Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu |
Pengadaan Langsung | 1144 | 101.567.394.078 | 49 | 3.318.600.980 | 1144 | 101.567.394.078 | 0 | 0 |
Penunjukan Langsung | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 1144 | 101.567.394.078 | 49 | 3.318.600.980 | 1144 | 101.567.394.078 | 0 | 0 |
Persentase | 4.28 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pekerjaan Pemeliharaan Jaringan Irigasi di beberapa Kecamatan Kab. Hulu Sungai Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1559282 | 47472392 | APBD | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,728,000 | 49,728,000 | 49,728,000 | 49,728,000 | 2024-01-22 | 2024-01-30 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 105,500 | 0.21 % | |
2 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Muning Dalam, Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe F)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1560282 | 47458175 | APBD | 50,000,000 | 49,839,000 | 49,728,000 | 49,728,000 | 48,840,000 | 48,840,000 | 48,840,000 | 48,840,000 | 2024-01-23 | 2024-01-30 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 272,000 | 0.54 % | |
3 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1561282 | 47697618 | APBD | 60,000,000 | 60,000,000 | 59,850,000 | 59,850,000 | 59,163,000 | 59,163,000 | 59,163,000 | 59,163,000 | 2024-02-10 | 2024-02-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 150,000 | 0.25 % | |
4 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bangkau Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1562282 | 47462197 | APBD | 100,000,000 | 99,844,500 | 99,789,000 | 99,789,000 | 98,623,500 | 98,623,500 | 98,623,500 | 98,623,500 | 2024-02-18 | 2024-02-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 211,000 | 0.21 % | |
5 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1563282 | 47457992 | APBD | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 2024-02-09 | 2024-02-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 151,000 | 0.38 % | |
6 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1633282 | 47698536 | APBD | 40,000,000 | 40,000,000 | 39,830,000 | 39,830,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-03-03 | 2024-03-08 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.43 % | |
7 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1634282 | 47473061 | APBD | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-05 | 2024-03-11 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 114,350 | 0.57 % | |
8 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Kandangan Kota (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1635282 | 47464819 | APBD | 45,000,000 | 44,955,000 | 44,844,000 | 44,844,000 | 44,011,500 | 44,011,500 | 44,011,500 | 44,011,500 | 2024-03-04 | 2024-03-11 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 156,000 | 0.35 % | |
9 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyelidikan Tanah Pembangunan DIR Pulau Hijau Kec. Daha utara (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1636282 | 47472245 | APBD | 100,000,000 | 99,955,500 | 99,844,500 | 99,844,500 | 98,068,500 | 98,068,500 | 98,068,500 | 98,068,500 | 2024-03-04 | 2024-03-11 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 155,500 | 0.16 % | |
10 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembersihan Raba/Sampah di Sungai (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1637282 | 47467897 | APBD | 25,000,000 | 25,000,000 | 24,900,000 | 24,900,000 | 24,420,000 | 24,420,000 | 24,420,000 | 24,420,000 | 2024-02-05 | 2024-02-14 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 100,000 | 0.4 % | |
11 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Rt.02 Kec. Loksado (Lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1638282 | 47463356 | APBD | 40,000,000 | 39,849,000 | 39,627,000 | 39,627,000 | 39,038,700 | 39,038,700 | 39,038,700 | 39,038,700 | 2024-02-21 | 2024-02-29 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 373,000 | 0.93 % | |
12 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1639282 | 47468117 | APBD | 198,849,510 | 198,710,897 | 198,500,077 | 198,500,077 | 197,909,418 | 197,909,418 | 197,909,418 | 197,909,418 | 2024-02-03 | 2024-02-08 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 349,433 | 0.18 % | |
13 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Padang Batung Rt.02 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1640282 | 47463177 | APBD | 20,000,000 | 20,000,000 | 19,925,000 | 19,925,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-21 | 2024-02-29 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 75,000 | 0.38 % | |
14 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1641282 | 47702564 | APBD | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,052,000 | 59,052,000 | 59,052,000 | 59,052,000 | 2024-02-19 | 2024-02-26 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 60,000 | 0.1 % | |
15 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1642282 | 47469966 | APBD | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-12 | 2024-03-19 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 20,000 | 0.1 % | |
16 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Amparaya Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1643282 | 47701808 | APBD | 80,000,000 | 80,000,000 | 79,982,501 | 79,982,501 | 79,032,000 | 79,032,000 | 79,032,000 | 79,032,000 | 2024-03-12 | 2024-03-19 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 17,499 | 0.02 % | |
17 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Belakang KUA Desa Padang Batung Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1644282 | 47464280 | APBD | 25,000,000 | 24,999,999 | 24,885,000 | 24,885,000 | 24,642,000 | 24,642,000 | 24,642,000 | 24,642,000 | 2024-02-09 | 2024-02-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 115,000 | 0.46 % | |
18 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DIR. Sianggantung (Pemeliharaan jaringan Irigasi Rawa dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1645282 | 47469610 | APBD | 198,791,250 | 198,653,035 | 198,597,535 | 198,597,535 | 198,014,563 | 198,014,562 | 198,014,562 | 198,014,562 | 2024-02-05 | 2024-02-14 | CV Remona | 41.175.606.7-735.000 | 193,715 | 0.1 % | |
19 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Kelurahan Kandangan Kota RT.07 Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1646282 | 47463581 | APBD | 30,000,000 | 29,999,999 | 29,775,750 | 29,775,750 | 29,304,000 | 29,304,000 | 29,304,000 | 29,304,000 | 2024-03-05 | 2024-03-11 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 224,250 | 0.75 % | |
20 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1650282 | 47469486 | APBD | 198,849,510 | 198,711,769 | 198,401,130 | 198,401,130 | 197,785,080 | 197,785,079 | 197,785,079 | 197,785,079 | 2024-02-03 | 2024-02-08 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 448,380 | 0.23 % | |
21 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Ulang Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1653282 | 47463859 | APBD | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,415,000 | 29,415,000 | 29,415,000 | 29,415,000 | 2024-03-04 | 2024-03-11 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.42 % | |
22 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1654282 | 47467064 | APBD | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-11 | 2024-03-18 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 50,000 | 0.25 % | |
23 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1655282 | 47466722 | APBD | 30,000,000 | 30,000,000 | 29,775,750 | 29,775,750 | 29,304,000 | 29,304,000 | 29,304,000 | 29,304,000 | 2024-03-05 | 2024-03-11 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 224,250 | 0.75 % | |
24 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1656282 | 47698304 | APBD | 40,000,000 | 40,000,000 | 39,825,000 | 39,825,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-02-20 | 2024-02-27 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 0.44 % | |
25 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Lumpangi Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1657282 | 47465274 | APBD | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-10 | 2024-02-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.5 % | |
26 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Simpur & Kalumpang (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1659282 | 47469165 | APBD | 168,957,100 | 168,655,519 | 168,624,340 | 168,624,340 | 167,515,672 | 167,515,672 | 167,515,672 | 167,515,672 | 2024-05-06 | 2024-05-15 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 332,760 | 0.2 % | |
27 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Tayub Kec.Telaga langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1660282 | 49104206 | APBD | 80,000,000 | 80,000,000 | 79,890,000 | 79,890,000 | 78,810,000 | 78,810,000 | 78,810,000 | 78,810,000 | 2024-02-21 | 2024-02-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 110,000 | 0.14 % | |
28 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1661282 | 47470705 | APBD | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-14 | 2024-03-21 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
29 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Daerah Irigasi Kupang Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1662282 | 47471563 | APBD | 20,000,000 | 20,000,000 | 19,880,000 | 19,880,000 | 19,314,000 | 19,314,000 | 19,314,000 | 19,314,000 | 2024-02-25 | 2024-03-01 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 120,000 | 0.6 % | |
30 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1663282 | 47700046 | APBD | 60,000,000 | 60,000,000 | 59,778,800 | 59,778,800 | 59,052,000 | 59,052,000 | 59,052,000 | 59,052,000 | 2024-03-14 | 2024-03-21 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 221,200 | 0.37 % | |
31 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1664282 | 47704255 | APBD | 60,000,000 | 60,000,000 | 59,850,000 | 59,850,000 | 59,274,000 | 59,274,000 | 59,274,000 | 59,274,000 | 2024-02-10 | 2024-02-16 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 150,000 | 0.25 % | |
32 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado RT.04 Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1665282 | 47464043 | APBD | 25,000,000 | 25,000,000 | 24,875,000 | 24,875,000 | 24,198,000 | 24,198,000 | 24,198,000 | 24,198,000 | 2024-02-18 | 2024-02-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.5 % | |
33 | 2024 | Dinas Kesehatan | Jasa Apraisal Pengadaan Lahan Puskesmas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 1667282 | 48410960;48410961 | APBD | 120,000,000 | 59,973,000 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 2024-02-13 | 2024-02-23 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 60,307,597 | 50.26 % | |
34 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI.Gumbil (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1668282 | 47469341 | APBD | 129,967,000 | 129,828,731 | 129,600,454 | 129,600,454 | 128,927,772 | 128,927,772 | 128,927,772 | 128,927,772 | 2024-03-04 | 2024-03-11 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 366,546 | 0.28 % | |
35 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1669282 | 47703758 | APBD | 80,000,000 | 80,000,000 | 79,850,000 | 79,850,000 | 79,032,000 | 79,032,000 | 79,032,000 | 79,032,000 | 2024-02-10 | 2024-02-16 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 150,000 | 0.19 % | |
36 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1670282 | 47466560 | APBD | 20,000,000 | 20,000,000 | 19,953,000 | 19,953,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-11 | 2024-03-18 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 47,000 | 0.23 % | |
37 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan DIR. Sungai Kajang Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1671282 | 47472081 | APBD | 50,000,000 | 49,839,000 | 49,728,000 | 49,728,000 | 48,840,000 | 48,840,000 | 48,840,000 | 48,840,000 | 2024-02-21 | 2024-02-29 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 272,000 | 0.54 % | |
38 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DIR. Sungai Balum (Pemeliharaan jaringan Irigasi Rawa dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1672282 | 47469681 | APBD | 198,791,250 | 198,653,035 | 198,597,535 | 198,597,535 | 198,014,563 | 198,014,562 | 198,014,562 | 198,014,562 | 2024-02-03 | 2024-02-08 | CV Remona | 41.175.606.7-735.000 | 193,715 | 0.1 % | |
39 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Baru Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1673282 | 47457794 | APBD | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-18 | 2024-02-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 131,000 | 0.66 % | |
40 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Halaman Polres HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 1675282 | 49342349 | APBD | 200,000,000 | 199,727,565 | 199,502,790 | 199,502,790 | 198,990,525 | 198,990,525 | 198,990,525 | 198,990,525 | 2024-02-06 | 2024-02-14 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 497,210 | 0.25 % | |
41 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hakurung Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1676282 | 47458328 | APBD | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 2024-02-09 | 2024-02-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 151,000 | 0.38 % | |
42 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Amawang Kanan (DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1677282 | 48423395 | APBD | 189,070,000 | 189,006,605 | 188,729,105 | 188,729,105 | 188,507,105 | 188,507,105 | 188,507,105 | 188,507,105 | 2024-02-13 | 2024-02-22 | cv. nurulillah | 50.826.160.9-733.000 | 340,895 | 0.18 % | |
43 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Muara Ulang | Pengadaan Langsung | Pekerjaan Konstruksi | 1678282 | 48423394 | APBD | 181,300,000 | 181,240,000 | 180,975,049 | 180,975,049 | 180,934,923 | 180,934,923 | 180,934,923 | 180,934,923 | 2024-03-27 | 2024-04-05 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 324,951 | 0.18 % | |
44 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Wasah Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 1679282 | 48423392 | APBD | 189,070,000 | 188,073,788 | 187,897,008 | 187,897,008 | 187,538,033 | 187,538,000 | 187,538,000 | 187,538,000 | 2024-06-04 | 2024-06-12 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 1,172,992 | 0.62 % | |
45 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Sungai Mandala | Pengadaan Langsung | Pekerjaan Konstruksi | 1680282 | 48423390 | APBD | 199,430,000 | 199,410,000 | 199,231,205 | 199,231,205 | 199,009,448 | 199,009,448 | 199,009,448 | 199,009,448 | 2024-03-26 | 2024-04-03 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 198,795 | 0.1 % | |
46 | 2024 | Dinas Kesehatan | Rehabilitasi Pustu Karang Jawa | Pengadaan Langsung | Pekerjaan Konstruksi | 1681282 | 48423388 | APBD | 189,070,000 | 189,000,000 | 188,720,629 | 188,720,629 | 188,443,129 | 188,443,000 | 188,443,000 | 188,443,000 | 2024-04-04 | 2024-04-22 | CV. KHALIF | 81.540.809.1-733.000 | 349,371 | 0.18 % | |
47 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Durian Rabung | Pengadaan Langsung | Pekerjaan Konstruksi | 1682282 | 48423386 | APBD | 119,658,000 | 119,286,445 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 2024-03-25 | 2024-04-03 | CV. KHALIF | 81.540.809.1-733.000 | 625,137 | 0.52 % | |
48 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Mandala | Pengadaan Langsung | Pekerjaan Konstruksi | 1683282 | 48423384 | APBD | 150,220,000 | 150,177,000 | 150,123,376 | 150,123,376 | 150,123,376 | 150,123,000 | 150,123,000 | 150,123,000 | 2024-04-02 | 2024-04-17 | cv. nurulillah | 50.826.160.9-733.000 | 96,624 | 0.06 % | |
49 | 2024 | Dinas Kesehatan | Gedung Kantor Sederhana ( Rehabilitasi Titian Pustu Bago Tanggul )(DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1684282 | 48423383 | APBD | 41,440,000 | 41,000,000 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 2024-03-14 | 2024-03-22 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 477,615 | 1.15 % | |
50 | 2024 | Dinas Kesehatan | Rehabilitasi Pustu Tampang | Pengadaan Langsung | Pekerjaan Konstruksi | 1685282 | 48423382 | APBD | 119,658,000 | 119,526,881 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 2024-03-13 | 2024-03-22 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 181,423 | 0.15 % | |
51 | 2024 | Dinas Kesehatan | Rehabilitasi poskesdes Hariti | Pengadaan Langsung | Pekerjaan Konstruksi | 1686282 | 48423376 | APBD | 119,658,000 | 119,645,000 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 2024-03-27 | 2024-04-05 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 1,211,047 | 1.01 % | |
52 | 2024 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan (DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1687282 | 48405532 | APBD | 199,430,000 | 199,275,000 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 2024-03-14 | 2024-03-22 | FADWI UTAMA | 94.246.044.5-733.000 | 374,470 | 0.19 % | |
53 | 2024 | Dinas Kesehatan | Perbaikan Halaman Puskesmas Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 1688282 | 48404003 | APBD | 189,100,000 | 189,013,000 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 2024-03-25 | 2024-04-03 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 788,278 | 0.42 % | |
54 | 2024 | Dinas Kesehatan | Rehabilitasi Puskesmas Batang Kulur | Pengadaan Langsung | Pekerjaan Konstruksi | 1689282 | 48403996 | APBD | 157,990,000 | 157,424,500 | 157,024,374 | 157,024,374 | 157,005,040 | 157,005,000 | 157,005,000 | 157,005,000 | 2024-07-15 | 2024-07-23 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 965,626 | 0.61 % | |
55 | 2024 | Dinas Kesehatan | Rehabilitasi Ruang Rawat Inap PKM Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1690282 | 48403994 | APBD | 197,358,000 | 196,364,773 | 196,151,360 | 196,151,360 | 196,151,360 | 196,151,000 | 196,151,000 | 196,151,000 | 2024-06-05 | 2024-06-14 | CV. KHALIF | 81.540.809.1-733.000 | 1,206,640 | 0.61 % | |
56 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Angkinang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1691282 | 47463027 | APBD | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-05 | 2024-03-13 | cv.airlangga konsultan | 03.122.016.3-732.000 | 114,350 | 0.57 % | |
57 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1692282 | 47468979 | APBD | 198,849,510 | 198,710,205 | 198,499,381 | 198,499,381 | 197,821,703 | 197,821,703 | 197,821,703 | 197,821,703 | 2024-02-06 | 2024-02-14 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 350,130 | 0.18 % | |
58 | 2024 | Dinas Kesehatan | Pengawasan Urugan Lahan PKM Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1694282 | 49438251 | APBD | 50,000,000 | 49,751,199 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 2024-06-27 | 2024-07-05 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 383,000 | 0.77 % | |
59 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1695282 | 49437141 | APBD | 50,000,000 | 49,223,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 2024-03-25 | 2024-04-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 938,000 | 1.88 % | |
60 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1696282 | 49436983 | APBD | 70,000,000 | 69,999,930 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-02-22 | 2024-03-01 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 181,000 | 0.26 % | |
61 | 2024 | Dinas Kesehatan | Pengawasan Poskesdes dan Pustu (DAK FISIK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1697282 | 49436694 | APBD | 45,000,000 | 45,000,000 | 44,999,955 | 44,999,955 | 44,844,000 | 44,844,000 | 44,844,000 | 44,844,000 | 2024-07-15 | 2024-07-24 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 45 | 0 % | |
62 | 2024 | Dinas Kesehatan | Pengawasan Renovasi PKM Kaliring ( DAK FISIK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1698282 | 49435282 | APBD | 119,000,000 | 98,223,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 2024-03-25 | 2024-04-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 21,209,000 | 17.82 % | |
63 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1699282 | 49434997 | APBD | 70,000,000 | 70,000,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-04-03 | 2024-04-22 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 181,000 | 0.26 % | |
64 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Konsolidasi Perencanaan Interior Loby Polres HSS & Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1701282 | 49492573 | APBD | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,460,500 | 39,460,500 | 39,460,500 | 39,460,500 | 2024-02-21 | 2024-02-29 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
65 | 2024 | RSUD Brigjen H. Hasan Basry | Audit Laporan keuangan BLUD | Pengadaan Langsung | Jasa Lainnya | 1702282 | 48652515 | BLUD | 99,100,000 | 89,445,000 | 89,377,200 | 89,377,200 | 89,000,000 | 89,000,000 | 89,000,000 | 89,000,000 | 2024-02-07 | 2024-02-13 | KANTOR AKUNTAN PUBLIK HARYONO, JUNIANTO DAN ANWAR | 01.882.064.7-003.000 | 9,722,800 | 9.81 % | |
66 | 2024 | Dinas Pertanian | Jasa Perencanaan Jalan Usaha Tani (JUT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1703282 | 48312620 | APBD | 79,800,000 | 79,800,000 | 79,698,000 | 79,698,000 | 79,587,000 | 79,587,000 | 79,587,000 | 79,587,000 | 2024-02-13 | 2024-02-21 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 102,000 | 0.13 % | |
67 | 2024 | Dinas Pertanian | Jasa Perencanaan Renovasi Gedung Kantor Toilet/WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1704282 | 48313616 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-02-15 | 2024-02-22 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 15,000 | 0.1 % | |
68 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Aula Kodim Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1705282 | 48096457 | APBD | 100,000,000 | 100,000,000 | 99,863,152 | 99,863,152 | 98,958,502 | 98,958,502 | 98,958,502 | 98,958,502 | 2024-02-25 | 2024-03-01 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 136,848 | 0.14 % | |
69 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1706282 | 47465606 | APBD | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-18 | 2024-02-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 50,000 | 0.25 % | |
70 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1707282 | 47457683 | APBD | 60,000,000 | 59,940,000 | 59,829,000 | 59,829,000 | 58,885,500 | 58,885,500 | 58,885,500 | 58,885,500 | 2024-02-18 | 2024-02-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 171,000 | 0.29 % | |
71 | 2024 | Dinas Kesehatan | Perencanaan Renovasi Gedung Kantor Dinas Kesehatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1708282 | 49732613 | APBD | 50,000,000 | 49,356,111 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 2024-02-13 | 2024-02-22 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 771,500 | 1.54 % | |
72 | 2024 | RSUD Daha Sejahtera | Perencanaan Urugan Lahan Rumah Sakit (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1709282 | 49684546 | APBD | 50,000,000 | 49,999,999 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 2024-02-13 | 2024-02-22 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 161,000 | 0.32 % | |
73 | 2024 | Dinas Kesehatan | Pengawasan Renovasi Gedung Kantor Dinas Kesehatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1710282 | 49732740 | APBD | 50,000,000 | 49,751,202 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 2024-10-08 | 2024-10-16 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 383,000 | 0.77 % | |
74 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1711282 | 48097924 | APBD | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,067,500 | 99,067,500 | 99,067,500 | 99,067,500 | 2024-03-20 | 2024-03-28 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 322,000 | 0.32 % | |
75 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Perpustakaan SDN SUNGAI KALI dan Ruang Guru SDN MADANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1712282 | 48540111 | APBD | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,771,300 | 39,771,300 | 0 | 39,771,300 | 2024-02-20 | 2024-02-26 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 111,000 | 0.28 % | |
76 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Tempat Ibadah SDN Pandulangan (Padang Batung) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1713282 | 48540241 | APBD | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-02-20 | 2024-02-26 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 111,000 | 0.56 % | |
77 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Utilitas (Halaman & Pagar) Kec.Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1714282 | 48540226 | APBD | 80,000,000 | 80,000,000 | 79,778,000 | 79,778,000 | 79,675,800 | 79,675,800 | 0 | 79,675,800 | 2024-02-20 | 2024-02-26 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 222,000 | 0.28 % | |
78 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Perpustakaan, Lab.Komputer,UKS) SDN 1 Batang Kulur Kiri (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1715282 | 48540108 | APBD | 90,000,000 | 90,000,000 | 89,889,000 | 89,889,000 | 89,810,100 | 89,810,100 | 89,810,100 | 89,810,100 | 2024-02-17 | 2024-02-22 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.12 % | |
79 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN Rehab Kelas (SDN 2 SUNGAI JARUM, ANJIRAN SUNGAI RAYA, TAMBAK PIPII, MANDAPAI, 2 TANITI, KARANG BULAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1716282 | 48540099 | APBD | 100,000,000 | 100,000,000 | 99,833,500 | 99,833,500 | 99,733,500 | 99,733,500 | 99,733,500 | 99,733,500 | 2024-02-17 | 2024-02-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 166,500 | 0.17 % | |
80 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Ruang Kelas kec. Kandangan, Simpur dan Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1717282 | 48540117 | APBD | 100,000,000 | 100,000,000 | 99,889,000 | 99,889,000 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-02-17 | 2024-02-22 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.11 % | |
81 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN PEMB.SARAPRAS UTILITAS (SDN TUMBUKAN BANYU, 1 TIBUNG RAYA, AMAWANG KIRI MUKA, 3 BAGO TANGGUL, BANJARBARU, ANGKINANG, PANTAI ULIN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1718282 | 48540125 | APBD | 100,000,000 | 100,000,000 | 99,778,000 | 99,778,000 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2024-02-17 | 2024-02-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 222,000 | 0.22 % | |
82 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Pagar dan Urugan Lahan Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1725282 | 48091178 | APBD | 50,000,000 | 50,000,000 | 49,850,100 | 49,850,100 | 49,339,500 | 49,339,500 | 49,339,500 | 49,339,500 | 2024-03-23 | 2024-03-28 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 149,900 | 0.3 % | |
83 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 Pakuan Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1726282 | 46875340 | APBD | 137,200,000 | 137,180,281 | 137,016,001 | 137,016,001 | 136,932,243 | 136,932,243 | 0 | 136,932,243 | 2024-02-23 | 2024-02-28 | cv. nurulillah | 50.826.160.9-733.000 | 183,999 | 0.13 % | |
84 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Longawang, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1727282 | 46981179 | APBD | 151,200,000 | 151,176,559 | 150,926,797 | 150,926,797 | 150,815,438 | 150,815,438 | 0 | 150,815,438 | 2024-02-24 | 2024-02-28 | cv. nurulillah | 50.826.160.9-733.000 | 273,203 | 0.18 % | |
85 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1728282 | 48091685 | APBD | 100,000,000 | 100,000,000 | 99,600,039 | 99,600,039 | 98,925,975 | 98,925,975 | 98,925,975 | 98,925,975 | 2024-03-31 | 2024-04-05 | CV. Sembilan Dua Teknik Konsultan | 81.763.047.8-731.000 | 399,961 | 0.4 % | |
86 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Logistik/Samapta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1729282 | 48093661 | APBD | 30,000,000 | 30,000,000 | 29,870,100 | 29,870,100 | 29,470,500 | 29,470,500 | 29,470,500 | 29,470,500 | 2024-03-23 | 2024-03-28 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 129,900 | 0.43 % | |
87 | 2024 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Ahli (BLUD) - KAP BLUD | Pengadaan Langsung | Jasa Lainnya | 1732282 | 49984077 | BLUD | 50,000,000 | 36,907,500 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 2024-02-27 | 2024-03-07 | KAP GIDEON ADI DAN REKAN | 03.215.027.8-615.001 | 15,000,000 | 30 % | |
88 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan WC (SDN 1 SIRIH HULU, SDN 1 TALUK LABAK, SDN GUMBIL, SDN HAMAYUNG UTARA ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1733282 | 50028037 | APBD | 35,000,000 | 34,999,998 | 34,800,000 | 34,800,000 | 34,743,000 | 34,743,000 | 0 | 34,743,000 | 2024-02-26 | 2024-02-29 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 200,000 | 0.57 % | |
89 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1734282 | 48108198 | APBD | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,644,958 | 19,644,958 | 19,644,958 | 19,644,958 | 2024-04-17 | 2024-04-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 20,000 | 0.1 % | |
90 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jalan Ruas Simpur - SP. 3 Muara Paring Agung - Taal Batang Kulur Kec. Simpur/Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1735282 | 50096033 | APBD | 200,000,000 | 199,965,000 | 199,850,000 | 199,850,000 | 199,800,050 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-02-27 | 2024-03-04 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 150,000 | 0.08 % | |
91 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1736282 | 47469266 | APBD | 198,849,510 | 198,710,932 | 198,500,260 | 198,500,260 | 197,978,549 | 197,978,549 | 197,978,549 | 197,978,549 | 2024-03-04 | 2024-03-11 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 349,250 | 0.18 % | |
92 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1738282 | 48985570 | APBD | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,602,600 | 19,602,600 | 19,602,600 | 19,602,600 | 2024-03-31 | 2024-04-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
93 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1739282 | 48985278 | APBD | 20,000,000 | 20,000,000 | 19,977,800 | 19,977,800 | 19,635,900 | 19,635,900 | 19,635,900 | 19,635,900 | 2024-03-31 | 2024-04-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 22,200 | 0.11 % | |
94 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1741282 | 48985507 | APBD | 20,000,000 | 20,000,000 | 19,977,800 | 19,977,800 | 19,635,900 | 19,635,900 | 19,635,900 | 19,635,900 | 2024-03-31 | 2024-04-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 22,200 | 0.11 % | |
95 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 1 SAMUDA | Pengadaan Langsung | Pekerjaan Konstruksi | 1742282 | 46873360 | APBD | 168,000,000 | 167,982,626 | 167,798,935 | 167,798,935 | 167,693,485 | 167,693,485 | 0 | 167,693,485 | 2024-02-28 | 2024-03-04 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 201,065 | 0.12 % | |
96 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Badaun, Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 1743282 | 46873651 | APBD | 165,200,000 | 165,057,796 | 164,827,260 | 164,827,260 | 164,709,600 | 164,709,600 | 0 | 164,709,600 | 2024-02-28 | 2024-03-04 | CV. KHALIF | 81.540.809.1-733.000 | 372,740 | 0.23 % | |
97 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 2 SUNGAI JARUM | Pengadaan Langsung | Pekerjaan Konstruksi | 1744282 | 46997543 | APBD | 170,000,000 | 169,997,128 | 169,802,069 | 169,802,069 | 169,711,049 | 169,711,049 | 0 | 169,711,049 | 2024-02-28 | 2024-03-04 | FADWI UTAMA | 94.246.044.5-733.000 | 197,931 | 0.12 % | |
98 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Pramuka Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1745282 | 48098358 | APBD | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,349,500 | 39,349,500 | 39,349,500 | 39,349,500 | 2024-03-17 | 2024-03-22 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
99 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Pos Polisi di Kecamatan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1746282 | 48092257 | APBD | 20,000,000 | 20,000,000 | 19,846,800 | 19,846,800 | 19,447,200 | 19,447,200 | 19,447,200 | 19,447,200 | 2024-03-19 | 2024-03-28 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 153,200 | 0.77 % | |
100 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1747282 | 48099326 | APBD | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | 2024-03-28 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
101 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama TNI AD Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1748282 | 48100527 | APBD | 50,000,000 | 50,000,000 | 49,852,302 | 49,852,302 | 49,284,000 | 49,284,000 | 49,284,000 | 49,284,000 | 2024-03-20 | 2024-03-28 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 147,698 | 0.3 % | |
102 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1749282 | 48104132 | APBD | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,644,725 | 19,644,725 | 19,644,725 | 19,644,725 | 2024-03-31 | 2024-04-05 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,700 | 0.49 % | |
103 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1750282 | 48104285 | APBD | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | 2024-03-28 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
104 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1751282 | 48104818 | APBD | 20,000,000 | 20,000,000 | 19,970,000 | 19,970,000 | 19,692,500 | 19,692,500 | 19,692,500 | 19,692,500 | 2024-04-01 | 2024-04-05 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 30,000 | 0.15 % | |
105 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1752282 | 48104862 | APBD | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | 2024-03-28 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
106 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 2 Samuda Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 1753282 | 46873572 | APBD | 168,000,000 | 167,984,675 | 167,827,593 | 167,827,593 | 167,731,929 | 167,731,929 | 0 | 167,731,929 | 2024-03-04 | 2024-03-08 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 172,407 | 0.1 % | |
107 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1754282 | 48988652 | APBD | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,722,500 | 19,722,500 | 19,722,500 | 19,722,500 | 2024-04-01 | 2024-04-05 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.28 % | |
108 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Perpustakaan SDN Sungai Kali | Pengadaan Langsung | Pekerjaan Konstruksi | 1755282 | 46871132 | APBD | 200,000,000 | 199,942,776 | 199,853,976 | 199,853,976 | 199,747,543 | 199,747,543 | 0 | 199,747,543 | 2024-03-01 | 2024-03-06 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 146,024 | 0.07 % | |
109 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN SDN 3 BAGO TANGGUL | Pengadaan Langsung | Pekerjaan Konstruksi | 1756282 | 46980944 | APBD | 190,000,000 | 189,990,566 | 189,902,476 | 189,902,476 | 189,806,414 | 189,806,414 | 0 | 189,806,414 | 2024-03-06 | 2024-03-14 | CV. YONIA | 02.089.778.1-733.000 | 97,524 | 0.05 % | |
110 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1757282 | 48103837 | APBD | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,644,725 | 19,644,725 | 19,644,725 | 19,644,725 | 2024-03-31 | 2024-04-05 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,700 | 0.49 % | |
111 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Bakarung Tengah (Angkinang) | Pengadaan Langsung | Pekerjaan Konstruksi | 1758282 | 46981116 | APBD | 170,800,000 | 170,781,764 | 170,714,880 | 170,714,880 | 170,627,745 | 170,627,745 | 0 | 170,627,745 | 2024-04-19 | 2024-04-24 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 85,120 | 0.05 % | |
112 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Balah Paikat DAHA UTARA | Pengadaan Langsung | Pekerjaan Konstruksi | 1759282 | 46874625 | APBD | 168,000,000 | 167,960,513 | 167,924,801 | 167,924,801 | 167,791,601 | 167,791,601 | 0 | 167,791,601 | 2024-02-29 | 2024-03-05 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 75,199 | 0.04 % | |
113 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Kambang Basar | Pengadaan Langsung | Pekerjaan Konstruksi | 1760282 | 46981156 | APBD | 151,200,000 | 151,178,577 | 151,088,192 | 151,088,192 | 150,932,792 | 150,932,792 | 0 | 150,932,792 | 2024-02-29 | 2024-03-05 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 111,808 | 0.07 % | |
114 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN KARANG BULAN | Pengadaan Langsung | Pekerjaan Konstruksi | 1761282 | 46998453 | APBD | 190,000,000 | 189,861,933 | 189,665,117 | 189,665,117 | 189,515,662 | 189,515,662 | 0 | 189,515,662 | 2024-03-01 | 2024-03-06 | CV. KHALIF | 81.540.809.1-733.000 | 334,883 | 0.18 % | |
115 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN MUARA ULANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1762282 | 46998861 | APBD | 198,912,000 | 198,752,261 | 198,473,111 | 198,473,111 | 198,397,034 | 198,397,034 | 0 | 198,397,034 | 2024-04-26 | 2024-05-03 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 438,889 | 0.22 % | |
116 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN PANGLIMA DAMBUNG | Pengadaan Langsung | Pekerjaan Konstruksi | 1763282 | 46980881 | APBD | 140,000,000 | 139,987,118 | 139,910,528 | 139,910,528 | 139,852,808 | 139,852,808 | 0 | 139,852,808 | 2024-03-06 | 2024-03-14 | CV. BUANA PRIMA MANDIRI | 02.675.388.9-733.000 | 89,472 | 0.06 % | |
117 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 1764282 | 46874869 | APBD | 165,200,000 | 165,193,314 | 165,020,201 | 165,020,201 | 164,931,401 | 164,931,401 | 0 | 164,931,401 | 2024-03-13 | 2024-03-20 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 179,799 | 0.11 % | |
118 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN TUMBUKAN BANYU | Pengadaan Langsung | Pekerjaan Konstruksi | 1765282 | 46874947 | APBD | 170,000,000 | 169,854,328 | 169,774,981 | 169,774,981 | 169,668,199 | 169,668,199 | 0 | 169,668,199 | 2024-02-29 | 2024-03-05 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 225,019 | 0.13 % | |
119 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1766282 | 50153077 | APBD | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-03-01 | 2024-03-05 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 131,000 | 0.66 % | |
120 | 2024 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Parkir Pasar Senin Negara Blok E | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1767282 | 50153098 | APBD | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-01 | 2024-03-05 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 242,000 | 1.21 % | |
121 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Perencanaan Rehab Balai Penyuluhan KB Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1768282 | 48397840 | APBD | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 2024-02-28 | 2024-03-08 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 236,000 | 1.69 % | |
122 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SD 2024 (SDN MALUTU dan SDN 2 KAPUH TENGAH) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1769282 | 48541465 | APBD | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-18 | 2024-03-22 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.14 % | |
123 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan SDN SUNGAI KALI dan Ruang Guru SDN MADANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1770282 | 48541433 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-14 | 2024-03-20 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
124 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Tempat Ibadah SDN Pandulangan Kec. padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1772282 | 48541500 | APBD | 15,000,000 | 14,999,996 | 14,900,000 | 14,900,000 | 14,874,000 | 14,874,000 | 0 | 14,874,000 | 2024-03-14 | 2024-03-20 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.67 % | |
125 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas (Halaman & Pagar) Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1773282 | 48541490 | APBD | 70,000,000 | 70,000,000 | 69,944,500 | 69,944,500 | 69,874,500 | 69,874,500 | 0 | 69,874,500 | 2024-03-04 | 2024-03-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 55,500 | 0.08 % | |
126 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas (Halaman & Pagar) SD Kec Daha Utara, Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1774282 | 48541488 | APBD | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-14 | 2024-03-20 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.14 % | |
127 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas Halaman dan Pagar SD Kec Telaga langsat, Kalumpang, Angkinang, Padang batung dan Kec Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1775282 | 48541492 | APBD | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-04 | 2024-03-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.16 % | |
128 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Perpustakaan, Lab.Komputer,UKS) SDN 1 Batang Kulur Kiri (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1776282 | 48541451 | APBD | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-19 | 2024-03-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.14 % | |
129 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN Rehab Kelas (SDN 2 SUNGAI JARUM, ANJIRAN SUNGAI RAYA, TAMBAK PIPII, MANDAPAI, 2 TANITI, KARANG BULAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1777282 | 48541405 | APBD | 90,000,000 | 90,000,000 | 89,900,000 | 89,900,000 | 89,799,000 | 89,799,000 | 0 | 89,799,000 | 2024-03-04 | 2024-03-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.11 % | |
130 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas Loksado, Daha Utara , Daha Barat dan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1778282 | 48541458 | APBD | 80,000,000 | 80,000,000 | 79,900,000 | 79,900,000 | 79,809,000 | 79,809,000 | 0 | 79,809,000 | 2024-03-19 | 2024-03-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.12 % | |
131 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas SDN PARIANGAN KEC.PADANG BATUNG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1779282 | 48541460 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-18 | 2024-03-22 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
132 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas kec. Kandangan, Simpur dan Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1780282 | 48541453 | APBD | 80,000,000 | 80,000,000 | 79,900,000 | 79,900,000 | 79,809,000 | 79,809,000 | 0 | 79,809,000 | 2024-03-19 | 2024-03-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.12 % | |
133 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN PEMB.SARAPRAS UTILITAS (SDN TUMBUKAN BANYU, 1 TIBUNG RAYA, AMAWANG KIRI MUKA, 3 BAGO TANGGUL, BANJARBARU, ANGKINANG, PANTAI ULIN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1781282 | 48541423 | APBD | 90,000,000 | 90,000,000 | 89,900,000 | 89,900,000 | 89,799,000 | 89,799,000 | 0 | 89,799,000 | 2024-03-18 | 2024-03-22 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.11 % | |
134 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1783282 | 50237309 | APBD | 25,000,000 | 24,672,000 | 24,649,770 | 24,649,770 | 24,594,270 | 24,594,270 | 100 | 24,594,270 | 2024-03-05 | 2024-03-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 350,230 | 1.4 % | |
135 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan Kalaka Indah dan sekitarnya Desa Tibung Raya Kec.Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1785282 | 50237178 | APBD | 25,000,000 | 24,672,000 | 24,571,848 | 24,571,848 | 24,527,448 | 24,527,448 | 100 | 24,527,448 | 2024-03-10 | 2024-03-18 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 428,152 | 1.71 % | |
136 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya (600x2 m) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1787282 | 50081915 | APBD | 30,000,000 | 29,646,000 | 29,535,493 | 29,535,493 | 29,513,293 | 29,513,293 | 100 | 29,513,293 | 2024-04-19 | 2024-04-25 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 464,507 | 1.55 % | |
137 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1788282 | 50237134 | APBD | 20,000,000 | 19,697,000 | 19,680,300 | 19,680,300 | 19,624,800 | 19,624,800 | 100 | 19,624,800 | 2024-03-05 | 2024-03-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 319,700 | 1.6 % | |
138 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1789282 | 50081453 | APBD | 100,000,000 | 99,738,000 | 99,386,514 | 99,386,514 | 99,331,014 | 99,331,014 | 100 | 99,331,014 | 2024-03-10 | 2024-03-18 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 613,486 | 0.61 % | |
139 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1790282 | 50081873 | APBD | 60,000,000 | 59,944,000 | 59,776,830 | 59,776,830 | 59,754,630 | 59,754,630 | 100 | 59,754,630 | 2024-03-05 | 2024-03-15 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 223,170 | 0.37 % | |
140 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1799282 | 50240583 | APBD | 15,000,000 | 14,949,000 | 14,936,715 | 14,936,715 | 14,881,215 | 14,881,215 | 100 | 14,881,215 | 2024-03-05 | 2024-03-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 63,285 | 0.42 % | |
141 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Kel. Jambu Hilir, RT 04 Kel. Kandangan Kota dan RT 01 Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1800282 | 50410940 | APBD | 45,000,000 | 44,849,000 | 44,682,546 | 44,682,546 | 44,610,345 | 44,610,345 | 100 | 44,610,345 | 2024-04-18 | 2024-04-24 | cv.nawasena konsultan | 62.243.237.5-731.000 | 317,454 | 0.71 % | |
142 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tabihi, Desa Durian Rabung dan Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1801282 | 50417596 | APBD | 45,000,000 | 44,622,000 | 44,584,260 | 44,584,260 | 44,417,760 | 44,417,760 | 100 | 44,417,760 | 2024-03-05 | 2024-03-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 415,740 | 0.92 % | |
143 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan dan RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1802282 | 50411148 | APBD | 30,000,000 | 29,447,000 | 29,268,758 | 29,268,758 | 29,224,358 | 29,224,358 | 100 | 29,224,358 | 2024-03-19 | 2024-03-22 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 731,243 | 2.44 % | |
144 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 02 Desa Gambah Luar Muka dan Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1803282 | 50414339 | APBD | 30,000,000 | 29,447,000 | 29,336,154 | 29,336,154 | 29,291,754 | 29,291,754 | 100 | 29,291,754 | 2024-03-19 | 2024-03-22 | Wing Rastafarindo | 03.282.590.3-732.000 | 663,846 | 2.21 % | |
145 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 dan RT 03 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1804282 | 50417776 | APBD | 30,000,000 | 29,447,000 | 29,336,154 | 29,336,154 | 29,280,654 | 29,280,654 | 100 | 29,280,654 | 2024-04-19 | 2024-04-25 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 663,846 | 2.21 % | |
146 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Bakarung dan Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1805282 | 50417232 | APBD | 30,000,000 | 29,447,000 | 29,280,654 | 29,280,654 | 29,255,160 | 29,255,160 | 100 | 29,255,160 | 2024-04-19 | 2024-04-25 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 719,346 | 2.4 % | |
147 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1806282 | 50416752 | APBD | 75,000,000 | 74,522,000 | 74,368,890 | 74,368,890 | 74,291,190 | 74,291,190 | 100 | 74,291,190 | 2024-03-10 | 2024-03-18 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 631,110 | 0.84 % | |
148 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 08 Kel. Kandangan Utara dan RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1807282 | 50416630 | APBD | 30,000,000 | 29,447,000 | 29,196,552 | 29,196,552 | 29,141,052 | 29,141,052 | 100 | 29,141,052 | 2024-03-26 | 2024-04-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 803,448 | 2.68 % | |
149 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan (Halaman Paving Block) SMP Negeri 2 Padang Batung dan SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1808282 | 48540254 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,870,100 | 29,870,100 | 0 | 29,870,100 | 2024-03-10 | 2024-03-18 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
150 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Ruang Kelas Baru SMP SMP Negeri 4 Daha Utara dan SMP Negeri 5 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1809282 | 48540278 | APBD | 65,000,000 | 64,999,991 | 64,889,999 | 64,889,999 | 64,824,000 | 64,824,000 | 0 | 64,824,000 | 2024-03-10 | 2024-03-18 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 110,001 | 0.17 % | |
151 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado dan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1810282 | 48540260 | APBD | 25,000,000 | 24,999,997 | 24,900,000 | 24,900,000 | 24,864,000 | 24,864,000 | 0 | 24,864,000 | 2024-03-10 | 2024-03-18 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.4 % | |
152 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Kelas SMP Negeri 4 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1811282 | 48540245 | APBD | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-03-10 | 2024-03-18 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.5 % | |
153 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang dan Perencanaan Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1812282 | 48540276 | APBD | 45,000,000 | 44,999,999 | 44,900,000 | 44,900,000 | 44,844,000 | 44,844,000 | 0 | 44,844,000 | 2024-03-10 | 2024-03-18 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,001 | 0.22 % | |
154 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Balimau | Pengadaan Langsung | Pekerjaan Konstruksi | 1813282 | 46981131 | APBD | 151,200,000 | 151,174,182 | 151,000,447 | 151,000,447 | 150,893,136 | 150,893,136 | 0 | 150,893,136 | 2024-03-08 | 2024-03-18 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 199,553 | 0.13 % | |
155 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 MANDALA (Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 1814282 | 46875052 | APBD | 137,200,000 | 137,192,734 | 137,088,895 | 137,088,895 | 137,033,395 | 137,033,395 | 0 | 137,033,395 | 2024-04-02 | 2024-04-17 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 111,105 | 0.08 % | |
156 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 1 Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 1815282 | 46873481 | APBD | 168,000,000 | 167,990,640 | 167,802,724 | 167,802,724 | 167,702,047 | 167,702,047 | 0 | 167,702,047 | 2024-03-08 | 2024-03-18 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 197,276 | 0.12 % | |
157 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 TIBUNG RAYA | Pengadaan Langsung | Pekerjaan Konstruksi | 1816282 | 46875857 | APBD | 150,000,000 | 149,978,150 | 149,774,941 | 149,774,941 | 149,675,818 | 149,675,818 | 0 | 149,675,818 | 2024-03-08 | 2024-03-18 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 225,059 | 0.15 % | |
158 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN AMAWANG KIRI MUKA | Pengadaan Langsung | Pekerjaan Konstruksi | 1817282 | 46981037 | APBD | 150,000,000 | 149,998,066 | 149,712,954 | 149,712,954 | 149,612,343 | 149,612,343 | 0 | 149,612,343 | 2024-03-13 | 2024-03-20 | FADWI UTAMA | 94.246.044.5-733.000 | 287,047 | 0.19 % | |
159 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Muning Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 1818282 | 46874732 | APBD | 170,800,000 | 170,799,373 | 170,611,036 | 170,611,036 | 170,496,255 | 170,496,255 | 0 | 170,496,255 | 2024-03-08 | 2024-03-18 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 188,964 | 0.11 % | |
160 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN Padang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1819282 | 46980975 | APBD | 159,600,000 | 159,572,161 | 159,300,205 | 159,300,205 | 159,185,098 | 159,185,098 | 0 | 159,185,098 | 2024-03-08 | 2024-03-18 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 299,795 | 0.19 % | |
161 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN Pandan Sari | Pengadaan Langsung | Pekerjaan Konstruksi | 1820282 | 46981016 | APBD | 151,200,000 | 151,191,867 | 151,149,576 | 151,149,576 | 151,066,659 | 151,066,659 | 0 | 151,066,659 | 2024-03-08 | 2024-03-18 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 50,424 | 0.03 % | |
162 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 1821282 | 46980905 | APBD | 168,000,000 | 167,996,564 | 167,753,882 | 167,753,882 | 167,664,250 | 167,664,250 | 0 | 167,664,250 | 2024-03-08 | 2024-03-18 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 246,118 | 0.15 % | |
163 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN THOBA | Pengadaan Langsung | Pekerjaan Konstruksi | 1822282 | 46980915 | APBD | 148,400,000 | 148,380,948 | 148,195,838 | 148,195,838 | 148,107,038 | 148,107,038 | 0 | 148,107,038 | 2024-03-08 | 2024-03-18 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 204,162 | 0.14 % | |
164 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang guru dan Kepsek SDN 2 MADANG Padang batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 1823282 | 46869589 | APBD | 200,000,000 | 199,915,544 | 199,776,794 | 199,776,794 | 199,667,255 | 199,667,255 | 0 | 199,667,255 | 2024-03-13 | 2024-03-20 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 223,206 | 0.11 % | |
165 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 4 Jambu Hilir Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 1824282 | 46997811 | APBD | 198,912,000 | 198,817,674 | 198,706,674 | 198,706,674 | 198,595,861 | 198,595,861 | 0 | 198,595,861 | 2024-03-20 | 2024-03-27 | cv. nurulillah | 50.826.160.9-733.000 | 205,326 | 0.1 % | |
166 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1825282 | 47472611 | APBD | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-11 | 2024-03-18 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 114,350 | 0.57 % | |
167 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Bajayau Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 1826282 | 46874079 | APBD | 165,200,000 | 165,041,539 | 164,986,039 | 164,986,039 | 164,892,383 | 164,892,383 | 0 | 164,892,383 | 2024-03-22 | 2024-03-27 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 213,961 | 0.13 % | |
168 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN HAMAK | Pengadaan Langsung | Pekerjaan Konstruksi | 1828282 | 46980952 | APBD | 137,200,000 | 137,197,556 | 137,142,056 | 137,142,056 | 137,069,471 | 137,069,471 | 0 | 137,069,471 | 2024-03-20 | 2024-03-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 57,944 | 0.04 % | |
169 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Kelas SMP Negeri 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 1829282 | 47051893 | APBD | 195,804,000 | 195,799,467 | 195,533,576 | 195,137,363 | 195,087,413 | 195,087,413 | 0 | 195,087,413 | 2024-03-23 | 2024-03-28 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 270,424 | 0.14 % | |
170 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang Ruang Kelas SMP Negeri 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1830282 | 47051992 | APBD | 168,350,000 | 168,344,429 | 168,266,729 | 168,266,729 | 168,175,154 | 168,175,154 | 0 | 168,175,154 | 2024-03-23 | 2024-03-28 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 83,271 | 0.05 % | |
171 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan DAK Fisik SMP Negeri 1 Kandangan, SMP Negeri 3 Kandangan, SMP Negeri 1 Daha Utara, dan SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1831282 | 48540103 | APBD | 90,000,000 | 90,000,000 | 89,754,600 | 89,754,600 | 89,688,000 | 89,688,000 | 0 | 89,688,000 | 2024-03-23 | 2024-03-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 245,400 | 0.27 % | |
172 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan DAK Fisik Tahun 2024 Kec. Loksado dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1832282 | 48540274 | APBD | 90,000,000 | 90,000,000 | 89,665,800 | 89,665,800 | 89,577,000 | 89,577,000 | 0 | 89,577,000 | 2024-03-23 | 2024-03-28 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 334,200 | 0.37 % | |
173 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran Ruas Jalan Bamban Selatan - Pakuan Timur Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1834282 | 50579352 | APBD | 35,000,000 | 34,991,622 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | 2024-03-27 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
174 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1835282 | 50464092 | APBD | 20,000,000 | 19,907,000 | 19,879,268 | 19,879,268 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-04-17 | 2024-04-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 120,733 | 0.6 % | |
175 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Jembatan Wawaran Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1837282 | 50628387 | APBD | 80,000,000 | 79,991,300 | 79,491,540 | 79,491,540 | 79,400,000 | 79,400,000 | 79,400,000 | 79,400,000 | 2024-05-01 | 2024-05-13 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 508,460 | 0.64 % | |
176 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Ruas Jalan SMAN Negara Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1838282 | 50442142 | APBD | 80,000,000 | 79,991,300 | 79,347,462 | 79,347,462 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2024-03-19 | 2024-03-25 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 652,538 | 0.82 % | |
177 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Desa Jambu Hulu Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1841282 | 50575126 | APBD | 35,000,000 | 34,991,600 | 34,852,872 | 34,852,872 | 34,700,000 | 34,700,000 | 34,700,000 | 34,700,000 | 2024-05-01 | 2024-05-08 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 147,128 | 0.42 % | |
178 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Gantung Desa Jambu Hulu - Desa Durian Rabung Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1844282 | 50629010 | APBD | 60,000,000 | 59,870,700 | 59,369,460 | 59,369,460 | 59,300,000 | 59,300,000 | 59,300,000 | 59,300,000 | 2024-05-01 | 2024-05-13 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 630,540 | 1.05 % | |
179 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Desa Bumi Berkat Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1845282 | 50576028 | APBD | 35,000,000 | 34,991,600 | 34,797,372 | 34,797,372 | 34,700,000 | 34,700,000 | 34,700,000 | 34,700,000 | 2024-03-25 | 2024-03-29 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 202,628 | 0.58 % | |
180 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rekonstruksi Ruas Jalan Baru - Ds. Bajayau Kec. Daha Barat (lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1846282 | 50549231 | APBD | 60,000,000 | 59,870,700 | 59,720,220 | 59,720,220 | 59,650,000 | 59,650,000 | 59,650,000 | 59,650,000 | 2024-03-15 | 2024-03-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 279,780 | 0.47 % | |
181 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Ruas Jalan Angkinang - Telaga Langsat Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1847282 | 50463544 | APBD | 50,000,000 | 49,886,000 | 49,653,075 | 49,653,075 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-03-20 | 2024-03-27 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 346,925 | 0.69 % | |
182 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Siring Pasangan Batu Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1848282 | 50577876 | APBD | 35,000,000 | 34,991,600 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | 2024-03-27 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
183 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Simpur - SP.3 Paring Agung Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1849282 | 50550936 | APBD | 60,000,000 | 59,870,700 | 59,552,055 | 59,552,055 | 59,500,000 | 59,500,000 | 59,500,000 | 59,500,000 | 2024-04-26 | 2024-05-02 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 447,945 | 0.75 % | |
184 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Ruas Jalan Hamalau - Ganda Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1850282 | 50573792 | APBD | 50,000,000 | 49,886,000 | 49,636,252 | 49,636,252 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-03-25 | 2024-03-29 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 363,748 | 0.73 % | |
185 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Galuntang - Tayub Desa Madang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1851282 | 50464364 | APBD | 80,000,000 | 79,991,300 | 79,629,735 | 79,629,735 | 79,600,000 | 79,600,000 | 79,600,000 | 79,600,000 | 2024-03-20 | 2024-03-27 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 370,265 | 0.46 % | |
186 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Kandangan Hulu - Tabihi Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1852282 | 50465922 | APBD | 50,000,000 | 49,886,000 | 49,830,502 | 49,830,502 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-04-17 | 2024-04-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 169,498 | 0.34 % | |
187 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Telaga Banta Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1855282 | 50464946 | APBD | 50,000,000 | 49,886,000 | 49,691,752 | 49,691,752 | 49,500,000 | 49,500,000 | 49,500,000 | 49,500,000 | 2024-04-17 | 2024-04-23 | cv.nawasena konsultan | 62.243.237.5-731.000 | 308,248 | 0.62 % | |
188 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Angkinang Selatan - Tawia - Wawaran Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1856282 | 50551470 | APBD | 80,000,000 | 79,991,300 | 79,901,796 | 79,901,796 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-03-15 | 2024-03-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 98,204 | 0.12 % | |
189 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Ruas Jalan Sungai Kalang - Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1857282 | 50548629 | APBD | 100,000,000 | 99,937,700 | 99,887,846 | 99,887,846 | 99,400,000 | 99,400,000 | 99,400,000 | 99,400,000 | 2024-05-03 | 2024-05-13 | Wiyasa Drawana | 80.902.072.0-731.000 | 112,155 | 0.11 % | |
190 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Manggis (Desa Baru - Desa Asam) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1858282 | 50548319 | APBD | 60,000,000 | 59,870,700 | 59,800,784 | 59,800,784 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-03-28 | 2024-04-04 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 199,216 | 0.33 % | |
191 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1859282 | 50627663 | APBD | 35,000,000 | 34,991,600 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | 2024-03-27 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
192 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Ruas Jalan Gg. Bidan RT 03 Desa Tambak Bitin Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1861282 | 50447051 | APBD | 35,000,000 | 34,991,600 | 34,959,450 | 34,959,450 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-19 | 2024-03-25 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 40,550 | 0.12 % | |
193 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Haratai 3 Kec. Loksado (Bertahap) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1862282 | 50550120 | APBD | 60,000,000 | 59,870,700 | 59,796,810 | 59,796,810 | 59,650,000 | 59,650,000 | 59,650,000 | 59,650,000 | 2024-03-15 | 2024-03-21 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 203,190 | 0.34 % | |
194 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Menuju Mesjid Noor Desa Pagar Haur Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1864282 | 50548807 | APBD | 50,000,000 | 49,886,000 | 49,675,275 | 49,675,275 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-04-26 | 2024-05-02 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 324,725 | 0.65 % | |
195 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Kalumpang - Baruh Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1865282 | 50649889 | APBD | 60,000,000 | 59,870,700 | 59,824,560 | 59,824,560 | 59,600,000 | 59,600,000 | 59,600,000 | 59,600,000 | 2024-03-25 | 2024-03-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,440 | 0.29 % | |
196 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Papancan Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1866282 | 50549067 | APBD | 80,000,000 | 79,991,300 | 79,629,735 | 79,629,735 | 79,600,000 | 79,600,000 | 79,600,000 | 79,600,000 | 2024-03-20 | 2024-03-27 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 370,265 | 0.46 % | |
197 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Bajayau - Bajayau Tengah Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1870282 | 50629844 | APBD | 50,000,000 | 49,886,000 | 49,222,950 | 49,222,950 | 49,200,000 | 49,200,000 | 49,200,000 | 49,200,000 | 2024-03-20 | 2024-03-26 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 777,050 | 1.55 % | |
198 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Goha - Ds. Amawang Kanan Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1871282 | 50448240 | APBD | 60,000,000 | 59,870,700 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-03-19 | 2024-03-25 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
199 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Siang Gantung - Ds. Baru Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1872282 | 50649706 | APBD | 50,000,000 | 49,886,000 | 49,472,700 | 49,472,700 | 49,400,000 | 49,400,000 | 49,400,000 | 49,400,000 | 2024-03-21 | 2024-03-27 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 527,300 | 1.05 % | |
200 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Ruang Laboratorium Komputer beserta perabotnya SMP Negeri 1 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1875282 | 48541520 | APBD | 65,000,000 | 64,999,991 | 64,579,800 | 64,579,800 | 64,535,400 | 64,535,400 | 0 | 64,535,400 | 2024-03-20 | 2024-03-27 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 420,200 | 0.65 % | |
201 | 2024 | Dinas Ketahanan Pangan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1877282 | 50797106 | APBD | 10,000,000 | 10,000,000 | 9,934,500 | 9,934,500 | 9,879,000 | 9,879,000 | 9,879,000 | 9,879,000 | 2024-03-18 | 2024-03-25 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 65,500 | 0.66 % | |
202 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN PAMUJAAN | Pengadaan Langsung | Pekerjaan Konstruksi | 1878282 | 46999057 | APBD | 182,336,000 | 182,297,643 | 182,153,529 | 182,153,529 | 182,049,352 | 182,049,352 | 0 | 182,049,352 | 2024-03-21 | 2024-03-27 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 182,471 | 0.1 % | |
203 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN MANDAPAI | Pengadaan Langsung | Pekerjaan Konstruksi | 1880282 | 46998545 | APBD | 190,000,000 | 189,942,922 | 189,820,822 | 189,820,822 | 189,711,221 | 189,711,221 | 0 | 189,711,221 | 2024-04-17 | 2024-04-24 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 179,178 | 0.09 % | |
204 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SDN Pandulangan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1881282 | 46981229 | APBD | 182,336,000 | 182,191,232 | 181,917,921 | 181,917,921 | 181,818,021 | 181,818,021 | 0 | 181,818,021 | 2024-03-23 | 2024-03-28 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 418,079 | 0.23 % | |
205 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC dan Pagar SDN PANTAI ULIN | Pengadaan Langsung | Pekerjaan Konstruksi | 1883282 | 46981315 | APBD | 190,000,000 | 189,953,144 | 189,719,460 | 189,719,460 | 189,608,460 | 189,608,460 | 0 | 189,608,460 | 2024-03-23 | 2024-03-28 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 280,540 | 0.15 % | |
206 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN PANGGUNG SDN BAJAYAU TENGAH (Daha Barat) | Pengadaan Langsung | Pekerjaan Konstruksi | 1884282 | 46874237 | APBD | 165,200,000 | 165,179,297 | 165,048,422 | 165,048,422 | 164,948,522 | 164,948,522 | 0 | 164,948,522 | 2024-04-26 | 2024-05-03 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 151,578 | 0.09 % | |
207 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1886282 | 48107823 | APBD | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,504,553 | 39,504,553 | 39,504,553 | 39,504,553 | 2024-03-26 | 2024-04-03 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 111,000 | 0.28 % | |
208 | 2024 | RSUD Brigjen H. Hasan Basry | Pengawasan Pembangunan Baru Ruang Cathlab | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1888282 | 50892595 | BLUD | 75,000,000 | 74,939,909 | 74,884,409 | 74,884,409 | 74,750,000 | 74,750,000 | 74,750,000 | 74,750,000 | 2024-03-20 | 2024-03-27 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 115,591 | 0.15 % | |
209 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 1889282 | 47090996 | APBD | 196,000,000 | 195,972,765 | 195,786,432 | 195,786,432 | 195,730,932 | 195,730,932 | 0 | 195,730,932 | 2024-04-02 | 2024-04-17 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 213,568 | 0.11 % | |
210 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya, Pembangunan Halaman RA Perwanida Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1890282 | 48540286 | APBD | 30,000,000 | 30,000,000 | 29,878,980 | 29,878,980 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-21 | 2024-03-27 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 121,020 | 0.4 % | |
211 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Kelas TK Negeri 2 Daha Utara, Rehabilitasi Ruang Kelas PAUD/KB Rangganala Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1892282 | 48540325 | APBD | 30,000,000 | 30,000,000 | 29,600,000 | 29,600,000 | 29,526,000 | 29,526,000 | 0 | 29,526,000 | 2024-04-18 | 2024-04-24 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 400,000 | 1.33 % | |
212 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN TANAH BANGKANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1893282 | 46999331 | APBD | 198,912,000 | 198,781,335 | 198,476,997 | 198,476,997 | 198,372,601 | 198,372,601 | 0 | 198,372,601 | 2024-04-02 | 2024-04-17 | FADWI UTAMA | 94.246.044.5-733.000 | 435,003 | 0.22 % | |
213 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN TAMBAK PIPI | Pengadaan Langsung | Pekerjaan Konstruksi | 1894282 | 46999132 | APBD | 190,000,000 | 189,991,033 | 189,935,533 | 189,935,533 | 189,827,788 | 189,827,788 | 0 | 189,827,788 | 2024-03-26 | 2024-04-02 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 64,467 | 0.03 % | |
214 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan pembangunan musholla museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1895282 | 48540379 | APBD | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-03-26 | 2024-04-02 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 100,000 | 0.5 % | |
215 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Pagar dan Pembuatan Taman Bunga Cagar Budaya Tugu 2 Januari 1949 Desa Hamayung Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1896282 | 48540382 | APBD | 40,000,000 | 40,000,000 | 39,875,000 | 39,875,000 | 39,849,000 | 39,849,000 | 0 | 39,849,000 | 2024-03-26 | 2024-04-02 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 125,000 | 0.31 % | |
216 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Samuda-Bajayau Kec. Daha Barat (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1901282 | 51005112 | APBD | 200,000,000 | 199,978,000 | 199,668,229 | 199,668,229 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-03-26 | 2024-04-01 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 331,771 | 0.17 % | |
217 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan Jalan dan Parkir Kawasan islamic Center (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1908282 | 48094416 | APBD | 100,000,000 | 100,000,000 | 99,833,500 | 99,833,500 | 98,879,402 | 98,879,402 | 98,879,402 | 98,879,402 | 2024-03-26 | 2024-04-03 | Wing Rastafarindo | 03.282.590.3-732.000 | 166,500 | 0.17 % | |
218 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN WC SDN BANJARBARU | Pengadaan Langsung | Pekerjaan Konstruksi | 1913282 | 46981392 | APBD | 150,000,000 | 149,967,909 | 149,664,159 | 149,664,159 | 149,572,276 | 149,572,276 | 0 | 149,572,276 | 2024-03-25 | 2024-04-02 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 335,841 | 0.22 % | |
219 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1914282 | 46998763 | APBD | 178,192,000 | 178,125,497 | 177,944,043 | 177,944,043 | 177,839,921 | 177,839,921 | 0 | 177,839,921 | 2024-04-17 | 2024-04-24 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 247,957 | 0.14 % | |
220 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Telaga Sili-sili | Pengadaan Langsung | Pekerjaan Konstruksi | 1917282 | 46999485 | APBD | 198,912,000 | 198,734,787 | 198,650,247 | 198,650,247 | 198,530,367 | 198,530,367 | 0 | 198,530,367 | 2024-03-25 | 2024-04-02 | CV. LALUNA DANA | 02.237.179.3-733.000 | 261,753 | 0.13 % | |
221 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Interior Loby Polres HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 1928282 | 50436551 | APBD | 200,000,000 | 185,875,037 | 185,504,823 | 185,504,823 | 184,605,223 | 184,605,223 | 184,605,223 | 184,605,223 | 2024-03-31 | 2024-04-05 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 14,495,177 | 7.25 % | |
222 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1929282 | 48108059 | APBD | 20,000,000 | 20,000,000 | 19,902,587 | 19,902,587 | 19,569,587 | 19,569,587 | 19,569,587 | 19,569,587 | 2024-03-31 | 2024-04-05 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,413 | 0.49 % | |
223 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Hariti Sungai Raya Selatan Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1932282 | 51005005 | APBD | 200,000,000 | 199,917,000 | 199,850,027 | 199,850,027 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2024-04-02 | 2024-04-05 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 149,973 | 0.07 % | |
224 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 Bayanan | Pengadaan Langsung | Pekerjaan Konstruksi | 1933282 | 46992312 | APBD | 190,624,000 | 190,437,842 | 190,347,097 | 190,347,097 | 190,286,434 | 190,286,434 | 0 | 190,286,434 | 2024-04-02 | 2024-04-17 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 276,903 | 0.15 % | |
225 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN ANJIRAN SUNGAI RAYA | Pengadaan Langsung | Pekerjaan Konstruksi | 1934282 | 46997913 | APBD | 190,000,000 | 189,896,658 | 189,841,158 | 189,841,158 | 189,740,080 | 189,740,080 | 0 | 189,740,080 | 2024-04-03 | 2024-04-17 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 158,842 | 0.08 % | |
226 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kalumpang (Pemeliharaan Sungai dengan Lebar Sungai 8 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1935282 | 47467530 | APBD | 198,333,200 | 198,305,466 | 198,259,392 | 198,259,392 | 197,702,727 | 197,702,700 | 197,702,700 | 197,702,700 | 2024-04-02 | 2024-04-05 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 73,808 | 0.04 % | |
227 | 2024 | RSUD Daha Sejahtera | Pengawasan Urugan Lahan Rumah Sakit (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1936282 | 49684600 | APBD | 50,000,000 | 49,999,999 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 2024-04-03 | 2024-04-22 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 161,000 | 0.32 % | |
228 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman Paving Block) SMP Negeri 2 Padang Batung dan SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1937282 | 48541514 | APBD | 25,000,000 | 24,999,997 | 24,900,000 | 24,900,000 | 24,864,000 | 24,864,000 | 0 | 24,864,000 | 2024-04-17 | 2024-04-24 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.4 % | |
229 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado dan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1938282 | 48541534 | APBD | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-04-17 | 2024-04-24 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.5 % | |
230 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang dan Pengawasan Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1939282 | 48541536 | APBD | 40,000,000 | 40,000,000 | 39,900,000 | 39,900,000 | 39,849,000 | 39,849,000 | 0 | 39,849,000 | 2024-04-17 | 2024-04-24 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.25 % | |
231 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruaang Perpustakaan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 1940282 | 47088396 | APBD | 168,350,000 | 168,057,475 | 167,841,567 | 167,841,567 | 167,756,221 | 167,756,221 | 0 | 167,756,221 | 2024-04-17 | 2024-04-24 | CV. KHALIF | 81.540.809.1-733.000 | 508,433 | 0.3 % | |
232 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SMP Negeri 2 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1942282 | 47048178 | APBD | 194,820,000 | 194,816,719 | 194,656,093 | 194,656,093 | 194,568,014 | 194,568,014 | 0 | 194,568,014 | 2024-04-19 | 2024-04-24 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 163,907 | 0.08 % | |
233 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 1943282 | 47048303 | APBD | 171,900,000 | 171,892,418 | 171,571,354 | 171,571,354 | 171,485,884 | 171,485,884 | 0 | 171,485,884 | 2024-04-30 | 2024-05-08 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 328,646 | 0.19 % | |
234 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Depo Arsip Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1944282 | 48096246 | APBD | 100,000,000 | 100,000,000 | 99,800,100 | 99,800,100 | 98,734,500 | 98,734,500 | 98,734,500 | 98,734,500 | 2024-04-22 | 2024-04-29 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 199,900 | 0.2 % | |
235 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Interior Loby Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1952282 | 48091926 | APBD | 15,000,000 | 15,000,000 | 14,818,500 | 14,818,500 | 14,600,052 | 14,600,052 | 14,600,052 | 14,600,052 | 2024-04-22 | 2024-04-29 | cv.akmalindo | 02.531.482.4-731.000 | 181,500 | 1.21 % | |
236 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Tanah Bangkang dan Paharuangan - Asam Dua Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1954282 | 51420737 | APBD | 200,000,000 | 199,993,000 | 199,901,013 | 199,901,013 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-04-18 | 2024-04-25 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 98,987 | 0.05 % | |
237 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN 2 TANITI | Pengadaan Langsung | Pekerjaan Konstruksi | 1955282 | 46997698 | APBD | 160,000,000 | 159,932,060 | 159,671,674 | 159,671,674 | 159,593,974 | 159,593,974 | 0 | 159,593,974 | 2024-04-24 | 2024-04-30 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 328,326 | 0.21 % | |
238 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kapuh Darat | Pengadaan Langsung | Pekerjaan Konstruksi | 1956282 | 46998303 | APBD | 182,336,000 | 182,203,611 | 182,125,911 | 182,125,911 | 182,014,911 | 182,014,911 | 0 | 182,014,911 | 2024-04-25 | 2024-04-30 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 210,089 | 0.12 % | |
239 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 1957282 | 47088475 | APBD | 101,010,000 | 100,990,736 | 100,935,236 | 100,935,236 | 100,848,811 | 100,848,811 | 0 | 100,848,811 | 2024-04-24 | 2024-04-30 | CV. KATIBURA | 53.260.332.1-733.000 | 74,764 | 0.07 % | |
240 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1959282 | 47090925 | APBD | 195,000,000 | 194,969,196 | 194,924,796 | 194,924,796 | 194,814,784 | 194,814,784 | 0 | 194,814,784 | 2024-04-26 | 2024-05-03 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 75,204 | 0.04 % | |
241 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1962282 | 48104739 | APBD | 15,000,000 | 15,000,000 | 14,988,500 | 14,988,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-18 | 2024-11-25 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 11,500 | 0.08 % | |
242 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase di Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1963282 | 48103973 | APBD | 100,000,000 | 15,000,000 | 14,875,000 | 14,875,000 | 14,711,052 | 14,711,052 | 14,711,052 | 14,711,052 | 2024-04-23 | 2024-04-30 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 85,125,000 | 85.12 % | |
243 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1966282 | 48104219;50438178 | APBD | 15,000,000 | 15,000,000 | 14,976,000 | 14,976,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-10 | 2024-08-16 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 24,000 | 0.16 % | |
244 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Kawasan Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 1970282 | 50437410 | APBD | 195,200,000 | 195,095,250 | 195,077,028 | 195,077,028 | 194,022,429 | 194,022,429 | 194,022,429 | 194,022,429 | 2024-04-22 | 2024-04-29 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 122,972 | 0.06 % | |
245 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1971282 | 51423002 | APBD | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 2024-04-23 | 2024-05-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 232,000 | 2.32 % | |
246 | 2024 | Sekretariat DPRD | Gedung Kantor Sederhana (Pembangunan Mushala) | Pengadaan Langsung | Pekerjaan Konstruksi | 1972282 | 48140923 | APBD | 165,760,000 | 165,700,000 | 165,412,311 | 165,412,311 | 165,375,681 | 0 | 0 | 0 | 2024-04-23 | 2024-05-01 | CV. KHALIF | 81.540.809.1-733.000 | 347,689 | 0.21 % | |
247 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Oprit Jembatan Ruas Jl. Tanuhi - Ulang Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1973282 | 51421204 | APBD | 96,100,000 | 96,087,000 | 96,053,842 | 96,053,842 | 95,600,000 | 95,600,000 | 95,600,000 | 95,600,000 | 2024-04-26 | 2024-05-02 | CV. KATIBURA | 53.260.332.1-733.000 | 46,158 | 0.05 % | |
248 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang pusat sumber pendidikan inklusif beserta perabotnya SMP Negeri 1 Kandangan (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 1974282 | 47048401 | APBD | 188,800,000 | 188,796,384 | 188,718,684 | 188,718,684 | 188,571,397 | 188,571,397 | 0 | 188,571,397 | 2024-05-13 | 2024-05-20 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 81,316 | 0.04 % | |
249 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang pusat sumber pendidikan inklusif beserta perabotnya SMP Negeri 3 Kandangan (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 1975282 | 47048553 | APBD | 194,700,000 | 194,692,784 | 194,542,313 | 194,542,313 | 194,442,413 | 194,442,413 | 0 | 194,442,413 | 2024-04-25 | 2024-04-30 | CV. LALUNA DANA | 02.237.179.3-733.000 | 157,687 | 0.08 % | |
250 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SMP Tahun 2024 (SMP Negeri 2 Kandangan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1977282 | 48541527 | APBD | 85,000,000 | 84,999,993 | 84,899,999 | 84,899,999 | 84,815,100 | 84,815,100 | 0 | 84,815,100 | 2024-04-25 | 2024-05-03 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,001 | 0.12 % | |
