,000 | 99,567,000 | 0 | 99,567,000 | 2022-07-05 | 2022-07-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 377,500 | 0.38 % | |
696 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Taal Jarau - Sp. Baru/Tampang Kec. Sungai Raya (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6069282 | 35776339 | APBD | 100,000,000 | 99,792,427 | 99,205,140 | 99,205,140 | 99,123,000 | 99,123,000 | 0 | 99,123,000 | 2022-06-27 | 2022-06-30 | cv.mitra talenta prima | 02.746.658.0-733.000 | 794,860 | 0.79 % | |
697 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Bago Tanggul - Teratai Kec. Kalumpang (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6070282 | 35776119 | APBD | 75,000,000 | 74,994,561 | 74,794,575 | 74,794,575 | 74,725,200 | 74,725,200 | 0 | 74,725,200 | 2022-06-28 | 2022-07-01 | CV. CITRA MULIA CONSULTANT | 92.966.672.5-733.000 | 205,425 | 0.27 % | |
698 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Tabihi-Telaga Langsat Kec. Padang Batung/ Telaga Langsat (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6071282 | 35776277 | APBD | 100,000,000 | 99,792,427 | 99,185,160 | 99,185,160 | 99,111,000 | 99,111,000 | 0 | 99,111,000 | 2022-06-24 | 2022-06-29 | cv.mitra talenta prima | 02.746.658.0-733.000 | 814,840 | 0.81 % | |
699 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran Jalan Bakarung - Rantauan Kec. Kandangan/ Angkinang (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6073282 | 35775656 | APBD | 100,000,000 | 99,792,427 | 98,246,100 | 98,246,100 | 98,198,000 | 98,198,000 | 0 | 98,198,000 | 2022-06-17 | 2022-06-22 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,753,900 | 1.75 % | |
700 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Panjampang Bahagia - Hanau Kec. Simpur (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6074282 | 35776243 | APBD | 100,000,000 | 99,792,427 | 99,678,000 | 99,678,000 | 99,666,000 | 99,666,000 | 0 | 99,666,000 | 2022-06-14 | 2022-06-17 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 322,000 | 0.32 % | |
701 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Jl. Siang Gantung - Ds. Baru Kec. Daha Barat (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6075282 | 35776133 | APBD | 100,000,000 | 99,792,427 | 99,518,160 | 99,518,160 | 99,456,000 | 99,456,000 | 0 | 99,456,000 | 2022-06-28 | 2022-07-01 | CV. CITRA MULIA CONSULTANT | 92.966.672.5-733.000 | 481,840 | 0.48 % | |
702 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan + Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Sungai Damang - Amawang Kiri Kec. Kandangan (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6076282 | 35776411 | APBD | 100,000,000 | 99,792,427 | 99,655,800 | 99,655,800 | 99,616,000 | 99,616,000 | 0 | 99,616,000 | 2022-06-14 | 2022-06-17 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 344,200 | 0.34 % | |
703 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Paharuangan - Sei. Raya Selatan Kec. Sungai Raya (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6077282 | 35775713 | APBD | 100,000,000 | 99,792,427 | 99,527,484 | 99,527,484 | 99,456,000 | 99,456,000 | 0 | 99,456,000 | 2022-06-21 | 2022-06-24 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 472,516 | 0.47 % | |
704 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet (jamban) beserta sanitasinya TK AISYIYAH BUSTANUL ATHFAL 3 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6078282 | 35198272 | APBD | 123,316,500 | 123,300,558 | 122,839,010 | 122,839,010 | 122,739,000 | 122,739,000 | 0 | 122,739,000 | 2022-06-03 | 2022-06-08 | CV. CHAI CHEL | 03.063.051.1-731.000 | 477,490 | 0.39 % | |
705 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6079282 | 32563351 | APBD | 13,860,000 | 13,859,904 | 13,836,150 | 13,836,150 | 13,819,500 | 13,819,500 | 100 | 13,819,500 | 2022-05-20 | 2022-05-24 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 23,850 | 0.17 % | |
706 | 2022 | Dinas Ketahanan Pangan | Belanja Gabah untuk Pengisian Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 6080282 | 35812289 | APBD | 207,200,500 | 199,231,250 | 199,071,865 | 199,071,865 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-05-27 | 2022-06-02 | CV.DITA | 02.242.686.0-733.000 | 8,128,635 | 3.92 % | |
707 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Mal Pelayanan Publik Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6081282 | 35798263 | APBD | 200,000,000 | 199,994,776 | 199,697,080 | 199,697,080 | 199,599,000 | 199,599,000 | 199,599,000 | 199,599,000 | 2022-05-19 | 2022-05-24 | CV. KHALIF | 81.540.809.1-733.000 | 302,920 | 0.15 % | |
708 | 2022 | Kecamatan Daha Utara | Pemeliharaan/Rehab Gedung Kantor Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6082282 | 32099466 | APBD | 168,700,000 | 168,691,000 | 168,489,061 | 168,489,061 | 168,350,000 | 168,350,000 | 168,350,000 | 168,350,000 | 2022-05-20 | 2022-05-24 | FADWI UTAMA | 94.246.044.5-733.000 | 210,939 | 0.13 % | |
709 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Pengawas Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6083282 | 32098025 | APBD | 16,870,000 | 16,860,000 | 16,777,650 | 16,777,650 | 16,650,000 | 16,650,000 | 16,650,000 | 16,650,000 | 2022-05-20 | 2022-05-24 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 92,350 | 0.55 % | |
710 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Pembangunan (Samping Dispera KPLH) Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6090282 | 31933457 | APBD | 185,000,000 | 184,583,980 | 184,390,042 | 184,390,042 | 184,250,000 | 184,250,000 | 184,250,000 | 184,250,000 | 2022-06-03 | 2022-06-07 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 609,958 | 0.33 % | |
711 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6091282 | 31456836 | APBD | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,846,800 | 19,846,800 | 19,846,800 | 19,846,800 | 2022-06-23 | 2022-06-30 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 114,350 | 0.57 % | |
712 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN SAMUDA 1 (DAK) dan Pembangunan ruang UKS SDN SAMUDA 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6093282 | 35822075 | APBD | 198,000,000 | 197,974,191 | 196,949,660 | 196,949,660 | 196,921,000 | 196,921,000 | 0 | 196,921,000 | 2022-05-31 | 2022-06-06 | CV. ADHI KARYA MANDIRI | 31.725.819.2-731.000 | 1,050,340 | 0.53 % | |
713 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab ruang UKS rusak ringan SDN SUNGAI HANYAR (DAK) dan Rehab perpustakaan rusak ringan SDN SUNGAI HANYAR (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6094282 | 35822076 | APBD | 169,000,000 | 168,988,995 | 168,961,245 | 168,961,245 | 168,747,000 | 168,747,000 | 0 | 168,747,000 | 2022-06-21 | 2022-06-24 | cv.cahayaanugerah | 80.015.259.7-731.000 | 38,755 | 0.02 % | |
714 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Laboratorium IPA SMPN 2 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6095282 | 31634366 | APBD | 148,000,000 | 147,988,522 | 147,877,522 | 147,877,522 | 147,656,000 | 147,656,000 | 147,656,000 | 147,656,000 | 2022-06-08 | 2022-06-14 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 122,478 | 0.08 % | |
715 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6096282 | 31732101 | APBD | 178,000,000 | 177,598,066 | 177,165,166 | 177,165,166 | 177,050,000 | 177,050,000 | 177,050,000 | 177,050,000 | 2022-06-08 | 2022-06-10 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 834,834 | 0.47 % | |
716 | 2022 | Kecamatan Daha Utara | Belanja Jasa Konsultasi Perencanaan Rehab Lapangan Tenis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6097282 | 32097348 | APBD | 11,000,000 | 10,979,000 | 10,896,179 | 10,896,179 | 10,800,000 | 10,800,000 | 10,800,000 | 10,800,000 | 2022-05-24 | 2022-05-27 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 103,821 | 0.94 % | |
717 | 2022 | Dinas Pertanian | Belanja Bahan-Bahan/Bibit Ternak/Bibit Ikan | Pengadaan Langsung | Pengadaan Barang | 6098282 | 32037394 | APBD | 172,500,000 | 165,757,000 | 165,670,000 | 165,670,000 | 165,570,000 | 165,570,000 | 100 | 165,570,000 | 2022-05-30 | 2022-06-03 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 6,830,000 | 3.96 % | |
718 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Mesin Pencacah Ranting,Belanja Modal Mesin Pencacah Kayu | Pengadaan Langsung | Pengadaan Barang | 6099282 | 35686250;35686502 | APBD | 80,000,000 | 79,997,700 | 79,870,050 | 79,870,050 | 79,800,000 | 79,800,000 | 23,940,000 | 79,800,000 | 2022-05-31 | 2022-06-03 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 129,950 | 0.16 % | |
719 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Fungsi Hutan Kota untuk Fungsi Taman dan Pendidikan | Pengadaan Langsung | Pekerjaan Konstruksi | 6100282 | 31837114 | APBD | 180,000,000 | 179,917,145 | 179,706,216 | 179,706,216 | 179,600,000 | 179,600,000 | 179,600,000 | 179,600,000 | 2022-05-25 | 2022-05-30 | CV. AISY | 75.132.070.6-733.000 | 293,784 | 0.16 % | |
720 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Taman Rahimin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6102282 | 32100511 | APBD | 13,480,000 | 13,474,000 | 13,397,700 | 13,397,700 | 13,300,000 | 13,300,000 | 13,300,000 | 13,300,000 | 2022-05-24 | 2022-05-27 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 82,300 | 0.61 % | |
721 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Kimia | Pengadaan Langsung | Pengadaan Barang | 6104282 | 32402724 | APBD | 154,348,200 | 153,883,960 | 153,654,000 | 153,654,000 | 153,600,000 | 153,600,000 | 153,600,000 | 153,600,000 | 2022-05-25 | 2022-05-30 | FADWI UTAMA | 94.246.044.5-733.000 | 694,200 | 0.45 % | |
722 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Taal Kec. Sungai Raya (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6105282 | 34748961 | APBD | 52,000,000 | 51,837,000 | 51,726,000 | 51,726,000 | 51,659,400 | 51,659,400 | 51,659,400 | 51,659,400 | 2022-06-06 | 2022-06-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 274,000 | 0.53 % | |
723 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan TPU Gambah | Pengadaan Langsung | Pekerjaan Konstruksi | 6106282 | 31835383 | APBD | 180,000,000 | 169,441,706 | 168,427,368 | 168,427,368 | 168,350,000 | 168,350,000 | 168,350,000 | 168,350,000 | 2022-05-25 | 2022-05-30 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 11,572,632 | 6.43 % | |
724 | 2022 | Kecamatan Simpur | Konsultan Perencanaan Rehab Ringan Rumah Jabatan Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6107282 | 35841440 | APBD | 12,500,000 | 12,444,000 | 12,333,296 | 12,333,296 | 12,250,000 | 12,250,000 | 12,250,000 | 12,250,000 | 2022-05-25 | 2022-05-30 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 166,704 | 1.33 % | |
725 | 2022 | Dinas Pertanian | Pembangunan /Rehab Jalan Usaha Tani Poktan Lok Nyiur Desa Bamban Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6108282 | 32060326 | APBD | 122,375,000 | 122,321,000 | 122,235,309 | 122,235,309 | 122,127,000 | 122,127,000 | 100 | 122,127,000 | 2022-05-27 | 2022-05-31 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 139,691 | 0.11 % | |
726 | 2022 | Dinas Pertanian | Pembangunan /Rehab Jalan Usaha Tani Poktan Neng Wang Sakarti Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6109282 | 32060309 | APBD | 123,200,000 | 123,115,000 | 123,098,156 | 123,098,156 | 122,993,800 | 122,993,800 | 100 | 122,993,800 | 2022-05-27 | 2022-05-31 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 101,844 | 0.08 % | |
727 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Balimau | Pengadaan Langsung | Pekerjaan Konstruksi | 6110282 | 31650054 | APBD | 70,000,000 | 69,995,562 | 69,797,136 | 69,797,136 | 69,697,000 | 69,697,000 | 69,697,000 | 69,697,000 | 2022-06-08 | 2022-06-14 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 202,864 | 0.29 % | |
728 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bamban Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6111282 | 31650076 | APBD | 100,000,000 | 99,973,196 | 99,864,628 | 99,864,628 | 99,820,000 | 99,820,000 | 0 | 99,820,000 | 2022-05-27 | 2022-06-02 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 135,372 | 0.14 % | |
729 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 6112282 | 31650088 | APBD | 90,000,000 | 89,993,959 | 89,897,521 | 89,897,521 | 89,771,000 | 89,771,000 | 0 | 89,771,000 | 2022-05-31 | 2022-06-08 | cv.agung perkasa | 02.475.425.1-735.000 | 102,479 | 0.11 % | |
730 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Kapuh Darat | Pengadaan Langsung | Pekerjaan Konstruksi | 6113282 | 31650084 | APBD | 100,000,000 | 99,995,658 | 99,835,710 | 99,835,710 | 99,735,000 | 99,735,000 | 99,735,000 | 99,735,000 | 2022-07-06 | 2022-07-12 | CV RIZKY BANUA | 02.089.856.5-733.000 | 164,290 | 0.16 % | |
731 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Pandulangan 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6114282 | 31650074 | APBD | 70,000,000 | 69,998,669 | 69,654,199 | 69,654,199 | 69,575,000 | 69,575,000 | 0 | 69,575,000 | 2022-05-30 | 2022-06-06 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 345,801 | 0.49 % | |
732 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6115282 | 31634643 | APBD | 114,600,000 | 114,238,497 | 114,141,306 | 114,141,306 | 114,021,000 | 114,021,000 | 0 | 114,021,000 | 2022-05-31 | 2022-06-06 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 458,694 | 0.4 % | |
733 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6116282 | 32147132 | APBD | 15,000,000 | 15,000,000 | 14,907,300 | 14,907,300 | 14,851,800 | 14,851,800 | 0 | 14,851,800 | 2022-05-25 | 2022-06-02 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 92,700 | 0.62 % | |
734 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Banyu Barau Kel. Kandangan Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6118282 | 35729970 | APBD | 35,000,000 | 35,000,000 | 34,750,000 | 34,750,000 | 34,632,000 | 34,632,000 | 34,632,000 | 34,632,000 | 2022-06-16 | 2022-06-22 | Wiyasa Drawana | 80.902.072.0-731.000 | 250,000 | 0.71 % | |
735 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab WC dan Rehab Ruang Kantor/ Guru SDN Mawangi | Pengadaan Langsung | Pekerjaan Konstruksi | 6119282 | 35861023 | APBD | 147,000,000 | 146,842,040 | 146,700,160 | 146,700,160 | 146,141,000 | 146,141,000 | 0 | 146,141,000 | 2022-06-03 | 2022-06-07 | CV. MEGA BUANA SAKTI | 02.324.986.3-733.000 | 299,840 | 0.2 % | |
736 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan perpustakaan beserta perabotnya SDN MUARA ULANG 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6120282 | 35056603 | APBD | 195,885,450 | 195,260,426 | 194,462,320 | 194,462,320 | 194,362,000 | 194,362,000 | 0 | 194,362,000 | 2022-06-13 | 2022-06-16 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 1,423,130 | 0.73 % | |
737 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang UKS SDN LOKLAHONG (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6121282 | 35059428 | APBD | 80,000,000 | 79,936,635 | 79,831,282 | 79,831,282 | 79,731,000 | 79,731,000 | 0 | 79,731,000 | 2022-06-17 | 2022-06-22 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 168,718 | 0.21 % | |
738 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN MURUNG RAYA (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6122282 | 35057794 | APBD | 101,250,000 | 101,212,327 | 100,884,818 | 100,884,818 | 100,812,000 | 100,812,000 | 0 | 100,812,000 | 2022-06-06 | 2022-06-09 | Rangga Borneo Perkasa | 96.727.714.6-731.000 | 365,182 | 0.36 % | |
739 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Sarang Halang Padang | Pengadaan Langsung | Pekerjaan Konstruksi | 6123282 | 31650090 | APBD | 50,000,000 | 49,990,896 | 49,929,846 | 49,929,846 | 49,846,000 | 49,846,000 | 0 | 49,846,000 | 2022-05-30 | 2022-06-03 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 70,154 | 0.14 % | |
740 | 2022 | Dinas Kesehatan | Belanja Jasa yang Diberikan kepada Pihak Ketiga/Pihak Lain ( Pengelolaan Kesehatan Lingkungan ) | Pengadaan Langsung | Jasa Lainnya | 6124282 | 34665269 | APBD | 251,955,000 | 192,661,590 | 192,661,590 | 192,661,590 | 192,537,000 | 192,537,000 | 192,537,000 | 192,537,000 | 2022-05-31 | 2022-06-10 | PT.TRANSWASTE MODA INDONESIA | 82.924.130.6-013.000 | 59,293,410 | 23.53 % | |
741 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6125282 | 35721966 | APBD | 62,874,000 | 62,874,000 | 62,748,300 | 62,748,300 | 62,662,000 | 62,662,000 | 62,662,000 | 62,662,000 | 2022-05-31 | 2022-06-06 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 125,700 | 0.2 % | |
742 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6126282 | 31456929 | APBD | 20,000,000 | 20,000,000 | 19,855,680 | 19,855,680 | 19,780,200 | 19,780,200 | 19,780,200 | 19,780,200 | 2022-06-23 | 2022-06-30 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 144,320 | 0.72 % | |
743 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Katilang Desa Bago tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6127282 | 31457004 | APBD | 19,056,000 | 19,056,000 | 19,000,678 | 19,000,678 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-06-23 | 2022-06-30 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 55,322 | 0.29 % | |
744 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Hulu Banyu Kec. Loksado dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6128282 | 35679758 | APBD | 29,000,000 | 29,000,000 | 28,802,420 | 28,802,420 | 28,682,400 | 28,682,400 | 28,682,400 | 28,682,400 | 2022-06-24 | 2022-06-30 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 197,580 | 0.68 % | |
745 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec.Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6129282 | 31456890 | APBD | 19,000,000 | 19,000,000 | 18,825,045 | 18,825,045 | 18,759,000 | 18,759,000 | 18,759,000 | 18,759,000 | 2022-06-23 | 2022-06-30 | cv.airlangga konsultan | 03.122.016.3-732.000 | 174,955 | 0.92 % | |
746 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6130282 | 35670779 | APBD | 10,000,000 | 10,000,000 | 9,930,060 | 9,930,060 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-06-10 | 2022-06-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 69,940 | 0.7 % | |
747 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya -- Pembangunan Tempat Parkir Alat Beratr | Pengadaan Langsung | Pekerjaan Konstruksi | 6131282 | 32562697 | APBD | 80,000,000 | 79,999,009 | 79,902,444 | 79,902,444 | 79,850,000 | 79,850,000 | 79,850,000 | 79,850,000 | 2022-06-08 | 2022-06-10 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 97,556 | 0.12 % | |
748 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya -- Pembangunan Tempat Daur Ulang (PDU) | Pengadaan Langsung | Pekerjaan Konstruksi | 6132282 | 32562333 | APBD | 150,000,000 | 149,990,623 | 149,789,231 | 149,789,231 | 149,700,000 | 149,700,000 | 149,700,000 | 149,700,000 | 2022-06-10 | 2022-06-14 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 210,769 | 0.14 % | |
749 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang UKS dan Pembangunan toilet WC SDN BAKARUNG SELATAN 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6133282 | 35881357 | APBD | 190,000,000 | 189,959,286 | 189,781,694 | 189,781,694 | 189,572,000 | 189,572,000 | 0 | 189,572,000 | 2022-06-07 | 2022-06-10 | P B B | 01.145.832.0-733.000 | 218,306 | 0.11 % | |
750 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru dan Kepala Sekolah TK NEGERI PEMBINA Simpur (DAK),Pembangunan Ruang UKS TK NEGERI PEMBINA Simpur (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6136282 | 35198230;35198357 | APBD | 197,000,000 | 196,964,888 | 196,350,548 | 196,350,548 | 193,608,000 | 193,608,000 | 0 | 193,608,000 | 2022-06-27 | 2022-07-01 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 649,452 | 0.33 % | |
751 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Pagar SDN Kandangan Barat 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6137282 | 31650041 | APBD | 17,050,000 | 17,019,902 | 17,006,421 | 17,006,421 | 16,949,700 | 16,949,700 | 0 | 16,949,700 | 2022-05-31 | 2022-06-06 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 43,579 | 0.26 % | |
752 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN PANDAN SARI (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6138282 | 35057686 | APBD | 101,250,000 | 101,247,355 | 100,984,403 | 100,984,403 | 100,886,000 | 100,886,000 | 0 | 100,886,000 | 2022-05-31 | 2022-06-07 | CV. CHAI CHEL | 03.063.051.1-731.000 | 265,597 | 0.26 % | |
753 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Rumah Dinas Jl. Aluh Idut | Pengadaan Langsung | Pekerjaan Konstruksi | 6139282 | 35899180 | BLUD | 200,000,000 | 199,961,149 | 199,657,837 | 199,657,837 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2022-06-04 | 2022-07-11 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 342,163 | 0.17 % | |
754 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Pondok nginap Pesantren Abdul Karim Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6140282 | 31633001 | APBD | 12,985,000 | 12,862,680 | 12,715,050 | 12,715,050 | 12,654,000 | 12,654,000 | 12,654,000 | 12,654,000 | 2022-06-02 | 2022-06-20 | cv.akmalindo | 02.531.482.4-731.000 | 269,950 | 2.08 % | |
755 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Selasar Antar Bangunan | Pengadaan Langsung | Pekerjaan Konstruksi | 6141282 | 35899243 | BLUD | 200,000,000 | 199,954,264 | 199,669,971 | 199,669,971 | 199,250,000 | 199,250,000 | 199,250,000 | 199,250,000 | 2022-06-04 | 2022-06-08 | CV. KHALIF | 81.540.809.1-733.000 | 330,029 | 0.17 % | |
756 | 2022 | RSUD Brigjen H. Hasan Basry | Pembuatan Jalan Paving menuju IPAL | Pengadaan Langsung | Pekerjaan Konstruksi | 6142282 | 35899291 | BLUD | 200,000,000 | 199,908,007 | 199,551,148 | 199,551,148 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-06-04 | 2022-06-08 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 448,852 | 0.22 % | |
757 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Kandangan Barat 5 | Pengadaan Langsung | Pekerjaan Konstruksi | 6143282 | 31650104 | APBD | 172,000,000 | 171,999,522 | 171,831,599 | 171,831,599 | 171,705,000 | 171,705,000 | 0 | 171,705,000 | 2022-06-14 | 2022-06-20 | CV. DEWI KUNTI | 02.242.675.3-733.000 | 168,401 | 0.1 % | |
758 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Kegiatan Pembuatan/Peningkatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan,Pengawasan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6144282 | 31933389 | APBD | 14,100,000 | 13,853,688 | 13,830,600 | 13,830,600 | 13,750,000 | 13,750,000 | 13,750,000 | 13,750,000 | 2022-06-07 | 2022-06-09 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 269,400 | 1.91 % | |
759 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Jarau Kec. Sungai Raya (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6145282 | 34715923 | APBD | 35,000,000 | 34,798,500 | 34,676,400 | 34,676,400 | 34,576,500 | 34,576,500 | 34,576,500 | 34,576,500 | 2022-06-21 | 2022-06-27 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 323,600 | 0.92 % | |
760 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pad Daerah Kabupaten/Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6146282 | 31933404 | APBD | 44,800,000 | 29,268,591 | 29,193,000 | 29,193,000 | 29,100,000 | 29,100,000 | 29,100,000 | 29,100,000 | 2022-06-07 | 2022-06-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 15,607,000 | 34.84 % | |
761 | 2022 | Dinas Pertanian | Pembangunan/Rehab Jaringan Irigasi Tersier (RJIT) Gapoktan Amban Basirang Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 6147282 | 32060298 | APBD | 199,950,000 | 199,935,250 | 199,738,092 | 199,738,092 | 199,591,900 | 199,591,900 | 100 | 199,591,900 | 2022-06-03 | 2022-06-07 | RIKA JAYA, CV | 01.424.626.8-733.000 | 211,908 | 0.11 % | |
762 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Pagar SD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6149282 | 31650036 | APBD | 30,000,000 | 29,942,318 | 29,860,554 | 29,860,554 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2022-06-03 | 2022-06-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 139,446 | 0.46 % | |
763 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6150282 | 31649983 | APBD | 91,876,500 | 91,712,159 | 91,661,358 | 91,661,358 | 91,597,200 | 91,597,200 | 91,597,200 | 91,597,200 | 2022-06-03 | 2022-06-08 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 215,142 | 0.23 % | |
764 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Aset Tetap Dalam Renovasi - Pemasangan Paving Blok Halaman Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 6151282 | 31980455 | APBD | 195,950,000 | 180,000,000 | 179,859,670 | 179,859,670 | 179,859,600 | 179,859,600 | 179,859,600 | 179,859,600 | 2022-06-03 | 2022-06-14 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 16,090,330 | 8.21 % | |
765 | 2022 | Dinas Pertanian | Pengawasan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6152282 | 32060293 | APBD | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,702,500 | 19,702,500 | 100 | 19,702,500 | 2022-06-03 | 2022-06-07 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 242,000 | 1.21 % | |
766 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Pamujaan Kec. Simpur (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6153282 | 34748586 | APBD | 45,000,000 | 44,871,750 | 44,738,550 | 44,738,550 | 44,688,600 | 44,688,600 | 44,688,600 | 44,688,600 | 2022-06-06 | 2022-06-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 261,450 | 0.58 % | |
767 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelaksanaan Kegiatan EPaksi (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6154282 | 35738797 | APBDP | 100,000,000 | 99,938,850 | 99,833,400 | 99,833,400 | 99,744,600 | 99,744,600 | 99,744,600 | 99,744,600 | 2022-06-06 | 2022-06-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 166,600 | 0.17 % | |
768 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Biopori (9Sekolah Adiwiyata x 3 titik),Pengadaan Komposter An Aerob Lengkap untuk Sekolah Adiwiyata,Pengadaan tanaman peneduh untuk sekolah Adiwiyata | Pengadaan Langsung | Pengadaan Barang | 6155282 | 32395208 | APBD | 111,303,000 | 89,440,000 | 88,999,000 | 88,999,000 | 88,900,000 | 88,900,000 | 88,900,000 | 88,900,000 | 2022-06-10 | 2022-06-14 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 22,304,000 | 20.04 % | |
769 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6156282 | 32562451 | APBD | 175,000,000 | 174,975,516 | 174,681,660 | 174,681,660 | 174,443,500 | 174,443,500 | 174,443,500 | 174,443,500 | 2022-06-13 | 2022-06-16 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 318,340 | 0.18 % | |
770 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6157282 | 32563335 | APBD | 12,250,000 | 12,249,960 | 12,232,200 | 12,232,200 | 12,210,000 | 12,210,000 | 12,210,000 | 12,210,000 | 2022-06-14 | 2022-06-17 | cv. vertical project | 03.169.392.2-734.000 | 17,800 | 0.15 % | |
771 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan Jalan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6158282 | 35397562 | APBD | 100,000,000 | 99,792,427 | 98,892,120 | 98,892,120 | 98,864,370 | 98,864,370 | 98,864,370 | 98,864,370 | 2022-07-18 | 2022-07-22 | cv.mitra talenta prima | 02.746.658.0-733.000 | 1,107,880 | 1.11 % | |
772 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kantor/ Guru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6159282 | 31649643 | APBD | 15,300,000 | 15,089,265 | 15,057,372 | 15,057,372 | 14,985,000 | 14,985,000 | 14,985,000 | 14,985,000 | 2022-06-07 | 2022-06-10 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 242,628 | 1.59 % | |
773 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana Prasaran dan Utilitas Sd,Pengawasan Pembangunan Halaman SDN Sungai Pinang 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6160282 | 31649769 | APBD | 26,600,000 | 26,582,699 | 26,437,980 | 26,437,980 | 26,362,500 | 26,362,500 | 26,362,500 | 26,362,500 | 2022-06-07 | 2022-06-10 | Wing Rastafarindo | 03.282.590.3-732.000 | 162,020 | 0.61 % | |
774 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Peningkatan Fungsi Hutan Kota untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Pengawasan Peningkatan TPU Gambah,Belanja Konsultansi Pengawasan Peningkatan Hiasan Jembatan Antaludin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6161282 | 31834337 | APBD | 22,058,900 | 21,845,466 | 21,744,900 | 21,744,900 | 21,650,000 | 21,650,000 | 21,650,000 | 21,650,000 | 2022-06-10 | 2022-06-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 314,000 | 1.42 % | |
775 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Jambu Hulu, Rehab WC SDN Jambu Hulu dan Pembangunan Pagar SDN Jambu Hulu Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6162282 | 35367103 | APBD | 195,000,000 | 194,877,644 | 193,726,566 | 193,726,566 | 193,637,000 | 193,637,000 | 193,637,000 | 193,637,000 | 2022-07-06 | 2022-07-12 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,273,434 | 0.65 % | |
776 | 2022 | Dinas Ketahanan Pangan | Pembangunan Lantai Jemur Desa Badaun Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6163282 | 32068155 | APBD | 154,100,000 | 154,100,000 | 153,929,554 | 153,929,554 | 153,800,000 | 153,800,000 | 100 | 153,800,000 | 2022-08-19 | 2022-08-24 | CV. SHINTA | 01.124.041.3-733.000 | 170,446 | 0.11 % | |
777 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Hamalau 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6165282 | 31650059 | APBD | 96,000,000 | 95,989,486 | 95,922,222 | 95,922,222 | 95,877,000 | 95,877,000 | 95,877,000 | 95,877,000 | 2022-08-24 | 2022-08-30 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 77,778 | 0.08 % | |
778 | 2022 | Dinas Kesehatan | Rehabilitasi Pustu Pantai Ulin | Pengadaan Langsung | Pekerjaan Konstruksi | 6167282 | 32400024 | APBD | 175,000,000 | 174,593,619 | 174,284,516 | 174,284,516 | 174,000,000 | 174,000,000 | 174,000,000 | 174,000,000 | 2022-06-24 | 2022-06-29 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 715,484 | 0.41 % | |
779 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 6170282 | 32633442 | APBD | 185,000,000 | 184,991,896 | 184,801,717 | 184,801,717 | 184,000,000 | 184,000,000 | 184,000,000 | 184,000,000 | 2022-06-24 | 2022-06-29 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 198,283 | 0.11 % | |
780 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Gapoktan Bahagia dan Poktan Buntit (2 Unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6171282 | 32061930 | APBD | 150,000,000 | 149,960,800 | 149,606,526 | 149,606,526 | 149,440,000 | 149,440,000 | 149,440,000 | 149,440,000 | 2022-06-15 | 2022-06-20 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 393,474 | 0.26 % | |
781 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Amparaya | Pengadaan Langsung | Pekerjaan Konstruksi | 6172282 | 32378797 | APBD | 150,000,000 | 149,999,611 | 149,827,886 | 149,827,886 | 149,250,000 | 149,250,000 | 149,250,000 | 149,250,000 | 2022-06-24 | 2022-06-29 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 172,114 | 0.11 % | |
782 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6173282 | 32380519 | APBD | 185,000,000 | 184,988,356 | 184,803,847 | 184,803,847 | 184,500,000 | 184,500,000 | 184,500,000 | 184,500,000 | 2022-06-23 | 2022-06-28 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 196,153 | 0.11 % | |
783 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6174282 | 32378505 | APBD | 80,000,000 | 80,000,000 | 79,696,857 | 79,696,857 | 79,500,000 | 79,500,000 | 79,500,000 | 79,500,000 | 2022-06-19 | 2022-06-22 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 303,143 | 0.38 % | |
784 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6175282 | 32442533 | APBD | 89,000,000 | 89,000,000 | 88,683,450 | 88,683,450 | 88,500,000 | 88,500,000 | 88,500,000 | 88,500,000 | 2022-06-19 | 2022-06-22 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 316,550 | 0.36 % | |
785 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6176282 | 31592325 | APBD | 18,000,000 | 18,000,000 | 17,937,600 | 17,937,600 | 17,871,000 | 17,871,000 | 0 | 17,871,000 | 2022-06-09 | 2022-06-14 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 62,400 | 0.35 % | |
786 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Poktan Mufakat dan Poktan Rasau Bakti (2 Unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6177282 | 36002557 | APBD | 150,000,000 | 149,960,800 | 149,926,725 | 149,926,725 | 149,815,700 | 149,815,700 | 149,815,700 | 149,815,700 | 2022-06-15 | 2022-06-20 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 73,275 | 0.05 % | |
787 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Poktan Kacipak dan Poktan Kalampaian (2 unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6178282 | 36002547 | APBD | 150,000,000 | 149,960,800 | 149,794,500 | 149,794,500 | 149,716,800 | 149,716,800 | 149,716,800 | 149,716,800 | 2022-06-13 | 2022-06-16 | FADWI UTAMA | 94.246.044.5-733.000 | 205,500 | 0.14 % | |
788 | 2022 | Dinas Pertanian | Pembangunan Sumur Bor Poktan Suka Maju Ds Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6179282 | 32061915 | APBD | 200,000,000 | 199,910,000 | 199,525,260 | 199,525,260 | 198,887,000 | 198,887,000 | 198,887,000 | 198,887,000 | 2022-06-13 | 2022-06-16 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 474,740 | 0.24 % | |
789 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Perpustakaan SDN Amawang Kiri Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6183282 | 31649604 | APBD | 114,000,000 | 113,996,926 | 113,900,362 | 113,900,362 | 113,662,000 | 113,662,000 | 0 | 113,662,000 | 2022-06-16 | 2022-06-21 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,638 | 0.09 % | |
790 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Jambu Hilir 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6184282 | 31649608 | APBD | 105,000,000 | 104,914,634 | 104,104,999 | 104,104,999 | 103,616,000 | 103,616,000 | 0 | 103,616,000 | 2022-06-20 | 2022-06-24 | CV. Cipta Pratama | 02.089.736.9-733.000 | 895,001 | 0.85 % | |
791 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Walangku | Pengadaan Langsung | Pekerjaan Konstruksi | 6185282 | 31649988 | APBD | 190,900,000 | 190,826,387 | 190,199,163 | 190,199,163 | 190,032,000 | 190,032,000 | 0 | 190,032,000 | 2022-06-20 | 2022-06-24 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 700,837 | 0.37 % | |
792 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kandangan Kota 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6186282 | 31649978 | APBD | 100,000,000 | 99,993,484 | 99,805,388 | 99,805,388 | 99,708,000 | 99,708,000 | 99,708,000 | 99,708,000 | 2022-06-29 | 2022-07-07 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 194,612 | 0.19 % | |
793 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Seranggan 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6187282 | 31649944 | APBD | 90,000,000 | 89,995,332 | 89,524,592 | 89,524,592 | 89,461,000 | 89,461,000 | 0 | 89,461,000 | 2022-06-22 | 2022-06-28 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 475,408 | 0.53 % | |
794 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Tamiang | Pengadaan Langsung | Pekerjaan Konstruksi | 6188282 | 31649941 | APBD | 90,000,000 | 89,980,100 | 89,867,591 | 89,867,591 | 89,767,000 | 89,767,000 | 0 | 89,767,000 | 2022-06-21 | 2022-06-28 | CV. CHAI CHEL | 03.063.051.1-731.000 | 132,409 | 0.15 % | |
795 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Teluk Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6189282 | 31649938 | APBD | 93,000,000 | 92,994,181 | 92,884,857 | 92,884,857 | 92,784,000 | 92,784,000 | 0 | 92,784,000 | 2022-06-21 | 2022-06-28 | CV. BERINGIN JAYA | 01.110.797.6-732.000 | 115,143 | 0.12 % | |
796 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Sungai Kali 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6190282 | 31649763 | APBD | 50,000,000 | 49,997,932 | 49,768,350 | 49,768,350 | 49,536,000 | 49,536,000 | 0 | 49,536,000 | 2022-06-20 | 2022-06-27 | cv.empat saudara | 02.243.056.5-735.000 | 231,650 | 0.46 % | |
797 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 6191282 | 31649756 | APBD | 50,000,000 | 49,957,764 | 49,588,541 | 49,588,541 | 49,089,000 | 49,089,000 | 0 | 49,089,000 | 2022-06-22 | 2022-06-27 | CV. SHINTA | 01.124.041.3-733.000 | 411,459 | 0.82 % | |
798 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6192282 | 32563306 | APBD | 12,950,000 | 12,949,982 | 12,920,400 | 12,920,400 | 12,876,000 | 12,876,000 | 12,876,000 | 12,876,000 | 2022-06-15 | 2022-06-20 | cv. vertical project | 03.169.392.2-734.000 | 29,600 | 0.23 % | |
799 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6193282 | 32563023 | APBD | 13,965,000 | 13,964,910 | 13,947,150 | 13,947,150 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-07-15 | 2022-07-20 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 17,850 | 0.13 % | |
800 | 2022 | Dinas Perdagangan | Pengawasan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6194282 | 32563388 | APBD | 13,825,000 | 13,824,995 | 13,797,300 | 13,797,300 | 13,708,500 | 13,708,500 | 13,708,500 | 13,708,500 | 2022-07-15 | 2022-07-19 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 27,700 | 0.2 % | |
801 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6195282 | 32563386 | APBD | 13,912,500 | 13,912,463 | 13,836,150 | 13,836,150 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 2022-06-22 | 2022-06-27 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 76,350 | 0.55 % | |
802 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6196282 | 32563341 | APBD | 14,000,000 | 13,999,986 | 13,830,600 | 13,830,600 | 13,819,500 | 13,819,500 | 13,819,500 | 13,819,500 | 2022-08-30 | 2022-09-05 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 169,400 | 1.21 % | |
803 | 2022 | Dinas Perdagangan | Pengawasan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6197282 | 32563357 | APBD | 12,950,000 | 12,949,926 | 12,942,600 | 12,942,600 | 12,931,500 | 12,931,500 | 12,931,500 | 12,931,500 | 2022-08-19 | 2022-08-24 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 7,400 | 0.06 % | |
804 | 2022 | Dinas Pertanian | Pengawasan Pembangunan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6198282 | 36016990 | APBD | 35,000,000 | 34,999,965 | 34,909,500 | 34,909,500 | 34,854,000 | 34,854,000 | 34,854,000 | 34,854,000 | 2022-06-13 | 2022-06-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 90,500 | 0.26 % | |
805 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PENGAWASAN DAK (Kandangan,Angkinang,Loksado,Sungai Raya) DAK,KONSULTAN PENGAWASAN DAK ( Daha Selatan,Daha Utara) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6199282 | 35058984;35059092 | APBD | 94,275,550 | 94,254,374 | 94,203,480 | 94,203,480 | 94,128,000 | 94,128,000 | 94,128,000 | 94,128,000 | 2022-06-13 | 2022-06-15 | Wing Rastafarindo | 03.282.590.3-732.000 | 72,070 | 0.08 % | |
806 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi IPAL dan Sanitasi Lingkungan Kawasan jalan Kesehatan dan Kawasan Mesjid Darul Khaliq Desa Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6203282 | 36025518 | APBD | 200,000,000 | 199,930,991 | 199,805,561 | 199,805,561 | 199,699,000 | 199,699,000 | 199,699,000 | 199,699,000 | 2022-06-13 | 2022-06-17 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 194,439 | 0.1 % | |
807 | 2022 | Dinas Perdagangan | Pekerjaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6205282 | 32562199 | APBD | 198,750,000 | 198,749,383 | 198,685,003 | 198,685,003 | 198,518,500 | 198,518,500 | 198,518,500 | 198,518,500 | 2022-06-22 | 2022-06-27 | CV.DITA | 02.242.686.0-733.000 | 64,997 | 0.03 % | |
808 | 2022 | Dinas Ketahanan Pangan | Biaya Konsultasi Pengawasan Pembangunan Lantai Jemur Desa Badaun Kecamatan Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6206282 | 32068123 | APBD | 10,000,000 | 10,000,000 | 9,928,950 | 9,928,950 | 9,928,000 | 9,928,000 | 100 | 9,928,000 | 2022-08-27 | 2022-08-31 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 71,050 | 0.71 % | |
809 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6207282 | 32563365 | APBD | 13,965,000 | 13,964,910 | 13,913,850 | 13,913,850 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-07-15 | 2022-07-19 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 51,150 | 0.37 % | |
810 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado,Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai 2 Kec. Loksado,Jasa Konsultansi Pengawasan Peningkatan Jl. Datar Belimbing Kec. Loksado,Jasa Konsultansi Pengawasan Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6209282 | 31562638 | APBD | 49,560,000 | 49,445,202 | 49,389,702 | 49,389,702 | 49,349,000 | 49,349,000 | 0 | 49,349,000 | 2022-07-01 | 2022-07-06 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 170,298 | 0.34 % | |
811 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Peninggian Jalan Desa Pantai Ulin Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6211282 | 31577432 | APBD | 58,800,000 | 58,716,378 | 58,608,000 | 58,608,000 | 58,585,000 | 58,585,000 | 0 | 58,585,000 | 2022-07-08 | 2022-07-13 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 192,000 | 0.33 % | |
812 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan),Jasa Konsultansi Pengawasan Siring Pasangan Batu Jalan Balanti Kec. Kalumpang,Jasa Konsultansi Pengawasan Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6212282 | 31577309 | APBD | 64,190,000 | 64,011,963 | 63,984,213 | 63,984,213 | 63,963,000 | 63,963,000 | 0 | 63,963,000 | 2022-07-07 | 2022-07-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 205,787 | 0.32 % | |
813 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung, Jl. Harapan Kel. Kandangan Barat Kec. Kandangan, Jalan HR Sukadani Desa Tabihi rt.03 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6213282 | 31576576 | APBD | 35,000,000 | 34,961,825 | 34,382,250 | 34,382,250 | 34,332,300 | 34,332,300 | 34,332,300 | 34,332,300 | 2022-07-29 | 2022-08-03 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 617,750 | 1.77 % | |
814 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan Jembatan Gantung Lungau Kec. Kandangan,Jasa Konsultansi Pengawasan Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6214282 | 31551904 | APBD | 14,600,000 | 14,557,874 | 14,504,370 | 14,504,370 | 14,463,300 | 14,463,300 | 0 | 14,463,300 | 2022-08-01 | 2022-08-09 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 95,630 | 0.66 % | |
815 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6217282 | 32562438 | APBD | 185,000,000 | 184,998,708 | 184,776,708 | 184,776,708 | 184,576,900 | 184,576,900 | 184,576,900 | 184,576,900 | 2022-06-15 | 2022-06-20 | FADWI UTAMA | 94.246.044.5-733.000 | 223,292 | 0.12 % | |
816 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat,Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6219282 | 31577375 | APBD | 48,310,000 | 48,187,699 | 48,085,429 | 48,085,429 | 48,048,000 | 48,048,000 | 0 | 48,048,000 | 2022-07-05 | 2022-07-11 | CV. DIAN GEMILANG KONSULINDO | 94.240.912.9-731.000 | 224,571 | 0.46 % | |
817 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6220282 | 31577489 | APBD | 59,290,000 | 59,135,830 | 59,123,000 | 59,123,000 | 59,074,200 | 59,074,200 | 0 | 59,074,200 | 2022-07-13 | 2022-07-19 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 167,000 | 0.28 % | |
818 | 2022 | Kecamatan Kandangan | Belanja Rehab Paving PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 6221282 | 32727377 | APBD | 75,850,000 | 40,002,000 | 39,817,803 | 39,817,803 | 39,750,000 | 39,750,000 | 39,750,000 | 39,750,000 | 2022-06-15 | 2022-06-17 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 36,032,197 | 47.5 % | |
819 | 2022 | Kecamatan Kandangan | Belanja Modal Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6222282 | 32543239 | APBD | 199,500,000 | 199,494,273 | 199,396,970 | 199,396,970 | 199,250,000 | 199,250,000 | 0 | 199,250,000 | 2022-06-15 | 2022-06-17 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 103,030 | 0.05 % | |
820 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan Insenerator | Pengadaan Langsung | Pekerjaan Konstruksi | 6225282 | 36044295 | BLUD | 200,000,000 | 199,611,656 | 199,436,447 | 199,436,447 | 198,500,000 | 198,500,000 | 198,500,000 | 198,500,000 | 2022-06-24 | 2022-06-29 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 563,553 | 0.28 % | |
821 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Saluran Drainase Desa Baluti Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6226282 | 36056148 | APBD | 173,923,000 | 173,895,807 | 173,840,287 | 173,840,287 | 172,913,000 | 172,913,000 | 172,913,000 | 172,913,000 | 2022-06-29 | 2022-07-05 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 82,713 | 0.05 % | |
822 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin jalan (Penanganan Longsor Desa Jelatang dan Desa Batu Laki Kec. Padang Batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 6227282 | 36056105 | APBD | 198,562,000 | 198,536,044 | 198,411,368 | 198,411,368 | 198,339,000 | 198,339,000 | 198,339,000 | 198,339,000 | 2022-07-09 | 2022-07-13 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 150,632 | 0.08 % | |
823 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Penanganan Longsor Desa Hamak Timur, Desa Pandulangan, dan Desa Telaga Langsat Kec. Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6228282 | 36056193 | APBD | 171,722,000 | 171,697,833 | 171,588,930 | 171,588,930 | 171,471,000 | 171,471,000 | 171,471,000 | 171,471,000 | 2022-07-01 | 2022-07-06 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 133,070 | 0.08 % | |
824 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Merdeka Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6229282 | 31592311 | APBD | 17,550,000 | 17,550,000 | 17,482,500 | 17,482,500 | 17,427,000 | 17,427,000 | 0 | 17,427,000 | 2022-06-22 | 2022-06-27 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 67,500 | 0.38 % | |
825 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Jalan Desa Simpur Kec. Simpur) | Pengadaan Langsung | Pekerjaan Konstruksi | 6230282 | 36056213 | APBD | 183,197,000 | 183,171,552 | 183,109,409 | 183,109,409 | 182,193,000 | 182,193,000 | 182,193,000 | 182,193,000 | 2022-06-29 | 2022-07-05 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 87,591 | 0.05 % | |
826 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab WC SDN Keramat Raya 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6231282 | 31649771 | APBD | 50,000,000 | 49,791,972 | 49,547,772 | 49,547,772 | 49,447,000 | 49,447,000 | 49,447,000 | 49,447,000 | 2022-06-16 | 2022-06-21 | CV. LALUNA DANA | 02.237.179.3-733.000 | 452,228 | 0.9 % | |
827 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Pihanin 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6232282 | 31650081 | APBD | 110,000,000 | 109,952,464 | 109,662,742 | 109,662,742 | 109,654,000 | 109,654,000 | 109,654,000 | 109,654,000 | 2022-08-01 | 2022-08-05 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 337,258 | 0.31 % | |
828 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bayanan 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6233282 | 31650112 | APBD | 160,000,000 | 159,999,616 | 159,739,029 | 159,739,029 | 159,582,000 | 159,582,000 | 159,582,000 | 159,582,000 | 2022-06-29 | 2022-07-05 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 260,971 | 0.16 % | |
829 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Peralatan Kerja Petugas Taman | Pengadaan Langsung | Pengadaan Barang | 6234282 | 31811730 | APBD | 80,000,000 | 79,494,000 | 79,359,000 | 79,359,000 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2022-06-20 | 2022-06-22 | CV. KHALIF | 81.540.809.1-733.000 | 641,000 | 0.8 % | |
830 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6235282 | 31576635 | APBD | 185,300,000 | 185,199,906 | 184,812,993 | 184,812,993 | 184,684,000 | 184,684,000 | 184,684,000 | 184,684,000 | 2022-06-23 | 2022-06-28 | CV.DITA | 02.242.686.0-733.000 | 487,007 | 0.26 % | |
831 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai 2 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6236282 | 35482820 | APBD | 195,000,000 | 194,964,701 | 193,033,895 | 193,033,895 | 193,033,000 | 193,033,000 | 193,033,000 | 193,033,000 | 2022-07-01 | 2022-07-06 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 1,966,105 | 1.01 % | |
832 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6237282 | 35482525 | APBD | 175,000,000 | 174,975,520 | 174,787,457 | 174,787,457 | 174,714,000 | 174,714,000 | 174,714,000 | 174,714,000 | 2022-06-24 | 2022-06-29 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 212,543 | 0.12 % | |
833 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Datar Belimbing Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6238282 | 35482715 | APBD | 173,000,000 | 172,823,783 | 171,878,631 | 171,878,631 | 171,775,000 | 171,775,000 | 171,775,000 | 171,775,000 | 2022-06-27 | 2022-07-01 | CV. ALBATROS | 01.222.160.2-733.000 | 1,121,369 | 0.65 % | |
834 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6239282 | 35489898 | APBD | 150,900,000 | 150,807,963 | 149,777,000 | 149,777,000 | 149,749,000 | 149,749,000 | 149,749,000 | 149,749,000 | 2022-06-27 | 2022-07-01 | CV. IZDIHAAR | 74.677.682.2-733.000 | 1,123,000 | 0.74 % | |
835 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6240282 | 35494450 | APBD | 199,600,000 | 199,442,711 | 199,316,839 | 199,316,839 | 199,199,000 | 199,199,000 | 199,199,000 | 199,199,000 | 2022-08-02 | 2022-08-08 | cv. bumi mandiri | 02.089.892.0-733.000 | 283,161 | 0.14 % | |
836 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan, Rehab / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Pekerjaan Konstruksi | 6241282 | 31663403 | APBD | 200,000,000 | 199,976,046 | 199,122,678 | 199,122,678 | 199,050,000 | 199,050,000 | 199,050,000 | 199,050,000 | 2022-07-06 | 2022-07-08 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 877,322 | 0.44 % | |
837 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6242282 | 35482891 | APBD | 200,000,000 | 199,970,917 | 199,814,642 | 199,814,642 | 199,725,000 | 199,725,000 | 199,725,000 | 199,725,000 | 2022-06-24 | 2022-06-29 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 185,358 | 0.09 % | |
838 | 2022 | Sekretariat Daerah | Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak (Cetak Buku Agenda) | Pengadaan Langsung | Pengadaan Barang | 6243282 | 35973362 | APBD | 71,720,000 | 71,600,000 | 71,500,000 | 71,500,000 | 71,400,000 | 0 | 0 | 0 | 2022-06-19 | 2022-06-24 | KARYA DWI CHADE | 75.416.433.3-733.000 | 220,000 | 0.31 % | |
839 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6244282 | 32950404 | APBD | 25,000,000 | 25,000,000 | 24,909,221 | 24,909,221 | 24,700,000 | 24,700,000 | 24,700,000 | 24,700,000 | 2022-06-25 | 2022-06-29 | cv. vertical project | 03.169.392.2-734.000 | 90,779 | 0.36 % | |
840 | 2022 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Renovasi Radiologi,Konsultan Pengawasan Rehab | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6245282 | 36057907;36058125 | BLUD | 80,000,000 | 80,000,000 | 79,698,000 | 79,698,000 | 79,000,000 | 79,000,000 | 79,000,000 | 79,000,000 | 2022-06-25 | 2022-06-29 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 302,000 | 0.38 % | |
841 | 2022 | Dinas Perikanan | Belanja Bibit Untuk Restocking | Pengadaan Langsung | Pengadaan Barang | 6246282 | 32500887 | APBD | 64,599,250 | 63,445,769 | 63,293,704 | 63,293,704 | 63,243,000 | 63,243,000 | 0 | 63,243,000 | 2022-06-22 | 2022-06-27 | Muda Membangun | 73.702.709.4-733.000 | 1,305,546 | 2.02 % | |
842 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6247282 | 31576606 | APBD | 184,000,000 | 183,960,630 | 183,124,982 | 183,124,982 | 183,031,000 | 183,031,000 | 183,031,000 | 183,031,000 | 2022-06-24 | 2022-06-29 | CV. LALUNA DANA | 02.237.179.3-733.000 | 875,018 | 0.48 % | |
843 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Alat Bantu Lainnya -- TPS Besi | Pengadaan Langsung | Pengadaan Barang | 6249282 | 35671608 | APBD | 130,000,000 | 128,138,400 | 127,849,800 | 127,849,800 | 127,750,000 | 127,750,000 | 127,750,000 | 127,750,000 | 2022-06-20 | 2022-06-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 2,150,200 | 1.65 % | |
844 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6250282 | 31576619 | APBD | 163,500,000 | 163,497,691 | 163,286,131 | 163,286,131 | 163,193,000 | 163,193,000 | 163,193,000 | 163,193,000 | 2022-09-02 | 2022-09-07 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 213,869 | 0.13 % | |
845 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang sedang ruang kelas SMPN 3 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6252282 | 31634328 | APBD | 184,756,400 | 184,152,190 | 183,745,795 | 183,745,795 | 183,634,000 | 183,634,000 | 183,634,000 | 183,634,000 | 2022-06-20 | 2022-06-23 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,010,605 | 0.55 % | |
846 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang Ruang Kelas SMPN 4 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6253282 | 31634380 | APBD | 105,750,000 | 105,749,993 | 105,575,145 | 105,575,145 | 105,464,000 | 105,464,000 | 105,464,000 | 105,464,000 | 2022-06-27 | 2022-07-01 | cv. afmi bersaudara | 03.266.032.6-731.000 | 174,855 | 0.17 % | |
847 | 2022 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas Lapangan (PDL),Belanja Pakaian Dinas Harian (PDH) | Pengadaan Langsung | Pengadaan Barang | 6257282 | 32045108;32045124 | APBD | 136,500,000 | 136,363,500 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 2022-06-20 | 2022-06-27 | FADWI UTAMA | 94.246.044.5-733.000 | 369,600 | 0.27 % | |
848 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6259282 | 31716465 | APBD | 17,100,000 | 17,100,000 | 16,983,000 | 16,983,000 | 16,966,000 | 16,966,000 | 16,966,000 | 16,966,000 | 2022-06-28 | 2022-07-01 | cv.akmalindo | 02.531.482.4-731.000 | 117,000 | 0.68 % | |
849 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6260282 | 32146210 | APBD | 15,600,000 | 15,600,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 2022-06-24 | 2022-06-29 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.64 % | |
850 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6261282 | 32146252 | APBD | 14,900,000 | 14,900,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2022-06-24 | 2022-06-29 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.67 % | |
851 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6262282 | 32146263 | APBD | 14,000,000 | 14,000,000 | 13,999,320 | 13,999,320 | 13,969,000 | 13,969,000 | 13,969,000 | 13,969,000 | 2022-07-02 | 2022-07-07 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 680 | 0 % | |
852 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6263282 | 32146193 | APBD | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,916,000 | 16,916,000 | 16,916,000 | 16,916,000 | 2022-07-01 | 2022-07-06 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 50,000 | 0.29 % | |
853 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6264282 | 32147100 | APBD | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,911,000 | 16,911,000 | 16,911,000 | 16,911,000 | 2022-07-01 | 2022-07-06 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 50,000 | 0.29 % | |
854 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6265282 | 32147171 | APBD | 16,000,000 | 16,000,000 | 15,999,540 | 15,999,540 | 15,959,000 | 15,959,000 | 15,959,000 | 15,959,000 | 2022-07-02 | 2022-07-07 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 460 | 0 % | |
855 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Hiasan Jembatan Antaluddin | Pengadaan Langsung | Pekerjaan Konstruksi | 6267282 | 35827133 | APBD | 95,000,000 | 94,682,685 | 94,219,242 | 94,219,242 | 94,100,000 | 94,100,000 | 94,100,000 | 94,100,000 | 2022-06-22 | 2022-06-24 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 780,758 | 0.82 % | |
856 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6268282 | 32398836 | APBD | 50,000,000 | 50,000,000 | 49,950,000 | 49,950,000 | 49,500,000 | 49,500,000 | 49,500,000 | 49,500,000 | 2022-06-24 | 2022-06-29 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 50,000 | 0.1 % | |
857 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Martajiwa Kec. Angkinang (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6270282 | 34722320 | APBD | 27,000,000 | 26,917,500 | 26,806,500 | 26,806,500 | 26,751,000 | 26,751,000 | 26,751,000 | 26,751,000 | 2022-06-21 | 2022-06-27 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 193,500 | 0.72 % | |
858 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Pengawasan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6271282 | 35196983 | APBD | 60,000,000 | 59,993,280 | 59,557,050 | 59,557,050 | 59,496,000 | 59,496,000 | 59,496,000 | 59,496,000 | 2022-06-23 | 2022-06-29 | cv.akmalindo | 02.531.482.4-731.000 | 442,950 | 0.74 % | |
859 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Ruang Perpustakaan SMPN 2 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6272282 | 35964802 | APBD | 32,000,000 | 31,857,000 | 31,496,250 | 31,496,250 | 31,440,750 | 31,440,750 | 31,440,750 | 31,440,750 | 2022-06-23 | 2022-06-29 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 503,750 | 1.57 % | |
860 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman SDN Sungai Pinang 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6278282 | 31650051 | APBD | 13,000,000 | 12,977,559 | 12,937,716 | 12,937,716 | 12,876,000 | 12,876,000 | 12,876,000 | 12,876,000 | 2022-06-22 | 2022-06-27 | Wing Rastafarindo | 03.282.590.3-732.000 | 62,284 | 0.48 % | |
861 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6282282 | 35491199 | APBD | 170,000,000 | 169,999,154 | 169,036,378 | 169,036,378 | 169,000,000 | 169,000,000 | 169,000,000 | 169,000,000 | 2022-06-27 | 2022-06-30 | CV. LALUNA DANA | 02.237.179.3-733.000 | 963,622 | 0.57 % | |
862 | 2022 | RSUD Brigjen H. Hasan Basry | Kontrak Service Always On Service (AOS) ARCHITECT i1000 SR (BLUD) | Pengadaan Langsung | Jasa Lainnya | 6284282 | 35662872 | BLUD | 198,024,000 | 198,024,000 | 198,000,000 | 198,000,000 | 196,500,000 | 196,500,000 | 196,500,000 | 196,500,000 | 2022-06-25 | 2022-06-29 | Rajawali Nusindo | 01.061.248.9-051.000 | 24,000 | 0.01 % | |
863 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Jaringan Hidran Eksisting Dan Baru RSUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6287282 | 36060149 | BLUD | 50,000,000 | 49,429,592 | 49,284,000 | 49,284,000 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2022-06-26 | 2022-06-29 | CV.SMILEINDO JAYA KONSULTAN | 83.812.802.3-731.000 | 716,000 | 1.43 % | |
864 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Penanganan permukiman terdampak Bencana dan Relokasi Program Kabupaten/Kota | Pengadaan Langsung | Jasa Lainnya | 6288282 | 32427235 | APBD | 60,000,000 | 59,826,780 | 59,341,710 | 59,341,710 | 59,280,000 | 59,280,000 | 59,280,000 | 59,280,000 | 2022-06-28 | 2022-06-30 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 658,290 | 1.1 % | |
865 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6289282 | 35493346 | APBD | 198,500,000 | 198,474,171 | 198,336,077 | 198,336,077 | 198,245,000 | 198,245,000 | 198,245,000 | 198,245,000 | 2022-07-27 | 2022-08-02 | cv. bumi mandiri | 02.089.892.0-733.000 | 163,924 | 0.08 % | |
866 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Jaringan Instalasi Listrik dan Panel Genset di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pekerjaan Konstruksi | 6291282 | 32951163 | APBD | 170,000,000 | 169,983,553 | 169,823,779 | 169,823,779 | 169,500,000 | 169,500,000 | 169,500,000 | 169,500,000 | 2022-06-28 | 2022-06-30 | FADWI UTAMA | 94.246.044.5-733.000 | 176,221 | 0.1 % | |
867 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Intake DI. Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6292282 | 31455752 | APBD | 15,000,000 | 15,000,000 | 14,922,840 | 14,922,840 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2022-06-28 | 2022-07-04 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 77,160 | 0.51 % | |
868 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Perencanaan Pembangunan Saluran Pembuang Irigasi Di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6293282 | 36109403 | APBD | 35,880,000 | 35,880,000 | 35,697,600 | 35,697,600 | 35,586,600 | 35,586,600 | 35,586,600 | 35,586,600 | 2022-06-28 | 2022-07-04 | STUDY ARCHI CONSULTANT | 03.132.867.7-735.000 | 182,400 | 0.51 % | |
869 | 2022 | Dinas Perikanan | Pengadaan Perahu Motor Tempel dan Perahu Kayu | Pengadaan Langsung | Pengadaan Barang | 6296282 | 32429793;32429854 | APBD | 225,000,000 | 199,245,000 | 198,967,500 | 198,967,500 | 198,856,500 | 198,856,500 | 0 | 198,856,500 | 2022-08-01 | 2022-08-04 | CV. AL QAWS | 70.619.811.6-733.000 | 26,032,500 | 11.57 % | |
870 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Sungai Pinang 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6298282 | 31650109 | APBD | 179,100,000 | 179,063,505 | 178,946,892 | 178,946,892 | 178,825,000 | 178,825,000 | 178,825,000 | 178,825,000 | 2022-07-05 | 2022-07-11 | CV. PUTRA TUNGGAL | 02.215.642.6-732.000 | 153,108 | 0.09 % | |
871 | 2022 | Dinas Pertanian | Rehab BPP Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6299282 | 32061083 | APBD | 199,500,000 | 199,467,000 | 199,249,083 | 199,249,083 | 198,914,500 | 198,914,500 | 198,914,500 | 198,914,500 | 2022-06-30 | 2022-07-05 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 250,917 | 0.13 % | |
872 | 2022 | Dinas Perhubungan | Perencanaan Pembangunan Halte Sungai dan Rehabilitasi WC / KM Dermaga Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6300282 | 32134692 | APBD | 10,000,000 | 9,982,920 | 9,978,012 | 9,978,012 | 9,978,000 | 9,978,000 | 9,978,000 | 9,978,000 | 2022-06-28 | 2022-07-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 21,988 | 0.22 % | |
873 | 2022 | Dinas Pertanian | Rehab BPP Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 6301282 | 32061021 | APBD | 198,800,000 | 198,250,000 | 198,039,677 | 198,039,677 | 197,852,900 | 197,852,900 | 197,852,900 | 197,852,900 | 2022-06-30 | 2022-07-05 | CV. KHALIF | 81.540.809.1-733.000 | 760,323 | 0.38 % | |
874 | 2022 | Dinas Pertanian | Rehab BPP Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6302282 | 32061029 | APBD | 167,500,000 | 167,311,942 | 167,219,812 | 167,219,812 | 167,147,600 | 167,147,600 | 167,147,600 | 167,147,600 | 2022-06-30 | 2022-07-05 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 280,188 | 0.17 % | |
875 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Balanti Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6304282 | 35492361 | APBD | 198,000,000 | 197,975,366 | 197,797,804 | 197,797,804 | 197,636,000 | 197,636,000 | 197,636,000 | 197,636,000 | 2022-07-27 | 2022-08-02 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 202,196 | 0.1 % | |
876 | 2022 | Kecamatan Daha Utara | Belanja Rehab Lapangan Tenis Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6305282 | 32097528 | APBD | 110,000,000 | 109,954,000 | 109,343,266 | 109,343,266 | 109,250,000 | 109,250,000 | 109,250,000 | 109,250,000 | 2022-07-01 | 2022-07-05 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 656,734 | 0.6 % | |
877 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6306282 | 35198529 | APBD | 14,529,700 | 14,528,790 | 14,422,100 | 14,422,100 | 14,414,100 | 14,414,100 | 14,414,100 | 14,414,100 | 2022-07-02 | 2022-07-06 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 107,600 | 0.74 % | |
878 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6308282 | 35199157 | APBD | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 2022-07-06 | 2022-07-11 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 1 % | |
879 | 2022 | Kecamatan Daha Utara | Belanja Jasa Konsultasi Pengawasan Rehab Lapangan Tenis dan Taman Rahimin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6309282 | 32115656 | APBD | 24,570,000 | 24,564,000 | 24,401,053 | 24,401,053 | 24,300,000 | 24,300,000 | 24,300,000 | 24,300,000 | 2022-07-01 | 2022-07-05 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 168,947 | 0.69 % | |
880 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6310282 | 35494722 | APBD | 198,300,000 | 198,273,747 | 198,027,683 | 198,027,683 | 197,943,000 | 197,943,000 | 197,943,000 | 197,943,000 | 2022-07-06 | 2022-07-11 | CV. URANUS XBER | 92.599.591.2-733.000 | 272,317 | 0.14 % | |
881 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6311282 | 35489949 | APBD | 193,750,000 | 193,720,800 | 193,526,075 | 193,526,075 | 193,479,000 | 193,479,000 | 193,479,000 | 193,479,000 | 2022-06-30 | 2022-07-06 | CV.Bangun Banua | 93.708.167.7-733.000 | 223,925 | 0.12 % | |
882 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6312282 | 35490247 | APBD | 166,000,000 | 165,981,154 | 165,866,115 | 165,866,115 | 165,838,000 | 165,838,000 | 165,838,000 | 165,838,000 | 2022-08-02 | 2022-08-18 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 133,885 | 0.08 % | |
883 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6313282 | 35490145 | APBD | 165,000,000 | 164,985,066 | 164,836,949 | 164,836,949 | 164,803,000 | 164,803,000 | 164,803,000 | 164,803,000 | 2022-08-01 | 2022-08-05 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 163,051 | 0.1 % | |
884 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6314282 | 35494307 | APBD | 195,500,000 | 195,488,273 | 195,421,085 | 195,421,085 | 195,195,000 | 195,195,000 | 195,195,000 | 195,195,000 | 2022-07-29 | 2022-08-03 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 78,915 | 0.04 % | |
885 | 2022 | Dinas Pertanian | Rehab BPP Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6317282 | 32061045 | APBD | 198,700,000 | 198,680,000 | 198,294,413 | 198,294,413 | 198,158,000 | 198,158,000 | 198,158,000 | 198,158,000 | 2022-07-04 | 2022-07-07 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 405,587 | 0.2 % | |
886 | 2022 | Dinas Pertanian | Rehab BPP Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6318282 | 32061006 | APBD | 199,000,000 | 198,680,000 | 198,280,236 | 198,280,236 | 197,918,000 | 197,918,000 | 197,918,000 | 197,918,000 | 2022-07-04 | 2022-07-07 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 719,764 | 0.36 % | |
887 | 2022 | Dinas Pertanian | Pengawasan Rehab BPP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6319282 | 32060983 | APBD | 85,435,125 | 85,435,125 | 85,026,000 | 85,026,000 | 84,915,000 | 84,915,000 | 84,915,000 | 84,915,000 | 2022-07-01 | 2022-07-05 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 409,125 | 0.48 % | |
888 | 2022 | Kecamatan Simpur | Konsultan Pengawasan Rehab Ringan Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6323282 | 35841491 | APBD | 10,500,000 | 10,346,000 | 10,290,852 | 10,290,852 | 10,250,000 | 10,250,000 | 10,250,000 | 10,250,000 | 2022-07-01 | 2022-07-05 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 209,148 | 1.99 % | |
889 | 2022 | Dinas Pertanian | Pengawasan Renovasi BPP Model dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6324282 | 34695749 | APBD | 80,000,000 | 80,000,000 | 79,720,200 | 79,720,200 | 79,642,500 | 79,642,500 | 79,642,500 | 79,642,500 | 2022-07-01 | 2022-07-05 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 279,800 | 0.35 % | |
890 | 2022 | Inspektorat Daerah | Pengawasan Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6325282 | 34907441 | APBD | 10,000,000 | 10,000,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 2022-07-07 | 2022-07-18 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 125,000 | 1.25 % | |
891 | 2022 | Inspektorat Daerah | Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Pekerjaan Konstruksi | 6326282 | 31933125 | APBD | 195,000,000 | 193,458,345 | 193,062,789 | 193,062,789 | 192,860,000 | 192,860,000 | 192,860,000 | 192,860,000 | 2022-07-07 | 2022-07-19 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,937,211 | 0.99 % | |
892 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6327282 | 31576747 | APBD | 182,000,000 | 181,998,805 | 181,827,208 | 181,827,208 | 181,818,000 | 181,818,000 | 181,818,000 | 181,818,000 | 2022-07-13 | 2022-07-19 | CV. AISY | 75.132.070.6-733.000 | 172,792 | 0.09 % | |
893 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6328282 | 35494539 | APBD | 157,000,000 | 156,988,266 | 156,813,683 | 156,813,683 | 156,781,000 | 156,781,000 | 156,781,000 | 156,781,000 | 2022-07-13 | 2022-07-19 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 186,317 | 0.12 % | |
894 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Panglima Dambung | Pengadaan Langsung | Pekerjaan Konstruksi | 6329282 | 31649935 | APBD | 90,000,000 | 89,993,001 | 89,904,711 | 89,904,711 | 89,804,000 | 89,804,000 | 89,804,000 | 89,804,000 | 2022-07-05 | 2022-07-11 | CV. NOOR LITA DAMAYANTI | 03.063.055.2-731.000 | 95,289 | 0.11 % | |
895 | 2022 | Kecamatan Simpur | Belanja Modal Pemeliharaan/Rehab Ringan Rumah Dinas | Pengadaan Langsung | Pekerjaan Konstruksi | 6330282 | 35901588 | APBD | 127,000,000 | 126,969,000 | 126,621,592 | 126,621,592 | 126,500,000 | 126,500,000 | 126,500,000 | 126,500,000 | 2022-07-06 | 2022-07-08 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 378,408 | 0.3 % | |
896 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6331282 | 35490433 | APBD | 164,000,000 | 163,980,096 | 163,937,890 | 163,937,890 | 163,889,000 | 163,889,000 | 163,889,000 | 163,889,000 | 2022-07-19 | 2022-07-22 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 62,110 | 0.04 % | |
897 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6333282 | 31705509 | APBD | 24,000,000 | 23,993,344 | 23,254,500 | 23,254,500 | 23,150,000 | 23,150,000 | 23,150,000 | 23,150,000 | 2022-07-06 | 2022-07-08 | cv. vertical project | 03.169.392.2-734.000 | 745,500 | 3.11 % | |
898 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Ruang Pelayanan Publik Dinas PUTR Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6334282 | 31716501 | APBD | 200,000,000 | 199,996,961 | 199,815,154 | 199,815,154 | 199,799,000 | 199,799,000 | 199,799,000 | 199,799,000 | 2022-07-14 | 2022-07-19 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 184,846 | 0.09 % | |
899 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6335282 | 35779241 | APBD | 45,000,000 | 44,880,246 | 44,497,680 | 44,497,680 | 44,414,000 | 44,414,000 | 44,414,000 | 44,414,000 | 2022-08-19 | 2022-08-25 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 502,320 | 1.12 % | |
900 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Pandak Daun - Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6336282 | 35779053 | APBD | 40,000,000 | 39,997,194 | 39,604,933 | 39,604,933 | 39,560,400 | 39,560,400 | 39,560,400 | 39,560,400 | 2022-07-27 | 2022-08-02 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 395,067 | 0.99 % | |
901 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6337282 | 35779459 | APBD | 40,000,000 | 39,997,194 | 39,535,980 | 39,535,980 | 39,493,000 | 39,493,000 | 39,493,000 | 39,493,000 | 2022-08-19 | 2022-08-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 464,020 | 1.16 % | |
902 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Bayanan - Habirau Tengah (Jl. Inpres) Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6338282 | 35777691 | APBD | 40,000,000 | 39,997,194 | 39,509,340 | 39,509,340 | 39,460,500 | 39,460,500 | 39,460,500 | 39,460,500 | 2022-07-27 | 2022-08-02 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 490,660 | 1.23 % | |
903 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6339282 | 35491023 | APBD | 150,000,000 | 149,992,085 | 149,870,162 | 149,870,162 | 149,839,000 | 149,839,000 | 149,839,000 | 149,839,000 | 2022-08-19 | 2022-08-24 | CV. LALUNA DANA | 02.237.179.3-733.000 | 129,838 | 0.09 % | |
904 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembuatan Ruang Pelayanan Publik Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6340282 | 31716451 | APBD | 18,000,000 | 18,000,000 | 17,900,000 | 17,900,000 | 17,878,000 | 17,878,000 | 17,878,000 | 17,878,000 | 2022-07-16 | 2022-07-20 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.56 % | |
905 | 2022 | Dinas Pertanian | Belanja Natura dan Pakan-Pakan | Pengadaan Langsung | Pengadaan Barang | 6341282 | 32037365 | APBD | 129,750,000 | 97,920,870 | 97,857,600 | 97,857,600 | 97,804,800 | 97,804,800 | 97,804,800 | 97,804,800 | 2022-07-12 | 2022-07-18 | CV. KATIBURA | 53.260.332.1-733.000 | 31,892,400 | 24.58 % | |
906 | 2022 | Kecamatan Kandangan | Pemeliharaan PJU di RT 05 dan RT 08 Kel Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6342282 | 36212026 | APBD | 100,000,000 | 99,971,000 | 99,680,886 | 99,680,886 | 99,550,000 | 99,550,000 | 99,550,000 | 99,550,000 | 2022-07-06 | 2022-07-08 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 319,114 | 0.32 % | |
907 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6343282 | 32146272 | APBD | 16,200,000 | 16,200,000 | 16,143,063 | 16,143,063 | 16,095,000 | 16,095,000 | 16,095,000 | 16,095,000 | 2022-07-27 | 2022-08-02 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 56,937 | 0.35 % | |
908 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Tamiyang | Pengadaan Langsung | Pekerjaan Konstruksi | 6346282 | 32386257 | APBD | 185,000,000 | 184,938,562 | 184,805,156 | 184,805,156 | 184,350,000 | 184,350,000 | 184,350,000 | 184,350,000 | 2022-07-20 | 2022-07-22 | CV. MEGA BUANA SAKTI | 02.324.986.3-733.000 | 194,844 | 0.11 % | |
909 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6347282 | 35490012 | APBD | 163,000,000 | 162,984,912 | 162,603,653 | 162,603,653 | 162,445,000 | 162,445,000 | 162,445,000 | 162,445,000 | 2022-08-04 | 2022-08-10 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 396,347 | 0.24 % | |
910 | 2022 | Dinas Pertanian | Rehab BPP Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6350282 | 32061106 | APBD | 200,000,000 | 199,660,000 | 199,642,578 | 199,642,578 | 199,366,400 | 199,366,400 | 199,366,400 | 199,366,400 | 2022-07-13 | 2022-07-18 | CV. ALBATROS | 01.222.160.2-733.000 | 357,422 | 0.18 % | |
911 | 2022 | Dinas Pertanian | Rehab BPP Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6351282 | 32061065 | APBD | 175,000,000 | 174,814,000 | 174,667,205 | 174,667,205 | 174,527,400 | 174,527,400 | 174,527,400 | 174,527,400 | 2022-07-13 | 2022-07-18 | CV. SHINTA | 01.124.041.3-733.000 | 332,795 | 0.19 % | |
912 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6352282 | 35495202 | APBD | 199,500,000 | 199,490,626 | 199,216,193 | 199,216,193 | 199,125,000 | 199,125,000 | 199,125,000 | 199,125,000 | 2022-07-08 | 2022-07-13 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 283,807 | 0.14 % | |
913 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya,Jasa Konsultansi Pengawasan Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6353282 | 31577527 | APBD | 59,310,000 | 59,302,330 | 59,230,491 | 59,230,491 | 59,163,000 | 59,163,000 | 0 | 59,163,000 | 2022-07-08 | 2022-07-13 | CV. DIAN GEMILANG KONSULINDO | 94.240.912.9-731.000 | 79,509 | 0.13 % | |
914 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6354282 | 31551774 | APBD | 188,100,000 | 188,076,336 | 187,903,064 | 187,903,064 | 187,878,000 | 187,878,000 | 187,878,000 | 187,878,000 | 2022-07-08 | 2022-07-13 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 196,936 | 0.1 % | |
915 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6355282 | 31716517 | APBD | 180,000,000 | 179,840,592 | 179,774,560 | 179,774,560 | 179,719,000 | 179,719,000 | 179,719,000 | 179,719,000 | 2022-08-19 | 2022-08-25 | CV. ALBATROS | 01.222.160.2-733.000 | 225,440 | 0.13 % | |
916 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6356282 | 32562579 | APBD | 197,500,000 | 197,498,378 | 197,147,439 | 197,147,439 | 196,953,100 | 196,953,100 | 196,953,100 | 196,953,100 | 2022-07-15 | 2022-07-19 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 352,561 | 0.18 % | |
917 | 2022 | Dinas Perdagangan | Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6357282 | 32562626 | APBD | 199,500,000 | 199,488,441 | 199,294,404 | 199,294,404 | 199,183,400 | 199,183,400 | 199,183,400 | 199,183,400 | 2022-07-15 | 2022-07-19 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 205,596 | 0.1 % | |
918 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Mambaul Ulum Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6358282 | 31632250 | APBD | 198,500,000 | 198,407,898 | 197,573,890 | 197,573,890 | 197,497,000 | 197,497,000 | 197,497,000 | 197,497,000 | 2022-07-15 | 2022-07-20 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 926,110 | 0.47 % | |
919 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6359282 | 32562616 | APBD | 199,500,000 | 199,498,227 | 199,376,127 | 199,376,127 | 199,221,800 | 199,221,800 | 199,221,800 | 199,221,800 | 2022-07-15 | 2022-07-19 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 123,873 | 0.06 % | |
920 | 2022 | Kecamatan Telaga Langsat | Rehab Atap dan Plapond Aula Kantor Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6360282 | 32617061 | APBD | 20,000,000 | 19,992,339 | 19,859,977 | 19,859,977 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2022-07-12 | 2022-07-14 | FADWI UTAMA | 94.246.044.5-733.000 | 140,023 | 0.7 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing RT.03 Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1282 | 35681150 | 36,700,000 | 36,700,000 | 36,520,000 | 36,520,000 | 36,408,000 | 36,408,000 | 0 | 36,408,000 | 2022-05-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 180,000 | 0.49 % | |
2 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang Batung dan Jasa Konsultansi Perencanaan Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2282 | 35679861 | 34,400,000 | 34,400,000 | 34,202,420 | 34,202,420 | 34,077,000 | 34,077,000 | 34,077,000 | 34,077,000 | 2022-06-17 | cv.airlangga konsultan | 03.122.016.3-732.000 | 197,580 | 0.57 % | |
3 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Perencanaan Normalisasi Sungai Tabuk Desa Tamiyang Kec. Sungai Raya, Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hamalau Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Normalisasi Sungai Buluh Padang Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 7282 | 35680289 | 73,000,000 | 73,000,000 | 72,600,000 | 72,600,000 | 72,483,000 | 72,483,000 | 72,483,000 | 72,483,000 | 2022-06-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 400,000 | 0.55 % | |
4 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Sungai Alimin Desa Baru Kec. Daha Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau lama Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 8282 | 35729911 | 39,000,000 | 39,000,000 | 38,833,350 | 38,833,350 | 38,761,200 | 38,761,200 | 38,761,200 | 38,761,200 | 2022-06-16 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 166,650 | 0.43 % | |
5 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Baru Kec. Daha Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10282 | 35730000 | 40,000,000 | 40,000,000 | 39,763,551 | 39,763,551 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2022-06-23 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 236,449 | 0.59 % | |
6 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jaranih Desa Mandala Kec. Telaga Langsat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 13282 | 35679997 | 33,500,000 | 33,500,000 | 33,386,540 | 33,386,540 | 33,322,200 | 33,322,200 | 33,322,200 | 33,322,200 | 2022-06-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 113,460 | 0.34 % | |
7 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Bayanan - Habirau Tengah (Jl. Inpres) Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 14282 | 35445844 | 45,000,000 | 44,802,752 | 44,655,300 | 44,655,300 | 44,557,000 | 44,557,000 | 0 | 0 | 2022-04-26 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 344,700 | 0.77 % | |
8 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi Hilir mesjid Kec.Padang Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 20282 | 31455552 | 16,000,000 | 16,000,000 | 15,952,920 | 15,952,920 | 15,917,400 | 15,917,400 | 15,917,400 | 15,917,400 | 2022-06-23 | Wing Rastafarindo | 03.282.590.3-732.000 | 47,080 | 0.29 % | |
9 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 23282 | 31456876 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-06-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 20,000 | 0.1 % | |
10 | 2022 | Dinas Pendidikan dan Kebudayaan | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan | Pengadaan Langsung | Pengadaan Barang | 25282 | 31631779 | 99,676,500 | 99,676,335 | 99,253,980 | 99,253,980 | 99,199,000 | 99,199,000 | 0 | 99,199,000 | 2022-05-23 | CV. An-Nidha | 02.675.485.3-733.000 | 422,520 | 0.42 % | |
11 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Sungai Simpang Tanjung Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 26282 | 31456820 | 15,500,000 | 15,500,000 | 15,318,000 | 15,318,000 | 15,251,400 | 15,251,400 | 15,251,400 | 15,251,400 | 2022-06-16 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 182,000 | 1.17 % | |
12 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Marta Jiwa Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 27282 | 31632238 | 198,500,000 | 198,471,858 | 197,265,843 | 197,265,843 | 197,197,000 | 197,197,000 | 0 | 197,197,000 | 2022-05-26 | CV. Cipta Pratama | 02.089.736.9-733.000 | 1,234,157 | 0.62 % | |
13 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung, Jl. Harapan Kel. Kandangan Barat Kec. Kandangan, Jalan HR Sukadani Desa Tabihi rt.03 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 33282 | 31576589 | 45,000,000 | 44,925,851 | 44,824,020 | 44,824,020 | 44,800,000 | 44,800,000 | 0 | 44,800,000 | 2022-06-13 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 175,980 | 0.39 % | |
14 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Ambarai | Pengadaan Langsung | Pekerjaan Konstruksi | 34282 | 31650072 | 70,000,000 | 69,993,468 | 69,853,025 | 69,853,025 | 69,797,000 | 69,797,000 | 0 | 69,797,000 | 2022-05-27 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 146,975 | 0.21 % | |
15 | 2022 | Dinas Perikanan | Belanja Natura dan pakan-pakan | Pengadaan Langsung | Pengadaan Barang | 36282 | 35682697 | 91,872,200 | 91,758,705 | 91,692,105 | 91,692,105 | 91,570,500 | 91,570,500 | 0 | 91,570,500 | 2022-05-18 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 180,095 | 0.2 % | |
16 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 38282 | 32146164 | 200,000,000 | 199,998,418 | 199,847,738 | 199,847,738 | 199,708,000 | 199,708,000 | 0 | 199,708,000 | 2022-05-13 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 152,262 | 0.08 % | |
17 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kandangan Kota 7 | Pengadaan Langsung | Pekerjaan Konstruksi | 39282 | 31649968 | 90,000,000 | 89,996,149 | 89,646,448 | 89,646,448 | 89,295,000 | 89,295,000 | 0 | 89,295,000 | 2022-05-23 | CV. SAHABAT SARANA TEKNIK MANDIRI | 94.007.054.3-733.000 | 353,552 | 0.39 % | |
18 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Bumi Thaibah | Pengadaan Langsung | Pekerjaan Konstruksi | 41282 | 31649962 | 100,000,000 | 99,989,931 | 99,934,431 | 99,934,431 | 99,878,000 | 99,878,000 | 99,878,000 | 99,878,000 | 2022-06-28 | CV.DITA | 02.242.686.0-733.000 | 65,569 | 0.07 % | |
19 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 42282 | 35740370 | 33,100,000 | 33,100,000 | 32,908,170 | 32,908,170 | 32,811,600 | 32,811,600 | 32,811,600 | 32,811,600 | 2022-06-16 | Wiyasa Drawana | 80.902.072.0-731.000 | 191,830 | 0.58 % | |
20 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing Pulau Nagara RT.02 Kel. Jambu Hilir Kec.Kandangan dan Jasa Konsultansi Perencanaan Perkuatan tebing di Kelurahan jambu hilir RT.11 Kec.Kandangan; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 43282 | 35679796 | 40,000,000 | 40,000,000 | 39,948,900 | 39,948,900 | 39,871,200 | 39,871,200 | 0 | 39,871,200 | 2022-05-17 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 51,100 | 0.13 % | |
21 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Biaya Pemeliharaan Rutin PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 52282 | 31832282 | 150,000,000 | 149,898,424 | 149,542,952 | 149,542,952 | 149,350,000 | 149,350,000 | 0 | 149,350,000 | 2022-05-11 | CV.RIYO JAYA TEHNIK | 03.094.054.8-732.000 | 457,048 | 0.3 % | |
22 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 53282 | 31592321 | 16,400,000 | 16,400,000 | 16,317,000 | 16,317,000 | 16,261,500 | 16,261,500 | 16,261,500 | 16,261,500 | 2022-05-13 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 83,000 | 0.51 % | |
23 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 61282 | 31457034 | 16,300,000 | 16,300,000 | 16,260,000 | 16,260,000 | 16,206,000 | 16,206,000 | 16,206,000 | 16,206,000 | 2022-06-02 | Wing Rastafarindo | 03.282.590.3-732.000 | 40,000 | 0.25 % | |
24 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 62282 | 31649743 | 90,000,000 | 89,972,552 | 89,805,640 | 89,805,640 | 89,764,000 | 89,764,000 | 0 | 89,764,000 | 2022-05-10 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 194,360 | 0.22 % | |
25 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Siring guha Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 63282 | 31456923 | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,940,600 | 14,940,600 | 14,940,600 | 14,940,600 | 2022-06-02 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 50,000 | 0.33 % | |
26 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan, Jasa Konsultansi Perencanaan Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec.Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 64282 | 35732227 | 91,400,000 | 91,400,000 | 90,998,870 | 90,998,870 | 90,864,600 | 90,864,600 | 90,864,600 | 90,864,600 | 2022-06-03 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 401,130 | 0.44 % | |
27 | 2022 | Dinas Sosial | Belanja Jasa Konsultant Perencanaan Pembuatan pagar Belakang dan Samping Halaman rumah Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 66282 | 32440495 | 13,000,000 | 12,994,520 | 12,821,610 | 12,821,610 | 12,765,000 | 12,765,000 | 12,765,000 | 12,765,000 | 2022-05-17 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 178,390 | 1.37 % | |
28 | 2022 | Dinas Pertanian | Pengadaan bahan -bahan bibit tanaman Belanja Bahan Bibit Tanaman pengembangan padi inbrida | Pengadaan Langsung | Pengadaan Barang | 67282 | 32227874 | 86,250,000 | 56,925,000 | 56,867,500 | 56,867,500 | 56,695,000 | 56,695,000 | 100 | 56,695,000 | 2022-05-24 | CV. KATIBURA | 53.260.332.1-733.000 | 29,382,500 | 34.07 % | |
29 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 68282 | 31810905 | 58,600,000 | 58,550,000 | 58,380,000 | 58,380,000 | 58,300,000 | 58,300,000 | 58,300,000 | 58,300,000 | 2022-05-11 | CV. KHALIF | 81.540.809.1-733.000 | 220,000 | 0.38 % | |
30 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 69282 | 31811013 | 179,279,100 | 179,081,800 | 178,787,700 | 178,787,700 | 178,600,000 | 178,600,000 | 178,600,000 | 178,600,000 | 2022-05-11 | CV. KARYA PUTRA PANDAWA | 31.713.913.7-731.000 | 491,400 | 0.27 % | |
31 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 70282 | 35670568 | 10,000,000 | 10,000,000 | 9,934,478 | 9,934,478 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-05-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 65,522 | 0.66 % | |
32 | 2022 | Sekretariat Daerah | Konsultan pengawasan rehab gedung PKK HSS, Konsultan pengawasan rehab pagar kantor setda (pagar belakang), Konsultan pengawasan rehab paving blok lapangan tugu,dan Konsultan pengawasan rehab ruang dapur pendopo kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 71282 | 35667017;35667159;35667215;35667267 | 35,400,000 | 35,382,100 | 35,224,740 | 35,224,740 | 35,224,740 | 0 | 0 | 0 | 2022-05-11 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 175,260 | 0.5 % | |
33 | 2022 | Kecamatan Daha Barat | Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 75282 | 32117656 | 177,050,000 | 176,922,365 | 176,760,774 | 176,760,774 | 176,600,000 | 176,600,000 | 0 | 176,600,000 | 2022-05-11 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 289,226 | 0.16 % | |
34 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 76282 | 31631646 | 95,000,000 | 94,944,461 | 94,469,686 | 94,469,686 | 94,444,000 | 94,444,000 | 94,444,000 | 94,444,000 | 2022-05-21 | CV. AISY | 75.132.070.6-733.000 | 530,314 | 0.56 % | |
35 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Jambu Hilir Baluti 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 77282 | 31649956 | 90,000,000 | 89,986,965 | 89,935,272 | 89,935,272 | 89,809,000 | 89,809,000 | 89,809,000 | 89,809,000 | 2022-05-17 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 64,728 | 0.07 % | |
36 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 78282 | 32117637 | 10,250,000 | 10,249,000 | 10,200,106 | 10,200,106 | 10,100,000 | 10,100,000 | 0 | 10,100,000 | 2022-05-11 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 49,894 | 0.49 % | |
37 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung,Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Jelatang Kec. Padang Batung,Jasa Konsultansi Perencanaan Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 79282 | 31551771 | 84,270,000 | 83,919,053 | 82,972,500 | 82,972,500 | 82,939,000 | 82,939,000 | 0 | 82,939,000 | 2022-05-12 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,297,500 | 1.54 % | |
38 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 80282 | 31933448 | 175,000,000 | 174,564,248 | 174,519,848 | 174,519,848 | 174,450,000 | 174,450,000 | 174,450,000 | 174,450,000 | 2022-06-03 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 480,152 | 0.27 % | |
39 | 2022 | Dinas Perdagangan | Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 85282 | 32562410 | 198,000,000 | 197,999,953 | 197,894,081 | 197,894,081 | 197,339,000 | 197,339,000 | 100 | 197,339,000 | 2022-05-20 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 105,919 | 0.05 % | |
40 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 89282 | 35778396 | 18,345,000 | 18,345,000 | 18,310,559 | 18,310,559 | 18,292,800 | 18,292,800 | 18,292,800 | 18,292,800 | 2022-06-03 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 34,441 | 0.19 % | |
41 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 90282 | 31933434 | 178,000,000 | 177,765,803 | 177,393,237 | 177,393,237 | 177,300,000 | 177,300,000 | 177,300,000 | 177,300,000 | 2022-06-03 | CV RIZKY BANUA | 02.089.856.5-733.000 | 606,763 | 0.34 % | |
42 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Darul Amin Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 91282 | 31632261 | 198,500,000 | 198,334,980 | 198,084,864 | 198,084,864 | 198,018,000 | 198,018,000 | 0 | 198,018,000 | 2022-05-23 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 415,137 | 0.21 % | |
43 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Lok Tungin Ds. Bamban Selatan Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 94282 | 32060525 | 195,000,000 | 195,000,000 | 194,929,177 | 194,929,177 | 194,862,500 | 194,862,500 | 194,862,500 | 194,862,500 | 2022-07-20 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 70,823 | 0.04 % | |
44 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase Jl. Harapan Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 96282 | 31576952 | 163,950,000 | 163,177,925 | 162,828,176 | 162,828,176 | 162,528,000 | 162,528,000 | 162,528,000 | 162,528,000 | 2022-07-19 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 1,121,825 | 0.68 % | |
45 | 2022 | Dinas Perikanan | Belanja Pembuatan Kolam Budidaya Ikan Gabus Haruan | Pengadaan Langsung | Pekerjaan Konstruksi | 97282 | 32507339 | 200,000,000 | 199,630,000 | 198,980,307 | 198,980,307 | 198,869,300 | 198,869,300 | 198,869,300 | 198,869,300 | 2022-08-04 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 1,019,693 | 0.51 % | |
46 | 2022 | Dinas Pertanian | Pengawasan Pembangunan/Rehab JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 99282 | 32060498 | 96,180,000 | 96,180,000 | 95,710,083 | 95,710,083 | 95,593,200 | 95,593,200 | 95,593,200 | 95,593,200 | 2022-07-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 469,917 | 0.49 % | |
47 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Wana Makmur Ds. Lumpangi Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 100282 | 32060580 | 199,500,000 | 199,500,000 | 199,435,028 | 199,435,028 | 199,284,900 | 199,284,900 | 199,284,900 | 199,284,900 | 2022-08-08 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 64,972 | 0.03 % | |
48 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Swarga Ds. Karang Jawa Muka Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 101282 | 32060568 | 195,000,000 | 195,000,000 | 194,910,894 | 194,910,894 | 194,730,500 | 194,730,500 | 194,730,500 | 194,730,500 | 2022-08-08 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 89,106 | 0.05 % | |
49 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Al Muttaqin Ds. Amawang Kanan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 102282 | 32060604 | 198,000,000 | 197,998,000 | 197,866,511 | 197,866,511 | 197,772,500 | 197,772,500 | 197,772,500 | 197,772,500 | 2022-08-03 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 133,489 | 0.07 % | |
50 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Mangupil Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 104282 | 32060540 | 195,000,000 | 195,000,000 | 194,945,322 | 194,945,322 | 194,760,700 | 194,760,700 | 194,760,700 | 194,760,700 | 2022-07-20 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 54,678 | 0.03 % | |
51 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Padang Parangan Ds. Baru Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 106282 | 32060592 | 196,500,000 | 196,454,000 | 196,029,230 | 196,029,230 | 193,686,600 | 193,686,600 | 193,686,600 | 193,686,600 | 2022-07-25 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 470,770 | 0.24 % | |
52 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 108282 | 31716441 | 15,300,000 | 15,300,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 15,200,000 | 2022-07-20 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.65 % | |
53 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 109282 | 35491099 | 174,000,000 | 173,999,441 | 173,010,833 | 173,010,833 | 172,989,000 | 172,989,000 | 172,989,000 | 172,989,000 | 2022-08-08 | CV. SHINTA | 01.124.041.3-733.000 | 989,167 | 0.57 % | |
54 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 110282 | 35490080 | 173,000,000 | 172,978,290 | 172,779,036 | 172,779,036 | 172,712,000 | 172,712,000 | 172,712,000 | 172,712,000 | 2022-08-12 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 220,964 | 0.13 % | |