251 | 2024 | Sekretariat DPRD | Jasa Konsultansi Pengawasan Arsitektur, Kategori 1 (Pengawasan Pembangunan Mushala) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1978282 | 48140581 | APBD | 15,000,000 | 15,000,000 | 14,857,350 | 14,857,350 | 14,857,350 | 0 | 0 | 0 | 2024-04-23 | 2024-05-01 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 142,650 | 0.95 % | |
252 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN 1 SIRIH HULU (Kalumpang) | Pengadaan Langsung | Pekerjaan Konstruksi | 1979282 | 46981343 | APBD | 100,000,000 | 99,793,081 | 99,737,581 | 99,737,581 | 99,665,958 | 99,665,958 | 0 | 99,665,958 | 2024-05-28 | 2024-06-04 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 262,419 | 0.26 % | |
253 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1981282 | 48108252 | APBD | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,713,050 | 14,713,050 | 14,713,050 | 14,713,050 | 2024-07-07 | 2024-07-15 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
254 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1983282 | 48984144 | APBD | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-07-08 | 2024-07-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
255 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1984282 | 48984336 | APBD | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-07-07 | 2024-07-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
256 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1989282 | 48984425 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,713,050 | 14,713,050 | 14,713,050 | 14,713,050 | 2024-07-07 | 2024-07-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
257 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Baru Kec Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 1991282 | 46998025 | APBD | 198,912,000 | 196,405,638 | 196,350,494 | 196,350,494 | 196,213,016 | 196,213,016 | 0 | 196,213,016 | 2024-04-24 | 2024-04-30 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 2,561,506 | 1.29 % | |
258 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 BARUH KEMBANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1992282 | 46992124 | APBD | 198,912,000 | 198,724,459 | 198,555,542 | 198,555,542 | 198,441,478 | 198,441,478 | 0 | 198,441,478 | 2024-04-24 | 2024-04-30 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 356,458 | 0.18 % | |
259 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN 1 TALUK LABAK | Pengadaan Langsung | Pekerjaan Konstruksi | 1993282 | 46981354 | APBD | 100,000,000 | 99,910,803 | 99,567,562 | 99,567,562 | 99,505,537 | 99,505,537 | 0 | 99,505,537 | 2024-04-24 | 2024-04-30 | CV. KHALIF | 81.540.809.1-733.000 | 432,438 | 0.43 % | |
260 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 1997282 | 47104964 | APBD | 150,000,000 | 149,991,342 | 149,656,413 | 149,656,413 | 149,545,413 | 149,545,413 | 0 | 149,545,413 | 2024-05-03 | 2024-05-14 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 343,587 | 0.23 % | |
261 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman RA Perwanida Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1999282 | 47104898 | APBD | 153,850,000 | 153,846,542 | 153,791,042 | 153,791,042 | 153,689,835 | 153,689,835 | 0 | 153,689,835 | 2024-05-03 | 2024-05-14 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 58,958 | 0.04 % | |
262 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Perencanaan Penataan PSU Perumahan Berlian Syariah Borneo | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2001282 | 47436953 | APBD | 94,652,824 | 94,652,489 | 94,489,150 | 94,489,150 | 94,433,650 | 94,433,650 | 94,433,650 | 94,433,650 | 2024-04-29 | 2024-05-06 | Haded Barakat Utama | 95.529.593.6-732.000 | 163,674 | 0.17 % | |
263 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Perencanaan Penataan PSU Perumahan Griya Intan Amandit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2002282 | 47437036 | APBD | 39,333,668 | 39,333,280 | 39,312,770 | 39,312,770 | 39,257,270 | 39,257,270 | 39,257,270 | 39,257,270 | 2024-04-29 | 2024-05-06 | Haded Barakat Utama | 95.529.593.6-732.000 | 20,898 | 0.05 % | |
264 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Hamayung Utara Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2006282 | 46981505 | APBD | 100,000,000 | 99,926,572 | 99,715,623 | 99,715,623 | 99,660,123 | 99,660,123 | 0 | 99,660,123 | 2024-05-03 | 2024-05-14 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 284,377 | 0.28 % | |
265 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2007282 | 47436954 | APBD | 25,000,000 | 24,998,935 | 24,929,290 | 24,929,290 | 24,873,790 | 24,873,790 | 24,873,790 | 24,873,790 | 2024-04-29 | 2024-05-06 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 70,710 | 0.28 % | |
266 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan WC (SDN 1 SIRIH HULU, SDN 1 TALUK LABAK, SDN GUMBIL, SDN HAMAYUNG UTARA ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2010282 | 48541471 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-05-01 | 2024-05-08 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.33 % | |
267 | 2024 | Dinas Ketahanan Pangan | Belanja Jasa Konsultasi Perencanaan Arsitektur - Jasa Nasihat dan Pradesain Arsitektural Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2011282 | 51484736 | APBD | 10,000,000 | 10,000,000 | 9,862,483 | 9,862,483 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 2024-05-03 | 2024-05-07 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 137,517 | 1.38 % | |
268 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman Panggung (SMP Negeri 6 Daha Selatan Satu Atap dan SMP Negeri 7 Daha Selatan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2014282 | 48540250 | APBD | 35,000,000 | 34,999,998 | 34,831,800 | 34,831,800 | 34,776,300 | 34,776,300 | 0 | 34,776,300 | 2024-04-30 | 2024-05-08 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 168,200 | 0.48 % | |
269 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Gumbil | Pengadaan Langsung | Pekerjaan Konstruksi | 2016282 | 46981461 | APBD | 100,000,000 | 99,595,122 | 99,344,654 | 99,344,654 | 99,289,154 | 99,289,154 | 0 | 99,289,154 | 2024-05-03 | 2024-05-14 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 655,346 | 0.66 % | |
270 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SMP Negeri 1 Kandangan, SMP Negeri 3 Kandangan, SMP Negeri 1 Daha Utara, dan SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2019282 | 48541417 | APBD | 85,000,000 | 84,999,993 | 84,693,000 | 84,693,000 | 84,748,500 | 84,748,500 | 0 | 84,748,500 | 2024-04-30 | 2024-05-08 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 307,000 | 0.36 % | |
271 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN ANGKINANG | Pengadaan Langsung | Pekerjaan Konstruksi | 2032282 | 46981075 | APBD | 185,000,000 | 184,992,854 | 184,667,400 | 184,667,400 | 184,589,700 | 184,589,700 | 0 | 184,589,700 | 2024-05-03 | 2024-05-14 | FADWI UTAMA | 94.246.044.5-733.000 | 332,600 | 0.18 % | |
272 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Desa Jambu Hulu Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2033282 | 47884119 | APBD | 25,000,000 | 24,991,500 | 24,917,044 | 24,917,044 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | 2024-08-21 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 82,956 | 0.33 % | |
273 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Angkinang Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2034282 | 47884147 | APBD | 15,000,000 | 15,000,000 | 14,935,000 | 14,935,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-19 | 2024-08-21 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 65,000 | 0.43 % | |
274 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2039282 | 47884136 | APBD | 25,000,000 | 24,991,500 | 24,764,100 | 24,764,100 | 24,750,000 | 24,750,000 | 24,750,000 | 24,750,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 235,900 | 0.94 % | |
275 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Desa Bumi Berkat Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2040282 | 47884120 | APBD | 25,000,000 | 24,991,500 | 24,919,764 | 24,919,764 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | 2024-08-21 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 80,236 | 0.32 % | |
276 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Bamban Selatan - Pakuan Timur Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2042282 | 47884134 | APBD | 25,000,000 | 24,991,500 | 24,950,000 | 24,950,000 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | 2024-08-21 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.2 % | |
277 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Kandangan Hulu - Tabihi Kec.Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2043282 | 47881162 | APBD | 45,000,000 | 44,997,000 | 44,844,000 | 44,844,000 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-23 | 2024-08-29 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 156,000 | 0.35 % | |
278 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Telaga Banta Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2047282 | 47881164 | APBD | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-14 | 2024-08-20 | cv.nawasena konsultan | 62.243.237.5-731.000 | 36,245 | 0.08 % | |
279 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Bajayau - Bajayau Tengah Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2050282 | 48025230 | APBD | 45,000,000 | 44,997,000 | 44,825,130 | 44,825,130 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-16 | 2024-08-21 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 174,870 | 0.39 % | |
280 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2052282 | 47884150 | APBD | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
281 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Menuju Mesjid Noor Desa Pagar Haur Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2054282 | 47881141 | APBD | 45,000,000 | 44,997,000 | 44,870,640 | 44,870,640 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-09 | 2024-08-14 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 129,360 | 0.29 % | |
282 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Ruas Jalan Hamalau - Ganda Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2059282 | 47884139 | APBD | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-14 | 2024-08-20 | cv.nawasena konsultan | 62.243.237.5-731.000 | 36,245 | 0.08 % | |
283 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Pakan Dalam Kecamatan Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2065282 | 47892517 | APBD | 15,000,000 | 15,000,000 | 14,983,890 | 14,983,890 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-08 | 2024-08-14 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 16,110 | 0.11 % | |
284 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Taniran Selatan-Desa Taniran Kubah Kecamatan Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2066282 | 47892519 | APBD | 15,000,000 | 15,000,000 | 14,935,000 | 14,935,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-16 | 2024-08-21 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 65,000 | 0.43 % | |
285 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Goha - Ds. Amawang Kanan Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2067282 | 47881137 | APBD | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-15 | 2024-08-21 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
286 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 3 Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2068282 | 47881148 | APBD | 50,000,000 | 49,999,800 | 49,911,150 | 49,911,150 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-06-06 | 2024-06-12 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 88,850 | 0.18 % | |
287 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Penyusunan Dokumen GRK (Gas Rumah Kaca) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2069282 | 51446703 | APBD | 85,000,000 | 83,953,000 | 83,474,220 | 83,474,220 | 83,324,370 | 83,324,370 | 100 | 83,324,370 | 2024-05-13 | 2024-05-20 | PT. ITNASINDO JAYA KONSULTAN | 85.453.556.4-732.000 | 1,525,780 | 1.8 % | |
288 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Manggis (Desa Baru - Desa Asam) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2070282 | 47881180 | APBD | 50,000,000 | 49,999,800 | 49,961,294 | 49,961,294 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-28 | 2024-09-02 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 38,706 | 0.08 % | |
289 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Desa Loksado Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2071282 | 47884149 | APBD | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
290 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Simpur - SP.3 Paring Agung Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2072282 | 47891459 | APBD | 50,000,000 | 49,999,800 | 48,792,131 | 48,792,131 | 48,700,000 | 48,700,000 | 48,700,000 | 48,700,000 | 2024-08-20 | 2024-08-23 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 1,207,869 | 2.42 % | |
291 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Karang Jawa - Ambarai Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2078282 | 47884161 | APBD | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
292 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Gantung Desa Jambu Hulu - Desa Durian Rabung Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2083282 | 48025234 | APBD | 50,000,000 | 49,999,800 | 49,938,761 | 49,938,761 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 61,239 | 0.12 % | |
293 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Kalumpang - Baruh Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2085282 | 48025235 | APBD | 50,000,000 | 49,999,800 | 49,983,300 | 49,983,300 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-16 | 2024-08-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 16,700 | 0.03 % | |
294 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Biti Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2088282 | 47881147 | APBD | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-19 | 2024-08-22 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
295 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Baru Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2096282 | 47884155 | APBD | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
296 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2098282 | 47884154 | APBD | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
297 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Taniran Selatan Kubah - Buntut Taniran / Wawaran Kec. Angkinang (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2099282 | 47884164 | APBD | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
298 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jalan Ruas Loklahung - Kamawakan Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2100282 | 47881130 | APBD | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
299 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 2 Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2101282 | 47881168 | APBD | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | 2024-09-04 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
300 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Tambangan Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2102282 | 47884158 | APBD | 15,000,000 | 15,000,000 | 14,983,890 | 14,983,890 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-08 | 2024-08-14 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 16,110 | 0.11 % | |
301 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Tabihi Telaga Langsat Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2103282 | 47884157 | APBD | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
302 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Papagaran Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2104282 | 47884159 | APBD | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
303 | 2024 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Parkir Pasar Senin Negara Blok E | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2110282 | 50153120 | APBD | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-05-13 | 2024-05-15 | cv.akmalindo | 02.531.482.4-731.000 | 237,000 | 1.58 % | |
304 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2115282 | 51471152 | APBD | 174,181,000 | 174,180,038 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 2024-06-04 | 2024-06-11 | CV.Bangun Banua | 93.708.167.7-733.000 | 124,416 | 0.07 % | |
305 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2117282 | 50153114 | APBD | 15,000,000 | 15,000,000 | 14,949,999 | 14,949,999 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-05-13 | 2024-05-15 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 50,001 | 0.33 % | |
306 | 2024 | Dinas Perdagangan | Pembuatan Kanopi Parkir Pasar Senin Nagara Blok. E | Pengadaan Langsung | Pekerjaan Konstruksi | 2119282 | 49496272 | APBD | 200,000,000 | 199,999,193 | 199,978,103 | 199,978,103 | 199,833,803 | 199,833,803 | 199,833,803 | 199,833,803 | 2024-05-13 | 2024-05-15 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 21,897 | 0.01 % | |
307 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 2121282 | 51470984 | APBD | 198,568,000 | 198,565,049 | 198,492,629 | 198,492,629 | 198,348,307 | 198,348,307 | 198,348,307 | 198,348,307 | 2024-05-17 | 2024-05-24 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 75,371 | 0.04 % | |
308 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2127282 | 48395873 | APBD | 75,000,000 | 74,996,398 | 74,930,975 | 74,930,975 | 74,701,543 | 74,701,543 | 74,701,543 | 74,701,543 | 2024-05-17 | 2024-05-24 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 69,025 | 0.09 % | |
309 | 2024 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 2133282 | 47635131 | APBD | 150,000,000 | 149,999,994 | 149,983,344 | 149,983,344 | 149,826,610 | 149,826,610 | 149,826,610 | 149,826,610 | 2024-05-14 | 2024-05-16 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 16,656 | 0.01 % | |
310 | 2024 | Dinas Kesehatan | Perencanaan urugan lahan Puskemas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2141282 | 49459006 | APBD | 50,000,000 | 49,356,000 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 2024-05-07 | 2024-05-17 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 738,200 | 1.48 % | |
311 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Papancan Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2142282 | 47881178 | APBD | 70,000,000 | 69,960,700 | 69,900,042 | 69,900,042 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-08-16 | 2024-08-21 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 99,958 | 0.14 % | |
312 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Angkinang Selatan - Tawia - Wawaran Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2146282 | 47891455 | APBD | 70,000,000 | 69,960,700 | 69,627,759 | 69,627,759 | 69,600,000 | 69,600,000 | 69,600,000 | 69,600,000 | 2024-08-19 | 2024-08-22 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 372,241 | 0.53 % | |
313 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan SMAN Negara Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2147282 | 47871995 | APBD | 70,000,000 | 69,960,700 | 69,949,659 | 69,949,659 | 69,900,000 | 69,900,000 | 69,900,000 | 69,900,000 | 2024-08-20 | 2024-08-23 | CV. Halicons Engineering | 99.750.185.3-732.000 | 50,341 | 0.07 % | |
314 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Galuntang - Tayub Desa Madang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2148282 | 47881153 | APBD | 70,000,000 | 69,960,700 | 69,752,733 | 69,752,733 | 69,700,000 | 69,700,000 | 69,700,000 | 69,700,000 | 2024-08-21 | 2024-08-26 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 247,267 | 0.35 % | |
315 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jembatan Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2149282 | 47891243 | APBD | 70,000,000 | 69,960,759 | 69,475,122 | 69,475,122 | 69,400,000 | 69,400,000 | 69,400,000 | 69,400,000 | 2024-08-28 | 2024-09-02 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 524,878 | 0.75 % | |
316 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jembatan Wawaran Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2151282 | 47891244 | APBD | 70,000,000 | 69,960,700 | 69,949,659 | 69,949,659 | 69,900,000 | 69,900,000 | 69,900,000 | 69,900,000 | 2024-08-21 | 2024-08-26 | CV. Halicons Engineering | 99.750.185.3-732.000 | 50,341 | 0.07 % | |
317 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Sungai Niman Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2152282 | 51575894 | APBD | 50,000,000 | 49,999,811 | 49,856,760 | 49,856,760 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-08-21 | 2024-08-26 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 143,240 | 0.29 % | |
318 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2155282 | 47884138 | APBD | 25,000,000 | 24,991,500 | 24,902,781 | 24,902,781 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-20 | 2024-08-23 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 97,219 | 0.39 % | |
319 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Samuda - Bajayau Kec. Daha Barat (Dana Bagi Hasil Sawit) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2156282 | 51574162 | APBD | 100,000,000 | 99,992,000 | 99,884,349 | 99,884,349 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-08-08 | 2024-08-14 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 115,651 | 0.12 % | |
320 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Peningkatan PSU Perumahan Kalian Asri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2161282 | 47437037 | APBD | 15,000,000 | 15,000,000 | 14,900,640 | 14,900,640 | 14,883,990 | 14,883,990 | 14,883,990 | 14,883,990 | 2024-05-17 | 2024-05-28 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 99,360 | 0.66 % | |
321 | 2024 | Dinas Perdagangan | Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2162282 | 51593721 | APBD | 199,947,420 | 199,946,246 | 199,595,989 | 199,595,989 | 199,329,589 | 199,329,589 | 199,329,589 | 199,329,589 | 2024-05-13 | 2024-05-15 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 351,431 | 0.18 % | |
322 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Kelas PAUD Rangganala | Pengadaan Langsung | Pekerjaan Konstruksi | 2165282 | 47110299 | APBD | 195,000,000 | 194,978,405 | 194,686,227 | 194,686,227 | 194,553,027 | 194,553,027 | 0 | 194,553,027 | 2024-05-15 | 2024-05-22 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 313,773 | 0.16 % | |
323 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas TK Negeri 2 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2166282 | 47110835 | APBD | 195,000,000 | 194,985,964 | 194,952,664 | 194,952,664 | 194,845,424 | 194,845,424 | 0 | 194,845,424 | 2024-05-20 | 2024-05-31 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 47,336 | 0.02 % | |
324 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman TK Negeri Pembina Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2169282 | 47105535 | APBD | 195,000,000 | 194,992,987 | 194,701,696 | 194,701,696 | 194,590,696 | 194,590,696 | 0 | 194,590,696 | 2024-05-15 | 2024-05-22 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 298,304 | 0.15 % | |
325 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Siang Gantung - Ds. Baru Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2170282 | 48025231 | APBD | 45,000,000 | 44,997,000 | 44,797,380 | 44,797,380 | 44,700,000 | 44,700,000 | 44,700,000 | 44,700,000 | 2024-08-16 | 2024-08-21 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 202,620 | 0.45 % | |
326 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Mangamol Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2182282 | 47881181 | APBD | 45,000,000 | 44,997,055 | 44,947,230 | 44,947,230 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-15 | 2024-08-21 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 52,770 | 0.12 % | |
327 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemindahan dan Pemasangan Jembatan Gantung Desa Loklahung Ke Desa Panggungan Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2184282 | 51575729 | APBD | 50,000,000 | 49,999,800 | 49,450,500 | 49,450,500 | 49,400,000 | 49,400,000 | 49,400,000 | 49,400,000 | 2024-08-28 | 2024-09-02 | Metro Engineering Consultant | 94.821.300.4-731.000 | 549,500 | 1.1 % | |
328 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur Rehab Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2185282 | 48370103 | APBD | 150,000,000 | 80,000,000 | 79,587,000 | 79,587,000 | 79,531,500 | 79,587,000 | 79,587,000 | 79,587,000 | 2024-05-22 | 2024-05-31 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 70,413,000 | 46.94 % | |
329 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Kelas SMP Negeri 4 Daha Utara dan Pengawasan Pembangunan Ruang Kelas Baru SMP (SMP Negeri 4 Daha Utara dan SMP Negeri5DahaSelatan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2191282 | 51634074 | APBD | 75,000,000 | 74,999,992 | 74,899,999 | 74,899,999 | 74,814,000 | 74,814,000 | 0 | 74,814,000 | 2024-05-17 | 2024-05-28 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,001 | 0.13 % | |
330 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2200282 | 47471417 | APBD | 180,200,000 | 179,975,000 | 179,724,399 | 179,724,399 | 179,622,332 | 179,622,332 | 100 | 179,622,332 | 2024-05-20 | 2024-05-31 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 475,601 | 0.26 % | |
331 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Pengawasan Rehab Balai Penyuluhan KB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2202282 | 48397953 | APBD | 11,049,000 | 11,049,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 2024-05-17 | 2024-05-24 | cv.akmalindo | 02.531.482.4-731.000 | 282,000 | 2.55 % | |
332 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2208282 | 47471414 | APBD | 187,000,000 | 186,696,000 | 186,491,934 | 186,491,934 | 186,408,684 | 186,408,684 | 100 | 186,408,684 | 2024-05-20 | 2024-05-31 | FADWI UTAMA | 94.246.044.5-733.000 | 508,066 | 0.27 % | |
333 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Kambang Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2209282 | 47471403 | APBD | 180,400,000 | 180,088,000 | 179,924,163 | 179,924,163 | 179,813,163 | 179,813,163 | 100 | 179,813,163 | 2024-05-21 | 2024-05-31 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 475,837 | 0.26 % | |
334 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Hamayung Utara Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2212282 | 47471408 | APBD | 193,600,000 | 193,347,447 | 193,154,114 | 193,154,114 | 193,081,964 | 193,081,964 | 100 | 193,081,964 | 2024-06-05 | 2024-06-14 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 445,886 | 0.23 % | |
335 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Muning Baru RT.02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2213282 | 47471406 | APBD | 180,400,000 | 180,093,000 | 179,993,751 | 179,993,751 | 179,889,622 | 179,889,622 | 100 | 179,889,622 | 2024-05-17 | 2024-05-28 | CV. ESTA KARYA MANDIRI | 99.978.347.5-733.000 | 406,249 | 0.23 % | |
336 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Paharangan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2214282 | 47471413 | APBD | 187,000,000 | 186,670,000 | 186,559,856 | 186,559,856 | 186,480,842 | 186,480,842 | 100 | 186,480,842 | 2024-06-21 | 2024-06-28 | CV. SORAYA | 01.834.078.6-733.000 | 440,144 | 0.24 % | |
337 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2215282 | 47471407 | APBD | 189,200,000 | 188,911,044 | 188,727,072 | 188,727,072 | 188,647,170 | 188,647,170 | 100 | 188,647,170 | 2024-05-27 | 2024-06-04 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 472,928 | 0.25 % | |
338 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Parigi RT. 05 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2216282 | 47471412 | APBD | 169,400,000 | 169,041,000 | 168,788,320 | 168,788,320 | 168,699,520 | 168,699,520 | 100 | 168,699,520 | 2024-05-31 | 2024-06-07 | cv. nurulillah | 50.826.160.9-733.000 | 611,680 | 0.36 % | |
339 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2217282 | 47471410 | APBD | 182,600,000 | 182,479,000 | 182,326,981 | 182,326,981 | 182,243,731 | 182,243,731 | 100 | 182,243,731 | 2024-05-20 | 2024-05-31 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,019 | 0.15 % | |
340 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2218282 | 47471405 | APBD | 178,200,000 | 177,908,000 | 177,635,215 | 177,635,215 | 177,524,215 | 177,524,215 | 100 | 177,524,215 | 2024-05-20 | 2024-05-31 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 564,785 | 0.32 % | |
341 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Sungai Mandala Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2219282 | 47471404 | APBD | 184,800,000 | 184,580,000 | 184,524,982 | 184,524,982 | 184,427,834 | 184,427,834 | 100 | 184,427,834 | 2024-05-22 | 2024-05-31 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 275,018 | 0.15 % | |
342 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Lokbahan Kec. Padang Batung (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2221282 | 51664035 | APBD | 200,000,000 | 199,999,000 | 199,953,688 | 199,953,688 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-05-21 | 2024-05-27 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 46,312 | 0.02 % | |
343 | 2024 | Dinas Pendidikan dan Kebudayaan | pembangunan musholla museum | Pengadaan Langsung | Pekerjaan Konstruksi | 2222282 | 47165721 | APBD | 150,000,000 | 149,967,034 | 149,850,087 | 149,850,087 | 149,711,337 | 149,711,337 | 0 | 149,711,337 | 2024-06-19 | 2024-06-27 | CV. YONIA | 02.089.778.1-733.000 | 149,913 | 0.1 % | |
344 | 2024 | Dinas Perhubungan | Rehab Bangunan Kantor Dinas Perhubungan | Pengadaan Langsung | Pekerjaan Konstruksi | 2223282 | 48357802 | APBD | 60,302,000 | 59,052,222 | 58,887,332 | 58,887,332 | 58,665,332 | 58,665,332 | 0 | 58,665,332 | 2024-05-29 | 2024-05-31 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 1,414,669 | 2.35 % | |
345 | 2024 | Dinas Sosial | Belanja Jasa Konsultan Perencanaan Rehab Bangunan/Ruang Tunggu di Taman Makam Pahlawan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2226282 | 48000286 | APBD | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,751,900 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-05-22 | 2024-05-31 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
346 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 2232282 | 47471401 | APBD | 192,500,000 | 192,398,000 | 191,973,133 | 191,973,133 | 191,858,069 | 191,858,069 | 100 | 191,858,069 | 2024-05-29 | 2024-06-07 | cemara indah | 02.090.160.9-731.000 | 526,867 | 0.27 % | |
347 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMP Negeri 7 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2235282 | 47048032 | APBD | 200,000,000 | 199,979,724 | 199,715,029 | 199,715,029 | 199,626,229 | 199,626,229 | 0 | 199,626,229 | 2024-05-28 | 2024-06-04 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 284,971 | 0.14 % | |
348 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Pekerjaan Konstruksi | 2238282 | 47047921 | APBD | 170,000,000 | 169,976,137 | 169,697,134 | 169,697,134 | 169,606,336 | 169,606,336 | 0 | 169,606,336 | 2024-05-28 | 2024-06-04 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 302,866 | 0.18 % | |
349 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemutakhiran Data Sungai di Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2242282 | 51723346 | APBD | 100,000,000 | 99,955,500 | 99,900,000 | 99,900,000 | 98,346,000 | 98,346,000 | 98,346,000 | 98,346,000 | 2024-05-27 | 2024-06-03 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 100,000 | 0.1 % | |
350 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Penataan Ruang-Jasa Perencanaan Wilayah, Kategori 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2245282 | 47689339 | APBD | 85,000,000 | 84,091,269 | 83,749,500 | 83,749,500 | 83,721,750 | 83,721,750 | 83,721,750 | 83,721,750 | 2024-05-29 | 2024-06-07 | CV. SENTRATECS | 01.719.362.4-732.000 | 1,250,500 | 1.47 % | |
351 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung (Rehab Gedung PKK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2257282 | 51423290 | APBD | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,768,000 | 0 | 0 | 0 | 2024-05-28 | 2024-06-05 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
352 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Banjarbaru RT 01 dan 02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2265282 | 47471411 | APBD | 191,400,000 | 191,122,000 | 190,942,221 | 190,942,221 | 190,875,621 | 190,875,621 | 100 | 190,875,621 | 2024-05-28 | 2024-06-04 | ARJUNA KARYA UTAMA,cv | 01.214.260.0-733.000 | 457,779 | 0.24 % | |
353 | 2024 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya (Rehab Gedung PKK) | Pengadaan Langsung | Pekerjaan Konstruksi | 2267282 | 51754351 | APBD | 201,250,000 | 200,000,000 | 199,889,197 | 199,889,197 | 199,889,197 | 0 | 0 | 0 | 2024-05-28 | 2024-06-05 | cv. nurulillah | 50.826.160.9-733.000 | 1,360,803 | 0.68 % | |
354 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman TK Negeri Daha Selatan, Pembangunan Halaman RA Perwanida Kec. Simpur, Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2279282 | 48541550 | APBD | 30,000,000 | 30,000,000 | 29,825,000 | 29,825,000 | 29,810,000 | 29,810,000 | 0 | 29,810,000 | 2024-06-05 | 2024-06-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 175,000 | 0.58 % | |
355 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Karasikan Kecamatan Sungai Raya (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2281282 | 48984021 | APBD | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,450,450 | 99,450,450 | 99,450,450 | 99,450,450 | 2024-06-04 | 2024-06-11 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 100,000 | 0.1 % | |
356 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Pagar dan Urugan Lahan Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2282282 | 48091507 | APBD | 45,000,000 | 45,000,000 | 44,855,100 | 44,855,100 | 44,511,000 | 44,511,000 | 44,511,000 | 44,511,000 | 2024-06-10 | 2024-06-19 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 144,900 | 0.32 % | |
357 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 Simpang Empat. Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2285282 | 46997299 | APBD | 198,912,000 | 198,854,496 | 198,662,696 | 198,662,696 | 198,571,008 | 198,571,008 | 0 | 198,571,008 | 2024-05-28 | 2024-06-04 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 249,304 | 0.13 % | |
358 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman Panggung SMP Negeri 6 Daha Selatan Satu Atap dan SMP Negeri 7 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2286282 | 48541508 | APBD | 30,000,000 | 30,000,000 | 29,836,800 | 29,836,800 | 29,803,500 | 29,803,500 | 0 | 29,803,500 | 2024-05-29 | 2024-06-07 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 163,200 | 0.54 % | |
359 | 2024 | Dinas Pertanian | Renovasi Toilet/Wc | Pengadaan Langsung | Pekerjaan Konstruksi | 2287282 | 47392325 | APBD | 123,342,000 | 123,063,000 | 122,954,488 | 122,954,488 | 122,600,000 | 122,600,000 | 122,600,000 | 122,600,000 | 2024-06-07 | 2024-06-14 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 387,512 | 0.31 % | |
360 | 2024 | Dinas Pertanian | Jasa Pengawasan Renovasi Toilet/WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2288282 | 48313832 | APBD | 10,000,000 | 10,000,000 | 9,950,000 | 9,950,000 | 9,800,000 | 9,800,000 | 9,800,000 | 9,800,000 | 2024-06-07 | 2024-06-14 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 50,000 | 0.5 % | |
361 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2289282 | 47471415 | APBD | 176,000,000 | 175,541,000 | 175,474,919 | 175,474,919 | 175,378,810 | 175,378,810 | 100 | 175,378,810 | 2024-06-24 | 2024-07-01 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 525,081 | 0.3 % | |
362 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2290282 | 47469390 | APBD | 161,600,000 | 161,477,000 | 161,313,861 | 161,313,861 | 161,247,261 | 161,247,261 | 100 | 161,247,261 | 2024-06-11 | 2024-06-19 | CV. SORAYA | 01.834.078.6-733.000 | 286,139 | 0.18 % | |
363 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Penghubung Jalan Inpres ke Jalan Pandai Besi Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2291282 | 47471409 | APBD | 189,200,000 | 188,932,000 | 188,853,621 | 188,853,621 | 188,775,921 | 188,775,921 | 100 | 188,775,921 | 2024-06-21 | 2024-06-28 | CV. SORAYA | 01.834.078.6-733.000 | 346,379 | 0.18 % | |
364 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Budi Mulia | Pengadaan Langsung | Pekerjaan Konstruksi | 2293282 | 47381952 | APBD | 163,500,000 | 163,459,000 | 163,404,399 | 163,404,399 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | 2024-06-14 | CV. KATIBURA | 53.260.332.1-733.000 | 95,601 | 0.06 % | |
365 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Pendataan dan Pemetaan RumahSewa Milik Masyarakat, Rumah Susun danRumah Khusus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2297282 | 47684513 | APBD | 40,000,000 | 39,925,190 | 39,782,400 | 39,782,400 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-05-31 | 2024-06-07 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 217,600 | 0.54 % | |
366 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Padang Basar | Pengadaan Langsung | Pekerjaan Konstruksi | 2300282 | 47381953 | APBD | 163,500,000 | 163,448,000 | 163,393,499 | 163,393,499 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | 2024-06-14 | CV. SORAYA | 01.834.078.6-733.000 | 106,502 | 0.07 % | |
367 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Mangupil | Pengadaan Langsung | Pekerjaan Konstruksi | 2301282 | 47381960 | APBD | 163,500,000 | 163,452,000 | 163,254,716 | 163,254,716 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | 2024-06-14 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 245,284 | 0.15 % | |
368 | 2024 | Dinas Pertanian | Jasa Pengawasan Pembangunan/Rehab JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2306282 | 51774837 | APBD | 43,254,111 | 43,254,111 | 43,038,081 | 43,038,081 | 43,000,000 | 43,000,000 | 43,000,000 | 43,000,000 | 2024-06-07 | 2024-06-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 216,030 | 0.5 % | |
369 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Rehabilitasi Tugu Batas Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2308282 | 47437027 | APBD | 10,000,000 | 10,000,000 | 9,916,851 | 9,916,851 | 9,900,201 | 9,900,201 | 9,900,201 | 9,900,201 | 2024-06-13 | 2024-06-21 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 83,149 | 0.83 % | |
370 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hakurung Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2318282 | 47458352 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-06-16 | 2024-06-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
371 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Mandala Kecamatan Telaga Langsat (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2323282 | 48108387 | APBD | 100,000,000 | 100,000,000 | 98,253,961 | 98,253,961 | 97,963,050 | 97,963,050 | 97,963,050 | 97,963,050 | 2024-06-04 | 2024-06-11 | CV HIDAYAH | 03.286.736.8-733.000 | 1,746,039 | 1.75 % | |
372 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Amawang Kiri Muka Kecamatan Kandangan (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2324282 | 48983904 | APBD | 100,000,000 | 100,000,000 | 99,848,891 | 99,848,891 | 98,901,000 | 98,901,000 | 98,901,000 | 98,901,000 | 2024-06-05 | 2024-06-14 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 151,109 | 0.15 % | |
373 | 2024 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Penugasan) (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2327282 | 48542275 | APBD | 15,000,000 | 14,999,996 | 14,875,000 | 14,875,000 | 14,860,000 | 14,860,000 | 0 | 14,860,000 | 2024-06-05 | 2024-06-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.83 % | |
374 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Kelas TK Negeri 2 Daha Utara, Rehabilitasi Ruang Kelas PAUD/KB Rangganala Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2331282 | 48541559 | APBD | 20,000,000 | 20,000,000 | 19,824,000 | 19,824,000 | 19,810,000 | 19,810,000 | 0 | 19,810,000 | 2024-06-05 | 2024-06-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 176,000 | 0.88 % | |
375 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2332282 | 50081566 | APBD | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-06-05 | 2024-06-14 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
376 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 2349282 | 51812391 | APBD | 154,997,000 | 154,884,000 | 154,773,051 | 154,773,051 | 154,671,989 | 154,671,989 | 100 | 154,671,989 | 2024-06-05 | 2024-06-14 | cv. nurulillah | 50.826.160.9-733.000 | 223,949 | 0.14 % | |
377 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. H. Kaderi Desa Bakarung Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2350282 | 51809761 | APBD | 60,947,000 | 60,827,000 | 60,757,170 | 60,757,170 | 60,734,625 | 60,734,625 | 100 | 60,734,625 | 2024-07-18 | 2024-07-26 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 189,830 | 0.31 % | |
378 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Tayub Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2354282 | 51838270 | APBD | 195,763,260 | 195,760,862 | 195,690,628 | 195,690,628 | 195,334,651 | 195,334,650 | 195,334,650 | 195,334,650 | 2024-06-07 | 2024-06-14 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 72,632 | 0.04 % | |
379 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2368282 | 51838222 | APBD | 198,711,044 | 198,703,699 | 198,623,636 | 198,623,636 | 197,976,506 | 197,976,500 | 197,976,500 | 197,976,500 | 2024-06-10 | 2024-06-19 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 87,408 | 0.04 % | |
380 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2370282 | 51838236 | APBD | 198,711,044 | 198,707,010 | 198,651,511 | 198,651,511 | 197,902,261 | 197,902,250 | 197,902,250 | 197,902,250 | 2024-06-10 | 2024-06-19 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 59,533 | 0.03 % | |
381 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado RT.04 Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2372282 | 47464105 | APBD | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-08-19 | 2024-08-26 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 150,000 | 0.75 % | |
382 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2373282 | 47466678 | APBD | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-08-03 | 2024-08-09 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.25 % | |
383 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2375282 | 50438733 | APBD | 187,419,914 | 187,400,000 | 187,361,339 | 187,361,339 | 186,761,207 | 186,761,207 | 186,761,207 | 186,761,207 | 2024-07-07 | 2024-07-15 | FADWI UTAMA | 94.246.044.5-733.000 | 58,575 | 0.03 % | |
384 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bangkau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2380282 | 47447396 | APBD | 75,000,000 | 74,980,500 | 74,925,000 | 74,925,000 | 74,370,000 | 74,370,000 | 74,370,000 | 74,370,000 | 2024-06-10 | 2024-06-14 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 75,000 | 0.1 % | |
385 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2383282 | 51838199 | APBD | 192,796,800 | 192,790,762 | 192,700,019 | 192,700,019 | 192,256,019 | 192,256,000 | 192,256,000 | 192,256,000 | 2024-06-11 | 2024-06-20 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 96,781 | 0.05 % | |
386 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2384282 | 51838272 | APBD | 197,627,672 | 197,624,204 | 197,363,354 | 197,363,354 | 196,985,954 | 196,985,950 | 196,985,950 | 196,985,950 | 2024-06-10 | 2024-06-20 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 264,318 | 0.13 % | |
387 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2392282 | 47465729 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-06-23 | 2024-07-02 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 15,000 | 0.1 % | |
388 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya (600x2 m) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2394282 | 50081821 | APBD | 15,000,000 | 14,891,000 | 14,830,242 | 14,830,242 | 14,824,692 | 14,824,692 | 100 | 14,824,692 | 2024-06-11 | 2024-06-19 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 169,758 | 1.13 % | |
389 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2399282 | 51437027 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-16 | 2024-07-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
390 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Belakang KUA Desa Padang Batung Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2400282 | 47464388 | APBD | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-03 | 2024-10-11 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 20,000 | 0.1 % | |
391 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingka) | Pengadaan Langsung | Pekerjaan Konstruksi | 2402282 | 51838208 | APBD | 198,711,044 | 198,711,044 | 198,577,867 | 198,577,867 | 197,997,337 | 197,997,300 | 197,997,300 | 197,997,300 | 2024-06-19 | 2024-06-28 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 133,177 | 0.07 % | |
392 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2404282 | 51838216 | APBD | 198,711,044 | 198,709,613 | 198,355,650 | 198,355,650 | 197,795,100 | 197,795,100 | 197,795,100 | 197,795,100 | 2024-06-16 | 2024-06-25 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 355,394 | 0.18 % | |
393 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2408282 | 50437528 | APBD | 199,680,000 | 199,667,446 | 199,613,453 | 199,613,453 | 198,955,223 | 198,955,223 | 198,955,223 | 198,955,223 | 2024-06-16 | 2024-06-25 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 66,547 | 0.03 % | |
394 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2409282 | 48104076 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,557,650 | 14,557,650 | 14,557,650 | 14,557,650 | 2024-06-18 | 2024-06-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
395 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Tayub Kec.Telaga langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2437282 | 51438111 | APBD | 30,000,000 | 30,000,000 | 29,859,000 | 29,859,000 | 29,415,000 | 29,415,000 | 29,415,000 | 29,415,000 | 2024-06-16 | 2024-06-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 141,000 | 0.47 % | |
396 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Lumpangi Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2441282 | 51881654 | APBD | 198,262,275 | 198,255,974 | 198,194,468 | 198,194,468 | 197,739,921 | 197,739,900 | 197,739,900 | 197,739,900 | 2024-06-11 | 2024-06-20 | CV. BEST KONSTRUKSI MANDIRI | 92.702.172.5-731.000 | 67,807 | 0.03 % | |
397 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2466282 | 51881410 | APBD | 192,796,800 | 192,790,800 | 192,700,169 | 192,700,169 | 192,256,169 | 192,256,150 | 192,256,150 | 192,256,150 | 2024-06-11 | 2024-06-20 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 96,631 | 0.05 % | |
398 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2477282 | 51881378 | APBD | 198,821,700 | 198,821,550 | 198,763,004 | 198,763,004 | 198,070,531 | 198,070,500 | 198,070,500 | 198,070,500 | 2024-07-09 | 2024-07-16 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 58,696 | 0.03 % | |
399 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2489282 | 51881649 | APBD | 198,262,275 | 198,230,398 | 198,042,194 | 198,042,194 | 197,473,874 | 197,473,800 | 197,473,800 | 197,473,800 | 2024-07-26 | 2024-08-02 | CV.Bangun Banua | 93.708.167.7-733.000 | 220,081 | 0.11 % | |
400 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2494282 | 50437377 | APBD | 195,840,000 | 195,833,658 | 195,559,745 | 195,559,745 | 194,976,995 | 194,976,995 | 194,976,995 | 194,976,995 | 2024-06-12 | 2024-06-25 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 280,255 | 0.14 % | |
401 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2495282 | 48103911;50437377 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,557,650 | 14,557,650 | 14,557,650 | 14,557,650 | 2024-06-18 | 2024-06-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
402 | 2024 | RSUD Brigjen H. Hasan Basry | Jasa Konsultan Pengawasan Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2498282 | 51819684 | BLUD | 50,000,000 | 49,834,102 | 49,412,760 | 49,412,760 | 49,150,000 | 49,150,000 | 49,150,000 | 49,150,000 | 2024-06-26 | 2024-06-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 587,240 | 1.17 % | |
403 | 2024 | RSUD Brigjen H. Hasan Basry | Pengawasan Rehabilitasi Eks Ruang Rawat Inap Anak | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2501282 | 51821097 | BLUD | 100,000,000 | 99,956,901 | 99,012,000 | 99,012,000 | 98,650,000 | 98,650,000 | 98,650,000 | 98,650,000 | 2024-06-26 | 2024-06-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 988,000 | 0.99 % | |
404 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2503282 | 50438831 | APBD | 185,389,897 | 185,000,000 | 184,953,942 | 184,953,942 | 184,019,238 | 184,019,238 | 184,019,238 | 184,019,238 | 2024-07-08 | 2024-07-15 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 435,955 | 0.24 % | |
405 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2504282 | 51881349 | APBD | 198,821,700 | 198,821,687 | 198,695,733 | 198,695,733 | 197,946,483 | 197,946,400 | 197,946,400 | 197,946,400 | 2024-06-22 | 2024-06-28 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 125,967 | 0.06 % | |
406 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Angkinang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2521282 | 51881868 | APBD | 15,000,000 | 15,000,000 | 14,955,500 | 14,955,500 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-09-12 | 2024-09-20 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 44,500 | 0.3 % | |
407 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kelurahan Kandangan Kota RT.07 Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2523282 | 51881848 | APBD | 25,000,000 | 25,000,000 | 24,945,500 | 24,945,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-08-27 | 2024-09-02 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 54,500 | 0.22 % | |
408 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2527282 | 51881727 | APBD | 15,000,000 | 15,000,000 | 14,865,000 | 14,865,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-26 | 2024-08-02 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 135,000 | 0.9 % | |
409 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2535282 | 51881588 | APBD | 198,711,044 | 198,709,800 | 198,558,335 | 198,558,335 | 197,963,375 | 197,963,350 | 197,963,350 | 197,963,350 | 2024-06-16 | 2024-06-25 | CV. ALBATROS | 01.222.160.2-733.000 | 152,709 | 0.08 % | |
410 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Ulang Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2536282 | 51881800 | APBD | 25,000,000 | 25,000,000 | 24,825,000 | 24,825,000 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-09-08 | 2024-09-16 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 0.7 % | |
411 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Budi Bakti Amawang Kiri Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 2556282 | 50437501 | APBD | 195,200,000 | 195,152,455 | 194,847,955 | 194,847,955 | 194,185,152 | 194,185,152 | 194,185,152 | 194,185,152 | 2024-06-26 | 2024-07-05 | cv. nurulillah | 50.826.160.9-733.000 | 352,045 | 0.18 % | |
412 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2585282 | 51838224 | APBD | 198,711,044 | 198,706,684 | 198,612,335 | 198,612,335 | 198,042,905 | 198,042,900 | 198,042,900 | 198,042,900 | 2024-06-19 | 2024-06-28 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 98,709 | 0.05 % | |
413 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2587282 | 51882007 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-09 | 2024-07-19 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
414 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Pekerjaan Konstruksi | 2588282 | 50437456 | APBD | 195,200,000 | 195,196,876 | 195,032,313 | 195,032,313 | 194,818,915 | 194,818,915 | 194,818,915 | 194,818,915 | 2024-06-18 | 2024-06-25 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | 167,687 | 0.09 % | |
415 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2589282 | 51881366 | APBD | 198,306,750 | 198,306,740 | 198,251,258 | 198,251,258 | 197,807,258 | 197,807,250 | 197,807,250 | 197,807,250 | 2024-06-15 | 2024-06-25 | CV. KATIBURA | 53.260.332.1-733.000 | 55,492 | 0.03 % | |
416 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2590282 | 48104441 | APBD | 15,000,000 | 15,000,000 | 14,889,000 | 14,889,000 | 14,524,350 | 14,524,350 | 14,524,350 | 14,524,350 | 2024-06-18 | 2024-06-25 | CV. Halicons Engineering | 99.750.185.3-732.000 | 111,000 | 0.74 % | |
417 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2592282 | 50438751 | APBD | 192,480,597 | 192,480,000 | 192,429,478 | 192,429,478 | 191,785,678 | 191,785,678 | 191,785,678 | 191,785,678 | 2024-06-26 | 2024-07-05 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 51,119 | 0.03 % | |
418 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2594282 | 51881841 | APBD | 15,000,000 | 15,000,000 | 14,905,500 | 14,905,500 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-09 | 2024-07-16 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 94,500 | 0.63 % | |
419 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Lumpangi Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2595282 | 51881743 | APBD | 15,000,000 | 15,000,000 | 14,860,000 | 14,860,000 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-06-16 | 2024-06-25 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 140,000 | 0.93 % | |
420 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2600282 | 51882048 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-06-23 | 2024-07-02 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
421 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2605282 | 51882076 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-08-03 | 2024-08-09 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
422 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung Rt.02 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2606282 | 51881858 | APBD | 15,000,000 | 15,000,000 | 14,925,000 | 14,925,000 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-10-14 | 2024-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 75,000 | 0.5 % | |
423 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Amparaya Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2612282 | 51882014 | APBD | 17,500,000 | 17,500,000 | 17,378,000 | 17,378,000 | 17,038,500 | 17,038,500 | 17,038,500 | 17,038,500 | 2024-08-03 | 2024-08-09 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 122,000 | 0.7 % | |
424 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Kandangan Kota (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2637282 | 51881751 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-08-13 | 2024-08-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
425 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2638282 | 51882049 | APBD | 30,000,000 | 30,000,000 | 29,870,000 | 29,870,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-06 | 2024-07-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 130,000 | 0.43 % | |
426 | 2024 | RSUD Brigjen H. Hasan Basry | Pembuatan Gutter Kabel Listrik Dan Rehab Ruang Panel Zona 1 RSUD BHHB | Pengadaan Langsung | Pekerjaan Konstruksi | 2639282 | 51819666 | BLUD | 200,000,000 | 199,815,601 | 199,388,756 | 199,388,756 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-06-21 | 2024-06-25 | FADWI UTAMA | 94.246.044.5-733.000 | 611,244 | 0.31 % | |
427 | 2024 | Dinas Kesehatan | Pengawasan Pembangunan Puskesmas Bajayau (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2644282 | 51649446 | APBD | 249,000,000 | 99,502,400 | 99,000,001 | 99,000,001 | 99,000,001 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-06-21 | 2024-07-05 | CV. Halicons Engineering | 99.750.185.3-732.000 | 149,999,999 | 60.24 % | |
428 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2645282 | 50237706 | APBD | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-06-13 | 2024-06-21 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
429 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2646282 | 51882075 | APBD | 30,000,000 | 30,000,000 | 29,850,000 | 29,850,000 | 29,581,500 | 29,581,500 | 29,581,500 | 29,581,500 | 2024-06-16 | 2024-06-25 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.5 % | |
430 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2654282 | 51881909 | APBD | 195,772,720 | 195,710,784 | 195,362,090 | 195,362,090 | 194,998,435 | 194,998,400 | 194,998,400 | 194,998,400 | 2024-06-22 | 2024-06-28 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 410,630 | 0.21 % | |
431 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2660282 | 51881866 | APBD | 192,007,860 | 191,993,893 | 191,899,532 | 191,899,532 | 191,470,628 | 191,470,600 | 191,470,600 | 191,470,600 | 2024-06-22 | 2024-06-28 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 108,328 | 0.06 % | |
432 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2662282 | 51881526 | APBD | 15,000,000 | 15,000,000 | 14,955,001 | 14,955,001 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-06-16 | 2024-06-25 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 44,999 | 0.3 % | |
433 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2677282 | 51881957 | APBD | 25,000,000 | 25,000,000 | 24,987,000 | 24,987,000 | 24,697,500 | 24,697,500 | 24,697,500 | 24,697,500 | 2024-08-03 | 2024-08-09 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 13,000 | 0.05 % | |
434 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2678282 | 51881886 | APBD | 169,418,700 | 169,414,971 | 169,359,481 | 169,359,481 | 168,943,453 | 168,943,450 | 168,943,450 | 168,943,450 | 2024-07-09 | 2024-07-19 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 59,219 | 0.03 % | |
435 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Baru Kec. Daha Barat (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2680282 | 51881346 | APBD | 198,821,700 | 198,752,286 | 198,609,919 | 198,609,919 | 197,916,169 | 197,916,150 | 197,916,150 | 197,916,150 | 2024-06-22 | 2024-06-28 | CV. LALUNA DANA | 02.237.179.3-733.000 | 211,781 | 0.11 % | |
436 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2686282 | 50438220 | APBD | 195,200,000 | 195,149,290 | 194,851,510 | 194,851,510 | 194,062,210 | 194,062,210 | 194,062,210 | 194,062,210 | 2024-06-22 | 2024-06-28 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 348,490 | 0.18 % | |
437 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2687282 | 48104585 | APBD | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,694,700 | 14,694,700 | 14,694,700 | 14,694,700 | 2024-06-27 | 2024-07-05 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 50,000 | 0.33 % | |
438 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 2699282 | 51881520 | APBD | 198,624,930 | 198,624,624 | 198,530,270 | 198,530,270 | 197,992,482 | 197,992,400 | 197,992,400 | 197,992,400 | 2024-06-23 | 2024-07-02 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 94,660 | 0.05 % | |
439 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Daerah Irigasi Kupang Kec.Kandangan (Peningkatan saluran irigasi dengan pasangan batu tinggi 1 m) | Pengadaan Langsung | Pekerjaan Konstruksi | 2704282 | 51881698 | APBD | 199,752,199 | 199,750,072 | 199,326,400 | 199,326,400 | 198,990,347 | 198,990,300 | 198,990,300 | 198,990,300 | 2024-07-09 | 2024-07-16 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 425,799 | 0.21 % | |
440 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2707282 | 51881944 | APBD | 30,000,000 | 30,000,000 | 29,930,500 | 29,930,500 | 29,692,500 | 29,692,500 | 29,692,500 | 29,692,500 | 2024-06-23 | 2024-07-02 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 69,500 | 0.23 % | |
441 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2714282 | 51881860 | APBD | 186,441,200 | 186,435,698 | 186,273,642 | 186,273,642 | 185,988,372 | 185,988,300 | 185,988,300 | 185,988,300 | 2024-07-27 | 2024-08-02 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 167,558 | 0.09 % | |
442 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan pelayanan di sekitar jaringan irigasi DI.Gumbil Kec.Telaga langsat (lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2716282 | 51928574 | APBD | 50,000,000 | 49,950,000 | 49,927,800 | 49,927,800 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-09-09 | 2024-09-16 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 72,200 | 0.14 % | |
443 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2720282 | 51881592 | APBD | 198,262,275 | 198,261,188 | 198,100,237 | 198,100,237 | 197,496,397 | 197,496,350 | 197,496,350 | 197,496,350 | 2024-07-08 | 2024-07-15 | CV. MAWAR | 02.918.043.7-733.000 | 162,038 | 0.08 % | |
444 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2729282 | 51881535 | APBD | 15,000,000 | 15,000,000 | 14,949,950 | 14,949,950 | 14,812,950 | 14,812,950 | 14,812,950 | 14,812,950 | 2024-06-23 | 2024-07-02 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 50,050 | 0.33 % | |
445 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2742282 | 51881306 | APBD | 198,821,700 | 198,819,808 | 198,681,028 | 198,681,028 | 198,070,528 | 198,070,500 | 198,070,500 | 198,070,500 | 2024-07-08 | 2024-07-15 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 140,672 | 0.07 % | |
446 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2746282 | 51881541 | APBD | 40,000,000 | 39,937,800 | 39,904,500 | 39,904,500 | 39,282,900 | 39,282,900 | 39,282,900 | 39,282,900 | 2024-08-19 | 2024-08-26 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 95,500 | 0.24 % | |
447 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2749282 | 51882030 | APBD | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-06-23 | 2024-07-02 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.42 % | |
448 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2752282 | 51881319 | APBD | 198,821,700 | 198,821,675 | 198,682,925 | 198,682,925 | 198,072,425 | 198,072,400 | 198,072,400 | 198,072,400 | 2024-07-08 | 2024-07-15 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 138,775 | 0.07 % | |
449 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2755282 | 51881797 | APBD | 15,000,000 | 15,000,000 | 14,935,500 | 14,935,500 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-29 | 2024-08-05 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 64,500 | 0.43 % | |
450 | 2024 | Dinas Ketahanan Pangan | Belanja Konsultan Pengawasan Pembangunan Rumah Rice Milling Unit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2765282 | 51876630 | APBD | 10,000,000 | 10,000,000 | 9,905,650 | 9,905,650 | 9,850,140 | 9,850,140 | 9,850,140 | 9,850,140 | 2024-06-26 | 2024-06-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 94,350 | 0.94 % | |
451 | 2024 | Dinas Ketahanan Pangan | Belanja Pembangunan Rumah RMU Gapoktan Rakat Mufakat Desa Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 2766282 | 51876504 | APBD | 162,560,000 | 162,560,000 | 162,148,301 | 162,148,301 | 161,946,558 | 161,946,558 | 161,946,558 | 161,946,558 | 2024-06-26 | 2024-06-28 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 411,700 | 0.25 % | |
452 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jalan Tipe D2) | Pengadaan Langsung | Pekerjaan Konstruksi | 2768282 | 51929724 | APBD | 132,840,000 | 132,840,000 | 132,679,073 | 132,679,073 | 132,300,000 | 132,300,000 | 132,300,000 | 132,300,000 | 2024-08-05 | 2024-08-09 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 160,927 | 0.12 % | |
453 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Desa Loksado Kec. Loksado (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 2769282 | 51929886 | APBD | 199,305,000 | 199,305,000 | 199,231,174 | 199,231,174 | 198,800,000 | 198,800,000 | 198,800,000 | 198,800,000 | 2024-06-24 | 2024-06-28 | CV. SORAYA | 01.834.078.6-733.000 | 73,826 | 0.04 % | |
454 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembangunan/Peningkatan PSU Permukiman Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2776282 | 51875910 | APBD | 50,000,000 | 49,937,000 | 49,725,780 | 49,725,780 | 49,720,230 | 49,720,230 | 100 | 49,720,230 | 2024-06-21 | 2024-06-28 | cv.akmalindo | 02.531.482.4-731.000 | 274,220 | 0.55 % | |
455 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Angkinang Telaga Langsat Kec. Telaga Langsat (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 2778282 | 51929735 | APBD | 196,524,000 | 196,524,000 | 196,403,126 | 196,403,126 | 196,300,000 | 196,300,000 | 196,300,000 | 196,300,000 | 2024-07-10 | 2024-07-15 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 120,874 | 0.06 % | |
456 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Tabihi Telaga Langsat Kec. Padang Batung (Jalan Tipe E5) | Pengadaan Langsung | Pekerjaan Konstruksi | 2783282 | 51929726 | APBD | 193,077,000 | 193,077,000 | 192,787,020 | 192,787,020 | 192,700,000 | 192,700,000 | 192,700,000 | 192,700,000 | 2024-07-12 | 2024-07-18 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 289,980 | 0.15 % | |
457 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jalan Ruas Loklahung - Kamawakan Kec. Loksado (Bertahap) (Jalan Tipe D8) | Pengadaan Langsung | Pekerjaan Konstruksi | 2788282 | 51929614 | APBD | 198,990,000 | 198,969,000 | 198,891,426 | 198,891,426 | 198,300,000 | 198,300,000 | 198,300,000 | 198,300,000 | 2024-06-24 | 2024-06-28 | CV. SORAYA | 01.834.078.6-733.000 | 98,574 | 0.05 % | |
458 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Tambangan Kec. Daha Selatan (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 2793282 | 51929792 | APBD | 198,180,000 | 198,180,000 | 197,891,688 | 197,891,688 | 197,800,000 | 197,800,000 | 197,800,000 | 197,800,000 | 2024-07-12 | 2024-07-18 | FADWI UTAMA | 94.246.044.5-733.000 | 288,312 | 0.15 % | |
459 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Taniran Selatan Kubah - Buntut Taniran / Wawaran Kec. Angkinang (Bertahap) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2794282 | 51929746 | APBD | 197,280,000 | 197,280,000 | 196,948,255 | 196,948,255 | 196,900,000 | 196,900,000 | 196,900,000 | 196,900,000 | 2024-07-12 | 2024-07-18 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 331,745 | 0.17 % | |
460 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Baru Kec. Sungai Raya (Jalan Tipe E1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2799282 | 51929890 | APBD | 199,998,000 | 199,997,000 | 0 | 199,724,198 | 199,700,000 | 199,700,000 | 199,700,000 | 199,700,000 | 2024-07-12 | 2024-07-18 | cv. nurulillah | 50.826.160.9-733.000 | 199,998,000 | 100 % | |
461 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Kalumpang - Balimau Kec. Kalumpang (Bertahap) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2821282 | 51929754 | APBD | 197,280,000 | 197,280,000 | 197,228,216 | 197,228,216 | 196,700,000 | 196,700,000 | 196,700,000 | 196,700,000 | 2024-07-30 | 2024-08-07 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 51,784 | 0.03 % | |
462 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin (Jalan Tipe A9) | Pengadaan Langsung | Pekerjaan Konstruksi | 2825282 | 51929889 | APBD | 199,410,000 | 199,410,000 | 199,225,348 | 199,225,348 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-07-01 | 2024-07-10 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 184,652 | 0.09 % | |
463 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2850282 | 51875981 | APBD | 70,000,000 | 69,834,000 | 69,757,053 | 69,757,053 | 69,745,953 | 69,745,953 | 100 | 69,745,953 | 2024-06-24 | 2024-07-02 | CV. RAYHANI | 75.410.426.3-733.000 | 242,947 | 0.35 % | |
464 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung di Desa Malinau Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2869282 | 51911960 | APBD | 200,000,000 | 199,999,000 | 199,892,424 | 199,892,424 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-07-01 | 2024-07-10 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 107,576 | 0.05 % | |
465 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2886282 | 51881352 | APBD | 192,796,800 | 192,736,531 | 192,681,031 | 192,681,031 | 191,987,281 | 191,987,250 | 191,987,250 | 191,987,250 | 2024-07-30 | 2024-08-06 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 115,769 | 0.06 % | |
466 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Pakan Dalam Kecamatan Daha Utara (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2902282 | 51929939 | APBD | 196,372,800 | 196,370,000 | 196,050,545 | 196,050,545 | 195,800,000 | 195,800,000 | 195,800,000 | 195,800,000 | 2024-07-19 | 2024-07-25 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 322,255 | 0.16 % | |
467 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Desa Tumingki Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2923282 | 51911987 | APBD | 100,000,000 | 100,000,000 | 99,899,286 | 99,899,286 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-07-01 | 2024-07-10 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 100,714 | 0.1 % | |
468 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Taniran Selatan-Desa Taniran Kubah Kecamatan Angkinang (Jembatan Tipe D3) | Pengadaan Langsung | Pekerjaan Konstruksi | 2924282 | 51929936 | APBD | 193,895,000 | 193,895,000 | 193,687,457 | 193,687,457 | 193,000,000 | 193,000,000 | 193,000,000 | 193,000,000 | 2024-07-01 | 2024-07-10 | CV.Bangun Banua | 93.708.167.7-733.000 | 207,543 | 0.11 % | |
469 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2929282 | 47467006 | APBD | 15,000,000 | 15,000,000 | 14,990,000 | 14,990,000 | 14,701,950 | 14,701,950 | 14,701,950 | 14,701,950 | 2024-06-26 | 2024-07-05 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 10,000 | 0.07 % | |
470 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2950282 | 47466442 | APBD | 15,000,000 | 15,000,000 | 14,955,001 | 14,955,001 | 14,701,950 | 14,701,950 | 14,701,950 | 14,701,950 | 2024-06-26 | 2024-07-05 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 44,999 | 0.3 % | |
471 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2955282 | 51881299 | APBD | 198,821,700 | 198,710,400 | 198,565,631 | 198,565,631 | 197,894,081 | 197,894,000 | 197,894,000 | 197,894,000 | 2024-06-26 | 2024-07-05 | CV. LALUNA DANA | 02.237.179.3-733.000 | 256,069 | 0.13 % | |
472 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik Tahun 2024 Kec. Loksado dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2956282 | 48541530 | APBD | 85,000,000 | 84,999,993 | 84,526,500 | 84,526,500 | 84,500,000 | 84,500,000 | 0 | 84,500,000 | 2024-06-25 | 2024-07-02 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 473,500 | 0.56 % | |
473 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Baru Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2963282 | 51881506 | APBD | 15,000,000 | 15,000,000 | 14,999,998 | 14,999,998 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-07-06 | 2024-07-15 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 2 | 0 % | |
474 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2965282 | 51881482 | APBD | 15,000,000 | 15,000,000 | 14,957,000 | 14,957,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-08-10 | 2024-08-16 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 43,000 | 0.29 % | |
475 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Daerah Irigasi Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2967282 | 51881714 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-09 | 2024-07-16 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
476 | 2024 | Dinas Ketahanan Pangan | Belanja Modal Bangunan Gedung Kantor (Perluasan Gedung Kantor Ruang Kerja) | Pengadaan Langsung | Pekerjaan Konstruksi | 2973282 | 48146602 | APBD | 176,120,000 | 176,120,000 | 176,052,061 | 176,052,061 | 175,824,511 | 175,824,511 | 175,824,511 | 175,824,511 | 2024-06-28 | 2024-07-05 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 67,939 | 0.04 % | |
477 | 2024 | Dinas Sosial | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Tempat Kerja Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 2979282 | 48001482 | APBD | 90,000,000 | 89,997,144 | 89,775,143 | 89,775,143 | 89,720,069 | 0 | 0 | 0 | 2024-06-28 | 2024-07-10 | cv. nurulillah | 50.826.160.9-733.000 | 224,857 | 0.25 % | |
478 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 2 Kec. Loksado (Bertahap) Jalan Tipe D8 | Pengadaan Langsung | Pekerjaan Konstruksi | 2980282 | 51929619 | APBD | 198,990,000 | 198,990,000 | 198,814,486 | 198,814,486 | 198,600,000 | 198,600,000 | 198,600,000 | 198,600,000 | 2024-07-16 | 2024-07-22 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 175,514 | 0.09 % | |
479 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Rehabilitasi Bendung dengan Pasangan Batu Ketinggian 3 Meter (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2981282 | 51881790 | APBD | 200,000,000 | 199,921,918 | 199,597,186 | 199,597,186 | 198,772,012 | 198,772,000 | 198,772,000 | 198,772,000 | 2024-07-09 | 2024-07-16 | FADWI UTAMA | 94.246.044.5-733.000 | 402,814 | 0.2 % | |
480 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2982282 | 50438767 | APBD | 192,480,597 | 192,480,000 | 192,398,337 | 192,398,337 | 191,607,795 | 191,607,795 | 191,607,795 | 191,607,795 | 2024-07-07 | 2024-07-15 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 82,260 | 0.04 % | |
481 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan pembangunan musholla museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2983282 | 48541553 | APBD | 15,000,000 | 14,999,996 | 14,900,000 | 14,900,000 | 14,888,000 | 14,888,000 | 0 | 14,888,000 | 2024-07-02 | 2024-07-09 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 100,000 | 0.67 % | |
482 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Pagar dan Pembuatan Taman Bunga Cagar Budaya Tugu 2 Januari 1949 Desa Hamayung Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2993282 | 48541555 | APBD | 35,000,000 | 34,999,998 | 34,900,000 | 34,900,000 | 34,826,250 | 34,826,250 | 0 | 34,826,250 | 2024-07-10 | 2024-07-19 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 100,000 | 0.29 % | |
483 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 3009282 | 51881616 | APBD | 198,262,275 | 198,252,128 | 198,184,724 | 198,184,724 | 197,416,604 | 197,416,600 | 197,416,600 | 197,416,600 | 2024-07-08 | 2024-07-15 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 77,551 | 0.04 % | |
484 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Rehabilitasi Bendung dengan Pasangan Batu Ketinggian 3 Meter (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 3013282 | 51881772 | APBD | 200,000,000 | 199,987,300 | 199,830,155 | 199,830,155 | 198,995,435 | 198,995,400 | 198,995,400 | 198,995,400 | 2024-07-09 | 2024-07-16 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 169,845 | 0.08 % | |
485 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3017282 | 51881469 | APBD | 15,000,000 | 15,000,000 | 14,999,998 | 14,999,998 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-07-06 | 2024-07-15 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 2 | 0 % | |
486 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3021282 | 51882090 | APBD | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-06 | 2024-07-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
487 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Papagaran Kec. Kandangan (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 3027282 | 51929733 | APBD | 194,670,000 | 194,670,000 | 194,613,483 | 194,613,483 | 194,200,000 | 194,200,000 | 194,200,000 | 194,200,000 | 2024-07-03 | 2024-07-10 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 56,517 | 0.03 % | |
488 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 11 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3028282 | 47471416 | APBD | 171,000,000 | 170,712,000 | 170,640,803 | 170,640,803 | 170,540,138 | 170,540,138 | 100 | 170,540,138 | 2024-07-19 | 2024-07-26 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 359,197 | 0.21 % | |
489 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 10 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3047282 | 47471418 | APBD | 170,000,000 | 169,804,000 | 169,748,580 | 169,748,580 | 169,657,036 | 169,657,036 | 100 | 169,657,036 | 2024-07-10 | 2024-07-19 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 251,420 | 0.15 % | |
490 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3071282 | 51809245 | APBD | 37,038,000 | 36,935,000 | 36,880,239 | 36,880,239 | 36,848,800 | 36,848,800 | 100 | 36,848,800 | 2024-07-10 | 2024-07-19 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 157,761 | 0.43 % | |
491 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Jalan Masuk Ponpes Ibnu Mas'ud Putra | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3080282 | 48095348 | APBD | 15,000,000 | 15,000,000 | 14,829,600 | 14,829,600 | 14,546,550 | 0 | 0 | 0 | 2024-07-21 | 2024-07-29 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 170,400 | 1.14 % | |
492 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jalan Masuk Ponpes Ibnu Mas'ud Putra | Pengadaan Langsung | Pekerjaan Konstruksi | 3081282 | 50436671 | APBD | 200,000,000 | 199,982,612 | 199,919,125 | 199,919,125 | 199,647,175 | 199,647,175 | 199,647,175 | 199,647,175 | 2024-07-14 | 2024-07-22 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 80,875 | 0.04 % | |
493 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3085282 | 51881312 | APBD | 198,306,750 | 198,232,277 | 198,106,703 | 198,106,703 | 197,745,953 | 197,745,950 | 197,745,950 | 197,745,950 | 2024-08-06 | 2024-08-12 | CV.BUMI SAHARA PUTRA | 41.042.955.9-732.000 | 200,047 | 0.1 % | |
494 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Pintu Gerbang dan Pagar Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3087282 | 48095705 | APBD | 100,000,000 | 100,000,000 | 99,819,864 | 99,819,864 | 99,498,735 | 99,498,735 | 99,498,735 | 99,498,735 | 2024-07-08 | 2024-07-15 | Wing Rastafarindo | 03.282.590.3-732.000 | 180,136 | 0.18 % | |
495 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Kantor Kecamatan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3091282 | 48099120 | APBD | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-07-08 | 2024-07-15 | cv.akmalindo | 02.531.482.4-731.000 | 322,000 | 0.32 % | |
496 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Asrama TNI AD Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3095282 | 48095437 | APBD | 45,000,000 | 45,000,000 | 44,900,000 | 44,900,000 | 44,455,500 | 44,455,500 | 44,455,500 | 44,455,500 | 2024-07-16 | 2024-07-25 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.22 % | |
497 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 3106282 | 51881667 | APBD | 198,711,044 | 198,710,032 | 198,536,471 | 198,536,471 | 197,997,455 | 197,997,450 | 197,997,450 | 197,997,450 | 2024-07-14 | 2024-07-22 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 174,573 | 0.09 % | |
498 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3110282 | 51881422 | APBD | 198,306,750 | 198,178,257 | 197,992,588 | 197,992,588 | 197,537,488 | 197,537,450 | 197,537,450 | 197,537,450 | 2024-07-14 | 2024-07-22 | CV. LALUNA DANA | 02.237.179.3-733.000 | 314,162 | 0.16 % | |
499 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3113282 | 51881402 | APBD | 198,821,700 | 198,755,688 | 198,555,888 | 198,555,888 | 198,056,388 | 198,056,350 | 0 | 198,056,350 | 2024-07-14 | 2024-07-22 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 265,812 | 0.13 % | |
500 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Amparaya Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 4 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3115282 | 51881339 | APBD | 196,390,100 | 196,334,963 | 196,196,685 | 196,196,685 | 195,652,785 | 195,652,750 | 195,652,750 | 195,652,750 | 2024-07-21 | 2024-07-29 | CV. LALUNA DANA | 02.237.179.3-733.000 | 193,415 | 0.1 % | |
501 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Karang Jawa - Ambarai Kec. Padang Batung (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 3117282 | 51929797 | APBD | 198,378,000 | 198,377,000 | 198,265,975 | 198,265,975 | 198,000,000 | 198,000,000 | 198,000,000 | 198,000,000 | 2024-07-11 | 2024-07-17 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 112,025 | 0.06 % | |
502 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3123282 | 51809828 | APBD | 63,964,000 | 63,834,000 | 63,778,692 | 63,778,692 | 63,737,057 | 63,737,057 | 100 | 63,737,057 | 2024-07-12 | 2024-07-19 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 185,308 | 0.29 % | |
503 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Gang Langgar Al Ikhlas) | Pengadaan Langsung | Pekerjaan Konstruksi | 3139282 | 51808759 | APBD | 49,270,000 | 49,201,000 | 49,146,453 | 49,146,453 | 49,134,250 | 49,134,250 | 100 | 49,134,250 | 2024-07-17 | 2024-07-26 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 123,547 | 0.25 % | |
504 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Aula Kodim Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3142282 | 48096633 | APBD | 95,000,000 | 95,000,000 | 94,813,162 | 94,813,162 | 94,566,450 | 94,566,450 | 94,566,450 | 94,566,450 | 2024-07-23 | 2024-08-05 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 186,838 | 0.2 % | |
505 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 02 Desa Gambah Luar Muka dan Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3144282 | 51875708 | APBD | 20,000,000 | 19,833,000 | 19,725,921 | 19,725,921 | 19,703,721 | 19,703,721 | 100 | 19,703,721 | 2024-07-13 | 2024-07-19 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 274,079 | 1.37 % | |
506 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Nurul Yaqin RT 02 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3145282 | 51809024 | APBD | 68,312,000 | 68,144,000 | 68,033,552 | 68,033,552 | 68,001,558 | 68,001,558 | 100 | 68,001,558 | 2024-07-19 | 2024-07-26 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 278,448 | 0.41 % | |
507 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Singakarsa Teluk Aman RT 07 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3146282 | 51808923 | APBD | 77,841,000 | 77,678,000 | 77,623,303 | 77,623,303 | 77,580,513 | 77,580,513 | 100 | 77,580,513 | 2024-07-22 | 2024-07-29 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 217,697 | 0.28 % | |
508 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3150282 | 51809686 | APBD | 73,880,000 | 73,759,000 | 73,676,709 | 73,676,709 | 73,606,448 | 73,606,448 | 100 | 73,606,448 | 2024-07-17 | 2024-07-26 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 203,291 | 0.28 % | |
509 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3151282 | 51809429 | APBD | 46,959,000 | 46,825,000 | 46,764,178 | 46,764,178 | 46,719,778 | 46,719,778 | 100 | 46,719,778 | 2024-07-17 | 2024-07-26 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 194,822 | 0.41 % | |