55 | 2022 | Dinas Kesehatan | Pengadaan bmhp reagen laboratorium pelayanan kesehatan primer (DAK) | Pengadaan Langsung | Pengadaan Barang | 111282 | 35175821 | 174,600,000 | 173,160,000 | 173,160,000 | 173,160,000 | 173,049,000 | 0 | 0 | 0 | 2022-07-25 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 1,440,000 | 0.82 % | |
56 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Lumpangi | Pengadaan Langsung | Pekerjaan Konstruksi | 113282 | 32385433 | 180,000,000 | 179,777,313 | 179,572,837 | 179,572,837 | 179,000,000 | 179,000,000 | 179,000,000 | 179,000,000 | 2022-07-25 | CV. AISY | 75.132.070.6-733.000 | 427,163 | 0.24 % | |
57 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 114282 | 31664656 | 10,000,000 | 9,974,016 | 9,901,200 | 9,901,200 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-07-15 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 98,800 | 0.99 % | |
58 | 2022 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan RT. 7 | Pengadaan Langsung | Pekerjaan Konstruksi | 117282 | 32727377 | 75,850,000 | 75,820,000 | 75,614,652 | 75,614,652 | 75,500,000 | 75,500,000 | 75,500,000 | 75,500,000 | 2022-07-19 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 235,348 | 0.31 % | |
59 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 120282 | 35495306 | 197,000,000 | 196,978,194 | 196,842,093 | 196,842,093 | 196,825,000 | 196,825,000 | 196,825,000 | 196,825,000 | 2022-08-01 | cv. bumi mandiri | 02.089.892.0-733.000 | 157,907 | 0.08 % | |
60 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 121282 | 32146282 | 173,000,000 | 172,966,337 | 172,458,823 | 172,458,823 | 172,372,000 | 172,372,000 | 172,372,000 | 172,372,000 | 2022-07-20 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 541,177 | 0.31 % | |
61 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 122282 | 32146175 | 165,750,000 | 165,743,495 | 165,256,033 | 165,256,033 | 165,165,000 | 165,165,000 | 165,165,000 | 165,165,000 | 2022-07-20 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 493,967 | 0.3 % | |
62 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 125282 | 32146245 | 13,850,000 | 13,850,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 13,650,000 | 2022-07-21 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 200,000 | 1.44 % | |
63 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 126282 | 32147158 | 13,250,000 | 13,250,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 13,000,000 | 2022-07-21 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 250,000 | 1.89 % | |
64 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Jalan Lingkar RSUD (BLUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 134282 | 36288158 | 50,000,000 | 49,429,592 | 49,284,000 | 49,284,000 | 48,800,000 | 48,800,000 | 0 | 48,800,000 | 2022-07-26 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 716,000 | 1.43 % | |
65 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan Gantung Lungau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 139282 | 35497507 | 187,000,000 | 186,938,849 | 186,677,019 | 186,677,019 | 186,588,000 | 186,588,000 | 186,588,000 | 186,588,000 | 2022-07-21 | CV.Bangun Banua | 93.708.167.7-733.000 | 322,981 | 0.17 % | |
66 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Lama Kec. Daha barat | Pengadaan Langsung | Pekerjaan Konstruksi | 141282 | 31457131 | 190,000,000 | 189,808,805 | 189,692,503 | 189,692,503 | 189,609,000 | 189,609,000 | 189,609,000 | 189,609,000 | 2022-08-31 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 307,497 | 0.16 % | |
67 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 142282 | 31457229 | 200,000,000 | 199,911,197 | 199,779,907 | 199,779,907 | 199,729,000 | 199,729,000 | 199,729,000 | 199,729,000 | 2022-07-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 220,094 | 0.11 % | |
68 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 143282 | 31457126 | 200,000,000 | 199,841,018 | 199,761,431 | 199,761,431 | 199,733,000 | 199,733,000 | 199,733,000 | 199,733,000 | 2022-08-31 | CV. JODHA SAE | 94.797.791.4-733.000 | 238,569 | 0.12 % | |
69 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 144282 | 31457078 | 200,000,000 | 199,826,747 | 199,692,702 | 199,692,702 | 199,631,000 | 199,631,000 | 199,631,000 | 199,631,000 | 2022-08-31 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 307,298 | 0.15 % | |
70 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Baru Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 146282 | 31457162 | 200,000,000 | 199,877,455 | 199,799,200 | 199,799,200 | 199,743,000 | 199,743,000 | 199,743,000 | 199,743,000 | 2022-08-01 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 200,800 | 0.1 % | |
71 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 147282 | 31457201 | 175,000,000 | 174,805,558 | 174,653,237 | 174,653,237 | 174,631,000 | 174,631,000 | 0 | 174,631,000 | 2022-08-17 | cv. rukun damai | 01.203.952.5-733.000 | 346,763 | 0.2 % | |
72 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 148282 | 31457156 | 200,000,000 | 199,913,955 | 199,725,285 | 199,725,285 | 199,697,000 | 199,697,000 | 0 | 199,697,000 | 2022-08-16 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 274,715 | 0.14 % | |
73 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 149282 | 35493534 | 192,000,000 | 191,953,502 | 191,215,464 | 191,215,464 | 191,151,000 | 191,151,000 | 191,151,000 | 191,151,000 | 2022-09-09 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 784,536 | 0.41 % | |
74 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 150282 | 31457298 | 163,000,000 | 162,834,755 | 162,657,150 | 162,657,150 | 162,623,000 | 162,623,000 | 0 | 162,623,000 | 2022-08-15 | CV. AMANAH RAYA | 31.714.116.6-733.000 | 342,850 | 0.21 % | |
75 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 151282 | 31457220 | 200,000,000 | 199,853,577 | 199,711,655 | 199,711,655 | 199,587,000 | 199,587,000 | 199,587,000 | 199,587,000 | 2022-07-28 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 288,345 | 0.14 % | |
76 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 152282 | 31457283 | 160,000,000 | 159,927,852 | 159,716,948 | 159,716,948 | 159,689,000 | 159,689,000 | 159,689,000 | 159,689,000 | 2022-08-01 | CV.SHOFADINA | 81.484.310.8-733.000 | 283,052 | 0.18 % | |
77 | 2022 | Sekretariat Daerah | Belanja Pemeliharaan Bangunan Gedung Kantor - Rehab WC Bagian PBJ | Pengadaan Langsung | Pekerjaan Konstruksi | 153282 | 32104459 | 90,000,000 | 55,775,500 | 55,491,238 | 55,491,238 | 55,491,200 | 55,491,200 | 55,491,200 | 55,491,200 | 2022-08-02 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 34,508,762 | 38.34 % | |
78 | 2022 | Dinas Pertanian | Pembangunan / rehab Jalan Usaha Tani (JUT) Poktan Telaga Bahari Ds. Lungau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 154282 | 32060554 | 195,000,000 | 195,000,000 | 194,800,863 | 194,800,863 | 194,620,400 | 194,620,400 | 194,620,400 | 194,620,400 | 2022-07-25 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 199,137 | 0.1 % | |
79 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 156282 | 31457317 | 200,000,000 | 199,894,944 | 199,786,748 | 199,786,748 | 199,753,000 | 199,753,000 | 199,753,000 | 199,753,000 | 2022-09-19 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 213,252 | 0.11 % | |
80 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 157282 | 31457213 | 193,750,000 | 193,570,119 | 193,443,710 | 193,443,710 | 193,393,000 | 193,393,000 | 0 | 193,393,000 | 2022-08-18 | cv. bumi mandiri | 02.089.892.0-733.000 | 306,290 | 0.16 % | |
81 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Siring Guha Desa Gumbil Kec. Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 158282 | 31457088 | 150,000,000 | 149,829,379 | 149,646,229 | 149,646,229 | 149,618,000 | 149,618,000 | 0 | 149,618,000 | 2022-08-15 | CV.SHOFADINA | 81.484.310.8-733.000 | 353,771 | 0.24 % | |
82 | 2022 | Dinas Perhubungan | Pembangunan Halte Sungai | Pengadaan Langsung | Pekerjaan Konstruksi | 159282 | 36303859 | 200,000,000 | 196,823,911 | 196,801,544 | 196,801,544 | 196,647,000 | 196,647,000 | 196,647,000 | 196,647,000 | 2022-07-26 | CV. RISNA | 01.214.257.6-733.000 | 3,198,456 | 1.6 % | |
83 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Buluh Padang Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 160282 | 31457253 | 187,500,000 | 187,416,790 | 187,219,896 | 187,219,896 | 187,108,000 | 187,108,000 | 0 | 187,108,000 | 2022-08-16 | RIKA JAYA, CV | 01.424.626.8-733.000 | 280,104 | 0.15 % | |
84 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 161282 | 31664306 | 32,500,000 | 32,362,328 | 32,245,500 | 32,245,500 | 32,150,000 | 32,150,000 | 32,150,000 | 32,150,000 | 2022-07-29 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 254,500 | 0.78 % | |
85 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 162282 | 31457239 | 170,000,000 | 169,900,093 | 169,683,635 | 169,683,635 | 169,655,000 | 169,655,000 | 169,655,000 | 169,655,000 | 2022-08-01 | CV. AMANAH RAYA | 31.714.116.6-733.000 | 316,365 | 0.19 % | |
86 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Banyu Barau Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 163282 | 31457245 | 149,700,000 | 149,598,107 | 149,398,307 | 149,398,307 | 149,342,000 | 149,342,000 | 149,342,000 | 149,342,000 | 2022-08-02 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 301,693 | 0.2 % | |
87 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Katilang Desa bago tanggul Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 164282 | 31457067 | 190,560,000 | 190,455,472 | 190,352,748 | 190,352,748 | 190,324,000 | 190,324,000 | 190,324,000 | 190,324,000 | 2022-09-07 | cv. bumi mandiri | 02.089.892.0-733.000 | 207,252 | 0.11 % | |
88 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tajun Padang Sangkuang Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 165282 | 31457262 | 170,000,000 | 169,911,233 | 169,700,333 | 169,700,333 | 169,644,000 | 169,644,000 | 169,644,000 | 169,644,000 | 2022-10-10 | cv perintis dua | 01.219.560.8-731.000 | 299,667 | 0.18 % | |
89 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 166282 | 31457207 | 181,250,000 | 181,142,223 | 181,035,864 | 181,035,864 | 181,002,000 | 181,002,000 | 181,002,000 | 181,002,000 | 2022-09-07 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 214,136 | 0.12 % | |
90 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Simpang Tanjung, Ds.Tambangan Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 167282 | 31457070 | 157,500,000 | 157,414,231 | 157,292,131 | 157,292,131 | 157,247,000 | 157,247,000 | 157,247,000 | 157,247,000 | 2022-09-06 | CV. JODHA SAE | 94.797.791.4-733.000 | 207,869 | 0.13 % | |
91 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 168282 | 31457170 | 175,000,000 | 174,912,753 | 174,763,585 | 174,763,585 | 174,708,000 | 174,708,000 | 0 | 174,708,000 | 2022-08-24 | cv. rukun damai | 01.203.952.5-733.000 | 236,415 | 0.14 % | |
92 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 169282 | 31457322 | 194,000,000 | 193,901,611 | 193,770,722 | 193,770,722 | 193,715,000 | 193,715,000 | 0 | 193,715,000 | 2022-08-23 | cv. bumi mandiri | 02.089.892.0-733.000 | 229,278 | 0.12 % | |
93 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase jalan HR Sukadani Desa Tabihi RT.03 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 171282 | 31576965 | 176,750,000 | 176,307,078 | 175,315,000 | 175,315,000 | 175,275,000 | 175,275,000 | 175,275,000 | 175,275,000 | 2022-07-29 | CV. @ BUKIDS | 02.300.374.2-733.000 | 1,435,000 | 0.81 % | |
94 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 172282 | 31576938 | 164,000,000 | 163,980,551 | 162,578,678 | 162,578,678 | 162,562,000 | 162,562,000 | 162,562,000 | 162,562,000 | 2022-07-29 | CV. ALBATROS | 01.222.160.2-733.000 | 1,421,322 | 0.87 % | |
95 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Buluh Hantamangau Desa Garunggang Kec. Simpur (Lanjutan) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanyar Desa Tebing Tinggi Kec. Simpur (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 173282 | 36312493 | 28,000,000 | 28,000,000 | 27,838,800 | 27,838,800 | 27,794,400 | 27,794,400 | 27,794,400 | 27,794,400 | 2022-09-07 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 161,200 | 0.58 % | |
96 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 174282 | 31456583 | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-09-20 | cv.airlangga konsultan | 03.122.016.3-732.000 | 50,000 | 0.36 % | |
97 | 2022 | Kecamatan Daha Utara | Pemeliharaan / Rehab Taman Rahimin Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 175282 | 32100690 | 168,700,000 | 168,700,000 | 168,388,105 | 168,388,105 | 168,250,000 | 168,250,000 | 168,250,000 | 168,250,000 | 2022-07-29 | CV. AL QAWS | 70.619.811.6-733.000 | 311,895 | 0.18 % | |
98 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Badaun Kec. Daha Barat (Lanjutan), Jasa Konsultansi Pengawasan Normalisasi Sungai Gatah Desa Tanjung Selor Kec. Daha Barat, Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Baru Kec.Daha barat, Jasa Konsultansi Pengwasan Normalisasi Sungai Desa Bajayau lama Kec.Daha barat, dan Jasa Konsultansi Pengawasan Sungai Alimin Desa Baru Kec.Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 176282 | 36312259 | 69,000,000 | 69,000,000 | 68,995,722 | 68,995,722 | 68,808,900 | 68,808,900 | 68,808,900 | 68,808,900 | 2022-08-29 | Wiyasa Drawana | 80.902.072.0-731.000 | 4,278 | 0.01 % | |
99 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Katilang Desa Bago tanggul Kec. Kalumpang dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Batangkulur Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 177282 | 36312188 | 23,040,250 | 23,040,250 | 23,000,000 | 23,000,000 | 22,932,600 | 22,932,600 | 22,932,600 | 22,932,600 | 2022-09-07 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 40,250 | 0.17 % | |
100 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Siring guha Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 178282 | 31456705 | 10,761,250 | 10,761,250 | 10,750,139 | 10,750,139 | 10,689,300 | 10,689,300 | 10,689,300 | 10,689,300 | 2022-08-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 11,111 | 0.1 % | |
101 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perngawasan Sungai Muning Dalam Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 179282 | 31456562 | 32,330,000 | 32,330,000 | 31,845,900 | 31,845,900 | 31,746,000 | 31,746,000 | 31,746,000 | 31,746,000 | 2022-10-12 | Wiyasa Drawana | 80.902.072.0-731.000 | 484,100 | 1.5 % | |
102 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 180282 | 32147207 | 160,000,000 | 159,555,966 | 159,376,864 | 159,376,864 | 159,159,000 | 159,159,000 | 159,159,000 | 159,159,000 | 2022-09-29 | cv perintis dua | 01.219.560.8-731.000 | 623,136 | 0.39 % | |
103 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 181282 | 32147139 | 13,000,000 | 13,000,000 | 12,987,000 | 12,987,000 | 12,921,000 | 12,921,000 | 12,921,000 | 12,921,000 | 2022-09-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 13,000 | 0.1 % | |
104 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perngawasan Sungai Bandung Desa Kalumpang Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 184282 | 31456569 | 14,000,000 | 14,000,000 | 13,955,000 | 13,955,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-08-17 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 45,000 | 0.32 % | |
105 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jarau Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Tabuk Desa Tamiyang Kec. Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hamalau Kecamatan Sungai Raya, Jasa Konsultansi Pengawasan Normalisasi Sungai Buluh Padang di Desa Batang Kulur Kiri Kec.Sungai raya, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Tajun Padang Sangkuang Desa Sungai Raya Utara Kec. Sungai Raya; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 185282 | 36312590 | 65,680,000 | 65,680,000 | 65,180,000 | 65,180,000 | 65,023,800 | 65,023,800 | 65,023,800 | 65,023,800 | 2022-08-18 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 0.76 % | |
106 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Sekitar Kec. Simpur dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Pantai Ulin Kec. Simpur (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 186282 | 36312181 | 27,350,000 | 27,350,000 | 27,250,000 | 27,250,000 | 27,195,000 | 27,195,000 | 27,195,000 | 27,195,000 | 2022-08-29 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 100,000 | 0.37 % | |
107 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaranih Desa Mandala Kec. Telaga Langsat dan Jasa Konsultansi Pengawasan Normalisasi Sungai Palas Desa Ambutun Kec.Telaga langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 189282 | 36312686 | 23,450,000 | 23,450,000 | 23,348,850 | 23,348,850 | 23,287,800 | 23,287,800 | 23,287,800 | 23,287,800 | 2022-08-18 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 101,150 | 0.43 % | |
108 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Alimin Desa Baru Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 195282 | 31457045 | 200,000,000 | 199,826,747 | 199,700,703 | 199,700,703 | 199,670,000 | 199,670,000 | 199,670,000 | 199,670,000 | 2022-09-20 | cv. rukun damai | 01.203.952.5-733.000 | 299,297 | 0.15 % | |
109 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Gambut Desa Karang bulan Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 196282 | 31456783 | 12,180,000 | 12,180,000 | 12,168,886 | 12,168,886 | 12,132,300 | 12,132,300 | 12,132,300 | 12,132,300 | 2022-09-03 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 11,114 | 0.09 % | |
110 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 197282 | 32146186 | 163,000,000 | 162,727,718 | 162,310,239 | 162,310,239 | 162,162,000 | 162,162,000 | 162,162,000 | 162,162,000 | 2022-08-09 | CV. SHINTA | 01.124.041.3-733.000 | 689,761 | 0.42 % | |
111 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Kaliring Kec. Padang batung | Pengadaan Langsung | Pekerjaan Konstruksi | 198282 | 31650492 | 167,000,000 | 166,936,637 | 166,847,835 | 166,847,835 | 166,770,000 | 166,770,000 | 166,770,000 | 166,770,000 | 2022-10-05 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 152,165 | 0.09 % | |
112 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 199282 | 31650671 | 130,000,000 | 129,930,820 | 129,753,220 | 129,753,220 | 129,714,000 | 129,714,000 | 129,714,000 | 129,714,000 | 2022-10-15 | cemara indah | 02.090.160.9-731.000 | 246,780 | 0.19 % | |
113 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 200282 | 32146233 | 15,000,000 | 15,000,000 | 14,965,000 | 14,965,000 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2022-08-31 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 35,000 | 0.23 % | |
114 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Kelurahan Jambu Hilir RT.11 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 201282 | 31650481 | 200,000,000 | 199,933,298 | 199,750,148 | 199,750,148 | 199,711,000 | 199,711,000 | 199,711,000 | 199,711,000 | 2022-10-15 | cemara indah | 02.090.160.9-731.000 | 249,852 | 0.12 % | |
115 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang batung dan Jasa Konsultansi pengawasan Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 202282 | 36312144 | 24,280,000 | 24,280,000 | 24,200,001 | 24,200,001 | 24,131,400 | 24,131,400 | 24,131,400 | 24,131,400 | 2022-09-12 | cv.airlangga konsultan | 03.122.016.3-732.000 | 79,999 | 0.33 % | |
116 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.03 Desa Jambu Hulu Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 203282 | 31650696 | 200,000,000 | 199,934,920 | 199,739,283 | 199,739,283 | 199,708,000 | 199,708,000 | 199,708,000 | 199,708,000 | 2022-10-15 | cemara indah | 02.090.160.9-731.000 | 260,717 | 0.13 % | |
117 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 204282 | 31593016 | 199,500,000 | 199,499,446 | 199,029,094 | 199,029,094 | 198,918,000 | 198,918,000 | 80 | 198,918,000 | 2022-08-22 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 470,906 | 0.24 % | |
118 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.02 Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 206282 | 31650714 | 174,000,000 | 173,933,971 | 173,745,271 | 173,745,271 | 173,706,000 | 173,706,000 | 173,706,000 | 173,706,000 | 2022-10-10 | cv perintis dua | 01.219.560.8-731.000 | 254,729 | 0.15 % | |
119 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 207282 | 31551770 | 15,000,000 | 14,999,430 | 14,952,810 | 14,952,810 | 14,907,300 | 14,907,300 | 0 | 14,907,300 | 2022-08-02 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 47,190 | 0.31 % | |
120 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Jl. Kapten F. Tendean Kelurahan Jambu Hilir Kec. Kandangan (Lanjutan) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Baluti RT.01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 208282 | 36334285 | 25,400,000 | 25,400,000 | 25,300,001 | 25,300,001 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 2022-09-04 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 99,999 | 0.39 % | |
121 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing di Desa Hulu banyu Kec. Loksado dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 209282 | 36312114 | 20,300,000 | 20,300,000 | 20,210,000 | 20,210,000 | 20,135,400 | 20,135,400 | 20,135,400 | 20,135,400 | 2022-09-21 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,000 | 0.44 % | |
122 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi Pengukuran Bidang Tanah | Pengadaan Langsung | Jasa Lainnya | 210282 | 32421130 | 56,100,000 | 51,000,000 | 50,850,000 | 50,850,000 | 50,600,000 | 50,600,000 | 50,600,000 | 50,600,000 | 2022-08-10 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 5,250,000 | 9.36 % | |
123 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengecatan RTH,Rehabilitasi Taman Darmansyah Djauhidie | Pengadaan Langsung | Pekerjaan Konstruksi | 214282 | 31835803;31836294 | 140,000,000 | 139,006,521 | 138,703,180 | 138,703,180 | 138,550,000 | 138,550,000 | 138,550,000 | 138,550,000 | 2022-08-10 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,296,820 | 0.93 % | |
124 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Jl. Kapten F. Tendean Kelurahan Jambu Hilir Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 216282 | 31650499 | 154,000,000 | 153,938,443 | 153,767,781 | 153,767,781 | 153,744,000 | 153,744,000 | 153,744,000 | 153,744,000 | 2022-08-29 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 232,219 | 0.15 % | |
125 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 217282 | 31650703 | 160,000,000 | 159,928,758 | 159,817,758 | 159,817,758 | 159,778,000 | 159,778,000 | 159,778,000 | 159,778,000 | 2022-08-16 | CV. JODHA SAE | 94.797.791.4-733.000 | 182,242 | 0.11 % | |
126 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Pulau Nagara RT.02 Kel. Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 218282 | 31650486 | 200,000,000 | 199,932,300 | 199,521,579 | 199,521,579 | 199,444,000 | 199,444,000 | 0 | 199,444,000 | 2022-08-15 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 478,421 | 0.24 % | |
127 | 2022 | Dinas Perhubungan | Rehabilitasi WC dan KM Dermaga Negara | Pengadaan Langsung | Pekerjaan Konstruksi | 219282 | 36303852 | 92,000,000 | 44,095,000 | 44,051,030 | 44,051,030 | 44,051,000 | 44,051,000 | 44,051,000 | 44,051,000 | 2022-08-03 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 47,948,970 | 52.12 % | |
128 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Baluti RT.01 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 221282 | 31650681 | 200,000,000 | 199,930,824 | 199,631,729 | 199,631,729 | 199,581,000 | 199,581,000 | 199,581,000 | 199,581,000 | 2022-08-29 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 368,271 | 0.18 % | |
129 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 03 Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Kaliring Kec. Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 222282 | 36312394 | 25,690,000 | 25,690,000 | 25,600,000 | 25,600,000 | 25,496,700 | 25,496,700 | 25,496,700 | 25,496,700 | 2022-10-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 90,000 | 0.35 % | |
130 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Padang Batung Rt.01 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 223282 | 31650664 | 184,000,000 | 183,934,415 | 183,632,728 | 183,632,728 | 183,493,000 | 183,493,000 | 183,493,000 | 183,493,000 | 2022-08-21 | FADWI UTAMA | 94.246.044.5-733.000 | 367,272 | 0.2 % | |
131 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Pulau Nagara RT. 02 Kel. Jambu Hilir Kec. Kandangan dan Jasa Konsultansi Pengawasan Perkuatan tebing di Kelurahan jambu hilir RT.11 Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 224282 | 36312485 | 28,000,000 | 28,000,000 | 27,960,000 | 27,960,000 | 27,927,600 | 27,927,600 | 27,927,600 | 27,927,600 | 2022-09-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 40,000 | 0.14 % | |
132 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 225282 | 35778559 | 176,000,000 | 175,850,686 | 175,725,062 | 175,725,062 | 175,669,000 | 175,669,000 | 175,669,000 | 175,669,000 | 2022-08-17 | CV. SHINTA | 01.124.041.3-733.000 | 274,938 | 0.16 % | |
133 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 228282 | 31455661 | 140,000,000 | 139,915,100 | 139,789,157 | 139,789,157 | 139,700,000 | 139,700,000 | 139,700,000 | 139,700,000 | 2022-09-29 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 210,843 | 0.15 % | |
134 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec.Sungai Raya dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Buluh Padang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 232282 | 36339873 | 23,800,000 | 23,800,000 | 23,550,000 | 23,550,000 | 23,465,400 | 23,465,400 | 23,465,400 | 23,465,400 | 2022-09-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 250,000 | 1.05 % | |
135 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Batangkulur Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 233282 | 31457180 | 137,500,000 | 137,423,085 | 137,325,618 | 137,325,618 | 137,297,000 | 137,297,000 | 137,297,000 | 137,297,000 | 2022-09-06 | cv. rukun damai | 01.203.952.5-733.000 | 174,382 | 0.13 % | |
136 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Pembangunan Taman Stadion 2 Desember,Belanja Konsultansi Pengawasan Pemeliharaan Tugu Dodol | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 234282 | 31829850;31829872 | 37,050,000 | 36,880,860 | 36,774,300 | 36,774,300 | 36,550,000 | 36,550,000 | 36,550,000 | 36,550,000 | 2022-08-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 275,700 | 0.74 % | |
137 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Pengurukan Lahan TPU Daha Selatan Desa Banjarbaru (lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 235282 | 31834189 | 28,000,000 | 27,845,016 | 27,758,103 | 27,758,103 | 27,700,000 | 27,700,000 | 27,700,000 | 27,700,000 | 2022-08-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 241,897 | 0.86 % | |
138 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tabuk Desa Tamiyang Kec.Sungai raya | Pengadaan Langsung | Pekerjaan Konstruksi | 237282 | 31457057 | 200,000,000 | 199,902,882 | 199,703,082 | 199,703,082 | 199,675,000 | 199,675,000 | 199,675,000 | 199,675,000 | 2022-09-14 | CV.SHOFADINA | 81.484.310.8-733.000 | 296,918 | 0.15 % | |
139 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Jarum Desa Bumi Berkat Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 239282 | 31455787 | 200,000,000 | 199,810,632 | 199,738,482 | 199,738,482 | 199,694,000 | 199,694,000 | 199,694,000 | 199,694,000 | 2022-09-02 | CV. JODHA SAE | 94.797.791.4-733.000 | 261,518 | 0.13 % | |
140 | 2022 | Kecamatan Kandangan | Drainase RT.06 | Pengadaan Langsung | Pekerjaan Konstruksi | 240282 | 32128114 | 71,100,000 | 70,994,000 | 70,883,425 | 70,883,425 | 70,750,000 | 70,750,000 | 70,750,000 | 70,750,000 | 2022-08-10 | Dina utama abadi | 72.168.809.1-735.000 | 216,575 | 0.3 % | |
141 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaranih Desa Mandala Kec.Telaga langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 241282 | 31457148 | 165,000,000 | 164,893,100 | 164,698,892 | 164,698,892 | 164,643,000 | 164,643,000 | 164,643,000 | 164,643,000 | 2022-10-03 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 301,108 | 0.18 % | |
142 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanyar Desa Tebing Tinggi Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 243282 | 31457107 | 200,000,000 | 199,891,785 | 199,691,985 | 199,691,985 | 199,664,000 | 199,664,000 | 199,664,000 | 199,664,000 | 2022-09-14 | CV. JODHA SAE | 94.797.791.4-733.000 | 308,015 | 0.15 % | |
143 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 244282 | 32146181 | 175,000,000 | 174,878,657 | 174,717,870 | 174,717,870 | 174,474,000 | 174,474,000 | 174,474,000 | 174,474,000 | 2022-09-19 | cv. akur bersaudara | 02.675.570.2-735.000 | 282,130 | 0.16 % | |
144 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 245282 | 32147144 | 17,000,000 | 17,000,000 | 16,966,700 | 16,966,700 | 16,916,000 | 16,916,000 | 16,916,000 | 16,916,000 | 2022-08-31 | Wiyasa Drawana | 80.902.072.0-731.000 | 33,300 | 0.2 % | |
145 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Badaun Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 246282 | 31457192 | 191,100,000 | 191,008,765 | 190,734,319 | 190,734,319 | 190,631,000 | 190,631,000 | 0 | 190,631,000 | 2022-08-16 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 365,681 | 0.19 % | |
146 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Pantai Ulin Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 247282 | 31457289 | 188,000,000 | 187,916,104 | 187,705,204 | 187,705,204 | 187,694,000 | 187,694,000 | 187,694,000 | 187,694,000 | 2022-09-14 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 294,796 | 0.16 % | |
147 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Kota : Jalan Sudirman Segmen I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 248282 | 31591829 | 18,000,000 | 18,000,000 | 17,941,000 | 17,941,000 | 17,871,000 | 17,871,000 | 17,871,000 | 17,871,000 | 2022-09-07 | cv.akmalindo | 02.531.482.4-731.000 | 59,000 | 0.33 % | |
148 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Pembuang Irigasi di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 249282 | 31529489 | 160,800,000 | 160,701,635 | 160,505,879 | 160,505,879 | 160,455,000 | 160,455,000 | 0 | 160,455,000 | 2022-08-17 | CV. ALBATROS | 01.222.160.2-733.000 | 294,121 | 0.18 % | |
149 | 2022 | RSUD Brigjen H. Hasan Basry | Bongkar Hidup dan Service Celling Radiografi IRC50HF | Pengadaan Langsung | Jasa Lainnya | 251282 | 36363905 | 200,000,000 | 199,400,000 | 199,400,000 | 199,400,000 | 197,000,000 | 197,000,000 | 197,000,000 | 197,000,000 | 2022-09-23 | Rajawali Nusindo | 01.061.248.9-051.000 | 600,000 | 0.3 % | |
150 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 252282 | 31529488 | 198,000,000 | 197,953,673 | 197,753,873 | 197,753,873 | 197,715,000 | 197,715,000 | 197,715,000 | 197,715,000 | 2022-10-03 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 246,127 | 0.12 % | |
151 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 254282 | 31457096 | 200,000,000 | 199,925,610 | 199,720,260 | 199,720,260 | 199,692,000 | 199,692,000 | 199,692,000 | 199,692,000 | 2022-09-14 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 279,740 | 0.14 % | |
152 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Buluh Hantamangau Desa Garunggang Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 255282 | 31457120 | 200,000,000 | 199,899,641 | 199,610,584 | 199,610,584 | 199,568,000 | 199,568,000 | 199,568,000 | 199,568,000 | 2022-08-29 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 389,416 | 0.19 % | |
153 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi jaringan irigasi Hilir Mesjid Kec.Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 256282 | 31455669 | 160,000,000 | 159,851,557 | 159,448,755 | 159,448,755 | 159,216,000 | 159,216,000 | 159,216,000 | 159,216,000 | 2022-08-21 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 551,245 | 0.34 % | |
154 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 257282 | 32146288 | 170,000,000 | 169,936,177 | 169,666,299 | 169,666,299 | 169,619,000 | 169,619,000 | 169,619,000 | 169,619,000 | 2022-09-08 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 333,701 | 0.2 % | |
155 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 258282 | 32146212 | 15,300,000 | 15,300,000 | 15,266,700 | 15,266,700 | 15,250,000 | 15,250,000 | 15,250,000 | 15,250,000 | 2022-08-31 | Wiyasa Drawana | 80.902.072.0-731.000 | 33,300 | 0.22 % | |
156 | 2022 | RSUD Brigjen H. Hasan Basry | Renovasi Gedung Panel Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 259282 | 36222959 | 200,000,000 | 199,998,897 | 199,845,172 | 199,845,172 | 199,689,000 | 199,689,000 | 199,689,000 | 199,689,000 | 2022-10-06 | cv. akur bersaudara | 02.675.570.2-735.000 | 154,828 | 0.08 % | |
157 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 261282 | 31592332 | 180,000,000 | 179,951,932 | 179,739,374 | 179,739,374 | 179,679,000 | 179,679,000 | 179,679,000 | 179,679,000 | 2022-09-02 | CV. JODHA SAE | 94.797.791.4-733.000 | 260,626 | 0.14 % | |
158 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Banyu Barau Kel. Kandangan Barat dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 262282 | 36312043 | 24,800,000 | 24,800,000 | 24,735,000 | 24,735,000 | 24,664,200 | 24,664,200 | 24,664,200 | 24,664,200 | 2022-09-04 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 65,000 | 0.26 % | |
159 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Jelatang | Pengadaan Langsung | Pekerjaan Konstruksi | 263282 | 32379642 | 125,000,000 | 124,774,583 | 124,664,600 | 124,664,600 | 123,500,000 | 123,500,000 | 123,500,000 | 123,500,000 | 2022-08-15 | CV. SHINTA | 01.124.041.3-733.000 | 335,400 | 0.27 % | |
160 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Wasah Tengah Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 264282 | 31456797 | 11,410,000 | 11,410,000 | 11,389,999 | 11,389,999 | 11,366,400 | 11,366,400 | 11,366,400 | 11,366,400 | 2022-09-03 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 20,001 | 0.18 % | |
161 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 265282 | 31593020 | 199,000,000 | 198,974,355 | 198,717,244 | 198,717,244 | 198,522,000 | 198,522,000 | 0 | 198,522,000 | 2022-08-30 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 282,756 | 0.14 % | |
162 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Penanganan Longsor di Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 266282 | 35494169 | 173,000,000 | 172,978,752 | 172,868,225 | 172,868,225 | 172,772,000 | 172,772,000 | 172,772,000 | 172,772,000 | 2022-08-15 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 131,775 | 0.08 % | |
163 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Ruas Jalan Simpur - SP.3 Muara Paring Agung, Taal Batang Kulur - SP.3 Muara Paring Agung dan Sungai Raya Selatan - Sarang Halang) | Pengadaan Langsung | Pekerjaan Konstruksi | 267282 | 36367707 | 107,000,000 | 106,673,406 | 106,645,849 | 106,645,849 | 106,562,000 | 106,562,000 | 106,562,000 | 106,562,000 | 2022-08-22 | CV.SURYA PUTERA | 02.708.747.7-731.000 | 354,151 | 0.33 % | |
164 | 2022 | Dinas Perdagangan | Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 268282 | 32562590 | 185,000,000 | 184,999,085 | 184,900,295 | 184,900,295 | 184,842,500 | 184,842,500 | 184,842,500 | 184,842,500 | 2022-08-19 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 99,705 | 0.05 % | |
165 | 2022 | RSUD Brigjen H. Hasan Basry | Pembuatan atap parkir karyawan | Pengadaan Langsung | Pekerjaan Konstruksi | 269282 | 35899312 | 200,000,000 | 199,993,563 | 199,597,800 | 199,597,800 | 199,399,000 | 199,399,000 | 199,399,000 | 199,399,000 | 2022-09-28 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 402,200 | 0.2 % | |
166 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Pengawasan Pembangunan Saluran Pembuang Irigasi Di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 271282 | 36312419 | 24,605,000 | 24,605,000 | 24,220,000 | 24,220,000 | 24,198,000 | 24,198,000 | 24,198,000 | 24,198,000 | 2022-09-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 385,000 | 1.56 % | |
167 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 272282 | 35778491 | 12,500,000 | 12,500,000 | 12,496,436 | 12,496,436 | 12,465,300 | 12,465,300 | 12,465,300 | 12,465,300 | 2022-09-02 | Wiyasa Drawana | 80.902.072.0-731.000 | 3,565 | 0.03 % | |
168 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 273282 | 31456620 | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-09-14 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 50,000 | 0.36 % | |
169 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi Hilir Mesjid Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 274282 | 31455638 | 11,000,000 | 11,000,000 | 10,950,000 | 10,950,000 | 10,933,500 | 10,933,500 | 10,933,500 | 10,933,500 | 2022-09-02 | Wiyasa Drawana | 80.902.072.0-731.000 | 50,000 | 0.45 % | |
170 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 275282 | 31593057 | 199,850,000 | 199,844,492 | 199,744,593 | 199,744,593 | 199,689,000 | 199,689,000 | 0 | 199,689,000 | 2022-09-01 | CV. PUTERI PERSADA | 02.342.993.9-733.000 | 105,407 | 0.05 % | |
171 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Tugu Dodol Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 276282 | 31835616 | 150,000,000 | 149,999,700 | 149,688,480 | 149,688,480 | 149,500,000 | 149,500,000 | 149,500,000 | 149,500,000 | 2022-09-02 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 311,520 | 0.21 % | |
172 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Gambut Desa Karang bulan Kec. Kalumpang (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 277282 | 31457268 | 174,000,000 | 173,915,000 | 173,818,398 | 173,818,398 | 173,790,000 | 173,790,000 | 0 | 173,790,000 | 2022-08-21 | CV. LANDAS JAYA UTAMA | 31.724.101.6-731.000 | 181,602 | 0.1 % | |
173 | 2022 | Dinas Kesehatan | Pemeliharaan Bangunan Puskesmas, Puskesmas pembantu dan Poskesdes (Pemeliharaan Pustu Bayur) | Pengadaan Langsung | Pekerjaan Konstruksi | 278282 | 36414505 | 100,000,000 | 98,160,531 | 97,996,366 | 97,996,366 | 97,500,000 | 97,500,000 | 97,500,000 | 97,500,000 | 2022-10-31 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 2,003,634 | 2 % | |
174 | 2022 | Dinas Perdagangan | Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 279282 | 32562476 | 200,000,000 | 199,994,742 | 199,900,026 | 199,900,026 | 199,825,400 | 199,825,400 | 199,825,400 | 199,825,400 | 2022-08-30 | CV.Bangun Banua | 93.708.167.7-733.000 | 99,974 | 0.05 % | |
175 | 2022 | Dinas Perhubungan | Pengawasan Pembangunan Halte Sungai dan Rehabilitasi WC dan KM Dermaga Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 280282 | 32134862 | 22,500,000 | 22,461,000 | 22,416,062 | 22,416,062 | 22,400,000 | 22,400,000 | 22,400,000 | 22,400,000 | 2022-08-26 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 83,939 | 0.37 % | |
176 | 2022 | RSUD Daha Sejahtera | Perencanaan Urugan Tanah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 282282 | 36390717 | 80,000,000 | 75,051,457 | 74,919,450 | 74,919,450 | 74,500,000 | 74,500,000 | 74,500,000 | 74,500,000 | 2022-10-16 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 5,080,550 | 6.35 % | |
177 | 2022 | Dinas Pertanian | Perencanaan Bangunan UPPB dan Laboraturium | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 285282 | 32065032;32066118 | 12,600,000 | 12,600,000 | 12,526,350 | 12,526,350 | 12,509,700 | 12,509,700 | 12,509,700 | 12,509,700 | 2022-08-30 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 73,650 | 0.58 % | |
178 | 2022 | RSUD Daha Sejahtera | Perencanaan Nurse Station | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 288282 | 36390713 | 15,000,000 | 14,999,985 | 14,785,200 | 14,785,200 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2022-10-11 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 214,800 | 1.43 % | |
179 | 2022 | RSUD Daha Sejahtera | Perencanaan Rehabilitasi Gedung Rawat Jalan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 289282 | 36390711 | 15,000,000 | 14,999,985 | 14,729,700 | 14,729,700 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2022-10-11 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 270,300 | 1.8 % | |
180 | 2022 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 291282 | 32128364 | 75,850,000 | 75,845,372 | 75,696,172 | 75,696,172 | 75,600,000 | 75,600,000 | 75,600,000 | 75,600,000 | 2022-09-02 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 153,828 | 0.2 % | |
181 | 2022 | Kecamatan Kandangan | Drainase RT.01 | Pengadaan Langsung | Pekerjaan Konstruksi | 292282 | 32129024 | 71,100,000 | 71,039,000 | 70,817,270 | 70,817,270 | 70,700,000 | 70,700,000 | 70,700,000 | 70,700,000 | 2022-09-02 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 282,730 | 0.4 % | |
182 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Gedung Serbaguna 2 Desember | Pengadaan Langsung | Pekerjaan Konstruksi | 293282 | 36455312 | 200,000,000 | 199,954,439 | 199,614,893 | 199,614,893 | 199,503,000 | 199,503,000 | 199,503,000 | 199,503,000 | 2022-09-10 | FADWI UTAMA | 94.246.044.5-733.000 | 385,107 | 0.19 % | |
183 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 297282 | 31592878 | 17,645,000 | 17,645,000 | 17,550,000 | 17,550,000 | 17,526,900 | 17,526,900 | 0 | 17,526,900 | 2022-09-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 95,000 | 0.54 % | |
184 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 298282 | 31592882 | 17,710,000 | 17,710,000 | 17,700,000 | 17,700,000 | 17,676,000 | 17,676,000 | 0 | 17,676,000 | 2022-09-09 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 10,000 | 0.06 % | |
185 | 2022 | Kecamatan Daha Barat | Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Pekerjaan Konstruksi | 300282 | 32117680 | 177,050,000 | 177,035,000 | 176,633,238 | 176,633,238 | 176,500,000 | 176,500,000 | 176,500,000 | 176,500,000 | 2022-09-06 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 416,762 | 0.24 % | |
186 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 301282 | 32117607 | 10,250,000 | 10,235,000 | 10,202,066 | 10,202,066 | 10,170,000 | 10,170,000 | 10,170,000 | 10,170,000 | 2022-09-06 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 47,935 | 0.47 % | |
187 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 306282 | 31592886 | 14,954,000 | 14,954,000 | 14,850,001 | 14,850,001 | 14,763,000 | 14,763,000 | 0 | 14,763,000 | 2022-10-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,999 | 0.7 % | |
188 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 307282 | 31592874 | 17,861,000 | 17,861,000 | 17,800,000 | 17,800,000 | 17,760,000 | 17,760,000 | 0 | 17,760,000 | 2022-09-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 61,000 | 0.34 % | |
189 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Muning Baru RT.02 Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Palangan Desa Habirau Tengah Kec. Daha selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Panggang Desa Banua Hanyar Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Tapung Desa Habirau Tengah Kec. Daha Selatan, Jasa Konsultansi Pengawasan Normalisasi Sungai Teluk Pemandian Desa Banua Hanyar Kec.Daha Selatan, dan Jasa Konsultansi Pengawasan Sungai Simpang Tanjung Desa Tambangan Kec. Daha Selatan; | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 308282 | 36312335 | 75,455,000 | 75,455,000 | 75,335,000 | 75,335,000 | 75,024,900 | 75,024,900 | 75,024,900 | 75,024,900 | 2022-09-12 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 120,000 | 0.16 % | |
190 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 309282 | 31592936 | 15,988,000 | 15,988,000 | 15,932,500 | 15,932,500 | 15,895,200 | 15,895,200 | 0 | 15,895,200 | 2022-09-15 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 55,500 | 0.35 % | |
191 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 312282 | 31592911 | 17,800,000 | 17,800,000 | 17,760,000 | 17,760,000 | 17,717,000 | 17,717,000 | 0 | 17,717,000 | 2022-10-05 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 40,000 | 0.22 % | |
192 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 313282 | 31592905 | 16,220,000 | 16,220,000 | 16,172,700 | 16,172,700 | 16,161,600 | 16,161,600 | 0 | 16,161,600 | 2022-10-07 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 47,300 | 0.29 % | |
193 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan tebing desa amawang kiri (lanjutan) Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 314282 | 31650650 | 31,700,000 | 31,700,000 | 31,490,700 | 31,490,700 | 31,468,500 | 31,468,500 | 31,468,500 | 31,468,500 | 2022-10-10 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 209,300 | 0.66 % | |
194 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 316282 | 31593012 | 200,000,000 | 199,997,115 | 199,919,404 | 199,919,404 | 199,863,000 | 199,863,000 | 0 | 199,863,000 | 2022-09-19 | CV. RISNA | 01.214.257.6-733.000 | 80,596 | 0.04 % | |
195 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Panggungan, Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 319282 | 31593047 | 120,000,000 | 119,989,711 | 119,900,680 | 119,900,680 | 119,156,900 | 119,156,900 | 0 | 119,156,900 | 2022-10-14 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 99,320 | 0.08 % | |
196 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 320282 | 31593024 | 174,600,000 | 174,599,835 | 174,440,162 | 174,440,162 | 174,358,000 | 174,358,000 | 0 | 174,358,000 | 2022-09-28 | cv. akur bersaudara | 02.675.570.2-735.000 | 159,838 | 0.09 % | |
197 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 321282 | 31593043 | 198,000,000 | 198,000,000 | 197,900,482 | 197,900,482 | 197,777,000 | 197,777,000 | 0 | 197,777,000 | 2022-10-12 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 99,518 | 0.05 % | |
198 | 2022 | Dinas Sosial | Belanja Jasa Konsultant Pengawasan Pembuatan pagar Belakang dan Samping Halaman rumah Singgah,Belanja Jasa Konsultant Pengawasan Pemasangan Paving Blok Halaman rumah Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 322282 | 32439951;32440869 | 20,000,000 | 20,000,000 | 19,852,350 | 19,852,350 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2022-09-23 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 147,650 | 0.74 % | |
199 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Bumi Berkat, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 323282 | 31593037 | 100,000,000 | 99,999,962 | 99,949,453 | 99,949,453 | 99,899,000 | 99,899,000 | 0 | 99,899,000 | 2022-11-02 | cv.garuda raisya kencana | 94.847.725.2-732.000 | 50,547 | 0.05 % | |
200 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Pantai Ulin, Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 324282 | 31593033 | 100,000,000 | 100,000,000 | 99,901,167 | 99,901,167 | 99,890,000 | 99,890,000 | 0 | 99,890,000 | 2022-11-19 | CV. PUTERA MAMA | 02.242.680.3-733.000 | 98,833 | 0.1 % | |
201 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Pekerjaan Konstruksi | 325282 | 31593040 | 178,000,000 | 177,998,720 | 177,904,370 | 177,904,370 | 177,771,000 | 177,771,000 | 0 | 177,771,000 | 2022-11-19 | CV. PUTERA MAMA | 02.242.680.3-733.000 | 95,630 | 0.05 % | |