510 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 03 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3155282 | 51809183 | APBD | 54,719,000 | 54,615,000 | 54,570,986 | 54,570,986 | 54,536,585 | 54,536,585 | 100 | 54,536,585 | 2024-07-23 | 2024-07-31 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 148,014 | 0.27 % | |
511 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 04 Kel Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3156282 | 51817407 | APBD | 42,743,000 | 42,568,000 | 42,493,864 | 42,493,864 | 42,468,943 | 42,468,943 | 100 | 42,468,943 | 2024-07-19 | 2024-07-26 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 249,136 | 0.58 % | |
512 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 03 Kel. Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3157282 | 51810286 | APBD | 56,776,000 | 56,609,000 | 56,551,032 | 56,551,032 | 56,527,225 | 56,527,225 | 100 | 56,527,225 | 2024-07-17 | 2024-07-26 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 224,968 | 0.4 % | |
513 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Pariangan Mesjid Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3158282 | 51809972 | APBD | 53,668,000 | 53,479,000 | 53,418,376 | 53,418,376 | 53,373,976 | 53,373,976 | 100 | 53,373,976 | 2024-07-17 | 2024-07-26 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 249,624 | 0.47 % | |
514 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 3159282 | 51819281 | APBD | 91,880,000 | 91,739,000 | 91,662,195 | 91,662,195 | 91,606,695 | 91,606,695 | 100 | 91,606,695 | 2024-07-17 | 2024-07-26 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 217,805 | 0.24 % | |
515 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3165282 | 51810046 | APBD | 36,388,000 | 36,268,000 | 36,183,023 | 36,183,023 | 36,155,273 | 36,155,273 | 100 | 36,155,273 | 2024-08-22 | 2024-08-30 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 204,977 | 0.56 % | |
516 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 03 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3171282 | 51810120 | APBD | 40,146,000 | 39,969,000 | 39,900,236 | 39,900,236 | 39,872,486 | 39,872,486 | 100 | 39,872,486 | 2024-08-26 | 2024-08-30 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 245,764 | 0.61 % | |
517 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3172282 | 50438348 | APBD | 196,819,416 | 196,723,278 | 196,604,924 | 196,604,924 | 195,993,314 | 195,993,314 | 195,993,314 | 195,993,314 | 2024-08-06 | 2024-08-12 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 214,492 | 0.11 % | |
518 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Desa Angkinang dan Abutment Jembatan Taniran Kec. Angkinang (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3194282 | 52100667 | APBD | 200,000,000 | 200,000,000 | 199,930,916 | 199,930,916 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-07-27 | 2024-08-01 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 69,084 | 0.03 % | |
519 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Kel. Kandangan Utara dan RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3203282 | 51876060 | APBD | 20,000,000 | 19,833,000 | 19,647,038 | 19,647,038 | 19,602,638 | 19,602,638 | 100 | 19,602,638 | 2024-07-23 | 2024-07-31 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 352,962 | 1.76 % | |
520 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Bakarung dan Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3212282 | 51876116 | APBD | 20,000,000 | 19,833,000 | 19,702,500 | 19,702,500 | 19,647,000 | 19,647,000 | 100 | 19,647,000 | 2024-07-22 | 2024-07-29 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 297,500 | 1.49 % | |
521 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3213282 | 48107981 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-07 | 2024-08-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
522 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4214282 | 51812399 | APBD | 39,104,000 | 39,017,000 | 38,972,827 | 38,972,827 | 38,961,802 | 38,961,802 | 100 | 38,961,802 | 2024-07-23 | 2024-07-31 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 131,173 | 0.34 % | |
523 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Budi Bakti Amawang Kiri Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4215282 | 48104349 | APBD | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,657,550 | 14,657,550 | 14,657,550 | 14,657,550 | 2024-07-26 | 2024-08-02 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
524 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi PengawasanPerkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4226282 | 51881753 | APBD | 15,000,000 | 15,000,000 | 14,900,000 | 14,900,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-29 | 2024-08-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.67 % | |
525 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4227282 | 51881534 | APBD | 15,000,000 | 15,000,000 | 14,965,002 | 14,965,002 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-08-03 | 2024-08-09 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 34,998 | 0.23 % | |
526 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Muning Dalam, Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe E)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4233282 | 51881480 | APBD | 40,000,000 | 39,937,800 | 39,849,000 | 39,849,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-08-06 | 2024-08-12 | CV. Halicons Engineering | 99.750.185.3-732.000 | 151,000 | 0.38 % | |
527 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado Rt.02 Kec. Loksado (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4234282 | 51881794 | APBD | 30,000,000 | 30,000,000 | 28,750,000 | 28,750,000 | 28,582,500 | 28,582,500 | 28,582,500 | 28,582,500 | 2024-09-11 | 2024-09-17 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 1,250,000 | 4.17 % | |
528 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan dan RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4235282 | 51875409 | APBD | 20,000,000 | 19,833,000 | 19,737,625 | 19,737,625 | 19,715,425 | 19,715,425 | 100 | 19,715,425 | 2024-07-31 | 2024-08-07 | CV. Halicons Engineering | 99.750.185.3-732.000 | 262,375 | 1.31 % | |
529 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4237282 | 51875766 | APBD | 50,000,000 | 49,937,000 | 49,820,130 | 49,820,130 | 49,809,030 | 49,809,030 | 100 | 49,809,030 | 2024-07-30 | 2024-08-07 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 179,870 | 0.36 % | |
530 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman Jl. Pertanian Desa Tabihi Kec. Padang Batung (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 4240282 | 47471394 | APBD | 172,400,000 | 172,252,000 | 172,100,201 | 172,100,201 | 172,044,701 | 172,044,701 | 100 | 172,044,701 | 2024-08-15 | 2024-08-23 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 299,799 | 0.17 % | |
531 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4241282 | 51810433 | APBD | 47,540,000 | 47,364,000 | 47,284,002 | 47,284,002 | 47,250,702 | 47,250,702 | 100 | 47,250,702 | 2024-07-30 | 2024-08-07 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 255,998 | 0.54 % | |
532 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4244282 | 51881372 | APBD | 193,470,000 | 193,418,400 | 193,268,481 | 193,268,481 | 192,685,731 | 192,685,700 | 191,000,000 | 192,685,700 | 2024-07-29 | 2024-08-05 | CV. LALUNA DANA | 02.237.179.3-733.000 | 201,519 | 0.1 % | |
533 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4247282 | 50438178 | APBD | 195,200,000 | 195,197,391 | 195,096,777 | 195,096,777 | 194,497,463 | 194,497,463 | 194,497,463 | 194,497,463 | 2024-07-30 | 2024-08-06 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 103,223 | 0.05 % | |
534 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Pekerjaan Konstruksi | 4248282 | 50438233 | APBD | 199,680,000 | 199,627,412 | 199,444,010 | 199,444,010 | 199,340,336 | 199,340,336 | 199,340,336 | 199,340,336 | 2024-08-26 | 2024-09-02 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 235,990 | 0.12 % | |
535 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4249282 | 50081627 | APBD | 15,000,000 | 14,891,000 | 14,844,030 | 14,844,030 | 14,832,930 | 14,832,930 | 100 | 14,832,930 | 2024-07-31 | 2024-08-07 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 155,970 | 1.04 % | |
536 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Pembangunan Bendung dengan Pasangan Batu Ketinggian 3 Meter (Irigasi Permukaan)) | Pengadaan Langsung | Pekerjaan Konstruksi | 4253282 | 51881474 | APBD | 200,000,000 | 199,898,719 | 199,843,219 | 199,843,219 | 199,158,349 | 199,158,300 | 199,158,300 | 199,158,300 | 2024-08-06 | 2024-08-12 | CV.BANUA JAYA PERDANA | 50.351.382.2-731.000 | 156,781 | 0.08 % | |
537 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 4 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4255282 | 51881325 | APBD | 196,390,100 | 196,349,931 | 196,184,057 | 196,184,057 | 195,545,807 | 195,545,800 | 195,545,800 | 195,545,800 | 2024-07-31 | 2024-08-09 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 206,043 | 0.1 % | |
538 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Rumah Dinas Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4257282 | 52172797 | APBD | 150,000,000 | 100,000,000 | 99,766,800 | 99,766,800 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-08-10 | 2024-08-16 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 50,233,200 | 33.49 % | |
539 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 01 - RT 02 Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4268282 | 52154845 | APBD | 55,582,000 | 55,420,000 | 55,348,788 | 55,348,788 | 55,293,288 | 55,293,288 | 100 | 55,293,288 | 2024-08-20 | 2024-08-27 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 233,212 | 0.42 % | |
540 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4272282 | 51881427 | APBD | 145,102,500 | 145,061,462 | 144,946,686 | 144,946,686 | 144,530,436 | 144,530,400 | 144,530,400 | 144,530,400 | 2024-08-19 | 2024-08-27 | FADWI UTAMA | 94.246.044.5-733.000 | 155,814 | 0.11 % | |
541 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4281282 | 52175399 | APBD | 95,000,000 | 95,000,000 | 94,840,620 | 94,840,620 | 94,560,900 | 94,560,900 | 94,560,900 | 94,560,900 | 2024-08-10 | 2024-08-16 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 159,380 | 0.17 % | |
542 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Angkinang (Pemeliharaan Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4282282 | 51881569 | APBD | 176,978,500 | 176,885,387 | 176,800,028 | 176,800,028 | 176,356,028 | 176,356,000 | 176,356,000 | 176,356,000 | 2024-08-06 | 2024-08-12 | CV. Haratai Permai | 02.089.737.7-733.000 | 178,472 | 0.1 % | |
543 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur Taman Makam Pahlawan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4285282 | 48000748 | APBD | 10,000,000 | 9,990,000 | 9,879,000 | 9,879,000 | 9,879,000 | 0 | 0 | 0 | 2024-08-05 | 2024-08-14 | cv.akmalindo | 02.531.482.4-731.000 | 121,000 | 1.21 % | |
544 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4289282 | 51881407 | APBD | 198,821,700 | 198,800,039 | 198,744,539 | 198,744,539 | 198,161,789 | 198,161,750 | 198,161,750 | 198,161,750 | 2024-08-19 | 2024-08-26 | CV. PERDANA | 71.124.808.8-733.000 | 77,161 | 0.04 % | |
545 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Baluti, Kel. Jambu Hilir dan Kel Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4301282 | 51839562 | APBD | 30,000,000 | 29,750,000 | 29,734,309 | 29,734,309 | 29,701,009 | 29,701,009 | 100 | 29,701,009 | 2024-08-07 | 2024-08-13 | cv.nawasena konsultan | 62.243.237.5-731.000 | 265,691 | 0.89 % | |
546 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Logistik/Samapta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4310282 | 52187147 | APBD | 25,000,000 | 25,000,000 | 24,875,100 | 24,875,100 | 24,630,900 | 24,630,900 | 24,630,900 | 24,630,900 | 2024-08-10 | 2024-08-16 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 124,900 | 0.5 % | |
547 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan UMKM Kuliner Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4312282 | 52187314 | APBD | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-08-10 | 2024-08-16 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 100,000 | 0.1 % | |
548 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4314282 | 52186959 | APBD | 95,000,000 | 95,000,000 | 94,627,500 | 94,627,500 | 94,461,000 | 94,461,000 | 94,461,000 | 94,461,000 | 2024-08-12 | 2024-08-19 | cv.akmalindo | 02.531.482.4-731.000 | 372,500 | 0.39 % | |
549 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Pemuda/Sekretariat KNPI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4317282 | 52187205 | APBD | 100,000,000 | 100,000,000 | 99,957,500 | 99,957,500 | 99,500,400 | 99,500,400 | 99,500,400 | 99,500,400 | 2024-08-12 | 2024-08-19 | CV. DAYAKARSA MADYA Consultant | 01.860.272.2-731.000 | 42,500 | 0.04 % | |
550 | 2024 | Dinas Perikanan | Revitalisasi Kolam Ikan Desa Lumpangi | Pengadaan Langsung | Pekerjaan Konstruksi | 4333282 | 51438367 | APBD | 149,365,000 | 148,505,502 | 148,488,125 | 148,488,125 | 148,400,000 | 0 | 0 | 0 | 2024-08-14 | 2024-08-21 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 876,875 | 0.59 % | |
551 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Kalumpang - Balimau Kec. Kalumpang (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4338282 | 47884152 | APBD | 15,000,000 | 15,000,000 | 14,997,168 | 14,997,168 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-21 | 2024-08-26 | CV. Halicons Engineering | 99.750.185.3-732.000 | 2,832 | 0.02 % | |
552 | 2024 | Kecamatan Kandangan | Belanja Jasa Perencanaan (Kel. Jambu Hilir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4339282 | 52099767 | APBD | 15,000,000 | 14,818,500 | 14,750,000 | 14,750,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-15 | 2024-08-19 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 250,000 | 1.67 % | |
553 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Malilingin - Lokbahan - Paniungan dan Ruas Jl. Tanayung - Tabihi (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4345282 | 52253922 | APBD | 199,998,000 | 199,998,000 | 199,934,969 | 199,934,969 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-08-16 | 2024-08-21 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 63,031 | 0.03 % | |
554 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4359282 | 51876158 | APBD | 30,000,000 | 29,750,000 | 29,651,059 | 29,651,059 | 29,617,759 | 29,617,759 | 100 | 29,617,759 | 2024-08-26 | 2024-08-30 | Wing Rastafarindo | 03.282.590.3-732.000 | 348,941 | 1.16 % | |
555 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Ruas Jalan Gg. Bidan RT 03 Desa Tambak Bitin Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4382282 | 47881151 | APBD | 25,000,000 | 24,991,500 | 24,864,000 | 24,864,000 | 24,800,000 | 24,800,000 | 24,800,000 | 24,800,000 | 2024-08-23 | 2024-08-29 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 136,000 | 0.54 % | |
556 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Hamalau - Pahampangan Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4386282 | 47881157 | APBD | 50,000,000 | 49,999,800 | 48,814,331 | 48,814,331 | 48,800,000 | 48,800,000 | 48,800,000 | 48,800,000 | 2024-09-05 | 2024-09-12 | Wiyasa Drawana | 80.902.072.0-731.000 | 1,185,669 | 2.37 % | |
557 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Baru - Ds. Bajayau Kec. Daha Barat (lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4407282 | 47881142 | APBD | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-09-05 | 2024-09-10 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 50,000 | 0.1 % | |
558 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Angkinang - Telaga Langsat Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4432282 | 47891458 | APBD | 45,000,000 | 44,997,000 | 44,947,230 | 44,947,230 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-09-05 | 2024-09-10 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 52,770 | 0.12 % | |
559 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan Kalaka Indah dan sekitarnya Desa Tibung Raya Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4442282 | 50081664 | APBD | 15,000,000 | 14,891,000 | 14,801,129 | 14,801,129 | 14,790,029 | 14,790,029 | 100 | 14,790,029 | 2024-08-28 | 2024-09-03 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 198,872 | 1.33 % | |
560 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4443282 | 51876232 | APBD | 20,000,000 | 19,833,000 | 19,722,973 | 19,722,973 | 19,700,773 | 19,700,773 | 100 | 19,700,773 | 2024-08-30 | 2024-09-06 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 277,027 | 1.39 % | |
561 | 2024 | Dinas Pertanian | Pembangunan/rehab Jalan Usaha Tani (JUT) Poktan Pandan Arum Desa Bakarung Kec Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4444282 | 47381959 | APBD | 199,500,000 | 199,449,000 | 199,278,186 | 199,278,186 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-09-05 | 2024-09-10 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 221,814 | 0.11 % | |
562 | 2024 | Dinas Pertanian | Belanja Jasa Konsultasi Pengawasan JUT Poktan Pandan Arum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4451282 | 51775012 | APBD | 14,418,037 | 14,418,000 | 14,374,500 | 14,374,500 | 14,370,000 | 14,370,000 | 14,370,000 | 14,370,000 | 2024-09-09 | 2024-09-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 43,537 | 0.3 % | |
563 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4455282 | 52186547 | APBD | 30,000,000 | 30,000,000 | 29,942,250 | 29,942,250 | 29,714,700 | 29,714,700 | 29,714,700 | 29,714,700 | 2024-09-03 | 2024-09-10 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 57,750 | 0.19 % | |
564 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4460282 | 51881488 | APBD | 30,000,000 | 30,000,000 | 29,998,860 | 29,998,860 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-09-03 | 2024-09-10 | CV. Halicons Engineering | 99.750.185.3-732.000 | 1,140 | 0 % | |
565 | 2024 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 4470282 | 47346769 | APBD | 74,592,000 | 72,372,000 | 72,208,931 | 72,208,931 | 71,897,465 | 0 | 0 | 0 | 2024-09-06 | 2024-09-10 | CV. KHALIF | 81.540.809.1-733.000 | 2,383,069 | 3.19 % | |
566 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kandangan (Pemeliharaan Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4472282 | 51881565 | APBD | 176,978,500 | 176,923,060 | 176,867,560 | 176,867,560 | 176,506,810 | 176,506,800 | 176,506,800 | 176,506,800 | 2024-09-08 | 2024-09-16 | CV. Haratai Permai | 02.089.737.7-733.000 | 110,940 | 0.06 % | |
567 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Tugu Batas Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 4480282 | 47437035 | APBD | 194,250,000 | 194,250,000 | 193,670,075 | 193,670,075 | 193,559,075 | 193,559,075 | 77,423,630 | 193,559,075 | 2024-10-04 | 2024-10-11 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 579,925 | 0.3 % | |
568 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Samuda - Bajayau Kec. Daha Barat (Dana Bagi Hasil Sawit Tahap 2) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4481282 | 52155497 | APBD | 100,000,000 | 99,928,900 | 99,884,349 | 99,884,349 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-09-17 | 2024-09-20 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 115,651 | 0.12 % | |
569 | 2024 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan (Kel. Jambu Hilir) | Pengadaan Langsung | Pekerjaan Konstruksi | 4487282 | 51640245 | APBD | 113,124,100 | 113,121,424 | 113,065,924 | 113,065,924 | 113,010,424 | 113,010,424 | 113,010,424 | 113,010,424 | 2024-09-20 | 2024-09-24 | CV. SORAYA | 01.834.078.6-733.000 | 58,176 | 0.05 % | |
570 | 2024 | Kecamatan Kandangan | Belanja Jasa Pengawasan (Kel. Jambu Hilir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4492282 | 52100009 | APBD | 15,000,000 | 14,985,000 | 14,910,000 | 14,910,000 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2024-09-20 | 2024-09-24 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 90,000 | 0.6 % | |
571 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Rumah Dinas PUTR Jl. Singakarsa | Pengadaan Langsung | Pekerjaan Konstruksi | 4499282 | 52186621 | APBD | 200,000,000 | 199,912,958 | 199,720,076 | 199,720,076 | 199,192,855 | 199,192,855 | 199,192,855 | 199,192,855 | 2024-09-30 | 2024-10-08 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 279,924 | 0.14 % | |
572 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Pramuka Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4500282 | 52187169 | APBD | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,503,800 | 29,503,800 | 29,503,800 | 29,503,800 | 2024-09-30 | 2024-10-08 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 252,000 | 0.84 % | |
573 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Rumah Dinas PUTR Jl. Singakarsa | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4501282 | 52187011 | APBD | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,574,300 | 14,574,300 | 14,574,300 | 14,574,300 | 2024-09-30 | 2024-10-08 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 237,000 | 1.58 % | |
574 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4502282 | 52172786 | APBD | 200,000,000 | 199,939,930 | 199,884,430 | 199,884,430 | 199,376,605 | 199,376,605 | 199,376,605 | 199,376,605 | 2024-10-07 | 2024-10-14 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 115,571 | 0.06 % | |
575 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4503282 | 52172802 | APBD | 15,000,000 | 15,000,000 | 14,965,000 | 14,965,000 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-10-16 | 2024-10-22 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 35,000 | 0.23 % | |
576 | 2024 | Kecamatan Kandangan | ,Belanja Modal Jalan Lainnya (KU) | Pengadaan Langsung | Pekerjaan Konstruksi | 4505282 | 47839750 | APBD | 100,883,880 | 100,778,000 | 100,241,674 | 100,241,674 | 100,017,454 | 0 | 0 | 0 | 2024-10-18 | 2024-10-30 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 642,206 | 0.64 % | |
577 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Pengaman Badan Jalan Desa Hulu Banyu Kec. Loksado (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4506282 | 52766136 | APBD | 199,999,999 | 199,999,000 | 199,952,587 | 199,952,587 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-10-10 | 2024-10-17 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 47,412 | 0.02 % | |
578 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Sungai Kudung - Kalinduku Kec. Angkinang, Hamak Timur - Umpaya Kec. Telaga Langsat, dan Singakarsa - Palas (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4541282 | 52766081 | APBD | 199,665,000 | 199,663,000 | 199,608,169 | 199,608,169 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2024-10-10 | 2024-10-17 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 56,831 | 0.03 % | |
579 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Wakaf Desa Hakurung Rt.02 Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4551282 | 52683845 | APBDP | 40,000,000 | 39,960,000 | 39,937,800 | 39,937,800 | 39,604,800 | 39,604,800 | 39,604,800 | 39,604,800 | 2024-10-14 | 2024-10-21 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 62,200 | 0.16 % | |
580 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4556282 | 52685199 | APBDP | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-14 | 2024-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.75 % | |
581 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung dan Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Tabihi (DI. Kambas) Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4558282 | 52731149 | APBDP | 40,000,000 | 40,000,000 | 39,850,000 | 39,850,000 | 39,405,000 | 39,405,000 | 39,405,000 | 39,405,000 | 2024-10-15 | 2024-10-22 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 150,000 | 0.38 % | |
582 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Madihin Desa Kayu Abang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4570282 | 52683655 | APBDP | 50,000,000 | 49,950,000 | 49,839,000 | 49,839,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-10-14 | 2024-10-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 161,000 | 0.32 % | |
583 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Survei Investigasi Design Daerah Irigasi Rawa (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4571282 | 52701379 | APBDP | 75,000,000 | 74,925,000 | 74,919,450 | 74,919,450 | 74,003,700 | 74,003,700 | 74,003,700 | 74,003,700 | 2024-10-24 | 2024-11-01 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 80,550 | 0.11 % | |
584 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4576282 | 52683954 | APBDP | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | 2024-10-31 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.75 % | |
585 | 2024 | Dinas Pertanian | Perencanaan Pemb/Rehab Jalan Usaha tani (JUT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4577282 | 52779971 | APBDP | 90,000,000 | 90,000,000 | 89,810,100 | 89,810,100 | 89,700,000 | 89,700,000 | 89,700,000 | 89,700,000 | 2024-10-10 | 2024-10-17 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 189,900 | 0.21 % | |
586 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Estimasi Nilai Lahan dan Bangunan (Appraisal Nilai Tanah untuk NJOP) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4583282 | 52383715 | APBD | 150,000,000 | 149,968,992 | 149,406,000 | 149,406,000 | 148,000,000 | 0 | 0 | 0 | 2024-10-30 | 2024-11-04 | KJPP Rizki Djunaedy dan Rekan Cabang Pontianak | 21.065.097.4-701.001 | 594,000 | 0.4 % | |
587 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Telaga Langsat RT.02 Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4587282 | 52684811 | APBDP | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-10-23 | 2024-11-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 105,500 | 0.21 % | |
588 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Telaga Langsat Kec. Telaga Langsat dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4651282 | 52731106 | APBDP | 40,000,000 | 40,000,000 | 39,960,000 | 39,960,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-14 | 2024-10-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 40,000 | 0.1 % | |
589 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4662282 | 52683901 | APBDP | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-19 | 2024-10-30 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 151,000 | 0.38 % | |
590 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Malilingin RT.01 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4665282 | 52685038 | APBDP | 50,000,000 | 49,983,300 | 49,894,500 | 49,894,500 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-10-15 | 2024-10-22 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 105,500 | 0.21 % | |
591 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Kandangan Kota RT.05 Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4666282 | 52684991 | APBDP | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-10-15 | 2024-10-22 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
592 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Halunuk Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4668282 | 52685109 | APBDP | 20,000,000 | 20,000,000 | 19,925,000 | 19,925,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | 2024-10-30 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 75,000 | 0.38 % | |
593 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Lokbinuang RT.02 Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4669282 | 52685149 | APBDP | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | 2024-10-31 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 150,000 | 0.75 % | |
594 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Malinau Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4689282 | 52684757 | APBDP | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-10-14 | 2024-10-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 105,500 | 0.21 % | |
595 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelaksanaan Kegiatan E-PAKSI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4705282 | 52701372 | APBDP | 100,000,000 | 99,938,850 | 99,900,000 | 99,900,000 | 99,067,500 | 99,067,500 | 99,067,500 | 99,067,500 | 2024-10-23 | 2024-11-01 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 100,000 | 0.1 % | |
596 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI. Tayub, DI. Mahlan, DI. Aliyaman, DI. Kamat di Kec. Telaga Langsat (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4707282 | 52701982 | APBDP | 198,804,700 | 198,665,939 | 198,633,372 | 198,633,372 | 198,217,122 | 198,217,100 | 198,217,100 | 198,217,100 | 2024-10-15 | 2024-10-21 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 171,328 | 0.09 % | |
597 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI. Jarau II dan DI. Ida Manggala di Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4708282 | 52701965 | APBDP | 198,804,700 | 198,665,398 | 198,648,312 | 198,648,312 | 198,232,062 | 198,232,000 | 198,232,000 | 198,232,000 | 2024-10-14 | 2024-10-21 | CV. Haratai Permai | 02.089.737.7-733.000 | 156,388 | 0.08 % | |
598 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Jambu Hilir Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4709282 | 52684337 | APBDP | 40,000,000 | 39,849,000 | 39,806,820 | 39,806,820 | 39,482,700 | 39,482,700 | 39,482,700 | 39,482,700 | 2024-10-15 | 2024-10-22 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 193,180 | 0.48 % | |
599 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing di desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4718282 | 52731093 | APBDP | 60,000,000 | 60,000,000 | 59,878,799 | 59,878,799 | 59,496,000 | 59,496,000 | 59,496,000 | 59,496,000 | 2024-10-25 | 2024-11-01 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 121,201 | 0.2 % | |
600 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI Jarau I di Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4722282 | 52701953 | APBDP | 198,804,700 | 198,666,679 | 198,601,196 | 198,601,196 | 198,184,946 | 198,184,900 | 198,184,900 | 198,184,900 | 2024-10-14 | 2024-10-21 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 203,504 | 0.1 % | |
601 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Balanti Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4728282 | 52683565 | APBDP | 40,000,000 | 39,960,000 | 39,793,500 | 39,793,500 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-25 | 2024-11-01 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 206,500 | 0.52 % | |
602 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan dan Jasa Konsultansi Perencanaan Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4730282 | 52731125 | APBDP | 40,000,000 | 40,000,000 | 39,960,000 | 39,960,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-15 | 2024-10-22 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 40,000 | 0.1 % | |
603 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4734282 | 52684381 | APBDP | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 0 | 0 | 0 | 2024-10-15 | 2024-10-22 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 50,000 | 0.25 % | |
604 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4736282 | 52701412 | APBDP | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-15 | 2024-10-22 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 100,000 | 0.5 % | |
605 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan DIR. Tirtabahalayung Kec. Kandangan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4738282 | 52701387 | APBDP | 75,000,000 | 74,897,250 | 74,814,000 | 74,814,000 | 74,037,000 | 74,037,000 | 74,037,000 | 74,037,000 | 2024-10-24 | 2024-11-01 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 186,000 | 0.25 % | |
606 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman | Pengadaan Langsung | Pekerjaan Konstruksi | 4748282 | 52925093 | APBD | 180,000,000 | 179,982,354 | 179,811,614 | 179,811,614 | 179,706,164 | 163,691,475 | 163,691,475 | 163,691,475 | 2024-10-23 | 2024-10-31 | CV. ELANG BANGUN SEMESTA | 71.364.465.6-733.000 | 188,386 | 0.1 % | |
607 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4749282 | 52684015 | APBDP | 40,000,000 | 39,960,000 | 39,860,100 | 39,860,100 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-19 | 2024-10-30 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 139,900 | 0.35 % | |
608 | 2024 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Perencanaan Arsitektur - Jasa Penilaian Perawatan dan kelayakan bangunan gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4752282 | 52947900 | APBDP | 10,000,000 | 10,000,000 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 2024-10-16 | 2024-10-23 | CV. CITRA TEKNIKA D | 72.050.193.1-731.000 | 132,100 | 1.32 % | |
609 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Lingkungan untuk Peningkatan DIR. Tirtabahalayung, Kec.Kandangan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4768282 | 52701398 | APBDP | 75,000,000 | 74,925,000 | 74,536,500 | 74,536,500 | 74,092,500 | 74,092,500 | 74,092,500 | 74,092,500 | 2024-10-28 | 2024-11-07 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 463,500 | 0.62 % | |
610 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Simpur Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4771282 | 52684654 | APBDP | 20,000,000 | 20,000,000 | 19,909,999 | 19,909,999 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-26 | 2024-11-01 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,001 | 0.45 % | |
611 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4778282 | 52684431 | APBDP | 20,000,000 | 20,000,000 | 19,909,999 | 19,909,999 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-25 | 2024-11-01 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,001 | 0.45 % | |
612 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4785282 | 52683493 | APBDP | 20,000,000 | 20,000,000 | 19,802,400 | 19,802,400 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-23 | 2024-11-01 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 197,600 | 0.99 % | |
613 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Bajayau Lama Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4791282 | 52683784 | APBDP | 40,000,000 | 39,960,000 | 39,937,800 | 39,937,800 | 39,604,800 | 39,604,800 | 39,604,800 | 39,604,800 | 2024-10-19 | 2024-10-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 62,200 | 0.16 % | |
614 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Pajah Api dan Jl. Ds. Kapuh Tengah (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4792282 | 52791806 | APBDP | 60,000,000 | 59,953,900 | 59,898,464 | 59,898,464 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-28 | 2024-11-01 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 101,536 | 0.17 % | |
615 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4819282 | 52785433 | APBDP | 20,000,000 | 19,907,000 | 19,795,851 | 19,795,851 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-11-08 | 2024-11-14 | Wing Rastafarindo | 03.282.590.3-732.000 | 204,149 | 1.02 % | |
616 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4820282 | 52793307 | APBDP | 35,000,000 | 34,991,600 | 34,880,418 | 34,880,418 | 34,800,000 | 34,800,000 | 34,800,000 | 34,800,000 | 2024-11-08 | 2024-11-14 | Wing Rastafarindo | 03.282.590.3-732.000 | 119,582 | 0.34 % | |
617 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Tawia - Kayu Abang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4821282 | 52791985 | APBDP | 80,000,000 | 79,991,300 | 79,308,390 | 79,308,390 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2024-11-04 | 2024-11-08 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 691,610 | 0.86 % | |
618 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jl. Tibung Raya - Asam Cangkok Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4822282 | 52792302 | APBDP | 80,000,000 | 79,991,300 | 79,858,284 | 79,858,284 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-10-25 | 2024-10-31 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 141,716 | 0.18 % | |
619 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Taal Jarau Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4824282 | 52793660 | APBDP | 80,000,000 | 79,991,300 | 79,963,601 | 79,963,601 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-07 | 2024-11-14 | CV. Halicons Engineering | 99.750.185.3-732.000 | 36,399 | 0.05 % | |
620 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Amawang Muka - Getek dan Jl. Angkakai (Jl. Sungai Hambawang) Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4825282 | 52791679 | APBDP | 80,000,000 | 79,991,351 | 79,863,390 | 79,863,390 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-04 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 136,610 | 0.17 % | |
621 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Banua Kambang Kec. Simpur (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4827282 | 52793495 | APBDP | 80,000,000 | 79,991,300 | 79,863,390 | 79,863,390 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-04 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 136,610 | 0.17 % | |
622 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Pianggu Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4837282 | 52792685 | APBDP | 60,000,000 | 59,953,900 | 59,812,350 | 59,812,350 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-25 | 2024-10-31 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 187,650 | 0.31 % | |
623 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Wasah Tengah - Sungai Tarap Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4838282 | 52791598 | APBDP | 60,000,000 | 59,953,900 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-11-04 | 2024-11-08 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
624 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Taniran Tengah - Taniran Selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4841282 | 52792399 | APBDP | 60,000,000 | 59,953,900 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-11-04 | 2024-11-08 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
625 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Halayung - Hantarukung Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4843282 | 52792992 | APBDP | 80,000,000 | 79,991,300 | 79,741,601 | 79,741,601 | 79,700,000 | 79,700,000 | 79,700,000 | 79,700,000 | 2024-10-23 | 2024-10-31 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 258,399 | 0.32 % | |
626 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Desa Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4853282 | 52793158 | APBDP | 80,000,000 | 79,991,300 | 79,741,601 | 79,741,601 | 79,700,000 | 79,700,000 | 79,700,000 | 79,700,000 | 2024-10-23 | 2024-10-31 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 258,399 | 0.32 % | |
627 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4856282 | 52783833 | APBDP | 20,000,000 | 19,907,000 | 19,647,000 | 19,647,000 | 19,600,000 | 19,600,000 | 19,600,000 | 19,600,000 | 2024-11-08 | 2024-11-14 | cv.akmalindo | 02.531.482.4-731.000 | 353,000 | 1.77 % | |
628 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Ruas Jl. Anjiran Rantauan - Ds. Taniran Tengah Kec. Angkinang (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4857282 | 52973534 | APBD | 200,000,000 | 199,996,000 | 199,897,919 | 199,897,919 | 199,700,000 | 199,700,000 | 199,700,000 | 199,700,000 | 2024-10-19 | 2024-10-24 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 102,081 | 0.05 % | |
629 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4869282 | 52784680 | APBDP | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-23 | 2024-10-29 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
630 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Kesehatan dan Jalan AES Nasution Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4872282 | 52793567 | APBDP | 50,000,000 | 49,969,200 | 49,891,552 | 49,891,552 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | 2024-10-25 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 108,448 | 0.22 % | |
631 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Simp 3 Baluti Amawang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4874282 | 52791359 | APBDP | 50,000,000 | 49,969,200 | 49,913,752 | 49,913,752 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | 2024-10-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 86,248 | 0.17 % | |
632 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4897282 | 52784595 | APBDP | 20,000,000 | 19,907,000 | 19,850,000 | 19,850,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-25 | 2024-10-31 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 150,000 | 0.75 % | |
633 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Sugiono dan Jl. Sekolah Islam Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4899282 | 52791487 | APBDP | 50,000,000 | 49,969,200 | 49,902,652 | 49,902,652 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | 2024-10-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 97,348 | 0.19 % | |
634 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4900282 | 52784813 | APBDP | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-23 | 2024-10-29 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
635 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Keramat Sakti Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4901282 | 52792862 | APBDP | 50,000,000 | 49,969,200 | 49,772,400 | 49,772,400 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-24 | 2024-10-31 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 227,600 | 0.46 % | |
636 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Kamawakan Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4902282 | 52793414 | APBDP | 50,000,000 | 49,969,200 | 49,916,700 | 49,916,700 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-10-31 | 2024-11-06 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 83,300 | 0.17 % | |
637 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Al-Ikhlas - Ds. Baluti Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4903282 | 52791901 | APBDP | 50,000,000 | 49,969,200 | 49,711,350 | 49,711,350 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-25 | 2024-10-31 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 288,650 | 0.58 % | |
638 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Matang Gadung - Halalang Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4904282 | 52792191 | APBDP | 50,000,000 | 49,969,200 | 49,772,400 | 49,772,400 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-24 | 2024-10-31 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 227,600 | 0.46 % | |
639 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4915282 | 52784465 | APBDP | 20,000,000 | 19,907,000 | 19,850,000 | 19,850,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-25 | 2024-10-31 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 150,000 | 0.75 % | |
640 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4920282 | 52785246 | APBDP | 20,000,000 | 19,907,000 | 19,884,818 | 19,884,818 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-21 | 2024-10-25 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 115,183 | 0.58 % | |
641 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4925282 | 52783526 | APBDP | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | 2024-10-29 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
642 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Pengawasan Rehabilitasi Tugu Batas Kota, Pengawasan Peningkatan PSU Perumahan Kalian Asri Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4926282 | 47436955;47437033 | APBD | 15,000,000 | 14,999,597 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 2024-10-22 | 2024-10-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 100,304 | 0.67 % | |
643 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4955282 | 52783759 | APBDP | 20,000,000 | 19,907,000 | 19,647,000 | 19,647,000 | 19,600,000 | 19,600,000 | 19,600,000 | 19,600,000 | 2024-11-08 | 2024-11-14 | cv.akmalindo | 02.531.482.4-731.000 | 353,000 | 1.77 % | |
644 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4967282 | 52785076 | APBDP | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | 2024-10-29 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
645 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4968282 | 52784415 | APBDP | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | 2024-10-29 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
646 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Hamak Timur Umpaya Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4972282 | 52792137 | APBDP | 60,000,000 | 59,953,900 | 59,935,560 | 59,935,560 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-31 | 2024-11-06 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 64,440 | 0.11 % | |
647 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Merah Johansyah - Jl. Melati Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4974282 | 52791743 | APBDP | 60,000,000 | 59,953,900 | 59,731,964 | 59,731,964 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-10-21 | 2024-10-25 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 268,036 | 0.45 % | |
648 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4975282 | 52784948 | APBDP | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | 2024-10-29 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
649 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4976282 | 52783678 | APBDP | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | 2024-10-29 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
650 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Batang Kulur Kiri - Durian Landung (Kalian Basar) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4979282 | 52792050 | APBDP | 60,000,000 | 59,953,900 | 59,812,350 | 59,812,350 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-25 | 2024-10-31 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 187,650 | 0.31 % | |
651 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado ((Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4983282 | 52785154 | APBDP | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-25 | 2024-10-31 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
652 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4995282 | 52833105 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-28 | 2024-11-04 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,400 | 0.88 % | |
653 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4996282 | 52834339 | APBDP | 20,000,000 | 20,000,000 | 19,880,000 | 19,880,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-28 | 2024-11-04 | Wing Rastafarindo | 03.282.590.3-732.000 | 120,000 | 0.6 % | |
654 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4997282 | 52826560 | APBDP | 20,000,000 | 20,000,000 | 19,702,500 | 19,702,500 | 19,613,700 | 19,613,700 | 19,613,700 | 19,613,700 | 2024-10-26 | 2024-11-01 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 297,500 | 1.49 % | |
655 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Urugan Samping Gedung MUI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5000282 | 52834912 | APBDP | 20,000,000 | 20,000,000 | 19,957,000 | 19,957,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 43,000 | 0.22 % | |
656 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5002282 | 52783780 | APBDP | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-26 | 2024-11-01 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
657 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5003282 | 52736666 | APBDP | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
658 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5004282 | 52793391 | APBDP | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
659 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5005282 | 52793814 | APBDP | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-26 | 2024-11-01 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
660 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5009282 | 52792277 | APBDP | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-25 | 2024-11-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,520 | 0.28 % | |
661 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5014282 | 52736216 | APBDP | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
662 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5017282 | 52732965 | APBDP | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
663 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5019282 | 52793709 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
664 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5030282 | 52790968 | APBDP | 20,000,000 | 20,000,000 | 19,888,980 | 19,888,980 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-26 | 2024-11-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 111,020 | 0.56 % | |
665 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5035282 | 52791275 | APBDP | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | 2024-11-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
666 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5038282 | 52792113 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-27 | 2024-11-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
667 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5048282 | 52793491 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-27 | 2024-11-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
668 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5070282 | 52791189 | APBDP | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
669 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5071282 | 52784589 | APBDP | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | 2024-11-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
670 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5072282 | 52791965 | APBDP | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-25 | 2024-11-01 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
671 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5079282 | 52793082 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
672 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5085282 | 52785160 | APBDP | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | 2024-11-04 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
673 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5087282 | 52791369 | APBDP | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | 2024-11-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
674 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5089282 | 52794188 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
675 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5092282 | 52794341 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
676 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5095282 | 52806025 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
677 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5096282 | 52806050 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
678 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5111282 | 52806072 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
679 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5112282 | 52806084 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
680 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5119282 | 52806095 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
681 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5122282 | 52806109 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
682 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5150282 | 52806116 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
683 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5152282 | 52806140 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
684 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5157282 | 52806149 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
685 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5161282 | 52806165 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
686 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5168282 | 52811871 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
687 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5174282 | 52811954 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-07 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
688 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5186282 | 52812010 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
689 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5189282 | 52812264 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-11-04 | 2024-11-11 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
690 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5213282 | 52812400 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-11-04 | 2024-11-11 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
691 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Survei Investigasi Design Daerah Irigasi Permukaan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5214282 | 52701376 | APBDP | 75,000,000 | 74,930,000 | 74,925,000 | 74,925,000 | 74,314,500 | 74,314,500 | 74,314,500 | 74,314,500 | 2024-10-24 | 2024-11-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 75,000 | 0.1 % | |
692 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5217282 | 52813357 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
693 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | ,Perencanaan Pembangunan PMA Desa Lumpangi Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5224282 | 52812520;52813599 | APBDP | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-11-02 | 2024-11-08 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
694 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5231282 | 52791060 | APBDP | 40,000,000 | 40,000,000 | 39,887,850 | 39,887,850 | 39,760,200 | 39,760,200 | 39,760,200 | 39,760,200 | 2024-10-27 | 2024-11-04 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 112,150 | 0.28 % | |
695 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5238282 | 52785337 | APBDP | 40,000,000 | 40,000,000 | 39,888,960 | 39,888,960 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-10-25 | 2024-11-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 111,040 | 0.28 % | |
696 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Olahraga/Serbaguna Kecamatan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5263282 | 52835143 | APBDP | 100,000,000 | 99,952,725 | 99,522,600 | 99,522,600 | 99,342,225 | 99,342,225 | 99,342,225 | 99,342,225 | 2024-11-04 | 2024-11-11 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 477,400 | 0.48 % | |
697 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Renovasi Kantor Kodim 1003 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5268282 | 52833327 | APBDP | 100,000,000 | 99,952,725 | 99,900,000 | 99,900,000 | 99,231,225 | 99,231,225 | 99,231,225 | 99,231,225 | 2024-10-27 | 2024-11-05 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 100,000 | 0.1 % | |
698 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Polsek Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5271282 | 52835238 | APBD | 40,000,000 | 40,000,000 | 39,793,500 | 39,793,500 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-10-28 | 2024-11-04 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 206,500 | 0.52 % | |
699 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Kecamatan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5275282 | 52826348 | APBDP | 100,000,000 | 99,952,725 | 99,453,225 | 99,453,225 | 99,342,225 | 99,342,225 | 99,342,225 | 99,342,225 | 2024-11-05 | 2024-11-12 | Asiyah Griya Persada | 50.479.063.5-732.000 | 546,775 | 0.55 % | |
700 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Kecamatan Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5277282 | 52826690 | APBDP | 100,000,000 | 99,952,725 | 99,564,225 | 99,564,225 | 99,508,725 | 99,508,725 | 99,508,725 | 99,508,725 | 2024-11-05 | 2024-11-12 | CV. Motif Konsultan | 75.076.899.6-731.000 | 435,775 | 0.44 % | |
701 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Backdrof Gedung Kantor Sekretariat Daerah/Kantor Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5287282 | 53073872 | APBDP | 100,000,000 | 99,952,725 | 99,622,500 | 99,622,500 | 99,286,725 | 99,286,725 | 99,286,725 | 99,286,725 | 2024-10-28 | 2024-11-04 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 377,500 | 0.38 % | |
702 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Asrama Santri Ponpes Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5288282 | 52835153 | APBDP | 100,000,000 | 99,795,938 | 99,345,000 | 99,345,000 | 99,189,600 | 99,189,600 | 99,189,600 | 99,189,600 | 2024-11-16 | 2024-11-22 | cv.akmalindo | 02.531.482.4-731.000 | 655,000 | 0.66 % | |
703 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Barak Remaja dan Ruang Tahanan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5290282 | 52833169 | APBDP | 100,000,000 | 99,795,938 | 99,433,800 | 99,433,800 | 99,245,100 | 99,245,100 | 99,245,100 | 99,245,100 | 2024-11-16 | 2024-11-22 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 566,200 | 0.57 % | |
704 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Di Ruko Sudi Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5294282 | 52732229 | APBDP | 20,000,000 | 20,000,000 | 19,957,000 | 19,957,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | 2024-11-05 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 43,000 | 0.22 % | |
705 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Kantor, Rumah Jabatan Kajari dan Mushola Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5297282 | 52833190 | APBDP | 40,000,000 | 40,000,000 | 39,958,500 | 39,958,500 | 39,782,400 | 39,782,400 | 39,782,400 | 39,782,400 | 2024-10-29 | 2024-11-05 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 41,500 | 0.1 % | |
706 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Rumah Jabatan dan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5302282 | 52833239 | APBDP | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-10-26 | 2024-11-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
707 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Rumah Jabatan Kapolres Kab HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5303282 | 52833322 | APBDP | 40,000,000 | 40,000,000 | 39,704,700 | 39,704,700 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-10-26 | 2024-11-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 295,300 | 0.74 % | |
708 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Dokumen Andalalin Kawasan Perkantoran Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5310282 | 52833113 | APBDP | 100,000,000 | 99,978,357 | 99,778,563 | 99,778,563 | 99,467,100 | 99,467,100 | 99,467,100 | 99,467,100 | 2024-11-12 | 2024-11-21 | PT TECTAMA KARYA | 01.534.559.8-731.000 | 221,437 | 0.22 % | |
709 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Study Transportasi Kawasan Perkantoran Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5320282 | 52855535 | APBDP | 100,000,000 | 99,978,982 | 99,779,182 | 99,779,182 | 99,467,100 | 99,467,100 | 99,467,100 | 99,467,100 | 2024-11-12 | 2024-11-21 | PT. TECHNIKATAMA JASA KONSULTAN | 02.089.773.2-733.000 | 220,818 | 0.22 % | |
710 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung II Kejaksaan Negeri Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5326282 | 52833323 | APBDP | 100,000,000 | 99,952,725 | 99,783,450 | 99,783,450 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 2024-11-22 | 2024-11-29 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 216,550 | 0.22 % | |
711 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Bappelitbangda Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5347282 | 52826971 | APBDP | 100,000,000 | 99,952,725 | 98,235,000 | 98,235,000 | 98,179,500 | 98,179,500 | 98,179,500 | 98,179,500 | 2024-11-19 | 2024-11-26 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 1,765,000 | 1.77 % | |
712 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putra Malaris Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5348282 | 52835149 | APBDP | 100,000,000 | 99,795,938 | 99,345,000 | 99,345,000 | 99,245,100 | 99,245,100 | 99,245,100 | 99,245,100 | 2024-11-19 | 2024-11-26 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 655,000 | 0.66 % | |
713 | 2024 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural (Konsultan Perencanaan Rehab Pagar Depan, Pembangunan Pagar dan Saluran Air Di Belakang Panggung Terbuka Obyek Wisata Air Panas Tanuhi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5358282 | 53017411 | APBD | 40,000,000 | 39,992,000 | 39,853,718 | 39,853,718 | 39,770,468 | 0 | 0 | 0 | 2024-10-23 | 2024-10-31 | SKETSA NIRINDO ADITAMA | 02.575.724.6-731.000 | 146,283 | 0.37 % | |
714 | 2024 | Dinas Perdagangan | Perencanaan Perkuatan Bangunan Los Amandit Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5378282 | 53015228 | APBDP | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-11-08 | 2024-11-14 | cv.akmalindo | 02.531.482.4-731.000 | 322,000 | 0.32 % | |
715 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5394282 | 52805922 | APBDP | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-08 | 2024-11-14 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 242,000 | 1.21 % | |
716 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5396282 | 52804739 | APBDP | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-08 | 2024-11-14 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 242,000 | 1.21 % | |
717 | 2024 | Dinas Perdagangan | Study Kelayakan - Peningkatan Pasar Agrobisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5399282 | 52773258 | APBDP | 95,000,000 | 94,999,999 | 94,712,970 | 94,712,970 | 94,461,000 | 94,461,000 | 94,461,000 | 94,461,000 | 2024-10-31 | 2024-11-05 | CV. LANTAR ABYUDAYA | 02.043.219.1-731.000 | 287,030 | 0.3 % | |
718 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Ruang Kantin Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5405282 | 52834009 | APBDP | 50,000,000 | 49,647,525 | 49,506,000 | 49,506,000 | 49,383,900 | 49,383,900 | 49,383,900 | 49,383,900 | 2024-10-28 | 2024-11-04 | cv.akmalindo | 02.531.482.4-731.000 | 494,000 | 0.99 % | |
719 | 2024 | Dinas Perdagangan | Belanja Jasa Perencanaan Rehab Pagar Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5422282 | 53072168 | APBDP | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-11-01 | 2024-11-05 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 237,000 | 1.58 % | |
720 | 2024 | Dinas Perdagangan | DED/Perencanaan Peningkatan Pasar Arba Batang Kulur Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5430282 | 52772550 | APBDP | 50,000,000 | 50,000,000 | 49,617,000 | 49,617,000 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-11-13 | 2024-11-15 | cv.akmalindo | 02.531.482.4-731.000 | 383,000 | 0.77 % | |
721 | 2024 | Dinas Perdagangan | DED/Perencanaan Peningkatan Pasar Agrobisnis Pasar Taniran Kec. angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5431282 | 52772931 | APBDP | 100,000,000 | 99,999,900 | 99,816,750 | 99,816,750 | 99,456,000 | 99,456,000 | 99,456,000 | 99,456,000 | 2024-11-01 | 2024-11-06 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 183,250 | 0.18 % | |
722 | 2024 | Dinas Perdagangan | DED/Perencanaan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5459282 | 52773577 | APBDP | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,511,500 | 99,511,500 | 99,511,500 | 99,511,500 | 2024-10-31 | 2024-11-05 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 100,000 | 0.1 % | |
723 | 2024 | Dinas Perdagangan | UPL dan UKL - Peningkatan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5474282 | 52774059 | APBDP | 100,000,000 | 99,998,513 | 99,900,000 | 99,900,000 | 99,511,500 | 99,511,500 | 99,511,500 | 99,511,500 | 2024-10-31 | 2024-11-05 | PT. PRISMA JASA KONSULINDO | 95.412.417.8-731.000 | 100,000 | 0.1 % | |
724 | 2024 | Dinas Perdagangan | UPL dan UKL - Peningkatan Pasar Agrobisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5478282 | 52773437 | APBDP | 100,000,000 | 99,998,513 | 99,720,180 | 99,720,180 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-10-31 | 2024-11-05 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 279,820 | 0.28 % | |
725 | 2024 | RSUD Daha Sejahtera | Pengawasan Rehabilitasi Poli Rawat Jalan Rumah Sakit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5479282 | 52950768 | APBDP | 25,000,000 | 25,000,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2024-11-10 | 2024-11-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 136,000 | 0.54 % | |
726 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN PEMBANGUNAN WC (SDN 1 PAKUAN DAN SDN 2 LOKBAHAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5486282 | 52754280 | APBDP | 35,000,000 | 34,999,998 | 34,944,501 | 34,944,501 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-10-28 | 2024-11-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 55,499 | 0.16 % | |
727 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS (SDN BARIANG, BAGAMBIR, JAMBU HULU, 1 ANGKINANG ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5490282 | 52753980 | APBDP | 80,000,000 | 80,000,000 | 79,833,500 | 79,833,500 | 79,799,010 | 79,799,010 | 79,799,010 | 79,799,010 | 2024-10-26 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 166,500 | 0.21 % | |
728 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS (SDN GAMBAH LUAR SELATANSDN BUKUANIN, SDN MUNING BARU, SDN 1 BATANG KULUR KIRI, SDN 1 PARIGI) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5505282 | 52754163 | APBDP | 80,000,000 | 80,000,000 | 79,944,500 | 79,944,500 | 79,879,000 | 79,879,000 | 79,879,000 | 79,879,000 | 2024-10-26 | 2024-11-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.07 % | |
729 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS ( SDN TABIHI KANAN, GARUNGGANG, 2 KERAMAT RAYA, PANTAI ULIN, 1 SIRIH ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5536282 | 52753803 | APBDP | 100,000,000 | 100,000,000 | 99,889,000 | 99,889,000 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-10-26 | 2024-11-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.11 % | |
730 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang dan Perencanaan Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5546282 | 52754733 | APBDP | 30,000,000 | 30,000,000 | 29,944,500 | 29,944,500 | 29,900,070 | 29,900,070 | 29,900,070 | 29,900,070 | 2024-10-28 | 2024-11-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.19 % | |
731 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5547282 | 52754427 | APBDP | 15,000,000 | 14,999,996 | 14,944,501 | 14,944,501 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2024-10-28 | 2024-11-08 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.37 % | |
732 | 2024 | RSUD Daha Sejahtera | Perencanaan Rehabilitasi Poli Rawat Jalan Rumah Sakit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5549282 | 52951244 | APBDP | 25,000,000 | 25,000,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2024-10-28 | 2024-11-05 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 136,000 | 0.54 % | |
733 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Angkinang - Kayu Abang - Panggang Hijau Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5555282 | 52794055 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
734 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Hariti - Sungai Raya Selatan Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5562282 | 52794180 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
735 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Jl. Neng Suriangpati kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5574282 | 52793799 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
736 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Padang Batung - Batu Laki - Malilingin Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5577282 | 52794115 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
737 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Sungai Raya - Jambu Hulu/Paku Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5584282 | 52793932 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
738 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Wasah Hilir - Amparaya kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5587282 | 52793984 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
739 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Wasah Hulu - Amparaya - Simpur Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5591282 | 52793877 | APBDP | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | 2024-11-07 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
740 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman SDN 2 TAMBANGAN dan Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5595282 | 52754366 | APBDP | 25,000,000 | 24,999,997 | 24,944,501 | 24,944,501 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-10-28 | 2024-11-08 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.22 % | |
741 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Sungai Kepayang, Desa Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 5600282 | 52780294 | APBDP | 163,500,000 | 163,500,000 | 163,431,771 | 163,431,771 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | 2024-11-08 | Lingga Perkasa | 20.558.364.4-733.000 | 68,229 | 0.04 % | |
742 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Rasau Bakti, Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 5614282 | 52780207 | APBDP | 163,500,000 | 163,500,000 | 163,476,766 | 163,476,766 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | 2024-11-08 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 23,234 | 0.01 % | |
743 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Padang Hariung, Desa Karang Jawa | Pengadaan Langsung | Pekerjaan Konstruksi | 5622282 | 52780118 | APBDP | 163,500,000 | 163,498,825 | 163,454,425 | 163,454,425 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | 2024-11-07 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 45,575 | 0.03 % | |
744 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5625282 | 52792415 | APBDP | 25,000,000 | 24,991,500 | 24,880,581 | 24,880,581 | 24,800,000 | 24,800,000 | 24,800,000 | 24,800,000 | 2024-11-30 | 2024-12-05 | CV. Halicons Engineering | 99.750.185.3-732.000 | 119,419 | 0.48 % | |
745 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5628282 | 52783597 | APBDP | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | 2024-11-28 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
746 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5636282 | 52784412 | APBDP | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | 2024-11-28 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
747 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5639282 | 52784974 | APBDP | 15,000,000 | 14,997,000 | 14,969,418 | 14,956,848 | 14,700,000 | 14,700,000 | 14,700,000 | 14,700,000 | 2024-11-25 | 2024-12-02 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,582 | 0.2 % | |
748 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5651282 | 52784677 | APBDP | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | 2024-11-27 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
749 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5653282 | 52784305 | APBDP | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | 2024-11-28 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
750 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5657282 | 52783230 | APBDP | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | 2024-11-27 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
751 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5660282 | 52784883 | APBDP | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | 2024-11-28 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
752 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5661282 | 53177335 | APBDP | 15,000,000 | 14,723,000 | 14,678,640 | 14,678,640 | 14,656,440 | 14,656,440 | 100 | 14,656,440 | 2024-10-31 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 321,360 | 2.14 % | |
753 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5668282 | 52783868 | APBDP | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | 2024-11-27 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
754 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5669282 | 52782999 | APBDP | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | 2024-11-27 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
755 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5682282 | 53177343 | APBDP | 15,000,000 | 14,723,000 | 14,547,660 | 14,547,660 | 14,519,910 | 14,519,910 | 100 | 14,519,910 | 2024-10-28 | 2024-11-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 452,340 | 3.02 % | |
756 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5689282 | 53177368 | APBDP | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,634,777 | 14,634,777 | 100 | 14,634,777 | 2024-10-28 | 2024-11-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 331,923 | 2.21 % | |
757 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5709282 | 52785310 | APBDP | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | 2024-11-27 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
758 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5712282 | 52785265 | APBDP | 15,000,000 | 14,997,000 | 14,969,418 | 14,969,418 | 14,700,000 | 14,700,000 | 14,700,000 | 14,700,000 | 2024-11-25 | 2024-12-02 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 30,582 | 0.2 % | |
759 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan Pihanin Raya (Batang Alai) - Ds. Muning Tengah Daha Selatan (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5724282 | 52785429 | APBDP | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-26 | 2024-12-02 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 36,245 | 0.08 % | |
760 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Matang Gadung - Halalang Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5725282 | 52792066 | APBDP | 45,000,000 | 44,997,000 | 44,886,180 | 44,886,180 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-30 | 2024-12-05 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 113,820 | 0.25 % | |
761 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan Tambangan - Ds. Baruh Jaya Kec. Daha Selatan (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5734282 | 52785477 | APBDP | 45,000,000 | 44,997,000 | 44,947,230 | 44,947,230 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-12-02 | 2024-12-06 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 52,770 | 0.12 % | |
762 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Al-Ikhlas - Ds. Baluti Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5735282 | 52791863 | APBDP | 45,000,000 | 44,997,000 | 44,769,630 | 44,769,630 | 44,700,000 | 44,700,000 | 44,700,000 | 44,700,000 | 2024-11-22 | 2024-11-28 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 230,370 | 0.51 % | |
763 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Kesehatan dan Jalan AES Nasution Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5736282 | 52793192 | APBDP | 45,000,000 | 44,997,000 | 44,913,805 | 44,913,805 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-25 | 2024-12-02 | Wiyasa Drawana | 80.902.072.0-731.000 | 86,195 | 0.19 % | |
764 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Simp 3 Baluti Amawang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5744282 | 52785513 | APBDP | 45,000,000 | 44,997,000 | 44,913,805 | 44,913,805 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-29 | 2024-12-05 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 86,195 | 0.19 % | |
765 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Keramat Sakti Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5767282 | 52792297 | APBDP | 45,000,000 | 44,997,000 | 44,886,180 | 44,886,180 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-30 | 2024-12-05 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 113,820 | 0.25 % | |
766 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Sugiono dan Jl. Sekolah Islam Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5772282 | 52791191 | APBDP | 45,000,000 | 44,997,000 | 44,930,455 | 44,930,455 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-29 | 2024-12-05 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 69,545 | 0.15 % | |
767 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Kamawakan Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5781282 | 52792809 | APBDP | 45,000,000 | 44,997,000 | 44,988,300 | 44,988,300 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-18 | 2024-11-22 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 11,700 | 0.03 % | |
768 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Hamak Timur Umpaya Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5786282 | 52792023 | APBDP | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-11-18 | 2024-11-22 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 50,000 | 0.1 % | |
769 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Pianggu Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5787282 | 52792265 | APBDP | 50,000,000 | 49,999,800 | 49,894,500 | 49,894,500 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-12 | 2024-11-15 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 105,500 | 0.21 % | |
770 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Taniran Tengah - Taniran Selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5788282 | 52792249 | APBDP | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-12-02 | 2024-12-06 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
771 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Pajah Api dan Jl. Ds. Kapuh Tengah (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5789282 | 52791640 | APBDP | 50,000,000 | 49,999,800 | 49,972,061 | 49,972,061 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-26 | 2024-12-02 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 27,939 | 0.06 % | |
772 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5790282 | 52753015 | APBDP | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,850,000 | 19,850,000 | 19,850,000 | 19,850,000 | 2024-10-28 | 2024-11-08 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 131,000 | 0.66 % | |
773 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Desa Lungau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5791282 | 52792426 | APBDP | 70,000,000 | 69,980,100 | 69,791,458 | 69,791,458 | 69,700,000 | 69,700,000 | 69,700,000 | 69,700,000 | 2024-11-12 | 2024-11-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 208,542 | 0.3 % | |
774 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Halayung - Hantarukung Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5792282 | 52792740 | APBDP | 70,000,000 | 69,980,100 | 69,886,363 | 69,886,363 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-12 | 2024-11-15 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 113,637 | 0.16 % | |
775 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Tawia - Kayu Abang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5795282 | 52791910 | APBDP | 70,000,000 | 69,980,100 | 69,805,680 | 69,805,680 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-12-02 | 2024-12-06 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 194,320 | 0.28 % | |
776 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Batang Kulur Kiri - Durian Landung (Kalian Basar) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5807282 | 52791960 | APBDP | 50,000,000 | 49,999,800 | 49,950,971 | 49,950,971 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-29 | 2024-12-05 | cv.nawasena konsultan | 62.243.237.5-731.000 | 49,029 | 0.1 % | |
777 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Pendawa dan Jalan Buluh Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5808282 | 52791737 | APBDP | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-12 | 2024-11-15 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 50,000 | 0.1 % | |
778 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Wasah Tengah - Sungai Tarap Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5811282 | 52791272 | APBDP | 50,000,000 | 49,999,800 | 49,950,971 | 49,950,971 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-29 | 2024-12-05 | cv.nawasena konsultan | 62.243.237.5-731.000 | 49,029 | 0.1 % | |
779 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Merah Johansyah - Jl. Melati Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5813282 | 52791484 | APBDP | 50,000,000 | 49,999,800 | 49,922,111 | 49,922,111 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-30 | 2024-12-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 77,889 | 0.16 % | |
780 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jl. Tibung Raya - Asam Cangkok Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5818282 | 52792115 | APBDP | 70,000,000 | 69,980,100 | 69,845,640 | 69,845,640 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-29 | 2024-12-05 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 154,360 | 0.22 % | |
781 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Taal Jarau Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5822282 | 52846752 | APBDP | 70,000,000 | 69,980,100 | 69,952,408 | 69,952,408 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-30 | 2024-12-05 | CV. Halicons Engineering | 99.750.185.3-732.000 | 47,592 | 0.07 % | |
782 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Banua Kambang Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5832282 | 52792851 | APBDP | 70,000,000 | 69,980,100 | 69,805,680 | 69,805,680 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-12-02 | 2024-12-06 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 194,320 | 0.28 % | |
783 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 2) | Pengadaan Langsung | Pekerjaan Konstruksi | 5851282 | 53199916 | APBDP | 195,650,000 | 194,624,549 | 194,588,443 | 194,588,443 | 194,499,643 | 194,499,643 | 194,499,643 | 194,499,643 | 2024-11-02 | 2024-11-08 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,061,557 | 0.54 % | |
784 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 3) | Pengadaan Langsung | Pekerjaan Konstruksi | 5867282 | 53199901 | APBDP | 195,650,000 | 194,795,093 | 194,767,343 | 194,767,343 | 194,397,269 | 194,397,269 | 194,397,269 | 194,397,269 | 2024-11-02 | 2024-11-08 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 882,657 | 0.45 % | |
785 | 2024 | Dinas Kesehatan | Jasa Apraisal untuk Pengadaan Tanah Puskesmas Bamban | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5868282 | 53179778 | APBDP | 50,000,000 | 49,972,200 | 49,856,804 | 49,856,804 | 49,856,804 | 49,856,000 | 49,856,000 | 49,856,000 | 2024-11-12 | 2024-11-19 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 143,196 | 0.29 % | |
786 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5869282 | 52834355 | APBDP | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | 2024-11-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,400 | 0.88 % | |
787 | 2024 | Dinas Kesehatan | Pengurugan Halaman Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5871282 | 53219438 | APBDP | 74,999,500 | 74,910,000 | 74,820,134 | 74,820,134 | 74,820,134 | 74,820,000 | 74,820,000 | 74,820,000 | 2024-11-11 | 2024-11-18 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 179,366 | 0.24 % | |
788 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu dan Poskesdes (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5872282 | 53180837 | APBDP | 50,000,000 | 34,500,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 2024-12-06 | 2024-12-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 15,701,000 | 31.4 % | |
789 | 2024 | Dinas Kesehatan | Pengawasan Pemasangan Paving Puskesmas Angkinang, Puskesmas Bajayau, Puskesmas Jambu Hilir dan Puskesmas Kaliring | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5886282 | 53180677 | APBDP | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 2024-12-03 | 2024-12-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 151,000 | 0.38 % | |
790 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5887282 | 53179948 | APBDP | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-11-20 | 2024-11-29 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 105,500 | 0.21 % | |
791 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Kaliring | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5909282 | 53179918 | APBDP | 50,000,000 | 49,950,000 | 49,783,500 | 49,783,500 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-11-20 | 2024-11-29 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 216,500 | 0.43 % | |
792 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5910282 | 53188518 | APBDP | 25,000,000 | 25,000,000 | 24,897,633 | 24,897,633 | 24,842,133 | 24,842,133 | 24,842,133 | 24,842,133 | 2024-11-01 | 2024-11-08 | Haded Barakat Utama | 95.529.593.6-732.000 | 102,367 | 0.41 % | |
793 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5911282 | 53199460 | APBDP | 15,000,000 | 14,723,000 | 14,623,677 | 14,623,677 | 14,595,927 | 14,595,927 | 100 | 14,595,927 | 2024-10-30 | 2024-11-07 | CV. Halicons Engineering | 99.750.185.3-732.000 | 376,323 | 2.51 % | |
794 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5912282 | 53199170 | APBDP | 30,000,000 | 29,872,000 | 29,772,698 | 29,772,698 | 29,744,948 | 29,744,948 | 100 | 29,744,948 | 2024-10-30 | 2024-11-07 | CV. Halicons Engineering | 99.750.185.3-732.000 | 227,303 | 0.76 % | |
795 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5913282 | 53199453 | APBDP | 30,000,000 | 29,872,000 | 29,754,938 | 29,754,938 | 29,743,838 | 29,743,838 | 100 | 29,743,838 | 2024-10-30 | 2024-11-08 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 245,063 | 0.82 % | |
796 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5914282 | 53199075 | APBDP | 25,000,000 | 24,898,000 | 24,707,490 | 24,707,490 | 24,701,940 | 24,701,940 | 100 | 24,701,940 | 2024-10-30 | 2024-11-08 | cv.akmalindo | 02.531.482.4-731.000 | 292,510 | 1.17 % | |
797 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5918282 | 53199053 | APBDP | 15,000,000 | 14,723,000 | 14,374,500 | 14,374,500 | 14,363,400 | 14,363,400 | 100 | 14,363,400 | 2024-10-30 | 2024-11-08 | cv.akmalindo | 02.531.482.4-731.000 | 625,500 | 4.17 % | |
798 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5919282 | 53199384 | APBDP | 25,000,000 | 24,898,000 | 24,815,042 | 24,815,042 | 24,803,942 | 24,803,942 | 100 | 24,803,942 | 2024-10-31 | 2024-11-08 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 184,958 | 0.74 % | |
799 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5920282 | 53199179 | APBDP | 15,000,000 | 14,723,000 | 14,623,677 | 14,623,677 | 14,612,577 | 14,612,577 | 100 | 14,612,577 | 2024-10-31 | 2024-11-08 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 376,323 | 2.51 % | |
800 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5922282 | 53199316 | APBDP | 15,000,000 | 14,723,000 | 14,695,827 | 14,695,827 | 14,673,627 | 14,673,627 | 100 | 14,673,627 | 2024-10-30 | 2024-11-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 304,173 | 2.03 % | |
801 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Muning Baru dan RT. 02 Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5923282 | 53208751 | APBDP | 30,000,000 | 29,899,000 | 29,677,364 | 29,677,364 | 29,666,264 | 29,666,264 | 100 | 29,666,264 | 2024-10-30 | 2024-11-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 322,636 | 1.08 % | |
802 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari dan RT. 02 Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5927282 | 53208696 | APBDP | 30,000,000 | 29,899,000 | 29,788,364 | 29,788,364 | 29,743,964 | 29,743,964 | 100 | 29,743,964 | 2024-10-30 | 2024-11-08 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 211,636 | 0.71 % | |
803 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5930282 | 53199363 | APBDP | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,640,327 | 14,640,327 | 100 | 14,640,327 | 2024-10-31 | 2024-11-08 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 331,923 | 2.21 % | |
804 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5936282 | 53199127 | APBDP | 30,000,000 | 29,872,000 | 29,817,098 | 29,817,098 | 29,761,598 | 29,761,598 | 100 | 29,761,598 | 2024-10-31 | 2024-11-08 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 182,903 | 0.61 % | |
805 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5937282 | 53199113 | APBDP | 25,000,000 | 24,898,000 | 24,807,390 | 24,807,390 | 24,800,064 | 24,800,064 | 100 | 24,800,064 | 2024-10-30 | 2024-11-08 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 192,610 | 0.77 % | |
806 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl.Parigi Desa Wasah Hulu - Desa Ulin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5958282 | 53199041 | APBDP | 60,000,000 | 44,679,000 | 44,522,100 | 44,522,100 | 44,466,600 | 44,466,600 | 100 | 44,466,600 | 2024-11-01 | 2024-11-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 15,477,900 | 25.8 % | |
807 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat Kec. Kandangan dan RT. 03 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5972282 | 53208809 | APBDP | 30,000,000 | 29,899,000 | 29,773,530 | 29,773,530 | 29,729,130 | 29,729,130 | 100 | 29,729,130 | 2024-11-01 | 2024-11-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 226,470 | 0.75 % | |
808 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5976282 | 53199062 | APBDP | 25,000,000 | 24,898,000 | 24,776,088 | 24,776,088 | 24,764,988 | 24,764,988 | 100 | 24,764,988 | 2024-10-30 | 2024-11-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 223,912 | 0.9 % | |
809 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan dan RT. 01 - 02 Desa Angkinang Selatan Kec Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5986282 | 53208565 | APBDP | 30,000,000 | 29,899,000 | 29,807,940 | 29,807,940 | 29,752,440 | 29,752,440 | 100 | 29,752,440 | 2024-10-31 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 192,060 | 0.64 % | |
810 | 2024 | RSUD Daha Sejahtera | Perencanaan Rehab Gedung Rawat Inap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5990282 | 52950282 | APBDP | 100,000,000 | 97,957,500 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 2024-10-30 | 2024-11-06 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 2,320,000 | 2.32 % | |
811 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kec. Sungai Raya (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 6004282 | 52701605 | APBDP | 198,306,750 | 198,284,070 | 198,228,569 | 198,228,569 | 197,895,569 | 197,895,500 | 197,895,500 | 197,895,500 | 2024-11-12 | 2024-11-19 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 78,181 | 0.04 % | |
812 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Jasa Konsultan Perencanaan Pemasangan Paving Blok di halaman Ruang Tunggu di TMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6007282 | 48000286 | APBD | 50,000,000 | 35,000,000 | 34,743,000 | 34,743,000 | 34,709,700 | 0 | 0 | 0 | 2024-10-31 | 2024-11-08 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 15,257,000 | 30.51 % | |
813 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6010282 | 52701576 | APBDP | 198,262,275 | 198,236,034 | 197,658,366 | 197,658,366 | 197,543,148 | 197,543,100 | 197,543,100 | 197,543,100 | 2024-11-20 | 2024-11-28 | CV RIZKY BANUA | 02.089.856.5-733.000 | 603,909 | 0.3 % | |
814 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6011282 | 52701445 | APBDP | 198,711,044 | 198,698,432 | 198,504,105 | 198,504,105 | 198,067,875 | 198,067,800 | 198,067,800 | 198,067,800 | 2024-11-05 | 2024-11-11 | CV. SHINTA | 01.124.041.3-733.000 | 206,939 | 0.1 % | |
815 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Halunuk Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6014282 | 52701453 | APBDP | 198,262,275 | 198,244,447 | 198,188,948 | 198,188,948 | 197,983,598 | 197,983,500 | 197,983,500 | 197,983,500 | 2024-11-23 | 2024-11-29 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 73,327 | 0.04 % | |
816 | 2024 | Dinas Perdagangan | Belanja Jasa Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6015282 | 53072100 | APBDP | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-11-01 | 2024-11-05 | cv.akmalindo | 02.531.482.4-731.000 | 242,000 | 1.21 % | |
817 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Urugan dan Pembangunan Pagar Belakang Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6018282 | 52833701 | APBDP | 100,000,000 | 99,952,725 | 99,811,200 | 99,811,200 | 99,619,725 | 99,619,725 | 99,619,725 | 99,619,725 | 2024-11-05 | 2024-11-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 188,800 | 0.19 % | |
818 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6020282 | 52701439 | APBDP | 198,262,275 | 198,223,748 | 197,973,860 | 197,973,860 | 197,539,850 | 197,539,850 | 197,539,850 | 197,539,850 | 2024-11-05 | 2024-11-11 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 288,415 | 0.15 % | |
819 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6022282 | 52754595 | APBDP | 15,000,000 | 14,999,996 | 14,944,501 | 14,944,501 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2024-11-01 | 2024-11-08 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.37 % | |
820 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Sungai Pisang Desa Angkinang, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6024282 | 52780326 | APBDP | 163,500,000 | 163,491,800 | 163,436,325 | 163,436,325 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | 2024-11-08 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 63,675 | 0.04 % | |
821 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6026282 | 53268820 | APBDP | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,600,000 | 14,600,000 | 100 | 14,600,000 | 2024-11-06 | 2024-11-13 | Wing Rastafarindo | 03.282.590.3-732.000 | 331,923 | 2.21 % | |
822 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN GARUNGGANG - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6027282 | 52753193 | APBDP | 170,000,000 | 169,991,449 | 169,958,149 | 169,958,149 | 169,835,654 | 169,835,654 | 169,835,654 | 169,835,654 | 2024-11-09 | 2024-11-15 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 41,851 | 0.02 % | |
823 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 2 KERAMAT RAYA - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6031282 | 52753691 | APBDP | 170,000,000 | 169,977,349 | 169,916,299 | 169,916,299 | 169,803,979 | 169,803,979 | 169,803,979 | 169,803,979 | 2024-11-04 | 2024-11-11 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 83,701 | 0.05 % | |
824 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 BATANG KULUR KIRI - SELATAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6032282 | 52754097 | APBDP | 180,000,000 | 179,995,741 | 179,967,991 | 179,967,991 | 179,841,271 | 179,841,271 | 179,841,271 | 179,841,271 | 2024-11-05 | 2024-11-11 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 32,009 | 0.02 % | |
825 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BUKUANIN - PEMBANGUNAN HALAMAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6033282 | 52754074 | APBDP | 170,000,000 | 169,983,336 | 169,927,836 | 169,927,836 | 169,818,533 | 169,818,533 | 169,818,533 | 169,818,533 | 2024-11-04 | 2024-11-11 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 72,164 | 0.04 % | |
826 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN MUNING BARU - PEMBANGUNAN HALAMAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6034282 | 52754135 | APBDP | 190,000,000 | 189,982,565 | 189,927,065 | 189,927,065 | 189,828,222 | 189,828,222 | 189,828,222 | 189,828,222 | 2024-11-05 | 2024-11-11 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 72,935 | 0.04 % | |
827 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN PANTAI ULIN - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6035282 | 52753719 | APBDP | 180,000,000 | 179,980,675 | 179,925,175 | 179,925,175 | 179,805,551 | 179,805,551 | 179,805,551 | 179,805,551 | 2024-11-04 | 2024-11-11 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 74,825 | 0.04 % | |
828 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN SDN 1 PARIGI | Pengadaan Langsung | Pekerjaan Konstruksi | 6036282 | 52754215 | APBDP | 170,000,000 | 169,971,248 | 169,816,001 | 169,816,001 | 169,760,501 | 169,760,501 | 169,760,501 | 169,760,501 | 2024-11-03 | 2024-11-08 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 183,999 | 0.11 % | |
829 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN Gambah Luar Selatan - Pembangunan Pagar | Pengadaan Langsung | Pekerjaan Konstruksi | 6040282 | 52754048 | APBDP | 190,000,000 | 189,954,794 | 189,789,346 | 189,789,346 | 189,667,246 | 189,667,246 | 189,667,246 | 189,667,246 | 2024-11-03 | 2024-11-08 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 210,654 | 0.11 % | |
830 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN TABIHI KANAN - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6041282 | 52753070 | APBDP | 180,000,000 | 169,983,574 | 169,819,142 | 169,819,142 | 169,741,664 | 169,741,664 | 169,741,664 | 169,741,664 | 2024-11-03 | 2024-11-08 | FADWI UTAMA | 94.246.044.5-733.000 | 10,180,858 | 5.66 % | |
831 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN JAMBU HULU - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6043282 | 52753928 | APBDP | 180,000,000 | 179,992,106 | 179,900,502 | 179,900,502 | 179,780,622 | 179,780,622 | 179,780,622 | 179,780,622 | 2024-11-06 | 2024-11-13 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 99,498 | 0.06 % | |
832 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BAGAMBIR - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6046282 | 52753895 | APBDP | 170,000,000 | 169,979,578 | 169,688,120 | 169,688,120 | 169,592,260 | 169,592,260 | 169,592,260 | 169,592,260 | 2024-11-06 | 2024-11-13 | CV. KHALIF | 81.540.809.1-733.000 | 311,880 | 0.18 % | |
833 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6048282 | 52752951 | APBDP | 200,000,000 | 199,939,221 | 199,575,213 | 199,575,213 | 199,468,304 | 199,468,304 | 199,468,304 | 199,468,304 | 2024-11-07 | 2024-11-13 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 424,787 | 0.21 % | |
834 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Pekerjaan Konstruksi | 6049282 | 52754339 | APBDP | 100,000,000 | 99,991,665 | 99,936,165 | 99,936,165 | 99,845,079 | 99,845,079 | 99,845,079 | 99,845,079 | 2024-11-11 | 2024-11-19 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 63,835 | 0.06 % | |
835 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN 2 TAMBANGAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6050282 | 52754321 | APBDP | 170,000,000 | 169,985,750 | 169,813,405 | 169,813,405 | 169,767,950 | 169,767,950 | 169,767,950 | 169,767,950 | 2024-11-06 | 2024-11-13 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 186,595 | 0.11 % | |
836 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 2 LOKBAHAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6072282 | 52754263 | APBDP | 170,000,000 | 169,954,916 | 169,899,416 | 169,899,416 | 169,788,416 | 169,788,416 | 169,788,416 | 169,788,416 | 2024-11-05 | 2024-11-11 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 100,584 | 0.06 % | |
837 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 PAKUAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6092282 | 52754227 | APBDP | 170,000,000 | 169,987,851 | 169,954,547 | 169,954,547 | 169,828,983 | 169,828,983 | 169,828,983 | 169,828,983 | 2024-11-08 | 2024-11-15 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 45,453 | 0.03 % | |
838 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Bajayau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6135282 | 53179879 | APBDP | 50,000,000 | 49,950,000 | 49,839,000 | 49,839,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-11-20 | 2024-11-29 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 161,000 | 0.32 % | |
839 | 2024 | Dinas Kesehatan | Pengurugan Halaman Pustu Karang Jawa Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6168282 | 53218852 | APBDP | 74,999,500 | 74,903,000 | 74,723,857 | 74,723,857 | 74,723,857 | 74,723,000 | 74,723,000 | 74,723,000 | 2024-11-14 | 2024-11-22 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 275,643 | 0.37 % | |
840 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Kaliring | Pengadaan Langsung | Pekerjaan Konstruksi | 6181282 | 53180553 | APBDP | 167,750,000 | 167,468,000 | 167,345,890 | 167,345,890 | 167,345,890 | 167,345,000 | 167,345,000 | 167,345,000 | 2024-11-18 | 2024-11-26 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 404,110 | 0.24 % | |
841 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6182282 | 53180208 | APBDP | 214,720,000 | 199,459,000 | 199,102,698 | 199,102,698 | 199,102,698 | 199,102,000 | 199,102,000 | 199,102,000 | 2024-11-14 | 2024-11-22 | FADWI UTAMA | 94.246.044.5-733.000 | 15,617,302 | 7.27 % | |
842 | 2024 | Dinas Kesehatan | Perencanaan Rehabilitasi Pustu 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6201282 | 53202880 | APBDP | 50,000,000 | 49,356,000 | 49,245,111 | 49,245,111 | 48,967,611 | 48,967,000 | 48,967,000 | 48,967,000 | 2024-12-03 | 2024-12-10 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 754,889 | 1.51 % | |
843 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SDN 2 TAMBANGAN dan Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6202282 | 52754387 | APBDP | 20,000,000 | 20,000,000 | 19,955,600 | 19,955,600 | 19,900,080 | 19,900,080 | 19,900,080 | 19,900,080 | 2024-11-07 | 2024-11-13 | Wing Rastafarindo | 03.282.590.3-732.000 | 44,400 | 0.22 % | |
844 | 2024 | Dinas Kesehatan | Perencanaan Rehabilitasi Poskesdes 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6208282 | 53181349 | APBDP | 50,000,000 | 49,356,000 | 49,245,111 | 49,245,111 | 48,967,611 | 48,967,000 | 48,967,000 | 48,967,000 | 2024-12-03 | 2024-12-10 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 754,889 | 1.51 % | |
845 | 2024 | Dinas Kesehatan | Perencanaan Pembangunan Poskesdes 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6210282 | 53180927 | APBDP | 50,000,000 | 49,356,000 | 49,339,461 | 49,339,461 | 49,339,461 | 49,339,000 | 49,339,000 | 49,339,000 | 2024-12-03 | 2024-12-13 | CV. Halicons Engineering | 99.750.185.3-732.000 | 660,539 | 1.32 % | |
846 | 2024 | Dinas Kesehatan | Perencanaan Pembangunan Pustu 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6215282 | 53181080 | APBDP | 50,000,000 | 49,356,000 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 2024-12-05 | 2024-12-13 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 773,720 | 1.55 % | |
847 | 2024 | Sekretariat DPRD | Konsultan Perencana pembuatan Ruang Fraksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6216282 | 53240853 | APBDP | 15,000,000 | 15,000,000 | 14,918,400 | 14,918,400 | 14,918,400 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 81,600 | 0.54 % | |
848 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN PEMBANGUNAN WC (SDN 1 PAKUAN DAN SDN 2 LOKBAHAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6258282 | 52754298 | APBDP | 30,000,000 | 30,000,000 | 29,889,000 | 29,889,000 | 29,859,000 | 29,859,000 | 29,859,000 | 29,859,000 | 2024-11-08 | 2024-11-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 111,000 | 0.37 % | |
849 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS (SDN BARIANG, BAGAMBIR, JAMBU HULU, 1 ANGKINANG ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6273282 | 52754006 | APBDP | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-11-08 | 2024-11-15 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 111,000 | 0.16 % | |
850 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS (SDN GAMBAH LUAR SELATANSDN BUKUANIN, SDN MUNING BARU, SDN 1 BATANG KULUR KIRI, SDN 1 PARIGI) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6275282 | 52754184 | APBDP | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-11-08 | 2024-11-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.16 % | |
851 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS ( SDN TABIHI KANAN, GARUNGGANG, 2 KERAMAT RAYA, PANTAI ULIN, 1 SIRIH ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6276282 | 52753822 | APBDP | 90,000,000 | 90,000,000 | 89,900,100 | 89,900,100 | 89,799,000 | 89,799,000 | 89,799,000 | 89,799,000 | 2024-11-07 | 2024-11-13 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 99,900 | 0.11 % | |
852 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Urugan Samping Gedung MUI | Pengadaan Langsung | Pekerjaan Konstruksi | 6279282 | 52834913 | APBDP | 200,000,000 | 199,929,144 | 199,879,742 | 199,879,742 | 199,652,192 | 199,652,192 | 199,652,192 | 199,652,192 | 2024-11-05 | 2024-11-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 120,258 | 0.06 % | |
853 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 SIRIH - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6281282 | 52753769 | APBDP | 170,000,000 | 169,942,198 | 169,886,698 | 169,886,698 | 169,774,023 | 169,774,023 | 169,774,023 | 169,774,023 | 2024-11-08 | 2024-11-15 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 113,302 | 0.07 % | |
854 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Jakstrada Sanitasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6286282 | 52814163 | APBDP | 100,000,000 | 99,938,295 | 99,799,545 | 99,799,545 | 99,578,100 | 99,578,100 | 99,578,100 | 99,578,100 | 2024-11-08 | 2024-11-15 | PT. SETIATAMA MEGA KONSULTAN | 85.453.751.1-732.000 | 200,455 | 0.2 % | |
855 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Fasade Bangunan Mesjid Nurul Hidayah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6290282 | 52834911 | APBDP | 100,000,000 | 99,952,725 | 99,465,990 | 99,465,990 | 99,222,900 | 99,222,900 | 99,222,900 | 99,222,900 | 2024-11-13 | 2024-11-21 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 534,010 | 0.53 % | |
856 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Pagar Rumah Jabatan Bupati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6294282 | 53273744 | APBDP | 60,000,000 | 59,995,500 | 59,551,500 | 59,551,500 | 59,551,500 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 448,500 | 0.75 % | |
857 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Pembuatan Pagar+Rehab Gedung Asrama Putri di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6295282 | 53270129 | APBDP | 15,000,000 | 15,000,000 | 14,774,100 | 14,774,100 | 14,774,100 | 0 | 0 | 0 | 2024-12-02 | 2024-12-09 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 225,900 | 1.51 % | |
858 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Pembuatan Pagar dan Rehab Gedung Asrama Putri HSS di Malang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6297282 | 53270046 | APBDP | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | cv.akmalindo | 02.531.482.4-731.000 | 242,000 | 1.21 % | |
859 | 2024 | Sekretariat Daerah | Jasa Konsultansi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Pembuatan Menara+Tandon) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6307282 | 53269792 | APBDP | 10,000,000 | 9,990,000 | 9,768,000 | 9,768,000 | 9,768,000 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 232,000 | 2.32 % | |
860 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6320282 | 52753039 | APBDP | 15,000,000 | 14,999,996 | 14,874,000 | 14,874,000 | 14,840,700 | 14,840,700 | 14,840,700 | 14,840,700 | 2024-11-09 | 2024-11-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 126,000 | 0.84 % | |
861 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Rumah Jabatan Bupati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6362282 | 53271448 | APBDP | 100,000,000 | 99,836,730 | 99,586,980 | 99,586,980 | 99,586,980 | 0 | 0 | 0 | 2024-11-10 | 2024-11-19 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 413,020 | 0.41 % | |
862 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Gedung Kesenian) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6363282 | 53268837 | APBDP | 75,000,000 | 74,952,750 | 74,536,500 | 74,536,500 | 74,536,500 | 0 | 0 | 0 | 2024-11-10 | 2024-11-19 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 463,500 | 0.62 % | |
863 | 2024 | Dinas Perdagangan | Study Kelayakan - Peningkatan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6364282 | 52773917 | APBDP | 95,000,000 | 94,999,999 | 94,350,000 | 94,350,000 | 94,083,600 | 94,083,600 | 94,083,600 | 94,083,600 | 2024-11-05 | 2024-11-07 | CV. RUHAFI ADHIRAJASA | 99.100.492.0-731.000 | 650,000 | 0.68 % | |
864 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Depo Arsip Kab. HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6365282 | 52826788 | APBDP | 100,000,000 | 99,906,938 | 99,740,438 | 99,740,438 | 99,500,400 | 99,500,400 | 99,500,400 | 99,500,400 | 2024-11-12 | 2024-11-18 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 259,563 | 0.26 % | |
865 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Perencanaan Arsitektur Pembangunan Rumah Anggrek | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6366282 | 53254038 | APBDP | 10,000,000 | 10,000,000 | 9,657,000 | 9,657,000 | 9,601,500 | 9,601,500 | 100 | 9,601,500 | 2024-11-05 | 2024-11-13 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 343,000 | 3.43 % | |
866 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6367282 | 52811880 | APBDP | 185,389,897 | 185,389,897 | 185,292,517 | 185,292,517 | 184,825,276 | 184,825,276 | 184,825,276 | 184,825,276 | 2024-11-17 | 2024-11-25 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 97,380 | 0.05 % | |
867 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6368282 | 52714880 | APBDP | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-12-05 | 2024-12-10 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.33 % | |
868 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6369282 | 52716052 | APBDP | 15,000,000 | 15,000,000 | 14,910,000 | 14,910,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-11-21 | 2024-11-28 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 90,000 | 0.6 % | |
869 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Malinau Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6370282 | 52715511 | APBDP | 30,000,000 | 30,000,000 | 29,997,750 | 29,997,750 | 29,809,050 | 29,809,050 | 29,809,050 | 29,809,050 | 2024-11-21 | 2024-11-28 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 2,250 | 0.01 % | |
870 | 2024 | RSUD Daha Sejahtera | Rehab Poli Rawat Jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 6371282 | 52950556 | APBDP | 200,000,000 | 200,000,000 | 199,991,027 | 199,991,027 | 199,830,077 | 199,830,076 | 199,830,076 | 199,830,076 | 2024-11-09 | 2024-11-18 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 8,973 | 0 % | |
871 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6372282 | 52716109 | APBDP | 15,000,000 | 15,000,000 | 14,970,000 | 14,970,000 | 14,859,000 | 14,859,000 | 14,859,000 | 14,859,000 | 2024-11-13 | 2024-11-19 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 30,000 | 0.2 % | |
872 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6373282 | 52715848 | APBDP | 15,000,000 | 15,000,000 | 14,825,000 | 14,825,000 | 14,714,000 | 14,714,000 | 14,714,000 | 14,714,000 | 2024-11-22 | 2024-11-29 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 1.17 % | |
873 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Kandangan Kota RT.05 Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6374282 | 52715623 | APBDP | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-12-01 | 2024-12-06 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.1 % | |
874 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6375282 | 52713891 | APBDP | 15,000,000 | 15,000,000 | 14,947,500 | 14,947,500 | 14,836,500 | 14,836,500 | 14,836,500 | 14,836,500 | 2024-11-09 | 2024-11-15 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 52,500 | 0.35 % | |
875 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan dan Jasa Konsultansi Pengawasan Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6376282 | 53323962 | APBDP | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,859,000 | 29,859,000 | 29,859,000 | 29,859,000 | 2024-11-21 | 2024-11-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
876 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6377282 | 53323831 | APBDP | 45,000,000 | 45,000,000 | 44,930,000 | 44,930,000 | 44,819,000 | 44,819,000 | 44,819,000 | 44,819,000 | 2024-11-09 | 2024-11-15 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 70,000 | 0.16 % | |
877 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Telaga Langsat RT.02 Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6378282 | 52715938 | APBDP | 30,000,000 | 30,000,000 | 29,997,750 | 29,997,750 | 29,534,325 | 29,534,300 | 29,534,300 | 29,534,300 | 2024-12-05 | 2024-12-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 2,250 | 0.01 % | |
878 | 2024 | Dinas Pertanian | Belanja Jasa Pengawasan Pemb/rehab JUT APBD-P | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6379282 | 52780044 | APBDP | 86,508,222 | 57,672,148 | 57,540,180 | 57,540,180 | 57,500,000 | 57,500,000 | 57,500,000 | 57,500,000 | 2024-11-07 | 2024-11-14 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 28,968,042 | 33.49 % | |
879 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 6380282 | 53177126 | APBDP | 197,600,000 | 197,490,000 | 197,291,184 | 197,291,184 | 197,235,684 | 197,235,684 | 100 | 197,235,684 | 2024-11-07 | 2024-11-15 | cv. nurulillah | 50.826.160.9-733.000 | 308,817 | 0.16 % | |
880 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6381282 | 53177052 | APBDP | 198,000,000 | 197,811,000 | 197,321,470 | 197,321,470 | 197,243,770 | 197,243,770 | 100 | 197,243,770 | 2024-11-07 | 2024-11-15 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 678,530 | 0.34 % | |
881 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Pekerjaan Konstruksi | 6382282 | 53200198 | APBDP | 198,000,000 | 197,898,000 | 197,742,053 | 197,742,053 | 197,627,544 | 197,627,544 | 100 | 197,627,544 | 2024-11-08 | 2024-11-15 | CV. LALUNA DANA | 02.237.179.3-733.000 | 257,947 | 0.13 % | |
882 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan (Samping Pangkalan Gas) | Pengadaan Langsung | Pekerjaan Konstruksi | 6383282 | 53192827 | APBDP | 192,000,000 | 191,840,000 | 191,786,544 | 191,786,544 | 191,683,218 | 191,683,218 | 100 | 191,683,218 | 2024-11-08 | 2024-11-15 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 213,456 | 0.11 % | |
883 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 6384282 | 53192490 | APBDP | 195,200,000 | 195,000,000 | 194,951,421 | 194,951,421 | 194,835,199 | 194,835,199 | 100 | 194,835,199 | 2024-11-08 | 2024-11-15 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 248,579 | 0.13 % | |
884 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 01 - 02 Ds. Angkinang Selatan, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6385282 | 53200178 | APBDP | 196,000,000 | 195,779,000 | 195,723,605 | 195,723,605 | 195,610,573 | 195,610,573 | 100 | 195,610,573 | 2024-11-08 | 2024-11-15 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 276,395 | 0.14 % | |
885 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6386282 | 52754680 | APBDP | 170,000,000 | 169,603,158 | 169,003,781 | 169,003,781 | 168,914,981 | 168,914,981 | 168,914,981 | 168,914,981 | 2024-11-07 | 2024-11-13 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 996,219 | 0.59 % | |
886 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6387282 | 53192621 | APBDP | 196,000,000 | 195,830,000 | 195,724,702 | 195,724,702 | 195,615,478 | 195,615,478 | 100 | 195,615,478 | 2024-11-22 | 2024-11-29 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 275,298 | 0.14 % | |
887 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6388282 | 52754576 | APBDP | 99,715,000 | 99,692,967 | 99,554,441 | 99,554,441 | 99,496,886 | 99,496,886 | 99,496,886 | 99,496,886 | 2024-11-07 | 2024-11-13 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 160,559 | 0.16 % | |
888 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Jakstrada Air Minum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6389282 | 52812520 | APBDP | 100,000,000 | 100,000,000 | 99,855,045 | 99,855,045 | 99,572,550 | 99,572,550 | 99,572,550 | 99,572,550 | 2024-11-08 | 2024-11-15 | PT. ITNASINDO JAYA KONSULTAN | 85.453.556.4-732.000 | 144,955 | 0.14 % | |
889 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Simpur Kec. Simpur (Pembangunan Perkuatan Tebing Dengan Pasangan Batu dengan Tinggi 2 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 6390282 | 52701506 | APBDP | 196,269,138 | 196,214,308 | 196,158,818 | 196,158,818 | 195,695,948 | 195,695,900 | 195,695,900 | 195,695,900 | 2024-11-08 | 2024-11-15 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 110,320 | 0.06 % | |
890 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6391282 | 52722543 | APBDP | 15,000,000 | 15,000,000 | 14,970,000 | 14,970,000 | 14,859,000 | 14,859,000 | 14,859,000 | 14,859,000 | 2024-11-16 | 2024-11-22 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 30,000 | 0.2 % | |
891 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Malilingin RT.01 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6392282 | 52715418 | APBDP | 40,000,000 | 40,000,000 | 39,994,450 | 39,994,450 | 39,778,001 | 39,778,000 | 39,778,000 | 39,778,000 | 2024-12-07 | 2024-12-12 | CV. Halicons Engineering | 99.750.185.3-732.000 | 5,550 | 0.01 % | |
892 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6393282 | 53335943 | APBDP | 195,650,000 | 195,649,654 | 195,608,598 | 195,608,598 | 195,485,581 | 195,485,581 | 195,485,581 | 195,485,581 | 2024-11-08 | 2024-11-15 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 41,402 | 0.02 % | |
893 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Jambu Hilir Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6394282 | 52715320 | APBDP | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,778,001 | 0 | 0 | 0 | 2024-12-05 | 2024-12-10 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.25 % | |
894 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Balanti Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6395282 | 52721810 | APBDP | 30,000,000 | 30,000,000 | 29,986,976 | 29,986,976 | 29,778,001 | 29,778,000 | 29,778,000 | 29,778,000 | 2024-12-01 | 2024-12-12 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 13,024 | 0.04 % | |
895 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Simpur Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6396282 | 52715020 | APBDP | 15,000,000 | 15,000,000 | 14,947,500 | 14,947,500 | 14,836,500 | 0 | 0 | 0 | 2024-11-09 | 2024-11-15 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 52,500 | 0.35 % | |
896 | 2024 | RSUD Daha Sejahtera | Pengawasan Pembangunan tempat parkir (BLUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6397282 | 52881769 | BLUD | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-11-14 | 2024-11-22 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 252,000 | 0.84 % | |
897 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6398282 | 52794190 | APBDP | 187,419,914 | 187,419,228 | 187,205,549 | 187,205,549 | 186,989,916 | 186,989,916 | 186,989,916 | 186,989,916 | 2024-11-19 | 2024-11-26 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 214,365 | 0.11 % | |
898 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Ds. Muning Baru, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6399282 | 53200087 | APBDP | 198,000,000 | 197,872,000 | 197,817,352 | 197,817,352 | 197,726,741 | 197,726,741 | 100 | 197,726,741 | 2024-11-08 | 2024-11-15 | CV. SORAYA | 01.834.078.6-733.000 | 182,648 | 0.09 % | |
899 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 02 Ds. Baruh Jaya, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6400282 | 53200102 | APBDP | 198,000,000 | 197,840,000 | 197,785,738 | 197,785,738 | 197,674,738 | 197,674,738 | 100 | 197,674,738 | 2024-11-08 | 2024-11-15 | CV. SORAYA | 01.834.078.6-733.000 | 214,262 | 0.11 % | |
900 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Wakaf Desa Hakurung RT.02 Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6401282 | 52721863 | APBDP | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,778,001 | 29,778,001 | 29,778,001 | 29,778,001 | 2024-12-05 | 2024-12-12 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
901 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jalan/Pemasangan Turap Desa Pandulangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6403282 | 53331591 | APBDP | 70,000,000 | 69,998,820 | 69,708,000 | 69,708,000 | 69,597,000 | 69,597,000 | 69,597,000 | 69,597,000 | 2024-11-12 | 2024-11-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 292,000 | 0.42 % | |
902 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6404282 | 53200156 | APBDP | 196,000,000 | 195,800,000 | 195,748,056 | 195,748,056 | 195,617,864 | 195,617,864 | 100 | 195,617,864 | 2024-11-08 | 2024-11-15 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 251,944 | 0.13 % | |
903 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 02 Ds. Bayanan, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6405282 | 53200142 | APBDP | 198,000,000 | 197,810,000 | 197,763,064 | 197,763,064 | 197,652,064 | 197,652,064 | 100 | 197,652,064 | 2024-11-11 | 2024-11-19 | CV. SORAYA | 01.834.078.6-733.000 | 236,936 | 0.12 % | |
904 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6406282 | 53200134 | APBDP | 194,700,000 | 194,540,000 | 194,491,687 | 194,491,687 | 194,401,369 | 194,401,369 | 100 | 194,401,369 | 2024-11-18 | 2024-11-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 208,313 | 0.11 % | |
905 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung dan Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Tabihi (DI.Kambas) Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6407282 | 53324022 | APBDP | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,778,001 | 29,778,000 | 29,778,000 | 29,778,000 | 2024-12-05 | 2024-12-10 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 125,000 | 0.42 % | |
906 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6409282 | 52784742 | APBDP | 199,746,000 | 199,743,000 | 199,550,428 | 199,550,428 | 199,400,000 | 199,400,000 | 199,400,000 | 199,400,000 | 2024-11-14 | 2024-11-20 | Lingga Perkasa | 20.558.364.4-733.000 | 195,572 | 0.1 % | |
907 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jalan Tipe C84) | Pengadaan Langsung | Pekerjaan Konstruksi | 6410282 | 52785539 | APBDP | 199,652,000 | 199,647,000 | 199,099,551 | 199,099,551 | 198,800,000 | 198,800,000 | 198,800,000 | 198,800,000 | 2024-11-29 | 2024-12-05 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 552,449 | 0.28 % | |
908 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6411282 | 52783699 | APBDP | 199,305,000 | 199,293,208 | 199,099,219 | 199,099,219 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-14 | 2024-11-20 | Lingga Perkasa | 20.558.364.4-733.000 | 205,781 | 0.1 % | |
909 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jalan Tipe D11) | Pengadaan Langsung | Pekerjaan Konstruksi | 6412282 | 52785237 | APBDP | 199,200,000 | 199,200,000 | 199,100,720 | 199,100,720 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-08 | 2024-11-14 | cv. nurulillah | 50.826.160.9-733.000 | 99,280 | 0.05 % | |
910 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Peninggian Jalan Desa Batu Laki RT. 03 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6413282 | 53331601 | APBDP | 100,000,000 | 99,999,900 | 99,345,000 | 99,345,000 | 99,234,000 | 99,234,000 | 99,234,000 | 99,234,000 | 2024-11-11 | 2024-11-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 655,000 | 0.66 % | |
911 | 2024 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6415282 | 53230855 | APBDP | 101,100,000 | 99,836,730 | 99,234,000 | 99,234,000 | 99,123,000 | 0 | 0 | 0 | 2024-11-14 | 2024-11-22 | cv.akmalindo | 02.531.482.4-731.000 | 1,866,000 | 1.85 % | |
912 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jalan Tipe D11) | Pengadaan Langsung | Pekerjaan Konstruksi | 6416282 | 52785309 | APBDP | 199,200,000 | 199,200,000 | 199,052,559 | 199,052,559 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-08 | 2024-11-14 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 147,441 | 0.07 % | |
913 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6417282 | 52701516 | APBDP | 198,711,044 | 198,700,024 | 198,347,945 | 198,347,945 | 197,968,325 | 197,968,300 | 197,968,300 | 197,968,300 | 2024-11-13 | 2024-11-25 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 363,099 | 0.18 % | |
914 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6418282 | 52783811 | APBDP | 199,746,000 | 199,741,000 | 199,562,608 | 199,562,608 | 199,400,000 | 199,400,000 | 199,400,000 | 199,400,000 | 2024-11-14 | 2024-11-20 | Lingga Perkasa | 20.558.364.4-733.000 | 183,392 | 0.09 % | |
915 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6419282 | 52783980 | APBDP | 198,914,000 | 198,907,000 | 198,376,902 | 198,376,902 | 198,200,000 | 198,200,000 | 198,200,000 | 198,200,000 | 2024-11-19 | 2024-11-25 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 537,098 | 0.27 % | |
916 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6420282 | 52784646 | APBDP | 199,305,000 | 199,305,000 | 197,485,744 | 197,485,744 | 197,400,000 | 197,400,000 | 197,400,000 | 197,400,000 | 2024-11-15 | 2024-11-21 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 1,819,256 | 0.91 % | |
917 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jalan Tipe D8) | Pengadaan Langsung | Pekerjaan Konstruksi | 6421282 | 52785434 | APBDP | 189,982,000 | 189,982,000 | 189,881,141 | 189,881,141 | 189,700,000 | 189,700,000 | 189,700,000 | 189,700,000 | 2024-11-18 | 2024-11-22 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 100,859 | 0.05 % | |
918 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6423282 | 52785084 | APBDP | 196,372,800 | 196,368,000 | 196,300,504 | 196,300,504 | 196,000,000 | 196,000,000 | 196,000,000 | 196,000,000 | 2024-11-18 | 2024-11-22 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 72,296 | 0.04 % | |
919 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6424282 | 52784992 | APBDP | 196,372,800 | 196,369,600 | 196,187,363 | 196,187,363 | 195,500,000 | 195,500,000 | 195,500,000 | 195,500,000 | 2024-11-19 | 2024-11-26 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 185,437 | 0.09 % | |
920 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6425282 | 52784495 | APBDP | 198,914,000 | 198,914,000 | 198,053,973 | 198,053,973 | 198,000,000 | 198,000,000 | 198,000,000 | 198,000,000 | 2024-11-29 | 2024-12-05 | CV LAKSANA NAWASENA | 39.407.240.9-733.000 | 860,027 | 0.43 % | |
921 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Lanjutan) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6426282 | 52784873 | APBDP | 199,746,000 | 199,612,000 | 199,501,730 | 199,501,730 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-11-18 | 2024-11-22 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 244,270 | 0.12 % | |
922 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado (Jembatan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6427282 | 52785682 | APBDP | 196,372,800 | 196,372,000 | 196,320,056 | 196,320,056 | 196,200,000 | 196,200,000 | 196,200,000 | 196,200,000 | 2024-11-15 | 2024-11-21 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 52,744 | 0.03 % | |
923 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6428282 | 53177098 | APBDP | 193,600,000 | 193,450,000 | 193,261,217 | 193,261,217 | 193,146,120 | 193,146,120 | 100 | 193,146,120 | 2024-11-13 | 2024-11-22 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 338,783 | 0.17 % | |
924 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6429282 | 53200055 | APBDP | 192,000,000 | 191,870,000 | 191,815,218 | 191,815,218 | 191,706,827 | 191,706,827 | 100 | 191,706,827 | 2024-11-09 | 2024-11-15 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 184,782 | 0.1 % | |
925 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Halunuk Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6430282 | 52714074 | APBDP | 15,000,000 | 15,000,000 | 14,875,000 | 14,875,000 | 14,764,000 | 14,764,000 | 14,764,000 | 14,764,000 | 2024-11-23 | 2024-11-29 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.83 % | |
926 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Lokbinuang RT.02 Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6431282 | 52714243 | APBDP | 15,000,000 | 15,000,000 | 14,900,000 | 14,900,000 | 14,789,000 | 14,789,000 | 14,789,000 | 14,789,000 | 2024-11-13 | 2024-11-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.67 % | |
927 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat, Kec. Kandangan (Arah Pesantren Irsyadul Amien Teluk Aman) | Pengadaan Langsung | Pekerjaan Konstruksi | 6433282 | 53193158 | APBDP | 198,000,000 | 197,800,000 | 197,763,841 | 197,763,841 | 197,661,628 | 197,661,628 | 100 | 197,661,628 | 2024-11-12 | 2024-11-22 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 236,159 | 0.12 % | |
928 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003740000 | 52721918 | APBDP | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,764,001 | 29,764,000 | 29,764,000 | 29,764,000 | 2024-12-06 | 2024-12-12 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 125,000 | 0.42 % | |
929 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Lungau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003777000 | 52721689 | APBDP | 30,000,000 | 30,000,000 | 29,850,000 | 29,850,000 | 29,739,001 | 29,739,000 | 29,739,000 | 29,739,000 | 2024-12-06 | 2024-12-12 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.5 % | |
930 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Madihin Desa Kayu Abang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003793000 | 52716214 | APBDP | 30,000,000 | 30,000,000 | 29,994,450 | 29,994,450 | 29,778,001 | 29,778,001 | 29,778,001 | 29,778,001 | 2024-12-09 | 2024-12-16 | CV. Halicons Engineering | 99.750.185.3-732.000 | 5,550 | 0.02 % | |
931 | 2024 | Sekretariat DPRD | Konsultan Pengawas pembuatan Ruang Fraksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003871000 | 53240899 | APBDP | 15,000,000 | 15,000,000 | 14,979,450 | 14,979,450 | 14,979,450 | 0 | 0 | 0 | 2024-11-13 | 2024-12-30 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 20,550 | 0.14 % | |
932 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Rahmat Ilahi dan Sekitarnya RT. 03 Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10003911000 | 53200070 | APBDP | 192,000,000 | 191,800,000 | 191,723,525 | 191,723,525 | 191,625,586 | 191,625,586 | 100 | 191,625,586 | 2024-11-12 | 2024-11-22 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 276,475 | 0.14 % | |
933 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10003932000 | 52701492 | APBDP | 198,262,275 | 198,243,145 | 198,187,641 | 198,187,641 | 197,882,391 | 197,882,300 | 197,882,300 | 197,882,300 | 2024-11-12 | 2024-11-19 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 74,634 | 0.04 % | |
934 | 2024 | Sekretariat DPRD | Belanja Modal Bangunan Gedung Kantor (Ruang Fraksi) | Pengadaan Langsung | Pekerjaan Konstruksi | 10004009000 | 53235975 | APBDP | 186,480,000 | 186,480,000 | 186,356,033 | 186,356,033 | 186,165,335 | 0 | 0 | 0 | 2024-11-13 | 2024-11-20 | cv. nurulillah | 50.826.160.9-733.000 | 123,967 | 0.07 % | |
935 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BARIANG - PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 10004161000 | 52753865 | APBDP | 180,000,000 | 179,993,239 | 179,740,139 | 179,740,139 | 179,629,139 | 179,629,139 | 179,629,139 | 179,629,139 | 2024-11-11 | 2024-11-19 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 259,861 | 0.14 % | |
936 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10004193000 | 52733334 | APBDP | 196,819,416 | 196,811,898 | 196,793,962 | 196,793,962 | 196,551,697 | 196,551,697 | 196,551,697 | 196,551,697 | 2024-11-24 | 2024-12-02 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 25,454 | 0.01 % | |
937 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004385000 | 53177295 | APBDP | 10,000,000 | 9,916,000 | 9,872,586 | 9,872,586 | 9,867,036 | 9,867,036 | 100 | 9,867,036 | 2024-11-20 | 2024-11-27 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 127,414 | 1.27 % | |
938 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004389000 | 53177221 | APBDP | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-11-21 | 2024-11-28 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
939 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004391000 | 53177250 | APBDP | 10,000,000 | 9,916,000 | 9,768,000 | 9,768,000 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-20 | 2024-11-27 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 232,000 | 2.32 % | |
940 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Di Pasar Sudi Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 10005197000 | 52732341 | APBDP | 103,700,000 | 103,579,855 | 103,402,588 | 103,402,588 | 103,102,000 | 103,102,000 | 103,102,000 | 103,102,000 | 2024-11-30 | 2024-12-09 | CV. ALBATROS | 01.222.160.2-733.000 | 297,412 | 0.29 % | |
941 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10005319000 | 52806024 | APBDP | 185,389,897 | 185,363,823 | 185,129,874 | 185,129,874 | 184,702,468 | 184,702,468 | 184,702,468 | 184,702,468 | 2024-11-13 | 2024-11-21 | FADWI UTAMA | 94.246.044.5-733.000 | 260,023 | 0.14 % | |
942 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 10005482000 | 52806083 | APBDP | 192,480,597 | 192,468,507 | 192,241,485 | 192,241,485 | 191,951,664 | 191,951,664 | 191,951,664 | 191,951,664 | 2024-11-13 | 2024-11-21 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 239,112 | 0.12 % | |
943 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005588000 | 52784211 | APBDP | 199,305,000 | 199,302,626 | 199,207,932 | 199,207,932 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-18 | 2024-11-22 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 97,068 | 0.05 % | |
944 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Telaga langsat Kec. Telaga Langsat dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10005616000 | 53323914 | APBDP | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,778,001 | 0 | 0 | 0 | 2024-11-16 | 2024-11-22 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
945 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Ida Manggala Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005682000 | 52701462 | APBDP | 198,711,044 | 198,701,771 | 198,657,318 | 198,657,318 | 198,284,358 | 198,284,300 | 198,284,300 | 198,284,300 | 2024-11-16 | 2024-11-22 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 53,726 | 0.03 % | |
946 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 10005755000 | 53218383 | APBDP | 189,070,000 | 189,000,000 | 188,807,701 | 188,807,701 | 188,807,701 | 188,807,000 | 188,807,000 | 188,807,000 | 2024-11-13 | 2024-11-20 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 262,299 | 0.14 % | |
947 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005793000 | 52701598 | APBDP | 198,306,750 | 198,294,010 | 197,473,718 | 197,473,718 | 197,362,718 | 197,362,700 | 197,362,700 | 197,362,700 | 2024-11-19 | 2024-11-26 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 833,033 | 0.42 % | |
948 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10005848000 | 52806108 | APBDP | 185,389,897 | 185,389,897 | 185,232,307 | 185,232,307 | 184,895,422 | 184,895,422 | 184,895,422 | 184,895,422 | 2024-11-16 | 2024-11-22 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 157,590 | 0.09 % | |
949 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005860000 | 52701911 | APBDP | 198,624,930 | 198,607,071 | 198,464,040 | 198,464,040 | 198,249,811 | 198,249,800 | 198,249,800 | 198,249,800 | 2024-12-05 | 2024-12-10 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 160,890 | 0.08 % | |
950 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 ANGKINANG - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 10005930000 | 52753947 | APBDP | 170,000,000 | 169,948,432 | 169,631,333 | 169,631,333 | 169,503,683 | 169,503,683 | 169,503,683 | 169,503,683 | 2024-11-15 | 2024-11-25 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 368,667 | 0.22 % | |
951 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang,Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10005945000 | 52754483;52754661 | APBDP | 198,258,000 | 198,126,647 | 198,123,701 | 198,123,701 | 197,992,121 | 197,992,121 | 197,992,121 | 197,992,121 | 2024-11-15 | 2024-11-25 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 134,299 | 0.07 % | |
952 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006016000 | 52701891 | APBDP | 198,415,905 | 198,394,411 | 198,248,294 | 198,248,294 | 197,981,894 | 197,981,800 | 197,981,800 | 197,981,800 | 2024-11-16 | 2024-11-22 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 167,611 | 0.08 % | |
953 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jembatan Sungai Teraban Desa Batu Laki RT. 04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006042000 | 53331615 | APBDP | 100,000,000 | 99,999,900 | 99,400,500 | 99,400,500 | 99,234,000 | 99,234,000 | 99,234,000 | 99,234,000 | 2024-11-14 | 2024-11-19 | CV. WIRA WIDYA CONSULTANT | 76.852.141.1-731.000 | 599,500 | 0.6 % | |
954 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jembatan Batu Tumbuk Desa Batu Laki RT. 03 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006056000 | 53331598 | APBDP | 100,000,000 | 99,999,900 | 99,444,900 | 99,444,900 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-11-13 | 2024-11-19 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 555,100 | 0.56 % | |
955 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Bajayau Lama Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006097000 | 52721741 | APBDP | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,803,500 | 29,803,500 | 29,803,500 | 29,803,500 | 2024-12-01 | 2024-12-06 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
956 | 2024 | Sekretariat Daerah | Belanja Kawat/Faksimili/Internet/TV Berlangganan Collacation Server SPSE | Pengadaan Langsung | Jasa Lainnya | 10006221000 | 53419470 | APBDP | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 0 | 16,000,000 | 2024-11-13 | 2024-11-21 | PT. Telekomunikasi Indonesia, Tbk. | 01.000.013.1-093.000 | 0 | 0 % | |
957 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10006256000 | 52812263 | APBDP | 187,419,914 | 187,417,251 | 187,146,275 | 187,146,275 | 186,824,373 | 186,824,373 | 186,824,373 | 186,824,373 | 2024-11-22 | 2024-11-29 | FADWI UTAMA | 94.246.044.5-733.000 | 273,639 | 0.15 % | |
958 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10006261000 | 52806141 | APBDP | 185,389,897 | 185,382,685 | 184,901,271 | 184,901,271 | 184,752,531 | 184,752,531 | 184,752,531 | 184,752,531 | 2024-11-22 | 2024-11-29 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 488,626 | 0.26 % | |
959 | 2024 | Dinas Perdagangan | Belanja Jasa Pengawasan Rehab Pagar Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006459000 | 53072247 | APBDP | 15,000,000 | 15,000,000 | 14,889,000 | 14,889,000 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-19 | 2024-11-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.74 % | |
960 | 2024 | Dinas Perdagangan | Belanja Jasa Pengawasan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006471000 | 53072201 | APBDP | 20,000,000 | 20,000,000 | 19,647,000 | 19,647,000 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-11-19 | 2024-11-21 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 353,000 | 1.77 % | |
961 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006474000 | 52701675 | APBDP | 195,791,640 | 195,781,574 | 195,726,074 | 195,726,074 | 195,337,574 | 195,337,500 | 195,337,500 | 195,337,500 | 2024-11-17 | 2024-11-25 | CV Remona | 41.175.606.7-735.000 | 65,566 | 0.03 % | |
962 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 10006478000 | 52806164 | APBDP | 192,480,597 | 192,465,891 | 192,105,876 | 192,105,876 | 191,758,510 | 191,758,510 | 191,758,510 | 191,758,510 | 2024-11-16 | 2024-11-22 | cv. nurulillah | 50.826.160.9-733.000 | 374,721 | 0.19 % | |
963 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Muara Banta - Karang Jawa Kec. Kandangan (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006570000 | 53440685 | APBDP | 140,278,500 | 140,273,000 | 140,130,415 | 140,130,415 | 140,000,000 | 140,000,000 | 140,000,000 | 140,000,000 | 2024-11-15 | 2024-11-21 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 148,085 | 0.11 % | |
964 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006596000 | 52701482 | APBDP | 198,262,275 | 198,237,607 | 198,144,475 | 198,144,475 | 197,930,246 | 197,930,200 | 197,930,200 | 197,930,200 | 2024-12-04 | 2024-12-10 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 117,800 | 0.06 % | |
965 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 10006682000 | 52813359 | APBDP | 187,419,914 | 187,419,914 | 187,219,233 | 187,219,233 | 186,969,483 | 186,969,483 | 186,969,483 | 186,969,483 | 2024-11-16 | 2024-11-22 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 200,681 | 0.11 % | |
966 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10006742000 | 52806151 | APBDP | 187,419,914 | 187,419,914 | 186,670,719 | 186,670,719 | 186,427,000 | 186,427,000 | 186,427,000 | 186,427,000 | 2024-11-22 | 2024-11-29 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 749,195 | 0.4 % | |
967 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006764000 | 53447745 | APBDP | 152,780,000 | 152,640,000 | 152,585,001 | 152,585,001 | 152,472,905 | 152,472,905 | 100 | 152,472,905 | 2024-11-15 | 2024-11-25 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 194,999 | 0.13 % | |
968 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006809000 | 53447247 | APBDP | 96,310,000 | 96,140,000 | 96,089,075 | 96,089,075 | 96,019,076 | 96,019,076 | 100 | 96,019,076 | 2024-11-15 | 2024-11-25 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 220,925 | 0.23 % | |
969 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006816000 | 53447343 | APBDP | 165,560,000 | 165,360,000 | 165,309,035 | 165,309,035 | 165,189,054 | 165,189,054 | 100 | 165,189,054 | 2024-11-15 | 2024-11-25 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 250,965 | 0.15 % | |
970 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Penataan Site Development Mesjid Nurul Hidayah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007045000 | 52835135 | APBDP | 100,000,000 | 99,795,938 | 99,261,750 | 99,261,750 | 99,189,600 | 99,189,600 | 99,189,600 | 99,189,600 | 2024-11-24 | 2024-12-03 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 738,250 | 0.74 % | |
971 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 10007048000 | 52812011 | APBDP | 187,419,914 | 187,415,712 | 187,211,595 | 187,211,595 | 186,919,253 | 186,919,253 | 186,919,253 | 186,919,253 | 2024-11-22 | 2024-11-29 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 208,319 | 0.11 % | |
972 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007165000 | 52806071 | APBDP | 185,389,897 | 185,389,660 | 185,079,816 | 185,079,816 | 184,732,801 | 184,732,801 | 184,732,801 | 184,732,801 | 2024-11-16 | 2024-11-22 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 310,081 | 0.17 % | |
973 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007189000 | 52794342 | APBDP | 187,419,914 | 187,417,589 | 187,312,412 | 187,312,412 | 186,985,147 | 186,985,147 | 186,985,147 | 186,985,147 | 2024-11-23 | 2024-11-29 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 107,502 | 0.06 % | |
974 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Rehab Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 10007208000 | 53350771 | APBDP | 5,000,000 | 5,000,000 | 4,955,600 | 4,955,600 | 4,850,000 | 0 | 0 | 0 | 2024-11-17 | 2024-11-20 | wahyu abdi maulana | 15.336.879.0-735.000 | 44,400 | 0.89 % | |
975 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007211000 | 53447642 | APBDP | 54,370,000 | 54,190,000 | 54,072,469 | 54,072,469 | 54,002,991 | 54,002,991 | 100 | 54,002,991 | 2024-11-15 | 2024-11-25 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 297,531 | 0.55 % | |
976 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007215000 | 53447528 | APBDP | 132,930,000 | 132,700,000 | 132,652,294 | 132,652,294 | 132,533,921 | 132,533,921 | 100 | 132,533,921 | 2024-11-15 | 2024-11-25 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 277,706 | 0.21 % | |
977 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007225000 | 53447480 | APBDP | 57,448,000 | 57,250,000 | 56,993,678 | 56,993,678 | 56,971,478 | 56,971,478 | 100 | 56,971,478 | 2024-12-04 | 2024-12-11 | CV LAKSANA NAWASENA | 39.407.240.9-733.000 | 454,322 | 0.79 % | |
978 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Pengawasan Arsitektur (Rehab Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 10007231000 | 53345290 | APBDP | 5,000,000 | 5,000,000 | 4,922,300 | 4,922,300 | 4,900,000 | 0 | 0 | 0 | 2024-11-21 | 2024-11-26 | wahyu abdi maulana | 15.336.879.0-735.000 | 77,700 | 1.55 % | |
979 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10007257000 | 53447872 | APBDP | 72,170,000 | 71,950,000 | 71,899,177 | 71,899,177 | 71,823,914 | 71,823,914 | 100 | 71,823,914 | 2024-11-20 | 2024-11-28 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 270,823 | 0.38 % | |
980 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007514000 | 52785200 | APBDP | 176,853,208 | 176,771,286 | 176,559,885 | 176,559,885 | 176,448,885 | 176,448,885 | 176,448,885 | 176,448,885 | 2024-11-24 | 2024-12-03 | CV. KHALIF | 81.540.809.1-733.000 | 293,323 | 0.17 % | |
981 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007526000 | 52791188 | APBDP | 198,959,859 | 198,944,893 | 198,680,956 | 198,680,956 | 198,569,956 | 198,569,956 | 198,569,956 | 198,569,956 | 2024-11-24 | 2024-12-03 | CV. KHALIF | 81.540.809.1-733.000 | 278,903 | 0.14 % | |
982 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007577000 | 52794195 | APBDP | 15,000,000 | 15,000,000 | 14,900,640 | 14,900,640 | 14,779,650 | 14,779,650 | 14,779,650 | 14,779,650 | 2024-11-21 | 2024-11-28 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 99,360 | 0.66 % | |
983 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007601000 | 52806022 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | 2024-11-22 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
984 | 2024 | Dinas Perpustakaan Dan Kearsipan | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 10007617000 | 52901440 | APBDP | 151,750,000 | 150,000,000 | 149,821,362 | 149,821,362 | 149,732,562 | 149,821,300 | 149,821,300 | 149,821,300 | 2024-11-26 | 2024-12-06 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 1,928,638 | 1.27 % | |
985 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007620000 | 52806052 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-21 | 2024-11-28 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
986 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007678000 | 52806070 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | 2024-11-22 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
987 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007700000 | 52806082 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
988 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007732000 | 52806097 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | 2024-11-22 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
989 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Telaga Langsat Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007845000 | 52701432 | APBDP | 198,262,275 | 198,249,144 | 198,193,644 | 198,193,644 | 197,881,734 | 197,881,700 | 197,881,700 | 197,881,700 | 2024-11-17 | 2024-11-25 | CV. KATIBURA | 53.260.332.1-733.000 | 68,631 | 0.03 % | |
990 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Lokbinuang Rt.02 Kec. Telaga langsat (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007852000 | 52701473 | APBDP | 198,711,044 | 198,696,744 | 198,641,245 | 198,641,245 | 198,279,385 | 198,279,300 | 198,279,300 | 198,279,300 | 2024-11-17 | 2024-11-25 | CV. KATIBURA | 53.260.332.1-733.000 | 69,799 | 0.04 % | |
991 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008250000 | 52806106 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-20 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
992 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008254000 | 52806114 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
993 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008257000 | 52806142 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
994 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008258000 | 52806152 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
995 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008263000 | 52806163 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | 2024-11-26 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
996 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008266000 | 52811893 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-20 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
997 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008269000 | 52811952 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
998 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008270000 | 52812008 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
999 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008276000 | 52812284 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1000 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008281000 | 52812398 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | 2024-11-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1001 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008287000 | 52813361 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1002 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan PMA Desa Lumpangi Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008292000 | 52813608 | APBDP | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-11-26 | 2024-12-03 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
1003 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Modal Rumah Negara Golongan III (Rehab Rumah Dinas) | Pengadaan Langsung | Pekerjaan Konstruksi | 10008512000 | 53461522 | APBDP | 179,112,000 | 179,078,323 | 177,782,360 | 177,782,360 | 177,000,000 | 0 | 0 | 0 | 2024-11-28 | 2024-12-02 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,329,640 | 0.74 % | |
1004 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang dan Pengawasan Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008741000 | 52754715 | APBDP | 25,000,000 | 24,999,997 | 24,944,501 | 24,944,501 | 24,919,500 | 24,919,500 | 24,919,500 | 24,919,500 | 2024-11-17 | 2024-11-25 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 55,499 | 0.22 % | |
1005 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008742000 | 52754617 | APBDP | 10,000,000 | 10,000,000 | 9,977,800 | 9,977,800 | 9,973,350 | 9,973,350 | 9,973,350 | 9,973,350 | 2024-11-17 | 2024-11-25 | Wing Rastafarindo | 03.282.590.3-732.000 | 22,200 | 0.22 % | |
1006 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008743000 | 52754449 | APBDP | 10,000,000 | 10,000,000 | 9,966,700 | 9,966,700 | 9,956,700 | 9,956,700 | 9,956,700 | 9,956,700 | 2024-11-17 | 2024-11-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 33,300 | 0.33 % | |
1007 | 2024 | Sekretariat DPRD | Konsultan Perencanaan pemasangan Paving blok Rumah Jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009202000 | 53241215 | APBDP | 10,000,000 | 10,000,000 | 9,962,250 | 9,962,250 | 9,962,250 | 0 | 0 | 0 | 2024-11-20 | 2024-11-25 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 37,750 | 0.38 % | |
1008 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 10009483000 | 52811955 | APBDP | 187,419,914 | 187,419,000 | 187,151,162 | 187,151,162 | 186,651,661 | 186,651,661 | 186,651,661 | 186,651,661 | 2024-11-23 | 2024-12-04 | cv. nurulillah | 50.826.160.9-733.000 | 268,752 | 0.14 % | |
1009 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 10009576000 | 53480499 | APBDP | 103,000,000 | 98,531,739 | 98,474,710 | 98,474,710 | 98,430,562 | 98,430,562 | 98,430,562 | 98,430,562 | 2024-11-20 | 2024-11-28 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 4,525,290 | 4.39 % | |
1010 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Revaluasi Nilai Wajar Tanah dan/atau Bangunan dan/atau Kendaraan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10009774000 | 53372617 | APBDP | 160,000,000 | 98,400,124 | 97,902,000 | 97,902,000 | 97,000,000 | 0 | 0 | 0 | 2024-11-20 | 2024-11-25 | KJPP Rizki Djunaedy dan Rekan Cabang Pontianak | 21.065.097.4-701.001 | 62,098,000 | 38.81 % | |
1011 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Gedung Kantor DISPERA KPLH | Pengadaan Langsung | Pekerjaan Konstruksi | 10009889000 | 47466586 | APBD | 129,914,400 | 129,900,000 | 129,800,475 | 129,800,475 | 129,711,674 | 129,711,674 | 100 | 129,711,674 | 2024-11-22 | 2024-11-27 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 113,925 | 0.09 % | |
1012 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Rumah Anggrek | Pengadaan Langsung | Pekerjaan Konstruksi | 10010319000 | 53191016 | APBDP | 190,500,000 | 190,430,000 | 190,141,717 | 190,141,717 | 187,838,467 | 187,838,467 | 100 | 187,838,467 | 2024-11-22 | 2024-11-27 | CV. KHALIF | 81.540.809.1-733.000 | 358,283 | 0.19 % | |
1013 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 10010356000 | 53205445 | APBDP | 197,470,000 | 197,390,000 | 197,361,834 | 197,361,834 | 197,195,334 | 197,195,334 | 100 | 197,195,334 | 2024-11-28 | 2024-12-03 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 108,166 | 0.05 % | |
1014 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Tabihi (DI.Kambas) Kec. Padang Batung (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010454000 | 52701932 | APBDP | 197,571,582 | 197,548,337 | 197,492,838 | 197,492,838 | 197,278,608 | 197,278,600 | 197,278,600 | 197,278,600 | 2024-12-01 | 2024-12-06 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 78,744 | 0.04 % | |
1015 | 2024 | Dinas Perdagangan | Belanja Modal Pagar (Rehab Pagar Kantor Sekretariat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010465000 | 53493807 | APBDP | 149,894,400 | 149,870,348 | 149,814,848 | 149,814,848 | 149,454,597 | 149,454,597 | 149,454,597 | 149,454,597 | 2024-11-19 | 2024-11-21 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 79,552 | 0.05 % | |
1016 | 2024 | Dinas Perdagangan | Belanja Bangunan Gedung Kantor (Rehap Gedung Kantor Sekretariat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010472000 | 53493822 | APBDP | 199,999,800 | 199,964,398 | 199,931,098 | 199,931,098 | 199,420,498 | 199,420,498 | 199,420,498 | 199,420,498 | 2024-11-19 | 2024-11-21 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 68,702 | 0.03 % | |
1017 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10011047000 | 52806115 | APBDP | 185,389,897 | 185,383,588 | 185,353,325 | 185,353,325 | 184,923,046 | 184,923,046 | 184,923,046 | 184,923,046 | 2024-11-20 | 2024-11-28 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 36,572 | 0.02 % | |
1018 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10011066000 | 52701666 | APBDP | 195,791,640 | 195,783,420 | 195,727,920 | 195,727,920 | 195,339,420 | 195,339,400 | 195,339,400 | 195,339,400 | 2024-11-20 | 2024-11-28 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 63,720 | 0.03 % | |
1019 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011391000 | 53199630 | APBDP | 10,000,000 | 9,916,000 | 9,817,086 | 9,817,086 | 9,815,976 | 9,815,976 | 100 | 9,815,976 | 2024-11-25 | 2024-12-03 | CV. Sector Engineering | 03.775.104.7-735.000 | 182,914 | 1.83 % | |
1020 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011399000 | 53199773 | APBDP | 20,000,000 | 19,865,000 | 19,756,890 | 19,756,890 | 19,745,790 | 19,745,790 | 100 | 19,745,790 | 2024-11-21 | 2024-11-29 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 243,110 | 1.22 % | |
1021 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011404000 | 53199781 | APBDP | 20,000,000 | 19,865,000 | 19,849,020 | 19,849,020 | 19,837,920 | 19,837,920 | 100 | 19,837,920 | 2024-11-28 | 2024-12-06 | PT. PILETEKA PLAN TATA | 95.363.613.1-732.000 | 150,980 | 0.75 % | |
1022 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011408000 | 53199492 | APBDP | 20,000,000 | 19,865,000 | 19,769,655 | 19,769,655 | 19,758,555 | 19,758,555 | 100 | 19,758,555 | 2024-11-26 | 2024-12-05 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 230,345 | 1.15 % | |
1023 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011418000 | 53199647 | APBDP | 15,000,000 | 14,891,000 | 14,791,392 | 14,791,392 | 14,780,292 | 14,780,292 | 100 | 14,780,292 | 2024-11-26 | 2024-12-05 | Wing Rastafarindo | 03.282.590.3-732.000 | 208,608 | 1.39 % | |
1024 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011423000 | 53199532 | APBDP | 10,000,000 | 9,916,000 | 9,712,500 | 9,712,500 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-25 | 2024-12-03 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 287,500 | 2.88 % | |
1025 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011433000 | 53199515 | APBDP | 15,000,000 | 14,891,000 | 14,791,392 | 14,791,392 | 14,780,292 | 14,780,292 | 100 | 14,780,292 | 2024-11-25 | 2024-12-03 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 208,608 | 1.39 % | |
1026 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011435000 | 53199728 | APBDP | 15,000,000 | 14,890,000 | 14,816,280 | 14,816,280 | 14,810,730 | 14,810,730 | 100 | 14,810,730 | 2024-11-22 | 2024-11-29 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 183,720 | 1.22 % | |
1027 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011452000 | 53199480 | APBDP | 10,000,000 | 9,916,000 | 9,817,086 | 9,817,086 | 9,817,086 | 9,817,086 | 100 | 9,817,086 | 2024-11-26 | 2024-12-05 | Wing Rastafarindo | 03.282.590.3-732.000 | 182,914 | 1.83 % | |
1028 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011462000 | 53199559 | APBDP | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-11-21 | 2024-11-28 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
1029 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011465000 | 53199788 | APBDP | 10,000,000 | 9,916,000 | 9,712,500 | 9,712,500 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-21 | 2024-11-29 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 287,500 | 2.88 % | |
1030 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan Samping Gedung MUI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011678000 | 52834921 | APBDP | 15,000,000 | 15,000,000 | 14,990,001 | 14,990,001 | 14,774,100 | 0 | 0 | 0 | 2024-11-26 | 2024-12-03 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 9,999 | 0.07 % | |
1031 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10011698000 | 52814894 | APBDP | 198,959,859 | 198,942,741 | 198,759,434 | 198,759,434 | 198,470,834 | 198,470,834 | 198,470,834 | 198,470,834 | 2024-11-24 | 2024-12-03 | FADWI UTAMA | 94.246.044.5-733.000 | 200,425 | 0.1 % | |
1032 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Kantor, Rumah Jabatan Kajari dan Mushola Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011788000 | 52833192 | APBDP | 35,000,000 | 35,000,000 | 34,950,500 | 34,950,500 | 34,715,250 | 34,715,250 | 34,715,250 | 34,715,250 | 2024-12-02 | 2024-12-09 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 49,500 | 0.14 % | |
1033 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Di Ruko Sudi Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011855000 | 52732501 | APBDP | 15,000,000 | 15,000,000 | 14,979,999 | 14,979,999 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-02 | 2024-12-09 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 20,001 | 0.13 % | |
1034 | 2024 | Sekretariat Daerah | Jasa Konsultansi Perencanaan Rehab Parkir Mobil di Rumah Jabatan Bupati dan Rehab Halaman Gedung PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012082000 | 53269652;53270326 | APBDP | 40,000,000 | 40,000,000 | 39,627,000 | 39,627,000 | 39,627,000 | 0 | 0 | 0 | 2024-11-20 | 2024-11-25 | cv.akmalindo | 02.531.482.4-731.000 | 373,000 | 0.93 % | |
1035 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Pendopo Wabup dan Rehab Rumah Jabatan Wabup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012143000 | 53269126;53269258 | APBDP | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 0 | 0 | 0 | 2024-11-20 | 2024-11-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
1036 | 2024 | Sekretariat Daerah | Belanja Modal Asrama | Pengadaan Langsung | Pekerjaan Konstruksi | 10012553000 | 53274201 | APBDP | 199,977,000 | 199,779,309 | 199,612,807 | 199,612,807 | 199,612,807 | 199,612,800 | 199,612,800 | 199,612,800 | 2024-11-21 | 2024-12-04 | cv. nurulillah | 50.826.160.9-733.000 | 364,193 | 0.18 % | |
1037 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012566000 | 52784490 | APBDP | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-21 | 2024-11-28 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
1038 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012583000 | 52784612 | APBDP | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-21 | 2024-11-28 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
1039 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10012844000 | 52806096 | APBDP | 185,389,897 | 185,300,920 | 184,317,628 | 184,317,628 | 184,045,678 | 184,045,678 | 184,045,678 | 184,045,678 | 2024-11-22 | 2024-12-02 | Lingga Perkasa | 20.558.364.4-733.000 | 1,072,269 | 0.58 % | |
1040 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10013099000 | 52793494 | APBDP | 198,959,859 | 198,955,237 | 198,626,680 | 198,626,680 | 198,537,880 | 198,537,880 | 198,537,880 | 198,537,880 | 2024-11-24 | 2024-12-03 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 333,179 | 0.17 % | |
1041 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013118000 | 52791187 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | 2024-12-10 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1042 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013130000 | 52834360 | APBDP | 200,000,000 | 199,999,800 | 199,471,440 | 199,471,440 | 199,427,040 | 199,427,040 | 199,427,040 | 199,427,040 | 2024-11-22 | 2024-11-29 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 528,560 | 0.26 % | |
1043 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013131000 | 52785228 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | 2024-12-09 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1044 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013157000 | 52792028 | APBDP | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | 2024-12-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1045 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013177000 | 52793489 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | 2024-12-03 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1046 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013199000 | 52791096 | APBDP | 30,000,000 | 30,000,000 | 29,953,350 | 29,953,350 | 29,725,800 | 29,725,800 | 29,725,800 | 29,725,800 | 2024-11-30 | 2024-12-09 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 46,650 | 0.16 % | |
1047 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013228000 | 52733453 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | 2024-12-09 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1048 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013249000 | 52784908 | APBDP | 30,000,000 | 30,000,000 | 29,940,000 | 29,940,000 | 29,703,600 | 29,703,600 | 29,703,600 | 29,703,600 | 2024-11-30 | 2024-12-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 60,000 | 0.2 % | |
1049 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013262000 | 52792291 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | 2024-12-03 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,500 | 0.37 % | |
1050 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013280000 | 52806053 | APBDP | 119,267,218 | 119,230,229 | 119,112,139 | 119,112,139 | 118,962,622 | 118,962,622 | 118,962,622 | 118,962,622 | 2024-11-21 | 2024-11-27 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 155,079 | 0.13 % | |
1051 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013298000 | 52793810 | APBDP | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | 2024-12-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1052 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013323000 | 52736903 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | 2024-12-09 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1053 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013961000 | 52793816 | APBDP | 198,959,859 | 198,903,501 | 198,768,187 | 198,768,187 | 198,324,189 | 198,324,189 | 198,324,189 | 198,324,189 | 2024-11-24 | 2024-12-03 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 191,672 | 0.1 % | |
1054 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013964000 | 52792282 | APBDP | 198,959,859 | 198,914,791 | 198,662,700 | 198,662,700 | 198,290,852 | 198,290,852 | 198,290,852 | 198,290,852 | 2024-11-24 | 2024-12-03 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 297,159 | 0.15 % | |
1055 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013981000 | 52793710 | APBDP | 198,959,859 | 198,911,713 | 198,879,129 | 198,879,129 | 198,745,929 | 198,745,929 | 198,745,929 | 198,745,929 | 2024-11-24 | 2024-12-03 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 80,730 | 0.04 % | |
1056 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013997000 | 52793117 | APBDP | 198,959,859 | 198,944,784 | 197,729,262 | 197,729,262 | 197,546,112 | 197,546,112 | 197,546,112 | 197,546,112 | 2024-11-24 | 2024-12-03 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 1,230,597 | 0.62 % | |