202 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Sewa Excavator | Pengadaan Langsung | Jasa Lainnya | 326282 | 31463237 | 177,270,000 | 177,269,997 | 176,861,850 | 176,861,850 | 176,528,850 | 176,528,850 | 176,528,850 | 176,528,850 | 2022-10-15 | ARJUNA KARYA UTAMA,cv | 01.214.260.0-733.000 | 408,150 | 0.23 % | |
203 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Durian Rabung, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 327282 | 31593050 | 199,000,000 | 199,000,000 | 198,822,033 | 198,822,033 | 198,487,000 | 198,487,000 | 0 | 198,487,000 | 2022-09-22 | cv. akur bersaudara | 02.675.570.2-735.000 | 177,967 | 0.09 % | |
204 | 2022 | RSUD Daha Sejahtera | Perencanaan Review Masterplan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 333282 | 36657883 | 100,000,000 | 99,324,000 | 99,050,000 | 99,050,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 2022-10-16 | PT. CIPTA MATRA HANDASA | 02.332.940.2-429.000 | 950,000 | 0.95 % | |
205 | 2022 | Kecamatan Kandangan | Pembuatan WC untuk Keluarga Pra Sejahtera | Pengadaan Langsung | Pekerjaan Konstruksi | 334282 | 36386562 | 50,400,000 | 50,400,000 | 50,340,000 | 50,340,000 | 50,250,000 | 50,250,000 | 0 | 50,250,000 | 2022-09-30 | CV. RISNA | 01.214.257.6-733.000 | 60,000 | 0.12 % | |
206 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Pengurugan Oprit Jembatan Menuju Tugu Niih) | Pengadaan Langsung | Pekerjaan Konstruksi | 339282 | 36637859 | 200,000,000 | 199,868,057 | 199,695,101 | 199,695,101 | 198,751,000 | 198,751,000 | 198,751,000 | 198,751,000 | 2022-10-03 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 304,899 | 0.15 % | |
207 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Gantung Desa Loksado, Kec. Loksado) | Pengadaan Langsung | Pekerjaan Konstruksi | 340282 | 36637936 | 83,700,000 | 83,641,682 | 83,337,255 | 83,337,255 | 83,226,000 | 83,226,000 | 83,226,000 | 83,226,000 | 2022-10-18 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 362,745 | 0.43 % | |
208 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Pemasangan Bronjong Jembatan Jl. Bayampah Kec. Loksado) | Pengadaan Langsung | Pekerjaan Konstruksi | 342282 | 36636983 | 200,000,000 | 199,969,189 | 199,754,490 | 199,754,490 | 199,726,740 | 199,726,740 | 199,726,740 | 199,726,740 | 2022-10-06 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 245,510 | 0.12 % | |
209 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bahalayung Desa Lungau Kec. Kandangan untuk Penanggulangan Bencana Banjir (Dana BTT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 343282 | 34294064 | 80,000,000 | 79,920,000 | 79,906,125 | 79,906,125 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 2022-10-10 | Wiyasa Drawana | 80.902.072.0-731.000 | 93,875 | 0.12 % | |
210 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 346282 | 36724498 | 60,000,000 | 59,949,713 | 59,385,000 | 59,385,000 | 59,329,500 | 59,329,500 | 59,329,500 | 59,329,500 | 2022-10-03 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 615,000 | 1.03 % | |
211 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Penggantian Jembatan di Jl. Biti Kec. Kandangan, Jasa Konsultansi Perencanaan Pekerjaan Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 347282 | 36724535 | 30,000,000 | 29,933,276 | 29,653,095 | 29,653,095 | 29,603,700 | 29,603,700 | 29,603,700 | 29,603,700 | 2022-10-03 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 346,905 | 1.16 % | |
212 | 2022 | Kecamatan Kandangan | Jasa Konsultasi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Rehab Gedung Kelurahan) / KU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 348282 | 36306958 | 14,000,000 | 13,976,000 | 13,847,250 | 13,847,250 | 13,750,000 | 13,750,000 | 13,750,000 | 13,750,000 | 2022-09-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 152,750 | 1.09 % | |
213 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Ruas Loklahung - Malaris Kec. Loksado, Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Jalan Duhat Kec. Simpur, Jasa Konsultansi Perencanaan Pekerjaan Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 349282 | 36714996 | 45,000,000 | 44,925,851 | 44,773,515 | 44,773,515 | 44,744,000 | 44,744,000 | 44,744,000 | 44,744,000 | 2022-10-10 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 226,485 | 0.5 % | |
214 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang, Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya, Jasa Konsultansi Perencanaan Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 350282 | 36724473 | 60,000,000 | 59,949,713 | 59,848,592 | 59,848,592 | 59,699,000 | 59,699,000 | 59,699,000 | 59,699,000 | 2022-10-10 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 151,409 | 0.25 % | |
215 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya, Jasa Konsultansi Perencanaan Pekerjaan Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung, Jasa Konsultansi Perencanaan Pekerjaan Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 351282 | 36724482 | 45,000,000 | 44,925,851 | 44,773,515 | 44,773,515 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 2022-10-10 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 226,485 | 0.5 % | |
216 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 354282 | 36724515 | 15,000,000 | 14,985,367 | 14,831,820 | 14,831,820 | 14,785,200 | 14,785,200 | 14,785,200 | 14,785,200 | 2022-10-03 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 168,180 | 1.12 % | |
217 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja-Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 357282 | 36755480 | 14,270,000 | 14,269,999 | 14,110,000 | 14,110,000 | 14,041,500 | 14,041,500 | 0 | 14,041,500 | 2022-10-06 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 160,000 | 1.12 % | |
218 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Perencanaan Pemasangan Pagar Lapangan Basket Amandit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 358282 | 36669167 | 15,000,000 | 14,969,099 | 14,935,050 | 14,935,050 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-10-13 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 64,950 | 0.43 % | |
219 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Perencanaan Pengurugan Gedung Serbaguna | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 359282 | 36669223 | 15,000,000 | 14,969,099 | 14,968,350 | 14,968,350 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-10-06 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 31,650 | 0.21 % | |
220 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Pagar Lapangan Basket Amandit | Pengadaan Langsung | Pekerjaan Konstruksi | 360282 | 36669308 | 152,000,000 | 151,986,837 | 151,497,168 | 151,497,168 | 151,364,000 | 151,364,000 | 151,364,000 | 151,364,000 | 2022-10-24 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 502,832 | 0.33 % | |
221 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Konsulidasi Pengawasan Perluasan SPAM Desa Panggungan, Kec. Loksado dan SPAM Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 361282 | 36744556 | 27,910,000 | 27,910,000 | 27,790,000 | 27,790,000 | 27,770,000 | 27,770,000 | 0 | 27,770,000 | 2022-10-06 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 120,000 | 0.43 % | |
222 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Halaman Polres HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 363282 | 36715966 | 90,000,000 | 90,000,000 | 89,855,000 | 89,855,000 | 89,810,000 | 89,810,000 | 89,810,000 | 89,810,000 | 2022-10-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 145,000 | 0.16 % | |
223 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Konsulidasi Pengawasan Perluasan SPAM Desa Bumi Berkat Kec. Sungai Raya dan SPAM Desa Pantai Ulin Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 364282 | 36744489 | 16,800,000 | 16,800,000 | 16,761,000 | 16,761,000 | 16,716,000 | 16,716,000 | 0 | 16,716,000 | 2022-10-04 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 39,000 | 0.23 % | |
224 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 365282 | 36554198 | 10,000,000 | 10,000,000 | 9,940,050 | 9,940,050 | 9,923,400 | 9,923,400 | 9,923,400 | 9,923,400 | 2022-10-12 | Wing Rastafarindo | 03.282.590.3-732.000 | 59,950 | 0.6 % | |
225 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ni'ih Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 366282 | 36762852 | 100,000,000 | 99,645,821 | 99,400,500 | 99,400,500 | 99,299,000 | 99,299,000 | 99,299,000 | 99,299,000 | 2022-11-08 | cv. alfa banua estetika | 81.252.051.8-731.000 | 599,500 | 0.6 % | |
226 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Hamak | Pengadaan Langsung | Pekerjaan Konstruksi | 367282 | 32378995 | 185,000,000 | 184,912,243 | 184,598,148 | 184,598,148 | 184,000,000 | 184,000,000 | 184,000,000 | 184,000,000 | 2022-10-09 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 401,852 | 0.22 % | |
227 | 2022 | Dinas Kesehatan | Rehabilitasi Pustu Hamak Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 368282 | 36485779 | 190,000,000 | 189,860,384 | 189,702,863 | 189,702,863 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 2022-10-09 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 297,137 | 0.16 % | |
228 | 2022 | Dinas Kesehatan | Perencanaan Pagar Puskesmas gambah,Perencanaan Perbaikan Halaman Puskesmas Loksado,Perencanaan Titian Puskesmas Bayanan,Perencanaan Rehabilitasi Ruang Rawat Jalan PKM Angkinang (Konsolidasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 370282 | 36695894;36695961;36696063;36696228 | 95,000,000 | 95,000,000 | 94,849,500 | 94,849,500 | 94,500,000 | 94,500,000 | 94,500,000 | 94,500,000 | 2022-10-17 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 150,500 | 0.16 % | |
229 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 371282 | 36527682 | 19,000,000 | 19,000,000 | 18,947,700 | 18,947,700 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-10-17 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 52,300 | 0.28 % | |
230 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 372282 | 36553858 | 18,500,000 | 18,500,000 | 18,459,300 | 18,459,300 | 18,426,000 | 18,426,000 | 18,426,000 | 18,426,000 | 2022-10-13 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 40,700 | 0.22 % | |
231 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 373282 | 36554102 | 15,000,000 | 15,000,000 | 14,962,800 | 14,962,800 | 14,918,400 | 14,918,400 | 14,918,400 | 14,918,400 | 2022-10-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 37,200 | 0.25 % | |
232 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 374282 | 36554077 | 17,000,000 | 17,000,000 | 16,960,800 | 16,960,800 | 16,938,600 | 16,938,600 | 16,938,600 | 16,938,600 | 2022-10-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 39,200 | 0.23 % | |
233 | 2022 | Dinas Perdagangan | Perencanaan Lokasi Parkir Khusus di Los Amandit Lantai II Pasar Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 376282 | 36790912 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,816,750 | 99,816,750 | 99,816,750 | 99,816,750 | 2022-10-10 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.1 % | |
234 | 2022 | Dinas Pertanian | Perencanaan JUT Poktan Pulau Sarindit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 377282 | 36768549 | 11,000,000 | 11,000,000 | 10,989,000 | 10,989,000 | 10,966,800 | 10,966,800 | 10,966,800 | 10,966,800 | 2022-10-07 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 11,000 | 0.1 % | |
235 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung, dan Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Karang jawa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 378282 | 36749418 | 38,000,000 | 38,000,000 | 37,873,200 | 37,873,200 | 37,784,400 | 37,784,400 | 37,784,400 | 37,784,400 | 2022-10-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 126,800 | 0.33 % | |
236 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 379282 | 36528342 | 11,000,000 | 11,000,000 | 10,966,800 | 10,966,800 | 10,922,400 | 10,922,400 | 10,922,400 | 10,922,400 | 2022-10-15 | Wing Rastafarindo | 03.282.590.3-732.000 | 33,200 | 0.3 % | |
237 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Depan Mesjid Al-Hidayah Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 380282 | 36776619 | 120,000,000 | 119,879,144 | 119,867,826 | 119,867,826 | 119,699,000 | 119,699,000 | 119,699,000 | 119,699,000 | 2022-10-06 | CV. Haratai Permai | 02.089.737.7-733.000 | 132,174 | 0.11 % | |
238 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Wasah Tengah (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 381282 | 36528715 | 70,000,000 | 69,999,930 | 69,860,625 | 69,860,625 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-06 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 139,375 | 0.2 % | |
239 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Tawia (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 382282 | 36528642 | 70,000,000 | 69,999,930 | 69,846,750 | 69,846,750 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 153,250 | 0.22 % | |
240 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 383282 | 36716188 | 18,000,000 | 18,000,000 | 17,968,685 | 17,968,685 | 17,927,000 | 17,927,000 | 17,927,000 | 17,927,000 | 2022-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 31,315 | 0.17 % | |
241 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DI. Asam (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 384282 | 36528552 | 70,000,000 | 69,999,930 | 69,830,100 | 69,830,100 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 169,900 | 0.24 % | |
242 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 385282 | 36716091 | 17,200,000 | 17,200,000 | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,950,000 | 16,950,000 | 2022-10-21 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 200,000 | 1.16 % | |
243 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi DI.Pantai Ulin III Kec.Simpur (PAD), dan Jasa Konsultansi Perencanaan Rehabilitasi jaringan irigasi DI.Panjampang bahagia Kec.Simpur (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 386282 | 36749386 | 26,000,000 | 26,000,000 | 25,974,000 | 25,974,000 | 25,929,600 | 25,929,600 | 25,929,600 | 25,929,600 | 2022-10-13 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 26,000 | 0.1 % | |
244 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Tatah di Desa Kayu abang Kec.Angkinang, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Tawia di Desa Tawia Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 388282 | 36749354 | 35,000,000 | 35,000,000 | 34,876,200 | 34,876,200 | 34,854,000 | 34,854,000 | 34,854,000 | 34,854,000 | 2022-10-13 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 123,800 | 0.35 % | |
245 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 389282 | 36554143 | 18,500,000 | 18,500,000 | 18,459,300 | 18,459,300 | 18,403,800 | 18,403,800 | 18,403,800 | 18,403,800 | 2022-10-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 40,700 | 0.22 % | |
246 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL Perkuatan Tebing di Pagar Haur Desa Jelatang RT. 003 Kec. Padang Batung (dekat Majelis Raudatul Firdaus) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 390282 | 36553352 | 100,000,000 | 99,886,680 | 99,550,350 | 99,550,350 | 99,378,300 | 99,378,300 | 99,378,300 | 99,378,300 | 2022-11-08 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 449,650 | 0.45 % | |
247 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL DIR Sungai Kajang Kec. Kandangan (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 391282 | 36528601 | 70,000,000 | 69,999,930 | 69,819,000 | 69,819,000 | 69,652,500 | 69,652,500 | 69,652,500 | 69,652,500 | 2022-11-07 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 181,000 | 0.26 % | |
248 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 392282 | 36527853 | 19,000,000 | 19,000,000 | 18,955,359 | 18,955,359 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-10-13 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 44,641 | 0.23 % | |
249 | 2022 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 393282 | 36790931 | 15,960,000 | 15,960,000 | 15,850,000 | 15,850,000 | 15,828,600 | 15,828,600 | 15,828,600 | 15,828,600 | 2022-10-10 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 110,000 | 0.69 % | |
250 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan Mal Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 395282 | 36716108 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2022-10-21 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.1 % | |
251 | 2022 | Dinas Perdagangan | Perencanaan Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 396282 | 36791051 | 16,000,000 | 16,000,000 | 15,873,000 | 15,873,000 | 15,817,500 | 15,817,500 | 15,817,500 | 15,817,500 | 2022-10-07 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 127,000 | 0.79 % | |
252 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 397282 | 36795310 | 15,470,000 | 15,423,839 | 15,207,000 | 15,207,000 | 15,120,000 | 15,120,000 | 100 | 15,120,000 | 2022-10-13 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 263,000 | 1.7 % | |
253 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec.Kalumpang, Jasa Konsultansi Perencanaan Normalisasi Sungai Lintingan di desa Amparaya Kec.Simpur, Jasa Konsultansi Perencanaan Normalisasi Sungai di desa tambingkar Kec.Kalumpang, dan Jasa Konsultansi Perencanaan Normalisasi Sungai Sarang nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 398282 | 36749273 | 74,000,000 | 74,000,000 | 73,995,542 | 73,995,542 | 73,859,400 | 73,859,400 | 73,859,400 | 73,859,400 | 2022-10-19 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 4,459 | 0.01 % | |
254 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Kuangan (usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 399282 | 36312018 | 70,000,000 | 69,999,930 | 69,877,275 | 69,877,275 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-08 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 122,725 | 0.18 % | |
255 | 2022 | Dinas Perdagangan | Perencanaan Rehab Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 400282 | 36791432 | 19,500,000 | 19,499,999 | 19,400,000 | 19,400,000 | 19,369,500 | 19,369,500 | 19,369,500 | 19,369,500 | 2022-10-12 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.51 % | |
256 | 2022 | Dinas Perdagangan | Perencanaan Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 401282 | 36791495 | 15,980,000 | 15,980,000 | 15,850,000 | 15,850,000 | 15,762,000 | 15,762,000 | 15,762,000 | 15,762,000 | 2022-10-12 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 130,000 | 0.81 % | |
257 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Kantor Bappelitbangda Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 402282 | 36716132 | 100,000,000 | 100,000,000 | 99,985,392 | 99,985,392 | 99,899,000 | 99,899,000 | 99,899,000 | 99,899,000 | 2022-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 14,608 | 0.01 % | |
258 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Pantai Ulin 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 403282 | 36312079 | 70,000,000 | 69,999,930 | 69,855,075 | 69,855,075 | 69,674,700 | 69,674,700 | 69,674,700 | 69,674,700 | 2022-11-08 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 144,925 | 0.21 % | |
259 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Kawasan Religi Kapuh Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 406282 | 36716276 | 100,000,000 | 100,000,000 | 98,734,500 | 98,734,500 | 98,698,000 | 98,698,000 | 98,698,000 | 98,698,000 | 2022-10-29 | CV. GHANI TEKNIK KONSULTAN | 31.696.039.2-731.000 | 1,265,500 | 1.27 % | |
260 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 409282 | 36813052 | 11,900,000 | 11,614,020 | 11,540,980 | 11,540,980 | 11,450,000 | 11,450,000 | 11,450,000 | 11,450,000 | 2022-10-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 359,020 | 3.02 % | |
261 | 2022 | Dinas Kesehatan | Titian Pustu muning Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 410282 | 36776066 | 45,150,000 | 44,699,926 | 44,617,782 | 44,617,782 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2022-10-31 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 532,218 | 1.18 % | |
262 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I. Wasah Hilir (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 411282 | 36312087 | 70,000,000 | 69,999,930 | 69,838,425 | 69,838,425 | 69,663,600 | 69,663,600 | 69,663,600 | 69,663,600 | 2022-11-07 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 161,575 | 0.23 % | |
263 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 412282 | 36795166;36795241 | 26,460,000 | 26,076,398 | 25,985,100 | 25,985,100 | 25,850,100 | 25,850,100 | 100 | 25,850,100 | 2022-10-13 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 474,900 | 1.79 % | |
264 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN),Konsultan Perencanaan Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota,Konsultan Perencanaan Peningkatan PSU Permukiman Gang Rt 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 414282 | 36803647;36803820;36803906 | 38,416,000 | 38,197,043 | 38,098,530 | 38,098,530 | 38,000,000 | 38,000,000 | 100 | 38,000,000 | 2022-10-13 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 317,470 | 0.83 % | |
265 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Rt 1,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara,Konsultan Perencanaan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 416282 | 36803577;36803699;36803764 | 40,250,000 | 39,665,129 | 39,659,190 | 39,659,190 | 39,500,000 | 39,500,000 | 100 | 39,500,000 | 2022-10-13 | cv. vertical project | 03.169.392.2-734.000 | 590,810 | 1.47 % | |
266 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loklahung Rt.001 Kec. Loksado, dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Rt.004 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 417282 | 36749220 | 38,500,000 | 38,500,000 | 38,472,600 | 38,472,600 | 38,428,200 | 38,428,200 | 38,428,200 | 38,428,200 | 2022-10-19 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 27,400 | 0.07 % | |
267 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Dokumen UKL dan UPL D.I.R. Danau Bangkau (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 418282 | 36312101 | 70,000,000 | 69,999,930 | 69,852,300 | 69,852,300 | 69,685,800 | 69,685,800 | 69,685,800 | 69,685,800 | 2022-11-07 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 147,700 | 0.21 % | |
268 | 2022 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Pertokoan/Koperasi/Pasar | Pengadaan Langsung | Pekerjaan Konstruksi | 420282 | 35984472 | 200,000,000 | 179,838,461 | 179,532,111 | 179,532,111 | 179,482,000 | 179,482,000 | 179,482,000 | 179,482,000 | 2022-10-17 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 20,467,889 | 10.23 % | |
269 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 421282 | 36554321 | 20,000,000 | 20,000,000 | 19,952,972 | 19,952,972 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-10-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 47,029 | 0.24 % | |
270 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 422282 | 36554447 | 20,000,000 | 20,000,000 | 19,943,057 | 19,943,057 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2022-10-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 56,943 | 0.28 % | |
271 | 2022 | RSUD Daha Sejahtera | Perencanaan Pembangunan gudang Penyimpanan Limbah RSUD Daha Sejahtera | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 423282 | 36825974 | 15,000,000 | 14,999,985 | 14,735,780 | 14,735,780 | 14,696,400 | 14,696,400 | 14,696,400 | 14,696,400 | 2022-10-14 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 264,220 | 1.76 % | |
272 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Penyusunan Peraturan Pedoman Penilaian Kinerja Penyedia Jasa Konstruksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 425282 | 36863037 | 100,000,000 | 99,955,000 | 98,851,050 | 98,851,050 | 98,789,000 | 98,789,000 | 98,789,000 | 98,789,000 | 2022-10-28 | SR MANAGEMENT | 60.754.845.0-732.000 | 1,148,950 | 1.15 % | |
273 | 2022 | RSUD Brigjen H. Hasan Basry | Renovasi Guesthouse | Pengadaan Langsung | Pekerjaan Konstruksi | 426282 | 36843355 | 200,900,000 | 200,000,000 | 199,857,145 | 199,857,145 | 199,600,600 | 199,600,600 | 199,600,600 | 199,600,600 | 2022-10-14 | cv. rukun damai | 01.203.952.5-733.000 | 1,042,855 | 0.52 % | |
274 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 427282 | 36733488 | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,038,500 | 17,038,500 | 0 | 17,038,500 | 2022-10-21 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 106,000 | 0.62 % | |
275 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Ponpes Baladul Amin,Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 428282 | 36734654 | 17,200,000 | 17,200,000 | 17,116,200 | 17,116,200 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-26 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 83,800 | 0.49 % | |
276 | 2022 | RSUD Brigjen H. Hasan Basry | Pemasangan Interior Manajemen | Pengadaan Langsung | Pekerjaan Konstruksi | 429282 | 36288330 | 100,000,000 | 97,148,865 | 97,004,210 | 97,004,210 | 96,833,300 | 96,833,300 | 96,833,300 | 96,833,300 | 2022-10-14 | CV.KOORI CIPTA KARYA | 84.740.433.2-732.000 | 2,995,790 | 3 % | |
277 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 430282 | 36734639 | 17,200,000 | 17,200,000 | 17,135,000 | 17,135,000 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 65,000 | 0.38 % | |
278 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 431282 | 36554176 | 100,000,000 | 99,983,250 | 99,816,750 | 99,816,750 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2022-10-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 183,250 | 0.18 % | |
279 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 432282 | 36733424 | 17,200,000 | 17,200,000 | 17,149,500 | 17,149,500 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-10-21 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 50,500 | 0.29 % | |
280 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Pemeliharaan Gedung dan Bangunan Perbaikan Lantai Balai Penyuluh KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 433282 | 36756235 | 22,170,500 | 22,170,030 | 22,088,459 | 22,088,459 | 21,978,000 | 21,978,000 | 0 | 21,978,000 | 2022-10-13 | RIKA JAYA, CV | 01.424.626.8-733.000 | 82,041 | 0.37 % | |
281 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 434282 | 36733458 | 17,200,000 | 17,200,000 | 17,153,696 | 17,153,696 | 17,117,000 | 17,117,000 | 0 | 17,117,000 | 2022-10-24 | Wing Rastafarindo | 03.282.590.3-732.000 | 46,304 | 0.27 % | |
282 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 437282 | 36791447 | 13,650,000 | 13,650,000 | 13,600,000 | 13,600,000 | 13,597,500 | 13,597,500 | 13,597,500 | 13,597,500 | 2022-11-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 50,000 | 0.37 % | |
283 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 438282 | 36733514 | 17,200,000 | 17,200,000 | 17,153,696 | 17,153,696 | 17,111,000 | 17,111,000 | 0 | 17,111,000 | 2022-10-24 | Wing Rastafarindo | 03.282.590.3-732.000 | 46,304 | 0.27 % | |
284 | 2022 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 439282 | 36790948 | 13,965,000 | 13,965,000 | 13,850,000 | 13,850,000 | 13,819,500 | 13,819,500 | 13,819,500 | 13,819,500 | 2022-11-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 115,000 | 0.82 % | |
285 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 440282 | 36733565 | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,017,000 | 17,017,000 | 0 | 17,017,000 | 2022-10-24 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 106,000 | 0.62 % | |
286 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 441282 | 36733601 | 17,200,000 | 17,200,000 | 17,094,000 | 17,094,000 | 17,011,000 | 17,011,000 | 0 | 17,011,000 | 2022-10-24 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 106,000 | 0.62 % | |
287 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Muara Banta Kandangan Hulu,Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 442282 | 36718950 | 17,200,000 | 17,200,000 | 17,157,000 | 17,157,000 | 17,094,000 | 17,094,000 | 0 | 17,094,000 | 2022-11-01 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 43,000 | 0.25 % | |
288 | 2022 | Dinas Perdagangan | Pengawasan Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 443282 | 36791396 | 14,000,000 | 14,000,000 | 13,986,000 | 13,986,000 | 13,924,950 | 13,924,950 | 13,924,950 | 13,924,950 | 2022-10-28 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 14,000 | 0.1 % | |
289 | 2022 | Dinas Perdagangan | Pengawasan Rehab Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 444282 | 36791516 | 13,982,500 | 13,982,499 | 13,900,000 | 13,900,000 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-11-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 82,500 | 0.59 % | |
290 | 2022 | RSUD Daha Sejahtera | Jasa Apraisal Pembelian Lahan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 445282 | 36825960 | 80,000,000 | 79,831,200 | 79,431,600 | 79,431,600 | 79,000,000 | 79,000,000 | 79,000,000 | 79,000,000 | 2022-10-19 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 568,400 | 0.71 % | |
291 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 447282 | 36755463 | 172,500,000 | 172,209,540 | 171,988,338 | 171,988,338 | 171,844,000 | 171,844,000 | 100 | 171,844,000 | 2022-10-27 | CV. AISY | 75.132.070.6-733.000 | 511,662 | 0.3 % | |
292 | 2022 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Modal Bangunan Gedung Tempat Kerja-Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 448282 | 36755492 | 10,530,000 | 10,529,999 | 10,350,000 | 10,350,000 | 10,300,800 | 10,300,800 | 10,300,800 | 10,300,800 | 2022-10-28 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 180,000 | 1.71 % | |
293 | 2022 | RSUD Daha Sejahtera | Perencanaan Pengadaan Parkir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 450282 | 36926762 | 25,000,000 | 25,000,000 | 24,886,200 | 24,886,200 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2022-10-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 113,800 | 0.46 % | |
294 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Sekolah Islam Kel. Kandangan Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 451282 | 31592304 | 14,500,000 | 14,500,000 | 14,430,000 | 14,430,000 | 14,374,500 | 14,374,500 | 14,374,500 | 14,374,500 | 2022-10-28 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 70,000 | 0.48 % | |
295 | 2022 | Dinas Perhubungan | Perencanaan pembangunan alat parkir otomatis (portal) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 452282 | 36882218 | 25,000,000 | 24,997,936 | 24,986,835 | 24,986,835 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2022-10-17 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 13,165 | 0.05 % | |
296 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Merdeka Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 453282 | 31592316 | 15,600,000 | 15,600,000 | 15,489,000 | 15,489,000 | 15,429,000 | 15,429,000 | 15,429,000 | 15,429,000 | 2022-11-07 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 111,000 | 0.71 % | |
297 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 455282 | 32147122 | 14,400,000 | 14,400,000 | 14,294,914 | 14,294,914 | 14,208,000 | 14,208,000 | 14,208,000 | 14,208,000 | 2022-10-31 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 105,086 | 0.73 % | |
298 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM Ponpes Darul Ulum Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 456282 | 32146154 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,929,500 | 14,929,500 | 14,929,500 | 14,929,500 | 2022-11-08 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 15,000 | 0.1 % | |
299 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 457282 | 36718929 | 17,200,000 | 17,200,000 | 17,100,000 | 17,100,000 | 17,057,000 | 17,057,000 | 0 | 17,057,000 | 2022-10-31 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.58 % | |
300 | 2022 | Sekretariat Daerah | Belanja Rehab Gudang Peralatan Samping Pendopo | Pengadaan Langsung | Pekerjaan Konstruksi | 459282 | 36834441 | 155,000,000 | 154,991,188 | 154,766,868 | 154,766,868 | 154,766,800 | 154,766,800 | 154,766,800 | 154,766,800 | 2022-10-20 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 233,132 | 0.15 % | |
301 | 2022 | Dinas Komunikasi dan Informatika | Perluasan Jaringan Internet Mall Pelayanan Publik | Pengadaan Langsung | Jasa Lainnya | 460282 | 36535685 | 156,400,000 | 153,282,000 | 152,971,320 | 152,971,320 | 151,950,000 | 151,950,000 | 90 | 151,950,000 | 2022-10-27 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 3,428,680 | 2.19 % | |
302 | 2022 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan Tempat Kerja Kelurahan | Pengadaan Langsung | Pekerjaan Konstruksi | 461282 | 32159074 | 174,500,000 | 174,497,000 | 174,292,508 | 174,292,508 | 174,150,000 | 174,150,000 | 174,150,000 | 174,150,000 | 2022-10-21 | CV. RISNA | 01.214.257.6-733.000 | 207,492 | 0.12 % | |
303 | 2022 | Kecamatan Kandangan | Jasa Konsultasi Pengawasan Arsitektur (KU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 462282 | 36307043 | 10,000,000 | 9,999,000 | 9,948,881 | 9,948,881 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 2022-10-21 | Wing Rastafarindo | 03.282.590.3-732.000 | 51,119 | 0.51 % | |
304 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 464282 | 32147192 | 200,000,000 | 199,903,789 | 199,838,708 | 199,838,708 | 199,730,000 | 199,730,000 | 199,730,000 | 199,730,000 | 2022-10-28 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 161,292 | 0.08 % | |
305 | 2022 | Dinas Perhubungan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 465282 | 36882885 | 50,000,000 | 49,998,834 | 49,705,218 | 49,705,218 | 49,705,000 | 49,705,000 | 49,705,000 | 49,705,000 | 2022-10-26 | cv.agung perkasa | 02.475.425.1-735.000 | 294,782 | 0.59 % | |
306 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM Ponpes Darul Ulum Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 466282 | 32146169 | 200,000,000 | 199,992,006 | 199,979,809 | 199,979,809 | 199,864,000 | 199,864,000 | 199,864,000 | 199,864,000 | 2022-11-01 | CV. KHALIF | 81.540.809.1-733.000 | 20,191 | 0.01 % | |
307 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Kota : Jalan Sudirman Segmen I | Pengadaan Langsung | Pekerjaan Konstruksi | 467282 | 31591831 | 200,000,000 | 199,812,281 | 199,521,093 | 199,521,093 | 198,751,000 | 198,751,000 | 198,751,000 | 198,751,000 | 2022-10-26 | CV.BUMI SAHARA PUTRA | 41.042.955.9-732.000 | 478,907 | 0.24 % | |
308 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Merdeka, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 468282 | 31592337 | 195,000,000 | 194,981,757 | 194,922,434 | 194,922,434 | 194,662,000 | 194,662,000 | 194,662,000 | 194,662,000 | 2022-11-03 | cv.usah bersama | 75.083.373.3-735.000 | 77,566 | 0.04 % | |
309 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 469282 | 31592340 | 200,000,000 | 199,794,891 | 199,350,852 | 199,350,852 | 199,256,000 | 199,256,000 | 199,256,000 | 199,256,000 | 2022-10-26 | cv.usah bersama | 75.083.373.3-735.000 | 649,148 | 0.32 % | |
310 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Kelas SDN Hakurung Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 470282 | 36765293 | 90,000,000 | 89,971,977 | 89,799,000 | 89,799,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 2022-10-28 | Wing Rastafarindo | 03.282.590.3-732.000 | 201,000 | 0.22 % | |
311 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Rumah Dinas SDN 3 Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 471282 | 36765331 | 20,000,000 | 19,982,016 | 19,946,700 | 19,946,700 | 19,891,200 | 19,891,200 | 19,891,200 | 19,891,200 | 2022-10-28 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 53,300 | 0.27 % | |
312 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Pekerjaan Konstruksi | 472282 | 36827940 | 187,000,000 | 186,994,000 | 186,491,837 | 186,491,837 | 184,410,950 | 184,410,950 | 184,410,950 | 184,410,950 | 2022-11-02 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 508,163 | 0.27 % | |
313 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi WC dan Kamar Ganti di Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Pekerjaan Konstruksi | 473282 | 36827856 | 75,000,000 | 74,998,000 | 74,795,138 | 74,795,138 | 74,790,000 | 74,790,000 | 74,790,000 | 74,790,000 | 2022-11-02 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 204,862 | 0.27 % | |
314 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing di Desa Padang Batung RT.02 Kec. Padang batung, dan Jasa Konsultansi Perencanaan Perkuatan tebing di Desa Batu bini Kec. Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 475282 | 36749193 | 39,000,000 | 39,000,000 | 38,872,200 | 38,872,200 | 38,827,800 | 38,827,800 | 38,827,800 | 38,827,800 | 2022-10-24 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 127,800 | 0.33 % | |
315 | 2022 | Dinas Komunikasi dan Informatika | Jaringan Internet Gedung Serba Guna 2 Desember / Ganda | Pengadaan Langsung | Jasa Lainnya | 476282 | 36903986 | 99,200,000 | 99,191,709 | 98,912,100 | 98,912,100 | 98,778,000 | 98,778,000 | 90 | 98,778,000 | 2022-11-11 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 287,900 | 0.29 % | |
316 | 2022 | Dinas Pertanian | Pembangunan/Rehabilitasi JUT Poktan Pulau Serindit Desa Bamban Utara Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 477282 | 36768688 | 179,000,000 | 178,940,000 | 178,848,681 | 178,848,681 | 178,789,900 | 178,789,900 | 178,789,900 | 178,789,900 | 2022-10-26 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 151,319 | 0.08 % | |
317 | 2022 | Dinas Pertanian | Pengawasan Pemb/Rehab JUTPoktan Pulau Sarindit Ds Bamban Utara Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 478282 | 36768609 | 10,000,000 | 10,000,000 | 9,990,000 | 9,990,000 | 9,978,900 | 9,978,900 | 9,978,900 | 9,978,900 | 2022-10-26 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 10,000 | 0.1 % | |
318 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Saluran Pembuangan di Ins.Gizi dan Mesjid RSUD BHHB | Pengadaan Langsung | Pekerjaan Konstruksi | 480282 | 36931340 | 200,000,000 | 179,911,713 | 179,716,218 | 179,716,218 | 179,579,000 | 179,579,000 | 179,579,000 | 179,579,000 | 2022-10-26 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | 20,283,782 | 10.14 % | |
319 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Pembangunan Gedung Rawat Inap Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 481282 | 36950515 | 150,000,000 | 99,372,750 | 99,000,900 | 99,000,900 | 98,910,000 | 98,910,000 | 98,910,000 | 98,910,000 | 2022-10-25 | CV. Sembilan Dua Teknik Konsultan | 81.763.047.8-731.000 | 50,999,100 | 34 % | |
320 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 483282 | 36716207 | 200,000,000 | 199,953,729 | 199,902,349 | 199,902,349 | 199,881,000 | 199,881,000 | 199,881,000 | 199,881,000 | 2022-11-10 | CV. ATIGA MULTI KARYA | 96.038.305.7-733.000 | 97,651 | 0.05 % | |
321 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 484282 | 36804128 | 175,122,000 | 174,901,231 | 174,295,474 | 174,295,474 | 174,200,000 | 174,200,000 | 174,200,000 | 174,200,000 | 2022-11-04 | CV. An-Nidha | 02.675.485.3-733.000 | 826,526 | 0.47 % | |
322 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 485282 | 36795548 | 182,420,000 | 182,190,215 | 181,968,998 | 181,968,998 | 181,850,000 | 181,850,000 | 100 | 181,850,000 | 2022-11-08 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 451,002 | 0.25 % | |
323 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Pekerjaan Konstruksi | 486282 | 36795630 | 193,990,000 | 193,827,057 | 193,707,692 | 193,707,692 | 193,600,000 | 193,600,000 | 100 | 193,600,000 | 2022-11-03 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 282,308 | 0.15 % | |
324 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Polsubsektor Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 487282 | 36716036 | 16,000,000 | 16,000,000 | 15,972,395 | 15,972,395 | 15,951,000 | 15,951,000 | 15,951,000 | 15,951,000 | 2022-11-02 | Wing Rastafarindo | 03.282.590.3-732.000 | 27,605 | 0.17 % | |
325 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Halaman Polres HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 488282 | 36715870 | 80,000,000 | 80,000,000 | 79,850,000 | 79,850,000 | 79,790,000 | 79,790,000 | 79,790,000 | 79,790,000 | 2022-11-04 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 150,000 | 0.19 % | |
326 | 2022 | RSUD Daha Sejahtera | Pengadaan Prasarana Penyimpanan Limbah Padat | Pengadaan Langsung | Pekerjaan Konstruksi | 489282 | 36826152 | 190,000,000 | 189,860,295 | 189,657,056 | 189,657,056 | 189,490,500 | 189,490,500 | 189,490,500 | 189,490,500 | 2022-10-27 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 342,944 | 0.18 % | |
327 | 2022 | RSUD Daha Sejahtera | Rehabilitasi Nurse Station | Pengadaan Langsung | Pekerjaan Konstruksi | 490282 | 36826130 | 198,000,000 | 197,980,271 | 197,717,147 | 197,717,147 | 197,683,800 | 197,683,800 | 197,683,800 | 197,683,800 | 2022-10-27 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 282,853 | 0.14 % | |
328 | 2022 | RSUD Daha Sejahtera | Rehabilitasi Gedung Rawat Jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 491282 | 36826141 | 170,000,000 | 167,693,052 | 167,276,995 | 167,276,995 | 167,265,800 | 167,265,800 | 167,265,800 | 167,265,800 | 2022-10-27 | FADWI UTAMA | 94.246.044.5-733.000 | 2,723,005 | 1.6 % | |
329 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loklahung RT. 001 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 493282 | 36862544 | 200,000,000 | 199,922,078 | 199,744,478 | 199,744,478 | 199,627,000 | 199,627,000 | 199,627,000 | 199,627,000 | 2022-11-09 | cv.usah bersama | 75.083.373.3-735.000 | 255,522 | 0.13 % | |
330 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Loksado RT. 004 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 494282 | 36862872 | 192,000,000 | 191,927,017 | 191,821,650 | 191,821,650 | 191,747,000 | 191,747,000 | 191,747,000 | 191,747,000 | 2022-11-06 | CV. RISNA | 01.214.257.6-733.000 | 178,350 | 0.09 % | |
331 | 2022 | Dinas Perdagangan | Rehab Eks Kantor Dekranasda dan Pembuatan Sumur Bor di Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 495282 | 36791412 | 200,000,000 | 199,968,220 | 199,750,855 | 199,750,855 | 197,200,400 | 197,200,400 | 197,200,400 | 197,200,400 | 2022-10-28 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 249,145 | 0.12 % | |
332 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Durian Rabung Kec. Padang batung (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 496282 | 36868822 | 200,000,000 | 199,930,257 | 199,708,167 | 199,708,167 | 199,638,000 | 199,638,000 | 199,638,000 | 199,638,000 | 2022-10-29 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 291,833 | 0.15 % | |
333 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Jasa Konsultansi Updating Penyusunan Rencana Detail Tata Ruang Kawasan Perkotaan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 497282 | 36869734 | 100,000,000 | 99,966,000 | 99,609,180 | 99,609,180 | 99,569,000 | 99,609,180 | 99,609,180 | 99,609,180 | 2022-10-28 | CV. Inditec Consultant | 02.090.318.3-731.000 | 390,820 | 0.39 % | |
334 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Jasa Konsultansi Updating Penyusunan Rencana Detail Tata Ruang Kawasan Perkotaan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 498282 | 36863755 | 100,000,000 | 99,966,000 | 99,766,800 | 99,766,800 | 99,699,000 | 99,766,800 | 99,766,800 | 99,766,800 | 2022-10-31 | CV. DIGDAYA MAHARDIKA | 03.242.995.3-731.000 | 233,200 | 0.23 % | |
335 | 2022 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Gabus Haruan di Kolam Tanah | Pengadaan Langsung | Pekerjaan Konstruksi | 499282 | 37129516 | 160,000,000 | 159,676,986 | 159,327,336 | 159,327,336 | 159,300,000 | 159,300,000 | 159,300,000 | 159,300,000 | 2022-10-28 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 672,664 | 0.42 % | |
336 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 500282 | 36871215 | 198,000,000 | 197,951,633 | 197,195,613 | 197,195,613 | 197,117,000 | 197,117,000 | 197,117,000 | 197,117,000 | 2022-10-29 | CV. RIZKI NOOR FAJAR | 02.300.399.9-735.000 | 804,387 | 0.41 % | |
337 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 502282 | 36871402 | 198,000,000 | 197,961,459 | 197,391,219 | 197,391,219 | 197,274,000 | 197,274,000 | 197,274,000 | 197,274,000 | 2022-11-28 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 608,781 | 0.31 % | |
338 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 503282 | 36871583 | 198,000,000 | 197,962,479 | 197,821,039 | 197,821,039 | 197,698,000 | 197,698,000 | 197,698,000 | 197,698,000 | 2022-11-09 | CV.AL-FAZZA | 92.913.236.3-735.000 | 178,961 | 0.09 % | |
339 | 2022 | Dinas Perdagangan | Rehab Selasar dan Kanopi Pasar Nagara Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 504282 | 36791527 | 199,750,000 | 199,746,602 | 199,448,500 | 199,448,500 | 199,359,600 | 199,359,600 | 199,359,600 | 199,359,600 | 2022-11-01 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 301,500 | 0.15 % | |
340 | 2022 | Dinas Perdagangan | Rehab Drainase Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 505282 | 36791032 | 199,500,000 | 199,497,957 | 199,165,318 | 199,165,318 | 199,132,000 | 199,132,000 | 199,132,000 | 199,132,000 | 2022-11-01 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 334,682 | 0.17 % | |
341 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 506282 | 36870346 | 187,500,000 | 187,391,827 | 187,125,838 | 187,125,838 | 186,895,000 | 186,895,000 | 186,895,000 | 186,895,000 | 2022-11-14 | FADWI UTAMA | 94.246.044.5-733.000 | 374,162 | 0.2 % | |
342 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 507282 | 36733387 | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,100,000 | 15,100,000 | 0 | 15,100,000 | 2022-11-16 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 48,500 | 0.32 % | |
343 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 509282 | 36861976 | 192,000,000 | 191,858,858 | 191,686,269 | 191,686,269 | 191,553,000 | 191,553,000 | 191,553,000 | 191,553,000 | 2022-11-13 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 313,731 | 0.16 % | |
344 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 510282 | 36869073 | 200,000,000 | 199,905,611 | 199,711,361 | 199,711,361 | 199,600,000 | 199,600,000 | 199,600,000 | 199,600,000 | 2022-12-01 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 288,639 | 0.14 % | |
345 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 511282 | 36734599 | 15,200,000 | 15,200,000 | 15,157,050 | 15,157,050 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 42,950 | 0.28 % | |
346 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Ponpes Baladul Amin, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 512282 | 36734622 | 15,200,000 | 15,200,000 | 15,123,750 | 15,123,750 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 76,250 | 0.5 % | |
347 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 513282 | 36733158 | 15,200,000 | 15,200,000 | 15,185,244 | 15,185,244 | 15,150,000 | 15,150,000 | 0 | 15,150,000 | 2022-11-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 14,756 | 0.1 % | |