1057 | 2024 | Dinas Perikanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014283000 | 53208019 | APBDP | 100,000,000 | 97,900,000 | 97,707,750 | 97,707,750 | 97,500,000 | 0 | 0 | 0 | 2024-11-26 | 2024-12-03 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,292,250 | 2.29 % | |
1058 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10014365000 | 52783777 | APBDP | 196,819,416 | 196,815,657 | 196,510,642 | 196,510,642 | 196,116,594 | 196,116,594 | 196,116,594 | 196,116,594 | 2024-11-24 | 2024-12-03 | cv. nurulillah | 50.826.160.9-733.000 | 308,774 | 0.16 % | |
1059 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10014423000 | 52792114 | APBDP | 198,959,859 | 198,959,363 | 198,848,349 | 198,848,349 | 198,436,983 | 198,436,983 | 198,436,983 | 198,436,983 | 2024-11-24 | 2024-12-03 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 111,510 | 0.06 % | |
1060 | 2024 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014437000 | 52948956 | APBDP | 10,000,000 | 10,000,000 | 9,901,200 | 9,901,200 | 9,900,090 | 9,901,200 | 9,901,200 | 9,901,200 | 2024-11-23 | 2024-12-03 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,800 | 0.99 % | |
1061 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014448000 | 52783774 | APBDP | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | 2024-12-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1062 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014470000 | 52792110 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | 2024-12-03 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1063 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10016651000 | 52812403 | APBDP | 187,419,914 | 187,417,185 | 187,080,716 | 187,080,716 | 186,803,214 | 186,803,214 | 186,803,214 | 186,803,214 | 2024-11-26 | 2024-12-03 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 339,198 | 0.18 % | |
1064 | 2024 | Sekretariat DPRD | Belanja Modal Rumah Negara Golongan I | Pengadaan Langsung | Pekerjaan Konstruksi | 10016652000 | 53236046 | APBDP | 97,600,000 | 97,600,000 | 97,369,882 | 97,369,882 | 97,369,882 | 0 | 0 | 0 | 2024-12-12 | 2024-12-18 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 230,118 | 0.24 % | |
1065 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Pakan Dalam Keminting Batu, Kec. Daha Utara Dan Ruas Tumbukan Banyu - Banua Hanyar, Kec. Daha Selatan (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10016693000 | 53516658 | APBDP | 199,350,000 | 199,350,000 | 199,302,580 | 199,302,580 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-28 | 2024-12-04 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 47,420 | 0.02 % | |
1066 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Jaringan Perpipaan Desa Amawang Kiri Muka Kecamatan Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016707000 | 52812832 | APBDP | 100,000,000 | 99,795,938 | 99,018,938 | 99,018,938 | 98,856,600 | 98,856,600 | 98,856,600 | 98,856,600 | 2024-12-01 | 2024-12-09 | Indoplan Mega Sarana | 41.563.380.9-732.000 | 981,063 | 0.98 % | |
1067 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Pekerjaan Konstruksi | 10016734000 | 52826612 | APBDP | 200,000,000 | 199,908,070 | 199,854,965 | 199,854,965 | 199,752,290 | 199,752,290 | 199,752,290 | 199,752,290 | 2024-12-01 | 2024-12-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 145,035 | 0.07 % | |
1068 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan dan RT. 01 - 02 Desa Angkinang Selatan Kec Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016741000 | 53518755 | APBDP | 20,000,000 | 19,833,000 | 19,811,773 | 19,811,773 | 19,800,673 | 19,800,673 | 100 | 19,800,673 | 2024-11-25 | 2024-12-03 | CV. RAYHANI | 75.410.426.3-733.000 | 188,227 | 0.94 % | |
1069 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Muning Baru dan RT. 02 Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016766000 | 53518734 | APBDP | 20,000,000 | 19,833,000 | 19,811,773 | 19,811,773 | 19,800,673 | 19,800,673 | 100 | 19,800,673 | 2024-11-25 | 2024-12-03 | CV. RAYHANI | 75.410.426.3-733.000 | 188,227 | 0.94 % | |
1070 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari dan RT. 02 Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016786000 | 53518744 | APBDP | 20,000,000 | 19,833,000 | 19,773,540 | 19,773,540 | 19,762,440 | 19,762,440 | 100 | 19,762,440 | 2024-11-25 | 2024-12-03 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 226,460 | 1.13 % | |
1071 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016808000 | 53188369 | APBDP | 15,000,000 | 15,000,000 | 14,923,761 | 14,923,761 | 14,912,661 | 14,912,661 | 14,912,661 | 14,912,661 | 2024-11-28 | 2024-12-06 | Haded Barakat Utama | 95.529.593.6-732.000 | 76,239 | 0.51 % | |
1072 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat Kec. Kandangan dan RT. 03 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016814000 | 53518761 | APBDP | 20,000,000 | 19,833,000 | 19,720,238 | 19,720,238 | 19,710,248 | 19,710,248 | 100 | 19,710,248 | 2024-11-25 | 2024-12-03 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 279,762 | 1.4 % | |
1073 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl.Parigi Desa Wasah Hulu - Desa Ulin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016846000 | 53199797 | APBDP | 45,000,000 | 29,810,000 | 29,726,744 | 29,726,744 | 29,715,644 | 29,715,644 | 100 | 29,715,644 | 2024-12-03 | 2024-12-06 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 15,273,257 | 33.94 % | |
1074 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10016924000 | 52790982 | APBDP | 198,959,859 | 198,943,568 | 198,790,380 | 198,790,380 | 198,436,766 | 198,436,766 | 198,436,766 | 198,436,766 | 2024-11-30 | 2024-12-09 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 169,479 | 0.09 % | |
1075 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10017010000 | 52791371 | APBDP | 164,016,180 | 164,003,782 | 163,760,298 | 163,760,298 | 163,467,256 | 163,467,256 | 163,467,256 | 163,467,256 | 2024-12-01 | 2024-12-09 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 255,882 | 0.16 % | |
1076 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 10017034000 | 52833106 | APBDP | 200,000,000 | 199,820,316 | 199,582,616 | 199,582,616 | 199,451,636 | 199,451,636 | 199,451,636 | 199,451,636 | 2024-12-01 | 2024-12-06 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 417,384 | 0.21 % | |
1077 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017036000 | 52790998 | APBDP | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | 2024-12-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,499 | 0.37 % | |
1078 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017052000 | 52791373 | APBDP | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,751,900 | 14,751,900 | 14,751,900 | 14,751,900 | 2024-12-01 | 2024-12-09 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 15,000 | 0.1 % | |
1079 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017070000 | 52791273 | APBDP | 15,000,000 | 15,000,000 | 14,996,100 | 14,996,100 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-30 | 2024-12-09 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 3,900 | 0.03 % | |
1080 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017083000 | 52784650 | APBDP | 15,000,000 | 15,000,000 | 14,996,100 | 14,996,100 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-30 | 2024-12-09 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 3,900 | 0.03 % | |
1081 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017094000 | 52826636 | APBDP | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,722,500 | 14,722,500 | 14,722,500 | 14,722,500 | 2024-12-03 | 2024-12-12 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
1082 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017118000 | 52833104 | APBDP | 15,000,000 | 15,000,000 | 14,858,693 | 14,858,693 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-03 | 2024-12-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 141,307 | 0.94 % | |
1083 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017128000 | 52834362 | APBDP | 15,000,000 | 15,000,000 | 14,858,693 | 14,858,693 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-03 | 2024-12-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 141,307 | 0.94 % | |
1084 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10017513000 | 52791277 | APBDP | 198,959,859 | 198,956,260 | 198,787,066 | 198,787,066 | 198,225,880 | 198,225,880 | 198,225,880 | 198,225,880 | 2024-11-30 | 2024-12-09 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 172,793 | 0.09 % | |
1085 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10017531000 | 52784619 | APBDP | 198,959,859 | 198,955,052 | 198,949,281 | 198,949,281 | 198,744,152 | 198,744,152 | 198,744,152 | 198,744,152 | 2024-11-30 | 2024-12-09 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 10,578 | 0.01 % | |
1086 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Rumah Jabatan Kapolres Kab HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017594000 | 52833319 | APBDP | 35,000,000 | 35,000,000 | 34,743,000 | 34,743,000 | 34,722,500 | 34,722,500 | 34,722,500 | 34,722,500 | 2024-12-03 | 2024-12-10 | cv.akmalindo | 02.531.482.4-731.000 | 257,000 | 0.73 % | |
1087 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Ruang Kantin Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017606000 | 52834007 | APBDP | 45,000,000 | 45,000,000 | 44,733,000 | 44,733,000 | 44,677,500 | 44,677,500 | 44,677,500 | 44,677,500 | 2024-12-03 | 2024-12-10 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 267,000 | 0.59 % | |
1088 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Sumur Bor TPA | Pengadaan Langsung | Pekerjaan Konstruksi | 10018414000 | 53186333 | APBDP | 80,000,000 | 76,083,419 | 75,849,948 | 75,849,948 | 75,006,937 | 75,006,937 | 75,006,937 | 75,006,937 | 2024-11-29 | 2024-12-04 | CV. AL QAWS | 70.619.811.6-733.000 | 4,150,052 | 5.19 % | |
1089 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10018588000 | 52736785 | APBDP | 198,959,859 | 198,872,495 | 198,662,743 | 198,662,743 | 198,440,743 | 198,440,743 | 198,440,743 | 198,440,743 | 2024-12-01 | 2024-12-09 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 297,116 | 0.15 % | |
1090 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 10018809000 | 52834343 | APBDP | 172,800,000 | 172,790,960 | 172,652,609 | 172,652,609 | 172,474,831 | 172,474,831 | 172,474,831 | 172,474,831 | 2024-11-30 | 2024-12-06 | cv. nurulillah | 50.826.160.9-733.000 | 147,391 | 0.09 % | |
1091 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10018888000 | 52736295 | APBDP | 198,959,859 | 198,958,290 | 198,876,877 | 198,876,877 | 198,443,545 | 198,443,545 | 198,443,545 | 198,443,545 | 2024-12-02 | 2024-12-09 | FADWI UTAMA | 94.246.044.5-733.000 | 82,982 | 0.04 % | |
1092 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10018974000 | 52793387 | APBDP | 196,819,416 | 196,734,151 | 196,613,315 | 196,613,315 | 196,572,800 | 196,572,800 | 196,572,800 | 196,572,800 | 2024-11-26 | 2024-12-02 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 206,101 | 0.1 % | |
1093 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019046000 | 52187301 | APBD | 15,000,000 | 15,000,000 | 14,735,250 | 14,735,250 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-05 | 2024-12-10 | cv.akmalindo | 02.531.482.4-731.000 | 264,750 | 1.77 % | |
1094 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019047000 | 52793713 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | 2024-12-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
1095 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019054000 | 52793143 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | 2024-12-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
1096 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019057000 | 52793386 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-26 | 2024-12-02 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1097 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Polsek Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019066000 | 52856036 | APBDP | 35,000,000 | 35,000,000 | 34,874,813 | 34,874,813 | 34,654,200 | 34,654,200 | 34,654,200 | 34,654,200 | 2024-12-03 | 2024-12-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,188 | 0.36 % | |
1098 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019070000 | 52736405 | APBDP | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | 2024-12-09 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1099 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan R'ehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019080000 | 52834345 | APBDP | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,740,800 | 14,740,800 | 14,740,800 | 14,740,800 | 2024-12-05 | 2024-12-10 | cv.akmalindo | 02.531.482.4-731.000 | 150,000 | 1 % | |
1100 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10019085000 | 53494535 | APBDP | 150,000,000 | 142,756,189 | 142,699,449 | 142,699,449 | 142,537,567 | 142,537,567 | 142,537,567 | 142,537,567 | 2024-12-03 | 2024-12-09 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 7,300,551 | 4.87 % | |
1101 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019659000 | 53199669 | APBDP | 20,000,000 | 19,865,000 | 19,800,995 | 19,800,995 | 19,789,895 | 19,789,895 | 100 | 19,789,895 | 2024-11-29 | 2024-12-06 | cv.nawasena konsultan | 62.243.237.5-731.000 | 199,005 | 1 % | |
1102 | 2024 | Sekretariat Daerah | Rehab Parkir Mobil Jabatan Bupati | Pengadaan Langsung | Pekerjaan Konstruksi | 10020202000 | 53274352 | APBDP | 198,330,000 | 198,330,000 | 198,244,382 | 198,244,382 | 198,098,001 | 0 | 0 | 0 | 2024-12-08 | 2024-12-16 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 85,618 | 0.04 % | |
1103 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10020862000 | 52794344 | APBDP | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | 2024-12-09 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
1104 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Amawang Muka - Getek dan Jl. Angkakai (Jl. Sungai Hambawang) Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10020961000 | 52785560 | APBDP | 70,000,000 | 69,980,100 | 68,298,300 | 68,298,300 | 68,200,000 | 68,200,000 | 68,200,000 | 68,200,000 | 2024-12-02 | 2024-12-06 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 1,701,700 | 2.43 % | |
1105 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Perencanaan Rehab Berat Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021195000 | 53469606 | APBDP | 75,000,000 | 60,000,000 | 59,718,841 | 59,718,841 | 59,600,000 | 0 | 0 | 0 | 2024-12-02 | 2024-12-04 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 15,281,159 | 20.37 % | |
1106 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Pengawasan Pembangunan Rumah Anggrek | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021835000 | 53253968 | APBDP | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-12-05 | 2024-12-10 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
1107 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Pengawasan Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021851000 | 53268867 | APBDP | 10,000,000 | 10,000,000 | 9,872,586 | 9,872,586 | 9,768,000 | 9,768,000 | 100 | 9,768,000 | 2024-12-02 | 2024-12-05 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 127,414 | 1.27 % | |
1108 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022004000 | 52805918 | APBDP | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-03 | 2024-12-05 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
1109 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022009000 | 52804724 | APBDP | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-03 | 2024-12-05 | cv.akmalindo | 02.531.482.4-731.000 | 237,000 | 1.58 % | |
1110 | 2024 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 10022014000 | 52791044 | APBDP | 150,000,000 | 149,996,780 | 149,941,280 | 149,941,280 | 149,767,010 | 149,767,010 | 149,767,010 | 149,767,010 | 2024-12-03 | 2024-12-05 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 58,720 | 0.04 % | |
1111 | 2024 | Dinas Perdagangan | Pekerjaan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10022019000 | 52805913 | APBDP | 196,200,000 | 196,197,368 | 196,003,635 | 196,003,635 | 195,706,377 | 195,706,377 | 195,706,377 | 195,706,377 | 2024-12-03 | 2024-12-05 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 196,365 | 0.1 % | |
1112 | 2024 | Dinas Perdagangan | Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10022023000 | 52804699 | APBDP | 161,950,020 | 161,941,113 | 161,678,905 | 161,678,905 | 161,369,797 | 161,369,797 | 161,369,797 | 161,369,797 | 2024-12-03 | 2024-12-05 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 271,115 | 0.17 % | |
1113 | 2024 | Sekretariat Daerah | Rehab Halaman Gedung PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 10022183000 | 53579473 | APBDP | 199,430,000 | 199,430,000 | 199,328,692 | 199,328,692 | 199,328,692 | 0 | 0 | 0 | 2024-12-08 | 2024-12-13 | cv. nurulillah | 50.826.160.9-733.000 | 101,308 | 0.05 % | |
1114 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Lapangan Tugu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022185000 | 53268905 | APBDP | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 0 | 0 | 0 | 2024-12-04 | 2024-12-09 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
1115 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022372000 | 52783802 | APBDP | 15,000,000 | 14,997,000 | 14,886,168 | 14,886,168 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-12-02 | 2024-12-06 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 113,832 | 0.76 % | |
1116 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022380000 | 52783694 | APBDP | 15,000,000 | 14,997,000 | 14,886,168 | 14,886,168 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-12-02 | 2024-12-06 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 113,832 | 0.76 % | |
1117 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan dan Pembangunan Pagar Belakang Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10023689000 | 52833704 | APBDP | 95,000,000 | 94,845,726 | 94,721,850 | 94,721,850 | 94,577,550 | 94,577,550 | 94,577,550 | 94,577,550 | 2024-12-03 | 2024-12-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 278,150 | 0.29 % | |
1118 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur - Jasa Konsultan Pengawasan Pemasangan Paving Blok di Halaman Ruang Tunggu di TMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10023798000 | 48000748 | APBD | 35,000,000 | 25,000,000 | 24,642,000 | 24,642,000 | 24,630,900 | 0 | 0 | 0 | 2024-12-05 | 2024-12-12 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 10,358,000 | 29.59 % | |
1119 | 2024 | Dinas Kesehatan | Pemeliharaan IPAL Puskesmas | Pengadaan Langsung | Pekerjaan Konstruksi | 10024820000 | 53180127 | APBDP | 247,671,500 | 194,250,000 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 2024-12-11 | 2024-12-16 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 53,699,000 | 21.68 % | |
1120 | 2024 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Perubahan) ( Konsultan Perencanaan Objek Wisata Air Panas Tanuhi ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10024923000 | 53391011 | APBDP | 100,000,000 | 99,997,770 | 99,716,850 | 99,716,850 | 99,666,900 | 0 | 0 | 0 | 2024-12-04 | 2024-12-13 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 283,150 | 0.28 % | |
1121 | 2024 | Sekretariat Daerah | Pembuatan Menara + Tandon Air | Pengadaan Langsung | Pekerjaan Konstruksi | 10025652000 | 53579317 | APBDP | 99,525,600 | 99,488,400 | 99,432,887 | 99,432,887 | 99,432,887 | 0 | 0 | 0 | 2024-12-05 | 2024-12-13 | FADWI UTAMA | 94.246.044.5-733.000 | 92,713 | 0.09 % | |
1122 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Ayitih Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10025689000 | 53600665 | APBDP | 101,351,000 | 101,350,000 | 101,246,096 | 101,246,096 | 101,200,000 | 101,200,000 | 101,200,000 | 101,200,000 | 2024-12-06 | 2024-12-12 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 104,904 | 0.1 % | |
1123 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Ruas Makam Habib Lumpangi, Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10025704000 | 53600668 | APBDP | 200,000,000 | 199,999,000 | 199,902,161 | 199,902,161 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-12-06 | 2024-12-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 97,839 | 0.05 % | |
1124 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Utilitas Jaringan Listrik Kawasan Perkantoran Kab. HSS Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10026465000 | 52834337 | APBDP | 100,000,000 | 100,000,000 | 99,083,904 | 99,083,904 | 99,056,400 | 99,056,400 | 99,056,400 | 99,056,400 | 2024-12-10 | 2024-12-16 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 916,096 | 0.92 % | |
1125 | 2024 | Puskesmas Negara | Belanja Modal Gedung dan Bangunan BLUD | Pengadaan Langsung | Pekerjaan Konstruksi | 10026548000 | 53183116 | APBD | 82,000,000 | 78,930,559 | 78,816,077 | 78,816,077 | 78,616,281 | 78,616,200 | 78,616,200 | 78,616,200 | 2024-12-07 | 2024-12-12 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 3,183,923 | 3.88 % | |
1126 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Hamalau - Anjiran, Jl. Desa Kapuh Tengah, Padang Batung - Batu Laki - Malilingin dan Simp. 3 Bukuanin - Riam Talo (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10026550000 | 53654177 | APBD | 200,000,000 | 199,995,000 | 199,929,168 | 199,929,168 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-12-17 | 2024-12-20 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 70,832 | 0.04 % | |
1127 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pendataan Bangunan Gedung di HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026665000 | 53661591 | APBDP | 70,000,000 | 69,883,380 | 69,883,380 | 69,883,380 | 69,439,380 | 69,439,380 | 69,439,380 | 69,439,380 | 2024-12-07 | 2024-12-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 116,620 | 0.17 % | |
1128 | 2024 | Sekretariat Daerah | Jasa Konsultansi Pengawasan Rehab Parkir Mobil di Rumah Jabatan Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027331000 | 53269433 | APBDP | 15,000,000 | 15,000,000 | 14,925,060 | 14,925,060 | 14,925,060 | 0 | 0 | 0 | 2024-12-11 | 2024-12-16 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 74,940 | 0.5 % | |
1129 | 2024 | Sekretariat Daerah | Pengawasan Rehab Halaman Gedung PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027332000 | 53270813 | APBDP | 15,000,000 | 15,000,000 | 14,607,600 | 14,607,600 | 14,607,600 | 0 | 0 | 0 | 2024-12-11 | 2024-12-16 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 392,400 | 2.62 % | |
1130 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Rehab Pagar Tumah Jabatan dan Pembuatan Menara+Tandon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027333000 | 53206615;53269851 | APBDP | 55,000,000 | 54,997,525 | 54,612,000 | 54,612,000 | 54,612,000 | 0 | 0 | 0 | 2024-12-09 | 2024-12-16 | cv.akmalindo | 02.531.482.4-731.000 | 388,000 | 0.71 % | |
1131 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Pendopo Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027335000 | 53269085 | APBDP | 50,000,000 | 50,000,000 | 49,975,808 | 49,975,808 | 49,975,808 | 0 | 0 | 0 | 2024-12-09 | 2024-12-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 24,193 | 0.05 % | |
1132 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 10027382000 | 53180478 | APBDP | 137,250,000 | 137,200,000 | 137,160,076 | 137,160,076 | 137,160,076 | 137,160,000 | 137,160,000 | 137,160,000 | 2024-12-08 | 2024-12-13 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 89,924 | 0.07 % | |
1133 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Rumah Jabatan dan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027524000 | 52833242 | APBDP | 35,000,000 | 34,338,544 | 34,077,000 | 34,077,000 | 33,954,900 | 33,954,900 | 33,954,900 | 33,954,900 | 2024-12-09 | 2024-12-16 | cv.akmalindo | 02.531.482.4-731.000 | 923,000 | 2.64 % | |
1134 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengaman Badan Jalan di Ruas Jalan Desa Angkinang - Desa Mandala Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10028576000 | 53653306 | APBDP | 85,000,000 | 84,997,000 | 84,875,169 | 84,875,169 | 84,300,000 | 84,300,000 | 84,300,000 | 84,300,000 | 2024-12-17 | 2024-12-20 | CV.Bangun Banua | 93.708.167.7-733.000 | 124,831 | 0.15 % | |
1135 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Bank Sampah dan Paving Halaman | Pengadaan Langsung | Pekerjaan Konstruksi | 10028753000 | 53670581 | APBDP | 89,980,000 | 89,969,210 | 89,896,775 | 89,896,775 | 89,719,175 | 89,719,175 | 100 | 89,719,175 | 2024-12-12 | 2024-12-17 | CV. KHALIF | 81.540.809.1-733.000 | 83,225 | 0.09 % | |
1136 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Ruas Jalan Jarau - Parandakan Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029095000 | 53654226 | APBDP | 200,000,000 | 199,964,000 | 199,897,786 | 199,897,786 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-12-18 | 2024-12-23 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 102,214 | 0.05 % | |
1137 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Panggang Hijau Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029138000 | 53710070 | APBDP | 200,000,000 | 199,999,000 | 199,900,209 | 199,900,209 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-12-12 | 2024-12-17 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 99,791 | 0.05 % | |
1138 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Ruas Jl. Kalaka Dayuh - Ds. Sungai Raya Utara Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029271000 | 53698648 | APBDP | 200,000,000 | 199,955,000 | 199,895,845 | 199,895,845 | 196,188,000 | 196,188,000 | 196,188,000 | 196,188,000 | 2024-12-12 | 2024-12-17 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 104,155 | 0.05 % | |
1139 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Sp. Bakarung Selatan - Sungai Kudung Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029325000 | 53722189 | APBDP | 140,000,000 | 110,820,000 | 110,773,026 | 110,773,026 | 110,400,000 | 110,400,000 | 110,400,000 | 110,400,000 | 2024-12-20 | 2024-12-25 | CV. SORAYA | 01.834.078.6-733.000 | 29,226,974 | 20.88 % | |
1140 | 2024 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan Sungai Pihaung / Sungai Tani | Pengadaan Langsung | Pekerjaan Konstruksi | 10030310000 | 53740896 | APBD | 50,172,500 | 50,056,035 | 50,022,379 | 50,022,379 | 50,000,800 | 0 | 0 | 0 | 2024-12-16 | 2024-12-17 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 150,121 | 0.3 % | |
1141 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Oprit Jembatan Ruas Teluk Pinang - Pahampangan Utara Kec. Sungai Raya (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031019000 | 53811229 | APBDP | 199,900,000 | 199,900,000 | 199,854,897 | 199,854,897 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-12-20 | 2024-12-25 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 45,103 | 0.02 % | |
1142 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan Ds. Telaga Sili-Sili, Ds. Kandangan Kota dan Ds. Pahampangan Kec. Sungai Raya (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031215000 | 53810646 | APBDP | 153,804,000 | 153,793,000 | 153,747,933 | 153,747,933 | 153,300,000 | 153,300,000 | 153,300,000 | 153,300,000 | 2024-12-20 | 2024-12-25 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 56,067 | 0.04 % | |
1143 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan Rahimin Kec. Daha Utara (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031419000 | 53811830 | APBDP | 182,437,670 | 182,437,000 | 182,370,844 | 182,370,844 | 182,000,000 | 182,000,000 | 182,000,000 | 182,000,000 | 2024-12-20 | 2024-12-25 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 66,826 | 0.04 % | |
1144 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan Ds. Sungai Balum Kec. Daha Barat (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031599000 | 53852269 | APBDP | 200,000,000 | 199,963,000 | 199,908,252 | 199,908,252 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-12-20 | 2024-12-25 | CV. SORAYA | 01.834.078.6-733.000 | 91,748 | 0.05 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pekerjaan Pemeliharaan Jaringan Irigasi di beberapa Kecamatan Kab. Hulu Sungai Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1559282 | 47472392 | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,728,000 | 49,728,000 | 49,728,000 | 49,728,000 | 2024-01-22 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 105,500 | 0.21 % | |
2 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Muning Dalam, Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe F)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1560282 | 47458175 | 50,000,000 | 49,839,000 | 49,728,000 | 49,728,000 | 48,840,000 | 48,840,000 | 48,840,000 | 48,840,000 | 2024-01-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 272,000 | 0.54 % | |
3 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1561282 | 47697618 | 60,000,000 | 60,000,000 | 59,850,000 | 59,850,000 | 59,163,000 | 59,163,000 | 59,163,000 | 59,163,000 | 2024-02-10 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 150,000 | 0.25 % | |
4 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bangkau Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1562282 | 47462197 | 100,000,000 | 99,844,500 | 99,789,000 | 99,789,000 | 98,623,500 | 98,623,500 | 98,623,500 | 98,623,500 | 2024-02-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 211,000 | 0.21 % | |
5 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1563282 | 47457992 | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 2024-02-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 151,000 | 0.38 % | |
6 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1633282 | 47698536 | 40,000,000 | 40,000,000 | 39,830,000 | 39,830,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-03-03 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.43 % | |
7 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1634282 | 47473061 | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-05 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 114,350 | 0.57 % | |
8 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Kandangan Kota (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1635282 | 47464819 | 45,000,000 | 44,955,000 | 44,844,000 | 44,844,000 | 44,011,500 | 44,011,500 | 44,011,500 | 44,011,500 | 2024-03-04 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 156,000 | 0.35 % | |
9 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyelidikan Tanah Pembangunan DIR Pulau Hijau Kec. Daha utara (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1636282 | 47472245 | 100,000,000 | 99,955,500 | 99,844,500 | 99,844,500 | 98,068,500 | 98,068,500 | 98,068,500 | 98,068,500 | 2024-03-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 155,500 | 0.16 % | |
10 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembersihan Raba/Sampah di Sungai (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1637282 | 47467897 | 25,000,000 | 25,000,000 | 24,900,000 | 24,900,000 | 24,420,000 | 24,420,000 | 24,420,000 | 24,420,000 | 2024-02-05 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 100,000 | 0.4 % | |
11 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado Rt.02 Kec. Loksado (Lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1638282 | 47463356 | 40,000,000 | 39,849,000 | 39,627,000 | 39,627,000 | 39,038,700 | 39,038,700 | 39,038,700 | 39,038,700 | 2024-02-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 373,000 | 0.93 % | |
12 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Padang Batung (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1639282 | 47468117 | 198,849,510 | 198,710,897 | 198,500,077 | 198,500,077 | 197,909,418 | 197,909,418 | 197,909,418 | 197,909,418 | 2024-02-03 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 349,433 | 0.18 % | |
13 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Padang Batung Rt.02 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1640282 | 47463177 | 20,000,000 | 20,000,000 | 19,925,000 | 19,925,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-21 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 75,000 | 0.38 % | |
14 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1641282 | 47702564 | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,052,000 | 59,052,000 | 59,052,000 | 59,052,000 | 2024-02-19 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 60,000 | 0.1 % | |
15 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1642282 | 47469966 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-12 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 20,000 | 0.1 % | |
16 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Amparaya Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1643282 | 47701808 | 80,000,000 | 80,000,000 | 79,982,501 | 79,982,501 | 79,032,000 | 79,032,000 | 79,032,000 | 79,032,000 | 2024-03-12 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 17,499 | 0.02 % | |
17 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Belakang KUA Desa Padang Batung Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1644282 | 47464280 | 25,000,000 | 24,999,999 | 24,885,000 | 24,885,000 | 24,642,000 | 24,642,000 | 24,642,000 | 24,642,000 | 2024-02-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 115,000 | 0.46 % | |
18 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DIR. Sianggantung (Pemeliharaan jaringan Irigasi Rawa dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1645282 | 47469610 | 198,791,250 | 198,653,035 | 198,597,535 | 198,597,535 | 198,014,563 | 198,014,562 | 198,014,562 | 198,014,562 | 2024-02-05 | CV Remona | 41.175.606.7-735.000 | 193,715 | 0.1 % | |
19 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Kelurahan Kandangan Kota RT.07 Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1646282 | 47463581 | 30,000,000 | 29,999,999 | 29,775,750 | 29,775,750 | 29,304,000 | 29,304,000 | 29,304,000 | 29,304,000 | 2024-03-05 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 224,250 | 0.75 % | |
20 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Angkinang (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1650282 | 47469486 | 198,849,510 | 198,711,769 | 198,401,130 | 198,401,130 | 197,785,080 | 197,785,079 | 197,785,079 | 197,785,079 | 2024-02-03 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 448,380 | 0.23 % | |
21 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Ulang Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1653282 | 47463859 | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,415,000 | 29,415,000 | 29,415,000 | 29,415,000 | 2024-03-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.42 % | |
22 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1654282 | 47467064 | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-11 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 50,000 | 0.25 % | |
23 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1655282 | 47466722 | 30,000,000 | 30,000,000 | 29,775,750 | 29,775,750 | 29,304,000 | 29,304,000 | 29,304,000 | 29,304,000 | 2024-03-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 224,250 | 0.75 % | |
24 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1656282 | 47698304 | 40,000,000 | 40,000,000 | 39,825,000 | 39,825,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-02-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 0.44 % | |
25 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Lumpangi Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1657282 | 47465274 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-10 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.5 % | |
26 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Simpur & Kalumpang (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1659282 | 47469165 | 168,957,100 | 168,655,519 | 168,624,340 | 168,624,340 | 167,515,672 | 167,515,672 | 167,515,672 | 167,515,672 | 2024-05-06 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 332,760 | 0.2 % | |
27 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Tayub Kec.Telaga langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1660282 | 49104206 | 80,000,000 | 80,000,000 | 79,890,000 | 79,890,000 | 78,810,000 | 78,810,000 | 78,810,000 | 78,810,000 | 2024-02-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 110,000 | 0.14 % | |
28 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1661282 | 47470705 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-14 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
29 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Daerah Irigasi Kupang Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1662282 | 47471563 | 20,000,000 | 20,000,000 | 19,880,000 | 19,880,000 | 19,314,000 | 19,314,000 | 19,314,000 | 19,314,000 | 2024-02-25 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 120,000 | 0.6 % | |
30 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1663282 | 47700046 | 60,000,000 | 60,000,000 | 59,778,800 | 59,778,800 | 59,052,000 | 59,052,000 | 59,052,000 | 59,052,000 | 2024-03-14 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 221,200 | 0.37 % | |
31 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1664282 | 47704255 | 60,000,000 | 60,000,000 | 59,850,000 | 59,850,000 | 59,274,000 | 59,274,000 | 59,274,000 | 59,274,000 | 2024-02-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 150,000 | 0.25 % | |
32 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Loksado RT.04 Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1665282 | 47464043 | 25,000,000 | 25,000,000 | 24,875,000 | 24,875,000 | 24,198,000 | 24,198,000 | 24,198,000 | 24,198,000 | 2024-02-18 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.5 % | |
33 | 2024 | Dinas Kesehatan | Jasa Apraisal Pengadaan Lahan Puskesmas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 1667282 | 48410960;48410961 | 120,000,000 | 59,973,000 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 59,692,403 | 2024-02-13 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 60,307,597 | 50.26 % | |
34 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI.Gumbil (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1668282 | 47469341 | 129,967,000 | 129,828,731 | 129,600,454 | 129,600,454 | 128,927,772 | 128,927,772 | 128,927,772 | 128,927,772 | 2024-03-04 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 366,546 | 0.28 % | |
35 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)), Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) dan Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1669282 | 47703758 | 80,000,000 | 80,000,000 | 79,850,000 | 79,850,000 | 79,032,000 | 79,032,000 | 79,032,000 | 79,032,000 | 2024-02-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 150,000 | 0.19 % | |
36 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1670282 | 47466560 | 20,000,000 | 20,000,000 | 19,953,000 | 19,953,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-11 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 47,000 | 0.23 % | |
37 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan DIR. Sungai Kajang Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1671282 | 47472081 | 50,000,000 | 49,839,000 | 49,728,000 | 49,728,000 | 48,840,000 | 48,840,000 | 48,840,000 | 48,840,000 | 2024-02-21 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 272,000 | 0.54 % | |
38 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DIR. Sungai Balum (Pemeliharaan jaringan Irigasi Rawa dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1672282 | 47469681 | 198,791,250 | 198,653,035 | 198,597,535 | 198,597,535 | 198,014,563 | 198,014,562 | 198,014,562 | 198,014,562 | 2024-02-03 | CV Remona | 41.175.606.7-735.000 | 193,715 | 0.1 % | |
39 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Baru Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1 (Tipe D)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1673282 | 47457794 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 131,000 | 0.66 % | |
40 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Halaman Polres HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 1675282 | 49342349 | 200,000,000 | 199,727,565 | 199,502,790 | 199,502,790 | 198,990,525 | 198,990,525 | 198,990,525 | 198,990,525 | 2024-02-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 497,210 | 0.25 % | |
41 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Hakurung Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1676282 | 47458328 | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 2024-02-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 151,000 | 0.38 % | |
42 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Amawang Kanan (DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1677282 | 48423395 | 189,070,000 | 189,006,605 | 188,729,105 | 188,729,105 | 188,507,105 | 188,507,105 | 188,507,105 | 188,507,105 | 2024-02-13 | cv. nurulillah | 50.826.160.9-733.000 | 340,895 | 0.18 % | |
43 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Muara Ulang | Pengadaan Langsung | Pekerjaan Konstruksi | 1678282 | 48423394 | 181,300,000 | 181,240,000 | 180,975,049 | 180,975,049 | 180,934,923 | 180,934,923 | 180,934,923 | 180,934,923 | 2024-03-27 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 324,951 | 0.18 % | |
44 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Wasah Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 1679282 | 48423392 | 189,070,000 | 188,073,788 | 187,897,008 | 187,897,008 | 187,538,033 | 187,538,000 | 187,538,000 | 187,538,000 | 2024-06-04 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 1,172,992 | 0.62 % | |
45 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Sungai Mandala | Pengadaan Langsung | Pekerjaan Konstruksi | 1680282 | 48423390 | 199,430,000 | 199,410,000 | 199,231,205 | 199,231,205 | 199,009,448 | 199,009,448 | 199,009,448 | 199,009,448 | 2024-03-26 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 198,795 | 0.1 % | |
46 | 2024 | Dinas Kesehatan | Rehabilitasi Pustu Karang Jawa | Pengadaan Langsung | Pekerjaan Konstruksi | 1681282 | 48423388 | 189,070,000 | 189,000,000 | 188,720,629 | 188,720,629 | 188,443,129 | 188,443,000 | 188,443,000 | 188,443,000 | 2024-04-04 | CV. KHALIF | 81.540.809.1-733.000 | 349,371 | 0.18 % | |
47 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Durian Rabung | Pengadaan Langsung | Pekerjaan Konstruksi | 1682282 | 48423386 | 119,658,000 | 119,286,445 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 119,032,863 | 2024-03-25 | CV. KHALIF | 81.540.809.1-733.000 | 625,137 | 0.52 % | |
48 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Mandala | Pengadaan Langsung | Pekerjaan Konstruksi | 1683282 | 48423384 | 150,220,000 | 150,177,000 | 150,123,376 | 150,123,376 | 150,123,376 | 150,123,000 | 150,123,000 | 150,123,000 | 2024-04-02 | cv. nurulillah | 50.826.160.9-733.000 | 96,624 | 0.06 % | |
49 | 2024 | Dinas Kesehatan | Gedung Kantor Sederhana ( Rehabilitasi Titian Pustu Bago Tanggul )(DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1684282 | 48423383 | 41,440,000 | 41,000,000 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 40,962,385 | 2024-03-14 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 477,615 | 1.15 % | |
50 | 2024 | Dinas Kesehatan | Rehabilitasi Pustu Tampang | Pengadaan Langsung | Pekerjaan Konstruksi | 1685282 | 48423382 | 119,658,000 | 119,526,881 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 119,476,577 | 2024-03-13 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 181,423 | 0.15 % | |
51 | 2024 | Dinas Kesehatan | Rehabilitasi poskesdes Hariti | Pengadaan Langsung | Pekerjaan Konstruksi | 1686282 | 48423376 | 119,658,000 | 119,645,000 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 118,446,953 | 2024-03-27 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 1,211,047 | 1.01 % | |
52 | 2024 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan (DAU) | Pengadaan Langsung | Pekerjaan Konstruksi | 1687282 | 48405532 | 199,430,000 | 199,275,000 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 199,055,530 | 2024-03-14 | FADWI UTAMA | 94.246.044.5-733.000 | 374,470 | 0.19 % | |
53 | 2024 | Dinas Kesehatan | Perbaikan Halaman Puskesmas Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 1688282 | 48404003 | 189,100,000 | 189,013,000 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 188,311,722 | 2024-03-25 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 788,278 | 0.42 % | |
54 | 2024 | Dinas Kesehatan | Rehabilitasi Puskesmas Batang Kulur | Pengadaan Langsung | Pekerjaan Konstruksi | 1689282 | 48403996 | 157,990,000 | 157,424,500 | 157,024,374 | 157,024,374 | 157,005,040 | 157,005,000 | 157,005,000 | 157,005,000 | 2024-07-15 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 965,626 | 0.61 % | |
55 | 2024 | Dinas Kesehatan | Rehabilitasi Ruang Rawat Inap PKM Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1690282 | 48403994 | 197,358,000 | 196,364,773 | 196,151,360 | 196,151,360 | 196,151,360 | 196,151,000 | 196,151,000 | 196,151,000 | 2024-06-05 | CV. KHALIF | 81.540.809.1-733.000 | 1,206,640 | 0.61 % | |
56 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Angkinang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1691282 | 47463027 | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-05 | cv.airlangga konsultan | 03.122.016.3-732.000 | 114,350 | 0.57 % | |
57 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1692282 | 47468979 | 198,849,510 | 198,710,205 | 198,499,381 | 198,499,381 | 197,821,703 | 197,821,703 | 197,821,703 | 197,821,703 | 2024-02-06 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 350,130 | 0.18 % | |
58 | 2024 | Dinas Kesehatan | Pengawasan Urugan Lahan PKM Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1694282 | 49438251 | 50,000,000 | 49,751,199 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 2024-06-27 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 383,000 | 0.77 % | |
59 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1695282 | 49437141 | 50,000,000 | 49,223,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 49,062,000 | 2024-03-25 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 938,000 | 1.88 % | |
60 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes (DAU) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1696282 | 49436983 | 70,000,000 | 69,999,930 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-02-22 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 181,000 | 0.26 % | |
61 | 2024 | Dinas Kesehatan | Pengawasan Poskesdes dan Pustu (DAK FISIK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1697282 | 49436694 | 45,000,000 | 45,000,000 | 44,999,955 | 44,999,955 | 44,844,000 | 44,844,000 | 44,844,000 | 44,844,000 | 2024-07-15 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 45 | 0 % | |
62 | 2024 | Dinas Kesehatan | Pengawasan Renovasi PKM Kaliring ( DAK FISIK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1698282 | 49435282 | 119,000,000 | 98,223,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 97,791,000 | 2024-03-25 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 21,209,000 | 17.82 % | |
63 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1699282 | 49434997 | 70,000,000 | 70,000,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-04-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 181,000 | 0.26 % | |
64 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Konsolidasi Perencanaan Interior Loby Polres HSS & Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1701282 | 49492573 | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,460,500 | 39,460,500 | 39,460,500 | 39,460,500 | 2024-02-21 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
65 | 2024 | RSUD Brigjen H. Hasan Basry | Audit Laporan keuangan BLUD | Pengadaan Langsung | Jasa Lainnya | 1702282 | 48652515 | 99,100,000 | 89,445,000 | 89,377,200 | 89,377,200 | 89,000,000 | 89,000,000 | 89,000,000 | 89,000,000 | 2024-02-07 | KANTOR AKUNTAN PUBLIK HARYONO, JUNIANTO DAN ANWAR | 01.882.064.7-003.000 | 9,722,800 | 9.81 % | |
66 | 2024 | Dinas Pertanian | Jasa Perencanaan Jalan Usaha Tani (JUT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1703282 | 48312620 | 79,800,000 | 79,800,000 | 79,698,000 | 79,698,000 | 79,587,000 | 79,587,000 | 79,587,000 | 79,587,000 | 2024-02-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 102,000 | 0.13 % | |
67 | 2024 | Dinas Pertanian | Jasa Perencanaan Renovasi Gedung Kantor Toilet/WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1704282 | 48313616 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-02-15 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 15,000 | 0.1 % | |
68 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Aula Kodim Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1705282 | 48096457 | 100,000,000 | 100,000,000 | 99,863,152 | 99,863,152 | 98,958,502 | 98,958,502 | 98,958,502 | 98,958,502 | 2024-02-25 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 136,848 | 0.14 % | |
69 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1706282 | 47465606 | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,425,000 | 19,425,000 | 19,425,000 | 19,425,000 | 2024-02-18 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 50,000 | 0.25 % | |
70 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1707282 | 47457683 | 60,000,000 | 59,940,000 | 59,829,000 | 59,829,000 | 58,885,500 | 58,885,500 | 58,885,500 | 58,885,500 | 2024-02-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 171,000 | 0.29 % | |
71 | 2024 | Dinas Kesehatan | Perencanaan Renovasi Gedung Kantor Dinas Kesehatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1708282 | 49732613 | 50,000,000 | 49,356,111 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 49,228,500 | 2024-02-13 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 771,500 | 1.54 % | |
72 | 2024 | RSUD Daha Sejahtera | Perencanaan Urugan Lahan Rumah Sakit (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1709282 | 49684546 | 50,000,000 | 49,999,999 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 2024-02-13 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 161,000 | 0.32 % | |
73 | 2024 | Dinas Kesehatan | Pengawasan Renovasi Gedung Kantor Dinas Kesehatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1710282 | 49732740 | 50,000,000 | 49,751,202 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 49,617,000 | 2024-10-08 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 383,000 | 0.77 % | |
74 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1711282 | 48097924 | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,067,500 | 99,067,500 | 99,067,500 | 99,067,500 | 2024-03-20 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 322,000 | 0.32 % | |
75 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Perpustakaan SDN SUNGAI KALI dan Ruang Guru SDN MADANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1712282 | 48540111 | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,771,300 | 39,771,300 | 0 | 39,771,300 | 2024-02-20 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 111,000 | 0.28 % | |
76 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Tempat Ibadah SDN Pandulangan (Padang Batung) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1713282 | 48540241 | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-02-20 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 111,000 | 0.56 % | |
77 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Utilitas (Halaman & Pagar) Kec.Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1714282 | 48540226 | 80,000,000 | 80,000,000 | 79,778,000 | 79,778,000 | 79,675,800 | 79,675,800 | 0 | 79,675,800 | 2024-02-20 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 222,000 | 0.28 % | |
78 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Perpustakaan, Lab.Komputer,UKS) SDN 1 Batang Kulur Kiri (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1715282 | 48540108 | 90,000,000 | 90,000,000 | 89,889,000 | 89,889,000 | 89,810,100 | 89,810,100 | 89,810,100 | 89,810,100 | 2024-02-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.12 % | |
79 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN Rehab Kelas (SDN 2 SUNGAI JARUM, ANJIRAN SUNGAI RAYA, TAMBAK PIPII, MANDAPAI, 2 TANITI, KARANG BULAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1716282 | 48540099 | 100,000,000 | 100,000,000 | 99,833,500 | 99,833,500 | 99,733,500 | 99,733,500 | 99,733,500 | 99,733,500 | 2024-02-17 | Wing Rastafarindo | 03.282.590.3-732.000 | 166,500 | 0.17 % | |
80 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Ruang Kelas kec. Kandangan, Simpur dan Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1717282 | 48540117 | 100,000,000 | 100,000,000 | 99,889,000 | 99,889,000 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-02-17 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.11 % | |
81 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN PEMB.SARAPRAS UTILITAS (SDN TUMBUKAN BANYU, 1 TIBUNG RAYA, AMAWANG KIRI MUKA, 3 BAGO TANGGUL, BANJARBARU, ANGKINANG, PANTAI ULIN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1718282 | 48540125 | 100,000,000 | 100,000,000 | 99,778,000 | 99,778,000 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2024-02-17 | Wing Rastafarindo | 03.282.590.3-732.000 | 222,000 | 0.22 % | |
82 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Pagar dan Urugan Lahan Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1725282 | 48091178 | 50,000,000 | 50,000,000 | 49,850,100 | 49,850,100 | 49,339,500 | 49,339,500 | 49,339,500 | 49,339,500 | 2024-03-23 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 149,900 | 0.3 % | |
83 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 Pakuan Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1726282 | 46875340 | 137,200,000 | 137,180,281 | 137,016,001 | 137,016,001 | 136,932,243 | 136,932,243 | 0 | 136,932,243 | 2024-02-23 | cv. nurulillah | 50.826.160.9-733.000 | 183,999 | 0.13 % | |
84 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Longawang, Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1727282 | 46981179 | 151,200,000 | 151,176,559 | 150,926,797 | 150,926,797 | 150,815,438 | 150,815,438 | 0 | 150,815,438 | 2024-02-24 | cv. nurulillah | 50.826.160.9-733.000 | 273,203 | 0.18 % | |
85 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1728282 | 48091685 | 100,000,000 | 100,000,000 | 99,600,039 | 99,600,039 | 98,925,975 | 98,925,975 | 98,925,975 | 98,925,975 | 2024-03-31 | CV. Sembilan Dua Teknik Konsultan | 81.763.047.8-731.000 | 399,961 | 0.4 % | |
86 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Logistik/Samapta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1729282 | 48093661 | 30,000,000 | 30,000,000 | 29,870,100 | 29,870,100 | 29,470,500 | 29,470,500 | 29,470,500 | 29,470,500 | 2024-03-23 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 129,900 | 0.43 % | |
87 | 2024 | RSUD Daha Sejahtera | Belanja Jasa Tenaga Ahli (BLUD) - KAP BLUD | Pengadaan Langsung | Jasa Lainnya | 1732282 | 49984077 | 50,000,000 | 36,907,500 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 35,000,000 | 2024-02-27 | KAP GIDEON ADI DAN REKAN | 03.215.027.8-615.001 | 15,000,000 | 30 % | |
88 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan WC (SDN 1 SIRIH HULU, SDN 1 TALUK LABAK, SDN GUMBIL, SDN HAMAYUNG UTARA ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1733282 | 50028037 | 35,000,000 | 34,999,998 | 34,800,000 | 34,800,000 | 34,743,000 | 34,743,000 | 0 | 34,743,000 | 2024-02-26 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 200,000 | 0.57 % | |
89 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1734282 | 48108198 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,644,958 | 19,644,958 | 19,644,958 | 19,644,958 | 2024-04-17 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 20,000 | 0.1 % | |
90 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Jalan Ruas Simpur - SP. 3 Muara Paring Agung - Taal Batang Kulur Kec. Simpur/Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1735282 | 50096033 | 200,000,000 | 199,965,000 | 199,850,000 | 199,850,000 | 199,800,050 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-02-27 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 150,000 | 0.08 % | |
91 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 1736282 | 47469266 | 198,849,510 | 198,710,932 | 198,500,260 | 198,500,260 | 197,978,549 | 197,978,549 | 197,978,549 | 197,978,549 | 2024-03-04 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 349,250 | 0.18 % | |
92 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1738282 | 48985570 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,602,600 | 19,602,600 | 19,602,600 | 19,602,600 | 2024-03-31 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
93 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1739282 | 48985278 | 20,000,000 | 20,000,000 | 19,977,800 | 19,977,800 | 19,635,900 | 19,635,900 | 19,635,900 | 19,635,900 | 2024-03-31 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 22,200 | 0.11 % | |
94 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1741282 | 48985507 | 20,000,000 | 20,000,000 | 19,977,800 | 19,977,800 | 19,635,900 | 19,635,900 | 19,635,900 | 19,635,900 | 2024-03-31 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 22,200 | 0.11 % | |
95 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 1 SAMUDA | Pengadaan Langsung | Pekerjaan Konstruksi | 1742282 | 46873360 | 168,000,000 | 167,982,626 | 167,798,935 | 167,798,935 | 167,693,485 | 167,693,485 | 0 | 167,693,485 | 2024-02-28 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 201,065 | 0.12 % | |
96 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Badaun, Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 1743282 | 46873651 | 165,200,000 | 165,057,796 | 164,827,260 | 164,827,260 | 164,709,600 | 164,709,600 | 0 | 164,709,600 | 2024-02-28 | CV. KHALIF | 81.540.809.1-733.000 | 372,740 | 0.23 % | |
97 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 2 SUNGAI JARUM | Pengadaan Langsung | Pekerjaan Konstruksi | 1744282 | 46997543 | 170,000,000 | 169,997,128 | 169,802,069 | 169,802,069 | 169,711,049 | 169,711,049 | 0 | 169,711,049 | 2024-02-28 | FADWI UTAMA | 94.246.044.5-733.000 | 197,931 | 0.12 % | |
98 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Pramuka Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1745282 | 48098358 | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,349,500 | 39,349,500 | 39,349,500 | 39,349,500 | 2024-03-17 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
99 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Pos Polisi di Kecamatan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1746282 | 48092257 | 20,000,000 | 20,000,000 | 19,846,800 | 19,846,800 | 19,447,200 | 19,447,200 | 19,447,200 | 19,447,200 | 2024-03-19 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 153,200 | 0.77 % | |
100 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1747282 | 48099326 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
101 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama TNI AD Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1748282 | 48100527 | 50,000,000 | 50,000,000 | 49,852,302 | 49,852,302 | 49,284,000 | 49,284,000 | 49,284,000 | 49,284,000 | 2024-03-20 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 147,698 | 0.3 % | |
102 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1749282 | 48104132 | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,644,725 | 19,644,725 | 19,644,725 | 19,644,725 | 2024-03-31 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,700 | 0.49 % | |
103 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1750282 | 48104285 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
104 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1751282 | 48104818 | 20,000,000 | 20,000,000 | 19,970,000 | 19,970,000 | 19,692,500 | 19,692,500 | 19,692,500 | 19,692,500 | 2024-04-01 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 30,000 | 0.15 % | |
105 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1752282 | 48104862 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,611,350 | 19,611,350 | 19,611,350 | 19,611,350 | 2024-03-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 150,000 | 0.75 % | |
106 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 2 Samuda Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 1753282 | 46873572 | 168,000,000 | 167,984,675 | 167,827,593 | 167,827,593 | 167,731,929 | 167,731,929 | 0 | 167,731,929 | 2024-03-04 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 172,407 | 0.1 % | |
107 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1754282 | 48988652 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,722,500 | 19,722,500 | 19,722,500 | 19,722,500 | 2024-04-01 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.28 % | |
108 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Perpustakaan SDN Sungai Kali | Pengadaan Langsung | Pekerjaan Konstruksi | 1755282 | 46871132 | 200,000,000 | 199,942,776 | 199,853,976 | 199,853,976 | 199,747,543 | 199,747,543 | 0 | 199,747,543 | 2024-03-01 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 146,024 | 0.07 % | |
109 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN SDN 3 BAGO TANGGUL | Pengadaan Langsung | Pekerjaan Konstruksi | 1756282 | 46980944 | 190,000,000 | 189,990,566 | 189,902,476 | 189,902,476 | 189,806,414 | 189,806,414 | 0 | 189,806,414 | 2024-03-06 | CV. YONIA | 02.089.778.1-733.000 | 97,524 | 0.05 % | |
110 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1757282 | 48103837 | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,644,725 | 19,644,725 | 19,644,725 | 19,644,725 | 2024-03-31 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,700 | 0.49 % | |
111 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Bakarung Tengah (Angkinang) | Pengadaan Langsung | Pekerjaan Konstruksi | 1758282 | 46981116 | 170,800,000 | 170,781,764 | 170,714,880 | 170,714,880 | 170,627,745 | 170,627,745 | 0 | 170,627,745 | 2024-04-19 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 85,120 | 0.05 % | |
112 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Balah Paikat DAHA UTARA | Pengadaan Langsung | Pekerjaan Konstruksi | 1759282 | 46874625 | 168,000,000 | 167,960,513 | 167,924,801 | 167,924,801 | 167,791,601 | 167,791,601 | 0 | 167,791,601 | 2024-02-29 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 75,199 | 0.04 % | |
113 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Kambang Basar | Pengadaan Langsung | Pekerjaan Konstruksi | 1760282 | 46981156 | 151,200,000 | 151,178,577 | 151,088,192 | 151,088,192 | 150,932,792 | 150,932,792 | 0 | 150,932,792 | 2024-02-29 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 111,808 | 0.07 % | |
114 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN KARANG BULAN | Pengadaan Langsung | Pekerjaan Konstruksi | 1761282 | 46998453 | 190,000,000 | 189,861,933 | 189,665,117 | 189,665,117 | 189,515,662 | 189,515,662 | 0 | 189,515,662 | 2024-03-01 | CV. KHALIF | 81.540.809.1-733.000 | 334,883 | 0.18 % | |
115 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN MUARA ULANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1762282 | 46998861 | 198,912,000 | 198,752,261 | 198,473,111 | 198,473,111 | 198,397,034 | 198,397,034 | 0 | 198,397,034 | 2024-04-26 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 438,889 | 0.22 % | |
116 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN PANGLIMA DAMBUNG | Pengadaan Langsung | Pekerjaan Konstruksi | 1763282 | 46980881 | 140,000,000 | 139,987,118 | 139,910,528 | 139,910,528 | 139,852,808 | 139,852,808 | 0 | 139,852,808 | 2024-03-06 | CV. BUANA PRIMA MANDIRI | 02.675.388.9-733.000 | 89,472 | 0.06 % | |
117 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 1764282 | 46874869 | 165,200,000 | 165,193,314 | 165,020,201 | 165,020,201 | 164,931,401 | 164,931,401 | 0 | 164,931,401 | 2024-03-13 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 179,799 | 0.11 % | |
118 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN TUMBUKAN BANYU | Pengadaan Langsung | Pekerjaan Konstruksi | 1765282 | 46874947 | 170,000,000 | 169,854,328 | 169,774,981 | 169,774,981 | 169,668,199 | 169,668,199 | 0 | 169,668,199 | 2024-02-29 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 225,019 | 0.13 % | |
119 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1766282 | 50153077 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-03-01 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 131,000 | 0.66 % | |
120 | 2024 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Parkir Pasar Senin Negara Blok E | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1767282 | 50153098 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-03-01 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 242,000 | 1.21 % | |
121 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Perencanaan Rehab Balai Penyuluhan KB Kecamatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1768282 | 48397840 | 14,000,000 | 14,000,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 13,764,000 | 2024-02-28 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 236,000 | 1.69 % | |
122 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SD 2024 (SDN MALUTU dan SDN 2 KAPUH TENGAH) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1769282 | 48541465 | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-18 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.14 % | |
123 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Perpustakaan SDN SUNGAI KALI dan Ruang Guru SDN MADANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1770282 | 48541433 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-14 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
124 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Tempat Ibadah SDN Pandulangan Kec. padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1772282 | 48541500 | 15,000,000 | 14,999,996 | 14,900,000 | 14,900,000 | 14,874,000 | 14,874,000 | 0 | 14,874,000 | 2024-03-14 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.67 % | |
125 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas (Halaman & Pagar) Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1773282 | 48541490 | 70,000,000 | 70,000,000 | 69,944,500 | 69,944,500 | 69,874,500 | 69,874,500 | 0 | 69,874,500 | 2024-03-04 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 55,500 | 0.08 % | |
126 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas (Halaman & Pagar) SD Kec Daha Utara, Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1774282 | 48541488 | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-14 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,000 | 0.14 % | |
127 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Utilitas Halaman dan Pagar SD Kec Telaga langsat, Kalumpang, Angkinang, Padang batung dan Kec Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1775282 | 48541492 | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.16 % | |
128 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Perpustakaan, Lab.Komputer,UKS) SDN 1 Batang Kulur Kiri (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1776282 | 48541451 | 70,000,000 | 70,000,000 | 69,900,000 | 69,900,000 | 69,819,000 | 69,819,000 | 0 | 69,819,000 | 2024-03-19 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.14 % | |
129 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN Rehab Kelas (SDN 2 SUNGAI JARUM, ANJIRAN SUNGAI RAYA, TAMBAK PIPII, MANDAPAI, 2 TANITI, KARANG BULAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1777282 | 48541405 | 90,000,000 | 90,000,000 | 89,900,000 | 89,900,000 | 89,799,000 | 89,799,000 | 0 | 89,799,000 | 2024-03-04 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.11 % | |
130 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas Loksado, Daha Utara , Daha Barat dan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1778282 | 48541458 | 80,000,000 | 80,000,000 | 79,900,000 | 79,900,000 | 79,809,000 | 79,809,000 | 0 | 79,809,000 | 2024-03-19 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.12 % | |
131 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas SDN PARIANGAN KEC.PADANG BATUNG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1779282 | 48541460 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-18 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
132 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Ruang Kelas kec. Kandangan, Simpur dan Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1780282 | 48541453 | 80,000,000 | 80,000,000 | 79,900,000 | 79,900,000 | 79,809,000 | 79,809,000 | 0 | 79,809,000 | 2024-03-19 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.12 % | |
133 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN PEMB.SARAPRAS UTILITAS (SDN TUMBUKAN BANYU, 1 TIBUNG RAYA, AMAWANG KIRI MUKA, 3 BAGO TANGGUL, BANJARBARU, ANGKINANG, PANTAI ULIN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1781282 | 48541423 | 90,000,000 | 90,000,000 | 89,900,000 | 89,900,000 | 89,799,000 | 89,799,000 | 0 | 89,799,000 | 2024-03-18 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.11 % | |
134 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1783282 | 50237309 | 25,000,000 | 24,672,000 | 24,649,770 | 24,649,770 | 24,594,270 | 24,594,270 | 100 | 24,594,270 | 2024-03-05 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 350,230 | 1.4 % | |
135 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan Kalaka Indah dan sekitarnya Desa Tibung Raya Kec.Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1785282 | 50237178 | 25,000,000 | 24,672,000 | 24,571,848 | 24,571,848 | 24,527,448 | 24,527,448 | 100 | 24,527,448 | 2024-03-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 428,152 | 1.71 % | |
136 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya (600x2 m) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1787282 | 50081915 | 30,000,000 | 29,646,000 | 29,535,493 | 29,535,493 | 29,513,293 | 29,513,293 | 100 | 29,513,293 | 2024-04-19 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 464,507 | 1.55 % | |
137 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1788282 | 50237134 | 20,000,000 | 19,697,000 | 19,680,300 | 19,680,300 | 19,624,800 | 19,624,800 | 100 | 19,624,800 | 2024-03-05 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 319,700 | 1.6 % | |
138 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1789282 | 50081453 | 100,000,000 | 99,738,000 | 99,386,514 | 99,386,514 | 99,331,014 | 99,331,014 | 100 | 99,331,014 | 2024-03-10 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 613,486 | 0.61 % | |
139 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1790282 | 50081873 | 60,000,000 | 59,944,000 | 59,776,830 | 59,776,830 | 59,754,630 | 59,754,630 | 100 | 59,754,630 | 2024-03-05 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 223,170 | 0.37 % | |
140 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1799282 | 50240583 | 15,000,000 | 14,949,000 | 14,936,715 | 14,936,715 | 14,881,215 | 14,881,215 | 100 | 14,881,215 | 2024-03-05 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 63,285 | 0.42 % | |
141 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Kel. Jambu Hilir, RT 04 Kel. Kandangan Kota dan RT 01 Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1800282 | 50410940 | 45,000,000 | 44,849,000 | 44,682,546 | 44,682,546 | 44,610,345 | 44,610,345 | 100 | 44,610,345 | 2024-04-18 | cv.nawasena konsultan | 62.243.237.5-731.000 | 317,454 | 0.71 % | |
142 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tabihi, Desa Durian Rabung dan Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1801282 | 50417596 | 45,000,000 | 44,622,000 | 44,584,260 | 44,584,260 | 44,417,760 | 44,417,760 | 100 | 44,417,760 | 2024-03-05 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 415,740 | 0.92 % | |
143 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan dan RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1802282 | 50411148 | 30,000,000 | 29,447,000 | 29,268,758 | 29,268,758 | 29,224,358 | 29,224,358 | 100 | 29,224,358 | 2024-03-19 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 731,243 | 2.44 % | |
144 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 02 Desa Gambah Luar Muka dan Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1803282 | 50414339 | 30,000,000 | 29,447,000 | 29,336,154 | 29,336,154 | 29,291,754 | 29,291,754 | 100 | 29,291,754 | 2024-03-19 | Wing Rastafarindo | 03.282.590.3-732.000 | 663,846 | 2.21 % | |
145 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 dan RT 03 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1804282 | 50417776 | 30,000,000 | 29,447,000 | 29,336,154 | 29,336,154 | 29,280,654 | 29,280,654 | 100 | 29,280,654 | 2024-04-19 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 663,846 | 2.21 % | |
146 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Bakarung dan Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1805282 | 50417232 | 30,000,000 | 29,447,000 | 29,280,654 | 29,280,654 | 29,255,160 | 29,255,160 | 100 | 29,255,160 | 2024-04-19 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 719,346 | 2.4 % | |
147 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1806282 | 50416752 | 75,000,000 | 74,522,000 | 74,368,890 | 74,368,890 | 74,291,190 | 74,291,190 | 100 | 74,291,190 | 2024-03-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 631,110 | 0.84 % | |
148 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 08 Kel. Kandangan Utara dan RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1807282 | 50416630 | 30,000,000 | 29,447,000 | 29,196,552 | 29,196,552 | 29,141,052 | 29,141,052 | 100 | 29,141,052 | 2024-03-26 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 803,448 | 2.68 % | |
149 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan (Halaman Paving Block) SMP Negeri 2 Padang Batung dan SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1808282 | 48540254 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,870,100 | 29,870,100 | 0 | 29,870,100 | 2024-03-10 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.33 % | |
150 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Ruang Kelas Baru SMP SMP Negeri 4 Daha Utara dan SMP Negeri 5 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1809282 | 48540278 | 65,000,000 | 64,999,991 | 64,889,999 | 64,889,999 | 64,824,000 | 64,824,000 | 0 | 64,824,000 | 2024-03-10 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 110,001 | 0.17 % | |
151 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado dan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1810282 | 48540260 | 25,000,000 | 24,999,997 | 24,900,000 | 24,900,000 | 24,864,000 | 24,864,000 | 0 | 24,864,000 | 2024-03-10 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.4 % | |
152 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Kelas SMP Negeri 4 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1811282 | 48540245 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-03-10 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.5 % | |
153 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang dan Perencanaan Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1812282 | 48540276 | 45,000,000 | 44,999,999 | 44,900,000 | 44,900,000 | 44,844,000 | 44,844,000 | 0 | 44,844,000 | 2024-03-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,001 | 0.22 % | |
154 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN Balimau | Pengadaan Langsung | Pekerjaan Konstruksi | 1813282 | 46981131 | 151,200,000 | 151,174,182 | 151,000,447 | 151,000,447 | 150,893,136 | 150,893,136 | 0 | 150,893,136 | 2024-03-08 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 199,553 | 0.13 % | |
155 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 MANDALA (Telaga Langsat) | Pengadaan Langsung | Pekerjaan Konstruksi | 1814282 | 46875052 | 137,200,000 | 137,192,734 | 137,088,895 | 137,088,895 | 137,033,395 | 137,033,395 | 0 | 137,033,395 | 2024-04-02 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 111,105 | 0.08 % | |
156 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN 1 Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 1815282 | 46873481 | 168,000,000 | 167,990,640 | 167,802,724 | 167,802,724 | 167,702,047 | 167,702,047 | 0 | 167,702,047 | 2024-03-08 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 197,276 | 0.12 % | |
157 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN 1 TIBUNG RAYA | Pengadaan Langsung | Pekerjaan Konstruksi | 1816282 | 46875857 | 150,000,000 | 149,978,150 | 149,774,941 | 149,774,941 | 149,675,818 | 149,675,818 | 0 | 149,675,818 | 2024-03-08 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 225,059 | 0.15 % | |
158 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN AMAWANG KIRI MUKA | Pengadaan Langsung | Pekerjaan Konstruksi | 1817282 | 46981037 | 150,000,000 | 149,998,066 | 149,712,954 | 149,712,954 | 149,612,343 | 149,612,343 | 0 | 149,612,343 | 2024-03-13 | FADWI UTAMA | 94.246.044.5-733.000 | 287,047 | 0.19 % | |
159 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Muning Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 1818282 | 46874732 | 170,800,000 | 170,799,373 | 170,611,036 | 170,611,036 | 170,496,255 | 170,496,255 | 0 | 170,496,255 | 2024-03-08 | CV. MAHANG RAYA | 75.871.426.5-733.000 | 188,964 | 0.11 % | |
160 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN Padang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1819282 | 46980975 | 159,600,000 | 159,572,161 | 159,300,205 | 159,300,205 | 159,185,098 | 159,185,098 | 0 | 159,185,098 | 2024-03-08 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 299,795 | 0.19 % | |
161 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN Pandan Sari | Pengadaan Langsung | Pekerjaan Konstruksi | 1820282 | 46981016 | 151,200,000 | 151,191,867 | 151,149,576 | 151,149,576 | 151,066,659 | 151,066,659 | 0 | 151,066,659 | 2024-03-08 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 50,424 | 0.03 % | |
162 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 1821282 | 46980905 | 168,000,000 | 167,996,564 | 167,753,882 | 167,753,882 | 167,664,250 | 167,664,250 | 0 | 167,664,250 | 2024-03-08 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 246,118 | 0.15 % | |
163 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Paving SDN THOBA | Pengadaan Langsung | Pekerjaan Konstruksi | 1822282 | 46980915 | 148,400,000 | 148,380,948 | 148,195,838 | 148,195,838 | 148,107,038 | 148,107,038 | 0 | 148,107,038 | 2024-03-08 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 204,162 | 0.14 % | |
164 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang guru dan Kepsek SDN 2 MADANG Padang batung) | Pengadaan Langsung | Pekerjaan Konstruksi | 1823282 | 46869589 | 200,000,000 | 199,915,544 | 199,776,794 | 199,776,794 | 199,667,255 | 199,667,255 | 0 | 199,667,255 | 2024-03-13 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 223,206 | 0.11 % | |
165 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 4 Jambu Hilir Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 1824282 | 46997811 | 198,912,000 | 198,817,674 | 198,706,674 | 198,706,674 | 198,595,861 | 198,595,861 | 0 | 198,595,861 | 2024-03-20 | cv. nurulillah | 50.826.160.9-733.000 | 205,326 | 0.1 % | |
166 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1825282 | 47472611 | 20,000,000 | 20,000,000 | 19,885,650 | 19,885,650 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-03-11 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 114,350 | 0.57 % | |
167 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SDN Bajayau Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 1826282 | 46874079 | 165,200,000 | 165,041,539 | 164,986,039 | 164,986,039 | 164,892,383 | 164,892,383 | 0 | 164,892,383 | 2024-03-22 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 213,961 | 0.13 % | |
168 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN HAMAK | Pengadaan Langsung | Pekerjaan Konstruksi | 1828282 | 46980952 | 137,200,000 | 137,197,556 | 137,142,056 | 137,142,056 | 137,069,471 | 137,069,471 | 0 | 137,069,471 | 2024-03-20 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 57,944 | 0.04 % | |
169 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Kelas SMP Negeri 1 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 1829282 | 47051893 | 195,804,000 | 195,799,467 | 195,533,576 | 195,137,363 | 195,087,413 | 195,087,413 | 0 | 195,087,413 | 2024-03-23 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 270,424 | 0.14 % | |
170 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang Ruang Kelas SMP Negeri 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1830282 | 47051992 | 168,350,000 | 168,344,429 | 168,266,729 | 168,266,729 | 168,175,154 | 168,175,154 | 0 | 168,175,154 | 2024-03-23 | CV.PUTRA LIDYS | 02.043.146.6-731.000 | 83,271 | 0.05 % | |
171 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan DAK Fisik SMP Negeri 1 Kandangan, SMP Negeri 3 Kandangan, SMP Negeri 1 Daha Utara, dan SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1831282 | 48540103 | 90,000,000 | 90,000,000 | 89,754,600 | 89,754,600 | 89,688,000 | 89,688,000 | 0 | 89,688,000 | 2024-03-23 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 245,400 | 0.27 % | |
172 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan DAK Fisik Tahun 2024 Kec. Loksado dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1832282 | 48540274 | 90,000,000 | 90,000,000 | 89,665,800 | 89,665,800 | 89,577,000 | 89,577,000 | 0 | 89,577,000 | 2024-03-23 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 334,200 | 0.37 % | |
173 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran Ruas Jalan Bamban Selatan - Pakuan Timur Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1834282 | 50579352 | 35,000,000 | 34,991,622 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
174 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1835282 | 50464092 | 20,000,000 | 19,907,000 | 19,879,268 | 19,879,268 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-04-17 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 120,733 | 0.6 % | |
175 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Jembatan Wawaran Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1837282 | 50628387 | 80,000,000 | 79,991,300 | 79,491,540 | 79,491,540 | 79,400,000 | 79,400,000 | 79,400,000 | 79,400,000 | 2024-05-01 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 508,460 | 0.64 % | |
176 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Ruas Jalan SMAN Negara Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1838282 | 50442142 | 80,000,000 | 79,991,300 | 79,347,462 | 79,347,462 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2024-03-19 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 652,538 | 0.82 % | |
177 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Desa Jambu Hulu Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1841282 | 50575126 | 35,000,000 | 34,991,600 | 34,852,872 | 34,852,872 | 34,700,000 | 34,700,000 | 34,700,000 | 34,700,000 | 2024-05-01 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 147,128 | 0.42 % | |
178 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Gantung Desa Jambu Hulu - Desa Durian Rabung Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1844282 | 50629010 | 60,000,000 | 59,870,700 | 59,369,460 | 59,369,460 | 59,300,000 | 59,300,000 | 59,300,000 | 59,300,000 | 2024-05-01 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 630,540 | 1.05 % | |
179 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Desa Bumi Berkat Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1845282 | 50576028 | 35,000,000 | 34,991,600 | 34,797,372 | 34,797,372 | 34,700,000 | 34,700,000 | 34,700,000 | 34,700,000 | 2024-03-25 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 202,628 | 0.58 % | |
180 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rekonstruksi Ruas Jalan Baru - Ds. Bajayau Kec. Daha Barat (lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1846282 | 50549231 | 60,000,000 | 59,870,700 | 59,720,220 | 59,720,220 | 59,650,000 | 59,650,000 | 59,650,000 | 59,650,000 | 2024-03-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 279,780 | 0.47 % | |
181 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Ruas Jalan Angkinang - Telaga Langsat Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1847282 | 50463544 | 50,000,000 | 49,886,000 | 49,653,075 | 49,653,075 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-03-20 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 346,925 | 0.69 % | |
182 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Siring Pasangan Batu Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1848282 | 50577876 | 35,000,000 | 34,991,600 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
183 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Simpur - SP.3 Paring Agung Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1849282 | 50550936 | 60,000,000 | 59,870,700 | 59,552,055 | 59,552,055 | 59,500,000 | 59,500,000 | 59,500,000 | 59,500,000 | 2024-04-26 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 447,945 | 0.75 % | |
184 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembuatan Saluran Drainase Ruas Jalan Hamalau - Ganda Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1850282 | 50573792 | 50,000,000 | 49,886,000 | 49,636,252 | 49,636,252 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-03-25 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 363,748 | 0.73 % | |
185 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Galuntang - Tayub Desa Madang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1851282 | 50464364 | 80,000,000 | 79,991,300 | 79,629,735 | 79,629,735 | 79,600,000 | 79,600,000 | 79,600,000 | 79,600,000 | 2024-03-20 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 370,265 | 0.46 % | |
186 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Kandangan Hulu - Tabihi Kec.Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1852282 | 50465922 | 50,000,000 | 49,886,000 | 49,830,502 | 49,830,502 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-04-17 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 169,498 | 0.34 % | |
187 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Telaga Banta Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1855282 | 50464946 | 50,000,000 | 49,886,000 | 49,691,752 | 49,691,752 | 49,500,000 | 49,500,000 | 49,500,000 | 49,500,000 | 2024-04-17 | cv.nawasena konsultan | 62.243.237.5-731.000 | 308,248 | 0.62 % | |
188 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Ruas Angkinang Selatan - Tawia - Wawaran Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1856282 | 50551470 | 80,000,000 | 79,991,300 | 79,901,796 | 79,901,796 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-03-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 98,204 | 0.12 % | |
189 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Ruas Jalan Sungai Kalang - Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1857282 | 50548629 | 100,000,000 | 99,937,700 | 99,887,846 | 99,887,846 | 99,400,000 | 99,400,000 | 99,400,000 | 99,400,000 | 2024-05-03 | Wiyasa Drawana | 80.902.072.0-731.000 | 112,155 | 0.11 % | |
190 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Manggis (Desa Baru - Desa Asam) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1858282 | 50548319 | 60,000,000 | 59,870,700 | 59,800,784 | 59,800,784 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-03-28 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 199,216 | 0.33 % | |
191 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1859282 | 50627663 | 35,000,000 | 34,991,600 | 34,936,122 | 34,936,122 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 63,878 | 0.18 % | |
192 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Ruas Jalan Gg. Bidan RT 03 Desa Tambak Bitin Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1861282 | 50447051 | 35,000,000 | 34,991,600 | 34,959,450 | 34,959,450 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-03-19 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 40,550 | 0.12 % | |
193 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Haratai 3 Kec. Loksado (Bertahap) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1862282 | 50550120 | 60,000,000 | 59,870,700 | 59,796,810 | 59,796,810 | 59,650,000 | 59,650,000 | 59,650,000 | 59,650,000 | 2024-03-15 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 203,190 | 0.34 % | |
194 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Menuju Mesjid Noor Desa Pagar Haur Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1864282 | 50548807 | 50,000,000 | 49,886,000 | 49,675,275 | 49,675,275 | 49,600,000 | 49,600,000 | 49,600,000 | 49,600,000 | 2024-04-26 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 324,725 | 0.65 % | |
195 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Kalumpang - Baruh Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1865282 | 50649889 | 60,000,000 | 59,870,700 | 59,824,560 | 59,824,560 | 59,600,000 | 59,600,000 | 59,600,000 | 59,600,000 | 2024-03-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,440 | 0.29 % | |
196 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Papancan Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1866282 | 50549067 | 80,000,000 | 79,991,300 | 79,629,735 | 79,629,735 | 79,600,000 | 79,600,000 | 79,600,000 | 79,600,000 | 2024-03-20 | PT. WINAYA KONTEKS KHARISMA | 01.517.846.0-731.000 | 370,265 | 0.46 % | |
197 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Bajayau - Bajayau Tengah Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1870282 | 50629844 | 50,000,000 | 49,886,000 | 49,222,950 | 49,222,950 | 49,200,000 | 49,200,000 | 49,200,000 | 49,200,000 | 2024-03-20 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 777,050 | 1.55 % | |
198 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Stuktur Ruas Jalan Goha - Ds. Amawang Kanan Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1871282 | 50448240 | 60,000,000 | 59,870,700 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-03-19 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
199 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Ruas Jalan Siang Gantung - Ds. Baru Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1872282 | 50649706 | 50,000,000 | 49,886,000 | 49,472,700 | 49,472,700 | 49,400,000 | 49,400,000 | 49,400,000 | 49,400,000 | 2024-03-21 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 527,300 | 1.05 % | |
200 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Ruang Laboratorium Komputer beserta perabotnya SMP Negeri 1 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1875282 | 48541520 | 65,000,000 | 64,999,991 | 64,579,800 | 64,579,800 | 64,535,400 | 64,535,400 | 0 | 64,535,400 | 2024-03-20 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 420,200 | 0.65 % | |
201 | 2024 | Dinas Ketahanan Pangan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1877282 | 50797106 | 10,000,000 | 10,000,000 | 9,934,500 | 9,934,500 | 9,879,000 | 9,879,000 | 9,879,000 | 9,879,000 | 2024-03-18 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 65,500 | 0.66 % | |
202 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN PAMUJAAN | Pengadaan Langsung | Pekerjaan Konstruksi | 1878282 | 46999057 | 182,336,000 | 182,297,643 | 182,153,529 | 182,153,529 | 182,049,352 | 182,049,352 | 0 | 182,049,352 | 2024-03-21 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 182,471 | 0.1 % | |
203 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN MANDAPAI | Pengadaan Langsung | Pekerjaan Konstruksi | 1880282 | 46998545 | 190,000,000 | 189,942,922 | 189,820,822 | 189,820,822 | 189,711,221 | 189,711,221 | 0 | 189,711,221 | 2024-04-17 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 179,178 | 0.09 % | |
204 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SDN Pandulangan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1881282 | 46981229 | 182,336,000 | 182,191,232 | 181,917,921 | 181,917,921 | 181,818,021 | 181,818,021 | 0 | 181,818,021 | 2024-03-23 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 418,079 | 0.23 % | |
205 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC dan Pagar SDN PANTAI ULIN | Pengadaan Langsung | Pekerjaan Konstruksi | 1883282 | 46981315 | 190,000,000 | 189,953,144 | 189,719,460 | 189,719,460 | 189,608,460 | 189,608,460 | 0 | 189,608,460 | 2024-03-23 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 280,540 | 0.15 % | |
206 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN PANGGUNG SDN BAJAYAU TENGAH (Daha Barat) | Pengadaan Langsung | Pekerjaan Konstruksi | 1884282 | 46874237 | 165,200,000 | 165,179,297 | 165,048,422 | 165,048,422 | 164,948,522 | 164,948,522 | 0 | 164,948,522 | 2024-04-26 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 151,578 | 0.09 % | |
207 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1886282 | 48107823 | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,504,553 | 39,504,553 | 39,504,553 | 39,504,553 | 2024-03-26 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 111,000 | 0.28 % | |
208 | 2024 | RSUD Brigjen H. Hasan Basry | Pengawasan Pembangunan Baru Ruang Cathlab | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1888282 | 50892595 | 75,000,000 | 74,939,909 | 74,884,409 | 74,884,409 | 74,750,000 | 74,750,000 | 74,750,000 | 74,750,000 | 2024-03-20 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 115,591 | 0.15 % | |
209 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 1889282 | 47090996 | 196,000,000 | 195,972,765 | 195,786,432 | 195,786,432 | 195,730,932 | 195,730,932 | 0 | 195,730,932 | 2024-04-02 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 213,568 | 0.11 % | |
210 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya, Pembangunan Halaman RA Perwanida Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1890282 | 48540286 | 30,000,000 | 30,000,000 | 29,878,980 | 29,878,980 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-03-21 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 121,020 | 0.4 % | |
211 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Ruang Kelas TK Negeri 2 Daha Utara, Rehabilitasi Ruang Kelas PAUD/KB Rangganala Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1892282 | 48540325 | 30,000,000 | 30,000,000 | 29,600,000 | 29,600,000 | 29,526,000 | 29,526,000 | 0 | 29,526,000 | 2024-04-18 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 400,000 | 1.33 % | |
212 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN TANAH BANGKANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1893282 | 46999331 | 198,912,000 | 198,781,335 | 198,476,997 | 198,476,997 | 198,372,601 | 198,372,601 | 0 | 198,372,601 | 2024-04-02 | FADWI UTAMA | 94.246.044.5-733.000 | 435,003 | 0.22 % | |
213 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN TAMBAK PIPI | Pengadaan Langsung | Pekerjaan Konstruksi | 1894282 | 46999132 | 190,000,000 | 189,991,033 | 189,935,533 | 189,935,533 | 189,827,788 | 189,827,788 | 0 | 189,827,788 | 2024-03-26 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 64,467 | 0.03 % | |
214 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan pembangunan musholla museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1895282 | 48540379 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-03-26 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 100,000 | 0.5 % | |
215 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Pagar dan Pembuatan Taman Bunga Cagar Budaya Tugu 2 Januari 1949 Desa Hamayung Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1896282 | 48540382 | 40,000,000 | 40,000,000 | 39,875,000 | 39,875,000 | 39,849,000 | 39,849,000 | 0 | 39,849,000 | 2024-03-26 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 125,000 | 0.31 % | |
216 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Samuda-Bajayau Kec. Daha Barat (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1901282 | 51005112 | 200,000,000 | 199,978,000 | 199,668,229 | 199,668,229 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-03-26 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 331,771 | 0.17 % | |
217 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan Jalan dan Parkir Kawasan islamic Center (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1908282 | 48094416 | 100,000,000 | 100,000,000 | 99,833,500 | 99,833,500 | 98,879,402 | 98,879,402 | 98,879,402 | 98,879,402 | 2024-03-26 | Wing Rastafarindo | 03.282.590.3-732.000 | 166,500 | 0.17 % | |
218 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN WC SDN BANJARBARU | Pengadaan Langsung | Pekerjaan Konstruksi | 1913282 | 46981392 | 150,000,000 | 149,967,909 | 149,664,159 | 149,664,159 | 149,572,276 | 149,572,276 | 0 | 149,572,276 | 2024-03-25 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 335,841 | 0.22 % | |
219 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1914282 | 46998763 | 178,192,000 | 178,125,497 | 177,944,043 | 177,944,043 | 177,839,921 | 177,839,921 | 0 | 177,839,921 | 2024-04-17 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 247,957 | 0.14 % | |
220 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Telaga Sili-sili | Pengadaan Langsung | Pekerjaan Konstruksi | 1917282 | 46999485 | 198,912,000 | 198,734,787 | 198,650,247 | 198,650,247 | 198,530,367 | 198,530,367 | 0 | 198,530,367 | 2024-03-25 | CV. LALUNA DANA | 02.237.179.3-733.000 | 261,753 | 0.13 % | |
221 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Interior Loby Polres HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 1928282 | 50436551 | 200,000,000 | 185,875,037 | 185,504,823 | 185,504,823 | 184,605,223 | 184,605,223 | 184,605,223 | 184,605,223 | 2024-03-31 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 14,495,177 | 7.25 % | |
222 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1929282 | 48108059 | 20,000,000 | 20,000,000 | 19,902,587 | 19,902,587 | 19,569,587 | 19,569,587 | 19,569,587 | 19,569,587 | 2024-03-31 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 97,413 | 0.49 % | |
223 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Hariti Sungai Raya Selatan Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1932282 | 51005005 | 200,000,000 | 199,917,000 | 199,850,027 | 199,850,027 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2024-04-02 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 149,973 | 0.07 % | |
224 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 Bayanan | Pengadaan Langsung | Pekerjaan Konstruksi | 1933282 | 46992312 | 190,624,000 | 190,437,842 | 190,347,097 | 190,347,097 | 190,286,434 | 190,286,434 | 0 | 190,286,434 | 2024-04-02 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 276,903 | 0.15 % | |
225 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN ANJIRAN SUNGAI RAYA | Pengadaan Langsung | Pekerjaan Konstruksi | 1934282 | 46997913 | 190,000,000 | 189,896,658 | 189,841,158 | 189,841,158 | 189,740,080 | 189,740,080 | 0 | 189,740,080 | 2024-04-03 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 158,842 | 0.08 % | |
226 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kalumpang (Pemeliharaan Sungai dengan Lebar Sungai 8 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 1935282 | 47467530 | 198,333,200 | 198,305,466 | 198,259,392 | 198,259,392 | 197,702,727 | 197,702,700 | 197,702,700 | 197,702,700 | 2024-04-02 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 73,808 | 0.04 % | |
227 | 2024 | RSUD Daha Sejahtera | Pengawasan Urugan Lahan Rumah Sakit (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1936282 | 49684600 | 50,000,000 | 49,999,999 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 49,839,000 | 2024-04-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 161,000 | 0.32 % | |
228 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman Paving Block) SMP Negeri 2 Padang Batung dan SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1937282 | 48541514 | 25,000,000 | 24,999,997 | 24,900,000 | 24,900,000 | 24,864,000 | 24,864,000 | 0 | 24,864,000 | 2024-04-17 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.4 % | |
229 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado dan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1938282 | 48541534 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,869,000 | 19,869,000 | 0 | 19,869,000 | 2024-04-17 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 100,000 | 0.5 % | |
230 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Sedang Pagar SMP Negeri 1 Angkinang dan Pengawasan Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1939282 | 48541536 | 40,000,000 | 40,000,000 | 39,900,000 | 39,900,000 | 39,849,000 | 39,849,000 | 0 | 39,849,000 | 2024-04-17 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.25 % | |
231 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruaang Perpustakaan SMP Negeri 2 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 1940282 | 47088396 | 168,350,000 | 168,057,475 | 167,841,567 | 167,841,567 | 167,756,221 | 167,756,221 | 0 | 167,756,221 | 2024-04-17 | CV. KHALIF | 81.540.809.1-733.000 | 508,433 | 0.3 % | |
232 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SMP Negeri 2 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 1942282 | 47048178 | 194,820,000 | 194,816,719 | 194,656,093 | 194,656,093 | 194,568,014 | 194,568,014 | 0 | 194,568,014 | 2024-04-19 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 163,907 | 0.08 % | |
233 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SMP Negeri 2 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 1943282 | 47048303 | 171,900,000 | 171,892,418 | 171,571,354 | 171,571,354 | 171,485,884 | 171,485,884 | 0 | 171,485,884 | 2024-04-30 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 328,646 | 0.19 % | |
234 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Depo Arsip Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1944282 | 48096246 | 100,000,000 | 100,000,000 | 99,800,100 | 99,800,100 | 98,734,500 | 98,734,500 | 98,734,500 | 98,734,500 | 2024-04-22 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 199,900 | 0.2 % | |
235 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Interior Loby Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1952282 | 48091926 | 15,000,000 | 15,000,000 | 14,818,500 | 14,818,500 | 14,600,052 | 14,600,052 | 14,600,052 | 14,600,052 | 2024-04-22 | cv.akmalindo | 02.531.482.4-731.000 | 181,500 | 1.21 % | |
236 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Tanah Bangkang dan Paharuangan - Asam Dua Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1954282 | 51420737 | 200,000,000 | 199,993,000 | 199,901,013 | 199,901,013 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-04-18 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 98,987 | 0.05 % | |
237 | 2024 | Dinas Pendidikan dan Kebudayaan | REHAB RUANG KELAS SDN 2 TANITI | Pengadaan Langsung | Pekerjaan Konstruksi | 1955282 | 46997698 | 160,000,000 | 159,932,060 | 159,671,674 | 159,671,674 | 159,593,974 | 159,593,974 | 0 | 159,593,974 | 2024-04-24 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 328,326 | 0.21 % | |
238 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Kapuh Darat | Pengadaan Langsung | Pekerjaan Konstruksi | 1956282 | 46998303 | 182,336,000 | 182,203,611 | 182,125,911 | 182,125,911 | 182,014,911 | 182,014,911 | 0 | 182,014,911 | 2024-04-25 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 210,089 | 0.12 % | |
239 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Perpustakaan SMP Negeri 2 Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 1957282 | 47088475 | 101,010,000 | 100,990,736 | 100,935,236 | 100,935,236 | 100,848,811 | 100,848,811 | 0 | 100,848,811 | 2024-04-24 | CV. KATIBURA | 53.260.332.1-733.000 | 74,764 | 0.07 % | |
240 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Pagar SMP Negeri 2 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 1959282 | 47090925 | 195,000,000 | 194,969,196 | 194,924,796 | 194,924,796 | 194,814,784 | 194,814,784 | 0 | 194,814,784 | 2024-04-26 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 75,204 | 0.04 % | |
241 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1962282 | 48104739 | 15,000,000 | 15,000,000 | 14,988,500 | 14,988,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-18 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 11,500 | 0.08 % | |
242 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase di Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1963282 | 48103973 | 100,000,000 | 15,000,000 | 14,875,000 | 14,875,000 | 14,711,052 | 14,711,052 | 14,711,052 | 14,711,052 | 2024-04-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 85,125,000 | 85.12 % | |
243 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1966282 | 48104219;50438178 | 15,000,000 | 15,000,000 | 14,976,000 | 14,976,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-10 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 24,000 | 0.16 % | |
244 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Kawasan Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 1970282 | 50437410 | 195,200,000 | 195,095,250 | 195,077,028 | 195,077,028 | 194,022,429 | 194,022,429 | 194,022,429 | 194,022,429 | 2024-04-22 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 122,972 | 0.06 % | |
245 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1971282 | 51423002 | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 2024-04-23 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 232,000 | 2.32 % | |
246 | 2024 | Sekretariat DPRD | Gedung Kantor Sederhana (Pembangunan Mushala) | Pengadaan Langsung | Pekerjaan Konstruksi | 1972282 | 48140923 | 165,760,000 | 165,700,000 | 165,412,311 | 165,412,311 | 165,375,681 | 0 | 0 | 0 | 2024-04-23 | CV. KHALIF | 81.540.809.1-733.000 | 347,689 | 0.21 % | |
247 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Oprit Jembatan Ruas Jl. Tanuhi - Ulang Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 1973282 | 51421204 | 96,100,000 | 96,087,000 | 96,053,842 | 96,053,842 | 95,600,000 | 95,600,000 | 95,600,000 | 95,600,000 | 2024-04-26 | CV. KATIBURA | 53.260.332.1-733.000 | 46,158 | 0.05 % | |
248 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang pusat sumber pendidikan inklusif beserta perabotnya SMP Negeri 1 Kandangan (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 1974282 | 47048401 | 188,800,000 | 188,796,384 | 188,718,684 | 188,718,684 | 188,571,397 | 188,571,397 | 0 | 188,571,397 | 2024-05-13 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 81,316 | 0.04 % | |
249 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan ruang pusat sumber pendidikan inklusif beserta perabotnya SMP Negeri 3 Kandangan (DAK) | Pengadaan Langsung | Pekerjaan Konstruksi | 1975282 | 47048553 | 194,700,000 | 194,692,784 | 194,542,313 | 194,542,313 | 194,442,413 | 194,442,413 | 0 | 194,442,413 | 2024-04-25 | CV. LALUNA DANA | 02.237.179.3-733.000 | 157,687 | 0.08 % | |
250 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SMP Tahun 2024 (SMP Negeri 2 Kandangan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1977282 | 48541527 | 85,000,000 | 84,999,993 | 84,899,999 | 84,899,999 | 84,815,100 | 84,815,100 | 0 | 84,815,100 | 2024-04-25 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,001 | 0.12 % | |
251 | 2024 | Sekretariat DPRD | Jasa Konsultansi Pengawasan Arsitektur, Kategori 1 (Pengawasan Pembangunan Mushala) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1978282 | 48140581 | 15,000,000 | 15,000,000 | 14,857,350 | 14,857,350 | 14,857,350 | 0 | 0 | 0 | 2024-04-23 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 142,650 | 0.95 % | |
252 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN 1 SIRIH HULU (Kalumpang) | Pengadaan Langsung | Pekerjaan Konstruksi | 1979282 | 46981343 | 100,000,000 | 99,793,081 | 99,737,581 | 99,737,581 | 99,665,958 | 99,665,958 | 0 | 99,665,958 | 2024-05-28 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 262,419 | 0.26 % | |
253 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1981282 | 48108252 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,713,050 | 14,713,050 | 14,713,050 | 14,713,050 | 2024-07-07 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
254 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1983282 | 48984144 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-07-08 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
255 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1984282 | 48984336 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-07-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
256 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 1989282 | 48984425 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,713,050 | 14,713,050 | 14,713,050 | 14,713,050 | 2024-07-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
257 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN Baru Kec Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 1991282 | 46998025 | 198,912,000 | 196,405,638 | 196,350,494 | 196,350,494 | 196,213,016 | 196,213,016 | 0 | 196,213,016 | 2024-04-24 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 2,561,506 | 1.29 % | |
258 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 BARUH KEMBANG | Pengadaan Langsung | Pekerjaan Konstruksi | 1992282 | 46992124 | 198,912,000 | 198,724,459 | 198,555,542 | 198,555,542 | 198,441,478 | 198,441,478 | 0 | 198,441,478 | 2024-04-24 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 356,458 | 0.18 % | |
259 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN 1 TALUK LABAK | Pengadaan Langsung | Pekerjaan Konstruksi | 1993282 | 46981354 | 100,000,000 | 99,910,803 | 99,567,562 | 99,567,562 | 99,505,537 | 99,505,537 | 0 | 99,505,537 | 2024-04-24 | CV. KHALIF | 81.540.809.1-733.000 | 432,438 | 0.43 % | |
260 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 1997282 | 47104964 | 150,000,000 | 149,991,342 | 149,656,413 | 149,656,413 | 149,545,413 | 149,545,413 | 0 | 149,545,413 | 2024-05-03 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 343,587 | 0.23 % | |
261 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman RA Perwanida Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 1999282 | 47104898 | 153,850,000 | 153,846,542 | 153,791,042 | 153,791,042 | 153,689,835 | 153,689,835 | 0 | 153,689,835 | 2024-05-03 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 58,958 | 0.04 % | |
262 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Perencanaan Penataan PSU Perumahan Berlian Syariah Borneo | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2001282 | 47436953 | 94,652,824 | 94,652,489 | 94,489,150 | 94,489,150 | 94,433,650 | 94,433,650 | 94,433,650 | 94,433,650 | 2024-04-29 | Haded Barakat Utama | 95.529.593.6-732.000 | 163,674 | 0.17 % | |
263 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Perencanaan Penataan PSU Perumahan Griya Intan Amandit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2002282 | 47437036 | 39,333,668 | 39,333,280 | 39,312,770 | 39,312,770 | 39,257,270 | 39,257,270 | 39,257,270 | 39,257,270 | 2024-04-29 | Haded Barakat Utama | 95.529.593.6-732.000 | 20,898 | 0.05 % | |
264 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Hamayung Utara Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2006282 | 46981505 | 100,000,000 | 99,926,572 | 99,715,623 | 99,715,623 | 99,660,123 | 99,660,123 | 0 | 99,660,123 | 2024-05-03 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 284,377 | 0.28 % | |
265 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan / Rehab PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2007282 | 47436954 | 25,000,000 | 24,998,935 | 24,929,290 | 24,929,290 | 24,873,790 | 24,873,790 | 24,873,790 | 24,873,790 | 2024-04-29 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 70,710 | 0.28 % | |
266 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan WC (SDN 1 SIRIH HULU, SDN 1 TALUK LABAK, SDN GUMBIL, SDN HAMAYUNG UTARA ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2010282 | 48541471 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,859,000 | 29,859,000 | 0 | 29,859,000 | 2024-05-01 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 100,000 | 0.33 % | |
267 | 2024 | Dinas Ketahanan Pangan | Belanja Jasa Konsultasi Perencanaan Arsitektur - Jasa Nasihat dan Pradesain Arsitektural Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2011282 | 51484736 | 10,000,000 | 10,000,000 | 9,862,483 | 9,862,483 | 9,768,000 | 9,768,000 | 9,768,000 | 9,768,000 | 2024-05-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 137,517 | 1.38 % | |
268 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman Panggung (SMP Negeri 6 Daha Selatan Satu Atap dan SMP Negeri 7 Daha Selatan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2014282 | 48540250 | 35,000,000 | 34,999,998 | 34,831,800 | 34,831,800 | 34,776,300 | 34,776,300 | 0 | 34,776,300 | 2024-04-30 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 168,200 | 0.48 % | |
269 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Gumbil | Pengadaan Langsung | Pekerjaan Konstruksi | 2016282 | 46981461 | 100,000,000 | 99,595,122 | 99,344,654 | 99,344,654 | 99,289,154 | 99,289,154 | 0 | 99,289,154 | 2024-05-03 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 655,346 | 0.66 % | |
270 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik SMP Negeri 1 Kandangan, SMP Negeri 3 Kandangan, SMP Negeri 1 Daha Utara, dan SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2019282 | 48541417 | 85,000,000 | 84,999,993 | 84,693,000 | 84,693,000 | 84,748,500 | 84,748,500 | 0 | 84,748,500 | 2024-04-30 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 307,000 | 0.36 % | |
271 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SDN ANGKINANG | Pengadaan Langsung | Pekerjaan Konstruksi | 2032282 | 46981075 | 185,000,000 | 184,992,854 | 184,667,400 | 184,667,400 | 184,589,700 | 184,589,700 | 0 | 184,589,700 | 2024-05-03 | FADWI UTAMA | 94.246.044.5-733.000 | 332,600 | 0.18 % | |
272 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Desa Jambu Hulu Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2033282 | 47884119 | 25,000,000 | 24,991,500 | 24,917,044 | 24,917,044 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 82,956 | 0.33 % | |
273 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Angkinang Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2034282 | 47884147 | 15,000,000 | 15,000,000 | 14,935,000 | 14,935,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-19 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 65,000 | 0.43 % | |
274 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2039282 | 47884136 | 25,000,000 | 24,991,500 | 24,764,100 | 24,764,100 | 24,750,000 | 24,750,000 | 24,750,000 | 24,750,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 235,900 | 0.94 % | |
275 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Desa Bumi Berkat Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2040282 | 47884120 | 25,000,000 | 24,991,500 | 24,919,764 | 24,919,764 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 80,236 | 0.32 % | |
276 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Bamban Selatan - Pakuan Timur Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2042282 | 47884134 | 25,000,000 | 24,991,500 | 24,950,000 | 24,950,000 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-16 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.2 % | |
277 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Kandangan Hulu - Tabihi Kec.Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2043282 | 47881162 | 45,000,000 | 44,997,000 | 44,844,000 | 44,844,000 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-23 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 156,000 | 0.35 % | |
278 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Telaga Banta Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2047282 | 47881164 | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-14 | cv.nawasena konsultan | 62.243.237.5-731.000 | 36,245 | 0.08 % | |
279 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Bajayau - Bajayau Tengah Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2050282 | 48025230 | 45,000,000 | 44,997,000 | 44,825,130 | 44,825,130 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-16 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 174,870 | 0.39 % | |
280 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2052282 | 47884150 | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
281 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Menuju Mesjid Noor Desa Pagar Haur Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2054282 | 47881141 | 45,000,000 | 44,997,000 | 44,870,640 | 44,870,640 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-08-09 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 129,360 | 0.29 % | |
282 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase Ruas Jalan Hamalau - Ganda Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2059282 | 47884139 | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-14 | cv.nawasena konsultan | 62.243.237.5-731.000 | 36,245 | 0.08 % | |
283 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Pakan Dalam Kecamatan Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2065282 | 47892517 | 15,000,000 | 15,000,000 | 14,983,890 | 14,983,890 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 16,110 | 0.11 % | |
284 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Taniran Selatan-Desa Taniran Kubah Kecamatan Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2066282 | 47892519 | 15,000,000 | 15,000,000 | 14,935,000 | 14,935,000 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-16 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 65,000 | 0.43 % | |
285 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Goha - Ds. Amawang Kanan Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2067282 | 47881137 | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-15 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
286 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 3 Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2068282 | 47881148 | 50,000,000 | 49,999,800 | 49,911,150 | 49,911,150 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-06-06 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 88,850 | 0.18 % | |
287 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Penyusunan Dokumen GRK (Gas Rumah Kaca) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2069282 | 51446703 | 85,000,000 | 83,953,000 | 83,474,220 | 83,474,220 | 83,324,370 | 83,324,370 | 100 | 83,324,370 | 2024-05-13 | PT. ITNASINDO JAYA KONSULTAN | 85.453.556.4-732.000 | 1,525,780 | 1.8 % | |
288 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Manggis (Desa Baru - Desa Asam) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2070282 | 47881180 | 50,000,000 | 49,999,800 | 49,961,294 | 49,961,294 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-28 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 38,706 | 0.08 % | |
289 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Desa Loksado Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2071282 | 47884149 | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
290 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Simpur - SP.3 Paring Agung Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2072282 | 47891459 | 50,000,000 | 49,999,800 | 48,792,131 | 48,792,131 | 48,700,000 | 48,700,000 | 48,700,000 | 48,700,000 | 2024-08-20 | CV GANESH GAUTAMA KONSULTAN | 41.203.762.4-731.000 | 1,207,869 | 2.42 % | |
291 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Karang Jawa - Ambarai Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2078282 | 47884161 | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
292 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Gantung Desa Jambu Hulu - Desa Durian Rabung Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2083282 | 48025234 | 50,000,000 | 49,999,800 | 49,938,761 | 49,938,761 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 61,239 | 0.12 % | |
293 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Kalumpang - Baruh Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2085282 | 48025235 | 50,000,000 | 49,999,800 | 49,983,300 | 49,983,300 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 16,700 | 0.03 % | |
294 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Biti Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2088282 | 47881147 | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-08-19 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
295 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Baru Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2096282 | 47884155 | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
296 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2098282 | 47884154 | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
297 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Taniran Selatan Kubah - Buntut Taniran / Wawaran Kec. Angkinang (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2099282 | 47884164 | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
298 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jalan Ruas Loklahung - Kamawakan Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2100282 | 47881130 | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
299 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 2 Kec. Loksado (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2101282 | 47881168 | 15,000,000 | 15,000,000 | 14,869,560 | 14,869,560 | 14,850,000 | 14,850,000 | 14,850,000 | 14,850,000 | 2024-08-30 | CV. LAURINDO | 02.963.320.3-735.000 | 130,440 | 0.87 % | |
300 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Tambangan Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2102282 | 47884158 | 15,000,000 | 15,000,000 | 14,983,890 | 14,983,890 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 16,110 | 0.11 % | |
301 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Tabihi Telaga Langsat Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2103282 | 47884157 | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
302 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Papagaran Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2104282 | 47884159 | 15,000,000 | 15,000,000 | 14,936,118 | 14,936,118 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 63,882 | 0.43 % | |
303 | 2024 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Parkir Pasar Senin Negara Blok E | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2110282 | 50153120 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-05-13 | cv.akmalindo | 02.531.482.4-731.000 | 237,000 | 1.58 % | |
304 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2115282 | 51471152 | 174,181,000 | 174,180,038 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 174,056,584 | 2024-06-04 | CV.Bangun Banua | 93.708.167.7-733.000 | 124,416 | 0.07 % | |
305 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2117282 | 50153114 | 15,000,000 | 15,000,000 | 14,949,999 | 14,949,999 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-05-13 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 50,001 | 0.33 % | |
306 | 2024 | Dinas Perdagangan | Pembuatan Kanopi Parkir Pasar Senin Nagara Blok. E | Pengadaan Langsung | Pekerjaan Konstruksi | 2119282 | 49496272 | 200,000,000 | 199,999,193 | 199,978,103 | 199,978,103 | 199,833,803 | 199,833,803 | 199,833,803 | 199,833,803 | 2024-05-13 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 21,897 | 0.01 % | |
307 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 2121282 | 51470984 | 198,568,000 | 198,565,049 | 198,492,629 | 198,492,629 | 198,348,307 | 198,348,307 | 198,348,307 | 198,348,307 | 2024-05-17 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 75,371 | 0.04 % | |
308 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Rehab Balai Penyuluhan KB Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2127282 | 48395873 | 75,000,000 | 74,996,398 | 74,930,975 | 74,930,975 | 74,701,543 | 74,701,543 | 74,701,543 | 74,701,543 | 2024-05-17 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 69,025 | 0.09 % | |
309 | 2024 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 2133282 | 47635131 | 150,000,000 | 149,999,994 | 149,983,344 | 149,983,344 | 149,826,610 | 149,826,610 | 149,826,610 | 149,826,610 | 2024-05-14 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 16,656 | 0.01 % | |
310 | 2024 | Dinas Kesehatan | Perencanaan urugan lahan Puskemas Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2141282 | 49459006 | 50,000,000 | 49,356,000 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 49,261,800 | 2024-05-07 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 738,200 | 1.48 % | |
311 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Papancan Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2142282 | 47881178 | 70,000,000 | 69,960,700 | 69,900,042 | 69,900,042 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-08-16 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 99,958 | 0.14 % | |
312 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Angkinang Selatan - Tawia - Wawaran Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2146282 | 47891455 | 70,000,000 | 69,960,700 | 69,627,759 | 69,627,759 | 69,600,000 | 69,600,000 | 69,600,000 | 69,600,000 | 2024-08-19 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 372,241 | 0.53 % | |
313 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan SMAN Negara Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2147282 | 47871995 | 70,000,000 | 69,960,700 | 69,949,659 | 69,949,659 | 69,900,000 | 69,900,000 | 69,900,000 | 69,900,000 | 2024-08-20 | CV. Halicons Engineering | 99.750.185.3-732.000 | 50,341 | 0.07 % | |
314 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Galuntang - Tayub Desa Madang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2148282 | 47881153 | 70,000,000 | 69,960,700 | 69,752,733 | 69,752,733 | 69,700,000 | 69,700,000 | 69,700,000 | 69,700,000 | 2024-08-21 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 247,267 | 0.35 % | |
315 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jembatan Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2149282 | 47891243 | 70,000,000 | 69,960,759 | 69,475,122 | 69,475,122 | 69,400,000 | 69,400,000 | 69,400,000 | 69,400,000 | 2024-08-28 | CV. Bagus Berataan Konsultan | 62.599.055.1-731.000 | 524,878 | 0.75 % | |
316 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jembatan Wawaran Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2151282 | 47891244 | 70,000,000 | 69,960,700 | 69,949,659 | 69,949,659 | 69,900,000 | 69,900,000 | 69,900,000 | 69,900,000 | 2024-08-21 | CV. Halicons Engineering | 99.750.185.3-732.000 | 50,341 | 0.07 % | |
317 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Sungai Niman Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2152282 | 51575894 | 50,000,000 | 49,999,811 | 49,856,760 | 49,856,760 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-08-21 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 143,240 | 0.29 % | |
318 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2155282 | 47884138 | 25,000,000 | 24,991,500 | 24,902,781 | 24,902,781 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-08-20 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 97,219 | 0.39 % | |
319 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Samuda - Bajayau Kec. Daha Barat (Dana Bagi Hasil Sawit) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2156282 | 51574162 | 100,000,000 | 99,992,000 | 99,884,349 | 99,884,349 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-08-08 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 115,651 | 0.12 % | |
320 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Peningkatan PSU Perumahan Kalian Asri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2161282 | 47437037 | 15,000,000 | 15,000,000 | 14,900,640 | 14,900,640 | 14,883,990 | 14,883,990 | 14,883,990 | 14,883,990 | 2024-05-17 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 99,360 | 0.66 % | |
321 | 2024 | Dinas Perdagangan | Pemasangan Paving Blok Pasar Taniran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2162282 | 51593721 | 199,947,420 | 199,946,246 | 199,595,989 | 199,595,989 | 199,329,589 | 199,329,589 | 199,329,589 | 199,329,589 | 2024-05-13 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 351,431 | 0.18 % | |
322 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang Kelas PAUD Rangganala | Pengadaan Langsung | Pekerjaan Konstruksi | 2165282 | 47110299 | 195,000,000 | 194,978,405 | 194,686,227 | 194,686,227 | 194,553,027 | 194,553,027 | 0 | 194,553,027 | 2024-05-15 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 313,773 | 0.16 % | |
323 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas TK Negeri 2 Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2166282 | 47110835 | 195,000,000 | 194,985,964 | 194,952,664 | 194,952,664 | 194,845,424 | 194,845,424 | 0 | 194,845,424 | 2024-05-20 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 47,336 | 0.02 % | |
324 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman TK Negeri Pembina Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2169282 | 47105535 | 195,000,000 | 194,992,987 | 194,701,696 | 194,701,696 | 194,590,696 | 194,590,696 | 0 | 194,590,696 | 2024-05-15 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 298,304 | 0.15 % | |
325 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Ruas Jalan Siang Gantung - Ds. Baru Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2170282 | 48025231 | 45,000,000 | 44,997,000 | 44,797,380 | 44,797,380 | 44,700,000 | 44,700,000 | 44,700,000 | 44,700,000 | 2024-08-16 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 202,620 | 0.45 % | |
326 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Mangamol Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2182282 | 47881181 | 45,000,000 | 44,997,055 | 44,947,230 | 44,947,230 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-08-15 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 52,770 | 0.12 % | |
327 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemindahan dan Pemasangan Jembatan Gantung Desa Loklahung Ke Desa Panggungan Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2184282 | 51575729 | 50,000,000 | 49,999,800 | 49,450,500 | 49,450,500 | 49,400,000 | 49,400,000 | 49,400,000 | 49,400,000 | 2024-08-28 | Metro Engineering Consultant | 94.821.300.4-731.000 | 549,500 | 1.1 % | |
328 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur Rehab Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2185282 | 48370103 | 150,000,000 | 80,000,000 | 79,587,000 | 79,587,000 | 79,531,500 | 79,587,000 | 79,587,000 | 79,587,000 | 2024-05-22 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 70,413,000 | 46.94 % | |
329 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Kelas SMP Negeri 4 Daha Utara dan Pengawasan Pembangunan Ruang Kelas Baru SMP (SMP Negeri 4 Daha Utara dan SMP Negeri5DahaSelatan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2191282 | 51634074 | 75,000,000 | 74,999,992 | 74,899,999 | 74,899,999 | 74,814,000 | 74,814,000 | 0 | 74,814,000 | 2024-05-17 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 100,001 | 0.13 % | |
330 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2200282 | 47471417 | 180,200,000 | 179,975,000 | 179,724,399 | 179,724,399 | 179,622,332 | 179,622,332 | 100 | 179,622,332 | 2024-05-20 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 475,601 | 0.26 % | |
331 | 2024 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Belanja Pengawasan Rehab Balai Penyuluhan KB | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2202282 | 48397953 | 11,049,000 | 11,049,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 10,767,000 | 2024-05-17 | cv.akmalindo | 02.531.482.4-731.000 | 282,000 | 2.55 % | |
332 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2208282 | 47471414 | 187,000,000 | 186,696,000 | 186,491,934 | 186,491,934 | 186,408,684 | 186,408,684 | 100 | 186,408,684 | 2024-05-20 | FADWI UTAMA | 94.246.044.5-733.000 | 508,066 | 0.27 % | |
333 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Kambang Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2209282 | 47471403 | 180,400,000 | 180,088,000 | 179,924,163 | 179,924,163 | 179,813,163 | 179,813,163 | 100 | 179,813,163 | 2024-05-21 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 475,837 | 0.26 % | |
334 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Hamayung Utara Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2212282 | 47471408 | 193,600,000 | 193,347,447 | 193,154,114 | 193,154,114 | 193,081,964 | 193,081,964 | 100 | 193,081,964 | 2024-06-05 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 445,886 | 0.23 % | |
335 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Muning Baru RT.02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2213282 | 47471406 | 180,400,000 | 180,093,000 | 179,993,751 | 179,993,751 | 179,889,622 | 179,889,622 | 100 | 179,889,622 | 2024-05-17 | CV. ESTA KARYA MANDIRI | 99.978.347.5-733.000 | 406,249 | 0.23 % | |
336 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Paharangan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2214282 | 47471413 | 187,000,000 | 186,670,000 | 186,559,856 | 186,559,856 | 186,480,842 | 186,480,842 | 100 | 186,480,842 | 2024-06-21 | CV. SORAYA | 01.834.078.6-733.000 | 440,144 | 0.24 % | |
337 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2215282 | 47471407 | 189,200,000 | 188,911,044 | 188,727,072 | 188,727,072 | 188,647,170 | 188,647,170 | 100 | 188,647,170 | 2024-05-27 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 472,928 | 0.25 % | |
338 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Parigi RT. 05 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2216282 | 47471412 | 169,400,000 | 169,041,000 | 168,788,320 | 168,788,320 | 168,699,520 | 168,699,520 | 100 | 168,699,520 | 2024-05-31 | cv. nurulillah | 50.826.160.9-733.000 | 611,680 | 0.36 % | |
339 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Pihanin Raya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2217282 | 47471410 | 182,600,000 | 182,479,000 | 182,326,981 | 182,326,981 | 182,243,731 | 182,243,731 | 100 | 182,243,731 | 2024-05-20 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,019 | 0.15 % | |
340 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2218282 | 47471405 | 178,200,000 | 177,908,000 | 177,635,215 | 177,635,215 | 177,524,215 | 177,524,215 | 100 | 177,524,215 | 2024-05-20 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 564,785 | 0.32 % | |
341 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Sungai Mandala Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2219282 | 47471404 | 184,800,000 | 184,580,000 | 184,524,982 | 184,524,982 | 184,427,834 | 184,427,834 | 100 | 184,427,834 | 2024-05-22 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 275,018 | 0.15 % | |
342 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Lokbahan Kec. Padang Batung (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2221282 | 51664035 | 200,000,000 | 199,999,000 | 199,953,688 | 199,953,688 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-05-21 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 46,312 | 0.02 % | |
343 | 2024 | Dinas Pendidikan dan Kebudayaan | pembangunan musholla museum | Pengadaan Langsung | Pekerjaan Konstruksi | 2222282 | 47165721 | 150,000,000 | 149,967,034 | 149,850,087 | 149,850,087 | 149,711,337 | 149,711,337 | 0 | 149,711,337 | 2024-06-19 | CV. YONIA | 02.089.778.1-733.000 | 149,913 | 0.1 % | |
344 | 2024 | Dinas Perhubungan | Rehab Bangunan Kantor Dinas Perhubungan | Pengadaan Langsung | Pekerjaan Konstruksi | 2223282 | 48357802 | 60,302,000 | 59,052,222 | 58,887,332 | 58,887,332 | 58,665,332 | 58,665,332 | 0 | 58,665,332 | 2024-05-29 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 1,414,669 | 2.35 % | |
345 | 2024 | Dinas Sosial | Belanja Jasa Konsultan Perencanaan Rehab Bangunan/Ruang Tunggu di Taman Makam Pahlawan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2226282 | 48000286 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,751,900 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-05-22 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
346 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 2232282 | 47471401 | 192,500,000 | 192,398,000 | 191,973,133 | 191,973,133 | 191,858,069 | 191,858,069 | 100 | 191,858,069 | 2024-05-29 | cemara indah | 02.090.160.9-731.000 | 526,867 | 0.27 % | |
347 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMP Negeri 7 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2235282 | 47048032 | 200,000,000 | 199,979,724 | 199,715,029 | 199,715,029 | 199,626,229 | 199,626,229 | 0 | 199,626,229 | 2024-05-28 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 284,971 | 0.14 % | |
348 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Panggung SMP Negeri 6 Daha Selatan Satu Atap | Pengadaan Langsung | Pekerjaan Konstruksi | 2238282 | 47047921 | 170,000,000 | 169,976,137 | 169,697,134 | 169,697,134 | 169,606,336 | 169,606,336 | 0 | 169,606,336 | 2024-05-28 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 302,866 | 0.18 % | |
349 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemutakhiran Data Sungai di Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2242282 | 51723346 | 100,000,000 | 99,955,500 | 99,900,000 | 99,900,000 | 98,346,000 | 98,346,000 | 98,346,000 | 98,346,000 | 2024-05-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 100,000 | 0.1 % | |
350 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Penataan Ruang-Jasa Perencanaan Wilayah, Kategori 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2245282 | 47689339 | 85,000,000 | 84,091,269 | 83,749,500 | 83,749,500 | 83,721,750 | 83,721,750 | 83,721,750 | 83,721,750 | 2024-05-29 | CV. SENTRATECS | 01.719.362.4-732.000 | 1,250,500 | 1.47 % | |
351 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Bangunan Gedung (Rehab Gedung PKK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2257282 | 51423290 | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,768,000 | 0 | 0 | 0 | 2024-05-28 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
352 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Banjarbaru RT 01 dan 02 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2265282 | 47471411 | 191,400,000 | 191,122,000 | 190,942,221 | 190,942,221 | 190,875,621 | 190,875,621 | 100 | 190,875,621 | 2024-05-28 | ARJUNA KARYA UTAMA,cv | 01.214.260.0-733.000 | 457,779 | 0.24 % | |
353 | 2024 | Sekretariat Daerah | Belanja Modal Bangunan Gedung Tempat Kerja Lainnya (Rehab Gedung PKK) | Pengadaan Langsung | Pekerjaan Konstruksi | 2267282 | 51754351 | 201,250,000 | 200,000,000 | 199,889,197 | 199,889,197 | 199,889,197 | 0 | 0 | 0 | 2024-05-28 | cv. nurulillah | 50.826.160.9-733.000 | 1,360,803 | 0.68 % | |
354 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman TK Negeri Daha Selatan, Pembangunan Halaman RA Perwanida Kec. Simpur, Pembangunan Pagar PAUD/TK Munggu Raya Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2279282 | 48541550 | 30,000,000 | 30,000,000 | 29,825,000 | 29,825,000 | 29,810,000 | 29,810,000 | 0 | 29,810,000 | 2024-06-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 175,000 | 0.58 % | |
355 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Karasikan Kecamatan Sungai Raya (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2281282 | 48984021 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,450,450 | 99,450,450 | 99,450,450 | 99,450,450 | 2024-06-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 100,000 | 0.1 % | |
356 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Pagar dan Urugan Lahan Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2282282 | 48091507 | 45,000,000 | 45,000,000 | 44,855,100 | 44,855,100 | 44,511,000 | 44,511,000 | 44,511,000 | 44,511,000 | 2024-06-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 144,900 | 0.32 % | |
357 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Kelas SDN 1 Simpang Empat. Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2285282 | 46997299 | 198,912,000 | 198,854,496 | 198,662,696 | 198,662,696 | 198,571,008 | 198,571,008 | 0 | 198,571,008 | 2024-05-28 | TIGA RUMA USRI, CV | 61.702.744.6-733.000 | 249,304 | 0.13 % | |
358 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman Panggung SMP Negeri 6 Daha Selatan Satu Atap dan SMP Negeri 7 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2286282 | 48541508 | 30,000,000 | 30,000,000 | 29,836,800 | 29,836,800 | 29,803,500 | 29,803,500 | 0 | 29,803,500 | 2024-05-29 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 163,200 | 0.54 % | |
359 | 2024 | Dinas Pertanian | Renovasi Toilet/Wc | Pengadaan Langsung | Pekerjaan Konstruksi | 2287282 | 47392325 | 123,342,000 | 123,063,000 | 122,954,488 | 122,954,488 | 122,600,000 | 122,600,000 | 122,600,000 | 122,600,000 | 2024-06-07 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 387,512 | 0.31 % | |
360 | 2024 | Dinas Pertanian | Jasa Pengawasan Renovasi Toilet/WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2288282 | 48313832 | 10,000,000 | 10,000,000 | 9,950,000 | 9,950,000 | 9,800,000 | 9,800,000 | 9,800,000 | 9,800,000 | 2024-06-07 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 50,000 | 0.5 % | |
361 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2289282 | 47471415 | 176,000,000 | 175,541,000 | 175,474,919 | 175,474,919 | 175,378,810 | 175,378,810 | 100 | 175,378,810 | 2024-06-24 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 525,081 | 0.3 % | |
362 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2290282 | 47469390 | 161,600,000 | 161,477,000 | 161,313,861 | 161,313,861 | 161,247,261 | 161,247,261 | 100 | 161,247,261 | 2024-06-11 | CV. SORAYA | 01.834.078.6-733.000 | 286,139 | 0.18 % | |
363 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Titian Penghubung Jalan Inpres ke Jalan Pandai Besi Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 2291282 | 47471409 | 189,200,000 | 188,932,000 | 188,853,621 | 188,853,621 | 188,775,921 | 188,775,921 | 100 | 188,775,921 | 2024-06-21 | CV. SORAYA | 01.834.078.6-733.000 | 346,379 | 0.18 % | |
364 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Budi Mulia | Pengadaan Langsung | Pekerjaan Konstruksi | 2293282 | 47381952 | 163,500,000 | 163,459,000 | 163,404,399 | 163,404,399 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | CV. KATIBURA | 53.260.332.1-733.000 | 95,601 | 0.06 % | |
365 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Pendataan dan Pemetaan RumahSewa Milik Masyarakat, Rumah Susun danRumah Khusus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 2297282 | 47684513 | 40,000,000 | 39,925,190 | 39,782,400 | 39,782,400 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-05-31 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 217,600 | 0.54 % | |
366 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Padang Basar | Pengadaan Langsung | Pekerjaan Konstruksi | 2300282 | 47381953 | 163,500,000 | 163,448,000 | 163,393,499 | 163,393,499 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | CV. SORAYA | 01.834.078.6-733.000 | 106,502 | 0.07 % | |
367 | 2024 | Dinas Pertanian | Pembangunan/Rehab Jalan Usaha Tani Poktan Mangupil | Pengadaan Langsung | Pekerjaan Konstruksi | 2301282 | 47381960 | 163,500,000 | 163,452,000 | 163,254,716 | 163,254,716 | 163,000,000 | 163,000,000 | 163,000,000 | 163,000,000 | 2024-06-07 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 245,284 | 0.15 % | |
368 | 2024 | Dinas Pertanian | Jasa Pengawasan Pembangunan/Rehab JUT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2306282 | 51774837 | 43,254,111 | 43,254,111 | 43,038,081 | 43,038,081 | 43,000,000 | 43,000,000 | 43,000,000 | 43,000,000 | 2024-06-07 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 216,030 | 0.5 % | |
369 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Rehabilitasi Tugu Batas Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2308282 | 47437027 | 10,000,000 | 10,000,000 | 9,916,851 | 9,916,851 | 9,900,201 | 9,900,201 | 9,900,201 | 9,900,201 | 2024-06-13 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 83,149 | 0.83 % | |
370 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hakurung Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2318282 | 47458352 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-06-16 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
371 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Mandala Kecamatan Telaga Langsat (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2323282 | 48108387 | 100,000,000 | 100,000,000 | 98,253,961 | 98,253,961 | 97,963,050 | 97,963,050 | 97,963,050 | 97,963,050 | 2024-06-04 | CV HIDAYAH | 03.286.736.8-733.000 | 1,746,039 | 1.75 % | |
372 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Jaringan Perpipaan Desa Amawang Kiri Muka Kecamatan Kandangan (DAK Penugasan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2324282 | 48983904 | 100,000,000 | 100,000,000 | 99,848,891 | 99,848,891 | 98,901,000 | 98,901,000 | 98,901,000 | 98,901,000 | 2024-06-05 | CV. FIAZTA MATRIX CONSULTANT | 02.531.704.1-731.000 | 151,109 | 0.15 % | |
373 | 2024 | Dinas Pendidikan dan Kebudayaan | Jasa konsultan pengawas kegiatan kontraktual (Penugasan) (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2327282 | 48542275 | 15,000,000 | 14,999,996 | 14,875,000 | 14,875,000 | 14,860,000 | 14,860,000 | 0 | 14,860,000 | 2024-06-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.83 % | |
374 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Ruang Kelas TK Negeri 2 Daha Utara, Rehabilitasi Ruang Kelas PAUD/KB Rangganala Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2331282 | 48541559 | 20,000,000 | 20,000,000 | 19,824,000 | 19,824,000 | 19,810,000 | 19,810,000 | 0 | 19,810,000 | 2024-06-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 176,000 | 0.88 % | |
375 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2332282 | 50081566 | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-06-05 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
376 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 2349282 | 51812391 | 154,997,000 | 154,884,000 | 154,773,051 | 154,773,051 | 154,671,989 | 154,671,989 | 100 | 154,671,989 | 2024-06-05 | cv. nurulillah | 50.826.160.9-733.000 | 223,949 | 0.14 % | |
377 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. H. Kaderi Desa Bakarung Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 2350282 | 51809761 | 60,947,000 | 60,827,000 | 60,757,170 | 60,757,170 | 60,734,625 | 60,734,625 | 100 | 60,734,625 | 2024-07-18 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 189,830 | 0.31 % | |
378 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Tayub Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2354282 | 51838270 | 195,763,260 | 195,760,862 | 195,690,628 | 195,690,628 | 195,334,651 | 195,334,650 | 195,334,650 | 195,334,650 | 2024-06-07 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 72,632 | 0.04 % | |
379 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2368282 | 51838222 | 198,711,044 | 198,703,699 | 198,623,636 | 198,623,636 | 197,976,506 | 197,976,500 | 197,976,500 | 197,976,500 | 2024-06-10 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 87,408 | 0.04 % | |
380 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2370282 | 51838236 | 198,711,044 | 198,707,010 | 198,651,511 | 198,651,511 | 197,902,261 | 197,902,250 | 197,902,250 | 197,902,250 | 2024-06-10 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 59,533 | 0.03 % | |
381 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado RT.04 Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2372282 | 47464105 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-08-19 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 150,000 | 0.75 % | |
382 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2373282 | 47466678 | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-08-03 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.25 % | |
383 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Majelis Ta'lim Raudhatul Firdaus Pagar Haur Desa Jelatang Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2375282 | 50438733 | 187,419,914 | 187,400,000 | 187,361,339 | 187,361,339 | 186,761,207 | 186,761,207 | 186,761,207 | 186,761,207 | 2024-07-07 | FADWI UTAMA | 94.246.044.5-733.000 | 58,575 | 0.03 % | |
384 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bangkau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2380282 | 47447396 | 75,000,000 | 74,980,500 | 74,925,000 | 74,925,000 | 74,370,000 | 74,370,000 | 74,370,000 | 74,370,000 | 2024-06-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 75,000 | 0.1 % | |
385 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2383282 | 51838199 | 192,796,800 | 192,790,762 | 192,700,019 | 192,700,019 | 192,256,019 | 192,256,000 | 192,256,000 | 192,256,000 | 2024-06-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 96,781 | 0.05 % | |
386 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2384282 | 51838272 | 197,627,672 | 197,624,204 | 197,363,354 | 197,363,354 | 196,985,954 | 196,985,950 | 196,985,950 | 196,985,950 | 2024-06-10 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 264,318 | 0.13 % | |
387 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2392282 | 47465729 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-06-23 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 15,000 | 0.1 % | |
388 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Desa Batang Kulur Tengah Kec. Sungai Raya (600x2 m) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2394282 | 50081821 | 15,000,000 | 14,891,000 | 14,830,242 | 14,830,242 | 14,824,692 | 14,824,692 | 100 | 14,824,692 | 2024-06-11 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 169,758 | 1.13 % | |
389 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2399282 | 51437027 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
390 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Belakang KUA Desa Padang Batung Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2400282 | 47464388 | 20,000,000 | 20,000,000 | 19,980,000 | 19,980,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-03 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 20,000 | 0.1 % | |
391 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingka) | Pengadaan Langsung | Pekerjaan Konstruksi | 2402282 | 51838208 | 198,711,044 | 198,711,044 | 198,577,867 | 198,577,867 | 197,997,337 | 197,997,300 | 197,997,300 | 197,997,300 | 2024-06-19 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 133,177 | 0.07 % | |
392 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2404282 | 51838216 | 198,711,044 | 198,709,613 | 198,355,650 | 198,355,650 | 197,795,100 | 197,795,100 | 197,795,100 | 197,795,100 | 2024-06-16 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 355,394 | 0.18 % | |
393 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2408282 | 50437528 | 199,680,000 | 199,667,446 | 199,613,453 | 199,613,453 | 198,955,223 | 198,955,223 | 198,955,223 | 198,955,223 | 2024-06-16 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 66,547 | 0.03 % | |
394 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Desa Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2409282 | 48104076 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,557,650 | 14,557,650 | 14,557,650 | 14,557,650 | 2024-06-18 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
395 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Tayub Kec.Telaga langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2437282 | 51438111 | 30,000,000 | 30,000,000 | 29,859,000 | 29,859,000 | 29,415,000 | 29,415,000 | 29,415,000 | 29,415,000 | 2024-06-16 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 141,000 | 0.47 % | |
396 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Lumpangi Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2441282 | 51881654 | 198,262,275 | 198,255,974 | 198,194,468 | 198,194,468 | 197,739,921 | 197,739,900 | 197,739,900 | 197,739,900 | 2024-06-11 | CV. BEST KONSTRUKSI MANDIRI | 92.702.172.5-731.000 | 67,807 | 0.03 % | |
397 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2466282 | 51881410 | 192,796,800 | 192,790,800 | 192,700,169 | 192,700,169 | 192,256,169 | 192,256,150 | 192,256,150 | 192,256,150 | 2024-06-11 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 96,631 | 0.05 % | |
398 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2477282 | 51881378 | 198,821,700 | 198,821,550 | 198,763,004 | 198,763,004 | 198,070,531 | 198,070,500 | 198,070,500 | 198,070,500 | 2024-07-09 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 58,696 | 0.03 % | |
399 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2489282 | 51881649 | 198,262,275 | 198,230,398 | 198,042,194 | 198,042,194 | 197,473,874 | 197,473,800 | 197,473,800 | 197,473,800 | 2024-07-26 | CV.Bangun Banua | 93.708.167.7-733.000 | 220,081 | 0.11 % | |
400 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2494282 | 50437377 | 195,840,000 | 195,833,658 | 195,559,745 | 195,559,745 | 194,976,995 | 194,976,995 | 194,976,995 | 194,976,995 | 2024-06-12 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 280,255 | 0.14 % | |
401 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Saluran Drainase Jalan Kerja Bakti Desa Baluti Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2495282 | 48103911;50437377 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,557,650 | 14,557,650 | 14,557,650 | 14,557,650 | 2024-06-18 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
402 | 2024 | RSUD Brigjen H. Hasan Basry | Jasa Konsultan Pengawasan Bangunan Gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2498282 | 51819684 | 50,000,000 | 49,834,102 | 49,412,760 | 49,412,760 | 49,150,000 | 49,150,000 | 49,150,000 | 49,150,000 | 2024-06-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 587,240 | 1.17 % | |
403 | 2024 | RSUD Brigjen H. Hasan Basry | Pengawasan Rehabilitasi Eks Ruang Rawat Inap Anak | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2501282 | 51821097 | 100,000,000 | 99,956,901 | 99,012,000 | 99,012,000 | 98,650,000 | 98,650,000 | 98,650,000 | 98,650,000 | 2024-06-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 988,000 | 0.99 % | |
404 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Belah Paikat Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 2503282 | 50438831 | 185,389,897 | 185,000,000 | 184,953,942 | 184,953,942 | 184,019,238 | 184,019,238 | 184,019,238 | 184,019,238 | 2024-07-08 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 435,955 | 0.24 % | |
405 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2504282 | 51881349 | 198,821,700 | 198,821,687 | 198,695,733 | 198,695,733 | 197,946,483 | 197,946,400 | 197,946,400 | 197,946,400 | 2024-06-22 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 125,967 | 0.06 % | |
406 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Angkinang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2521282 | 51881868 | 15,000,000 | 15,000,000 | 14,955,500 | 14,955,500 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-09-12 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 44,500 | 0.3 % | |
407 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kelurahan Kandangan Kota RT.07 Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2523282 | 51881848 | 25,000,000 | 25,000,000 | 24,945,500 | 24,945,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-08-27 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 54,500 | 0.22 % | |
408 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2527282 | 51881727 | 15,000,000 | 15,000,000 | 14,865,000 | 14,865,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-26 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 135,000 | 0.9 % | |
409 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2535282 | 51881588 | 198,711,044 | 198,709,800 | 198,558,335 | 198,558,335 | 197,963,375 | 197,963,350 | 197,963,350 | 197,963,350 | 2024-06-16 | CV. ALBATROS | 01.222.160.2-733.000 | 152,709 | 0.08 % | |
410 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Ulang Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2536282 | 51881800 | 25,000,000 | 25,000,000 | 24,825,000 | 24,825,000 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-09-08 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 0.7 % | |
411 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Budi Bakti Amawang Kiri Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 2556282 | 50437501 | 195,200,000 | 195,152,455 | 194,847,955 | 194,847,955 | 194,185,152 | 194,185,152 | 194,185,152 | 194,185,152 | 2024-06-26 | cv. nurulillah | 50.826.160.9-733.000 | 352,045 | 0.18 % | |
412 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Angkinang Selatan Kec. Angkinang (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2585282 | 51838224 | 198,711,044 | 198,706,684 | 198,612,335 | 198,612,335 | 198,042,905 | 198,042,900 | 198,042,900 | 198,042,900 | 2024-06-19 | FARIZ MULYA REZEKI | 76.286.812.3-735.000 | 98,709 | 0.05 % | |
413 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2587282 | 51882007 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-09 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
414 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Pekerjaan Konstruksi | 2588282 | 50437456 | 195,200,000 | 195,196,876 | 195,032,313 | 195,032,313 | 194,818,915 | 194,818,915 | 194,818,915 | 194,818,915 | 2024-06-18 | CV. BANGUN SELARAS | 02.362.068.5-731.000 | 167,687 | 0.09 % | |
415 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2589282 | 51881366 | 198,306,750 | 198,306,740 | 198,251,258 | 198,251,258 | 197,807,258 | 197,807,250 | 197,807,250 | 197,807,250 | 2024-06-15 | CV. KATIBURA | 53.260.332.1-733.000 | 55,492 | 0.03 % | |
416 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Sudirman, Desa Hamalau (Lanjutan) Sistem 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2590282 | 48104441 | 15,000,000 | 15,000,000 | 14,889,000 | 14,889,000 | 14,524,350 | 14,524,350 | 14,524,350 | 14,524,350 | 2024-06-18 | CV. Halicons Engineering | 99.750.185.3-732.000 | 111,000 | 0.74 % | |
417 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Batu Laki Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2592282 | 50438751 | 192,480,597 | 192,480,000 | 192,429,478 | 192,429,478 | 191,785,678 | 191,785,678 | 191,785,678 | 191,785,678 | 2024-06-26 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 51,119 | 0.03 % | |
418 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2594282 | 51881841 | 15,000,000 | 15,000,000 | 14,905,500 | 14,905,500 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-09 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 94,500 | 0.63 % | |
419 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Lumpangi Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2595282 | 51881743 | 15,000,000 | 15,000,000 | 14,860,000 | 14,860,000 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-06-16 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 140,000 | 0.93 % | |
420 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Es Lilin Desa Bayanan Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Muning Baru Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2600282 | 51882048 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-06-23 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
421 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2605282 | 51882076 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-08-03 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
422 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Padang Batung Rt.02 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2606282 | 51881858 | 15,000,000 | 15,000,000 | 14,925,000 | 14,925,000 | 14,707,500 | 14,707,500 | 14,707,500 | 14,707,500 | 2024-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 75,000 | 0.5 % | |
423 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Amparaya Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2612282 | 51882014 | 17,500,000 | 17,500,000 | 17,378,000 | 17,378,000 | 17,038,500 | 17,038,500 | 17,038,500 | 17,038,500 | 2024-08-03 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 122,000 | 0.7 % | |
424 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Kandangan Kota (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2637282 | 51881751 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-08-13 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
425 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2638282 | 51882049 | 30,000,000 | 30,000,000 | 29,870,000 | 29,870,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 130,000 | 0.43 % | |
426 | 2024 | RSUD Brigjen H. Hasan Basry | Pembuatan Gutter Kabel Listrik Dan Rehab Ruang Panel Zona 1 RSUD BHHB | Pengadaan Langsung | Pekerjaan Konstruksi | 2639282 | 51819666 | 200,000,000 | 199,815,601 | 199,388,756 | 199,388,756 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-06-21 | FADWI UTAMA | 94.246.044.5-733.000 | 611,244 | 0.31 % | |
427 | 2024 | Dinas Kesehatan | Pengawasan Pembangunan Puskesmas Bajayau (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2644282 | 51649446 | 249,000,000 | 99,502,400 | 99,000,001 | 99,000,001 | 99,000,001 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-06-21 | CV. Halicons Engineering | 99.750.185.3-732.000 | 149,999,999 | 60.24 % | |
428 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Titian Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2645282 | 50237706 | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-06-13 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
429 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Kuangan Kec.Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2646282 | 51882075 | 30,000,000 | 30,000,000 | 29,850,000 | 29,850,000 | 29,581,500 | 29,581,500 | 29,581,500 | 29,581,500 | 2024-06-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.5 % | |
430 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Luaw Kec. Padang Batung (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2654282 | 51881909 | 195,772,720 | 195,710,784 | 195,362,090 | 195,362,090 | 194,998,435 | 194,998,400 | 194,998,400 | 194,998,400 | 2024-06-22 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 410,630 | 0.21 % | |
431 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Pakuan Timur III Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2660282 | 51881866 | 192,007,860 | 191,993,893 | 191,899,532 | 191,899,532 | 191,470,628 | 191,470,600 | 191,470,600 | 191,470,600 | 2024-06-22 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 108,328 | 0.06 % | |
432 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kasa Desa Sirih Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2662282 | 51881526 | 15,000,000 | 15,000,000 | 14,955,001 | 14,955,001 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-06-16 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 44,999 | 0.3 % | |
433 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2677282 | 51881957 | 25,000,000 | 25,000,000 | 24,987,000 | 24,987,000 | 24,697,500 | 24,697,500 | 24,697,500 | 24,697,500 | 2024-08-03 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 13,000 | 0.05 % | |
434 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Libak I Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2678282 | 51881886 | 169,418,700 | 169,414,971 | 169,359,481 | 169,359,481 | 168,943,453 | 168,943,450 | 168,943,450 | 168,943,450 | 2024-07-09 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 59,219 | 0.03 % | |
435 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Baru Kec. Daha Barat (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2680282 | 51881346 | 198,821,700 | 198,752,286 | 198,609,919 | 198,609,919 | 197,916,169 | 197,916,150 | 197,916,150 | 197,916,150 | 2024-06-22 | CV. LALUNA DANA | 02.237.179.3-733.000 | 211,781 | 0.11 % | |
436 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 2686282 | 50438220 | 195,200,000 | 195,149,290 | 194,851,510 | 194,851,510 | 194,062,210 | 194,062,210 | 194,062,210 | 194,062,210 | 2024-06-22 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 348,490 | 0.18 % | |
437 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jalan Pahlawan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2687282 | 48104585 | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,694,700 | 14,694,700 | 14,694,700 | 14,694,700 | 2024-06-27 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 50,000 | 0.33 % | |
438 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 2699282 | 51881520 | 198,624,930 | 198,624,624 | 198,530,270 | 198,530,270 | 197,992,482 | 197,992,400 | 197,992,400 | 197,992,400 | 2024-06-23 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 94,660 | 0.05 % | |
439 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Daerah Irigasi Kupang Kec.Kandangan (Peningkatan saluran irigasi dengan pasangan batu tinggi 1 m) | Pengadaan Langsung | Pekerjaan Konstruksi | 2704282 | 51881698 | 199,752,199 | 199,750,072 | 199,326,400 | 199,326,400 | 198,990,347 | 198,990,300 | 198,990,300 | 198,990,300 | 2024-07-09 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 425,799 | 0.21 % | |
440 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jarau Desa Karangpaci, Kec. Kalumpan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) dan Jasa Konsultansi Pengawasan Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2707282 | 51881944 | 30,000,000 | 30,000,000 | 29,930,500 | 29,930,500 | 29,692,500 | 29,692,500 | 29,692,500 | 29,692,500 | 2024-06-23 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 69,500 | 0.23 % | |
441 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Durari I Kec. Telaga Langsat (Rehabilitasi Saluran Irigasi Dengan Pasangan Batu Tinggi 70 cm (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2714282 | 51881860 | 186,441,200 | 186,435,698 | 186,273,642 | 186,273,642 | 185,988,372 | 185,988,300 | 185,988,300 | 185,988,300 | 2024-07-27 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 167,558 | 0.09 % | |
442 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan pelayanan di sekitar jaringan irigasi DI.Gumbil Kec.Telaga langsat (lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2716282 | 51928574 | 50,000,000 | 49,950,000 | 49,927,800 | 49,927,800 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-09-09 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 72,200 | 0.14 % | |