348 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 514282 | 36733139 | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,096,000 | 15,096,000 | 0 | 15,096,000 | 2022-11-25 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 48,500 | 0.32 % | |
349 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 515282 | 36733312 | 15,200,000 | 15,200,000 | 15,074,244 | 15,074,244 | 15,015,000 | 15,015,000 | 0 | 15,015,000 | 2022-11-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,756 | 0.83 % | |
350 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 516282 | 36733340 | 15,200,000 | 15,200,000 | 15,151,500 | 15,151,500 | 15,101,500 | 15,101,500 | 0 | 15,101,500 | 2022-11-16 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 48,500 | 0.32 % | |
351 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD BBM (Bersuci, Berwudhu,Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 517282 | 36733269 | 15,200,000 | 15,200,000 | 15,096,000 | 15,096,000 | 15,040,500 | 15,040,500 | 0 | 15,040,500 | 2022-11-03 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 104,000 | 0.68 % | |
352 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Muara Banta Kandangan Hulu, Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 518282 | 36718917 | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,050,000 | 15,050,000 | 0 | 15,050,000 | 2022-11-21 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 100,000 | 0.66 % | |
353 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 519282 | 36718881 | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,051,000 | 15,051,000 | 0 | 15,051,000 | 2022-11-18 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 0.66 % | |
354 | 2022 | RSUD Daha Sejahtera | Pengawasan Rehabilitasi Nurse Station,Pengawasan Rehabilitasi Gedung Rawat Jalan,Pengawasan Pengadaan Prasarana Penyimpanan Limbah Padat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 520282 | 36826135;36826145;36826167 | 45,000,000 | 44,999,999 | 44,875,080 | 44,875,080 | 44,844,000 | 44,844,000 | 44,844,000 | 44,844,000 | 2022-10-31 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 124,920 | 0.28 % | |
355 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi WC dan Kamar Ganti di Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 522282 | 36828069 | 15,000,000 | 15,000,000 | 14,874,000 | 14,874,000 | 14,860,000 | 14,860,000 | 14,860,000 | 14,860,000 | 2022-11-10 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 126,000 | 0.84 % | |
356 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 523282 | 36862212 | 104,000,000 | 103,842,848 | 103,643,049 | 103,643,049 | 103,509,000 | 103,509,000 | 103,509,000 | 103,509,000 | 2022-11-06 | CV. BAHALAYUNG | 01.222.171.9-733.000 | 356,951 | 0.34 % | |
357 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 525282 | 36868854 | 192,000,000 | 191,901,828 | 191,807,756 | 191,807,756 | 191,685,000 | 191,685,000 | 191,685,000 | 191,685,000 | 2022-11-06 | CV. JODHA SAE | 94.797.791.4-733.000 | 192,244 | 0.1 % | |
358 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Padang Batung RT. 02 Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 526282 | 36868747 | 200,000,000 | 199,931,021 | 199,797,820 | 199,797,820 | 199,681,000 | 199,681,000 | 199,681,000 | 199,681,000 | 2022-11-09 | cv.usah bersama | 75.083.373.3-735.000 | 202,180 | 0.1 % | |
359 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Tambingkar Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 527282 | 36869330 | 200,000,000 | 199,913,186 | 199,633,119 | 199,633,119 | 199,522,000 | 199,522,000 | 199,522,000 | 199,522,000 | 2022-11-28 | cv.usah bersama | 75.083.373.3-735.000 | 366,881 | 0.18 % | |
360 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Sarang Nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 528282 | 36869135 | 193,750,000 | 193,661,207 | 193,522,457 | 193,522,457 | 193,383,000 | 193,383,000 | 193,383,000 | 193,383,000 | 2022-11-21 | CV. RAJA WALI | 85.277.425.6-731.000 | 227,543 | 0.12 % | |
361 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Pantai Ulin III Kec. Simpur (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 529282 | 36861836 | 152,000,000 | 151,842,764 | 151,637,414 | 151,637,414 | 151,498,000 | 151,498,000 | 151,498,000 | 151,498,000 | 2022-11-21 | cv. bumi mandiri | 02.089.892.0-733.000 | 362,586 | 0.24 % | |
362 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengecatan Lampu Hias Asma'ul Husna | Pengadaan Langsung | Pekerjaan Konstruksi | 530282 | 36810893 | 175,000,000 | 174,129,197 | 173,274,497 | 173,274,497 | 173,100,000 | 173,100,000 | 173,100,000 | 173,100,000 | 2022-11-01 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 1,725,504 | 0.99 % | |
363 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lintingan di Desa Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 532282 | 36861517 | 156,250,000 | 156,172,271 | 155,966,921 | 155,966,921 | 155,855,000 | 155,855,000 | 155,855,000 | 155,855,000 | 2022-11-21 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 283,079 | 0.18 % | |
364 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 533282 | 36658979 | 195,800,000 | 195,769,833 | 195,624,756 | 195,624,756 | 195,565,000 | 195,565,000 | 195,565,000 | 195,565,000 | 2022-11-28 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 175,244 | 0.09 % | |
365 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 534282 | 36659167 | 190,800,000 | 190,793,905 | 190,640,614 | 190,640,614 | 190,551,000 | 190,551,000 | 190,551,000 | 190,551,000 | 2022-11-28 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 159,386 | 0.08 % | |
366 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 535282 | 36659277 | 191,100,000 | 191,093,783 | 190,945,001 | 190,945,001 | 190,890,000 | 190,890,000 | 190,890,000 | 190,890,000 | 2022-11-28 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 154,999 | 0.08 % | |
367 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Ruas Loklahung - Malaris Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 537282 | 36536870 | 198,000,000 | 197,995,360 | 197,762,107 | 197,762,107 | 197,691,000 | 197,691,000 | 197,691,000 | 197,691,000 | 2022-11-25 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 237,893 | 0.12 % | |
368 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 538282 | 36716061 | 198,600,000 | 198,592,336 | 198,472,536 | 198,472,536 | 198,298,000 | 198,298,000 | 198,298,000 | 198,298,000 | 2022-11-03 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 127,464 | 0.06 % | |
369 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Gedung Sekretariat MUI Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 539282 | 37206031 | 200,000,000 | 199,987,705 | 199,765,707 | 199,765,707 | 199,599,000 | 199,599,000 | 199,599,000 | 199,599,000 | 2022-11-07 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 234,293 | 0.12 % | |
370 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 540282 | 36659369 | 193,200,000 | 193,187,189 | 193,000,424 | 193,000,424 | 192,885,000 | 192,885,000 | 192,885,000 | 192,885,000 | 2022-11-09 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 199,576 | 0.1 % | |
371 | 2022 | Dinas Kesehatan | Pemeliharaan Rumah Dinas Tenaga Kesehatan | Pengadaan Langsung | Pekerjaan Konstruksi | 541282 | 36860509 | 50,000,000 | 49,886,920 | 49,726,970 | 49,726,970 | 47,195,000 | 47,195,000 | 47,195,000 | 47,195,000 | 2022-11-01 | CV. AISY | 75.132.070.6-733.000 | 273,030 | 0.55 % | |
372 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 542282 | 36804442 | 125,460,000 | 125,306,623 | 125,182,248 | 125,182,248 | 125,100,000 | 125,100,000 | 100 | 125,100,000 | 2022-11-08 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 277,752 | 0.22 % | |
373 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman titian penghubung Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 543282 | 36804398 | 177,080,000 | 176,906,462 | 176,895,507 | 176,895,507 | 176,700,000 | 176,700,000 | 100 | 176,700,000 | 2022-11-03 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 184,493 | 0.1 % | |
374 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Telaga Sili-Sili Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 544282 | 36871309 | 13,000,000 | 13,000,000 | 12,976,000 | 12,976,000 | 12,898,200 | 12,898,200 | 12,898,200 | 12,898,200 | 2022-11-28 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 24,000 | 0.18 % | |
375 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 545282 | 36804343 | 147,710,000 | 147,290,305 | 147,086,292 | 147,086,292 | 147,000,000 | 147,000,000 | 147,000,000 | 147,000,000 | 2022-11-07 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 623,708 | 0.42 % | |
376 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 546282 | 36804032 | 178,860,000 | 178,104,001 | 178,048,501 | 178,048,501 | 177,950,000 | 177,950,000 | 177,950,000 | 177,950,000 | 2022-11-04 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 811,500 | 0.45 % | |
377 | 2022 | Kecamatan Angkinang | Belanja Tambah Daya Listrik | Pengadaan Langsung | Pekerjaan Konstruksi | 547282 | 32359068 | 30,000,000 | 29,987,000 | 29,979,990 | 29,979,990 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2022-11-03 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 20,010 | 0.07 % | |
378 | 2022 | Kecamatan Angkinang | Belanja Pemeliharaan Rumah Dinas | Pengadaan Langsung | Pekerjaan Konstruksi | 548282 | 32359945 | 25,000,000 | 24,996,000 | 24,887,380 | 24,887,380 | 24,850,000 | 24,850,000 | 24,850,000 | 24,850,000 | 2022-11-18 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 112,620 | 0.45 % | |
379 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Padang Batung Kec. Padang Batung, dan Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Karang Jawa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 550282 | 37018706 | 26,000,000 | 26,000,000 | 25,885,200 | 25,885,200 | 25,796,400 | 25,796,400 | 25,796,400 | 25,796,400 | 2022-11-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 114,800 | 0.44 % | |
380 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Pantai Ulin III Kec. Simpur (PAD), dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Panjampang Bahagia Kec. Simpur (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 551282 | 37018433 | 18,500,000 | 18,500,000 | 18,470,400 | 18,470,400 | 18,381,600 | 18,381,600 | 18,381,600 | 18,381,600 | 2022-11-22 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 29,600 | 0.16 % | |
381 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kamat Desa Pakuan Timur Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 552282 | 36870176 | 13,500,000 | 13,500,000 | 13,453,200 | 13,453,200 | 13,408,800 | 13,408,800 | 13,408,800 | 13,408,800 | 2022-11-16 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 46,800 | 0.35 % | |
382 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Kalumpang, Jasa Konsultansi Pengawasan Normalisasi Sungai Lintingan di Desa Amparaya Kec. Simpur, Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Tambingkar Kec. Kalumpang, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Sarang Nyamuk Desa Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 553282 | 37017488 | 51,650,000 | 51,650,000 | 51,592,800 | 51,592,800 | 51,459,600 | 51,459,600 | 51,300,000 | 51,459,600 | 2022-11-26 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 57,200 | 0.11 % | |
383 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loklahung RT.001 Kec. Loksado dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado RT. 004 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 554282 | 37017056 | 26,550,000 | 26,550,000 | 26,400,000 | 26,400,000 | 26,295,900 | 26,295,900 | 26,295,900 | 26,295,900 | 2022-11-16 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 150,000 | 0.56 % | |
384 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Halaman dan Parkir Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 556282 | 36715997 | 15,200,000 | 15,200,000 | 15,100,000 | 15,100,000 | 15,051,000 | 15,051,000 | 15,051,000 | 15,051,000 | 2022-11-04 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 0.66 % | |
385 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung RT. 02 Kec. Padang Batung, Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Durian Rabung Kec. Padang Batung (Lanjutan), dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 558282 | 37017203 | 41,800,000 | 41,800,000 | 41,500,000 | 41,500,000 | 41,358,600 | 41,358,600 | 41,358,600 | 41,358,600 | 2022-11-15 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 300,000 | 0.72 % | |
386 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 559282 | 36554060 | 12,150,000 | 12,150,000 | 12,130,000 | 12,130,000 | 12,099,000 | 12,099,000 | 12,099,000 | 12,099,000 | 2022-11-23 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 20,000 | 0.16 % | |
387 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 560282 | 36658898 | 196,600,000 | 196,591,422 | 196,259,032 | 196,259,032 | 195,752,000 | 195,752,000 | 195,752,000 | 195,752,000 | 2022-11-22 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 340,968 | 0.17 % | |
388 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 561282 | 36628356 | 193,600,000 | 193,582,964 | 193,363,563 | 193,363,563 | 192,905,000 | 192,905,000 | 192,905,000 | 192,905,000 | 2022-11-08 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 236,437 | 0.12 % | |
389 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman Desa Pihanin Raya Kec. Daha Selatan,Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman titian Desa Hamayung Kec. Daha Utara,Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman titian penghubung Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 562282 | 36803002;36803174;36803302 | 23,000,000 | 22,615,640 | 22,577,400 | 22,577,400 | 22,500,000 | 22,500,000 | 100 | 22,500,000 | 2022-11-09 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 422,600 | 1.84 % | |
390 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman RT. 03 Desa Jambu Hulu Kec. Padang Batung (LANJUTAN),Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman Makam Gang Syahdan Kel. Kandangan Kota,Konsultan Pengawas Peningkatan PSU Permukiman Gang Rt 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 563282 | 36803063;36803410;36803479 | 21,952,000 | 21,147,554 | 21,062,250 | 21,062,250 | 21,000,000 | 21,000,000 | 100 | 21,000,000 | 2022-11-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 889,750 | 4.05 % | |
391 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 564282 | 36868983 | 200,000,000 | 199,859,024 | 199,596,998 | 199,596,998 | 199,485,000 | 199,485,000 | 199,485,000 | 199,485,000 | 2022-11-09 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 403,002 | 0.2 % | |
392 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Luaw Desa Madang Kec. Padang Batung dan Jasa Konsultansi Pengawasan Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 565282 | 37241296 | 28,000,000 | 28,000,000 | 27,948,024 | 27,948,024 | 27,883,200 | 27,883,200 | 27,883,200 | 27,883,200 | 2022-11-15 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 51,976 | 0.19 % | |
393 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 566282 | 36628567 | 191,100,000 | 191,090,057 | 190,927,886 | 190,927,886 | 190,900,000 | 190,900,000 | 190,900,000 | 190,900,000 | 2022-11-28 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 172,114 | 0.09 % | |
394 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 567282 | 36869484 | 150,000,000 | 149,915,252 | 149,710,606 | 149,710,606 | 149,577,000 | 149,577,000 | 149,577,000 | 149,577,000 | 2022-11-09 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 289,394 | 0.19 % | |
395 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 568282 | 36815820 | 118,200,000 | 118,190,761 | 117,975,928 | 117,975,928 | 117,878,000 | 117,878,000 | 117,878,000 | 117,878,000 | 2022-11-10 | CV. RESTI BERSAUDARA | 01.961.577.2-733.000 | 224,072 | 0.19 % | |
396 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 570282 | 36625442 | 189,000,000 | 188,944,604 | 188,599,706 | 188,599,706 | 188,566,000 | 188,566,000 | 188,566,000 | 188,566,000 | 2022-11-15 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 400,294 | 0.21 % | |
397 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Simpang Balimau Desa Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 571282 | 36868950 | 14,000,000 | 14,000,000 | 13,950,000 | 13,950,000 | 13,897,200 | 13,897,200 | 13,897,200 | 13,897,200 | 2022-11-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 50,000 | 0.36 % | |
398 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Duhat Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 573282 | 36543083 | 192,500,000 | 192,438,808 | 191,930,194 | 191,930,194 | 191,872,000 | 191,872,000 | 191,872,000 | 191,872,000 | 2022-11-07 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 569,806 | 0.3 % | |
399 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 574282 | 36624567 | 193,600,000 | 193,584,866 | 193,400,217 | 193,400,217 | 193,267,000 | 193,267,000 | 193,267,000 | 193,267,000 | 2022-11-07 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 199,783 | 0.1 % | |
400 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 575282 | 36870425 | 100,000,000 | 99,932,579 | 99,610,679 | 99,610,679 | 99,555,000 | 99,555,000 | 99,555,000 | 99,555,000 | 2022-11-28 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 389,321 | 0.39 % | |
401 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 576282 | 36812084 | 148,600,000 | 148,476,130 | 148,298,530 | 148,298,530 | 148,200,000 | 148,200,000 | 148,200,000 | 148,200,000 | 2022-11-04 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 301,470 | 0.2 % | |
402 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 577282 | 36659473 | 200,000,000 | 199,991,009 | 199,890,609 | 199,890,609 | 199,717,000 | 199,717,000 | 199,717,000 | 199,717,000 | 2022-11-09 | CV. LALUNA DANA | 02.237.179.3-733.000 | 109,391 | 0.05 % | |
403 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Jl. Biti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 578282 | 36659601 | 198,000,000 | 197,952,619 | 197,640,055 | 197,640,055 | 197,362,000 | 197,362,000 | 197,362,000 | 197,362,000 | 2022-11-07 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 359,945 | 0.18 % | |
404 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 579282 | 36659720 | 200,000,000 | 199,733,203 | 199,468,432 | 199,468,432 | 199,399,000 | 199,399,000 | 199,399,000 | 199,399,000 | 2022-11-15 | CV.Bangun Banua | 93.708.167.7-733.000 | 531,568 | 0.27 % | |
405 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tatah di Desa Kayu Abang Kec. Angkinang, dan Jasa Konsultansi Pengawasan Normalisasi Sungai Tawia di Desa Tawia Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 582282 | 37017675 | 25,100,000 | 25,100,000 | 25,040,000 | 25,040,000 | 24,952,800 | 24,952,800 | 24,952,800 | 24,952,800 | 2022-11-22 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 60,000 | 0.24 % | |
406 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 583282 | 36654525 | 120,000,000 | 119,994,165 | 119,704,329 | 119,704,329 | 119,626,000 | 119,626,000 | 119,626,000 | 119,626,000 | 2022-11-07 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 295,671 | 0.25 % | |
407 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Ruas Loklahung - Malaris Kec. Loksado, Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Jalan Duhat Kec. Simpur, Jasa Konsultansi Pengawasan Pekerjaan Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 584282 | 36805421 | 45,000,000 | 39,967,341 | 39,922,941 | 39,922,941 | 39,899,000 | 39,899,000 | 39,899,000 | 39,899,000 | 2022-12-06 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 5,077,059 | 11.28 % | |
408 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 585282 | 31592308 | 16,000,000 | 16,000,000 | 15,873,000 | 15,873,000 | 15,817,500 | 15,817,500 | 15,817,500 | 15,817,500 | 2022-11-08 | CV. RAYHANI | 75.410.426.3-733.000 | 127,000 | 0.79 % | |
409 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jalan Tanah Habang Kec. Simpur, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Kalumpang Baruh Kec. Kalumpang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Karasikan - Sarang Halang Kec. Sungai Raya, Jasa Konsultansi Pengawasan Siring Pasangan Batu Ruas Teluk Pinang - Padang Rasau Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 586282 | 36805464 | 60,000,000 | 59,987,854 | 59,843,985 | 59,843,985 | 59,773,500 | 59,773,500 | 59,773,500 | 59,773,500 | 2022-11-11 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 156,015 | 0.26 % | |
410 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Slab Culvert Jalan Kalaka Dayuh Kec. Sungai Raya, Jasa Konsultansi Pengawasan Pekerjaan Slab Culvert Ruas Kandangan Hulu - Sp. Tabihi Kec. Padang Batung, Jasa Konsultansi Pengawasan Pekerjaan Saluran Drainase Jl. Ciputat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 587282 | 36805501 | 45,000,000 | 39,967,341 | 39,922,482 | 39,922,482 | 39,900,000 | 39,900,000 | 39,900,000 | 39,900,000 | 2022-11-08 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 5,077,518 | 11.28 % | |
411 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jalan Jl. TMMD Kec. Angkinang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Kayu Abang - Panggang Hijau Kec. Angkinang, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Telaga Langsat - Pakuan Timur Kec. Telaga Langsat, Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Mawangi Pariangan Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 588282 | 36805546 | 60,000,000 | 59,987,854 | 59,761,840 | 59,761,840 | 59,684,700 | 59,684,700 | 59,684,700 | 59,684,700 | 2022-11-14 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 238,160 | 0.4 % | |
412 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Penggantian Jembatan di Jl. Biti Kec. Kandangan, Jasa Konsultansi Pengawasan Pekerjaan Perbaikan Jembatan Gantung Ds. Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 589282 | 36805606 | 30,000,000 | 29,875,701 | 29,696,940 | 29,696,940 | 29,696,000 | 29,696,000 | 29,696,000 | 29,696,000 | 2022-11-16 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 303,060 | 1.01 % | |
413 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 591282 | 36795429 | 130,911,000 | 130,632,701 | 130,151,183 | 130,151,183 | 130,100,000 | 130,100,000 | 100 | 130,100,000 | 2022-11-08 | CV. MITRA UTAMA | 31.693.402.5-733.000 | 759,817 | 0.58 % | |
414 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/ Peningkatan PSU Permukiman Gang RT 005 B Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 592282 | 36804657 | 179,750,000 | 179,569,037 | 179,385,029 | 179,385,029 | 179,250,000 | 179,250,000 | 179,250,000 | 179,250,000 | 2022-11-07 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 364,971 | 0.2 % | |
415 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Pulalaian Kec. Kandangan (PAD) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I. Ida Manggala Kec. Sungai Raya (PAD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 596282 | 37342478 | 21,000,000 | 21,000,000 | 20,956,400 | 20,956,400 | 20,890,200 | 20,890,200 | 20,890,200 | 20,890,200 | 2022-11-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 43,600 | 0.21 % | |
416 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Gerbang Gang Harapan Kel. Kandangan Barat,Konsultan Pengawasan Penataan PSU Perumahan Teluk Pinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 597282 | 36794822;36812886 | 13,600,000 | 13,119,645 | 13,048,050 | 13,048,050 | 13,000,000 | 13,000,000 | 100 | 13,000,000 | 2022-11-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 551,950 | 4.06 % | |
417 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan PSU Permukiman Gang Berkah Rt 6 Kel Kandangan Barat,Konsultan Pengawas Pembuatan/ Peningkatan PSU Permukiman Gg. Pertanian Desa Gambah Luar Muka ( Tembus Desa Tabihi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 598282 | 36794904;36795078 | 17,160,000 | 16,789,860 | 16,707,720 | 16,707,720 | 16,670,000 | 16,670,000 | 100 | 16,670,000 | 2022-11-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 452,280 | 2.64 % | |
418 | 2022 | Kecamatan Kandangan | Bantuan Hibah Water Closet untuk Warga Tidak Mampu | Pengadaan Langsung | Pekerjaan Konstruksi | 599282 | 32362123 | 50,000,000 | 49,814,000 | 49,276,140 | 49,276,140 | 49,200,000 | 49,200,000 | 49,200,000 | 49,200,000 | 2022-11-08 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 723,860 | 1.45 % | |
419 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 600282 | 36869194 | 200,000,000 | 199,955,219 | 199,755,419 | 199,755,419 | 199,672,000 | 199,672,000 | 199,672,000 | 199,672,000 | 2022-12-01 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 244,581 | 0.12 % | |
420 | 2022 | Dinas Pertanian | Pembangunan UPPB Poktan Pasungguhan Ds. Hamak Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 601282 | 32066085 | 150,000,000 | 149,967,000 | 149,790,222 | 149,790,222 | 149,734,000 | 149,734,000 | 149,734,000 | 149,734,000 | 2022-11-09 | cv. akur bersaudara | 02.675.570.2-735.000 | 209,778 | 0.14 % | |
421 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putri II, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 602282 | 36719619 | 198,600,000 | 198,594,356 | 198,381,242 | 198,381,242 | 198,381,000 | 198,381,000 | 0 | 198,381,000 | 2022-11-14 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 218,758 | 0.11 % | |
422 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Kayu Abang, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 604282 | 36719697 | 198,600,000 | 198,599,421 | 198,549,169 | 198,549,169 | 198,398,000 | 198,398,000 | 0 | 198,398,000 | 2022-11-21 | CV. ALBATROS | 01.222.160.2-733.000 | 50,831 | 0.03 % | |
423 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Tabihi-Gumbil-Longawang Kec.Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 605282 | 37374357 | 200,000,000 | 184,568,408 | 184,235,408 | 184,235,408 | 184,152,000 | 184,152,000 | 184,152,000 | 184,152,000 | 2022-11-16 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 15,764,592 | 7.88 % | |
424 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kecamatan Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 606282 | 36554087 | 168,750,000 | 95,587,568 | 95,101,218 | 95,101,218 | 94,962,000 | 94,962,000 | 94,962,000 | 94,962,000 | 2022-11-22 | CV. CITRA DHARMA | 02.089.933.2-733.000 | 73,648,782 | 43.64 % | |
425 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 607282 | 37376610 | 42,300,000 | 42,290,255 | 41,889,005 | 41,889,005 | 41,789,000 | 41,789,000 | 41,789,000 | 41,789,000 | 2022-11-25 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 410,995 | 0.97 % | |
426 | 2022 | Dinas Pertanian | Pembangunan Laboratorium BPP Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 608282 | 32065098 | 100,000,000 | 99,860,000 | 99,681,132 | 99,681,132 | 99,675,000 | 99,675,000 | 99,675,000 | 99,675,000 | 2022-11-09 | cv. Usaha Papadaan | 02.675.571.0-735.000 | 318,868 | 0.32 % | |
427 | 2022 | Dinas Pertanian | Pengawasan Pembangunan UPPB dan Laboratorium BPP Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 610282 | 32065020;32066100 | 11,250,000 | 11,250,000 | 11,172,150 | 11,172,150 | 11,155,500 | 11,155,500 | 11,155,500 | 11,155,500 | 2022-11-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 77,850 | 0.69 % | |
428 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Gantung Pantai Ulin Kec. Simpur) | Pengadaan Langsung | Pekerjaan Konstruksi | 611282 | 37383426 | 145,000,000 | 144,888,143 | 144,658,963 | 144,658,963 | 144,592,000 | 144,592,000 | 144,592,000 | 144,592,000 | 2022-11-24 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 341,037 | 0.24 % | |
429 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai 3 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 612282 | 37395409 | 200,000,000 | 199,996,889 | 199,982,638 | 199,982,638 | 199,816,000 | 199,816,000 | 199,816,000 | 199,816,000 | 2022-11-28 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 17,362 | 0.01 % | |
430 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT (Jamban Sehat Keluarga) Desa Hamak Utara, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 613282 | 36719677 | 198,600,000 | 198,583,183 | 198,528,102 | 198,528,102 | 198,316,000 | 198,316,000 | 0 | 198,316,000 | 2022-11-11 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 71,898 | 0.04 % | |
431 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Ds. Sirih Kec. Kalumpang) | Pengadaan Langsung | Pekerjaan Konstruksi | 614282 | 37398285 | 60,150,000 | 60,070,078 | 59,858,970 | 59,858,970 | 59,747,000 | 59,747,000 | 59,747,000 | 59,747,000 | 2022-11-30 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 291,030 | 0.48 % | |
432 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi D.I. Panjampang Bahagia Kec. Simpur (PAD) | Pengadaan Langsung | Pekerjaan Konstruksi | 615282 | 36862349 | 104,000,000 | 103,851,490 | 103,668,343 | 103,668,343 | 103,557,000 | 103,557,000 | 103,557,000 | 103,557,000 | 2022-12-01 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 331,657 | 0.32 % | |
433 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Karang Jawa di Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 616282 | 36554181 | 200,000,000 | 199,900,599 | 199,567,599 | 199,567,599 | 199,528,000 | 199,528,000 | 199,528,000 | 199,528,000 | 2022-11-13 | CV. LALUNA DANA | 02.237.179.3-733.000 | 432,401 | 0.22 % | |
434 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Mesjid Raudhatul Muslimin Parincahan, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 617282 | 36719621 | 198,600,000 | 198,542,931 | 198,349,349 | 198,349,349 | 198,238,000 | 198,238,000 | 0 | 198,238,000 | 2022-11-11 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 250,651 | 0.13 % | |
435 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Panggung Terbuka dan Kamar Ganti di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pekerjaan Konstruksi | 618282 | 36827900 | 175,000,000 | 174,973,000 | 174,640,299 | 174,640,299 | 174,573,000 | 174,573,000 | 174,573,000 | 174,573,000 | 2022-11-18 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 359,701 | 0.21 % | |
436 | 2022 | Dinas Kesehatan | Paving dan Pagar Puskesmas Gambah | Pengadaan Langsung | Pekerjaan Konstruksi | 619282 | 36696305 | 150,000,000 | 149,995,701 | 149,973,501 | 149,973,501 | 149,500,000 | 149,500,000 | 0 | 149,500,000 | 2022-11-24 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 26,499 | 0.02 % | |
437 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Muara Banta-Kandangan Hulu, Segmen I, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 620282 | 36719004 | 198,600,000 | 198,600,000 | 198,245,288 | 198,245,288 | 198,188,000 | 198,188,000 | 0 | 198,188,000 | 2022-11-21 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 354,712 | 0.18 % | |
438 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen II, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 621282 | 36718981 | 198,600,000 | 198,600,000 | 198,206,366 | 198,206,366 | 198,198,000 | 198,198,000 | 0 | 198,198,000 | 2022-11-18 | CV.BANGUN CIPTA MANDIRI PRATAMA | 95.921.872.8-732.000 | 393,634 | 0.2 % | |
439 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Pekerjaan Konstruksi | 622282 | 36827965 | 116,600,000 | 116,595,000 | 116,543,418 | 116,543,418 | 116,509,000 | 116,509,000 | 116,509,000 | 116,509,000 | 2022-11-18 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 56,582 | 0.05 % | |
440 | 2022 | RSUD Brigjen H. Hasan Basry | Pemasangan mebeleur VIP dan pintu HPL | Pengadaan Langsung | Pekerjaan Konstruksi | 623282 | 36916830 | 179,873,297 | 179,796,690 | 179,635,740 | 179,635,740 | 179,579,000 | 179,579,000 | 179,579,000 | 179,579,000 | 2022-11-12 | CV.KOORI CIPTA KARYA | 84.740.433.2-732.000 | 237,557 | 0.13 % | |
441 | 2022 | Dinas Kesehatan | Perencanaan Puskesmas Bamban | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 624282 | 37156855 | 84,890,000 | 84,200,000 | 84,027,000 | 84,027,000 | 83,700,000 | 83,700,000 | 0 | 83,700,000 | 2022-11-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 863,000 | 1.02 % | |
442 | 2022 | Sekretariat DPRD | Pembuatan WC Pos Jaga & Kantin | Pengadaan Langsung | Pekerjaan Konstruksi | 625282 | 37432316 | 157,000,000 | 156,933,051 | 156,772,101 | 156,772,101 | 156,666,000 | 0 | 0 | 0 | 2022-11-15 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 227,899 | 0.15 % | |
443 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Ibnu Mas'ud, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 626282 | 36719638 | 198,600,000 | 198,600,000 | 198,298,039 | 198,298,039 | 198,198,000 | 198,198,000 | 0 | 198,198,000 | 2022-11-16 | cv. bumi mandiri | 02.089.892.0-733.000 | 301,961 | 0.15 % | |
444 | 2022 | Dinas Perdagangan | Rehab Los Batu Pasar Kandangan Tahap II | Pengadaan Langsung | Pekerjaan Konstruksi | 627282 | 36791468 | 195,000,000 | 194,994,020 | 194,355,609 | 194,355,609 | 194,244,600 | 194,244,600 | 194,244,600 | 194,244,600 | 2022-11-11 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 644,391 | 0.33 % | |
445 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Kawasan Religi Kapuh, Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 628282 | 36719576 | 198,600,000 | 198,600,000 | 198,317,526 | 198,317,526 | 198,230,000 | 198,230,000 | 0 | 198,230,000 | 2022-11-15 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 282,474 | 0.14 % | |
446 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi Panggung Terbuka dan Kamar Ganti di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 629282 | 36828104 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,922,000 | 19,922,000 | 19,922,000 | 19,922,000 | 2022-11-18 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 20,000 | 0.1 % | |
447 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 630282 | 36828175 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,948,000 | 19,948,000 | 19,948,000 | 19,948,000 | 2022-11-18 | cv. vertical project | 03.169.392.2-734.000 | 0 | 0 % | |
448 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Majlis dan Ponpes As Shofa, Rantauan,Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 631282 | 36734545 | 198,600,000 | 198,600,000 | 198,544,366 | 198,544,366 | 198,447,000 | 198,447,000 | 0 | 198,447,000 | 2022-11-17 | cv. akur bersaudara | 02.675.570.2-735.000 | 55,634 | 0.03 % | |
449 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes Baladul Amin, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 632282 | 36734582 | 198,600,000 | 198,600,000 | 198,544,366 | 198,544,366 | 198,280,000 | 198,280,000 | 0 | 198,280,000 | 2022-11-17 | CV. AL QAWS | 70.619.811.6-733.000 | 55,634 | 0.03 % | |
450 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes An Noor Putri, Desa Pihanin Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 633282 | 37205917 | 160,000,000 | 160,000,000 | 159,595,800 | 159,595,800 | 159,484,800 | 159,484,800 | 0 | 159,484,800 | 2022-11-17 | CV. AL QAWS | 70.619.811.6-733.000 | 404,200 | 0.25 % | |
451 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Ponpes An Noor Putra, Desa Pihanin Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 634282 | 37205868 | 200,000,000 | 200,000,000 | 199,400,123 | 199,400,123 | 199,350,000 | 199,350,000 | 0 | 199,350,000 | 2022-11-16 | CV. AL QAWS | 70.619.811.6-733.000 | 599,878 | 0.3 % | |
452 | 2022 | Kecamatan Kandangan | Bantuan Hibah Pemasangan Daya Listrik untuk Warga Tidak Mampu | Pengadaan Langsung | Pekerjaan Konstruksi | 635282 | 32526517 | 52,000,000 | 51,687,000 | 51,630,540 | 51,630,540 | 51,550,000 | 51,550,000 | 51,550,000 | 51,550,000 | 2022-11-18 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 369,460 | 0.71 % | |
453 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultansi Pengawasan Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 636282 | 36828058 | 22,000,000 | 22,000,000 | 21,978,000 | 21,978,000 | 21,926,000 | 21,926,000 | 21,926,000 | 21,926,000 | 2022-11-14 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 22,000 | 0.1 % | |
454 | 2022 | Sekretariat Daerah | konsultan pengawasan rehab gudang peralatan ( samping pendopo Kab) dan Pengawasan Rehab Kantor Setda Kab.HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 637282 | 35667104;35853702 | 18,200,000 | 17,959,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 17,848,800 | 2022-11-16 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 351,200 | 1.93 % | |
455 | 2022 | Sekretariat Daerah | Belanja Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 638282 | 36834295 | 60,000,000 | 59,967,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 59,856,750 | 2022-11-16 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 143,250 | 0.24 % | |
456 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tawia di Desa Tawia Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 639282 | 36861303 | 197,500,000 | 197,411,918 | 197,123,318 | 197,123,318 | 197,012,000 | 197,012,000 | 197,012,000 | 197,012,000 | 2022-11-21 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 376,682 | 0.19 % | |
457 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Kantor (Rehabilitasi Kantor Setda Kab. HSS) | Pengadaan Langsung | Pekerjaan Konstruksi | 640282 | 37511826 | 170,000,000 | 169,996,600 | 169,755,733 | 169,755,733 | 169,755,700 | 169,755,700 | 169,755,700 | 169,755,700 | 2022-11-16 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 244,267 | 0.14 % | |
458 | 2022 | Dinas Kesehatan | Pemeliharaan Bangunan Dinas Kesehatan | Pengadaan Langsung | Pekerjaan Konstruksi | 641282 | 37147229 | 75,000,000 | 70,588,000 | 70,427,269 | 70,427,269 | 70,000,000 | 70,000,000 | 0 | 70,000,000 | 2022-11-25 | CV. Jaya Engineering | 02.941.119.6-734.000 | 4,572,731 | 6.1 % | |
459 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pemasangan Turab Baja / Beton Jalan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 642282 | 37106832 | 70,000,000 | 69,965,500 | 69,857,850 | 69,857,850 | 69,857,850 | 0 | 0 | 0 | 2022-11-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 142,150 | 0.2 % | |
460 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Peninggian Jalan Desa | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 645282 | 37100742 | 100,000,000 | 99,706,000 | 99,578,100 | 99,578,100 | 99,578,100 | 0 | 0 | 0 | 2022-11-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 421,900 | 0.42 % | |
461 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Perkuatan Tebing Pantai Merana Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 646282 | 36659543 | 15,000,000 | 14,971,567 | 14,859,570 | 14,859,570 | 14,848,000 | 14,848,000 | 14,848,000 | 14,848,000 | 2022-11-16 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 140,430 | 0.94 % | |
462 | 2022 | RSUD Daha Sejahtera | Pengadaan Parkir | Pengadaan Langsung | Pekerjaan Konstruksi | 647282 | 36926774 | 370,000,000 | 199,996,935 | 199,803,431 | 199,803,431 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-11-25 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 170,196,569 | 46 % | |
463 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Pembukaan dan Penutupan PEPARPROV HSS | Pengadaan Langsung | Jasa Lainnya | 648282 | 36793117 | 200,000,000 | 199,800,000 | 199,633,500 | 199,633,500 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-11-17 | Mitra Razqa Zolution | 63.995.553.3-731.000 | 366,500 | 0.18 % | |
464 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lintingan Baru Desa Sungai Paring Kec. Kandangan dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanau Desa Panjampang Bahagia Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 649282 | 37307509 | 17,500,000 | 17,500,000 | 17,418,173 | 17,418,173 | 17,316,000 | 17,316,000 | 17,316,000 | 17,316,000 | 2022-11-19 | Wiyasa Drawana | 80.902.072.0-731.000 | 81,827 | 0.47 % | |
465 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Pengecatan Gedung 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 650282 | 37105884 | 100,000,000 | 99,979,000 | 99,750,288 | 99,750,288 | 99,750,200 | 0 | 0 | 0 | 2022-11-22 | cv. bumi mandiri | 02.089.892.0-733.000 | 249,712 | 0.25 % | |
466 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tatah di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 651282 | 36860919 | 152,500,000 | 152,421,310 | 152,215,960 | 152,215,960 | 152,077,000 | 152,077,000 | 152,077,000 | 152,077,000 | 2022-11-21 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 284,040 | 0.19 % | |
467 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 652282 | 36861124 | 181,250,000 | 181,160,549 | 180,955,199 | 180,955,199 | 180,816,000 | 180,816,000 | 180,816,000 | 180,816,000 | 2022-11-21 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 294,801 | 0.16 % | |
468 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pembangunan Jembatan Desa Teraban Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 653282 | 37106430 | 100,000,000 | 99,986,000 | 99,866,700 | 99,866,700 | 99,866,700 | 0 | 0 | 0 | 2022-11-22 | CV. R-PLAN ARSIMETRIKA | 31.715.969.7-731.000 | 133,300 | 0.13 % | |
469 | 2022 | RSUD Daha Sejahtera | Perencanaan Pembangunan Mushola RSUD Daha Sejahtera,Perencanaan Penataan halaman (pemasangan paving block) halaman RSUD Daha Sejahtera (Konsolidasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 655282 | 36826027;36926869 | 55,000,000 | 54,922,236 | 54,792,375 | 54,792,375 | 54,500,000 | 54,500,000 | 54,500,000 | 54,500,000 | 2022-11-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 207,625 | 0.38 % | |
470 | 2022 | RSUD Daha Sejahtera | Pengawasan Pengurugan Lahan RSDS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 656282 | 36825951 | 80,000,000 | 79,997,910 | 79,875,600 | 79,875,600 | 79,500,000 | 79,500,000 | 79,500,000 | 79,500,000 | 2022-11-28 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 124,400 | 0.16 % | |
471 | 2022 | Badan Penanggulangan Bencana Daerah | Perencanaan Pembangunan Jembatan Desa Batu Tumbuk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 657282 | 37106715 | 100,000,000 | 99,986,000 | 99,860,040 | 99,860,040 | 99,860,040 | 0 | 0 | 0 | 2022-11-22 | CV. R-PLAN ARSIMETRIKA | 31.715.969.7-731.000 | 139,960 | 0.14 % | |
472 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Muning baru RT.03 Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 658282 | 36860996 | 13,750,000 | 13,750,000 | 13,545,900 | 13,545,900 | 13,497,600 | 13,497,600 | 13,497,600 | 13,497,600 | 2022-11-23 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 204,100 | 1.48 % | |
473 | 2022 | Dinas Kesehatan | Jasa Apraisal | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 659282 | 36775993 | 50,000,000 | 49,217,400 | 49,106,400 | 49,106,400 | 49,000,000 | 49,000,000 | 0 | 49,000,000 | 2022-11-25 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 893,600 | 1.79 % | |
474 | 2022 | RSUD Brigjen H. Hasan Basry | Belanja Instalasi Kabel 20kV Panel Induk dan tambahannya | Pengadaan Langsung | Jasa Lainnya | 660282 | 36893158 | 284,024,299 | 180,375,000 | 177,799,800 | 177,799,800 | 177,771,000 | 177,771,000 | 177,771,000 | 177,771,000 | 2022-12-01 | PT.Murakata Multi Power | 72.936.620.3-733.000 | 106,224,499 | 37.4 % | |
475 | 2022 | RSUD Daha Sejahtera | Pengawasan Pengadaan Parkir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 661282 | 36926786 | 25,000,000 | 24,999,999 | 24,880,650 | 24,880,650 | 24,500,000 | 24,500,000 | 24,500,000 | 24,500,000 | 2022-11-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 119,350 | 0.48 % | |
476 | 2022 | Dinas Kesehatan | Perencanaan Puskesmas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 663282 | 37157022 | 95,910,100 | 94,000,000 | 93,906,000 | 93,906,000 | 93,500,000 | 93,500,000 | 0 | 93,500,000 | 2022-11-29 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 2,004,100 | 2.09 % | |
477 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultasi Reviu Perencanaan Asrama Amuk Hantarukung Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 664282 | 36716353 | 30,000,000 | 30,000,000 | 29,481,600 | 29,481,600 | 29,429,000 | 29,429,000 | 29,429,000 | 29,429,000 | 2022-12-06 | Wing Rastafarindo | 03.282.590.3-732.000 | 518,400 | 1.73 % | |
478 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Jl. Budi Bakti - 3 Desember Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 665282 | 37906569 | 140,000,000 | 139,987,627 | 139,932,113 | 139,932,113 | 139,876,000 | 139,876,000 | 139,876,000 | 139,876,000 | 2022-12-06 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 67,887 | 0.05 % | |
479 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Pembangunan Fasilitas Kawasan Objek Wisata Air Panas Tanuhi (dukungan DAK Fisik Pariwisata TA. 2023) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 666282 | 37635619 | 30,000,000 | 30,000,000 | 29,863,440 | 29,863,440 | 29,813,000 | 29,813,000 | 29,813,000 | 29,813,000 | 2022-12-06 | cv. vertical project | 03.169.392.2-734.000 | 136,560 | 0.46 % | |
480 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Ruas Hamalau - Telaga Bidadari Kec. Sungai Raya) | Pengadaan Langsung | Pekerjaan Konstruksi | 667282 | 37906679 | 198,100,000 | 198,065,815 | 197,876,077 | 197,876,077 | 197,831,000 | 197,831,000 | 197,831,000 | 197,831,000 | 2022-12-06 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 223,923 | 0.11 % | |
481 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penyediaan Biaya Pemeliharaan Rutin RTH di Seluruh Wilayah Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 668282 | 31836615 | 150,000,000 | 149,916,000 | 149,644,650 | 149,644,650 | 149,500,000 | 149,500,000 | 149,500,000 | 149,500,000 | 2022-12-07 | CV. Jaya Engineering | 02.941.119.6-734.000 | 355,350 | 0.24 % | |
482 | 2022 | Dinas Perhubungan | Pemeliharaan Rambu Bersuar | Pengadaan Langsung | Jasa Lainnya | 669282 | 37890991 | 100,000,000 | 96,475,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 96,426,000 | 2022-12-07 | CV. KATIBURA | 53.260.332.1-733.000 | 3,574,000 | 3.57 % | |
483 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Pendataan dan Pemetaan Rumah Sewa Milik Masyarakat, Rumah Susun dan Rumah Khusus | Pengadaan Langsung | Jasa Lainnya | 670282 | 32398687 | 40,000,000 | 39,779,070 | 39,557,070 | 39,557,070 | 39,400,000 | 39,400,000 | 39,400,000 | 39,400,000 | 2022-12-07 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 442,930 | 1.11 % | |
484 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Penyusunan Profil Keanekaragaman Hayati (kehati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 671282 | 36810660 | 85,000,000 | 84,136,000 | 83,282,190 | 83,282,190 | 83,100,000 | 83,100,000 | 83,100,000 | 83,100,000 | 2022-12-07 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 1,717,810 | 2.02 % | |
485 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemutakhiran Data Sungai di Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 672282 | 38057109 | 100,000,000 | 99,983,250 | 99,977,700 | 99,977,700 | 99,766,800 | 99,766,800 | 99,766,800 | 99,766,800 | 2022-12-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 22,300 | 0.02 % | |
486 | 2022 | Dinas Perdagangan | Pengurugan Pasar Rakyat Terpadu (Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Pertokoan/Koperasi/Pasar) | Pengadaan Langsung | Pekerjaan Konstruksi | 673282 | 38183357 | 53,000,000 | 52,996,571 | 52,968,821 | 52,968,821 | 52,952,000 | 52,952,000 | 52,952,000 | 52,952,000 | 2022-12-16 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 31,179 | 0.06 % | |
487 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Penanganan Longsor Ruas Jalan Sp. 4 Lungau Garis Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 676282 | 38339712 | 171,850,000 | 171,809,452 | 171,698,452 | 171,698,452 | 171,615,000 | 171,615,000 | 171,615,000 | 171,615,000 | 2022-12-26 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 151,548 | 0.09 % | |
488 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan (Perbaikan Jembatan Sungai Minting Desa Malutu dan Desa Batu Laki Kec. Padang Batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 678282 | 38552772 | 91,500,000 | 91,388,467 | 91,083,159 | 91,083,159 | 90,905,000 | 90,905,000 | 90,905,000 | 90,905,000 | 2022-12-26 | CV. PANTAI HARAPAN JAYA | 82.007.665.1-733.000 | 416,841 | 0.46 % | |
489 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Wasah Tengah (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5794282 | 31455798 | 60,000,000 | 60,000,000 | 59,900,500 | 59,900,500 | 59,686,000 | 59,686,000 | 0 | 59,686,000 | 2022-03-14 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 99,500 | 0.17 % | |
490 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Rekonstruksi Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5798282 | 31562759 | 99,650,000 | 99,640,188 | 99,000,900 | 99,000,900 | 0 | 99,000,900 | 0 | 0 | 2022-03-23 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 649,100 | 0.65 % | |
491 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Rekonstruksi Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5798282 | 31562759 | 99,650,000 | 99,640,188 | 99,000,900 | 99,000,900 | 0 | 99,000,900 | 0 | 0 | 2022-03-23 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 649,100 | 0.65 % | |
492 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 5799282 | 31454060 | 119,700,000 | 119,532,367 | 118,926,819 | 118,927,851 | 118,795,000 | 118,795,000 | 0 | 118,795,000 | 2022-01-27 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 773,181 | 0.65 % | |
493 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 5799282 | 31454060 | 119,700,000 | 119,532,367 | 118,926,819 | 118,927,851 | 118,795,000 | 118,795,000 | 0 | 0 | 2022-01-27 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 773,181 | 0.65 % | |
494 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5800282 | 31454069 | 149,700,000 | 149,564,333 | 149,008,750 | 149,008,750 | 148,920,000 | 148,920,000 | 0 | 148,920,000 | 2022-01-27 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 691,250 | 0.46 % | |
495 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5800282 | 31454069 | 149,700,000 | 149,564,333 | 149,008,750 | 149,008,750 | 148,920,000 | 148,920,000 | 0 | 0 | 2022-01-27 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 691,250 | 0.46 % | |
496 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Penggantian Jembatan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5801282 | 31551911 | 99,650,000 | 99,645,821 | 99,568,121 | 99,568,121 | 99,483,750 | 99,483,750 | 0 | 0 | 2022-03-22 | Cv.demah adyatma cipta | 94.456.539.9-731.000 | 81,879 | 0.08 % | |
497 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Penggantian Jembatan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5801282 | 31551911 | 99,650,000 | 99,645,821 | 99,568,121 | 99,568,121 | 99,483,750 | 99,483,750 | 0 | 0 | 2022-03-22 | Cv.demah adyatma cipta | 94.456.539.9-731.000 | 81,879 | 0.08 % | |
498 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Aliyaman (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5802282 | 31455772 | 60,000,000 | 60,000,000 | 59,950,500 | 59,950,500 | 59,840,500 | 59,840,500 | 0 | 59,840,500 | 2022-02-15 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 49,500 | 0.08 % | |
499 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Bamban Utara 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5803282 | 31455791 | 60,000,000 | 60,000,000 | 59,969,800 | 59,969,800 | 59,840,000 | 59,840,000 | 0 | 59,840,000 | 2022-03-14 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,200 | 0.05 % | |
500 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Kayu Abang (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5805282 | 31455820 | 60,000,000 | 60,000,000 | 59,900,000 | 59,900,000 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-15 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.17 % | |
501 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Jarau 1 (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5806282 | 31455804 | 60,000,000 | 60,000,000 | 59,900,500 | 59,900,500 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-18 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 99,500 | 0.17 % | |
502 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Pemeliharaan Berkala Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5809282 | 31576981 | 99,650,000 | 99,640,188 | 99,234,000 | 99,234,000 | 99,196,000 | 99,196,000 | 0 | 0 | 2022-03-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 416,000 | 0.42 % | |
503 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Usulan DAK Pemeliharaan Berkala Jalan Tahun 2023 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5809282 | 31576981 | 99,650,000 | 99,640,188 | 99,234,000 | 99,234,000 | 99,196,000 | 99,196,000 | 0 | 0 | 2022-03-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 416,000 | 0.42 % | |
504 | 2022 | Dinas Ketahanan Pangan | Biaya konsultan perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5810282 | 32068142 | 10,000,000 | 10,000,000 | 9,982,500 | 9,982,500 | 9,966,000 | 9,966,000 | 0 | 0 | 2022-01-28 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 17,500 | 0.18 % | |
505 | 2022 | Dinas Ketahanan Pangan | Biaya konsultan perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5810282 | 32068142 | 10,000,000 | 10,000,000 | 9,982,500 | 9,982,500 | 9,966,000 | 9,966,000 | 0 | 0 | 2022-01-28 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 17,500 | 0.18 % | |
506 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5812282 | 32562183 | 20,000,000 | 20,000,000 | 19,745,000 | 0 | 19,690,000 | 19,690,000 | 19,690,000 | 19,690,000 | 2022-01-31 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 255,000 | 1.28 % | |
507 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5812282 | 32562183 | 20,000,000 | 20,000,000 | 19,745,000 | 0 | 19,690,000 | 19,690,000 | 0 | 0 | 2022-01-31 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 255,000 | 1.28 % | |
508 | 2022 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Keamanan | Pengadaan Langsung | Jasa Lainnya | 5814282 | 32803943 | 200,000,000 | 199,980,000 | 198,664,338 | 198,664,338 | 198,500,000 | 198,500,000 | 198,500,000 | 198,500,000 | 2022-03-05 | PT VISADA PRATAMA INDONESIA | 66.511.969.9-731.000 | 1,335,662 | 0.67 % | |
509 | 2022 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Keamanan | Pengadaan Langsung | Jasa Lainnya | 5814282 | 32803943 | 200,000,000 | 199,980,000 | 198,664,338 | 198,664,338 | 198,500,000 | 198,500,000 | 0 | 0 | 2022-03-05 | PT VISADA PRATAMA INDONESIA | 66.511.969.9-731.000 | 1,335,662 | 0.67 % | |
510 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 5816282 | 31454094 | 164,700,000 | 164,333,612 | 164,058,172 | 164,058,172 | 163,783,000 | 163,783,000 | 0 | 163,783,000 | 2022-02-04 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 641,828 | 0.39 % | |
511 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 5816282 | 31454094 | 164,700,000 | 164,333,612 | 164,058,172 | 164,058,172 | 163,783,000 | 163,783,000 | 0 | 0 | 2022-02-04 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 641,828 | 0.39 % | |
512 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 5817282 | 31454084 | 188,850,000 | 188,636,080 | 188,004,130 | 188,004,130 | 187,938,000 | 187,938,000 | 0 | 187,938,000 | 2022-02-04 | CV. Haratai Permai | 02.089.737.7-733.000 | 845,871 | 0.45 % | |
513 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Upacara SMPN 4 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 5820282 | 31634633 | 150,000,000 | 149,943,857 | 149,150,719 | 149,150,719 | 149,048,933 | 149,048,933 | 0 | 0 | 2022-02-21 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 849,281 | 0.57 % | |
514 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Upacara SMPN 4 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 5820282 | 31634633 | 150,000,000 | 149,943,857 | 149,150,719 | 149,150,719 | 149,048,933 | 149,048,933 | 0 | 0 | 2022-02-21 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 849,281 | 0.57 % | |
515 | 2022 | RSUD Daha Sejahtera | Belanja Bahan Habis Pakai Kimia Darah dan Hematologi Analyzer 3 Diff | Pengadaan Langsung | Pengadaan Barang | 5825282 | 32680506 | 400,000,000 | 188,980,000 | 182,580,500 | 182,580,500 | 182,000,000 | 182,000,000 | 0 | 0 | 2022-03-09 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 217,419,500 | 54.35 % | |
516 | 2022 | RSUD Daha Sejahtera | Belanja Bahan Habis Pakai Kimia Darah dan Hematologi Analyzer 3 Diff | Pengadaan Langsung | Pengadaan Barang | 5825282 | 32680506 | 400,000,000 | 188,980,000 | 182,580,500 | 182,580,500 | 182,000,000 | 182,000,000 | 0 | 0 | 2022-03-09 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 217,419,500 | 54.35 % | |
517 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DIR. Sungai Kajang (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5830282 | 31455826 | 60,000,000 | 60,000,000 | 59,900,000 | 59,900,000 | 59,620,000 | 59,620,000 | 0 | 59,620,000 | 2022-02-11 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.17 % | |
518 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Tawia (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5831282 | 31455813 | 60,000,000 | 60,000,000 | 59,950,500 | 59,950,500 | 59,840,000 | 59,840,000 | 0 | 59,840,000 | 2022-02-11 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 49,500 | 0.08 % | |
519 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Alat Test Urine | Pengadaan Langsung | Pengadaan Barang | 5833282 | 32140150 | 68,500,000 | 68,475,000 | 68,310,000 | 68,310,000 | 68,310,000 | 68,310,000 | 0 | 0 | 2022-02-25 | FADWI UTAMA | 94.246.044.5-733.000 | 190,000 | 0.28 % | |
520 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Alat Test Urine | Pengadaan Langsung | Pengadaan Barang | 5833282 | 32140150 | 68,500,000 | 68,475,000 | 68,310,000 | 68,310,000 | 68,310,000 | 68,310,000 | 0 | 0 | 2022-02-25 | FADWI UTAMA | 94.246.044.5-733.000 | 190,000 | 0.28 % | |
521 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pada Daerah Kabupaten/ Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5834282 | 31933469 | 39,150,000 | 38,926,360 | 38,797,000 | 38,797,000 | 38,650,000 | 38,650,000 | 0 | 0 | 2022-03-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 353,000 | 0.9 % | |
522 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pada Daerah Kabupaten/ Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5834282 | 31933469 | 39,150,000 | 38,926,360 | 38,797,000 | 38,797,000 | 38,650,000 | 38,650,000 | 0 | 0 | 2022-03-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 353,000 | 0.9 % | |
523 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5836282 | 31933412 | 12,200,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 265,000 | 2.17 % | |
524 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5836282 | 31933412 | 12,200,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 265,000 | 2.17 % | |
525 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5838282 | 31707287 | 12,300,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 365,000 | 2.97 % | |
526 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5838282 | 31707287 | 12,300,000 | 12,011,450 | 11,935,000 | 11,935,000 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 365,000 | 2.97 % | |
527 | 2022 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5839282 | 31840523 | 100,000,000 | 99,955,625 | 99,495,000 | 99,495,000 | 99,440,000 | 99,440,000 | 0 | 0 | 2022-02-18 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 505,000 | 0.51 % | |
528 | 2022 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5839282 | 31840523 | 100,000,000 | 99,955,625 | 99,495,000 | 99,495,000 | 99,440,000 | 99,440,000 | 0 | 0 | 2022-02-18 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 505,000 | 0.51 % | |
529 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Pakan Dalam 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 5841282 | 31649599 | 105,000,000 | 104,823,408 | 104,441,494 | 104,441,494 | 104,325,994 | 104,325,994 | 0 | 0 | 2022-03-15 | CV. KHALIF | 81.540.809.1-733.000 | 558,506 | 0.53 % | |
530 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Pakan Dalam 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 5841282 | 31649599 | 105,000,000 | 104,823,408 | 104,441,494 | 104,441,494 | 104,325,994 | 104,325,994 | 0 | 0 | 2022-03-15 | CV. KHALIF | 81.540.809.1-733.000 | 558,506 | 0.53 % | |
531 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kantor/ Guru/ Pkg SDN Sungai Raya Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 5842282 | 31649656 | 125,000,000 | 124,957,246 | 124,818,407 | 124,818,407 | 124,263,000 | 124,263,000 | 0 | 124,263,000 | 2022-04-20 | CV.DITA | 02.242.686.0-733.000 | 181,593 | 0.15 % | |
532 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Stadion dan Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5849282 | 31716547 | 65,000,000 | 64,935,000 | 63,984,872 | 63,984,872 | 63,963,000 | 63,963,000 | 0 | 0 | 2022-03-25 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,015,128 | 1.56 % | |
533 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Stadion dan Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5849282 | 31716547 | 65,000,000 | 64,935,000 | 63,984,872 | 63,984,872 | 63,963,000 | 63,963,000 | 0 | 0 | 2022-03-25 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,015,128 | 1.56 % | |
534 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5850282 | 32563078 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,690,000 | 19,690,000 | 19,690,000 | 19,690,000 | 2022-03-14 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,000 | 0.28 % | |
535 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5850282 | 32563078 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,690,000 | 19,690,000 | 0 | 0 | 2022-03-14 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,000 | 0.28 % | |
536 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMPN 6 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5852282 | 31634623 | 150,000,000 | 149,946,057 | 149,780,257 | 149,780,257 | 149,710,957 | 149,710,957 | 0 | 0 | 2022-02-22 | FADWI UTAMA | 94.246.044.5-733.000 | 219,743 | 0.15 % | |
537 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMPN 6 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5852282 | 31634623 | 150,000,000 | 149,946,057 | 149,780,257 | 149,780,257 | 149,710,957 | 149,710,957 | 0 | 0 | 2022-02-22 | FADWI UTAMA | 94.246.044.5-733.000 | 219,743 | 0.15 % | |
538 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5853282 | 32563043 | 19,875,000 | 19,875,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,400,000 | 19,400,000 | 19,400,000 | 2022-02-24 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 75,000 | 0.38 % | |
539 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5853282 | 32563043 | 19,875,000 | 19,875,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,400,000 | 0 | 0 | 2022-02-24 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 75,000 | 0.38 % | |
540 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5855282 | 32562634 | 19,950,000 | 19,950,000 | 19,855,000 | 19,855,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2022-03-08 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 95,000 | 0.48 % | |
541 | 2022 | Dinas Perdagangan | Perencanaan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5855282 | 32562634 | 19,950,000 | 19,950,000 | 19,855,000 | 19,855,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2022-03-08 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 95,000 | 0.48 % | |
542 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5856282 | 32563401 | 18,500,000 | 18,500,000 | 18,370,000 | 18,370,000 | 18,293,000 | 18,293,000 | 18,293,000 | 18,293,000 | 2022-03-02 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 130,000 | 0.7 % | |
543 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5856282 | 32563401 | 18,500,000 | 18,500,000 | 18,370,000 | 18,370,000 | 18,293,000 | 18,293,000 | 0 | 0 | 2022-03-02 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 130,000 | 0.7 % | |
544 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5857282 | 32562064 | 17,500,000 | 17,500,000 | 17,275,500 | 17,275,500 | 17,215,000 | 17,215,000 | 17,215,000 | 17,215,000 | 2022-02-24 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 224,500 | 1.28 % | |
545 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5857282 | 32562064 | 17,500,000 | 17,500,000 | 17,275,500 | 17,275,500 | 17,215,000 | 17,215,000 | 0 | 0 | 2022-02-24 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 224,500 | 1.28 % | |
546 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5858282 | 32563084 | 20,000,000 | 20,000,000 | 19,910,000 | 19,910,000 | 19,855,000 | 19,855,000 | 19,855,000 | 19,855,000 | 2022-03-08 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 90,000 | 0.45 % | |
547 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5858282 | 32563084 | 20,000,000 | 20,000,000 | 19,910,000 | 19,910,000 | 19,855,000 | 19,855,000 | 0 | 0 | 2022-03-08 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 90,000 | 0.45 % | |
548 | 2022 | Dinas Perdagangan | Perencanaan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5859282 | 32563071 | 19,750,000 | 19,750,000 | 19,690,000 | 19,690,000 | 19,635,000 | 19,635,000 | 19,635,000 | 19,635,000 | 2022-03-02 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 60,000 | 0.3 % | |
549 | 2022 | Dinas Perdagangan | Perencanaan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5859282 | 32563071 | 19,750,000 | 19,750,000 | 19,690,000 | 19,690,000 | 19,635,000 | 19,635,000 | 0 | 0 | 2022-03-02 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 60,000 | 0.3 % | |
550 | 2022 | Dinas Perdagangan | Perencanaan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5860282 | 32563058 | 18,500,000 | 18,500,000 | 18,452,500 | 18,452,500 | 18,370,000 | 18,370,000 | 18,370,000 | 18,370,000 | 2022-03-02 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 47,500 | 0.26 % | |
551 | 2022 | Dinas Perdagangan | Perencanaan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5860282 | 32563058 | 18,500,000 | 18,500,000 | 18,452,500 | 18,452,500 | 18,370,000 | 18,370,000 | 0 | 0 | 2022-03-02 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 47,500 | 0.26 % | |
552 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5861282 | 32563048 | 19,950,000 | 19,950,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 19,745,000 | 19,745,000 | 2022-02-24 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 150,000 | 0.75 % | |
553 | 2022 | Dinas Perdagangan | Perencanaan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5861282 | 32563048 | 19,950,000 | 19,950,000 | 19,800,000 | 19,800,000 | 19,745,000 | 19,745,000 | 0 | 0 | 2022-02-24 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 150,000 | 0.75 % | |
554 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jaringan Irigasi DI. Asam (Usulan DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5862282 | 31455786 | 60,000,000 | 60,000,000 | 59,969,800 | 59,969,800 | 59,840,000 | 59,840,000 | 59,840,000 | 59,840,000 | 2022-02-18 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,200 | 0.05 % | |
555 | 2022 | Dinas Pendidikan dan Kebudayaan | pengadaan printer + fotokopi | Pengadaan Langsung | Pengadaan Barang | 5863282 | 33866625 | 70,000,000 | 69,993,000 | 69,931,400 | 69,931,400 | 0 | 69,931,400 | 0 | 0 | 2022-02-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 68,600 | 0.1 % | |
556 | 2022 | Dinas Pendidikan dan Kebudayaan | pengadaan printer + fotokopi | Pengadaan Langsung | Pengadaan Barang | 5863282 | 33866625 | 70,000,000 | 69,993,000 | 69,931,400 | 69,931,400 | 0 | 69,931,400 | 0 | 0 | 2022-02-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 68,600 | 0.1 % | |
557 | 2022 | Dinas Perhubungan | Pengadaan alat Uji Lampu Utama (headlight tester) | Pengadaan Langsung | Pengadaan Barang | 5864282 | 32020581 | 170,000,000 | 169,950,000 | 169,895,000 | 169,895,000 | 169,840,000 | 0 | 0 | 0 | 2022-02-24 | CV BUANA INTI PERSADA | 31.297.283.9-451.000 | 105,000 | 0.06 % | |
558 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Bakar dan Pelumas | Pengadaan Langsung | Pengadaan Barang | 5865282 | 32180283 | 129,402,500 | 129,247,250 | 129,100,400 | 129,100,400 | 128,900,000 | 128,900,000 | 0 | 0 | 2022-03-08 | CV. KHALIF | 81.540.809.1-733.000 | 302,100 | 0.23 % | |
559 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Bakar dan Pelumas | Pengadaan Langsung | Pengadaan Barang | 5865282 | 32180283 | 129,402,500 | 129,247,250 | 129,100,400 | 129,100,400 | 128,900,000 | 128,900,000 | 0 | 0 | 2022-03-08 | CV. KHALIF | 81.540.809.1-733.000 | 302,100 | 0.23 % | |
560 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Peralatan Personal Computer - Pengadaan Scanner | Pengadaan Langsung | Pengadaan Barang | 5866282 | 31981860 | 77,974,800 | 77,972,000 | 77,820,000 | 77,820,000 | 77,820,000 | 77,820,000 | 0 | 0 | 2022-02-25 | CV. HITRO | 02.918.384.5-733.000 | 154,800 | 0.2 % | |
561 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Peralatan Personal Computer - Pengadaan Scanner | Pengadaan Langsung | Pengadaan Barang | 5866282 | 31981860 | 77,974,800 | 77,972,000 | 77,820,000 | 77,820,000 | 77,820,000 | 77,820,000 | 0 | 0 | 2022-02-25 | CV. HITRO | 02.918.384.5-733.000 | 154,800 | 0.2 % | |
562 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Semi Indoor Takraw | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5870282 | 31716302 | 65,000,000 | 64,935,000 | 64,840,650 | 64,840,650 | 64,800,000 | 64,800,000 | 0 | 0 | 2022-03-25 | cv.akmalindo | 02.531.482.4-731.000 | 159,350 | 0.25 % | |
563 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Semi Indoor Takraw | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5870282 | 31716302 | 65,000,000 | 64,935,000 | 64,840,650 | 64,840,650 | 64,800,000 | 64,800,000 | 0 | 0 | 2022-03-25 | cv.akmalindo | 02.531.482.4-731.000 | 159,350 | 0.25 % | |
564 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Pembangunan RTH Stadion 2 Desember,Belanja Konsultansi Perencanaan Pemeliharaan Tugu Dodol,Belanja Konsultansi Perencanaan Peningkatan Fungsi Hutan Kota Untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Perencanaan Peningkatan TPU Gambah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5873282 | 31818803;31827217;31827252;31827384 | 58,250,000 | 57,437,160 | 57,315,499 | 57,315,499 | 57,177,000 | 57,177,000 | 0 | 0 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 934,501 | 1.6 % | |
565 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Perencanaan Pembangunan RTH Stadion 2 Desember,Belanja Konsultansi Perencanaan Pemeliharaan Tugu Dodol,Belanja Konsultansi Perencanaan Peningkatan Fungsi Hutan Kota Untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Perencanaan Peningkatan TPU Gambah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5873282 | 31818803;31827217;31827252;31827384 | 58,250,000 | 57,437,160 | 57,315,499 | 57,315,499 | 57,177,000 | 57,177,000 | 0 | 0 | 2022-03-08 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 934,501 | 1.6 % | |
566 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Modal Pengadaan Perlengkapan dan Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 5882282 | 32139954 | 195,000,000 | 194,997,000 | 194,803,400 | 0 | 194,716,500 | 194,716,500 | 0 | 0 | 2022-03-14 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 196,600 | 0.1 % | |
567 | 2022 | Badan Kesatuan Bangsa dan Politik | Belanja Modal Pengadaan Perlengkapan dan Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 5882282 | 32139954 | 195,000,000 | 194,997,000 | 194,803,400 | 0 | 194,716,500 | 194,716,500 | 0 | 0 | 2022-03-14 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 196,600 | 0.1 % | |
568 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pekerjaan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5883282 | 31707799 | 42,000,000 | 41,836,080 | 41,514,000 | 41,514,000 | 41,420,000 | 41,420,000 | 0 | 0 | 2022-03-09 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 486,000 | 1.16 % | |
569 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pekerjaan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5883282 | 31707799 | 42,000,000 | 41,836,080 | 41,514,000 | 41,514,000 | 41,420,000 | 41,420,000 | 0 | 0 | 2022-03-09 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 486,000 | 1.16 % | |
570 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5884282 | 31933422 | 12,250,000 | 12,011,450 | 11,990,000 | 11,990,000 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-09 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 260,000 | 2.12 % | |
571 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5884282 | 31933422 | 12,250,000 | 12,011,450 | 11,990,000 | 11,990,000 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-09 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 260,000 | 2.12 % | |
572 | 2022 | Sekretariat Daerah | Cetak Cover LPPD, LKPJ, Resume LKPJ dan SPM serta Penggandaan isi LPPD, LKPJ, Resume LKPJ dan SPM, | Pengadaan Langsung | Jasa Lainnya | 5885282 | 34384370;34384536 | 77,775,000 | 72,371,000 | 72,355,000 | 0 | 72,355,000 | 0 | 0 | 0 | 2022-03-17 | KARYA DWI CHADE | 75.416.433.3-733.000 | 5,420,000 | 6.97 % | |
573 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5888282 | 31665434 | 14,000,000 | 13,978,168 | 13,882,000 | 13,882,000 | 13,800,000 | 13,800,000 | 0 | 0 | 2022-03-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 118,000 | 0.84 % | |
574 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan, Rehab PJU / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5888282 | 31665434 | 14,000,000 | 13,978,168 | 13,882,000 | 13,882,000 | 13,800,000 | 13,800,000 | 0 | 0 | 2022-03-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 118,000 | 0.84 % | |
575 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5889282 | 31665261 | 45,500,000 | 44,893,943 | 44,770,000 | 44,770,000 | 44,680,000 | 44,680,000 | 0 | 0 | 2022-03-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 730,000 | 1.6 % | |
576 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU Kec. Kandangan, Kec. Kalumpang, Kec. Sungai Raya Kec. Simpur, Kec. Padang Batung, Kec. Loksado, Kec. Angkinang dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5889282 | 31665261 | 45,500,000 | 44,893,943 | 44,770,000 | 44,770,000 | 44,680,000 | 44,680,000 | 0 | 0 | 2022-03-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 730,000 | 1.6 % | |
577 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultan Perencanaan Rehabilitasi Kantor Disporapar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5890282 | 32378040 | 12,000,000 | 11,999,999 | 11,946,000 | 11,946,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2022-03-22 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 54,000 | 0.45 % | |
578 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultan Perencanaan Rehabilitasi Kantor Disporapar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5890282 | 32378040 | 12,000,000 | 11,999,999 | 11,946,000 | 11,946,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2022-03-22 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 54,000 | 0.45 % | |
579 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5896282 | 31632226 | 59,550,000 | 59,487,897 | 59,212,950 | 59,212,950 | 59,159,000 | 59,159,000 | 0 | 0 | 2022-03-16 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 337,050 | 0.57 % | |
580 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5896282 | 31632226 | 59,550,000 | 59,487,897 | 59,212,950 | 59,212,950 | 59,159,000 | 59,159,000 | 0 | 0 | 2022-03-16 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 337,050 | 0.57 % | |
581 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SMPN 6 Daha Selatan, SMPN 4 Daha Utara dan Pengawasan Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5897282 | 34579124 | 29,000,000 | 28,999,860 | 28,770,090 | 28,770,090 | 28,704,600 | 28,704,600 | 0 | 0 | 2022-03-15 | cv.akmalindo | 02.531.482.4-731.000 | 229,910 | 0.79 % | |
582 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SMPN 6 Daha Selatan, SMPN 4 Daha Utara dan Pengawasan Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5897282 | 34579124 | 29,000,000 | 28,999,860 | 28,770,090 | 28,770,090 | 28,704,600 | 28,704,600 | 0 | 0 | 2022-03-15 | cv.akmalindo | 02.531.482.4-731.000 | 229,910 | 0.79 % | |
583 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Batang Kulur Kiri 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 5898282 | 31649973 | 100,000,000 | 99,995,634 | 99,940,180 | 99,940,180 | 99,740,929 | 99,740,929 | 0 | 0 | 2022-03-25 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 59,820 | 0.06 % | |
584 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Batang Kulur Kiri 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 5898282 | 31649973 | 100,000,000 | 99,995,634 | 99,940,180 | 99,940,180 | 99,740,929 | 99,740,929 | 0 | 0 | 2022-03-25 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 59,820 | 0.06 % | |
585 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Dalam Barat 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 5900282 | 31649965 | 100,000,000 | 99,991,447 | 99,759,563 | 99,759,563 | 99,610,278 | 99,610,278 | 0 | 0 | 2022-03-25 | CV. KHALIF | 81.540.809.1-733.000 | 240,437 | 0.24 % | |
586 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Dalam Barat 3 | Pengadaan Langsung | Pekerjaan Konstruksi | 5900282 | 31649965 | 100,000,000 | 99,991,447 | 99,759,563 | 99,759,563 | 99,610,278 | 99,610,278 | 0 | 0 | 2022-03-25 | CV. KHALIF | 81.540.809.1-733.000 | 240,437 | 0.24 % | |
587 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bahalayung Desa Lungau Kec. Kandangan untuk Penanggulangan Bencana Banjir (Dana BTT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5921282 | 34294762 | 100,000,000 | 100,000,000 | 99,948,840 | 99,948,840 | 99,900,000 | 99,900,000 | 0 | 99,900,000 | 2022-04-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 51,160 | 0.05 % | |
588 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehabilitasi Ruangan Stadion 2 Desember,Konsultan Pengawas Rehab Kolam Renang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5924282 | 32542029;32542059 | 77,093,780 | 77,093,700 | 76,879,710 | 76,879,710 | 76,700,000 | 76,700,000 | 0 | 0 | 2022-04-07 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 214,070 | 0.28 % | |
589 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehabilitasi Ruangan Stadion 2 Desember,Konsultan Pengawas Rehab Kolam Renang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5924282 | 32542029;32542059 | 77,093,780 | 77,093,700 | 76,879,710 | 76,879,710 | 76,700,000 | 76,700,000 | 0 | 0 | 2022-04-07 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 214,070 | 0.28 % | |
590 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehab Pagar dan Pos Keamanan Gedung GOS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5925282 | 32542034 | 10,800,000 | 10,799,967 | 10,669,320 | 10,669,320 | 10,500,000 | 10,500,000 | 10,500,000 | 10,500,000 | 2022-04-07 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 130,680 | 1.21 % | |
591 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan Pengawas Rehab Pagar dan Pos Keamanan Gedung GOS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5925282 | 32542034 | 10,800,000 | 10,799,967 | 10,669,320 | 10,669,320 | 10,500,000 | 10,500,000 | 0 | 0 | 2022-04-07 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 130,680 | 1.21 % | |
592 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung dan Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5926282 | 34799167 | 25,000,000 | 24,978,899 | 24,780,750 | 24,780,750 | 24,724,700 | 24,724,700 | 0 | 0 | 2022-03-23 | cv.akmalindo | 02.531.482.4-731.000 | 219,250 | 0.88 % | |
593 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung dan Perencanaan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5926282 | 34799167 | 25,000,000 | 24,978,899 | 24,780,750 | 24,780,750 | 24,724,700 | 24,724,700 | 0 | 0 | 2022-03-23 | cv.akmalindo | 02.531.482.4-731.000 | 219,250 | 0.88 % | |
594 | 2022 | Inspektorat Daerah | Perencanaan Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5929282 | 34907354 | 15,000,000 | 14,985,000 | 14,874,000 | 0 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2022-03-24 | cv.akmalindo | 02.531.482.4-731.000 | 126,000 | 0.84 % | |
595 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli 2 Desember (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5931282 | 31716564 | 94,500,000 | 94,500,000 | 93,422,500 | 93,422,500 | 93,393,000 | 93,393,000 | 93,393,000 | 93,393,000 | 2022-04-22 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 1,077,500 | 1.14 % | |
596 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pengaspalan Jalan lingkungan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5933282 | 31571774 | 100,000,000 | 99,984,288 | 99,786,780 | 99,786,780 | 99,675,780 | 99,675,780 | 99,675,780 | 99,675,780 | 2022-03-29 | Wing Rastafarindo | 03.282.590.3-732.000 | 213,220 | 0.21 % | |
597 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pengaspalan Jalan lingkungan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5933282 | 31571774 | 100,000,000 | 99,984,288 | 99,786,780 | 99,786,780 | 99,675,780 | 99,675,780 | 0 | 0 | 2022-03-29 | Wing Rastafarindo | 03.282.590.3-732.000 | 213,220 | 0.21 % | |
598 | 2022 | Dinas Pertanian | Perencanaan kegiatan rehab BPP dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5934282 | 34695474 | 99,805,950 | 99,706,144 | 99,578,100 | 99,578,100 | 99,345,000 | 99,345,000 | 0 | 0 | 2022-03-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 227,850 | 0.23 % | |
599 | 2022 | Dinas Pertanian | Perencanaan kegiatan rehab BPP dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5934282 | 34695474 | 99,805,950 | 99,706,144 | 99,578,100 | 99,578,100 | 99,345,000 | 99,345,000 | 0 | 0 | 2022-03-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 227,850 | 0.23 % | |
600 | 2022 | Dinas Pemberdayaan Masyarakat Dan Desa | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Konstruksi Pondasi serta Struktur Bangunan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5935282 | 32519229 | 10,000,000 | 9,990,000 | 9,768,000 | 0 | 9,768,000 | 9,768,000 | 100 | 9,768,000 | 2022-04-18 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
601 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan UPS Taurus 40 KVA | Pengadaan Langsung | Jasa Lainnya | 5939282 | 35048146 | 100,000,000 | 94,350,000 | 71,928,000 | 71,928,000 | 67,488,000 | 67,488,000 | 67,488,000 | 67,488,000 | 2022-04-06 | PT. VEKTORDAYA MEKATRIKA | 01.755.704.2-038.000 | 28,072,000 | 28.07 % | |
602 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan UPS Taurus 40 KVA | Pengadaan Langsung | Jasa Lainnya | 5939282 | 35048146 | 100,000,000 | 94,350,000 | 71,928,000 | 71,928,000 | 67,488,000 | 67,488,000 | 0 | 0 | 2022-04-06 | PT. VEKTORDAYA MEKATRIKA | 01.755.704.2-038.000 | 28,072,000 | 28.07 % | |
603 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5940282 | 32562422 | 200,000,000 | 199,989,366 | 199,488,476 | 199,488,476 | 199,210,900 | 199,210,900 | 199,210,900 | 199,210,900 | 2022-04-01 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 511,524 | 0.26 % | |
604 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 5940282 | 32562422 | 200,000,000 | 199,989,366 | 199,488,476 | 199,488,476 | 199,210,900 | 199,210,900 | 0 | 0 | 2022-04-01 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 511,524 | 0.26 % | |
605 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5941282 | 31649606 | 22,400,000 | 22,366,500 | 22,301,676 | 22,301,676 | 22,283,250 | 22,283,250 | 0 | 0 | 2022-04-01 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,324 | 0.44 % | |
606 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5941282 | 31649606 | 22,400,000 | 22,366,500 | 22,301,676 | 22,301,676 | 22,283,250 | 22,283,250 | 0 | 0 | 2022-04-01 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,324 | 0.44 % | |
607 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehab Panggung Terbuka dan Kamar Ganti Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5942282 | 32947902 | 22,000,000 | 22,000,000 | 21,966,900 | 21,966,900 | 21,700,000 | 21,700,000 | 21,700,000 | 21,700,000 | 2022-03-28 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 33,100 | 0.15 % | |
608 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehab Panggung Terbuka dan Kamar Ganti Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5942282 | 32947902 | 22,000,000 | 22,000,000 | 21,966,900 | 21,966,900 | 21,700,000 | 21,700,000 | 0 | 0 | 2022-03-28 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 33,100 | 0.15 % | |
609 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 5944282 | 31651161 | 150,000,000 | 149,634,549 | 148,609,797 | 148,609,797 | 148,500,000 | 148,500,000 | 0 | 0 | 2022-03-29 | CV. e_Caracter | 75.998.700.1-733.000 | 1,390,203 | 0.93 % | |
610 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 5944282 | 31651161 | 150,000,000 | 149,634,549 | 148,609,797 | 148,609,797 | 148,500,000 | 148,500,000 | 0 | 0 | 2022-03-29 | CV. e_Caracter | 75.998.700.1-733.000 | 1,390,203 | 0.93 % | |
611 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5945282 | 32117566 | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-29 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
612 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pembangunan Gedung Sekretariat PKK Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5945282 | 32117566 | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,850,000 | 11,850,000 | 0 | 0 | 2022-03-29 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
613 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5946282 | 32117511 | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-29 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
614 | 2022 | Kecamatan Daha Barat | Belanja Jasa Konsultan Perencanaan Pekerjaan Urugan dan Siring Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5946282 | 32117511 | 12,000,000 | 11,998,046 | 11,990,831 | 11,990,831 | 11,900,000 | 11,900,000 | 0 | 0 | 2022-03-29 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 9,170 | 0.08 % | |
615 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bajayau | Pengadaan Langsung | Pekerjaan Konstruksi | 5948282 | 31650069 | 170,000,000 | 169,878,580 | 169,536,730 | 169,536,730 | 169,514,000 | 169,514,000 | 0 | 0 | 2022-03-29 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 463,270 | 0.27 % | |
616 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bajayau | Pengadaan Langsung | Pekerjaan Konstruksi | 5948282 | 31650069 | 170,000,000 | 169,878,580 | 169,536,730 | 169,536,730 | 169,514,000 | 169,514,000 | 0 | 0 | 2022-03-29 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 463,270 | 0.27 % | |
617 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Perorangan | 5951282 | 32098890 | 13,480,000 | 13,474,124 | 13,264,500 | 13,264,500 | 13,100,000 | 13,100,000 | 0 | 0 | 2022-03-29 | wahyu abdi maulana | 15.336.879.0-735.000 | 215,500 | 1.6 % | |
618 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Perorangan | 5951282 | 32098890 | 13,480,000 | 13,474,124 | 13,264,500 | 13,264,500 | 13,100,000 | 13,100,000 | 0 | 0 | 2022-03-29 | wahyu abdi maulana | 15.336.879.0-735.000 | 215,500 | 1.6 % | |
619 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Pemeliharaan Lampu Hias | Pengadaan Langsung | Pengadaan Barang | 5954282 | 31811676 | 145,000,000 | 144,505,350 | 144,323,865 | 144,323,865 | 144,200,000 | 144,200,000 | 144,200,000 | 144,200,000 | 2022-04-05 | CV. e_Caracter | 75.998.700.1-733.000 | 676,135 | 0.47 % | |
620 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bahan Pemeliharaan Lampu Hias | Pengadaan Langsung | Pengadaan Barang | 5954282 | 31811676 | 145,000,000 | 144,505,350 | 144,323,865 | 144,323,865 | 144,200,000 | 144,200,000 | 0 | 0 | 2022-04-05 | CV. e_Caracter | 75.998.700.1-733.000 | 676,135 | 0.47 % | |
621 | 2022 | Dinas Pertanian | Perencanaan Rehab Balai Penyuluh Pertanian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5956282 | 32060994 | 90,670,125 | 90,579,455 | 90,187,500 | 90,187,500 | 89,910,000 | 89,910,000 | 0 | 0 | 2022-03-30 | cv.akmalindo | 02.531.482.4-731.000 | 482,625 | 0.53 % | |
622 | 2022 | Dinas Pertanian | Perencanaan Rehab Balai Penyuluh Pertanian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5956282 | 32060994 | 90,670,125 | 90,579,455 | 90,187,500 | 90,187,500 | 89,910,000 | 89,910,000 | 0 | 0 | 2022-03-30 | cv.akmalindo | 02.531.482.4-731.000 | 482,625 | 0.53 % | |
623 | 2022 | Dinas Pertanian | Perencanaan Jalan Usaha Tani | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5957282 | 32060512 | 99,000,000 | 98,901,000 | 98,512,500 | 98,512,500 | 98,346,000 | 98,346,000 | 0 | 0 | 2022-03-30 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 487,500 | 0.49 % | |
624 | 2022 | Dinas Pertanian | Perencanaan Jalan Usaha Tani | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5957282 | 32060512 | 99,000,000 | 98,901,000 | 98,512,500 | 98,512,500 | 98,346,000 | 98,346,000 | 0 | 0 | 2022-03-30 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 487,500 | 0.49 % | |
625 | 2022 | Sekretariat Daerah | Belanja Barang Promosi Sasirangan | Pengadaan Langsung | Pengadaan Barang | 5959282 | 32045816 | 74,700,000 | 74,647,500 | 74,536,500 | 0 | 74,536,500 | 74,536,500 | 100 | 74,536,500 | 2022-04-03 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 163,500 | 0.22 % | |
626 | 2022 | Sekretariat Daerah | Belanja Barang Promosi Sasirangan | Pengadaan Langsung | Pengadaan Barang | 5959282 | 32045816 | 74,700,000 | 74,647,500 | 74,536,500 | 0 | 74,536,500 | 74,536,500 | 0 | 0 | 2022-04-03 | ANUGERAH ALMUBARAK | 41.349.011.1-733.000 | 163,500 | 0.22 % | |
627 | 2022 | Sekretariat Daerah | Belanja Modal Tugu/Tanda Batas Lainnya (Rehab pemasangan Paving Blok Lapangan Tugu) | Pengadaan Langsung | Pekerjaan Konstruksi | 5960282 | 32107775 | 150,000,000 | 149,999,694 | 149,787,525 | 0 | 149,787,500 | 149,787,500 | 0 | 0 | 2022-04-03 | CV. AISY | 75.132.070.6-733.000 | 212,475 | 0.14 % | |
628 | 2022 | Sekretariat Daerah | Belanja Modal Tugu/Tanda Batas Lainnya (Rehab pemasangan Paving Blok Lapangan Tugu) | Pengadaan Langsung | Pekerjaan Konstruksi | 5960282 | 32107775 | 150,000,000 | 149,999,694 | 149,787,525 | 0 | 149,787,500 | 149,787,500 | 0 | 0 | 2022-04-03 | CV. AISY | 75.132.070.6-733.000 | 212,475 | 0.14 % | |
629 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5961282 | 31463246 | 200,000,000 | 199,755,423 | 199,600,023 | 199,600,023 | 199,544,000 | 199,544,000 | 0 | 199,544,000 | 2022-03-31 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 399,977 | 0.2 % | |
630 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Perencanaan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5962282 | 35197004 | 76,000,000 | 75,971,397 | 75,746,400 | 75,746,400 | 75,702,000 | 75,702,000 | 0 | 0 | 2022-04-04 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 253,600 | 0.33 % | |
631 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Perencanaan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5962282 | 35197004 | 76,000,000 | 75,971,397 | 75,746,400 | 75,746,400 | 75,702,000 | 75,702,000 | 0 | 0 | 2022-04-04 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 253,600 | 0.33 % | |
632 | 2022 | Dinas Pertanian | Perencanaan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5963282 | 32061879 | 50,000,000 | 49,950,000 | 49,805,700 | 49,805,700 | 49,672,500 | 49,672,500 | 100 | 49,672,500 | 2022-04-04 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 194,300 | 0.39 % | |
633 | 2022 | Dinas Pertanian | Perencanaan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5963282 | 32061879 | 50,000,000 | 49,950,000 | 49,805,700 | 49,805,700 | 49,672,500 | 49,672,500 | 0 | 0 | 2022-04-04 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 194,300 | 0.39 % | |
634 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5966282 | 32563016 | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,708,500 | 13,708,500 | 13,708,500 | 13,708,500 | 2022-04-01 | cv.akmalindo | 02.531.482.4-731.000 | 236,000 | 1.69 % | |
635 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Negara Blok E Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5966282 | 32563016 | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,708,500 | 13,708,500 | 0 | 0 | 2022-04-01 | cv.akmalindo | 02.531.482.4-731.000 | 236,000 | 1.69 % | |
636 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5967282 | 32146199 | 16,500,000 | 16,500,000 | 16,190,460 | 16,190,460 | 16,095,000 | 16,095,000 | 0 | 0 | 2022-04-13 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 309,540 | 1.88 % | |
637 | 2022 | Sekretariat Daerah | Belanja Modal Pagar (Rehab Pagar Kantor Setda (Pagar belakang) | Pengadaan Langsung | Pekerjaan Konstruksi | 5968282 | 32107545 | 150,000,000 | 149,985,383 | 149,858,154 | 0 | 149,858,100 | 149,858,100 | 100 | 149,858,100 | 2022-04-03 | CV.DITA | 02.242.686.0-733.000 | 141,846 | 0.09 % | |
638 | 2022 | Dinas Pertanian | Perencanaan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969282 | 32060276 | 26,200,000 | 24,675,300 | 24,531,000 | 24,531,000 | 24,420,000 | 24,420,000 | 0 | 0 | 2022-04-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 1,669,000 | 6.37 % | |
639 | 2022 | Dinas Pertanian | Perencanaan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5969282 | 32060276 | 26,200,000 | 24,675,300 | 24,531,000 | 24,531,000 | 24,420,000 | 24,420,000 | 0 | 0 | 2022-04-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 1,669,000 | 6.37 % | |
640 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5974282 | 35198472 | 29,200,000 | 29,198,550 | 29,048,700 | 29,048,700 | 29,029,000 | 29,029,000 | 0 | 0 | 2022-04-08 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 151,300 | 0.52 % | |
641 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5974282 | 35198472 | 29,200,000 | 29,198,550 | 29,048,700 | 29,048,700 | 29,029,000 | 29,029,000 | 0 | 0 | 2022-04-08 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 151,300 | 0.52 % | |
642 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5975282 | 35199059 | 10,042,700 | 10,039,950 | 9,945,600 | 9,945,600 | 0 | 9,945,600 | 0 | 0 | 2022-04-08 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 97,100 | 0.97 % | |
643 | 2022 | Dinas Pendidikan dan Kebudayaan | Desain perencanaan untuk kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5975282 | 35199059 | 10,042,700 | 10,039,950 | 9,945,600 | 9,945,600 | 0 | 9,945,600 | 0 | 0 | 2022-04-08 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 97,100 | 0.97 % | |