443 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di belakang Tk.Banjar Pasar Kandangan Kel. Kandangan Kota, Kec. Kandangan (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 2720282 | 51881592 | 198,262,275 | 198,261,188 | 198,100,237 | 198,100,237 | 197,496,397 | 197,496,350 | 197,496,350 | 197,496,350 | 2024-07-08 | CV. MAWAR | 02.918.043.7-733.000 | 162,038 | 0.08 % | |
444 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2729282 | 51881535 | 15,000,000 | 15,000,000 | 14,949,950 | 14,949,950 | 14,812,950 | 14,812,950 | 14,812,950 | 14,812,950 | 2024-06-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 50,050 | 0.33 % | |
445 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Hamayung RT.002, Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2742282 | 51881306 | 198,821,700 | 198,819,808 | 198,681,028 | 198,681,028 | 198,070,528 | 198,070,500 | 198,070,500 | 198,070,500 | 2024-07-08 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 140,672 | 0.07 % | |
446 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2746282 | 51881541 | 40,000,000 | 39,937,800 | 39,904,500 | 39,904,500 | 39,282,900 | 39,282,900 | 39,282,900 | 39,282,900 | 2024-08-19 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 95,500 | 0.24 % | |
447 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batu Laki Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2749282 | 51882030 | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-06-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.42 % | |
448 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Pandak Daun, Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2752282 | 51881319 | 198,821,700 | 198,821,675 | 198,682,925 | 198,682,925 | 198,072,425 | 198,072,400 | 198,072,400 | 198,072,400 | 2024-07-08 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 138,775 | 0.07 % | |
449 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2755282 | 51881797 | 15,000,000 | 15,000,000 | 14,935,500 | 14,935,500 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-29 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 64,500 | 0.43 % | |
450 | 2024 | Dinas Ketahanan Pangan | Belanja Konsultan Pengawasan Pembangunan Rumah Rice Milling Unit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2765282 | 51876630 | 10,000,000 | 10,000,000 | 9,905,650 | 9,905,650 | 9,850,140 | 9,850,140 | 9,850,140 | 9,850,140 | 2024-06-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 94,350 | 0.94 % | |
451 | 2024 | Dinas Ketahanan Pangan | Belanja Pembangunan Rumah RMU Gapoktan Rakat Mufakat Desa Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 2766282 | 51876504 | 162,560,000 | 162,560,000 | 162,148,301 | 162,148,301 | 161,946,558 | 161,946,558 | 161,946,558 | 161,946,558 | 2024-06-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 411,700 | 0.25 % | |
452 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Jalan Tipe D2) | Pengadaan Langsung | Pekerjaan Konstruksi | 2768282 | 51929724 | 132,840,000 | 132,840,000 | 132,679,073 | 132,679,073 | 132,300,000 | 132,300,000 | 132,300,000 | 132,300,000 | 2024-08-05 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 160,927 | 0.12 % | |
453 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Desa Loksado Kec. Loksado (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 2769282 | 51929886 | 199,305,000 | 199,305,000 | 199,231,174 | 199,231,174 | 198,800,000 | 198,800,000 | 198,800,000 | 198,800,000 | 2024-06-24 | CV. SORAYA | 01.834.078.6-733.000 | 73,826 | 0.04 % | |
454 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembangunan/Peningkatan PSU Permukiman Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2776282 | 51875910 | 50,000,000 | 49,937,000 | 49,725,780 | 49,725,780 | 49,720,230 | 49,720,230 | 100 | 49,720,230 | 2024-06-21 | cv.akmalindo | 02.531.482.4-731.000 | 274,220 | 0.55 % | |
455 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Angkinang Telaga Langsat Kec. Telaga Langsat (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 2778282 | 51929735 | 196,524,000 | 196,524,000 | 196,403,126 | 196,403,126 | 196,300,000 | 196,300,000 | 196,300,000 | 196,300,000 | 2024-07-10 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 120,874 | 0.06 % | |
456 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Tabihi Telaga Langsat Kec. Padang Batung (Jalan Tipe E5) | Pengadaan Langsung | Pekerjaan Konstruksi | 2783282 | 51929726 | 193,077,000 | 193,077,000 | 192,787,020 | 192,787,020 | 192,700,000 | 192,700,000 | 192,700,000 | 192,700,000 | 2024-07-12 | CV. JAYA BANUA KONSTRUKSI | 63.594.064.6-733.000 | 289,980 | 0.15 % | |
457 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jalan Ruas Loklahung - Kamawakan Kec. Loksado (Bertahap) (Jalan Tipe D8) | Pengadaan Langsung | Pekerjaan Konstruksi | 2788282 | 51929614 | 198,990,000 | 198,969,000 | 198,891,426 | 198,891,426 | 198,300,000 | 198,300,000 | 198,300,000 | 198,300,000 | 2024-06-24 | CV. SORAYA | 01.834.078.6-733.000 | 98,574 | 0.05 % | |
458 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Tambangan Kec. Daha Selatan (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 2793282 | 51929792 | 198,180,000 | 198,180,000 | 197,891,688 | 197,891,688 | 197,800,000 | 197,800,000 | 197,800,000 | 197,800,000 | 2024-07-12 | FADWI UTAMA | 94.246.044.5-733.000 | 288,312 | 0.15 % | |
459 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Taniran Selatan Kubah - Buntut Taniran / Wawaran Kec. Angkinang (Bertahap) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2794282 | 51929746 | 197,280,000 | 197,280,000 | 196,948,255 | 196,948,255 | 196,900,000 | 196,900,000 | 196,900,000 | 196,900,000 | 2024-07-12 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 331,745 | 0.17 % | |
460 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pekerjaan Siring Jalan di Desa Baru Kec. Sungai Raya (Jalan Tipe E1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2799282 | 51929890 | 199,998,000 | 199,997,000 | 0 | 199,724,198 | 199,700,000 | 199,700,000 | 199,700,000 | 199,700,000 | 2024-07-12 | cv. nurulillah | 50.826.160.9-733.000 | 199,998,000 | 100 % | |
461 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Kalumpang - Balimau Kec. Kalumpang (Bertahap) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2821282 | 51929754 | 197,280,000 | 197,280,000 | 197,228,216 | 197,228,216 | 196,700,000 | 196,700,000 | 196,700,000 | 196,700,000 | 2024-07-30 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 51,784 | 0.03 % | |
462 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peninggian Jalan Desa Pantai Ulin (Jalan Tipe A9) | Pengadaan Langsung | Pekerjaan Konstruksi | 2825282 | 51929889 | 199,410,000 | 199,410,000 | 199,225,348 | 199,225,348 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-07-01 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 184,652 | 0.09 % | |
463 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2850282 | 51875981 | 70,000,000 | 69,834,000 | 69,757,053 | 69,757,053 | 69,745,953 | 69,745,953 | 100 | 69,745,953 | 2024-06-24 | CV. RAYHANI | 75.410.426.3-733.000 | 242,947 | 0.35 % | |
464 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung di Desa Malinau Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2869282 | 51911960 | 200,000,000 | 199,999,000 | 199,892,424 | 199,892,424 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-07-01 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 107,576 | 0.05 % | |
465 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Murung Raya Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2886282 | 51881352 | 192,796,800 | 192,736,531 | 192,681,031 | 192,681,031 | 191,987,281 | 191,987,250 | 191,987,250 | 191,987,250 | 2024-07-30 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 115,769 | 0.06 % | |
466 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Pakan Dalam Kecamatan Daha Utara (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 2902282 | 51929939 | 196,372,800 | 196,370,000 | 196,050,545 | 196,050,545 | 195,800,000 | 195,800,000 | 195,800,000 | 195,800,000 | 2024-07-19 | CV KARUNIA DHIBA ALMAHERA | 39.076.125.2-733.000 | 322,255 | 0.16 % | |
467 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Desa Tumingki Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 2923282 | 51911987 | 100,000,000 | 100,000,000 | 99,899,286 | 99,899,286 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-07-01 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 100,714 | 0.1 % | |
468 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Desa Taniran Selatan-Desa Taniran Kubah Kecamatan Angkinang (Jembatan Tipe D3) | Pengadaan Langsung | Pekerjaan Konstruksi | 2924282 | 51929936 | 193,895,000 | 193,895,000 | 193,687,457 | 193,687,457 | 193,000,000 | 193,000,000 | 193,000,000 | 193,000,000 | 2024-07-01 | CV.Bangun Banua | 93.708.167.7-733.000 | 207,543 | 0.11 % | |
469 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Baru RT.04 Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2929282 | 47467006 | 15,000,000 | 15,000,000 | 14,990,000 | 14,990,000 | 14,701,950 | 14,701,950 | 14,701,950 | 14,701,950 | 2024-06-26 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 10,000 | 0.07 % | |
470 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Kalumpang Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2950282 | 47466442 | 15,000,000 | 15,000,000 | 14,955,001 | 14,955,001 | 14,701,950 | 14,701,950 | 14,701,950 | 14,701,950 | 2024-06-26 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 44,999 | 0.3 % | |
471 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 2955282 | 51881299 | 198,821,700 | 198,710,400 | 198,565,631 | 198,565,631 | 197,894,081 | 197,894,000 | 197,894,000 | 197,894,000 | 2024-06-26 | CV. LALUNA DANA | 02.237.179.3-733.000 | 256,069 | 0.13 % | |
472 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan DAK Fisik Tahun 2024 Kec. Loksado dan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2956282 | 48541530 | 85,000,000 | 84,999,993 | 84,526,500 | 84,526,500 | 84,500,000 | 84,500,000 | 0 | 84,500,000 | 2024-06-25 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 473,500 | 0.56 % | |
473 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Baru Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2963282 | 51881506 | 15,000,000 | 15,000,000 | 14,999,998 | 14,999,998 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-07-06 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 2 | 0 % | |
474 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2965282 | 51881482 | 15,000,000 | 15,000,000 | 14,957,000 | 14,957,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-08-10 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 43,000 | 0.29 % | |
475 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Daerah Irigasi Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2967282 | 51881714 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-09 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 15,000 | 0.1 % | |
476 | 2024 | Dinas Ketahanan Pangan | Belanja Modal Bangunan Gedung Kantor (Perluasan Gedung Kantor Ruang Kerja) | Pengadaan Langsung | Pekerjaan Konstruksi | 2973282 | 48146602 | 176,120,000 | 176,120,000 | 176,052,061 | 176,052,061 | 175,824,511 | 175,824,511 | 175,824,511 | 175,824,511 | 2024-06-28 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 67,939 | 0.04 % | |
477 | 2024 | Dinas Sosial | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Tempat Kerja Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 2979282 | 48001482 | 90,000,000 | 89,997,144 | 89,775,143 | 89,775,143 | 89,720,069 | 0 | 0 | 0 | 2024-06-28 | cv. nurulillah | 50.826.160.9-733.000 | 224,857 | 0.25 % | |
478 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Haratai 2 Kec. Loksado (Bertahap) Jalan Tipe D8 | Pengadaan Langsung | Pekerjaan Konstruksi | 2980282 | 51929619 | 198,990,000 | 198,990,000 | 198,814,486 | 198,814,486 | 198,600,000 | 198,600,000 | 198,600,000 | 198,600,000 | 2024-07-16 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 175,514 | 0.09 % | |
479 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI. Lokdalam Kec. Angkinang (Rehabilitasi Bendung dengan Pasangan Batu Ketinggian 3 Meter (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 2981282 | 51881790 | 200,000,000 | 199,921,918 | 199,597,186 | 199,597,186 | 198,772,012 | 198,772,000 | 198,772,000 | 198,772,000 | 2024-07-09 | FADWI UTAMA | 94.246.044.5-733.000 | 402,814 | 0.2 % | |
480 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Tambak Pipi'i Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 2982282 | 50438767 | 192,480,597 | 192,480,000 | 192,398,337 | 192,398,337 | 191,607,795 | 191,607,795 | 191,607,795 | 191,607,795 | 2024-07-07 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 82,260 | 0.04 % | |
481 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan pembangunan musholla museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2983282 | 48541553 | 15,000,000 | 14,999,996 | 14,900,000 | 14,900,000 | 14,888,000 | 14,888,000 | 0 | 14,888,000 | 2024-07-02 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 100,000 | 0.67 % | |
482 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Pagar dan Pembuatan Taman Bunga Cagar Budaya Tugu 2 Januari 1949 Desa Hamayung Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 2993282 | 48541555 | 35,000,000 | 34,999,998 | 34,900,000 | 34,900,000 | 34,826,250 | 34,826,250 | 0 | 34,826,250 | 2024-07-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 100,000 | 0.29 % | |
483 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Batu Bini, Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 3009282 | 51881616 | 198,262,275 | 198,252,128 | 198,184,724 | 198,184,724 | 197,416,604 | 197,416,600 | 197,416,600 | 197,416,600 | 2024-07-08 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 77,551 | 0.04 % | |
484 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jaringan Irigasi DI.Jarau I Kec. Sungai Raya (Rehabilitasi Bendung dengan Pasangan Batu Ketinggian 3 Meter (Rusak berat)) | Pengadaan Langsung | Pekerjaan Konstruksi | 3013282 | 51881772 | 200,000,000 | 199,987,300 | 199,830,155 | 199,830,155 | 198,995,435 | 198,995,400 | 198,995,400 | 198,995,400 | 2024-07-09 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 169,845 | 0.08 % | |
485 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Begandi di Desa Baruh Jaya, Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe C)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3017282 | 51881469 | 15,000,000 | 15,000,000 | 14,999,998 | 14,999,998 | 14,818,500 | 14,818,500 | 14,818,500 | 14,818,500 | 2024-07-06 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 2 | 0 % | |
486 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Taniran selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) dan Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Taniran Kubah Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3021282 | 51882090 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-07-06 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
487 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Papagaran Kec. Kandangan (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 3027282 | 51929733 | 194,670,000 | 194,670,000 | 194,613,483 | 194,613,483 | 194,200,000 | 194,200,000 | 194,200,000 | 194,200,000 | 2024-07-03 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 56,517 | 0.03 % | |
488 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 11 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3028282 | 47471416 | 171,000,000 | 170,712,000 | 170,640,803 | 170,640,803 | 170,540,138 | 170,540,138 | 100 | 170,540,138 | 2024-07-19 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 359,197 | 0.21 % | |
489 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 10 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3047282 | 47471418 | 170,000,000 | 169,804,000 | 169,748,580 | 169,748,580 | 169,657,036 | 169,657,036 | 100 | 169,657,036 | 2024-07-10 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 251,420 | 0.15 % | |
490 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 Desa Gambah Luar Muka Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3071282 | 51809245 | 37,038,000 | 36,935,000 | 36,880,239 | 36,880,239 | 36,848,800 | 36,848,800 | 100 | 36,848,800 | 2024-07-10 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 157,761 | 0.43 % | |
491 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Jalan Masuk Ponpes Ibnu Mas'ud Putra | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3080282 | 48095348 | 15,000,000 | 15,000,000 | 14,829,600 | 14,829,600 | 14,546,550 | 0 | 0 | 0 | 2024-07-21 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 170,400 | 1.14 % | |
492 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Jalan Masuk Ponpes Ibnu Mas'ud Putra | Pengadaan Langsung | Pekerjaan Konstruksi | 3081282 | 50436671 | 200,000,000 | 199,982,612 | 199,919,125 | 199,919,125 | 199,647,175 | 199,647,175 | 199,647,175 | 199,647,175 | 2024-07-14 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 80,875 | 0.04 % | |
493 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Paharangan RT.02 Kec. Daha Utara (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3085282 | 51881312 | 198,306,750 | 198,232,277 | 198,106,703 | 198,106,703 | 197,745,953 | 197,745,950 | 197,745,950 | 197,745,950 | 2024-08-06 | CV.BUMI SAHARA PUTRA | 41.042.955.9-732.000 | 200,047 | 0.1 % | |
494 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Pintu Gerbang dan Pagar Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3087282 | 48095705 | 100,000,000 | 100,000,000 | 99,819,864 | 99,819,864 | 99,498,735 | 99,498,735 | 99,498,735 | 99,498,735 | 2024-07-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 180,136 | 0.18 % | |
495 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Kantor Kecamatan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3091282 | 48099120 | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-07-08 | cv.akmalindo | 02.531.482.4-731.000 | 322,000 | 0.32 % | |
496 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Asrama TNI AD Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3095282 | 48095437 | 45,000,000 | 45,000,000 | 44,900,000 | 44,900,000 | 44,455,500 | 44,455,500 | 44,455,500 | 44,455,500 | 2024-07-16 | Wing Rastafarindo | 03.282.590.3-732.000 | 100,000 | 0.22 % | |
497 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 3106282 | 51881667 | 198,711,044 | 198,710,032 | 198,536,471 | 198,536,471 | 197,997,455 | 197,997,450 | 197,997,450 | 197,997,450 | 2024-07-14 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 174,573 | 0.09 % | |
498 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Ray Damar Desa Pantai Ulin Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3110282 | 51881422 | 198,306,750 | 198,178,257 | 197,992,588 | 197,992,588 | 197,537,488 | 197,537,450 | 197,537,450 | 197,537,450 | 2024-07-14 | CV. LALUNA DANA | 02.237.179.3-733.000 | 314,162 | 0.16 % | |
499 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3113282 | 51881402 | 198,821,700 | 198,755,688 | 198,555,888 | 198,555,888 | 198,056,388 | 198,056,350 | 0 | 198,056,350 | 2024-07-14 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 265,812 | 0.13 % | |
500 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Amparaya Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 4 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 3115282 | 51881339 | 196,390,100 | 196,334,963 | 196,196,685 | 196,196,685 | 195,652,785 | 195,652,750 | 195,652,750 | 195,652,750 | 2024-07-21 | CV. LALUNA DANA | 02.237.179.3-733.000 | 193,415 | 0.1 % | |
501 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Saluran Drainase di Ruas Jalan Karang Jawa - Ambarai Kec. Padang Batung (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 3117282 | 51929797 | 198,378,000 | 198,377,000 | 198,265,975 | 198,265,975 | 198,000,000 | 198,000,000 | 198,000,000 | 198,000,000 | 2024-07-11 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 112,025 | 0.06 % | |
502 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3123282 | 51809828 | 63,964,000 | 63,834,000 | 63,778,692 | 63,778,692 | 63,737,057 | 63,737,057 | 100 | 63,737,057 | 2024-07-12 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 185,308 | 0.29 % | |
503 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Gang Langgar Al Ikhlas) | Pengadaan Langsung | Pekerjaan Konstruksi | 3139282 | 51808759 | 49,270,000 | 49,201,000 | 49,146,453 | 49,146,453 | 49,134,250 | 49,134,250 | 100 | 49,134,250 | 2024-07-17 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 123,547 | 0.25 % | |
504 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Aula Kodim Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3142282 | 48096633 | 95,000,000 | 95,000,000 | 94,813,162 | 94,813,162 | 94,566,450 | 94,566,450 | 94,566,450 | 94,566,450 | 2024-07-23 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 186,838 | 0.2 % | |
505 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 02 Desa Gambah Luar Muka dan Desa Gambah Luar Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3144282 | 51875708 | 20,000,000 | 19,833,000 | 19,725,921 | 19,725,921 | 19,703,721 | 19,703,721 | 100 | 19,703,721 | 2024-07-13 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 274,079 | 1.37 % | |
506 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gang Nurul Yaqin RT 02 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3145282 | 51809024 | 68,312,000 | 68,144,000 | 68,033,552 | 68,033,552 | 68,001,558 | 68,001,558 | 100 | 68,001,558 | 2024-07-19 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 278,448 | 0.41 % | |
507 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Singakarsa Teluk Aman RT 07 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3146282 | 51808923 | 77,841,000 | 77,678,000 | 77,623,303 | 77,623,303 | 77,580,513 | 77,580,513 | 100 | 77,580,513 | 2024-07-22 | CV. KARYA PERDANA MANDIRI | 02.237.561.2-732.000 | 217,697 | 0.28 % | |
508 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3150282 | 51809686 | 73,880,000 | 73,759,000 | 73,676,709 | 73,676,709 | 73,606,448 | 73,606,448 | 100 | 73,606,448 | 2024-07-17 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 203,291 | 0.28 % | |
509 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3151282 | 51809429 | 46,959,000 | 46,825,000 | 46,764,178 | 46,764,178 | 46,719,778 | 46,719,778 | 100 | 46,719,778 | 2024-07-17 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 194,822 | 0.41 % | |
510 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 03 Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3155282 | 51809183 | 54,719,000 | 54,615,000 | 54,570,986 | 54,570,986 | 54,536,585 | 54,536,585 | 100 | 54,536,585 | 2024-07-23 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 148,014 | 0.27 % | |
511 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 04 Kel Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3156282 | 51817407 | 42,743,000 | 42,568,000 | 42,493,864 | 42,493,864 | 42,468,943 | 42,468,943 | 100 | 42,468,943 | 2024-07-19 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 249,136 | 0.58 % | |
512 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 03 Kel. Jambu Hilir Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3157282 | 51810286 | 56,776,000 | 56,609,000 | 56,551,032 | 56,551,032 | 56,527,225 | 56,527,225 | 100 | 56,527,225 | 2024-07-17 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 224,968 | 0.4 % | |
513 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Pariangan Mesjid Desa Batu Bini Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3158282 | 51809972 | 53,668,000 | 53,479,000 | 53,418,376 | 53,418,376 | 53,373,976 | 53,373,976 | 100 | 53,373,976 | 2024-07-17 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 249,624 | 0.47 % | |
514 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 3159282 | 51819281 | 91,880,000 | 91,739,000 | 91,662,195 | 91,662,195 | 91,606,695 | 91,606,695 | 100 | 91,606,695 | 2024-07-17 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 217,805 | 0.24 % | |
515 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3165282 | 51810046 | 36,388,000 | 36,268,000 | 36,183,023 | 36,183,023 | 36,155,273 | 36,155,273 | 100 | 36,155,273 | 2024-08-22 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 204,977 | 0.56 % | |
516 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 03 Desa Mandala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3171282 | 51810120 | 40,146,000 | 39,969,000 | 39,900,236 | 39,900,236 | 39,872,486 | 39,872,486 | 100 | 39,872,486 | 2024-08-26 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 245,764 | 0.61 % | |
517 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3172282 | 50438348 | 196,819,416 | 196,723,278 | 196,604,924 | 196,604,924 | 195,993,314 | 195,993,314 | 195,993,314 | 195,993,314 | 2024-08-06 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 214,492 | 0.11 % | |
518 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Desa Angkinang dan Abutment Jembatan Taniran Kec. Angkinang (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3194282 | 52100667 | 200,000,000 | 200,000,000 | 199,930,916 | 199,930,916 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-07-27 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 69,084 | 0.03 % | |
519 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Kel. Kandangan Utara dan RT 11 Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3203282 | 51876060 | 20,000,000 | 19,833,000 | 19,647,038 | 19,647,038 | 19,602,638 | 19,602,638 | 100 | 19,602,638 | 2024-07-23 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 352,962 | 1.76 % | |
520 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Bakarung dan Desa Angkinang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3212282 | 51876116 | 20,000,000 | 19,833,000 | 19,702,500 | 19,702,500 | 19,647,000 | 19,647,000 | 100 | 19,647,000 | 2024-07-22 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 297,500 | 1.49 % | |
521 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tambak Pipi'I Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 3213282 | 48107981 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
522 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4214282 | 51812399 | 39,104,000 | 39,017,000 | 38,972,827 | 38,972,827 | 38,961,802 | 38,961,802 | 100 | 38,961,802 | 2024-07-23 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 131,173 | 0.34 % | |
523 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Jl. Budi Bakti Amawang Kiri Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4215282 | 48104349 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,657,550 | 14,657,550 | 14,657,550 | 14,657,550 | 2024-07-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 15,000 | 0.1 % | |
524 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi PengawasanPerkuatan Tebing Desa Jembatan Merah RT.01 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4226282 | 51881753 | 15,000,000 | 15,000,000 | 14,900,000 | 14,900,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-07-29 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.67 % | |
525 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4227282 | 51881534 | 15,000,000 | 15,000,000 | 14,965,002 | 14,965,002 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-08-03 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 34,998 | 0.23 % | |
526 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Muning Dalam, Kec. Daha Selatan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1 (Tipe E)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4233282 | 51881480 | 40,000,000 | 39,937,800 | 39,849,000 | 39,849,000 | 39,294,000 | 39,294,000 | 39,294,000 | 39,294,000 | 2024-08-06 | CV. Halicons Engineering | 99.750.185.3-732.000 | 151,000 | 0.38 % | |
527 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Loksado Rt.02 Kec. Loksado (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4234282 | 51881794 | 30,000,000 | 30,000,000 | 28,750,000 | 28,750,000 | 28,582,500 | 28,582,500 | 28,582,500 | 28,582,500 | 2024-09-11 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 1,250,000 | 4.17 % | |
528 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan dan RT 04 Desa Telaga Bidadari Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4235282 | 51875409 | 20,000,000 | 19,833,000 | 19,737,625 | 19,737,625 | 19,715,425 | 19,715,425 | 100 | 19,715,425 | 2024-07-31 | CV. Halicons Engineering | 99.750.185.3-732.000 | 262,375 | 1.31 % | |
529 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4237282 | 51875766 | 50,000,000 | 49,937,000 | 49,820,130 | 49,820,130 | 49,809,030 | 49,809,030 | 100 | 49,809,030 | 2024-07-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 179,870 | 0.36 % | |
530 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman Jl. Pertanian Desa Tabihi Kec. Padang Batung (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 4240282 | 47471394 | 172,400,000 | 172,252,000 | 172,100,201 | 172,100,201 | 172,044,701 | 172,044,701 | 100 | 172,044,701 | 2024-08-15 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 299,799 | 0.17 % | |
531 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Baluti Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4241282 | 51810433 | 47,540,000 | 47,364,000 | 47,284,002 | 47,284,002 | 47,250,702 | 47,250,702 | 100 | 47,250,702 | 2024-07-30 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 255,998 | 0.54 % | |
532 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Wasah Tengah Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4244282 | 51881372 | 193,470,000 | 193,418,400 | 193,268,481 | 193,268,481 | 192,685,731 | 192,685,700 | 191,000,000 | 192,685,700 | 2024-07-29 | CV. LALUNA DANA | 02.237.179.3-733.000 | 201,519 | 0.1 % | |
533 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jl. Kesehatan-A.E.S Nasution Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4247282 | 50438178 | 195,200,000 | 195,197,391 | 195,096,777 | 195,096,777 | 194,497,463 | 194,497,463 | 194,497,463 | 194,497,463 | 2024-07-30 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 103,223 | 0.05 % | |
534 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Jalan By. Pass Depan Jl. Kartawidana Sistem 07 | Pengadaan Langsung | Pekerjaan Konstruksi | 4248282 | 50438233 | 199,680,000 | 199,627,412 | 199,444,010 | 199,444,010 | 199,340,336 | 199,340,336 | 199,340,336 | 199,340,336 | 2024-08-26 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 235,990 | 0.12 % | |
535 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 01 Desa Bayanan Kec. Daha Selatan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4249282 | 50081627 | 15,000,000 | 14,891,000 | 14,844,030 | 14,844,030 | 14,832,930 | 14,832,930 | 100 | 14,832,930 | 2024-07-31 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 155,970 | 1.04 % | |
536 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pembahanan Desa Sirih Hulu Kec. Kalumpang (Pembangunan Bendung dengan Pasangan Batu Ketinggian 3 Meter (Irigasi Permukaan)) | Pengadaan Langsung | Pekerjaan Konstruksi | 4253282 | 51881474 | 200,000,000 | 199,898,719 | 199,843,219 | 199,843,219 | 199,158,349 | 199,158,300 | 199,158,300 | 199,158,300 | 2024-08-06 | CV.BANUA JAYA PERDANA | 50.351.382.2-731.000 | 156,781 | 0.08 % | |
537 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di Desa Amawang Kanan, Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 4 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4255282 | 51881325 | 196,390,100 | 196,349,931 | 196,184,057 | 196,184,057 | 195,545,807 | 195,545,800 | 195,545,800 | 195,545,800 | 2024-07-31 | CV. Tia Yasmin Azzam | 63.027.517.0-733.000 | 206,043 | 0.1 % | |
538 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Rumah Dinas Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4257282 | 52172797 | 150,000,000 | 100,000,000 | 99,766,800 | 99,766,800 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-08-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 50,233,200 | 33.49 % | |
539 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 01 - RT 02 Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4268282 | 52154845 | 55,582,000 | 55,420,000 | 55,348,788 | 55,348,788 | 55,293,288 | 55,293,288 | 100 | 55,293,288 | 2024-08-20 | CV. TIGA BERSAUDARA ABADI | 94.821.034.9-733.000 | 233,212 | 0.42 % | |
540 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bising Desa Kapuh Kec. Simpur (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4272282 | 51881427 | 145,102,500 | 145,061,462 | 144,946,686 | 144,946,686 | 144,530,436 | 144,530,400 | 144,530,400 | 144,530,400 | 2024-08-19 | FADWI UTAMA | 94.246.044.5-733.000 | 155,814 | 0.11 % | |
541 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Satreskrim dan Sattahti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4281282 | 52175399 | 95,000,000 | 95,000,000 | 94,840,620 | 94,840,620 | 94,560,900 | 94,560,900 | 94,560,900 | 94,560,900 | 2024-08-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 159,380 | 0.17 % | |
542 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Angkinang (Pemeliharaan Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4282282 | 51881569 | 176,978,500 | 176,885,387 | 176,800,028 | 176,800,028 | 176,356,028 | 176,356,000 | 176,356,000 | 176,356,000 | 2024-08-06 | CV. Haratai Permai | 02.089.737.7-733.000 | 178,472 | 0.1 % | |
543 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur Taman Makam Pahlawan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4285282 | 48000748 | 10,000,000 | 9,990,000 | 9,879,000 | 9,879,000 | 9,879,000 | 0 | 0 | 0 | 2024-08-05 | cv.akmalindo | 02.531.482.4-731.000 | 121,000 | 1.21 % | |
544 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Hanyar Desa Kalumpang, Kec. Kalumpang (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4289282 | 51881407 | 198,821,700 | 198,800,039 | 198,744,539 | 198,744,539 | 198,161,789 | 198,161,750 | 198,161,750 | 198,161,750 | 2024-08-19 | CV. PERDANA | 71.124.808.8-733.000 | 77,161 | 0.04 % | |
545 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Baluti, Kel. Jambu Hilir dan Kel Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4301282 | 51839562 | 30,000,000 | 29,750,000 | 29,734,309 | 29,734,309 | 29,701,009 | 29,701,009 | 100 | 29,701,009 | 2024-08-07 | cv.nawasena konsultan | 62.243.237.5-731.000 | 265,691 | 0.89 % | |
546 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Logistik/Samapta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4310282 | 52187147 | 25,000,000 | 25,000,000 | 24,875,100 | 24,875,100 | 24,630,900 | 24,630,900 | 24,630,900 | 24,630,900 | 2024-08-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 124,900 | 0.5 % | |
547 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan UMKM Kuliner Kawasan Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4312282 | 52187314 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,528,150 | 99,528,150 | 99,528,150 | 99,528,150 | 2024-08-10 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 100,000 | 0.1 % | |
548 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Badminton Dr. H.M. Syafii, Kec. Daha Selatan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4314282 | 52186959 | 95,000,000 | 95,000,000 | 94,627,500 | 94,627,500 | 94,461,000 | 94,461,000 | 94,461,000 | 94,461,000 | 2024-08-12 | cv.akmalindo | 02.531.482.4-731.000 | 372,500 | 0.39 % | |
549 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Gedung Pemuda/Sekretariat KNPI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4317282 | 52187205 | 100,000,000 | 100,000,000 | 99,957,500 | 99,957,500 | 99,500,400 | 99,500,400 | 99,500,400 | 99,500,400 | 2024-08-12 | CV. DAYAKARSA MADYA Consultant | 01.860.272.2-731.000 | 42,500 | 0.04 % | |
550 | 2024 | Dinas Perikanan | Revitalisasi Kolam Ikan Desa Lumpangi | Pengadaan Langsung | Pekerjaan Konstruksi | 4333282 | 51438367 | 149,365,000 | 148,505,502 | 148,488,125 | 148,488,125 | 148,400,000 | 0 | 0 | 0 | 2024-08-14 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 876,875 | 0.59 % | |
551 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Kalumpang - Balimau Kec. Kalumpang (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4338282 | 47884152 | 15,000,000 | 15,000,000 | 14,997,168 | 14,997,168 | 14,900,000 | 14,900,000 | 14,900,000 | 14,900,000 | 2024-08-21 | CV. Halicons Engineering | 99.750.185.3-732.000 | 2,832 | 0.02 % | |
552 | 2024 | Kecamatan Kandangan | Belanja Jasa Perencanaan (Kel. Jambu Hilir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4339282 | 52099767 | 15,000,000 | 14,818,500 | 14,750,000 | 14,750,000 | 14,718,600 | 14,718,600 | 14,718,600 | 14,718,600 | 2024-08-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 250,000 | 1.67 % | |
553 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Malilingin - Lokbahan - Paniungan dan Ruas Jl. Tanayung - Tabihi (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4345282 | 52253922 | 199,998,000 | 199,998,000 | 199,934,969 | 199,934,969 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-08-16 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 63,031 | 0.03 % | |
554 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4359282 | 51876158 | 30,000,000 | 29,750,000 | 29,651,059 | 29,651,059 | 29,617,759 | 29,617,759 | 100 | 29,617,759 | 2024-08-26 | Wing Rastafarindo | 03.282.590.3-732.000 | 348,941 | 1.16 % | |
555 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Ruas Jalan Gg. Bidan RT 03 Desa Tambak Bitin Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4382282 | 47881151 | 25,000,000 | 24,991,500 | 24,864,000 | 24,864,000 | 24,800,000 | 24,800,000 | 24,800,000 | 24,800,000 | 2024-08-23 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 136,000 | 0.54 % | |
556 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Hamalau - Pahampangan Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4386282 | 47881157 | 50,000,000 | 49,999,800 | 48,814,331 | 48,814,331 | 48,800,000 | 48,800,000 | 48,800,000 | 48,800,000 | 2024-09-05 | Wiyasa Drawana | 80.902.072.0-731.000 | 1,185,669 | 2.37 % | |
557 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Baru - Ds. Bajayau Kec. Daha Barat (lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4407282 | 47881142 | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 2024-09-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 50,000 | 0.1 % | |
558 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Angkinang - Telaga Langsat Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4432282 | 47891458 | 45,000,000 | 44,997,000 | 44,947,230 | 44,947,230 | 44,900,000 | 44,900,000 | 44,900,000 | 44,900,000 | 2024-09-05 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 52,770 | 0.12 % | |
559 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan Kalaka Indah dan sekitarnya Desa Tibung Raya Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4442282 | 50081664 | 15,000,000 | 14,891,000 | 14,801,129 | 14,801,129 | 14,790,029 | 14,790,029 | 100 | 14,790,029 | 2024-08-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 198,872 | 1.33 % | |
560 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4443282 | 51876232 | 20,000,000 | 19,833,000 | 19,722,973 | 19,722,973 | 19,700,773 | 19,700,773 | 100 | 19,700,773 | 2024-08-30 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 277,027 | 1.39 % | |
561 | 2024 | Dinas Pertanian | Pembangunan/rehab Jalan Usaha Tani (JUT) Poktan Pandan Arum Desa Bakarung Kec Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4444282 | 47381959 | 199,500,000 | 199,449,000 | 199,278,186 | 199,278,186 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-09-05 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 221,814 | 0.11 % | |
562 | 2024 | Dinas Pertanian | Belanja Jasa Konsultasi Pengawasan JUT Poktan Pandan Arum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4451282 | 51775012 | 14,418,037 | 14,418,000 | 14,374,500 | 14,374,500 | 14,370,000 | 14,370,000 | 14,370,000 | 14,370,000 | 2024-09-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 43,537 | 0.3 % | |
563 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4455282 | 52186547 | 30,000,000 | 30,000,000 | 29,942,250 | 29,942,250 | 29,714,700 | 29,714,700 | 29,714,700 | 29,714,700 | 2024-09-03 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 57,750 | 0.19 % | |
564 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Teluk Haur Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4460282 | 51881488 | 30,000,000 | 30,000,000 | 29,998,860 | 29,998,860 | 29,526,000 | 29,526,000 | 29,526,000 | 29,526,000 | 2024-09-03 | CV. Halicons Engineering | 99.750.185.3-732.000 | 1,140 | 0 % | |
565 | 2024 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 4470282 | 47346769 | 74,592,000 | 72,372,000 | 72,208,931 | 72,208,931 | 71,897,465 | 0 | 0 | 0 | 2024-09-06 | CV. KHALIF | 81.540.809.1-733.000 | 2,383,069 | 3.19 % | |
566 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembersihan Raba/Sampah di Sungai Kec. Kandangan (Pemeliharaan Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 4472282 | 51881565 | 176,978,500 | 176,923,060 | 176,867,560 | 176,867,560 | 176,506,810 | 176,506,800 | 176,506,800 | 176,506,800 | 2024-09-08 | CV. Haratai Permai | 02.089.737.7-733.000 | 110,940 | 0.06 % | |
567 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Tugu Batas Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 4480282 | 47437035 | 194,250,000 | 194,250,000 | 193,670,075 | 193,670,075 | 193,559,075 | 193,559,075 | 77,423,630 | 193,559,075 | 2024-10-04 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 579,925 | 0.3 % | |
568 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Samuda - Bajayau Kec. Daha Barat (Dana Bagi Hasil Sawit Tahap 2) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4481282 | 52155497 | 100,000,000 | 99,928,900 | 99,884,349 | 99,884,349 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-09-17 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 115,651 | 0.12 % | |
569 | 2024 | Kecamatan Kandangan | Belanja Pemeliharaan Jalan (Kel. Jambu Hilir) | Pengadaan Langsung | Pekerjaan Konstruksi | 4487282 | 51640245 | 113,124,100 | 113,121,424 | 113,065,924 | 113,065,924 | 113,010,424 | 113,010,424 | 113,010,424 | 113,010,424 | 2024-09-20 | CV. SORAYA | 01.834.078.6-733.000 | 58,176 | 0.05 % | |
570 | 2024 | Kecamatan Kandangan | Belanja Jasa Pengawasan (Kel. Jambu Hilir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4492282 | 52100009 | 15,000,000 | 14,985,000 | 14,910,000 | 14,910,000 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 2024-09-20 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 90,000 | 0.6 % | |
571 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Rumah Dinas PUTR Jl. Singakarsa | Pengadaan Langsung | Pekerjaan Konstruksi | 4499282 | 52186621 | 200,000,000 | 199,912,958 | 199,720,076 | 199,720,076 | 199,192,855 | 199,192,855 | 199,192,855 | 199,192,855 | 2024-09-30 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 279,924 | 0.14 % | |
572 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Pramuka Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4500282 | 52187169 | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,503,800 | 29,503,800 | 29,503,800 | 29,503,800 | 2024-09-30 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 252,000 | 0.84 % | |
573 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Rumah Dinas PUTR Jl. Singakarsa | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4501282 | 52187011 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,574,300 | 14,574,300 | 14,574,300 | 14,574,300 | 2024-09-30 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 237,000 | 1.58 % | |
574 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4502282 | 52172786 | 200,000,000 | 199,939,930 | 199,884,430 | 199,884,430 | 199,376,605 | 199,376,605 | 199,376,605 | 199,376,605 | 2024-10-07 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 115,571 | 0.06 % | |
575 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Lapangan Bola Kecamatan Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4503282 | 52172802 | 15,000,000 | 15,000,000 | 14,965,000 | 14,965,000 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-10-16 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 35,000 | 0.23 % | |
576 | 2024 | Kecamatan Kandangan | ,Belanja Modal Jalan Lainnya (KU) | Pengadaan Langsung | Pekerjaan Konstruksi | 4505282 | 47839750 | 100,883,880 | 100,778,000 | 100,241,674 | 100,241,674 | 100,017,454 | 0 | 0 | 0 | 2024-10-18 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 642,206 | 0.64 % | |
577 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Pengaman Badan Jalan Desa Hulu Banyu Kec. Loksado (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4506282 | 52766136 | 199,999,999 | 199,999,000 | 199,952,587 | 199,952,587 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-10-10 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 47,412 | 0.02 % | |
578 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Sungai Kudung - Kalinduku Kec. Angkinang, Hamak Timur - Umpaya Kec. Telaga Langsat, dan Singakarsa - Palas (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4541282 | 52766081 | 199,665,000 | 199,663,000 | 199,608,169 | 199,608,169 | 199,200,000 | 199,200,000 | 199,200,000 | 199,200,000 | 2024-10-10 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 56,831 | 0.03 % | |
579 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Wakaf Desa Hakurung Rt.02 Kec. Daha Utara (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4551282 | 52683845 | 40,000,000 | 39,960,000 | 39,937,800 | 39,937,800 | 39,604,800 | 39,604,800 | 39,604,800 | 39,604,800 | 2024-10-14 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 62,200 | 0.16 % | |
580 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4556282 | 52685199 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.75 % | |
581 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung dan Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Tabihi (DI. Kambas) Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4558282 | 52731149 | 40,000,000 | 40,000,000 | 39,850,000 | 39,850,000 | 39,405,000 | 39,405,000 | 39,405,000 | 39,405,000 | 2024-10-15 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 150,000 | 0.38 % | |
582 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Madihin Desa Kayu Abang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4570282 | 52683655 | 50,000,000 | 49,950,000 | 49,839,000 | 49,839,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-10-14 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 161,000 | 0.32 % | |
583 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Survei Investigasi Design Daerah Irigasi Rawa (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4571282 | 52701379 | 75,000,000 | 74,925,000 | 74,919,450 | 74,919,450 | 74,003,700 | 74,003,700 | 74,003,700 | 74,003,700 | 2024-10-24 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 80,550 | 0.11 % | |
584 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4576282 | 52683954 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.75 % | |
585 | 2024 | Dinas Pertanian | Perencanaan Pemb/Rehab Jalan Usaha tani (JUT) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4577282 | 52779971 | 90,000,000 | 90,000,000 | 89,810,100 | 89,810,100 | 89,700,000 | 89,700,000 | 89,700,000 | 89,700,000 | 2024-10-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 189,900 | 0.21 % | |
586 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Estimasi Nilai Lahan dan Bangunan (Appraisal Nilai Tanah untuk NJOP) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4583282 | 52383715 | 150,000,000 | 149,968,992 | 149,406,000 | 149,406,000 | 148,000,000 | 0 | 0 | 0 | 2024-10-30 | KJPP Rizki Djunaedy dan Rekan Cabang Pontianak | 21.065.097.4-701.001 | 594,000 | 0.4 % | |
587 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Telaga Langsat RT.02 Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4587282 | 52684811 | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-10-23 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 105,500 | 0.21 % | |
588 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Telaga Langsat Kec. Telaga Langsat dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4651282 | 52731106 | 40,000,000 | 40,000,000 | 39,960,000 | 39,960,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-14 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 40,000 | 0.1 % | |
589 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4662282 | 52683901 | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-19 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 151,000 | 0.38 % | |
590 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Malilingin RT.01 Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4665282 | 52685038 | 50,000,000 | 49,983,300 | 49,894,500 | 49,894,500 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-10-15 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 105,500 | 0.21 % | |
591 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Kandangan Kota RT.05 Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4666282 | 52684991 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,637,000 | 29,637,000 | 29,637,000 | 29,637,000 | 2024-10-15 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 30,000 | 0.1 % | |
592 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Halunuk Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4668282 | 52685109 | 20,000,000 | 20,000,000 | 19,925,000 | 19,925,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 75,000 | 0.38 % | |
593 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Lokbinuang RT.02 Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4669282 | 52685149 | 20,000,000 | 20,000,000 | 19,850,000 | 19,850,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-19 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 150,000 | 0.75 % | |
594 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing Desa Malinau Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4689282 | 52684757 | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-10-14 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 105,500 | 0.21 % | |
595 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelaksanaan Kegiatan E-PAKSI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4705282 | 52701372 | 100,000,000 | 99,938,850 | 99,900,000 | 99,900,000 | 99,067,500 | 99,067,500 | 99,067,500 | 99,067,500 | 2024-10-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 100,000 | 0.1 % | |
596 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI. Tayub, DI. Mahlan, DI. Aliyaman, DI. Kamat di Kec. Telaga Langsat (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4707282 | 52701982 | 198,804,700 | 198,665,939 | 198,633,372 | 198,633,372 | 198,217,122 | 198,217,100 | 198,217,100 | 198,217,100 | 2024-10-15 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 171,328 | 0.09 % | |
597 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI. Jarau II dan DI. Ida Manggala di Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4708282 | 52701965 | 198,804,700 | 198,665,398 | 198,648,312 | 198,648,312 | 198,232,062 | 198,232,000 | 198,232,000 | 198,232,000 | 2024-10-14 | CV. Haratai Permai | 02.089.737.7-733.000 | 156,388 | 0.08 % | |
598 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Kelurahan Jambu Hilir Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4709282 | 52684337 | 40,000,000 | 39,849,000 | 39,806,820 | 39,806,820 | 39,482,700 | 39,482,700 | 39,482,700 | 39,482,700 | 2024-10-15 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 193,180 | 0.48 % | |
599 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan tebing di desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya dan Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4718282 | 52731093 | 60,000,000 | 60,000,000 | 59,878,799 | 59,878,799 | 59,496,000 | 59,496,000 | 59,496,000 | 59,496,000 | 2024-10-25 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 121,201 | 0.2 % | |
600 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Jaringan Irigasi DI Jarau I di Kec. Sungai Raya (Pemeliharaan jaringan Irigasi Permukaan dengan galian Lumpur tinggi 30 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 4722282 | 52701953 | 198,804,700 | 198,666,679 | 198,601,196 | 198,601,196 | 198,184,946 | 198,184,900 | 198,184,900 | 198,184,900 | 2024-10-14 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 203,504 | 0.1 % | |
601 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Balanti Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4728282 | 52683565 | 40,000,000 | 39,960,000 | 39,793,500 | 39,793,500 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-25 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 206,500 | 0.52 % | |
602 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan dan Jasa Konsultansi Perencanaan Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4730282 | 52731125 | 40,000,000 | 40,000,000 | 39,960,000 | 39,960,000 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-15 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 40,000 | 0.1 % | |
603 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4734282 | 52684381 | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,647,000 | 0 | 0 | 0 | 2024-10-15 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 50,000 | 0.25 % | |
604 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4736282 | 52701412 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-15 | CV. ASRINDO GRAHA CONSULTANT | 01.585.258.5-731.000 | 100,000 | 0.5 % | |
605 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan DIR. Tirtabahalayung Kec. Kandangan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4738282 | 52701387 | 75,000,000 | 74,897,250 | 74,814,000 | 74,814,000 | 74,037,000 | 74,037,000 | 74,037,000 | 74,037,000 | 2024-10-24 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 186,000 | 0.25 % | |
606 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan/Peningkatan PSU Permukiman | Pengadaan Langsung | Pekerjaan Konstruksi | 4748282 | 52925093 | 180,000,000 | 179,982,354 | 179,811,614 | 179,811,614 | 179,706,164 | 163,691,475 | 163,691,475 | 163,691,475 | 2024-10-23 | CV. ELANG BANGUN SEMESTA | 71.364.465.6-733.000 | 188,386 | 0.1 % | |
607 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4749282 | 52684015 | 40,000,000 | 39,960,000 | 39,860,100 | 39,860,100 | 39,627,000 | 39,627,000 | 39,627,000 | 39,627,000 | 2024-10-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 139,900 | 0.35 % | |
608 | 2024 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Perencanaan Arsitektur - Jasa Penilaian Perawatan dan kelayakan bangunan gedung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4752282 | 52947900 | 10,000,000 | 10,000,000 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 9,867,900 | 2024-10-16 | CV. CITRA TEKNIKA D | 72.050.193.1-731.000 | 132,100 | 1.32 % | |
609 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Lingkungan untuk Peningkatan DIR. Tirtabahalayung, Kec.Kandangan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4768282 | 52701398 | 75,000,000 | 74,925,000 | 74,536,500 | 74,536,500 | 74,092,500 | 74,092,500 | 74,092,500 | 74,092,500 | 2024-10-28 | PT. Geotenviro Teknindo Nusantara | 63.939.411.3-732.000 | 463,500 | 0.62 % | |
610 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Simpur Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4771282 | 52684654 | 20,000,000 | 20,000,000 | 19,909,999 | 19,909,999 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-26 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,001 | 0.45 % | |
611 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4778282 | 52684431 | 20,000,000 | 20,000,000 | 19,909,999 | 19,909,999 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-25 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 90,001 | 0.45 % | |
612 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di sekitar Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4785282 | 52683493 | 20,000,000 | 20,000,000 | 19,802,400 | 19,802,400 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-10-23 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 197,600 | 0.99 % | |
613 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai di Desa Bajayau Lama Kec. Daha Barat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4791282 | 52683784 | 40,000,000 | 39,960,000 | 39,937,800 | 39,937,800 | 39,604,800 | 39,604,800 | 39,604,800 | 39,604,800 | 2024-10-19 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 62,200 | 0.16 % | |
614 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Pajah Api dan Jl. Ds. Kapuh Tengah (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4792282 | 52791806 | 60,000,000 | 59,953,900 | 59,898,464 | 59,898,464 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-28 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 101,536 | 0.17 % | |
615 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4819282 | 52785433 | 20,000,000 | 19,907,000 | 19,795,851 | 19,795,851 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-11-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 204,149 | 1.02 % | |
616 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4820282 | 52793307 | 35,000,000 | 34,991,600 | 34,880,418 | 34,880,418 | 34,800,000 | 34,800,000 | 34,800,000 | 34,800,000 | 2024-11-08 | Wing Rastafarindo | 03.282.590.3-732.000 | 119,582 | 0.34 % | |
617 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Tawia - Kayu Abang Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4821282 | 52791985 | 80,000,000 | 79,991,300 | 79,308,390 | 79,308,390 | 79,300,000 | 79,300,000 | 79,300,000 | 79,300,000 | 2024-11-04 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 691,610 | 0.86 % | |
618 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jl. Tibung Raya - Asam Cangkok Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4822282 | 52792302 | 80,000,000 | 79,991,300 | 79,858,284 | 79,858,284 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-10-25 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 141,716 | 0.18 % | |
619 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Taal Jarau Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4824282 | 52793660 | 80,000,000 | 79,991,300 | 79,963,601 | 79,963,601 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-07 | CV. Halicons Engineering | 99.750.185.3-732.000 | 36,399 | 0.05 % | |
620 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Amawang Muka - Getek dan Jl. Angkakai (Jl. Sungai Hambawang) Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4825282 | 52791679 | 80,000,000 | 79,991,351 | 79,863,390 | 79,863,390 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-04 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 136,610 | 0.17 % | |
621 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Banua Kambang Kec. Simpur (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4827282 | 52793495 | 80,000,000 | 79,991,300 | 79,863,390 | 79,863,390 | 79,800,000 | 79,800,000 | 79,800,000 | 79,800,000 | 2024-11-04 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 136,610 | 0.17 % | |
622 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Pianggu Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4837282 | 52792685 | 60,000,000 | 59,953,900 | 59,812,350 | 59,812,350 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-25 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 187,650 | 0.31 % | |
623 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Wasah Tengah - Sungai Tarap Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4838282 | 52791598 | 60,000,000 | 59,953,900 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-11-04 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
624 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Taniran Tengah - Taniran Selatan Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4841282 | 52792399 | 60,000,000 | 59,953,900 | 59,781,270 | 59,781,270 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-11-04 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 218,730 | 0.36 % | |
625 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Halayung - Hantarukung Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4843282 | 52792992 | 80,000,000 | 79,991,300 | 79,741,601 | 79,741,601 | 79,700,000 | 79,700,000 | 79,700,000 | 79,700,000 | 2024-10-23 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 258,399 | 0.32 % | |
626 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Desa Lungau Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4853282 | 52793158 | 80,000,000 | 79,991,300 | 79,741,601 | 79,741,601 | 79,700,000 | 79,700,000 | 79,700,000 | 79,700,000 | 2024-10-23 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 258,399 | 0.32 % | |
627 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4856282 | 52783833 | 20,000,000 | 19,907,000 | 19,647,000 | 19,647,000 | 19,600,000 | 19,600,000 | 19,600,000 | 19,600,000 | 2024-11-08 | cv.akmalindo | 02.531.482.4-731.000 | 353,000 | 1.77 % | |
628 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Ruas Jl. Anjiran Rantauan - Ds. Taniran Tengah Kec. Angkinang (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4857282 | 52973534 | 200,000,000 | 199,996,000 | 199,897,919 | 199,897,919 | 199,700,000 | 199,700,000 | 199,700,000 | 199,700,000 | 2024-10-19 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 102,081 | 0.05 % | |
629 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4869282 | 52784680 | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-23 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
630 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Kesehatan dan Jalan AES Nasution Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4872282 | 52793567 | 50,000,000 | 49,969,200 | 49,891,552 | 49,891,552 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 108,448 | 0.22 % | |
631 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Simp 3 Baluti Amawang Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4874282 | 52791359 | 50,000,000 | 49,969,200 | 49,913,752 | 49,913,752 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | Wiyasa Drawana | 80.902.072.0-731.000 | 86,248 | 0.17 % | |
632 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4897282 | 52784595 | 20,000,000 | 19,907,000 | 19,850,000 | 19,850,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-25 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 150,000 | 0.75 % | |
633 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Sugiono dan Jl. Sekolah Islam Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4899282 | 52791487 | 50,000,000 | 49,969,200 | 49,902,652 | 49,902,652 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-19 | Wiyasa Drawana | 80.902.072.0-731.000 | 97,348 | 0.19 % | |
634 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4900282 | 52784813 | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-23 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
635 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Keramat Sakti Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4901282 | 52792862 | 50,000,000 | 49,969,200 | 49,772,400 | 49,772,400 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-24 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 227,600 | 0.46 % | |
636 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Kamawakan Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4902282 | 52793414 | 50,000,000 | 49,969,200 | 49,916,700 | 49,916,700 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-10-31 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 83,300 | 0.17 % | |
637 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Al-Ikhlas - Ds. Baluti Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4903282 | 52791901 | 50,000,000 | 49,969,200 | 49,711,350 | 49,711,350 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-25 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 288,650 | 0.58 % | |
638 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Matang Gadung - Halalang Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4904282 | 52792191 | 50,000,000 | 49,969,200 | 49,772,400 | 49,772,400 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-10-24 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 227,600 | 0.46 % | |
639 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4915282 | 52784465 | 20,000,000 | 19,907,000 | 19,850,000 | 19,850,000 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-25 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 150,000 | 0.75 % | |
640 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4920282 | 52785246 | 20,000,000 | 19,907,000 | 19,884,818 | 19,884,818 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-21 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 115,183 | 0.58 % | |
641 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4925282 | 52783526 | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
642 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Pengawasan Rehabilitasi Tugu Batas Kota, Pengawasan Peningkatan PSU Perumahan Kalian Asri Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4926282 | 47436955;47437033 | 15,000,000 | 14,999,597 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 14,899,697 | 2024-10-22 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 100,304 | 0.67 % | |
643 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4955282 | 52783759 | 20,000,000 | 19,907,000 | 19,647,000 | 19,647,000 | 19,600,000 | 19,600,000 | 19,600,000 | 19,600,000 | 2024-11-08 | cv.akmalindo | 02.531.482.4-731.000 | 353,000 | 1.77 % | |
644 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4967282 | 52785076 | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
645 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4968282 | 52784415 | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
646 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Hamak Timur Umpaya Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4972282 | 52792137 | 60,000,000 | 59,953,900 | 59,935,560 | 59,935,560 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-31 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 64,440 | 0.11 % | |
647 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Merah Johansyah - Jl. Melati Kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4974282 | 52791743 | 60,000,000 | 59,953,900 | 59,731,964 | 59,731,964 | 59,700,000 | 59,700,000 | 59,700,000 | 59,700,000 | 2024-10-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 268,036 | 0.45 % | |
648 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4975282 | 52784948 | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
649 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4976282 | 52783678 | 20,000,000 | 19,907,000 | 19,829,318 | 19,829,318 | 19,800,000 | 19,800,000 | 19,800,000 | 19,800,000 | 2024-10-22 | PT. KARYA CAKRAWALA PRANATA | 01.741.055.6-731.000 | 170,683 | 0.85 % | |
650 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Batang Kulur Kiri - Durian Landung (Kalian Basar) Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4979282 | 52792050 | 60,000,000 | 59,953,900 | 59,812,350 | 59,812,350 | 59,800,000 | 59,800,000 | 59,800,000 | 59,800,000 | 2024-10-25 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 187,650 | 0.31 % | |
651 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado ((Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4983282 | 52785154 | 20,000,000 | 19,907,000 | 19,752,450 | 19,752,450 | 19,700,000 | 19,700,000 | 19,700,000 | 19,700,000 | 2024-10-25 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 247,550 | 1.24 % | |
652 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4995282 | 52833105 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,400 | 0.88 % | |
653 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4996282 | 52834339 | 20,000,000 | 20,000,000 | 19,880,000 | 19,880,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-28 | Wing Rastafarindo | 03.282.590.3-732.000 | 120,000 | 0.6 % | |
654 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 4997282 | 52826560 | 20,000,000 | 20,000,000 | 19,702,500 | 19,702,500 | 19,613,700 | 19,613,700 | 19,613,700 | 19,613,700 | 2024-10-26 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 297,500 | 1.49 % | |
655 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Urugan Samping Gedung MUI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5000282 | 52834912 | 20,000,000 | 20,000,000 | 19,957,000 | 19,957,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 43,000 | 0.22 % | |
656 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5002282 | 52783780 | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-26 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
657 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5003282 | 52736666 | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
658 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5004282 | 52793391 | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
659 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5005282 | 52793814 | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-26 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
660 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5009282 | 52792277 | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,520 | 0.28 % | |
661 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5014282 | 52736216 | 20,000,000 | 20,000,000 | 19,902,300 | 19,902,300 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. ANS CONSULINDO | 72.112.192.9-731.000 | 97,700 | 0.49 % | |
662 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5017282 | 52732965 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
663 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5019282 | 52793709 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
664 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5030282 | 52790968 | 20,000,000 | 20,000,000 | 19,888,980 | 19,888,980 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-26 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 111,020 | 0.56 % | |
665 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5035282 | 52791275 | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
666 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5038282 | 52792113 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-27 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
667 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5048282 | 52793491 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-27 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
668 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5070282 | 52791189 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
669 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5071282 | 52784589 | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
670 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5072282 | 52791965 | 20,000,000 | 20,000,000 | 19,944,480 | 19,944,480 | 19,813,500 | 19,813,500 | 19,813,500 | 19,813,500 | 2024-10-25 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 55,520 | 0.28 % | |
671 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5079282 | 52793082 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
672 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5085282 | 52785160 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-27 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 131,000 | 0.66 % | |
673 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5087282 | 52791369 | 20,000,000 | 20,000,000 | 19,996,650 | 19,996,650 | 19,741,350 | 19,741,350 | 19,741,350 | 19,741,350 | 2024-10-27 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 3,350 | 0.02 % | |
674 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5089282 | 52794188 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
675 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5092282 | 52794341 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
676 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5095282 | 52806025 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
677 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5096282 | 52806050 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
678 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5111282 | 52806072 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
679 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5112282 | 52806084 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
680 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5119282 | 52806095 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
681 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5122282 | 52806109 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
682 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5150282 | 52806116 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
683 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5152282 | 52806140 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 175,400 | 0.88 % | |
684 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5157282 | 52806149 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
685 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5161282 | 52806165 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
686 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5168282 | 52811871 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
687 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5174282 | 52811954 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
688 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5186282 | 52812010 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
689 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5189282 | 52812264 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-11-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
690 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5213282 | 52812400 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-11-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.28 % | |
691 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Survei Investigasi Design Daerah Irigasi Permukaan (Usulan DAK) (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5214282 | 52701376 | 75,000,000 | 74,930,000 | 74,925,000 | 74,925,000 | 74,314,500 | 74,314,500 | 74,314,500 | 74,314,500 | 2024-10-24 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 75,000 | 0.1 % | |
692 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5217282 | 52813357 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
693 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | ,Perencanaan Pembangunan PMA Desa Lumpangi Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5224282 | 52812520;52813599 | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-11-02 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
694 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5231282 | 52791060 | 40,000,000 | 40,000,000 | 39,887,850 | 39,887,850 | 39,760,200 | 39,760,200 | 39,760,200 | 39,760,200 | 2024-10-27 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 112,150 | 0.28 % | |
695 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan SPALD JAGAT di Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5238282 | 52785337 | 40,000,000 | 40,000,000 | 39,888,960 | 39,888,960 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-10-25 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 111,040 | 0.28 % | |
696 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Gedung Olahraga/Serbaguna Kecamatan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5263282 | 52835143 | 100,000,000 | 99,952,725 | 99,522,600 | 99,522,600 | 99,342,225 | 99,342,225 | 99,342,225 | 99,342,225 | 2024-11-04 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 477,400 | 0.48 % | |
697 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Renovasi Kantor Kodim 1003 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5268282 | 52833327 | 100,000,000 | 99,952,725 | 99,900,000 | 99,900,000 | 99,231,225 | 99,231,225 | 99,231,225 | 99,231,225 | 2024-10-27 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 100,000 | 0.1 % | |
698 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Polsek Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5271282 | 52835238 | 40,000,000 | 40,000,000 | 39,793,500 | 39,793,500 | 39,704,700 | 39,704,700 | 39,704,700 | 39,704,700 | 2024-10-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 206,500 | 0.52 % | |
699 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Kecamatan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5275282 | 52826348 | 100,000,000 | 99,952,725 | 99,453,225 | 99,453,225 | 99,342,225 | 99,342,225 | 99,342,225 | 99,342,225 | 2024-11-05 | Asiyah Griya Persada | 50.479.063.5-732.000 | 546,775 | 0.55 % | |
700 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Kecamatan Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5277282 | 52826690 | 100,000,000 | 99,952,725 | 99,564,225 | 99,564,225 | 99,508,725 | 99,508,725 | 99,508,725 | 99,508,725 | 2024-11-05 | CV. Motif Konsultan | 75.076.899.6-731.000 | 435,775 | 0.44 % | |
701 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Backdrof Gedung Kantor Sekretariat Daerah/Kantor Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5287282 | 53073872 | 100,000,000 | 99,952,725 | 99,622,500 | 99,622,500 | 99,286,725 | 99,286,725 | 99,286,725 | 99,286,725 | 2024-10-28 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 377,500 | 0.38 % | |
702 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Asrama Santri Ponpes Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5288282 | 52835153 | 100,000,000 | 99,795,938 | 99,345,000 | 99,345,000 | 99,189,600 | 99,189,600 | 99,189,600 | 99,189,600 | 2024-11-16 | cv.akmalindo | 02.531.482.4-731.000 | 655,000 | 0.66 % | |
703 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Barak Remaja dan Ruang Tahanan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5290282 | 52833169 | 100,000,000 | 99,795,938 | 99,433,800 | 99,433,800 | 99,245,100 | 99,245,100 | 99,245,100 | 99,245,100 | 2024-11-16 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 566,200 | 0.57 % | |
704 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Saluran Drainase Di Ruko Sudi Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5294282 | 52732229 | 20,000,000 | 20,000,000 | 19,957,000 | 19,957,000 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-29 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 43,000 | 0.22 % | |
705 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Kantor, Rumah Jabatan Kajari dan Mushola Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5297282 | 52833190 | 40,000,000 | 40,000,000 | 39,958,500 | 39,958,500 | 39,782,400 | 39,782,400 | 39,782,400 | 39,782,400 | 2024-10-29 | CV.PUTRA KUIN ENGINEERING | 94.320.679.7-731.000 | 41,500 | 0.1 % | |
706 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Rumah Jabatan dan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5302282 | 52833239 | 40,000,000 | 40,000,000 | 39,815,700 | 39,815,700 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-10-26 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 184,300 | 0.46 % | |
707 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Rumah Jabatan Kapolres Kab HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5303282 | 52833322 | 40,000,000 | 40,000,000 | 39,704,700 | 39,704,700 | 39,649,200 | 39,649,200 | 39,649,200 | 39,649,200 | 2024-10-26 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 295,300 | 0.74 % | |
708 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Dokumen Andalalin Kawasan Perkantoran Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5310282 | 52833113 | 100,000,000 | 99,978,357 | 99,778,563 | 99,778,563 | 99,467,100 | 99,467,100 | 99,467,100 | 99,467,100 | 2024-11-12 | PT TECTAMA KARYA | 01.534.559.8-731.000 | 221,437 | 0.22 % | |
709 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Study Transportasi Kawasan Perkantoran Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5320282 | 52855535 | 100,000,000 | 99,978,982 | 99,779,182 | 99,779,182 | 99,467,100 | 99,467,100 | 99,467,100 | 99,467,100 | 2024-11-12 | PT. TECHNIKATAMA JASA KONSULTAN | 02.089.773.2-733.000 | 220,818 | 0.22 % | |
710 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung II Kejaksaan Negeri Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5326282 | 52833323 | 100,000,000 | 99,952,725 | 99,783,450 | 99,783,450 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 2024-11-22 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 216,550 | 0.22 % | |
711 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Kantor Bappelitbangda Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5347282 | 52826971 | 100,000,000 | 99,952,725 | 98,235,000 | 98,235,000 | 98,179,500 | 98,179,500 | 98,179,500 | 98,179,500 | 2024-11-19 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 1,765,000 | 1.77 % | |
712 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putra Malaris Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5348282 | 52835149 | 100,000,000 | 99,795,938 | 99,345,000 | 99,345,000 | 99,245,100 | 99,245,100 | 99,245,100 | 99,245,100 | 2024-11-19 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 655,000 | 0.66 % | |
713 | 2024 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural (Konsultan Perencanaan Rehab Pagar Depan, Pembangunan Pagar dan Saluran Air Di Belakang Panggung Terbuka Obyek Wisata Air Panas Tanuhi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5358282 | 53017411 | 40,000,000 | 39,992,000 | 39,853,718 | 39,853,718 | 39,770,468 | 0 | 0 | 0 | 2024-10-23 | SKETSA NIRINDO ADITAMA | 02.575.724.6-731.000 | 146,283 | 0.37 % | |
714 | 2024 | Dinas Perdagangan | Perencanaan Perkuatan Bangunan Los Amandit Pasar Kandangan Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5378282 | 53015228 | 100,000,000 | 100,000,000 | 99,678,000 | 99,678,000 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-11-08 | cv.akmalindo | 02.531.482.4-731.000 | 322,000 | 0.32 % | |
715 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5394282 | 52805922 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-08 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 242,000 | 1.21 % | |
716 | 2024 | Dinas Perdagangan | Perencanaan Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5396282 | 52804739 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-08 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 242,000 | 1.21 % | |
717 | 2024 | Dinas Perdagangan | Study Kelayakan - Peningkatan Pasar Agrobisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5399282 | 52773258 | 95,000,000 | 94,999,999 | 94,712,970 | 94,712,970 | 94,461,000 | 94,461,000 | 94,461,000 | 94,461,000 | 2024-10-31 | CV. LANTAR ABYUDAYA | 02.043.219.1-731.000 | 287,030 | 0.3 % | |
718 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Ruang Kantin Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5405282 | 52834009 | 50,000,000 | 49,647,525 | 49,506,000 | 49,506,000 | 49,383,900 | 49,383,900 | 49,383,900 | 49,383,900 | 2024-10-28 | cv.akmalindo | 02.531.482.4-731.000 | 494,000 | 0.99 % | |
719 | 2024 | Dinas Perdagangan | Belanja Jasa Perencanaan Rehab Pagar Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5422282 | 53072168 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-11-01 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 237,000 | 1.58 % | |
720 | 2024 | Dinas Perdagangan | DED/Perencanaan Peningkatan Pasar Arba Batang Kulur Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5430282 | 52772550 | 50,000,000 | 50,000,000 | 49,617,000 | 49,617,000 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-11-13 | cv.akmalindo | 02.531.482.4-731.000 | 383,000 | 0.77 % | |
721 | 2024 | Dinas Perdagangan | DED/Perencanaan Peningkatan Pasar Agrobisnis Pasar Taniran Kec. angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5431282 | 52772931 | 100,000,000 | 99,999,900 | 99,816,750 | 99,816,750 | 99,456,000 | 99,456,000 | 99,456,000 | 99,456,000 | 2024-11-01 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 183,250 | 0.18 % | |
722 | 2024 | Dinas Perdagangan | DED/Perencanaan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5459282 | 52773577 | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,511,500 | 99,511,500 | 99,511,500 | 99,511,500 | 2024-10-31 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 100,000 | 0.1 % | |
723 | 2024 | Dinas Perdagangan | UPL dan UKL - Peningkatan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5474282 | 52774059 | 100,000,000 | 99,998,513 | 99,900,000 | 99,900,000 | 99,511,500 | 99,511,500 | 99,511,500 | 99,511,500 | 2024-10-31 | PT. PRISMA JASA KONSULINDO | 95.412.417.8-731.000 | 100,000 | 0.1 % | |
724 | 2024 | Dinas Perdagangan | UPL dan UKL - Peningkatan Pasar Agrobisnis Taniran Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5478282 | 52773437 | 100,000,000 | 99,998,513 | 99,720,180 | 99,720,180 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-10-31 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 279,820 | 0.28 % | |
725 | 2024 | RSUD Daha Sejahtera | Pengawasan Rehabilitasi Poli Rawat Jalan Rumah Sakit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5479282 | 52950768 | 25,000,000 | 25,000,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2024-11-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 136,000 | 0.54 % | |
726 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN PEMBANGUNAN WC (SDN 1 PAKUAN DAN SDN 2 LOKBAHAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5486282 | 52754280 | 35,000,000 | 34,999,998 | 34,944,501 | 34,944,501 | 34,900,000 | 34,900,000 | 34,900,000 | 34,900,000 | 2024-10-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 55,499 | 0.16 % | |
727 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS (SDN BARIANG, BAGAMBIR, JAMBU HULU, 1 ANGKINANG ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5490282 | 52753980 | 80,000,000 | 80,000,000 | 79,833,500 | 79,833,500 | 79,799,010 | 79,799,010 | 79,799,010 | 79,799,010 | 2024-10-26 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 166,500 | 0.21 % | |
728 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS (SDN GAMBAH LUAR SELATANSDN BUKUANIN, SDN MUNING BARU, SDN 1 BATANG KULUR KIRI, SDN 1 PARIGI) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5505282 | 52754163 | 80,000,000 | 80,000,000 | 79,944,500 | 79,944,500 | 79,879,000 | 79,879,000 | 79,879,000 | 79,879,000 | 2024-10-26 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.07 % | |
729 | 2024 | Dinas Pendidikan dan Kebudayaan | PERENCANAAN UTILITAS ( SDN TABIHI KANAN, GARUNGGANG, 2 KERAMAT RAYA, PANTAI ULIN, 1 SIRIH ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5536282 | 52753803 | 100,000,000 | 100,000,000 | 99,889,000 | 99,889,000 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-10-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.11 % | |
730 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang dan Perencanaan Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5546282 | 52754733 | 30,000,000 | 30,000,000 | 29,944,500 | 29,944,500 | 29,900,070 | 29,900,070 | 29,900,070 | 29,900,070 | 2024-10-28 | Wing Rastafarindo | 03.282.590.3-732.000 | 55,500 | 0.19 % | |
731 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5547282 | 52754427 | 15,000,000 | 14,999,996 | 14,944,501 | 14,944,501 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2024-10-28 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.37 % | |
732 | 2024 | RSUD Daha Sejahtera | Perencanaan Rehabilitasi Poli Rawat Jalan Rumah Sakit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5549282 | 52951244 | 25,000,000 | 25,000,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 24,864,000 | 2024-10-28 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 136,000 | 0.54 % | |
733 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Angkinang - Kayu Abang - Panggang Hijau Kec. Angkinang (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5555282 | 52794055 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
734 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Hariti - Sungai Raya Selatan Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5562282 | 52794180 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
735 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Jl. Neng Suriangpati kec. Kandangan (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5574282 | 52793799 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
736 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Padang Batung - Batu Laki - Malilingin Kec. Padang Batung (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5577282 | 52794115 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
737 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Sungai Raya - Jambu Hulu/Paku Kec. Sungai Raya (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5584282 | 52793932 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
738 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Wasah Hilir - Amparaya kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5587282 | 52793984 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
739 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Struktur Ruas Jalan Wasah Hulu - Amparaya - Simpur Kec. Simpur (Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5591282 | 52793877 | 100,000,000 | 99,915,000 | 99,763,470 | 99,763,470 | 99,700,000 | 99,700,000 | 99,700,000 | 99,700,000 | 2024-11-02 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 236,530 | 0.24 % | |
740 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Pembangunan Halaman SDN 2 TAMBANGAN dan Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5595282 | 52754366 | 25,000,000 | 24,999,997 | 24,944,501 | 24,944,501 | 24,900,000 | 24,900,000 | 24,900,000 | 24,900,000 | 2024-10-28 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.22 % | |
741 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Sungai Kepayang, Desa Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 5600282 | 52780294 | 163,500,000 | 163,500,000 | 163,431,771 | 163,431,771 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | Lingga Perkasa | 20.558.364.4-733.000 | 68,229 | 0.04 % | |
742 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Rasau Bakti, Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 5614282 | 52780207 | 163,500,000 | 163,500,000 | 163,476,766 | 163,476,766 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 23,234 | 0.01 % | |
743 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Padang Hariung, Desa Karang Jawa | Pengadaan Langsung | Pekerjaan Konstruksi | 5622282 | 52780118 | 163,500,000 | 163,498,825 | 163,454,425 | 163,454,425 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 45,575 | 0.03 % | |
744 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Ruas Jalan Pagat Batu - Muara Hariang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5625282 | 52792415 | 25,000,000 | 24,991,500 | 24,880,581 | 24,880,581 | 24,800,000 | 24,800,000 | 24,800,000 | 24,800,000 | 2024-11-30 | CV. Halicons Engineering | 99.750.185.3-732.000 | 119,419 | 0.48 % | |
745 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5628282 | 52783597 | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
746 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5636282 | 52784412 | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
747 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5639282 | 52784974 | 15,000,000 | 14,997,000 | 14,969,418 | 14,956,848 | 14,700,000 | 14,700,000 | 14,700,000 | 14,700,000 | 2024-11-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 30,582 | 0.2 % | |
748 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5651282 | 52784677 | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
749 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5653282 | 52784305 | 15,000,000 | 14,997,000 | 14,950,000 | 14,950,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | CV. RIFQINDO CONSULTANT | 75.098.613.5-714.000 | 50,000 | 0.33 % | |
750 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5657282 | 52783230 | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
751 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5660282 | 52784883 | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-22 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
752 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5661282 | 53177335 | 15,000,000 | 14,723,000 | 14,678,640 | 14,678,640 | 14,656,440 | 14,656,440 | 100 | 14,656,440 | 2024-10-31 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 321,360 | 2.14 % | |
753 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5668282 | 52783868 | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
754 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5669282 | 52782999 | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
755 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5682282 | 53177343 | 15,000,000 | 14,723,000 | 14,547,660 | 14,547,660 | 14,519,910 | 14,519,910 | 100 | 14,519,910 | 2024-10-28 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 452,340 | 3.02 % | |
756 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5689282 | 53177368 | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,634,777 | 14,634,777 | 100 | 14,634,777 | 2024-10-28 | Wing Rastafarindo | 03.282.590.3-732.000 | 331,923 | 2.21 % | |
757 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5709282 | 52785310 | 15,000,000 | 14,997,000 | 14,925,000 | 14,925,000 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-19 | CV. LAURINDO | 02.963.320.3-735.000 | 75,000 | 0.5 % | |
758 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Lanjutan) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5712282 | 52785265 | 15,000,000 | 14,997,000 | 14,969,418 | 14,969,418 | 14,700,000 | 14,700,000 | 14,700,000 | 14,700,000 | 2024-11-25 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 30,582 | 0.2 % | |
759 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan Pihanin Raya (Batang Alai) - Ds. Muning Tengah Daha Selatan (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5724282 | 52785429 | 45,000,000 | 44,997,000 | 44,963,755 | 44,963,755 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 36,245 | 0.08 % | |
760 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Matang Gadung - Halalang Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5725282 | 52792066 | 45,000,000 | 44,997,000 | 44,886,180 | 44,886,180 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-30 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 113,820 | 0.25 % | |
761 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Ruas Jalan Tambangan - Ds. Baruh Jaya Kec. Daha Selatan (Bertahap) (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5734282 | 52785477 | 45,000,000 | 44,997,000 | 44,947,230 | 44,947,230 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-12-02 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 52,770 | 0.12 % | |
762 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Al-Ikhlas - Ds. Baluti Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5735282 | 52791863 | 45,000,000 | 44,997,000 | 44,769,630 | 44,769,630 | 44,700,000 | 44,700,000 | 44,700,000 | 44,700,000 | 2024-11-22 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 230,370 | 0.51 % | |
763 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Kesehatan dan Jalan AES Nasution Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5736282 | 52793192 | 45,000,000 | 44,997,000 | 44,913,805 | 44,913,805 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-25 | Wiyasa Drawana | 80.902.072.0-731.000 | 86,195 | 0.19 % | |
764 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Simp 3 Baluti Amawang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5744282 | 52785513 | 45,000,000 | 44,997,000 | 44,913,805 | 44,913,805 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-29 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 86,195 | 0.19 % | |
765 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Keramat Sakti Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5767282 | 52792297 | 45,000,000 | 44,997,000 | 44,886,180 | 44,886,180 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-30 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 113,820 | 0.25 % | |
766 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Sugiono dan Jl. Sekolah Islam Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5772282 | 52791191 | 45,000,000 | 44,997,000 | 44,930,455 | 44,930,455 | 44,500,000 | 44,500,000 | 44,500,000 | 44,500,000 | 2024-11-29 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 69,545 | 0.15 % | |
767 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Kamawakan Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5781282 | 52792809 | 45,000,000 | 44,997,000 | 44,988,300 | 44,988,300 | 44,800,000 | 44,800,000 | 44,800,000 | 44,800,000 | 2024-11-18 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 11,700 | 0.03 % | |
768 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Hamak Timur Umpaya Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5786282 | 52792023 | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 2024-11-18 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 50,000 | 0.1 % | |
769 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Pianggu Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5787282 | 52792265 | 50,000,000 | 49,999,800 | 49,894,500 | 49,894,500 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-12 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 105,500 | 0.21 % | |
770 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Taniran Tengah - Taniran Selatan Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5788282 | 52792249 | 50,000,000 | 49,999,800 | 49,944,450 | 49,944,450 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-12-02 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 55,550 | 0.11 % | |
771 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jl. Pajah Api dan Jl. Ds. Kapuh Tengah (Jl. Menuju Majelis Taklim) Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5789282 | 52791640 | 50,000,000 | 49,999,800 | 49,972,061 | 49,972,061 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-26 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 27,939 | 0.06 % | |
772 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5790282 | 52753015 | 20,000,000 | 20,000,000 | 19,869,000 | 19,869,000 | 19,850,000 | 19,850,000 | 19,850,000 | 19,850,000 | 2024-10-28 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 131,000 | 0.66 % | |
773 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengamanan Badan Jalan di Desa Lungau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5791282 | 52792426 | 70,000,000 | 69,980,100 | 69,791,458 | 69,791,458 | 69,700,000 | 69,700,000 | 69,700,000 | 69,700,000 | 2024-11-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 208,542 | 0.3 % | |
774 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Halayung - Hantarukung Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5792282 | 52792740 | 70,000,000 | 69,980,100 | 69,886,363 | 69,886,363 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-12 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 113,637 | 0.16 % | |
775 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Tawia - Kayu Abang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5795282 | 52791910 | 70,000,000 | 69,980,100 | 69,805,680 | 69,805,680 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-12-02 | CV. CITRA MANDIRI CONSULTANT | 76.325.165.9-735.000 | 194,320 | 0.28 % | |
776 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Batang Kulur Kiri - Durian Landung (Kalian Basar) Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5807282 | 52791960 | 50,000,000 | 49,999,800 | 49,950,971 | 49,950,971 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-29 | cv.nawasena konsultan | 62.243.237.5-731.000 | 49,029 | 0.1 % | |
777 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Ruas Jalan Pendawa dan Jalan Buluh Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5808282 | 52791737 | 50,000,000 | 49,999,800 | 49,950,000 | 49,950,000 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-12 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 50,000 | 0.1 % | |
778 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Wasah Tengah - Sungai Tarap Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5811282 | 52791272 | 50,000,000 | 49,999,800 | 49,950,971 | 49,950,971 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-29 | cv.nawasena konsultan | 62.243.237.5-731.000 | 49,029 | 0.1 % | |
779 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Merah Johansyah - Jl. Melati Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5813282 | 52791484 | 50,000,000 | 49,999,800 | 49,922,111 | 49,922,111 | 49,800,000 | 49,800,000 | 49,800,000 | 49,800,000 | 2024-11-30 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 77,889 | 0.16 % | |
780 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Stuktur Jl. Tibung Raya - Asam Cangkok Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5818282 | 52792115 | 70,000,000 | 69,980,100 | 69,845,640 | 69,845,640 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-29 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 154,360 | 0.22 % | |
781 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Taal Jarau Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5822282 | 52846752 | 70,000,000 | 69,980,100 | 69,952,408 | 69,952,408 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-11-30 | CV. Halicons Engineering | 99.750.185.3-732.000 | 47,592 | 0.07 % | |
782 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rekonstruksi Ruas Jalan Banua Kambang Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5832282 | 52792851 | 70,000,000 | 69,980,100 | 69,805,680 | 69,805,680 | 69,800,000 | 69,800,000 | 69,800,000 | 69,800,000 | 2024-12-02 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 194,320 | 0.28 % | |
783 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 2) | Pengadaan Langsung | Pekerjaan Konstruksi | 5851282 | 53199916 | 195,650,000 | 194,624,549 | 194,588,443 | 194,588,443 | 194,499,643 | 194,499,643 | 194,499,643 | 194,499,643 | 2024-11-02 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,061,557 | 0.54 % | |
784 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 3) | Pengadaan Langsung | Pekerjaan Konstruksi | 5867282 | 53199901 | 195,650,000 | 194,795,093 | 194,767,343 | 194,767,343 | 194,397,269 | 194,397,269 | 194,397,269 | 194,397,269 | 2024-11-02 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 882,657 | 0.45 % | |
785 | 2024 | Dinas Kesehatan | Jasa Apraisal untuk Pengadaan Tanah Puskesmas Bamban | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5868282 | 53179778 | 50,000,000 | 49,972,200 | 49,856,804 | 49,856,804 | 49,856,804 | 49,856,000 | 49,856,000 | 49,856,000 | 2024-11-12 | KJPP Pung S Zulkarnain & Rekan Cabang Banjarmasin | 21.046.880.7-731.001 | 143,196 | 0.29 % | |
786 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5869282 | 52834355 | 20,000,000 | 20,000,000 | 19,824,600 | 19,824,600 | 19,758,000 | 19,758,000 | 19,758,000 | 19,758,000 | 2024-10-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,400 | 0.88 % | |
787 | 2024 | Dinas Kesehatan | Pengurugan Halaman Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 5871282 | 53219438 | 74,999,500 | 74,910,000 | 74,820,134 | 74,820,134 | 74,820,134 | 74,820,000 | 74,820,000 | 74,820,000 | 2024-11-11 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 179,366 | 0.24 % | |
788 | 2024 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu dan Poskesdes (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5872282 | 53180837 | 50,000,000 | 34,500,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 2024-12-06 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 15,701,000 | 31.4 % | |
789 | 2024 | Dinas Kesehatan | Pengawasan Pemasangan Paving Puskesmas Angkinang, Puskesmas Bajayau, Puskesmas Jambu Hilir dan Puskesmas Kaliring | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5886282 | 53180677 | 40,000,000 | 39,960,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 39,849,000 | 2024-12-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 151,000 | 0.38 % | |
790 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Pasungkan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5887282 | 53179948 | 50,000,000 | 49,950,000 | 49,894,500 | 49,894,500 | 49,561,500 | 49,561,500 | 49,561,500 | 49,561,500 | 2024-11-20 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 105,500 | 0.21 % | |
791 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Kaliring | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 5909282 | 53179918 | 50,000,000 | 49,950,000 | 49,783,500 | 49,783,500 | 49,450,500 | 49,450,500 | 49,450,500 | 49,450,500 | 2024-11-20 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 216,500 | 0.43 % | |
792 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5910282 | 53188518 | 25,000,000 | 25,000,000 | 24,897,633 | 24,897,633 | 24,842,133 | 24,842,133 | 24,842,133 | 24,842,133 | 2024-11-01 | Haded Barakat Utama | 95.529.593.6-732.000 | 102,367 | 0.41 % | |
793 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5911282 | 53199460 | 15,000,000 | 14,723,000 | 14,623,677 | 14,623,677 | 14,595,927 | 14,595,927 | 100 | 14,595,927 | 2024-10-30 | CV. Halicons Engineering | 99.750.185.3-732.000 | 376,323 | 2.51 % | |
794 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5912282 | 53199170 | 30,000,000 | 29,872,000 | 29,772,698 | 29,772,698 | 29,744,948 | 29,744,948 | 100 | 29,744,948 | 2024-10-30 | CV. Halicons Engineering | 99.750.185.3-732.000 | 227,303 | 0.76 % | |
795 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5913282 | 53199453 | 30,000,000 | 29,872,000 | 29,754,938 | 29,754,938 | 29,743,838 | 29,743,838 | 100 | 29,743,838 | 2024-10-30 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 245,063 | 0.82 % | |
796 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5914282 | 53199075 | 25,000,000 | 24,898,000 | 24,707,490 | 24,707,490 | 24,701,940 | 24,701,940 | 100 | 24,701,940 | 2024-10-30 | cv.akmalindo | 02.531.482.4-731.000 | 292,510 | 1.17 % | |
797 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5918282 | 53199053 | 15,000,000 | 14,723,000 | 14,374,500 | 14,374,500 | 14,363,400 | 14,363,400 | 100 | 14,363,400 | 2024-10-30 | cv.akmalindo | 02.531.482.4-731.000 | 625,500 | 4.17 % | |
798 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5919282 | 53199384 | 25,000,000 | 24,898,000 | 24,815,042 | 24,815,042 | 24,803,942 | 24,803,942 | 100 | 24,803,942 | 2024-10-31 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 184,958 | 0.74 % | |
799 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5920282 | 53199179 | 15,000,000 | 14,723,000 | 14,623,677 | 14,623,677 | 14,612,577 | 14,612,577 | 100 | 14,612,577 | 2024-10-31 | CV.ERNAN HUTAMA KARYA | 42.209.608.1-735.000 | 376,323 | 2.51 % | |
800 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5922282 | 53199316 | 15,000,000 | 14,723,000 | 14,695,827 | 14,695,827 | 14,673,627 | 14,673,627 | 100 | 14,673,627 | 2024-10-30 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 304,173 | 2.03 % | |
801 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Muning Baru dan RT. 02 Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5923282 | 53208751 | 30,000,000 | 29,899,000 | 29,677,364 | 29,677,364 | 29,666,264 | 29,666,264 | 100 | 29,666,264 | 2024-10-30 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 322,636 | 1.08 % | |
802 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari dan RT. 02 Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5927282 | 53208696 | 30,000,000 | 29,899,000 | 29,788,364 | 29,788,364 | 29,743,964 | 29,743,964 | 100 | 29,743,964 | 2024-10-30 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 211,636 | 0.71 % | |
803 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5930282 | 53199363 | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,640,327 | 14,640,327 | 100 | 14,640,327 | 2024-10-31 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 331,923 | 2.21 % | |
804 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5936282 | 53199127 | 30,000,000 | 29,872,000 | 29,817,098 | 29,817,098 | 29,761,598 | 29,761,598 | 100 | 29,761,598 | 2024-10-31 | CV. TRIPLE ENGINEERING | 20.635.856.6-733.000 | 182,903 | 0.61 % | |
805 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5937282 | 53199113 | 25,000,000 | 24,898,000 | 24,807,390 | 24,807,390 | 24,800,064 | 24,800,064 | 100 | 24,800,064 | 2024-10-30 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 192,610 | 0.77 % | |
806 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl.Parigi Desa Wasah Hulu - Desa Ulin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5958282 | 53199041 | 60,000,000 | 44,679,000 | 44,522,100 | 44,522,100 | 44,466,600 | 44,466,600 | 100 | 44,466,600 | 2024-11-01 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 15,477,900 | 25.8 % | |
807 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat Kec. Kandangan dan RT. 03 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5972282 | 53208809 | 30,000,000 | 29,899,000 | 29,773,530 | 29,773,530 | 29,729,130 | 29,729,130 | 100 | 29,729,130 | 2024-11-01 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 226,470 | 0.75 % | |
808 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5976282 | 53199062 | 25,000,000 | 24,898,000 | 24,776,088 | 24,776,088 | 24,764,988 | 24,764,988 | 100 | 24,764,988 | 2024-10-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 223,912 | 0.9 % | |
809 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perencanaan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan dan RT. 01 - 02 Desa Angkinang Selatan Kec Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5986282 | 53208565 | 30,000,000 | 29,899,000 | 29,807,940 | 29,807,940 | 29,752,440 | 29,752,440 | 100 | 29,752,440 | 2024-10-31 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 192,060 | 0.64 % | |
810 | 2024 | RSUD Daha Sejahtera | Perencanaan Rehab Gedung Rawat Inap | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 5990282 | 52950282 | 100,000,000 | 97,957,500 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 97,680,000 | 2024-10-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 2,320,000 | 2.32 % | |
811 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai di sekitar Kec. Sungai Raya (Normalisasi Sungai dengan Lebar Sungai 6 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 6004282 | 52701605 | 198,306,750 | 198,284,070 | 198,228,569 | 198,228,569 | 197,895,569 | 197,895,500 | 197,895,500 | 197,895,500 | 2024-11-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 78,181 | 0.04 % | |
812 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Jasa Konsultan Perencanaan Pemasangan Paving Blok di halaman Ruang Tunggu di TMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6007282 | 48000286 | 50,000,000 | 35,000,000 | 34,743,000 | 34,743,000 | 34,709,700 | 0 | 0 | 0 | 2024-10-31 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 15,257,000 | 30.51 % | |
813 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6010282 | 52701576 | 198,262,275 | 198,236,034 | 197,658,366 | 197,658,366 | 197,543,148 | 197,543,100 | 197,543,100 | 197,543,100 | 2024-11-20 | CV RIZKY BANUA | 02.089.856.5-733.000 | 603,909 | 0.3 % | |
814 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6011282 | 52701445 | 198,711,044 | 198,698,432 | 198,504,105 | 198,504,105 | 198,067,875 | 198,067,800 | 198,067,800 | 198,067,800 | 2024-11-05 | CV. SHINTA | 01.124.041.3-733.000 | 206,939 | 0.1 % | |
815 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Halunuk Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6014282 | 52701453 | 198,262,275 | 198,244,447 | 198,188,948 | 198,188,948 | 197,983,598 | 197,983,500 | 197,983,500 | 197,983,500 | 2024-11-23 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 73,327 | 0.04 % | |
816 | 2024 | Dinas Perdagangan | Belanja Jasa Perencanaan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6015282 | 53072100 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,647,000 | 19,647,000 | 19,647,000 | 19,647,000 | 2024-11-01 | cv.akmalindo | 02.531.482.4-731.000 | 242,000 | 1.21 % | |
817 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Urugan dan Pembangunan Pagar Belakang Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6018282 | 52833701 | 100,000,000 | 99,952,725 | 99,811,200 | 99,811,200 | 99,619,725 | 99,619,725 | 99,619,725 | 99,619,725 | 2024-11-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 188,800 | 0.19 % | |
818 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6020282 | 52701439 | 198,262,275 | 198,223,748 | 197,973,860 | 197,973,860 | 197,539,850 | 197,539,850 | 197,539,850 | 197,539,850 | 2024-11-05 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 288,415 | 0.15 % | |
819 | 2024 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6022282 | 52754595 | 15,000,000 | 14,999,996 | 14,944,501 | 14,944,501 | 14,914,000 | 14,914,000 | 14,914,000 | 14,914,000 | 2024-11-01 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 55,499 | 0.37 % | |
820 | 2024 | Dinas Pertanian | Pemb/Rehab JUT Poktan Sungai Pisang Desa Angkinang, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6024282 | 52780326 | 163,500,000 | 163,491,800 | 163,436,325 | 163,436,325 | 163,300,000 | 163,300,000 | 163,300,000 | 163,300,000 | 2024-11-01 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 63,675 | 0.04 % | |
821 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Perencanaan Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6026282 | 53268820 | 15,000,000 | 14,723,000 | 14,668,077 | 14,668,077 | 14,600,000 | 14,600,000 | 100 | 14,600,000 | 2024-11-06 | Wing Rastafarindo | 03.282.590.3-732.000 | 331,923 | 2.21 % | |
822 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN GARUNGGANG - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6027282 | 52753193 | 170,000,000 | 169,991,449 | 169,958,149 | 169,958,149 | 169,835,654 | 169,835,654 | 169,835,654 | 169,835,654 | 2024-11-09 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 41,851 | 0.02 % | |
823 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 2 KERAMAT RAYA - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6031282 | 52753691 | 170,000,000 | 169,977,349 | 169,916,299 | 169,916,299 | 169,803,979 | 169,803,979 | 169,803,979 | 169,803,979 | 2024-11-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 83,701 | 0.05 % | |
824 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 BATANG KULUR KIRI - SELATAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6032282 | 52754097 | 180,000,000 | 179,995,741 | 179,967,991 | 179,967,991 | 179,841,271 | 179,841,271 | 179,841,271 | 179,841,271 | 2024-11-05 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 32,009 | 0.02 % | |
825 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BUKUANIN - PEMBANGUNAN HALAMAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6033282 | 52754074 | 170,000,000 | 169,983,336 | 169,927,836 | 169,927,836 | 169,818,533 | 169,818,533 | 169,818,533 | 169,818,533 | 2024-11-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 72,164 | 0.04 % | |
826 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN MUNING BARU - PEMBANGUNAN HALAMAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6034282 | 52754135 | 190,000,000 | 189,982,565 | 189,927,065 | 189,927,065 | 189,828,222 | 189,828,222 | 189,828,222 | 189,828,222 | 2024-11-05 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 72,935 | 0.04 % | |
827 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN PANTAI ULIN - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6035282 | 52753719 | 180,000,000 | 179,980,675 | 179,925,175 | 179,925,175 | 179,805,551 | 179,805,551 | 179,805,551 | 179,805,551 | 2024-11-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 74,825 | 0.04 % | |
828 | 2024 | Dinas Pendidikan dan Kebudayaan | PEMBANGUNAN HALAMAN SDN 1 PARIGI | Pengadaan Langsung | Pekerjaan Konstruksi | 6036282 | 52754215 | 170,000,000 | 169,971,248 | 169,816,001 | 169,816,001 | 169,760,501 | 169,760,501 | 169,760,501 | 169,760,501 | 2024-11-03 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 183,999 | 0.11 % | |
829 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN Gambah Luar Selatan - Pembangunan Pagar | Pengadaan Langsung | Pekerjaan Konstruksi | 6040282 | 52754048 | 190,000,000 | 189,954,794 | 189,789,346 | 189,789,346 | 189,667,246 | 189,667,246 | 189,667,246 | 189,667,246 | 2024-11-03 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 210,654 | 0.11 % | |
830 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN TABIHI KANAN - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6041282 | 52753070 | 180,000,000 | 169,983,574 | 169,819,142 | 169,819,142 | 169,741,664 | 169,741,664 | 169,741,664 | 169,741,664 | 2024-11-03 | FADWI UTAMA | 94.246.044.5-733.000 | 10,180,858 | 5.66 % | |
831 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN JAMBU HULU - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6043282 | 52753928 | 180,000,000 | 179,992,106 | 179,900,502 | 179,900,502 | 179,780,622 | 179,780,622 | 179,780,622 | 179,780,622 | 2024-11-06 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 99,498 | 0.06 % | |
832 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BAGAMBIR - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6046282 | 52753895 | 170,000,000 | 169,979,578 | 169,688,120 | 169,688,120 | 169,592,260 | 169,592,260 | 169,592,260 | 169,592,260 | 2024-11-06 | CV. KHALIF | 81.540.809.1-733.000 | 311,880 | 0.18 % | |
833 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6048282 | 52752951 | 200,000,000 | 199,939,221 | 199,575,213 | 199,575,213 | 199,468,304 | 199,468,304 | 199,468,304 | 199,468,304 | 2024-11-07 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 424,787 | 0.21 % | |
834 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Pekerjaan Konstruksi | 6049282 | 52754339 | 100,000,000 | 99,991,665 | 99,936,165 | 99,936,165 | 99,845,079 | 99,845,079 | 99,845,079 | 99,845,079 | 2024-11-11 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 63,835 | 0.06 % | |
835 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan Halaman SDN 2 TAMBANGAN | Pengadaan Langsung | Pekerjaan Konstruksi | 6050282 | 52754321 | 170,000,000 | 169,985,750 | 169,813,405 | 169,813,405 | 169,767,950 | 169,767,950 | 169,767,950 | 169,767,950 | 2024-11-06 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 186,595 | 0.11 % | |
836 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 2 LOKBAHAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6072282 | 52754263 | 170,000,000 | 169,954,916 | 169,899,416 | 169,899,416 | 169,788,416 | 169,788,416 | 169,788,416 | 169,788,416 | 2024-11-05 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 100,584 | 0.06 % | |
837 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 PAKUAN PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 6092282 | 52754227 | 170,000,000 | 169,987,851 | 169,954,547 | 169,954,547 | 169,828,983 | 169,828,983 | 169,828,983 | 169,828,983 | 2024-11-08 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 45,453 | 0.03 % | |
838 | 2024 | Dinas Kesehatan | Jasa Konsultansi Penyusunan Dokumen Lingkungan PKM Bajayau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6135282 | 53179879 | 50,000,000 | 49,950,000 | 49,839,000 | 49,839,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-11-20 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | 161,000 | 0.32 % | |
839 | 2024 | Dinas Kesehatan | Pengurugan Halaman Pustu Karang Jawa Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 6168282 | 53218852 | 74,999,500 | 74,903,000 | 74,723,857 | 74,723,857 | 74,723,857 | 74,723,000 | 74,723,000 | 74,723,000 | 2024-11-14 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 275,643 | 0.37 % | |
840 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Kaliring | Pengadaan Langsung | Pekerjaan Konstruksi | 6181282 | 53180553 | 167,750,000 | 167,468,000 | 167,345,890 | 167,345,890 | 167,345,890 | 167,345,000 | 167,345,000 | 167,345,000 | 2024-11-18 | CV. CIPTA AMANDIT SAKTI | 53.616.362.9-733.000 | 404,110 | 0.24 % | |
841 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6182282 | 53180208 | 214,720,000 | 199,459,000 | 199,102,698 | 199,102,698 | 199,102,698 | 199,102,000 | 199,102,000 | 199,102,000 | 2024-11-14 | FADWI UTAMA | 94.246.044.5-733.000 | 15,617,302 | 7.27 % | |
842 | 2024 | Dinas Kesehatan | Perencanaan Rehabilitasi Pustu 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6201282 | 53202880 | 50,000,000 | 49,356,000 | 49,245,111 | 49,245,111 | 48,967,611 | 48,967,000 | 48,967,000 | 48,967,000 | 2024-12-03 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 754,889 | 1.51 % | |
843 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman SDN 2 TAMBANGAN dan Pembangunan Halaman Parkir SDN 2 SUNGAI JARUM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6202282 | 52754387 | 20,000,000 | 20,000,000 | 19,955,600 | 19,955,600 | 19,900,080 | 19,900,080 | 19,900,080 | 19,900,080 | 2024-11-07 | Wing Rastafarindo | 03.282.590.3-732.000 | 44,400 | 0.22 % | |
844 | 2024 | Dinas Kesehatan | Perencanaan Rehabilitasi Poskesdes 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6208282 | 53181349 | 50,000,000 | 49,356,000 | 49,245,111 | 49,245,111 | 48,967,611 | 48,967,000 | 48,967,000 | 48,967,000 | 2024-12-03 | CV. RIA KONSULTAN | 02.883.220.2-731.000 | 754,889 | 1.51 % | |
845 | 2024 | Dinas Kesehatan | Perencanaan Pembangunan Poskesdes 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6210282 | 53180927 | 50,000,000 | 49,356,000 | 49,339,461 | 49,339,461 | 49,339,461 | 49,339,000 | 49,339,000 | 49,339,000 | 2024-12-03 | CV. Halicons Engineering | 99.750.185.3-732.000 | 660,539 | 1.32 % | |
846 | 2024 | Dinas Kesehatan | Perencanaan Pembangunan Pustu 2025 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6215282 | 53181080 | 50,000,000 | 49,356,000 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 49,226,280 | 2024-12-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 773,720 | 1.55 % | |
847 | 2024 | Sekretariat DPRD | Konsultan Perencana pembuatan Ruang Fraksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6216282 | 53240853 | 15,000,000 | 15,000,000 | 14,918,400 | 14,918,400 | 14,918,400 | 0 | 0 | 0 | 2024-11-04 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 81,600 | 0.54 % | |
848 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN PEMBANGUNAN WC (SDN 1 PAKUAN DAN SDN 2 LOKBAHAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6258282 | 52754298 | 30,000,000 | 30,000,000 | 29,889,000 | 29,889,000 | 29,859,000 | 29,859,000 | 29,859,000 | 29,859,000 | 2024-11-08 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 111,000 | 0.37 % | |
849 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS (SDN BARIANG, BAGAMBIR, JAMBU HULU, 1 ANGKINANG ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6273282 | 52754006 | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-11-08 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 111,000 | 0.16 % | |
850 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS (SDN GAMBAH LUAR SELATANSDN BUKUANIN, SDN MUNING BARU, SDN 1 BATANG KULUR KIRI, SDN 1 PARIGI) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6275282 | 52754184 | 70,000,000 | 70,000,000 | 69,889,000 | 69,889,000 | 69,819,000 | 69,819,000 | 69,819,000 | 69,819,000 | 2024-11-08 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.16 % | |
851 | 2024 | Dinas Pendidikan dan Kebudayaan | PENGAWASAN UTILITAS ( SDN TABIHI KANAN, GARUNGGANG, 2 KERAMAT RAYA, PANTAI ULIN, 1 SIRIH ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6276282 | 52753822 | 90,000,000 | 90,000,000 | 89,900,100 | 89,900,100 | 89,799,000 | 89,799,000 | 89,799,000 | 89,799,000 | 2024-11-07 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 99,900 | 0.11 % | |
852 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Urugan Samping Gedung MUI | Pengadaan Langsung | Pekerjaan Konstruksi | 6279282 | 52834913 | 200,000,000 | 199,929,144 | 199,879,742 | 199,879,742 | 199,652,192 | 199,652,192 | 199,652,192 | 199,652,192 | 2024-11-05 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 120,258 | 0.06 % | |
853 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 SIRIH - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 6281282 | 52753769 | 170,000,000 | 169,942,198 | 169,886,698 | 169,886,698 | 169,774,023 | 169,774,023 | 169,774,023 | 169,774,023 | 2024-11-08 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 113,302 | 0.07 % | |
854 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Jakstrada Sanitasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6286282 | 52814163 | 100,000,000 | 99,938,295 | 99,799,545 | 99,799,545 | 99,578,100 | 99,578,100 | 99,578,100 | 99,578,100 | 2024-11-08 | PT. SETIATAMA MEGA KONSULTAN | 85.453.751.1-732.000 | 200,455 | 0.2 % | |
855 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Fasade Bangunan Mesjid Nurul Hidayah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6290282 | 52834911 | 100,000,000 | 99,952,725 | 99,465,990 | 99,465,990 | 99,222,900 | 99,222,900 | 99,222,900 | 99,222,900 | 2024-11-13 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 534,010 | 0.53 % | |
856 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Pagar Rumah Jabatan Bupati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6294282 | 53273744 | 60,000,000 | 59,995,500 | 59,551,500 | 59,551,500 | 59,551,500 | 0 | 0 | 0 | 2024-11-04 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 448,500 | 0.75 % | |
857 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Pembuatan Pagar+Rehab Gedung Asrama Putri di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6295282 | 53270129 | 15,000,000 | 15,000,000 | 14,774,100 | 14,774,100 | 14,774,100 | 0 | 0 | 0 | 2024-12-02 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 225,900 | 1.51 % | |
858 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Pembuatan Pagar dan Rehab Gedung Asrama Putri HSS di Malang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6297282 | 53270046 | 20,000,000 | 20,000,000 | 19,758,000 | 19,758,000 | 19,758,000 | 0 | 0 | 0 | 2024-11-04 | cv.akmalindo | 02.531.482.4-731.000 | 242,000 | 1.21 % | |
859 | 2024 | Sekretariat Daerah | Jasa Konsultansi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Pembuatan Menara+Tandon) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6307282 | 53269792 | 10,000,000 | 9,990,000 | 9,768,000 | 9,768,000 | 9,768,000 | 0 | 0 | 0 | 2024-11-04 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 232,000 | 2.32 % | |
860 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehab Aula TKN Pembina Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6320282 | 52753039 | 15,000,000 | 14,999,996 | 14,874,000 | 14,874,000 | 14,840,700 | 14,840,700 | 14,840,700 | 14,840,700 | 2024-11-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 126,000 | 0.84 % | |
861 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Rumah Jabatan Bupati) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6362282 | 53271448 | 100,000,000 | 99,836,730 | 99,586,980 | 99,586,980 | 99,586,980 | 0 | 0 | 0 | 2024-11-10 | NATA CIPTA BANUA | 95.694.619.8-735.000 | 413,020 | 0.41 % | |
862 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Penilai Perawatan dan Kelayakan Bangunan Gedung (Rehab Gedung Kesenian) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6363282 | 53268837 | 75,000,000 | 74,952,750 | 74,536,500 | 74,536,500 | 74,536,500 | 0 | 0 | 0 | 2024-11-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 463,500 | 0.62 % | |
863 | 2024 | Dinas Perdagangan | Study Kelayakan - Peningkatan Pasar Terpadu Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6364282 | 52773917 | 95,000,000 | 94,999,999 | 94,350,000 | 94,350,000 | 94,083,600 | 94,083,600 | 94,083,600 | 94,083,600 | 2024-11-05 | CV. RUHAFI ADHIRAJASA | 99.100.492.0-731.000 | 650,000 | 0.68 % | |
864 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Depo Arsip Kab. HSS (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6365282 | 52826788 | 100,000,000 | 99,906,938 | 99,740,438 | 99,740,438 | 99,500,400 | 99,500,400 | 99,500,400 | 99,500,400 | 2024-11-12 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 259,563 | 0.26 % | |
865 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Perencanaan Arsitektur Pembangunan Rumah Anggrek | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6366282 | 53254038 | 10,000,000 | 10,000,000 | 9,657,000 | 9,657,000 | 9,601,500 | 9,601,500 | 100 | 9,601,500 | 2024-11-05 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 343,000 | 3.43 % | |
866 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6367282 | 52811880 | 185,389,897 | 185,389,897 | 185,292,517 | 185,292,517 | 184,825,276 | 184,825,276 | 184,825,276 | 184,825,276 | 2024-11-17 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 97,380 | 0.05 % | |
867 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6368282 | 52714880 | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-12-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.33 % | |
868 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6369282 | 52716052 | 15,000,000 | 15,000,000 | 14,910,000 | 14,910,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-11-21 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 90,000 | 0.6 % | |
869 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Malinau Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6370282 | 52715511 | 30,000,000 | 30,000,000 | 29,997,750 | 29,997,750 | 29,809,050 | 29,809,050 | 29,809,050 | 29,809,050 | 2024-11-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 2,250 | 0.01 % | |
870 | 2024 | RSUD Daha Sejahtera | Rehab Poli Rawat Jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 6371282 | 52950556 | 200,000,000 | 200,000,000 | 199,991,027 | 199,991,027 | 199,830,077 | 199,830,076 | 199,830,076 | 199,830,076 | 2024-11-09 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 8,973 | 0 % | |
871 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di sekitar Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6372282 | 52716109 | 15,000,000 | 15,000,000 | 14,970,000 | 14,970,000 | 14,859,000 | 14,859,000 | 14,859,000 | 14,859,000 | 2024-11-13 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 30,000 | 0.2 % | |
872 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Pandulangan Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6373282 | 52715848 | 15,000,000 | 15,000,000 | 14,825,000 | 14,825,000 | 14,714,000 | 14,714,000 | 14,714,000 | 14,714,000 | 2024-11-22 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 175,000 | 1.17 % | |
873 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Kandangan Kota RT.05 Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6374282 | 52715623 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,778,000 | 14,778,000 | 14,778,000 | 14,778,000 | 2024-12-01 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.1 % | |
874 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Amawang Kiri Muka Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6375282 | 52713891 | 15,000,000 | 15,000,000 | 14,947,500 | 14,947,500 | 14,836,500 | 14,836,500 | 14,836,500 | 14,836,500 | 2024-11-09 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 52,500 | 0.35 % | |
875 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan dan Jasa Konsultansi Pengawasan Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6376282 | 53323962 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,859,000 | 29,859,000 | 29,859,000 | 29,859,000 | 2024-11-21 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
876 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Ida Manggala Kec. Sungai Raya, Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Batang Kulur Tengah Kec. Sungai Raya dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6377282 | 53323831 | 45,000,000 | 45,000,000 | 44,930,000 | 44,930,000 | 44,819,000 | 44,819,000 | 44,819,000 | 44,819,000 | 2024-11-09 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 70,000 | 0.16 % | |
877 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Telaga Langsat RT.02 Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6378282 | 52715938 | 30,000,000 | 30,000,000 | 29,997,750 | 29,997,750 | 29,534,325 | 29,534,300 | 29,534,300 | 29,534,300 | 2024-12-05 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 2,250 | 0.01 % | |
878 | 2024 | Dinas Pertanian | Belanja Jasa Pengawasan Pemb/rehab JUT APBD-P | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6379282 | 52780044 | 86,508,222 | 57,672,148 | 57,540,180 | 57,540,180 | 57,500,000 | 57,500,000 | 57,500,000 | 57,500,000 | 2024-11-07 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 28,968,042 | 33.49 % | |
879 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Pekerjaan Konstruksi | 6380282 | 53177126 | 197,600,000 | 197,490,000 | 197,291,184 | 197,291,184 | 197,235,684 | 197,235,684 | 100 | 197,235,684 | 2024-11-07 | cv. nurulillah | 50.826.160.9-733.000 | 308,817 | 0.16 % | |
880 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6381282 | 53177052 | 198,000,000 | 197,811,000 | 197,321,470 | 197,321,470 | 197,243,770 | 197,243,770 | 100 | 197,243,770 | 2024-11-07 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 678,530 | 0.34 % | |
881 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Pekerjaan Konstruksi | 6382282 | 53200198 | 198,000,000 | 197,898,000 | 197,742,053 | 197,742,053 | 197,627,544 | 197,627,544 | 100 | 197,627,544 | 2024-11-08 | CV. LALUNA DANA | 02.237.179.3-733.000 | 257,947 | 0.13 % | |
882 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan (Samping Pangkalan Gas) | Pengadaan Langsung | Pekerjaan Konstruksi | 6383282 | 53192827 | 192,000,000 | 191,840,000 | 191,786,544 | 191,786,544 | 191,683,218 | 191,683,218 | 100 | 191,683,218 | 2024-11-08 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 213,456 | 0.11 % | |
883 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 6384282 | 53192490 | 195,200,000 | 195,000,000 | 194,951,421 | 194,951,421 | 194,835,199 | 194,835,199 | 100 | 194,835,199 | 2024-11-08 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 248,579 | 0.13 % | |
884 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 01 - 02 Ds. Angkinang Selatan, Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 6385282 | 53200178 | 196,000,000 | 195,779,000 | 195,723,605 | 195,723,605 | 195,610,573 | 195,610,573 | 100 | 195,610,573 | 2024-11-08 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 276,395 | 0.14 % | |
885 | 2024 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6386282 | 52754680 | 170,000,000 | 169,603,158 | 169,003,781 | 169,003,781 | 168,914,981 | 168,914,981 | 168,914,981 | 168,914,981 | 2024-11-07 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 996,219 | 0.59 % | |
886 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6387282 | 53192621 | 196,000,000 | 195,830,000 | 195,724,702 | 195,724,702 | 195,615,478 | 195,615,478 | 100 | 195,615,478 | 2024-11-22 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 275,298 | 0.14 % | |
887 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6388282 | 52754576 | 99,715,000 | 99,692,967 | 99,554,441 | 99,554,441 | 99,496,886 | 99,496,886 | 99,496,886 | 99,496,886 | 2024-11-07 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 160,559 | 0.16 % | |
888 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penyusunan Dokumen Jakstrada Air Minum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 6389282 | 52812520 | 100,000,000 | 100,000,000 | 99,855,045 | 99,855,045 | 99,572,550 | 99,572,550 | 99,572,550 | 99,572,550 | 2024-11-08 | PT. ITNASINDO JAYA KONSULTAN | 85.453.556.4-732.000 | 144,955 | 0.14 % | |
889 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Simpur Kec. Simpur (Pembangunan Perkuatan Tebing Dengan Pasangan Batu dengan Tinggi 2 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 6390282 | 52701506 | 196,269,138 | 196,214,308 | 196,158,818 | 196,158,818 | 195,695,948 | 195,695,900 | 195,695,900 | 195,695,900 | 2024-11-08 | CV. ANUGERAH MADINATUL RIZKY | 84.796.755.1-735.000 | 110,320 | 0.06 % | |
890 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6391282 | 52722543 | 15,000,000 | 15,000,000 | 14,970,000 | 14,970,000 | 14,859,000 | 14,859,000 | 14,859,000 | 14,859,000 | 2024-11-16 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 30,000 | 0.2 % | |
891 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Malilingin RT.01 Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6392282 | 52715418 | 40,000,000 | 40,000,000 | 39,994,450 | 39,994,450 | 39,778,001 | 39,778,000 | 39,778,000 | 39,778,000 | 2024-12-07 | CV. Halicons Engineering | 99.750.185.3-732.000 | 5,550 | 0.01 % | |
892 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Operasi dan Pemeliharaan Sistem Drainase (Segmen 4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6393282 | 53335943 | 195,650,000 | 195,649,654 | 195,608,598 | 195,608,598 | 195,485,581 | 195,485,581 | 195,485,581 | 195,485,581 | 2024-11-08 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 41,402 | 0.02 % | |
893 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Kelurahan Jambu Hilir Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6394282 | 52715320 | 20,000,000 | 20,000,000 | 19,950,000 | 19,950,000 | 19,778,001 | 0 | 0 | 0 | 2024-12-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 50,000 | 0.25 % | |
894 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Balanti Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6395282 | 52721810 | 30,000,000 | 30,000,000 | 29,986,976 | 29,986,976 | 29,778,001 | 29,778,000 | 29,778,000 | 29,778,000 | 2024-12-01 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 13,024 | 0.04 % | |
895 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Simpur Kec. Simpur (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6396282 | 52715020 | 15,000,000 | 15,000,000 | 14,947,500 | 14,947,500 | 14,836,500 | 0 | 0 | 0 | 2024-11-09 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 52,500 | 0.35 % | |
896 | 2024 | RSUD Daha Sejahtera | Pengawasan Pembangunan tempat parkir (BLUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6397282 | 52881769 | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-11-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 252,000 | 0.84 % | |
897 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6398282 | 52794190 | 187,419,914 | 187,419,228 | 187,205,549 | 187,205,549 | 186,989,916 | 186,989,916 | 186,989,916 | 186,989,916 | 2024-11-19 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 214,365 | 0.11 % | |
898 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Ds. Muning Baru, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6399282 | 53200087 | 198,000,000 | 197,872,000 | 197,817,352 | 197,817,352 | 197,726,741 | 197,726,741 | 100 | 197,726,741 | 2024-11-08 | CV. SORAYA | 01.834.078.6-733.000 | 182,648 | 0.09 % | |
899 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 02 Ds. Baruh Jaya, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6400282 | 53200102 | 198,000,000 | 197,840,000 | 197,785,738 | 197,785,738 | 197,674,738 | 197,674,738 | 100 | 197,674,738 | 2024-11-08 | CV. SORAYA | 01.834.078.6-733.000 | 214,262 | 0.11 % | |
900 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Wakaf Desa Hakurung RT.02 Kec. Daha Utara (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6401282 | 52721863 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,778,001 | 29,778,001 | 29,778,001 | 29,778,001 | 2024-12-05 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
901 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jalan/Pemasangan Turap Desa Pandulangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6403282 | 53331591 | 70,000,000 | 69,998,820 | 69,708,000 | 69,708,000 | 69,597,000 | 69,597,000 | 69,597,000 | 69,597,000 | 2024-11-12 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 292,000 | 0.42 % | |
902 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 6404282 | 53200156 | 196,000,000 | 195,800,000 | 195,748,056 | 195,748,056 | 195,617,864 | 195,617,864 | 100 | 195,617,864 | 2024-11-08 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 251,944 | 0.13 % | |
903 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 02 Ds. Bayanan, Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 6405282 | 53200142 | 198,000,000 | 197,810,000 | 197,763,064 | 197,763,064 | 197,652,064 | 197,652,064 | 100 | 197,652,064 | 2024-11-11 | CV. SORAYA | 01.834.078.6-733.000 | 236,936 | 0.12 % | |
904 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 6406282 | 53200134 | 194,700,000 | 194,540,000 | 194,491,687 | 194,491,687 | 194,401,369 | 194,401,369 | 100 | 194,401,369 | 2024-11-18 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 208,313 | 0.11 % | |
905 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung dan Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Desa Tabihi (DI.Kambas) Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6407282 | 53324022 | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,778,001 | 29,778,000 | 29,778,000 | 29,778,000 | 2024-12-05 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 125,000 | 0.42 % | |
906 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Hamak Kec. Telaga Langsat (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6409282 | 52784742 | 199,746,000 | 199,743,000 | 199,550,428 | 199,550,428 | 199,400,000 | 199,400,000 | 199,400,000 | 199,400,000 | 2024-11-14 | Lingga Perkasa | 20.558.364.4-733.000 | 195,572 | 0.1 % | |
907 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Tabihi - Telaga Langsat Kec. Telaga Langsat (Jalan Tipe C84) | Pengadaan Langsung | Pekerjaan Konstruksi | 6410282 | 52785539 | 199,652,000 | 199,647,000 | 199,099,551 | 199,099,551 | 198,800,000 | 198,800,000 | 198,800,000 | 198,800,000 | 2024-11-29 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 552,449 | 0.28 % | |
908 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase di Desa Jelatang Kec. Padang Batung (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6411282 | 52783699 | 199,305,000 | 199,293,208 | 199,099,219 | 199,099,219 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-14 | Lingga Perkasa | 20.558.364.4-733.000 | 205,781 | 0.1 % | |
909 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loksado - Haratai Kec. Loksado (Jalan Tipe D11) | Pengadaan Langsung | Pekerjaan Konstruksi | 6412282 | 52785237 | 199,200,000 | 199,200,000 | 199,100,720 | 199,100,720 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-08 | cv. nurulillah | 50.826.160.9-733.000 | 99,280 | 0.05 % | |
910 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Peninggian Jalan Desa Batu Laki RT. 03 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6413282 | 53331601 | 100,000,000 | 99,999,900 | 99,345,000 | 99,345,000 | 99,234,000 | 99,234,000 | 99,234,000 | 99,234,000 | 2024-11-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 655,000 | 0.66 % | |
911 | 2024 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6415282 | 53230855 | 101,100,000 | 99,836,730 | 99,234,000 | 99,234,000 | 99,123,000 | 0 | 0 | 0 | 2024-11-14 | cv.akmalindo | 02.531.482.4-731.000 | 1,866,000 | 1.85 % | |
912 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Struktur Ruas Jalan Loklahung - Malaris Kec. Loksado (Jalan Tipe D11) | Pengadaan Langsung | Pekerjaan Konstruksi | 6416282 | 52785309 | 199,200,000 | 199,200,000 | 199,052,559 | 199,052,559 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-08 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 147,441 | 0.07 % | |
913 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Sungai Raya Utara Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 6417282 | 52701516 | 198,711,044 | 198,700,024 | 198,347,945 | 198,347,945 | 197,968,325 | 197,968,300 | 197,968,300 | 197,968,300 | 2024-11-13 | CV. BUNTARA AMERTA | 39.199.614.7-733.000 | 363,099 | 0.18 % | |
914 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Jalan Desa Gumbil Kec. Telaga Langsat (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6418282 | 52783811 | 199,746,000 | 199,741,000 | 199,562,608 | 199,562,608 | 199,400,000 | 199,400,000 | 199,400,000 | 199,400,000 | 2024-11-14 | Lingga Perkasa | 20.558.364.4-733.000 | 183,392 | 0.09 % | |
915 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6419282 | 52783980 | 198,914,000 | 198,907,000 | 198,376,902 | 198,376,902 | 198,200,000 | 198,200,000 | 198,200,000 | 198,200,000 | 2024-11-19 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 537,098 | 0.27 % | |
916 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Longawang Kec. Telaga Langsat (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 6420282 | 52784646 | 199,305,000 | 199,305,000 | 197,485,744 | 197,485,744 | 197,400,000 | 197,400,000 | 197,400,000 | 197,400,000 | 2024-11-15 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 1,819,256 | 0.91 % | |
917 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Tanuhi - Ulang Kec. Loksado (Lanjutan) (Jalan Tipe D8) | Pengadaan Langsung | Pekerjaan Konstruksi | 6421282 | 52785434 | 189,982,000 | 189,982,000 | 189,881,141 | 189,881,141 | 189,700,000 | 189,700,000 | 189,700,000 | 189,700,000 | 2024-11-18 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 100,859 | 0.05 % | |
918 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6423282 | 52785084 | 196,372,800 | 196,368,000 | 196,300,504 | 196,300,504 | 196,000,000 | 196,000,000 | 196,000,000 | 196,000,000 | 2024-11-18 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 72,296 | 0.04 % | |
919 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jembatan Tipe A1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6424282 | 52784992 | 196,372,800 | 196,369,600 | 196,187,363 | 196,187,363 | 195,500,000 | 195,500,000 | 195,500,000 | 195,500,000 | 2024-11-19 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 185,437 | 0.09 % | |
920 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Ida Manggala Kec. Sungai Raya (Jalan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6425282 | 52784495 | 198,914,000 | 198,914,000 | 198,053,973 | 198,053,973 | 198,000,000 | 198,000,000 | 198,000,000 | 198,000,000 | 2024-11-29 | CV LAKSANA NAWASENA | 39.407.240.9-733.000 | 860,027 | 0.43 % | |
921 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pelebaran Ruas Jalan Hamalau - Anjiran (Jalan Murni) Kec. Sungai Raya (Lanjutan) (Jalan Tipe D1) | Pengadaan Langsung | Pekerjaan Konstruksi | 6426282 | 52784873 | 199,746,000 | 199,612,000 | 199,501,730 | 199,501,730 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-11-18 | CV. PERMATA DAHA | 03.185.512.5-733.000 | 244,270 | 0.12 % | |
922 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Desa Hulu Banyu Kec. Loksado (Jembatan Tipe E2) | Pengadaan Langsung | Pekerjaan Konstruksi | 6427282 | 52785682 | 196,372,800 | 196,372,000 | 196,320,056 | 196,320,056 | 196,200,000 | 196,200,000 | 196,200,000 | 196,200,000 | 2024-11-15 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 52,744 | 0.03 % | |
923 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6428282 | 53177098 | 193,600,000 | 193,450,000 | 193,261,217 | 193,261,217 | 193,146,120 | 193,146,120 | 100 | 193,146,120 | 2024-11-13 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 338,783 | 0.17 % | |
924 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 6429282 | 53200055 | 192,000,000 | 191,870,000 | 191,815,218 | 191,815,218 | 191,706,827 | 191,706,827 | 100 | 191,706,827 | 2024-11-09 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 184,782 | 0.1 % | |
925 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Halunuk Kec. Loksado (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6430282 | 52714074 | 15,000,000 | 15,000,000 | 14,875,000 | 14,875,000 | 14,764,000 | 14,764,000 | 14,764,000 | 14,764,000 | 2024-11-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 125,000 | 0.83 % | |
926 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Lokbinuang RT.02 Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 6431282 | 52714243 | 15,000,000 | 15,000,000 | 14,900,000 | 14,900,000 | 14,789,000 | 14,789,000 | 14,789,000 | 14,789,000 | 2024-11-13 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 100,000 | 0.67 % | |
927 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat, Kec. Kandangan (Arah Pesantren Irsyadul Amien Teluk Aman) | Pengadaan Langsung | Pekerjaan Konstruksi | 6433282 | 53193158 | 198,000,000 | 197,800,000 | 197,763,841 | 197,763,841 | 197,661,628 | 197,661,628 | 100 | 197,661,628 | 2024-11-12 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 236,159 | 0.12 % | |
928 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Sirih Hulu Kec. Kalumpang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003740000 | 52721918 | 30,000,000 | 30,000,000 | 29,875,000 | 29,875,000 | 29,764,001 | 29,764,000 | 29,764,000 | 29,764,000 | 2024-12-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 125,000 | 0.42 % | |
929 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Lungau Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003777000 | 52721689 | 30,000,000 | 30,000,000 | 29,850,000 | 29,850,000 | 29,739,001 | 29,739,000 | 29,739,000 | 29,739,000 | 2024-12-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 150,000 | 0.5 % | |
930 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Madihin Desa Kayu Abang Kec. Angkinang (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003793000 | 52716214 | 30,000,000 | 30,000,000 | 29,994,450 | 29,994,450 | 29,778,001 | 29,778,001 | 29,778,001 | 29,778,001 | 2024-12-09 | CV. Halicons Engineering | 99.750.185.3-732.000 | 5,550 | 0.02 % | |
931 | 2024 | Sekretariat DPRD | Konsultan Pengawas pembuatan Ruang Fraksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10003871000 | 53240899 | 15,000,000 | 15,000,000 | 14,979,450 | 14,979,450 | 14,979,450 | 0 | 0 | 0 | 2024-11-13 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 20,550 | 0.14 % | |
932 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Rahmat Ilahi dan Sekitarnya RT. 03 Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10003911000 | 53200070 | 192,000,000 | 191,800,000 | 191,723,525 | 191,723,525 | 191,625,586 | 191,625,586 | 100 | 191,625,586 | 2024-11-12 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 276,475 | 0.14 % | |
933 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10003932000 | 52701492 | 198,262,275 | 198,243,145 | 198,187,641 | 198,187,641 | 197,882,391 | 197,882,300 | 197,882,300 | 197,882,300 | 2024-11-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 74,634 | 0.04 % | |
934 | 2024 | Sekretariat DPRD | Belanja Modal Bangunan Gedung Kantor (Ruang Fraksi) | Pengadaan Langsung | Pekerjaan Konstruksi | 10004009000 | 53235975 | 186,480,000 | 186,480,000 | 186,356,033 | 186,356,033 | 186,165,335 | 0 | 0 | 0 | 2024-11-13 | cv. nurulillah | 50.826.160.9-733.000 | 123,967 | 0.07 % | |
935 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN BARIANG - PEMBANGUNAN WC | Pengadaan Langsung | Pekerjaan Konstruksi | 10004161000 | 52753865 | 180,000,000 | 179,993,239 | 179,740,139 | 179,740,139 | 179,629,139 | 179,629,139 | 179,629,139 | 179,629,139 | 2024-11-11 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 259,861 | 0.14 % | |
936 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10004193000 | 52733334 | 196,819,416 | 196,811,898 | 196,793,962 | 196,793,962 | 196,551,697 | 196,551,697 | 196,551,697 | 196,551,697 | 2024-11-24 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 25,454 | 0.01 % | |
937 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Kel. Kandangan Kota RT.04 Kandangan Hulu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004385000 | 53177295 | 10,000,000 | 9,916,000 | 9,872,586 | 9,872,586 | 9,867,036 | 9,867,036 | 100 | 9,867,036 | 2024-11-20 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 127,414 | 1.27 % | |
938 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Balah Paikat Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004389000 | 53177221 | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-11-21 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
939 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.05 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004391000 | 53177250 | 10,000,000 | 9,916,000 | 9,768,000 | 9,768,000 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 232,000 | 2.32 % | |
940 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Di Pasar Sudi Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 10005197000 | 52732341 | 103,700,000 | 103,579,855 | 103,402,588 | 103,402,588 | 103,102,000 | 103,102,000 | 103,102,000 | 103,102,000 | 2024-11-30 | CV. ALBATROS | 01.222.160.2-733.000 | 297,412 | 0.29 % | |
941 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10005319000 | 52806024 | 185,389,897 | 185,363,823 | 185,129,874 | 185,129,874 | 184,702,468 | 184,702,468 | 184,702,468 | 184,702,468 | 2024-11-13 | FADWI UTAMA | 94.246.044.5-733.000 | 260,023 | 0.14 % | |
942 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 10005482000 | 52806083 | 192,480,597 | 192,468,507 | 192,241,485 | 192,241,485 | 191,951,664 | 191,951,664 | 191,951,664 | 191,951,664 | 2024-11-13 | CV. MITRA GLOBAL KALIMANTAN | 99.960.218.8-733.000 | 239,112 | 0.12 % | |
943 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jalan Tipe E4) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005588000 | 52784211 | 199,305,000 | 199,302,626 | 199,207,932 | 199,207,932 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-18 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 97,068 | 0.05 % | |
944 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Telaga langsat Kec. Telaga Langsat dan Jasa Konsultansi Pengawasan Perkuatan Tebing di Desa Mandala Kec. Telaga Langsat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10005616000 | 53323914 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,778,001 | 0 | 0 | 0 | 2024-11-16 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 30,000 | 0.1 % | |
945 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Ida Manggala Kec. Sungai Raya (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005682000 | 52701462 | 198,711,044 | 198,701,771 | 198,657,318 | 198,657,318 | 198,284,358 | 198,284,300 | 198,284,300 | 198,284,300 | 2024-11-16 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 53,726 | 0.03 % | |
946 | 2024 | Dinas Kesehatan | Rehabilitasi Poskesdes Siang Gantung | Pengadaan Langsung | Pekerjaan Konstruksi | 10005755000 | 53218383 | 189,070,000 | 189,000,000 | 188,807,701 | 188,807,701 | 188,807,701 | 188,807,000 | 188,807,000 | 188,807,000 | 2024-11-13 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 262,299 | 0.14 % | |
947 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bacagat Desa Sungai Kupang Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005793000 | 52701598 | 198,306,750 | 198,294,010 | 197,473,718 | 197,473,718 | 197,362,718 | 197,362,700 | 197,362,700 | 197,362,700 | 2024-11-19 | CIPTA RAHAYU MANDIRI | 62.287.515.1-733.000 | 833,033 | 0.42 % | |
948 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10005848000 | 52806108 | 185,389,897 | 185,389,897 | 185,232,307 | 185,232,307 | 184,895,422 | 184,895,422 | 184,895,422 | 184,895,422 | 2024-11-16 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 157,590 | 0.09 % | |
949 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Padang Batung Kec. Padang Batung (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 60 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10005860000 | 52701911 | 198,624,930 | 198,607,071 | 198,464,040 | 198,464,040 | 198,249,811 | 198,249,800 | 198,249,800 | 198,249,800 | 2024-12-05 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 160,890 | 0.08 % | |
950 | 2024 | Dinas Pendidikan dan Kebudayaan | SDN 1 ANGKINANG - PEMBANGUNAN HALAMAN PAVING | Pengadaan Langsung | Pekerjaan Konstruksi | 10005930000 | 52753947 | 170,000,000 | 169,948,432 | 169,631,333 | 169,631,333 | 169,503,683 | 169,503,683 | 169,503,683 | 169,503,683 | 2024-11-15 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 368,667 | 0.22 % | |
951 | 2024 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang,Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10005945000 | 52754483;52754661 | 198,258,000 | 198,126,647 | 198,123,701 | 198,123,701 | 197,992,121 | 197,992,121 | 197,992,121 | 197,992,121 | 2024-11-15 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 134,299 | 0.07 % | |
952 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Lokbinuang Kec. Telaga Langsat (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006016000 | 52701891 | 198,415,905 | 198,394,411 | 198,248,294 | 198,248,294 | 197,981,894 | 197,981,800 | 197,981,800 | 197,981,800 | 2024-11-16 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 167,611 | 0.08 % | |
953 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jembatan Sungai Teraban Desa Batu Laki RT. 04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006042000 | 53331615 | 100,000,000 | 99,999,900 | 99,400,500 | 99,400,500 | 99,234,000 | 99,234,000 | 99,234,000 | 99,234,000 | 2024-11-14 | CV. WIRA WIDYA CONSULTANT | 76.852.141.1-731.000 | 599,500 | 0.6 % | |
954 | 2024 | Badan Penanggulangan Bencana Daerah | Jasa Konsultansi Perencanaan Rekonstruksi Jembatan Batu Tumbuk Desa Batu Laki RT. 03 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006056000 | 53331598 | 100,000,000 | 99,999,900 | 99,444,900 | 99,444,900 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 2024-11-13 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 555,100 | 0.56 % | |
955 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai di Desa Bajayau Lama Kec. Daha Barat (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Air, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006097000 | 52721741 | 30,000,000 | 30,000,000 | 29,970,000 | 29,970,000 | 29,803,500 | 29,803,500 | 29,803,500 | 29,803,500 | 2024-12-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 30,000 | 0.1 % | |
956 | 2024 | Sekretariat Daerah | Belanja Kawat/Faksimili/Internet/TV Berlangganan Collacation Server SPSE | Pengadaan Langsung | Jasa Lainnya | 10006221000 | 53419470 | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 16,000,000 | 0 | 16,000,000 | 2024-11-13 | PT. Telekomunikasi Indonesia, Tbk. | 01.000.013.1-093.000 | 0 | 0 % | |
957 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10006256000 | 52812263 | 187,419,914 | 187,417,251 | 187,146,275 | 187,146,275 | 186,824,373 | 186,824,373 | 186,824,373 | 186,824,373 | 2024-11-22 | FADWI UTAMA | 94.246.044.5-733.000 | 273,639 | 0.15 % | |
958 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10006261000 | 52806141 | 185,389,897 | 185,382,685 | 184,901,271 | 184,901,271 | 184,752,531 | 184,752,531 | 184,752,531 | 184,752,531 | 2024-11-22 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 488,626 | 0.26 % | |
959 | 2024 | Dinas Perdagangan | Belanja Jasa Pengawasan Rehab Pagar Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006459000 | 53072247 | 15,000,000 | 15,000,000 | 14,889,000 | 14,889,000 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-19 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 111,000 | 0.74 % | |
960 | 2024 | Dinas Perdagangan | Belanja Jasa Pengawasan Rehab Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006471000 | 53072201 | 20,000,000 | 20,000,000 | 19,647,000 | 19,647,000 | 19,536,000 | 19,536,000 | 19,536,000 | 19,536,000 | 2024-11-19 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 353,000 | 1.77 % | |
961 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bahalayung RT.04 Desa Bangkau Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006474000 | 52701675 | 195,791,640 | 195,781,574 | 195,726,074 | 195,726,074 | 195,337,574 | 195,337,500 | 195,337,500 | 195,337,500 | 2024-11-17 | CV Remona | 41.175.606.7-735.000 | 65,566 | 0.03 % | |
962 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 10006478000 | 52806164 | 192,480,597 | 192,465,891 | 192,105,876 | 192,105,876 | 191,758,510 | 191,758,510 | 191,758,510 | 191,758,510 | 2024-11-16 | cv. nurulillah | 50.826.160.9-733.000 | 374,721 | 0.19 % | |
963 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Muara Banta - Karang Jawa Kec. Kandangan (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006570000 | 53440685 | 140,278,500 | 140,273,000 | 140,130,415 | 140,130,415 | 140,000,000 | 140,000,000 | 140,000,000 | 140,000,000 | 2024-11-15 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 148,085 | 0.11 % | |
964 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Lumpangi RT.03 Kec. Loksado (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10006596000 | 52701482 | 198,262,275 | 198,237,607 | 198,144,475 | 198,144,475 | 197,930,246 | 197,930,200 | 197,930,200 | 197,930,200 | 2024-12-04 | CV. DWI JAYA PUTERA | 03.197.146.8-733.000 | 117,800 | 0.06 % | |
965 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 10006682000 | 52813359 | 187,419,914 | 187,419,914 | 187,219,233 | 187,219,233 | 186,969,483 | 186,969,483 | 186,969,483 | 186,969,483 | 2024-11-16 | CV. LUQMANUL PERSADA | 80.598.812.8-733.000 | 200,681 | 0.11 % | |
966 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10006742000 | 52806151 | 187,419,914 | 187,419,914 | 186,670,719 | 186,670,719 | 186,427,000 | 186,427,000 | 186,427,000 | 186,427,000 | 2024-11-22 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 749,195 | 0.4 % | |
967 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006764000 | 53447745 | 152,780,000 | 152,640,000 | 152,585,001 | 152,585,001 | 152,472,905 | 152,472,905 | 100 | 152,472,905 | 2024-11-15 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 194,999 | 0.13 % | |
968 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006809000 | 53447247 | 96,310,000 | 96,140,000 | 96,089,075 | 96,089,075 | 96,019,076 | 96,019,076 | 100 | 96,019,076 | 2024-11-15 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 220,925 | 0.23 % | |
969 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10006816000 | 53447343 | 165,560,000 | 165,360,000 | 165,309,035 | 165,309,035 | 165,189,054 | 165,189,054 | 100 | 165,189,054 | 2024-11-15 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 250,965 | 0.15 % | |
970 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Penataan Site Development Mesjid Nurul Hidayah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007045000 | 52835135 | 100,000,000 | 99,795,938 | 99,261,750 | 99,261,750 | 99,189,600 | 99,189,600 | 99,189,600 | 99,189,600 | 2024-11-24 | CV. RANCANG BANGUN JAYA KONSULTAN | 40.011.058.1-732.000 | 738,250 | 0.74 % | |
971 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 10007048000 | 52812011 | 187,419,914 | 187,415,712 | 187,211,595 | 187,211,595 | 186,919,253 | 186,919,253 | 186,919,253 | 186,919,253 | 2024-11-22 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 208,319 | 0.11 % | |
972 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007165000 | 52806071 | 185,389,897 | 185,389,660 | 185,079,816 | 185,079,816 | 184,732,801 | 184,732,801 | 184,732,801 | 184,732,801 | 2024-11-16 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 310,081 | 0.17 % | |
973 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007189000 | 52794342 | 187,419,914 | 187,417,589 | 187,312,412 | 187,312,412 | 186,985,147 | 186,985,147 | 186,985,147 | 186,985,147 | 2024-11-23 | AL HIDAYAH, CV | 74.916.754.0-733.000 | 107,502 | 0.06 % | |
974 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Rehab Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 10007208000 | 53350771 | 5,000,000 | 5,000,000 | 4,955,600 | 4,955,600 | 4,850,000 | 0 | 0 | 0 | 2024-11-17 | wahyu abdi maulana | 15.336.879.0-735.000 | 44,400 | 0.89 % | |
975 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007211000 | 53447642 | 54,370,000 | 54,190,000 | 54,072,469 | 54,072,469 | 54,002,991 | 54,002,991 | 100 | 54,002,991 | 2024-11-15 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 297,531 | 0.55 % | |
976 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007215000 | 53447528 | 132,930,000 | 132,700,000 | 132,652,294 | 132,652,294 | 132,533,921 | 132,533,921 | 100 | 132,533,921 | 2024-11-15 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 277,706 | 0.21 % | |
977 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007225000 | 53447480 | 57,448,000 | 57,250,000 | 56,993,678 | 56,993,678 | 56,971,478 | 56,971,478 | 100 | 56,971,478 | 2024-12-04 | CV LAKSANA NAWASENA | 39.407.240.9-733.000 | 454,322 | 0.79 % | |
978 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Pengawasan Arsitektur (Rehab Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 10007231000 | 53345290 | 5,000,000 | 5,000,000 | 4,922,300 | 4,922,300 | 4,900,000 | 0 | 0 | 0 | 2024-11-21 | wahyu abdi maulana | 15.336.879.0-735.000 | 77,700 | 1.55 % | |
979 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10007257000 | 53447872 | 72,170,000 | 71,950,000 | 71,899,177 | 71,899,177 | 71,823,914 | 71,823,914 | 100 | 71,823,914 | 2024-11-20 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 270,823 | 0.38 % | |
980 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007514000 | 52785200 | 176,853,208 | 176,771,286 | 176,559,885 | 176,559,885 | 176,448,885 | 176,448,885 | 176,448,885 | 176,448,885 | 2024-11-24 | CV. KHALIF | 81.540.809.1-733.000 | 293,323 | 0.17 % | |
981 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10007526000 | 52791188 | 198,959,859 | 198,944,893 | 198,680,956 | 198,680,956 | 198,569,956 | 198,569,956 | 198,569,956 | 198,569,956 | 2024-11-24 | CV. KHALIF | 81.540.809.1-733.000 | 278,903 | 0.14 % | |
982 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Sungai Kupang Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007577000 | 52794195 | 15,000,000 | 15,000,000 | 14,900,640 | 14,900,640 | 14,779,650 | 14,779,650 | 14,779,650 | 14,779,650 | 2024-11-21 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 99,360 | 0.66 % | |
983 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Tanjung Selor Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007601000 | 52806022 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
984 | 2024 | Dinas Perpustakaan Dan Kearsipan | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 10007617000 | 52901440 | 151,750,000 | 150,000,000 | 149,821,362 | 149,821,362 | 149,732,562 | 149,821,300 | 149,821,300 | 149,821,300 | 2024