644 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman dan Drainase Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5979282 | 31650100 | 56,500,000 | 56,347,747 | 56,316,738 | 56,316,738 | 56,277,000 | 56,277,000 | 0 | 56,277,000 | 2022-04-25 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 183,262 | 0.32 % | |
645 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehabilitasi Dermaga Wisata Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5984282 | 32946939 | 22,000,000 | 22,000,000 | 21,853,680 | 21,853,680 | 21,650,000 | 21,650,000 | 21,650,000 | 21,650,000 | 2022-04-11 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 146,320 | 0.67 % | |
646 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Drainase jalan Tembus Bilui - Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 5987282 | 35472519 | 199,170,000 | 199,169,404 | 198,999,574 | 198,999,574 | 198,891,000 | 198,891,000 | 0 | 0 | 2022-04-11 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 170,426 | 0.09 % | |
647 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Drainase jalan Tembus Bilui - Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 5987282 | 35472519 | 199,170,000 | 199,169,404 | 198,999,574 | 198,999,574 | 198,891,000 | 198,891,000 | 0 | 0 | 2022-04-11 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 170,426 | 0.09 % | |
648 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Jl. Bukhari, Jl. Kesehatan, Jl. Ade Irma Nasution, Jl. D.I Panjaitan, Jl. Jend. Sudirman, SMA 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5988282 | 35472360 | 150,000,000 | 149,999,895 | 149,944,395 | 149,944,395 | 149,900,000 | 149,900,000 | 0 | 149,900,000 | 2022-04-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 55,605 | 0.04 % | |
649 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi Pemeliharaan Jl. Bukhari, Jl. Kesehatan, Jl. Ade Irma Nasution, Jl. D.I Panjaitan, Jl. Jend. Sudirman, SMA 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5988282 | 35472360 | 150,000,000 | 149,999,895 | 149,944,395 | 149,944,395 | 149,900,000 | 149,900,000 | 0 | 0 | 2022-04-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 55,605 | 0.04 % | |
650 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 5991282 | 31629864 | 165,000,000 | 164,896,917 | 164,655,253 | 164,655,253 | 164,646,000 | 164,646,000 | 0 | 164,646,000 | 2022-04-14 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 344,747 | 0.21 % | |
651 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi berat Ruang Aula, selasar SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5992282 | 31634389 | 190,000,000 | 189,992,627 | 189,754,236 | 189,754,236 | 189,734,000 | 189,734,000 | 0 | 0 | 2022-04-07 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 245,764 | 0.13 % | |
652 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi berat Ruang Aula, selasar SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5992282 | 31634389 | 190,000,000 | 189,992,627 | 189,754,236 | 189,754,236 | 189,734,000 | 189,734,000 | 0 | 0 | 2022-04-07 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 245,764 | 0.13 % | |
653 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5993282 | 31634354 | 69,600,000 | 68,998,278 | 68,650,916 | 68,650,916 | 68,617,000 | 68,617,000 | 0 | 0 | 2022-04-07 | CV. AISY | 75.132.070.6-733.000 | 949,084 | 1.36 % | |
654 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 5993282 | 31634354 | 69,600,000 | 68,998,278 | 68,650,916 | 68,650,916 | 68,617,000 | 68,617,000 | 0 | 0 | 2022-04-07 | CV. AISY | 75.132.070.6-733.000 | 949,084 | 1.36 % | |
655 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5994282 | 35446261 | 50,000,000 | 49,527,870 | 49,472,370 | 49,472,370 | 49,450,000 | 49,450,000 | 0 | 0 | 2022-04-12 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 527,630 | 1.06 % | |
656 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5994282 | 35446261 | 50,000,000 | 49,527,870 | 49,472,370 | 49,472,370 | 49,450,000 | 49,450,000 | 0 | 0 | 2022-04-12 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 527,630 | 1.06 % | |
657 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5997282 | 35446361 | 45,000,000 | 44,497,880 | 44,442,380 | 44,442,380 | 44,400,000 | 44,400,000 | 0 | 0 | 2022-04-13 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 557,620 | 1.24 % | |
658 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5997282 | 35446361 | 45,000,000 | 44,497,880 | 44,442,380 | 44,442,380 | 44,400,000 | 44,400,000 | 0 | 0 | 2022-04-13 | CV. FIANDRAAJASA | 96.011.510.3-732.000 | 557,620 | 1.24 % | |
659 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Pandak Daun - Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5998282 | 35446116 | 45,000,000 | 44,802,752 | 44,629,104 | 44,629,104 | 0 | 44,629,104 | 0 | 0 | 2022-04-12 | Wiyasa Drawana | 80.902.072.0-731.000 | 370,896 | 0.82 % | |
660 | 2022 | Kecamatan Kandangan | Belanja Jasa Perencanaan Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5999282 | 32541992 | 15,000,000 | 14,999,932 | 14,896,200 | 14,896,200 | 14,800,000 | 14,800,000 | 0 | 0 | 2022-04-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,800 | 0.69 % | |
661 | 2022 | Kecamatan Kandangan | Belanja Jasa Perencanaan Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5999282 | 32541992 | 15,000,000 | 14,999,932 | 14,896,200 | 14,896,200 | 14,800,000 | 14,800,000 | 0 | 0 | 2022-04-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 103,800 | 0.69 % | |
662 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado,Jasa Konsultansi Perencanaan Peningkatan Jl. Haratai 2 Kec. Loksado,Jasa Konsultansi Perencanaan Peningkatan Jl. Datar Belimbing Kec. Loksado,Jasa Konsultansi Perencanaan Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6002282 | 31562660;31562673;31562687;31577178 | 70,800,000 | 70,713,383 | 70,673,700 | 70,673,700 | 70,629,300 | 70,629,300 | 0 | 0 | 2022-04-14 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 126,300 | 0.18 % | |
663 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya,Jasa Konsultansi Perencanaan Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6003282 | 31562649;31576994;31577001;31577014;31577028 | 83,000,000 | 82,864,553 | 82,540,433 | 82,540,433 | 82,473,000 | 82,473,000 | 0 | 0 | 2022-04-11 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 459,568 | 0.55 % | |
664 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6005282 | 31577038;31577047;31577057;31577065;31577070 | 84,700,000 | 84,640,553 | 84,471,000 | 84,471,000 | 84,440,000 | 84,440,000 | 0 | 0 | 2022-04-14 | cv.akmalindo | 02.531.482.4-731.000 | 229,000 | 0.27 % | |
665 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan),Jasa Konsultansi Perencanaan Peninggian Jalan Desa Pantai Ulin Kec. Simpur,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6006282 | 31576563;31577077;31577087;31577100;31577111 | 84,000,000 | 83,974,553 | 83,922,660 | 83,922,660 | 83,864,000 | 83,864,000 | 0 | 0 | 2022-04-26 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 77,340 | 0.09 % | |
666 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan,Jasa Konsultansi Perencanaan Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan),Jasa Konsultansi Perencanaan Siring Pasangan Batu Jalan Balanti Kec. Kalumpang,Jasa Konsultansi Perencanaan Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6008282 | 31577121;31577133;31577205;31577219;31577229 | 91,700,000 | 91,594,592 | 90,570,450 | 90,570,450 | 90,520,500 | 90,520,500 | 0 | 0 | 2022-04-19 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,129,550 | 1.23 % | |
667 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perbaikan Jembatan Gantung Lungau Kec. Kandangan,Jasa Konsultansi Perencanaan Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6009282 | 31551908;35396510 | 20,400,000 | 20,364,877 | 19,995,540 | 19,995,540 | 19,980,000 | 19,980,000 | 0 | 19,980,000 | 2022-04-26 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 404,460 | 1.98 % | |
668 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PERENCANAAN DAK (Kandangan,Angkinang,Loksado,Sungai Raya) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6012282 | 35058875 | 77,000,000 | 76,998,881 | 76,925,997 | 76,925,997 | 76,845,300 | 76,845,300 | 0 | 76,845,300 | 2022-04-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 74,003 | 0.1 % | |
669 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana, Prasarana dan Utilitas Sekolah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6016282 | 31634318 | 49,108,600 | 49,006,206 | 48,801,150 | 48,801,150 | 48,751,200 | 48,751,200 | 0 | 0 | 2022-04-14 | cv.akmalindo | 02.531.482.4-731.000 | 307,450 | 0.63 % | |
670 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana, Prasarana dan Utilitas Sekolah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6016282 | 31634318 | 49,108,600 | 49,006,206 | 48,801,150 | 48,801,150 | 48,751,200 | 48,751,200 | 0 | 0 | 2022-04-14 | cv.akmalindo | 02.531.482.4-731.000 | 307,450 | 0.63 % | |
671 | 2022 | Kecamatan Kandangan | Pekerjaan Rehab JUT dan Jembatan JUT Telaga Sasanting RT.005 dan Rehab JUT Jalan Tembus Pondok Pertanian RT.009 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6019282 | 32540907;32540998 | 150,000,000 | 149,941,058 | 149,845,087 | 149,845,087 | 149,750,000 | 149,750,000 | 0 | 0 | 2022-04-12 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 154,913 | 0.1 % | |
672 | 2022 | Kecamatan Kandangan | Pekerjaan Rehab JUT dan Jembatan JUT Telaga Sasanting RT.005 dan Rehab JUT Jalan Tembus Pondok Pertanian RT.009 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6019282 | 32540907;32540998 | 150,000,000 | 149,941,058 | 149,845,087 | 149,845,087 | 149,750,000 | 149,750,000 | 0 | 0 | 2022-04-12 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 154,913 | 0.1 % | |
673 | 2022 | Sekretariat DPRD | Konsultan Pengawas Pembangunan Rumah Jabatan Ketua DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6021282 | 33555400 | 80,000,000 | 79,969,121 | 79,830,371 | 79,830,371 | 79,799,000 | 79,799,000 | 79,799,000 | 79,799,000 | 2022-04-14 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 169,629 | 0.21 % | |
674 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya - Rehab Gedung PKK Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6028282 | 35052943 | 130,000,000 | 129,960,896 | 129,636,122 | 129,636,122 | 129,636,100 | 129,636,100 | 100 | 129,636,100 | 2022-04-18 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 363,878 | 0.28 % | |
675 | 2022 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Pertemuan (Rehabilitasi Ruang Dapur Pendopo Kab.HSS) | Pengadaan Langsung | Pekerjaan Konstruksi | 6029282 | 32107077 | 160,000,000 | 159,985,744 | 159,879,408 | 0 | 159,879,400 | 159,879,400 | 100 | 159,879,400 | 2022-04-18 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,592 | 0.08 % | |
676 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Rehabilitasi WC dan Kamar Ganti Dermaga Bamboo Rafting Ni'ih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6038282 | 32948599 | 18,000,000 | 18,000,000 | 17,926,500 | 17,926,500 | 17,750,000 | 17,750,000 | 17,750,000 | 17,750,000 | 2022-04-18 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 73,500 | 0.41 % | |
677 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pondok nginap Pesantren Abdul Karim Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6042282 | 31633016 | 185,500,000 | 184,916,047 | 184,602,173 | 184,602,173 | 184,526,000 | 184,526,000 | 0 | 184,526,000 | 2022-04-20 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 897,827 | 0.48 % | |
678 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Bangkau | Pengadaan Langsung | Pekerjaan Konstruksi | 6045282 | 31649950 | 115,000,000 | 114,968,821 | 114,859,455 | 114,859,455 | 114,648,000 | 114,648,000 | 0 | 114,648,000 | 2022-04-21 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 140,545 | 0.12 % | |
679 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PERENCANAAN DAK ( Daha Selatan,Daha Utara) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6051282 | 35058772 | 65,800,000 | 65,788,691 | 65,750,073 | 65,750,073 | 65,689,800 | 65,689,800 | 0 | 65,689,800 | 2022-04-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 49,927 | 0.08 % | |
680 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Badaun, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6052282 | 31592942 | 20,000,000 | 20,000,000 | 19,988,900 | 19,988,900 | 19,924,500 | 19,924,500 | 80 | 19,924,500 | 2022-07-21 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 11,100 | 0.06 % | |
681 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Balap Sepeda Malutu (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6053282 | 35445286 | 25,550,000 | 25,550,000 | 25,457,850 | 25,457,850 | 25,425,000 | 25,425,000 | 25,425,000 | 25,425,000 | 2022-05-18 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 92,150 | 0.36 % | |
682 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Bajayau Lama, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6054282 | 31592968 | 18,120,000 | 18,120,000 | 17,926,500 | 17,926,500 | 17,871,000 | 17,871,000 | 80 | 17,871,000 | 2022-05-30 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 193,500 | 1.07 % | |
683 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Mandala Murung Mesjid | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6055282 | 31592984 | 17,500,000 | 17,500,000 | 17,427,000 | 17,427,000 | 17,371,500 | 17,371,500 | 80 | 17,371,500 | 2022-06-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 73,000 | 0.42 % | |
684 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Perdesaan Desa Samuda | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6056282 | 31593008 | 17,986,500 | 17,986,500 | 17,958,750 | 17,958,750 | 17,898,750 | 17,898,750 | 80 | 17,898,750 | 2022-07-13 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 27,750 | 0.15 % | |
685 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Banua Hanyar, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6057282 | 31592947 | 20,160,000 | 20,160,000 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 80 | 19,980,000 | 2022-07-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 160,000 | 0.79 % | |
686 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Panggungan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6058282 | 31592994 | 13,000,000 | 13,000,000 | 12,953,700 | 12,953,700 | 12,945,000 | 12,945,000 | 80 | 12,945,000 | 2022-06-21 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 46,300 | 0.36 % | |
687 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Durian Rabung, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6059282 | 31592999 | 19,500,000 | 19,500,000 | 19,420,000 | 19,420,000 | 19,399,000 | 19,399,000 | 80 | 19,399,000 | 2022-06-21 | CV. FAJAR KARYA PRATAMA | 02.090.106.2-732.000 | 80,000 | 0.41 % | |
688 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Gedung/Ruang Kelas/Ruang Guru PAUD TK Tumingki Kec. Loksado, Pengawasan Rehabilitasi Sedang/Berat Gedung/Ruang Kelas/Ruang Guru PAUD TK Surya Pagi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6060282 | 35782648 | 16,750,000 | 16,708,381 | 16,630,575 | 16,630,575 | 16,616,100 | 16,616,100 | 0 | 16,616,100 | 2022-05-17 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 119,425 | 0.71 % | |
689 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Gedung PKBM Marta Jiwa, PKBM Darul Amin, PKBM Mambaul Ulum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6061282 | 31632214 | 39,135,000 | 39,105,584 | 38,921,595 | 38,921,595 | 38,888,000 | 38,888,000 | 0 | 38,888,000 | 2022-05-17 | cv.akmalindo | 02.531.482.4-731.000 | 213,405 | 0.55 % | |
690 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6063282 | 31592988 | 19,720,000 | 19,720,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 80 | 19,647,000 | 2022-06-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 73,000 | 0.37 % | |
691 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Asam, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6064282 | 31592962 | 20,000,000 | 20,000,000 | 19,991,871 | 19,991,871 | 19,919,000 | 19,919,000 | 80 | 19,919,000 | 2022-06-06 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 8,129 | 0.04 % | |
692 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Bumi Berkat, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6065282 | 31592981 | 10,500,000 | 10,500,000 | 10,480,000 | 10,480,000 | 10,450,000 | 10,450,000 | 80 | 10,450,000 | 2022-06-10 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 20,000 | 0.19 % | |
693 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Pantai Ulin, Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6066282 | 31592976 | 10,500,000 | 10,500,000 | 10,479,000 | 10,479,000 | 10,449,000 | 10,449,000 | 80 | 10,449,000 | 2022-06-10 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 21,000 | 0.2 % | |
694 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Pengawas Kegiatan Kontraktual (Reguler) - (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6067282 | 35477258 | 100,000,000 | 100,000,000 | 99,944,500 | 99,944,500 | 99,899,000 | 99,899,000 | 99,899,000 | 99,899,000 | 2022-06-03 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 55,500 | 0.06 % | |
695 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan + Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6068282 | 35776295 | 100,000,000 | 99,792,427 | 99,622,500 | 99,622,500 | 99,567,000 | 99,567,000 | 0 | 99,567,000 | 2022-07-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 377,500 | 0.38 % | |
696 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Taal Jarau - Sp. Baru/Tampang Kec. Sungai Raya (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6069282 | 35776339 | 100,000,000 | 99,792,427 | 99,205,140 | 99,205,140 | 99,123,000 | 99,123,000 | 0 | 99,123,000 | 2022-06-27 | cv.mitra talenta prima | 02.746.658.0-733.000 | 794,860 | 0.79 % | |
697 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Bago Tanggul - Teratai Kec. Kalumpang (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6070282 | 35776119 | 75,000,000 | 74,994,561 | 74,794,575 | 74,794,575 | 74,725,200 | 74,725,200 | 0 | 74,725,200 | 2022-06-28 | CV. CITRA MULIA CONSULTANT | 92.966.672.5-733.000 | 205,425 | 0.27 % | |
698 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Tabihi-Telaga Langsat Kec. Padang Batung/ Telaga Langsat (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6071282 | 35776277 | 100,000,000 | 99,792,427 | 99,185,160 | 99,185,160 | 99,111,000 | 99,111,000 | 0 | 99,111,000 | 2022-06-24 | cv.mitra talenta prima | 02.746.658.0-733.000 | 814,840 | 0.81 % | |
699 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran Jalan Bakarung - Rantauan Kec. Kandangan/ Angkinang (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6073282 | 35775656 | 100,000,000 | 99,792,427 | 98,246,100 | 98,246,100 | 98,198,000 | 98,198,000 | 0 | 98,198,000 | 2022-06-17 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,753,900 | 1.75 % | |
700 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan Panjampang Bahagia - Hanau Kec. Simpur (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6074282 | 35776243 | 100,000,000 | 99,792,427 | 99,678,000 | 99,678,000 | 99,666,000 | 99,666,000 | 0 | 99,666,000 | 2022-06-14 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 322,000 | 0.32 % | |
701 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Jl. Siang Gantung - Ds. Baru Kec. Daha Barat (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6075282 | 35776133 | 100,000,000 | 99,792,427 | 99,518,160 | 99,518,160 | 99,456,000 | 99,456,000 | 0 | 99,456,000 | 2022-06-28 | CV. CITRA MULIA CONSULTANT | 92.966.672.5-733.000 | 481,840 | 0.48 % | |
702 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pemeliharaan berkala/Rehabilitasi Jalan + Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Sungai Damang - Amawang Kiri Kec. Kandangan (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6076282 | 35776411 | 100,000,000 | 99,792,427 | 99,655,800 | 99,655,800 | 99,616,000 | 99,616,000 | 0 | 99,616,000 | 2022-06-14 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 344,200 | 0.34 % | |
703 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rekonstruksi/Peningkatan Kapasitas Struktur Jalan Paharuangan - Sei. Raya Selatan Kec. Sungai Raya (DAK Reguler) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6077282 | 35775713 | 100,000,000 | 99,792,427 | 99,527,484 | 99,527,484 | 99,456,000 | 99,456,000 | 0 | 99,456,000 | 2022-06-21 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 472,516 | 0.47 % | |
704 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet (jamban) beserta sanitasinya TK AISYIYAH BUSTANUL ATHFAL 3 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6078282 | 35198272 | 123,316,500 | 123,300,558 | 122,839,010 | 122,839,010 | 122,739,000 | 122,739,000 | 0 | 122,739,000 | 2022-06-03 | CV. CHAI CHEL | 03.063.051.1-731.000 | 477,490 | 0.39 % | |
705 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Los Batu Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6079282 | 32563351 | 13,860,000 | 13,859,904 | 13,836,150 | 13,836,150 | 13,819,500 | 13,819,500 | 100 | 13,819,500 | 2022-05-20 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 23,850 | 0.17 % | |
706 | 2022 | Dinas Ketahanan Pangan | Belanja Gabah untuk Pengisian Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 6080282 | 35812289 | 207,200,500 | 199,231,250 | 199,071,865 | 199,071,865 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-05-27 | CV.DITA | 02.242.686.0-733.000 | 8,128,635 | 3.92 % | |
707 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Mal Pelayanan Publik Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6081282 | 35798263 | 200,000,000 | 199,994,776 | 199,697,080 | 199,697,080 | 199,599,000 | 199,599,000 | 199,599,000 | 199,599,000 | 2022-05-19 | CV. KHALIF | 81.540.809.1-733.000 | 302,920 | 0.15 % | |
708 | 2022 | Kecamatan Daha Utara | Pemeliharaan/Rehab Gedung Kantor Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6082282 | 32099466 | 168,700,000 | 168,691,000 | 168,489,061 | 168,489,061 | 168,350,000 | 168,350,000 | 168,350,000 | 168,350,000 | 2022-05-20 | FADWI UTAMA | 94.246.044.5-733.000 | 210,939 | 0.13 % | |
709 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Pengawas Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6083282 | 32098025 | 16,870,000 | 16,860,000 | 16,777,650 | 16,777,650 | 16,650,000 | 16,650,000 | 16,650,000 | 16,650,000 | 2022-05-20 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 92,350 | 0.55 % | |
710 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Pembangunan (Samping Dispera KPLH) Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6090282 | 31933457 | 185,000,000 | 184,583,980 | 184,390,042 | 184,390,042 | 184,250,000 | 184,250,000 | 184,250,000 | 184,250,000 | 2022-06-03 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 609,958 | 0.33 % | |
711 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Telaga Bangkal Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6091282 | 31456836 | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,846,800 | 19,846,800 | 19,846,800 | 19,846,800 | 2022-06-23 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 114,350 | 0.57 % | |
712 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN SAMUDA 1 (DAK) dan Pembangunan ruang UKS SDN SAMUDA 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6093282 | 35822075 | 198,000,000 | 197,974,191 | 196,949,660 | 196,949,660 | 196,921,000 | 196,921,000 | 0 | 196,921,000 | 2022-05-31 | CV. ADHI KARYA MANDIRI | 31.725.819.2-731.000 | 1,050,340 | 0.53 % | |
713 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab ruang UKS rusak ringan SDN SUNGAI HANYAR (DAK) dan Rehab perpustakaan rusak ringan SDN SUNGAI HANYAR (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6094282 | 35822076 | 169,000,000 | 168,988,995 | 168,961,245 | 168,961,245 | 168,747,000 | 168,747,000 | 0 | 168,747,000 | 2022-06-21 | cv.cahayaanugerah | 80.015.259.7-731.000 | 38,755 | 0.02 % | |
714 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Laboratorium IPA SMPN 2 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6095282 | 31634366 | 148,000,000 | 147,988,522 | 147,877,522 | 147,877,522 | 147,656,000 | 147,656,000 | 147,656,000 | 147,656,000 | 2022-06-08 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 122,478 | 0.08 % | |
715 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Padang Karawat Desa Amawang Kiri Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6096282 | 31732101 | 178,000,000 | 177,598,066 | 177,165,166 | 177,165,166 | 177,050,000 | 177,050,000 | 177,050,000 | 177,050,000 | 2022-06-08 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 834,834 | 0.47 % | |
716 | 2022 | Kecamatan Daha Utara | Belanja Jasa Konsultasi Perencanaan Rehab Lapangan Tenis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6097282 | 32097348 | 11,000,000 | 10,979,000 | 10,896,179 | 10,896,179 | 10,800,000 | 10,800,000 | 10,800,000 | 10,800,000 | 2022-05-24 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 103,821 | 0.94 % | |
717 | 2022 | Dinas Pertanian | Belanja Bahan-Bahan/Bibit Ternak/Bibit Ikan | Pengadaan Langsung | Pengadaan Barang | 6098282 | 32037394 | 172,500,000 | 165,757,000 | 165,670,000 | 165,670,000 | 165,570,000 | 165,570,000 | 100 | 165,570,000 | 2022-05-30 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 6,830,000 | 3.96 % | |
718 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Mesin Pencacah Ranting,Belanja Modal Mesin Pencacah Kayu | Pengadaan Langsung | Pengadaan Barang | 6099282 | 35686250;35686502 | 80,000,000 | 79,997,700 | 79,870,050 | 79,870,050 | 79,800,000 | 79,800,000 | 23,940,000 | 79,800,000 | 2022-05-31 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 129,950 | 0.16 % | |
719 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Fungsi Hutan Kota untuk Fungsi Taman dan Pendidikan | Pengadaan Langsung | Pekerjaan Konstruksi | 6100282 | 31837114 | 180,000,000 | 179,917,145 | 179,706,216 | 179,706,216 | 179,600,000 | 179,600,000 | 179,600,000 | 179,600,000 | 2022-05-25 | CV. AISY | 75.132.070.6-733.000 | 293,784 | 0.16 % | |
720 | 2022 | Kecamatan Daha Utara | Jasa Konsultansi Perencanaan Rehab Taman Rahimin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6102282 | 32100511 | 13,480,000 | 13,474,000 | 13,397,700 | 13,397,700 | 13,300,000 | 13,300,000 | 13,300,000 | 13,300,000 | 2022-05-24 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 82,300 | 0.61 % | |
721 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan-Bahan Kimia | Pengadaan Langsung | Pengadaan Barang | 6104282 | 32402724 | 154,348,200 | 153,883,960 | 153,654,000 | 153,654,000 | 153,600,000 | 153,600,000 | 153,600,000 | 153,600,000 | 2022-05-25 | FADWI UTAMA | 94.246.044.5-733.000 | 694,200 | 0.45 % | |
722 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Taal Kec. Sungai Raya (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6105282 | 34748961 | 52,000,000 | 51,837,000 | 51,726,000 | 51,726,000 | 51,659,400 | 51,659,400 | 51,659,400 | 51,659,400 | 2022-06-06 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 274,000 | 0.53 % | |
723 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan TPU Gambah | Pengadaan Langsung | Pekerjaan Konstruksi | 6106282 | 31835383 | 180,000,000 | 169,441,706 | 168,427,368 | 168,427,368 | 168,350,000 | 168,350,000 | 168,350,000 | 168,350,000 | 2022-05-25 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 11,572,632 | 6.43 % | |
724 | 2022 | Kecamatan Simpur | Konsultan Perencanaan Rehab Ringan Rumah Jabatan Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6107282 | 35841440 | 12,500,000 | 12,444,000 | 12,333,296 | 12,333,296 | 12,250,000 | 12,250,000 | 12,250,000 | 12,250,000 | 2022-05-25 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 166,704 | 1.33 % | |
725 | 2022 | Dinas Pertanian | Pembangunan /Rehab Jalan Usaha Tani Poktan Lok Nyiur Desa Bamban Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6108282 | 32060326 | 122,375,000 | 122,321,000 | 122,235,309 | 122,235,309 | 122,127,000 | 122,127,000 | 100 | 122,127,000 | 2022-05-27 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 139,691 | 0.11 % | |
726 | 2022 | Dinas Pertanian | Pembangunan /Rehab Jalan Usaha Tani Poktan Neng Wang Sakarti Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6109282 | 32060309 | 123,200,000 | 123,115,000 | 123,098,156 | 123,098,156 | 122,993,800 | 122,993,800 | 100 | 122,993,800 | 2022-05-27 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 101,844 | 0.08 % | |
727 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Balimau | Pengadaan Langsung | Pekerjaan Konstruksi | 6110282 | 31650054 | 70,000,000 | 69,995,562 | 69,797,136 | 69,797,136 | 69,697,000 | 69,697,000 | 69,697,000 | 69,697,000 | 2022-06-08 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 202,864 | 0.29 % | |
728 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bamban Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6111282 | 31650076 | 100,000,000 | 99,973,196 | 99,864,628 | 99,864,628 | 99,820,000 | 99,820,000 | 0 | 99,820,000 | 2022-05-27 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 135,372 | 0.14 % | |
729 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 6112282 | 31650088 | 90,000,000 | 89,993,959 | 89,897,521 | 89,897,521 | 89,771,000 | 89,771,000 | 0 | 89,771,000 | 2022-05-31 | cv.agung perkasa | 02.475.425.1-735.000 | 102,479 | 0.11 % | |
730 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Kapuh Darat | Pengadaan Langsung | Pekerjaan Konstruksi | 6113282 | 31650084 | 100,000,000 | 99,995,658 | 99,835,710 | 99,835,710 | 99,735,000 | 99,735,000 | 99,735,000 | 99,735,000 | 2022-07-06 | CV RIZKY BANUA | 02.089.856.5-733.000 | 164,290 | 0.16 % | |
731 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Pandulangan 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6114282 | 31650074 | 70,000,000 | 69,998,669 | 69,654,199 | 69,654,199 | 69,575,000 | 69,575,000 | 0 | 69,575,000 | 2022-05-30 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 345,801 | 0.49 % | |
732 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6115282 | 31634643 | 114,600,000 | 114,238,497 | 114,141,306 | 114,141,306 | 114,021,000 | 114,021,000 | 0 | 114,021,000 | 2022-05-31 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 458,694 | 0.4 % | |
733 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6116282 | 32147132 | 15,000,000 | 15,000,000 | 14,907,300 | 14,907,300 | 14,851,800 | 14,851,800 | 0 | 14,851,800 | 2022-05-25 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 92,700 | 0.62 % | |
734 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Banyu Barau Kel. Kandangan Barat dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bangkau RT.04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6118282 | 35729970 | 35,000,000 | 35,000,000 | 34,750,000 | 34,750,000 | 34,632,000 | 34,632,000 | 34,632,000 | 34,632,000 | 2022-06-16 | Wiyasa Drawana | 80.902.072.0-731.000 | 250,000 | 0.71 % | |
735 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab WC dan Rehab Ruang Kantor/ Guru SDN Mawangi | Pengadaan Langsung | Pekerjaan Konstruksi | 6119282 | 35861023 | 147,000,000 | 146,842,040 | 146,700,160 | 146,700,160 | 146,141,000 | 146,141,000 | 0 | 146,141,000 | 2022-06-03 | CV. MEGA BUANA SAKTI | 02.324.986.3-733.000 | 299,840 | 0.2 % | |
736 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan perpustakaan beserta perabotnya SDN MUARA ULANG 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6120282 | 35056603 | 195,885,450 | 195,260,426 | 194,462,320 | 194,462,320 | 194,362,000 | 194,362,000 | 0 | 194,362,000 | 2022-06-13 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 1,423,130 | 0.73 % | |
737 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang UKS SDN LOKLAHONG (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6121282 | 35059428 | 80,000,000 | 79,936,635 | 79,831,282 | 79,831,282 | 79,731,000 | 79,731,000 | 0 | 79,731,000 | 2022-06-17 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 168,718 | 0.21 % | |
738 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN MURUNG RAYA (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6122282 | 35057794 | 101,250,000 | 101,212,327 | 100,884,818 | 100,884,818 | 100,812,000 | 100,812,000 | 0 | 100,812,000 | 2022-06-06 | Rangga Borneo Perkasa | 96.727.714.6-731.000 | 365,182 | 0.36 % | |
739 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Sarang Halang Padang | Pengadaan Langsung | Pekerjaan Konstruksi | 6123282 | 31650090 | 50,000,000 | 49,990,896 | 49,929,846 | 49,929,846 | 49,846,000 | 49,846,000 | 0 | 49,846,000 | 2022-05-30 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 70,154 | 0.14 % | |
740 | 2022 | Dinas Kesehatan | Belanja Jasa yang Diberikan kepada Pihak Ketiga/Pihak Lain ( Pengelolaan Kesehatan Lingkungan ) | Pengadaan Langsung | Jasa Lainnya | 6124282 | 34665269 | 251,955,000 | 192,661,590 | 192,661,590 | 192,661,590 | 192,537,000 | 192,537,000 | 192,537,000 | 192,537,000 | 2022-05-31 | PT.TRANSWASTE MODA INDONESIA | 82.924.130.6-013.000 | 59,293,410 | 23.53 % | |
741 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6125282 | 35721966 | 62,874,000 | 62,874,000 | 62,748,300 | 62,748,300 | 62,662,000 | 62,662,000 | 62,662,000 | 62,662,000 | 2022-05-31 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 125,700 | 0.2 % | |
742 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kortalan Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6126282 | 31456929 | 20,000,000 | 20,000,000 | 19,855,680 | 19,855,680 | 19,780,200 | 19,780,200 | 19,780,200 | 19,780,200 | 2022-06-23 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 144,320 | 0.72 % | |
743 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Katilang Desa Bago tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6127282 | 31457004 | 19,056,000 | 19,056,000 | 19,000,678 | 19,000,678 | 18,914,400 | 18,914,400 | 18,914,400 | 18,914,400 | 2022-06-23 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 55,322 | 0.29 % | |
744 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Hulu Banyu Kec. Loksado dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Belakang Posyandu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6128282 | 35679758 | 29,000,000 | 29,000,000 | 28,802,420 | 28,802,420 | 28,682,400 | 28,682,400 | 28,682,400 | 28,682,400 | 2022-06-24 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 197,580 | 0.68 % | |
745 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec.Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6129282 | 31456890 | 19,000,000 | 19,000,000 | 18,825,045 | 18,825,045 | 18,759,000 | 18,759,000 | 18,759,000 | 18,759,000 | 2022-06-23 | cv.airlangga konsultan | 03.122.016.3-732.000 | 174,955 | 0.92 % | |
746 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6130282 | 35670779 | 10,000,000 | 10,000,000 | 9,930,060 | 9,930,060 | 9,850,000 | 9,850,000 | 9,850,000 | 9,850,000 | 2022-06-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 69,940 | 0.7 % | |
747 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya -- Pembangunan Tempat Parkir Alat Beratr | Pengadaan Langsung | Pekerjaan Konstruksi | 6131282 | 32562697 | 80,000,000 | 79,999,009 | 79,902,444 | 79,902,444 | 79,850,000 | 79,850,000 | 79,850,000 | 79,850,000 | 2022-06-08 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 97,556 | 0.12 % | |
748 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya -- Pembangunan Tempat Daur Ulang (PDU) | Pengadaan Langsung | Pekerjaan Konstruksi | 6132282 | 32562333 | 150,000,000 | 149,990,623 | 149,789,231 | 149,789,231 | 149,700,000 | 149,700,000 | 149,700,000 | 149,700,000 | 2022-06-10 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 210,769 | 0.14 % | |
749 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang UKS dan Pembangunan toilet WC SDN BAKARUNG SELATAN 1 (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6133282 | 35881357 | 190,000,000 | 189,959,286 | 189,781,694 | 189,781,694 | 189,572,000 | 189,572,000 | 0 | 189,572,000 | 2022-06-07 | P B B | 01.145.832.0-733.000 | 218,306 | 0.11 % | |
750 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru dan Kepala Sekolah TK NEGERI PEMBINA Simpur (DAK),Pembangunan Ruang UKS TK NEGERI PEMBINA Simpur (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6136282 | 35198230;35198357 | 197,000,000 | 196,964,888 | 196,350,548 | 196,350,548 | 193,608,000 | 193,608,000 | 0 | 193,608,000 | 2022-06-27 | CV. ANANDA NUSANTARA | 76.249.348.4-735.000 | 649,452 | 0.33 % | |
751 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Pagar SDN Kandangan Barat 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6137282 | 31650041 | 17,050,000 | 17,019,902 | 17,006,421 | 17,006,421 | 16,949,700 | 16,949,700 | 0 | 16,949,700 | 2022-05-31 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 43,579 | 0.26 % | |
752 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan toilet WC SDN PANDAN SARI (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 6138282 | 35057686 | 101,250,000 | 101,247,355 | 100,984,403 | 100,984,403 | 100,886,000 | 100,886,000 | 0 | 100,886,000 | 2022-05-31 | CV. CHAI CHEL | 03.063.051.1-731.000 | 265,597 | 0.26 % | |
753 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Rumah Dinas Jl. Aluh Idut | Pengadaan Langsung | Pekerjaan Konstruksi | 6139282 | 35899180 | 200,000,000 | 199,961,149 | 199,657,837 | 199,657,837 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2022-06-04 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 342,163 | 0.17 % | |
754 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Pondok nginap Pesantren Abdul Karim Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6140282 | 31633001 | 12,985,000 | 12,862,680 | 12,715,050 | 12,715,050 | 12,654,000 | 12,654,000 | 12,654,000 | 12,654,000 | 2022-06-02 | cv.akmalindo | 02.531.482.4-731.000 | 269,950 | 2.08 % | |
755 | 2022 | RSUD Brigjen H. Hasan Basry | Rehab Selasar Antar Bangunan | Pengadaan Langsung | Pekerjaan Konstruksi | 6141282 | 35899243 | 200,000,000 | 199,954,264 | 199,669,971 | 199,669,971 | 199,250,000 | 199,250,000 | 199,250,000 | 199,250,000 | 2022-06-04 | CV. KHALIF | 81.540.809.1-733.000 | 330,029 | 0.17 % | |
756 | 2022 | RSUD Brigjen H. Hasan Basry | Pembuatan Jalan Paving menuju IPAL | Pengadaan Langsung | Pekerjaan Konstruksi | 6142282 | 35899291 | 200,000,000 | 199,908,007 | 199,551,148 | 199,551,148 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2022-06-04 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 448,852 | 0.22 % | |
757 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Kandangan Barat 5 | Pengadaan Langsung | Pekerjaan Konstruksi | 6143282 | 31650104 | 172,000,000 | 171,999,522 | 171,831,599 | 171,831,599 | 171,705,000 | 171,705,000 | 0 | 171,705,000 | 2022-06-14 | CV. DEWI KUNTI | 02.242.675.3-733.000 | 168,401 | 0.1 % | |
758 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Kegiatan Pembuatan/Peningkatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 05 Desa Pihanin Raya Kec. Daha Selatan,Pengawasan Konsultan Kegiatan Pembuatan/Peningkatan PSU Permukiman Titian RT. 01 Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6144282 | 31933389 | 14,100,000 | 13,853,688 | 13,830,600 | 13,830,600 | 13,750,000 | 13,750,000 | 13,750,000 | 13,750,000 | 2022-06-07 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 269,400 | 1.91 % | |
759 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Jarau Kec. Sungai Raya (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6145282 | 34715923 | 35,000,000 | 34,798,500 | 34,676,400 | 34,676,400 | 34,576,500 | 34,576,500 | 34,576,500 | 34,576,500 | 2022-06-21 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 323,600 | 0.92 % | |
760 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Kegiatan Pencegahan Perumahan dan Kawasan Permukiman Kumuh pad Daerah Kabupaten/Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6146282 | 31933404 | 44,800,000 | 29,268,591 | 29,193,000 | 29,193,000 | 29,100,000 | 29,100,000 | 29,100,000 | 29,100,000 | 2022-06-07 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 15,607,000 | 34.84 % | |
761 | 2022 | Dinas Pertanian | Pembangunan/Rehab Jaringan Irigasi Tersier (RJIT) Gapoktan Amban Basirang Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 6147282 | 32060298 | 199,950,000 | 199,935,250 | 199,738,092 | 199,738,092 | 199,591,900 | 199,591,900 | 100 | 199,591,900 | 2022-06-03 | RIKA JAYA, CV | 01.424.626.8-733.000 | 211,908 | 0.11 % | |
762 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Pagar SD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6149282 | 31650036 | 30,000,000 | 29,942,318 | 29,860,554 | 29,860,554 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2022-06-03 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 139,446 | 0.46 % | |
763 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas Sd | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6150282 | 31649983 | 91,876,500 | 91,712,159 | 91,661,358 | 91,661,358 | 91,597,200 | 91,597,200 | 91,597,200 | 91,597,200 | 2022-06-03 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 215,142 | 0.23 % | |
764 | 2022 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Modal Aset Tetap Dalam Renovasi - Pemasangan Paving Blok Halaman Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 6151282 | 31980455 | 195,950,000 | 180,000,000 | 179,859,670 | 179,859,670 | 179,859,600 | 179,859,600 | 179,859,600 | 179,859,600 | 2022-06-03 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 16,090,330 | 8.21 % | |
765 | 2022 | Dinas Pertanian | Pengawasan RJIT dan JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6152282 | 32060293 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,702,500 | 19,702,500 | 100 | 19,702,500 | 2022-06-03 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 242,000 | 1.21 % | |
766 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Pamujaan Kec. Simpur (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6153282 | 34748586 | 45,000,000 | 44,871,750 | 44,738,550 | 44,738,550 | 44,688,600 | 44,688,600 | 44,688,600 | 44,688,600 | 2022-06-06 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 261,450 | 0.58 % | |
767 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelaksanaan Kegiatan EPaksi (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6154282 | 35738797 | 100,000,000 | 99,938,850 | 99,833,400 | 99,833,400 | 99,744,600 | 99,744,600 | 99,744,600 | 99,744,600 | 2022-06-06 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 166,600 | 0.17 % | |
768 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Biopori (9Sekolah Adiwiyata x 3 titik),Pengadaan Komposter An Aerob Lengkap untuk Sekolah Adiwiyata,Pengadaan tanaman peneduh untuk sekolah Adiwiyata | Pengadaan Langsung | Pengadaan Barang | 6155282 | 32395208 | 111,303,000 | 89,440,000 | 88,999,000 | 88,999,000 | 88,900,000 | 88,900,000 | 88,900,000 | 88,900,000 | 2022-06-10 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 22,304,000 | 20.04 % | |
769 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6156282 | 32562451 | 175,000,000 | 174,975,516 | 174,681,660 | 174,681,660 | 174,443,500 | 174,443,500 | 174,443,500 | 174,443,500 | 2022-06-13 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 318,340 | 0.18 % | |
770 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6157282 | 32563335 | 12,250,000 | 12,249,960 | 12,232,200 | 12,232,200 | 12,210,000 | 12,210,000 | 12,210,000 | 12,210,000 | 2022-06-14 | cv. vertical project | 03.169.392.2-734.000 | 17,800 | 0.15 % | |
771 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan Jalan Stadion 2 Desember Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6158282 | 35397562 | 100,000,000 | 99,792,427 | 98,892,120 | 98,892,120 | 98,864,370 | 98,864,370 | 98,864,370 | 98,864,370 | 2022-07-18 | cv.mitra talenta prima | 02.746.658.0-733.000 | 1,107,880 | 1.11 % | |
772 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kantor/ Guru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6159282 | 31649643 | 15,300,000 | 15,089,265 | 15,057,372 | 15,057,372 | 14,985,000 | 14,985,000 | 14,985,000 | 14,985,000 | 2022-06-07 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 242,628 | 1.59 % | |
773 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sarana Prasaran dan Utilitas Sd,Pengawasan Pembangunan Halaman SDN Sungai Pinang 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6160282 | 31649769 | 26,600,000 | 26,582,699 | 26,437,980 | 26,437,980 | 26,362,500 | 26,362,500 | 26,362,500 | 26,362,500 | 2022-06-07 | Wing Rastafarindo | 03.282.590.3-732.000 | 162,020 | 0.61 % | |
774 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultansi Pengawasan Peningkatan Fungsi Hutan Kota untuk Fungsi Taman dan Pendidikan,Belanja Konsultansi Pengawasan Peningkatan TPU Gambah,Belanja Konsultansi Pengawasan Peningkatan Hiasan Jembatan Antaludin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6161282 | 31834337 | 22,058,900 | 21,845,466 | 21,744,900 | 21,744,900 | 21,650,000 | 21,650,000 | 21,650,000 | 21,650,000 | 2022-06-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 314,000 | 1.42 % | |
775 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Jambu Hulu, Rehab WC SDN Jambu Hulu dan Pembangunan Pagar SDN Jambu Hulu Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6162282 | 35367103 | 195,000,000 | 194,877,644 | 193,726,566 | 193,726,566 | 193,637,000 | 193,637,000 | 193,637,000 | 193,637,000 | 2022-07-06 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,273,434 | 0.65 % | |
776 | 2022 | Dinas Ketahanan Pangan | Pembangunan Lantai Jemur Desa Badaun Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6163282 | 32068155 | 154,100,000 | 154,100,000 | 153,929,554 | 153,929,554 | 153,800,000 | 153,800,000 | 100 | 153,800,000 | 2022-08-19 | CV. SHINTA | 01.124.041.3-733.000 | 170,446 | 0.11 % | |
777 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Hamalau 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6165282 | 31650059 | 96,000,000 | 95,989,486 | 95,922,222 | 95,922,222 | 95,877,000 | 95,877,000 | 95,877,000 | 95,877,000 | 2022-08-24 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 77,778 | 0.08 % | |
778 | 2022 | Dinas Kesehatan | Rehabilitasi Pustu Pantai Ulin | Pengadaan Langsung | Pekerjaan Konstruksi | 6167282 | 32400024 | 175,000,000 | 174,593,619 | 174,284,516 | 174,284,516 | 174,000,000 | 174,000,000 | 174,000,000 | 174,000,000 | 2022-06-24 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 715,484 | 0.41 % | |
779 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 6170282 | 32633442 | 185,000,000 | 184,991,896 | 184,801,717 | 184,801,717 | 184,000,000 | 184,000,000 | 184,000,000 | 184,000,000 | 2022-06-24 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 198,283 | 0.11 % | |
780 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Gapoktan Bahagia dan Poktan Buntit (2 Unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6171282 | 32061930 | 150,000,000 | 149,960,800 | 149,606,526 | 149,606,526 | 149,440,000 | 149,440,000 | 149,440,000 | 149,440,000 | 2022-06-15 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 393,474 | 0.26 % | |
781 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Amparaya | Pengadaan Langsung | Pekerjaan Konstruksi | 6172282 | 32378797 | 150,000,000 | 149,999,611 | 149,827,886 | 149,827,886 | 149,250,000 | 149,250,000 | 149,250,000 | 149,250,000 | 2022-06-24 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 172,114 | 0.11 % | |
782 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6173282 | 32380519 | 185,000,000 | 184,988,356 | 184,803,847 | 184,803,847 | 184,500,000 | 184,500,000 | 184,500,000 | 184,500,000 | 2022-06-23 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 196,153 | 0.11 % | |
783 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6174282 | 32378505 | 80,000,000 | 80,000,000 | 79,696,857 | 79,696,857 | 79,500,000 | 79,500,000 | 79,500,000 | 79,500,000 | 2022-06-19 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 303,143 | 0.38 % | |
784 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6175282 | 32442533 | 89,000,000 | 89,000,000 | 88,683,450 | 88,683,450 | 88,500,000 | 88,500,000 | 88,500,000 | 88,500,000 | 2022-06-19 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 316,550 | 0.36 % | |
785 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Lingkungan Teluk Mesjid - Muara Banta Segmen I, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6176282 | 31592325 | 18,000,000 | 18,000,000 | 17,937,600 | 17,937,600 | 17,871,000 | 17,871,000 | 0 | 17,871,000 | 2022-06-09 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 62,400 | 0.35 % | |
786 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Poktan Mufakat dan Poktan Rasau Bakti (2 Unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6177282 | 36002557 | 150,000,000 | 149,960,800 | 149,926,725 | 149,926,725 | 149,815,700 | 149,815,700 | 149,815,700 | 149,815,700 | 2022-06-15 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 73,275 | 0.05 % | |
787 | 2022 | Dinas Pertanian | Pembangunan Pondok Pertemuan Poktan Kacipak dan Poktan Kalampaian (2 unit) | Pengadaan Langsung | Pekerjaan Konstruksi | 6178282 | 36002547 | 150,000,000 | 149,960,800 | 149,794,500 | 149,794,500 | 149,716,800 | 149,716,800 | 149,716,800 | 149,716,800 | 2022-06-13 | FADWI UTAMA | 94.246.044.5-733.000 | 205,500 | 0.14 % | |
788 | 2022 | Dinas Pertanian | Pembangunan Sumur Bor Poktan Suka Maju Ds Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6179282 | 32061915 | 200,000,000 | 199,910,000 | 199,525,260 | 199,525,260 | 198,887,000 | 198,887,000 | 198,887,000 | 198,887,000 | 2022-06-13 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 474,740 | 0.24 % | |
789 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Perpustakaan SDN Amawang Kiri Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6183282 | 31649604 | 114,000,000 | 113,996,926 | 113,900,362 | 113,900,362 | 113,662,000 | 113,662,000 | 0 | 113,662,000 | 2022-06-16 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,638 | 0.09 % | |
790 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Total Perpustakaan SDN Jambu Hilir 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6184282 | 31649608 | 105,000,000 | 104,914,634 | 104,104,999 | 104,104,999 | 103,616,000 | 103,616,000 | 0 | 103,616,000 | 2022-06-20 | CV. Cipta Pratama | 02.089.736.9-733.000 | 895,001 | 0.85 % | |
791 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Gambah Walangku | Pengadaan Langsung | Pekerjaan Konstruksi | 6185282 | 31649988 | 190,900,000 | 190,826,387 | 190,199,163 | 190,199,163 | 190,032,000 | 190,032,000 | 0 | 190,032,000 | 2022-06-20 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 700,837 | 0.37 % | |
792 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kandangan Kota 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6186282 | 31649978 | 100,000,000 | 99,993,484 | 99,805,388 | 99,805,388 | 99,708,000 | 99,708,000 | 99,708,000 | 99,708,000 | 2022-06-29 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 194,612 | 0.19 % | |
793 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Seranggan 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6187282 | 31649944 | 90,000,000 | 89,995,332 | 89,524,592 | 89,524,592 | 89,461,000 | 89,461,000 | 0 | 89,461,000 | 2022-06-22 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 475,408 | 0.53 % | |
794 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Tamiang | Pengadaan Langsung | Pekerjaan Konstruksi | 6188282 | 31649941 | 90,000,000 | 89,980,100 | 89,867,591 | 89,867,591 | 89,767,000 | 89,767,000 | 0 | 89,767,000 | 2022-06-21 | CV. CHAI CHEL | 03.063.051.1-731.000 | 132,409 | 0.15 % | |
795 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Teluk Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6189282 | 31649938 | 93,000,000 | 92,994,181 | 92,884,857 | 92,884,857 | 92,784,000 | 92,784,000 | 0 | 92,784,000 | 2022-06-21 | CV. BERINGIN JAYA | 01.110.797.6-732.000 | 115,143 | 0.12 % | |
796 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Sungai Kali 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 6190282 | 31649763 | 50,000,000 | 49,997,932 | 49,768,350 | 49,768,350 | 49,536,000 | 49,536,000 | 0 | 49,536,000 | 2022-06-20 | cv.empat saudara | 02.243.056.5-735.000 | 231,650 | 0.46 % | |
797 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Wc SDN Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 6191282 | 31649756 | 50,000,000 | 49,957,764 | 49,588,541 | 49,588,541 | 49,089,000 | 49,089,000 | 0 | 49,089,000 | 2022-06-22 | CV. SHINTA | 01.124.041.3-733.000 | 411,459 | 0.82 % | |
798 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6192282 | 32563306 | 12,950,000 | 12,949,982 | 12,920,400 | 12,920,400 | 12,876,000 | 12,876,000 | 12,876,000 | 12,876,000 | 2022-06-15 | cv. vertical project | 03.169.392.2-734.000 | 29,600 | 0.23 % | |
799 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6193282 | 32563023 | 13,965,000 | 13,964,910 | 13,947,150 | 13,947,150 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-07-15 | CV PUTRAKASUMA ENGINEERING | 91.014.583.8-732.000 | 17,850 | 0.13 % | |
800 | 2022 | Dinas Perdagangan | Pengawasan Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6194282 | 32563388 | 13,825,000 | 13,824,995 | 13,797,300 | 13,797,300 | 13,708,500 | 13,708,500 | 13,708,500 | 13,708,500 | 2022-07-15 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 27,700 | 0.2 % | |
801 | 2022 | Dinas Perdagangan | Pengawasan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6195282 | 32563386 | 13,912,500 | 13,912,463 | 13,836,150 | 13,836,150 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 2022-06-22 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 76,350 | 0.55 % | |
802 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Los Amandit Lantai II Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6196282 | 32563341 | 14,000,000 | 13,999,986 | 13,830,600 | 13,830,600 | 13,819,500 | 13,819,500 | 13,819,500 | 13,819,500 | 2022-08-30 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 169,400 | 1.21 % | |
803 | 2022 | Dinas Perdagangan | Pengawasan Rehab Bak Iwak Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6197282 | 32563357 | 12,950,000 | 12,949,926 | 12,942,600 | 12,942,600 | 12,931,500 | 12,931,500 | 12,931,500 | 12,931,500 | 2022-08-19 | CV. JAYA UTAMA KONSULTAN | 02.050.857.8-731.000 | 7,400 | 0.06 % | |
804 | 2022 | Dinas Pertanian | Pengawasan Pembangunan Pondok Pertemuan dan Sumur Bor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6198282 | 36016990 | 35,000,000 | 34,999,965 | 34,909,500 | 34,909,500 | 34,854,000 | 34,854,000 | 34,854,000 | 34,854,000 | 2022-06-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 90,500 | 0.26 % | |
805 | 2022 | Dinas Pendidikan dan Kebudayaan | KONSULTAN PENGAWASAN DAK (Kandangan,Angkinang,Loksado,Sungai Raya) DAK,KONSULTAN PENGAWASAN DAK ( Daha Selatan,Daha Utara) DAK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6199282 | 35058984;35059092 | 94,275,550 | 94,254,374 | 94,203,480 | 94,203,480 | 94,128,000 | 94,128,000 | 94,128,000 | 94,128,000 | 2022-06-13 | Wing Rastafarindo | 03.282.590.3-732.000 | 72,070 | 0.08 % | |
806 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi IPAL dan Sanitasi Lingkungan Kawasan jalan Kesehatan dan Kawasan Mesjid Darul Khaliq Desa Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6203282 | 36025518 | 200,000,000 | 199,930,991 | 199,805,561 | 199,805,561 | 199,699,000 | 199,699,000 | 199,699,000 | 199,699,000 | 2022-06-13 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 194,439 | 0.1 % | |
807 | 2022 | Dinas Perdagangan | Pekerjaan Rehab Pasar Arba Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6205282 | 32562199 | 198,750,000 | 198,749,383 | 198,685,003 | 198,685,003 | 198,518,500 | 198,518,500 | 198,518,500 | 198,518,500 | 2022-06-22 | CV.DITA | 02.242.686.0-733.000 | 64,997 | 0.03 % | |
808 | 2022 | Dinas Ketahanan Pangan | Biaya Konsultasi Pengawasan Pembangunan Lantai Jemur Desa Badaun Kecamatan Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6206282 | 32068123 | 10,000,000 | 10,000,000 | 9,928,950 | 9,928,950 | 9,928,000 | 9,928,000 | 100 | 9,928,000 | 2022-08-27 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 71,050 | 0.71 % | |
809 | 2022 | Dinas Perdagangan | Pengawasan Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6207282 | 32563365 | 13,965,000 | 13,964,910 | 13,913,850 | 13,913,850 | 13,875,000 | 13,875,000 | 13,875,000 | 13,875,000 | 2022-07-15 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 51,150 | 0.37 % | |
810 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado,Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai 2 Kec. Loksado,Jasa Konsultansi Pengawasan Peningkatan Jl. Datar Belimbing Kec. Loksado,Jasa Konsultansi Pengawasan Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6209282 | 31562638 | 49,560,000 | 49,445,202 | 49,389,702 | 49,389,702 | 49,349,000 | 49,349,000 | 0 | 49,349,000 | 2022-07-01 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 170,298 | 0.34 % | |
811 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jl. Tungkaran Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Peninggian Jalan Desa Pantai Ulin Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6211282 | 31577432 | 58,800,000 | 58,716,378 | 58,608,000 | 58,608,000 | 58,585,000 | 58,585,000 | 0 | 58,585,000 | 2022-07-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 192,000 | 0.33 % | |
812 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Gg. Bidan Kec. Daha Utara (Lanjutan),Jasa Konsultansi Pengawasan Siring Pasangan Batu Jalan Balanti Kec. Kalumpang,Jasa Konsultansi Pengawasan Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6212282 | 31577309 | 64,190,000 | 64,011,963 | 63,984,213 | 63,984,213 | 63,963,000 | 63,963,000 | 0 | 63,963,000 | 2022-07-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 205,787 | 0.32 % | |
813 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Drainase Jl. Bakarung Tengah - Karang Jawa Desa Karang Jawa Kec. Padang Batung, Jl. Harapan Kel. Kandangan Barat Kec. Kandangan, Jalan HR Sukadani Desa Tabihi rt.03 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6213282 | 31576576 | 35,000,000 | 34,961,825 | 34,382,250 | 34,382,250 | 34,332,300 | 34,332,300 | 34,332,300 | 34,332,300 | 2022-07-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 617,750 | 1.77 % | |
814 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan Jembatan Gantung Lungau Kec. Kandangan,Jasa Konsultansi Pengawasan Perbaikan Jembatan di Desa Haratai Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6214282 | 31551904 | 14,600,000 | 14,557,874 | 14,504,370 | 14,504,370 | 14,463,300 | 14,463,300 | 0 | 14,463,300 | 2022-08-01 | CV. RANCANG BANUA NUSA | 94.427.536.1-736.000 | 95,630 | 0.66 % | |
815 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6217282 | 32562438 | 185,000,000 | 184,998,708 | 184,776,708 | 184,776,708 | 184,576,900 | 184,576,900 | 184,576,900 | 184,576,900 | 2022-06-15 | FADWI UTAMA | 94.246.044.5-733.000 | 223,292 | 0.12 % | |
816 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat,Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6219282 | 31577375 | 48,310,000 | 48,187,699 | 48,085,429 | 48,085,429 | 48,048,000 | 48,048,000 | 0 | 48,048,000 | 2022-07-05 | CV. DIAN GEMILANG KONSULINDO | 94.240.912.9-731.000 | 224,571 | 0.46 % | |
817 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Ruas Jl. Mondar Desa Ulin Kec. Simpur,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan),Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6220282 | 31577489 | 59,290,000 | 59,135,830 | 59,123,000 | 59,123,000 | 59,074,200 | 59,074,200 | 0 | 59,074,200 | 2022-07-13 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 167,000 | 0.28 % | |
818 | 2022 | Kecamatan Kandangan | Belanja Rehab Paving PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 6221282 | 32727377 | 75,850,000 | 40,002,000 | 39,817,803 | 39,817,803 | 39,750,000 | 39,750,000 | 39,750,000 | 39,750,000 | 2022-06-15 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 36,032,197 | 47.5 % | |
819 | 2022 | Kecamatan Kandangan | Belanja Modal Pengadaan Gedung PKK Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 6222282 | 32543239 | 199,500,000 | 199,494,273 | 199,396,970 | 199,396,970 | 199,250,000 | 199,250,000 | 0 | 199,250,000 | 2022-06-15 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 103,030 | 0.05 % | |
820 | 2022 | RSUD Brigjen H. Hasan Basry | Pemeliharaan Insenerator | Pengadaan Langsung | Pekerjaan Konstruksi | 6225282 | 36044295 | 200,000,000 | 199,611,656 | 199,436,447 | 199,436,447 | 198,500,000 | 198,500,000 | 198,500,000 | 198,500,000 | 2022-06-24 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 563,553 | 0.28 % | |
821 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Saluran Drainase Desa Baluti Kec. Kandangan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6226282 | 36056148 | 173,923,000 | 173,895,807 | 173,840,287 | 173,840,287 | 172,913,000 | 172,913,000 | 172,913,000 | 172,913,000 | 2022-06-29 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 82,713 | 0.05 % | |
822 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin jalan (Penanganan Longsor Desa Jelatang dan Desa Batu Laki Kec. Padang Batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 6227282 | 36056105 | 198,562,000 | 198,536,044 | 198,411,368 | 198,411,368 | 198,339,000 | 198,339,000 | 198,339,000 | 198,339,000 | 2022-07-09 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 150,632 | 0.08 % | |
823 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Penanganan Longsor Desa Hamak Timur, Desa Pandulangan, dan Desa Telaga Langsat Kec. Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6228282 | 36056193 | 171,722,000 | 171,697,833 | 171,588,930 | 171,588,930 | 171,471,000 | 171,471,000 | 171,471,000 | 171,471,000 | 2022-07-01 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 133,070 | 0.08 % | |
824 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Merdeka Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6229282 | 31592311 | 17,550,000 | 17,550,000 | 17,482,500 | 17,482,500 | 17,427,000 | 17,427,000 | 0 | 17,427,000 | 2022-06-22 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 67,500 | 0.38 % | |
825 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan (Perbaikan Jalan Desa Simpur Kec. Simpur) | Pengadaan Langsung | Pekerjaan Konstruksi | 6230282 | 36056213 | 183,197,000 | 183,171,552 | 183,109,409 | 183,109,409 | 182,193,000 | 182,193,000 | 182,193,000 | 182,193,000 | 2022-06-29 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 87,591 | 0.05 % | |
826 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab WC SDN Keramat Raya 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6231282 | 31649771 | 50,000,000 | 49,791,972 | 49,547,772 | 49,547,772 | 49,447,000 | 49,447,000 | 49,447,000 | 49,447,000 | 2022-06-16 | CV. LALUNA DANA | 02.237.179.3-733.000 | 452,228 | 0.9 % | |
827 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Pihanin 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6232282 | 31650081 | 110,000,000 | 109,952,464 | 109,662,742 | 109,662,742 | 109,654,000 | 109,654,000 | 109,654,000 | 109,654,000 | 2022-08-01 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 337,258 | 0.31 % | |
828 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Bayanan 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6233282 | 31650112 | 160,000,000 | 159,999,616 | 159,739,029 | 159,739,029 | 159,582,000 | 159,582,000 | 159,582,000 | 159,582,000 | 2022-06-29 | CV RAHMAT HIDAYAT | 01.434.944.3-733.000 | 260,971 | 0.16 % | |
829 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Peralatan Kerja Petugas Taman | Pengadaan Langsung | Pengadaan Barang | 6234282 | 31811730 | 80,000,000 | 79,494,000 | 79,359,000 | 79,359,000 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2022-06-20 | CV. KHALIF | 81.540.809.1-733.000 | 641,000 | 0.8 % | |
830 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6235282 | 31576635 | 185,300,000 | 185,199,906 | 184,812,993 | 184,812,993 | 184,684,000 | 184,684,000 | 184,684,000 | 184,684,000 | 2022-06-23 | CV.DITA | 02.242.686.0-733.000 | 487,007 | 0.26 % | |
831 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai 2 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6236282 | 35482820 | 195,000,000 | 194,964,701 | 193,033,895 | 193,033,895 | 193,033,000 | 193,033,000 | 193,033,000 | 193,033,000 | 2022-07-01 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 1,966,105 | 1.01 % | |
832 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Loklahung - Kamawakan Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6237282 | 35482525 | 175,000,000 | 174,975,520 | 174,787,457 | 174,787,457 | 174,714,000 | 174,714,000 | 174,714,000 | 174,714,000 | 2022-06-24 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 212,543 | 0.12 % | |
833 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Datar Belimbing Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6238282 | 35482715 | 173,000,000 | 172,823,783 | 171,878,631 | 171,878,631 | 171,775,000 | 171,775,000 | 171,775,000 | 171,775,000 | 2022-06-27 | CV. ALBATROS | 01.222.160.2-733.000 | 1,121,369 | 0.65 % | |
834 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6239282 | 35489898 | 150,900,000 | 150,807,963 | 149,777,000 | 149,777,000 | 149,749,000 | 149,749,000 | 149,749,000 | 149,749,000 | 2022-06-27 | CV. IZDIHAAR | 74.677.682.2-733.000 | 1,123,000 | 0.74 % | |
835 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring dan pengecoran bahu Jalan di Desa Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6240282 | 35494450 | 199,600,000 | 199,442,711 | 199,316,839 | 199,316,839 | 199,199,000 | 199,199,000 | 199,199,000 | 199,199,000 | 2022-08-02 | cv. bumi mandiri | 02.089.892.0-733.000 | 283,161 | 0.14 % | |
836 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan, Rehab / Pemasangan Lampu Penerangan Venue Porprov dan Penunjangnya | Pengadaan Langsung | Pekerjaan Konstruksi | 6241282 | 31663403 | 200,000,000 | 199,976,046 | 199,122,678 | 199,122,678 | 199,050,000 | 199,050,000 | 199,050,000 | 199,050,000 | 2022-07-06 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 877,322 | 0.44 % | |
837 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6242282 | 35482891 | 200,000,000 | 199,970,917 | 199,814,642 | 199,814,642 | 199,725,000 | 199,725,000 | 199,725,000 | 199,725,000 | 2022-06-24 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 185,358 | 0.09 % | |
838 | 2022 | Sekretariat Daerah | Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak (Cetak Buku Agenda) | Pengadaan Langsung | Pengadaan Barang | 6243282 | 35973362 | 71,720,000 | 71,600,000 | 71,500,000 | 71,500,000 | 71,400,000 | 0 | 0 | 0 | 2022-06-19 | KARYA DWI CHADE | 75.416.433.3-733.000 | 220,000 | 0.31 % | |
839 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Konsultansi Perencanaan Pembangunan Gerbang Objek Wisata Kalang Hadangan Pandak Daun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6244282 | 32950404 | 25,000,000 | 25,000,000 | 24,909,221 | 24,909,221 | 24,700,000 | 24,700,000 | 24,700,000 | 24,700,000 | 2022-06-25 | cv. vertical project | 03.169.392.2-734.000 | 90,779 | 0.36 % | |
840 | 2022 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Renovasi Radiologi,Konsultan Pengawasan Rehab | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6245282 | 36057907;36058125 | 80,000,000 | 80,000,000 | 79,698,000 | 79,698,000 | 79,000,000 | 79,000,000 | 79,000,000 | 79,000,000 | 2022-06-25 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 302,000 | 0.38 % | |
841 | 2022 | Dinas Perikanan | Belanja Bibit Untuk Restocking | Pengadaan Langsung | Pengadaan Barang | 6246282 | 32500887 | 64,599,250 | 63,445,769 | 63,293,704 | 63,293,704 | 63,243,000 | 63,243,000 | 0 | 63,243,000 | 2022-06-22 | Muda Membangun | 73.702.709.4-733.000 | 1,305,546 | 2.02 % | |
842 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6247282 | 31576606 | 184,000,000 | 183,960,630 | 183,124,982 | 183,124,982 | 183,031,000 | 183,031,000 | 183,031,000 | 183,031,000 | 2022-06-24 | CV. LALUNA DANA | 02.237.179.3-733.000 | 875,018 | 0.48 % | |
843 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Alat Bantu Lainnya -- TPS Besi | Pengadaan Langsung | Pengadaan Barang | 6249282 | 35671608 | 130,000,000 | 128,138,400 | 127,849,800 | 127,849,800 | 127,750,000 | 127,750,000 | 127,750,000 | 127,750,000 | 2022-06-20 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 2,150,200 | 1.65 % | |
844 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6250282 | 31576619 | 163,500,000 | 163,497,691 | 163,286,131 | 163,286,131 | 163,193,000 | 163,193,000 | 163,193,000 | 163,193,000 | 2022-09-02 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 213,869 | 0.13 % | |
845 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang sedang ruang kelas SMPN 3 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6252282 | 31634328 | 184,756,400 | 184,152,190 | 183,745,795 | 183,745,795 | 183,634,000 | 183,634,000 | 183,634,000 | 183,634,000 | 2022-06-20 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,010,605 | 0.55 % | |
846 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang Ruang Kelas SMPN 4 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6253282 | 31634380 | 105,750,000 | 105,749,993 | 105,575,145 | 105,575,145 | 105,464,000 | 105,464,000 | 105,464,000 | 105,464,000 | 2022-06-27 | cv. afmi bersaudara | 03.266.032.6-731.000 | 174,855 | 0.17 % | |
847 | 2022 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas Lapangan (PDL),Belanja Pakaian Dinas Harian (PDH) | Pengadaan Langsung | Pengadaan Barang | 6257282 | 32045108;32045124 | 136,500,000 | 136,363,500 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 136,130,400 | 2022-06-20 | FADWI UTAMA | 94.246.044.5-733.000 | 369,600 | 0.27 % | |
848 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6259282 | 31716465 | 17,100,000 | 17,100,000 | 16,983,000 | 16,983,000 | 16,966,000 | 16,966,000 | 16,966,000 | 16,966,000 | 2022-06-28 | cv.akmalindo | 02.531.482.4-731.000 | 117,000 | 0.68 % | |
849 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tanjung Selor, Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6260282 | 32146210 | 15,600,000 | 15,600,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 15,500,000 | 2022-06-24 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.64 % | |
850 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Tambangan, Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6261282 | 32146252 | 14,900,000 | 14,900,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2022-06-24 | CV.HADIMARTA ARZITEC | 74.008.527.9-733.000 | 100,000 | 0.67 % | |
851 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Bangkau, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6262282 | 32146263 | 14,000,000 | 14,000,000 | 13,999,320 | 13,999,320 | 13,969,000 | 13,969,000 | 13,969,000 | 13,969,000 | 2022-07-02 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 680 | 0 % | |
852 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Kamawakan, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6263282 | 32146193 | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,916,000 | 16,916,000 | 16,916,000 | 16,916,000 | 2022-07-01 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 50,000 | 0.29 % | |
853 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Haratai, Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6264282 | 32147100 | 17,000,000 | 17,000,000 | 16,950,000 | 16,950,000 | 16,911,000 | 16,911,000 | 16,911,000 | 16,911,000 | 2022-07-01 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 50,000 | 0.29 % | |
854 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT (Jamban Keluarga Sehat) Desa Mawangi, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6265282 | 32147171 | 16,000,000 | 16,000,000 | 15,999,540 | 15,999,540 | 15,959,000 | 15,959,000 | 15,959,000 | 15,959,000 | 2022-07-02 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 460 | 0 % | |
855 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Hiasan Jembatan Antaluddin | Pengadaan Langsung | Pekerjaan Konstruksi | 6267282 | 35827133 | 95,000,000 | 94,682,685 | 94,219,242 | 94,219,242 | 94,100,000 | 94,100,000 | 94,100,000 | 94,100,000 | 2022-06-22 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 780,758 | 0.82 % | |
856 | 2022 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6268282 | 32398836 | 50,000,000 | 50,000,000 | 49,950,000 | 49,950,000 | 49,500,000 | 49,500,000 | 49,500,000 | 49,500,000 | 2022-06-24 | CV. Profil Jasa Mandiri | 96.896.325.6-731.000 | 50,000 | 0.1 % | |
857 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I Martajiwa Kec. Angkinang (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6270282 | 34722320 | 27,000,000 | 26,917,500 | 26,806,500 | 26,806,500 | 26,751,000 | 26,751,000 | 26,751,000 | 26,751,000 | 2022-06-21 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 193,500 | 0.72 % | |
858 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa Konsultansi Pengawasan DAK Fisik SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6271282 | 35196983 | 60,000,000 | 59,993,280 | 59,557,050 | 59,557,050 | 59,496,000 | 59,496,000 | 59,496,000 | 59,496,000 | 2022-06-23 | cv.akmalindo | 02.531.482.4-731.000 | 442,950 | 0.74 % | |
859 | 2022 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Ruang Perpustakaan SMPN 2 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6272282 | 35964802 | 32,000,000 | 31,857,000 | 31,496,250 | 31,496,250 | 31,440,750 | 31,440,750 | 31,440,750 | 31,440,750 | 2022-06-23 | CV. DIAN CIPTA PRATAMA | 84.496.863.6-731.000 | 503,750 | 1.57 % | |
860 | 2022 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman SDN Sungai Pinang 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6278282 | 31650051 | 13,000,000 | 12,977,559 | 12,937,716 | 12,937,716 | 12,876,000 | 12,876,000 | 12,876,000 | 12,876,000 | 2022-06-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 62,284 | 0.48 % | |
861 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Wasah Hilir - Sarang Halang Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6282282 | 35491199 | 170,000,000 | 169,999,154 | 169,036,378 | 169,036,378 | 169,000,000 | 169,000,000 | 169,000,000 | 169,000,000 | 2022-06-27 | CV. LALUNA DANA | 02.237.179.3-733.000 | 963,622 | 0.57 % | |
862 | 2022 | RSUD Brigjen H. Hasan Basry | Kontrak Service Always On Service (AOS) ARCHITECT i1000 SR (BLUD) | Pengadaan Langsung | Jasa Lainnya | 6284282 | 35662872 | 198,024,000 | 198,024,000 | 198,000,000 | 198,000,000 | 196,500,000 | 196,500,000 | 196,500,000 | 196,500,000 | 2022-06-25 | Rajawali Nusindo | 01.061.248.9-051.000 | 24,000 | 0.01 % | |
863 | 2022 | RSUD Brigjen H. Hasan Basry | Perencanaan Jaringan Hidran Eksisting Dan Baru RSUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6287282 | 36060149 | 50,000,000 | 49,429,592 | 49,284,000 | 49,284,000 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2022-06-26 | CV.SMILEINDO JAYA KONSULTAN | 83.812.802.3-731.000 | 716,000 | 1.43 % | |
864 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Penanganan permukiman terdampak Bencana dan Relokasi Program Kabupaten/Kota | Pengadaan Langsung | Jasa Lainnya | 6288282 | 32427235 | 60,000,000 | 59,826,780 | 59,341,710 | 59,341,710 | 59,280,000 | 59,280,000 | 59,280,000 | 59,280,000 | 2022-06-28 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 658,290 | 1.1 % | |
865 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan di Desa Karang Bulan Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6289282 | 35493346 | 198,500,000 | 198,474,171 | 198,336,077 | 198,336,077 | 198,245,000 | 198,245,000 | 198,245,000 | 198,245,000 | 2022-07-27 | cv. bumi mandiri | 02.089.892.0-733.000 | 163,924 | 0.08 % | |
866 | 2022 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi Jaringan Instalasi Listrik dan Panel Genset di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pekerjaan Konstruksi | 6291282 | 32951163 | 170,000,000 | 169,983,553 | 169,823,779 | 169,823,779 | 169,500,000 | 169,500,000 | 169,500,000 | 169,500,000 | 2022-06-28 | FADWI UTAMA | 94.246.044.5-733.000 | 176,221 | 0.1 % | |
867 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Intake DI. Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6292282 | 31455752 | 15,000,000 | 15,000,000 | 14,922,840 | 14,922,840 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2022-06-28 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 77,160 | 0.51 % | |
868 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Jambu Hulu Kec. Padang Batung dan Jasa Konsultansi Perencanaan Pembangunan Saluran Pembuang Irigasi Di Desa Kaliring Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6293282 | 36109403 | 35,880,000 | 35,880,000 | 35,697,600 | 35,697,600 | 35,586,600 | 35,586,600 | 35,586,600 | 35,586,600 | 2022-06-28 | STUDY ARCHI CONSULTANT | 03.132.867.7-735.000 | 182,400 | 0.51 % | |
869 | 2022 | Dinas Perikanan | Pengadaan Perahu Motor Tempel dan Perahu Kayu | Pengadaan Langsung | Pengadaan Barang | 6296282 | 32429793;32429854 | 225,000,000 | 199,245,000 | 198,967,500 | 198,967,500 | 198,856,500 | 198,856,500 | 0 | 198,856,500 | 2022-08-01 | CV. AL QAWS | 70.619.811.6-733.000 | 26,032,500 | 11.57 % | |
870 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman dan Drainase SDN Sungai Pinang 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 6298282 | 31650109 | 179,100,000 | 179,063,505 | 178,946,892 | 178,946,892 | 178,825,000 | 178,825,000 | 178,825,000 | 178,825,000 | 2022-07-05 | CV. PUTRA TUNGGAL | 02.215.642.6-732.000 | 153,108 | 0.09 % | |
871 | 2022 | Dinas Pertanian | Rehab BPP Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6299282 | 32061083 | 199,500,000 | 199,467,000 | 199,249,083 | 199,249,083 | 198,914,500 | 198,914,500 | 198,914,500 | 198,914,500 | 2022-06-30 | CV REZQI AL BAROQAH | 94.827.847.8-733.000 | 250,917 | 0.13 % | |
872 | 2022 | Dinas Perhubungan | Perencanaan Pembangunan Halte Sungai dan Rehabilitasi WC / KM Dermaga Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6300282 | 32134692 | 10,000,000 | 9,982,920 | 9,978,012 | 9,978,012 | 9,978,000 | 9,978,000 | 9,978,000 | 9,978,000 | 2022-06-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 21,988 | 0.22 % | |
873 | 2022 | Dinas Pertanian | Rehab BPP Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 6301282 | 32061021 | 198,800,000 | 198,250,000 | 198,039,677 | 198,039,677 | 197,852,900 | 197,852,900 | 197,852,900 | 197,852,900 | 2022-06-30 | CV. KHALIF | 81.540.809.1-733.000 | 760,323 | 0.38 % | |
874 | 2022 | Dinas Pertanian | Rehab BPP Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6302282 | 32061029 | 167,500,000 | 167,311,942 | 167,219,812 | 167,219,812 | 167,147,600 | 167,147,600 | 167,147,600 | 167,147,600 | 2022-06-30 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 280,188 | 0.17 % | |
875 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Balanti Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 6304282 | 35492361 | 198,000,000 | 197,975,366 | 197,797,804 | 197,797,804 | 197,636,000 | 197,636,000 | 197,636,000 | 197,636,000 | 2022-07-27 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 202,196 | 0.1 % | |
876 | 2022 | Kecamatan Daha Utara | Belanja Rehab Lapangan Tenis Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6305282 | 32097528 | 110,000,000 | 109,954,000 | 109,343,266 | 109,343,266 | 109,250,000 | 109,250,000 | 109,250,000 | 109,250,000 | 2022-07-01 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 656,734 | 0.6 % | |
877 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Reguler) DAK PAUD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6306282 | 35198529 | 14,529,700 | 14,528,790 | 14,422,100 | 14,422,100 | 14,414,100 | 14,414,100 | 14,414,100 | 14,414,100 | 2022-07-02 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 107,600 | 0.74 % | |
878 | 2022 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Reguler) DAK SKB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6308282 | 35199157 | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 2022-07-06 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 100,000 | 1 % | |
879 | 2022 | Kecamatan Daha Utara | Belanja Jasa Konsultasi Pengawasan Rehab Lapangan Tenis dan Taman Rahimin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6309282 | 32115656 | 24,570,000 | 24,564,000 | 24,401,053 | 24,401,053 | 24,300,000 | 24,300,000 | 24,300,000 | 24,300,000 | 2022-07-01 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 168,947 | 0.69 % | |
880 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jl. Sungai Karuh - Tembus Tawar Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6310282 | 35494722 | 198,300,000 | 198,273,747 | 198,027,683 | 198,027,683 | 197,943,000 | 197,943,000 | 197,943,000 | 197,943,000 | 2022-07-06 | CV. URANUS XBER | 92.599.591.2-733.000 | 272,317 | 0.14 % | |
881 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Tajun - Sp.3 Paring Agung Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6311282 | 35489949 | 193,750,000 | 193,720,800 | 193,526,075 | 193,526,075 | 193,479,000 | 193,479,000 | 193,479,000 | 193,479,000 | 2022-06-30 | CV.Bangun Banua | 93.708.167.7-733.000 | 223,925 | 0.12 % | |
882 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Halayung - Hantarukung Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6312282 | 35490247 | 166,000,000 | 165,981,154 | 165,866,115 | 165,866,115 | 165,838,000 | 165,838,000 | 165,838,000 | 165,838,000 | 2022-08-02 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 133,885 | 0.08 % | |
883 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Halaban Kec. Simpur (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 6313282 | 35490145 | 165,000,000 | 164,985,066 | 164,836,949 | 164,836,949 | 164,803,000 | 164,803,000 | 164,803,000 | 164,803,000 | 2022-08-01 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 163,051 | 0.1 % | |
884 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Luaw - Sei Bungur Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6314282 | 35494307 | 195,500,000 | 195,488,273 | 195,421,085 | 195,421,085 | 195,195,000 | 195,195,000 | 195,195,000 | 195,195,000 | 2022-07-29 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 78,915 | 0.04 % | |
885 | 2022 | Dinas Pertanian | Rehab BPP Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6317282 | 32061045 | 198,700,000 | 198,680,000 | 198,294,413 | 198,294,413 | 198,158,000 | 198,158,000 | 198,158,000 | 198,158,000 | 2022-07-04 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 405,587 | 0.2 % | |
886 | 2022 | Dinas Pertanian | Rehab BPP Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6318282 | 32061006 | 199,000,000 | 198,680,000 | 198,280,236 | 198,280,236 | 197,918,000 | 197,918,000 | 197,918,000 | 197,918,000 | 2022-07-04 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 719,764 | 0.36 % | |
887 | 2022 | Dinas Pertanian | Pengawasan Rehab BPP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6319282 | 32060983 | 85,435,125 | 85,435,125 | 85,026,000 | 85,026,000 | 84,915,000 | 84,915,000 | 84,915,000 | 84,915,000 | 2022-07-01 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 409,125 | 0.48 % | |
888 | 2022 | Kecamatan Simpur | Konsultan Pengawasan Rehab Ringan Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6323282 | 35841491 | 10,500,000 | 10,346,000 | 10,290,852 | 10,290,852 | 10,250,000 | 10,250,000 | 10,250,000 | 10,250,000 | 2022-07-01 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 209,148 | 1.99 % | |
889 | 2022 | Dinas Pertanian | Pengawasan Renovasi BPP Model dan Pembangunan UV Dryer (DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6324282 | 34695749 | 80,000,000 | 80,000,000 | 79,720,200 | 79,720,200 | 79,642,500 | 79,642,500 | 79,642,500 | 79,642,500 | 2022-07-01 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 279,800 | 0.35 % | |
890 | 2022 | Inspektorat Daerah | Pengawasan Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6325282 | 34907441 | 10,000,000 | 10,000,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 9,875,000 | 2022-07-07 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 125,000 | 1.25 % | |
891 | 2022 | Inspektorat Daerah | Penataan Taman dan Lingkungan Kantor Inspektorat Daerah | Pengadaan Langsung | Pekerjaan Konstruksi | 6326282 | 31933125 | 195,000,000 | 193,458,345 | 193,062,789 | 193,062,789 | 192,860,000 | 192,860,000 | 192,860,000 | 192,860,000 | 2022-07-07 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 1,937,211 | 0.99 % | |
892 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6327282 | 31576747 | 182,000,000 | 181,998,805 | 181,827,208 | 181,827,208 | 181,818,000 | 181,818,000 | 181,818,000 | 181,818,000 | 2022-07-13 | CV. AISY | 75.132.070.6-733.000 | 172,792 | 0.09 % | |
893 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Pulau Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6328282 | 35494539 | 157,000,000 | 156,988,266 | 156,813,683 | 156,813,683 | 156,781,000 | 156,781,000 | 156,781,000 | 156,781,000 | 2022-07-13 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 186,317 | 0.12 % | |
894 | 2022 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Panglima Dambung | Pengadaan Langsung | Pekerjaan Konstruksi | 6329282 | 31649935 | 90,000,000 | 89,993,001 | 89,904,711 | 89,904,711 | 89,804,000 | 89,804,000 | 89,804,000 | 89,804,000 | 2022-07-05 | CV. NOOR LITA DAMAYANTI | 03.063.055.2-731.000 | 95,289 | 0.11 % | |
895 | 2022 | Kecamatan Simpur | Belanja Modal Pemeliharaan/Rehab Ringan Rumah Dinas | Pengadaan Langsung | Pekerjaan Konstruksi | 6330282 | 35901588 | 127,000,000 | 126,969,000 | 126,621,592 | 126,621,592 | 126,500,000 | 126,500,000 | 126,500,000 | 126,500,000 | 2022-07-06 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 378,408 | 0.3 % | |
896 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Amparaya - Karangan - Hanau Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6331282 | 35490433 | 164,000,000 | 163,980,096 | 163,937,890 | 163,937,890 | 163,889,000 | 163,889,000 | 163,889,000 | 163,889,000 | 2022-07-19 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 62,110 | 0.04 % | |
897 | 2022 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Handil Es Lilin (Jalan Menuju Pesantren) Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6333282 | 31705509 | 24,000,000 | 23,993,344 | 23,254,500 | 23,254,500 | 23,150,000 | 23,150,000 | 23,150,000 | 23,150,000 | 2022-07-06 | cv. vertical project | 03.169.392.2-734.000 | 745,500 | 3.11 % | |
898 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Ruang Pelayanan Publik Dinas PUTR Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 6334282 | 31716501 | 200,000,000 | 199,996,961 | 199,815,154 | 199,815,154 | 199,799,000 | 199,799,000 | 199,799,000 | 199,799,000 | 2022-07-14 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 184,846 | 0.09 % | |
899 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Samuda - Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6335282 | 35779241 | 45,000,000 | 44,880,246 | 44,497,680 | 44,497,680 | 44,414,000 | 44,414,000 | 44,414,000 | 44,414,000 | 2022-08-19 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 502,320 | 1.12 % | |
900 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Pandak Daun - Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6336282 | 35779053 | 40,000,000 | 39,997,194 | 39,604,933 | 39,604,933 | 39,560,400 | 39,560,400 | 39,560,400 | 39,560,400 | 2022-07-27 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 395,067 | 0.99 % | |
901 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Hulu Banyu Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6337282 | 35779459 | 40,000,000 | 39,997,194 | 39,535,980 | 39,535,980 | 39,493,000 | 39,493,000 | 39,493,000 | 39,493,000 | 2022-08-19 | Wiyasa Drawana | 80.902.072.0-731.000 | 464,020 | 1.16 % | |
902 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Ruas Bayanan - Habirau Tengah (Jl. Inpres) Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6338282 | 35777691 | 40,000,000 | 39,997,194 | 39,509,340 | 39,509,340 | 39,460,500 | 39,460,500 | 39,460,500 | 39,460,500 | 2022-07-27 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 490,660 | 1.23 % | |
903 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Garunggang - Hantamangu Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 6339282 | 35491023 | 150,000,000 | 149,992,085 | 149,870,162 | 149,870,162 | 149,839,000 | 149,839,000 | 149,839,000 | 149,839,000 | 2022-08-19 | CV. LALUNA DANA | 02.237.179.3-733.000 | 129,838 | 0.09 % | |
904 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembuatan Ruang Pelayanan Publik Dinas PUTR Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6340282 | 31716451 | 18,000,000 | 18,000,000 | 17,900,000 | 17,900,000 | 17,878,000 | 17,878,000 | 17,878,000 | 17,878,000 | 2022-07-16 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 100,000 | 0.56 % | |
905 | 2022 | Dinas Pertanian | Belanja Natura dan Pakan-Pakan | Pengadaan Langsung | Pengadaan Barang | 6341282 | 32037365 | 129,750,000 | 97,920,870 | 97,857,600 | 97,857,600 | 97,804,800 | 97,804,800 | 97,804,800 | 97,804,800 | 2022-07-12 | CV. KATIBURA | 53.260.332.1-733.000 | 31,892,400 | 24.58 % | |
906 | 2022 | Kecamatan Kandangan | Pemeliharaan PJU di RT 05 dan RT 08 Kel Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6342282 | 36212026 | 100,000,000 | 99,971,000 | 99,680,886 | 99,680,886 | 99,550,000 | 99,550,000 | 99,550,000 | 99,550,000 | 2022-07-06 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | 319,114 | 0.32 % | |
907 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD BBM (Bersuci, Berwudhu, Mandi) Ponpes Babussalam, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6343282 | 32146272 | 16,200,000 | 16,200,000 | 16,143,063 | 16,143,063 | 16,095,000 | 16,095,000 | 16,095,000 | 16,095,000 | 2022-07-27 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 56,937 | 0.35 % | |
908 | 2022 | Dinas Kesehatan | Rehabilitasi Poskesdes Tamiyang | Pengadaan Langsung | Pekerjaan Konstruksi | 6346282 | 32386257 | 185,000,000 | 184,938,562 | 184,805,156 | 184,805,156 | 184,350,000 | 184,350,000 | 184,350,000 | 184,350,000 | 2022-07-20 | CV. MEGA BUANA SAKTI | 02.324.986.3-733.000 | 194,844 | 0.11 % | |
909 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. Batang Kulur Kanan - Sarangan Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6347282 | 35490012 | 163,000,000 | 162,984,912 | 162,603,653 | 162,603,653 | 162,445,000 | 162,445,000 | 162,445,000 | 162,445,000 | 2022-08-04 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 396,347 | 0.24 % | |
910 | 2022 | Dinas Pertanian | Rehab BPP Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6350282 | 32061106 | 200,000,000 | 199,660,000 | 199,642,578 | 199,642,578 | 199,366,400 | 199,366,400 | 199,366,400 | 199,366,400 | 2022-07-13 | CV. ALBATROS | 01.222.160.2-733.000 | 357,422 | 0.18 % | |
911 | 2022 | Dinas Pertanian | Rehab BPP Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6351282 | 32061065 | 175,000,000 | 174,814,000 | 174,667,205 | 174,667,205 | 174,527,400 | 174,527,400 | 174,527,400 | 174,527,400 | 2022-07-13 | CV. SHINTA | 01.124.041.3-733.000 | 332,795 | 0.19 % | |
912 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Pasangan Batu Jl. SP. 4 Lungau - Bangkau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6352282 | 35495202 | 199,500,000 | 199,490,626 | 199,216,193 | 199,216,193 | 199,125,000 | 199,125,000 | 199,125,000 | 199,125,000 | 2022-07-08 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 283,807 | 0.14 % | |
913 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Tanjungan - Sp.3 Sakijang Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Baru - Asam Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Desa Asam Seranggan Kec. Sungai Raya,Jasa Konsultansi Pengawasan Pekerjaan Siring Pasangan Batu Jl. Simp.10 Batang Kulur-Sungai Kali Kec. Sungai Raya,Jasa Konsultansi Pengawasan Peningkatan Jalan Sungai Namang Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6353282 | 31577527 | 59,310,000 | 59,302,330 | 59,230,491 | 59,230,491 | 59,163,000 | 59,163,000 | 0 | 59,163,000 | 2022-07-08 | CV. DIAN GEMILANG KONSULINDO | 94.240.912.9-731.000 | 79,509 | 0.13 % | |
914 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran jalan Datar Belimbing - Datar Mangkung (242) Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 6354282 | 31551774 | 188,100,000 | 188,076,336 | 187,903,064 | 187,903,064 | 187,878,000 | 187,878,000 | 187,878,000 | 187,878,000 | 2022-07-08 | CV. RIDA WIDIYANTI LESTARI | 02.918.036.1-733.000 | 196,936 | 0.1 % | |
915 | 2022 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Mushola dan Toilet Gedung Serbaguna Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6355282 | 31716517 | 180,000,000 | 179,840,592 | 179,774,560 | 179,774,560 | 179,719,000 | 179,719,000 | 179,719,000 | 179,719,000 | 2022-08-19 | CV. ALBATROS | 01.222.160.2-733.000 | 225,440 | 0.13 % | |
916 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Muara Ambarai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 6356282 | 32562579 | 197,500,000 | 197,498,378 | 197,147,439 | 197,147,439 | 196,953,100 | 196,953,100 | 196,953,100 | 196,953,100 | 2022-07-15 | CV. FIRDAUS BANGUN MANDIRI | 90.059.543.0-736.000 | 352,561 | 0.18 % | |
917 | 2022 | Dinas Perdagangan | Rehab Pasar Agro Bisnis Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6357282 | 32562626 | 199,500,000 | 199,488,441 | 199,294,404 | 199,294,404 | 199,183,400 | 199,183,400 | 199,183,400 | 199,183,400 | 2022-07-15 | CV. DWI INDAH MANDIRI | 02.675.534.8-733.000 | 205,596 | 0.1 % | |
918 | 2022 | Dinas Pendidikan dan Kebudayaan | Pembangunan Gedung PKBM Mambaul Ulum Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 6358282 | 31632250 | 198,500,000 | 198,407,898 | 197,573,890 | 197,573,890 | 197,497,000 | 197,497,000 | 197,497,000 | 197,497,000 | 2022-07-15 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 926,110 | 0.47 % | |
919 | 2022 | Dinas Perdagangan | Rehabilitasi Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6359282 | 32562616 | 199,500,000 | 199,498,227 | 199,376,127 | 199,376,127 | 199,221,800 | 199,221,800 | 199,221,800 | 199,221,800 | 2022-07-15 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 123,873 | 0.06 % | |
920 | 2022 | Kecamatan Telaga Langsat | Rehab Atap dan Plapond Aula Kantor Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6360282 | 32617061 | 20,000,000 | 19,992,339 | 19,859,977 | 19,859,977 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2022-07-12 | FADWI UTAMA | 94.246.044.5-733.000 | 140,023 | 0.7 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |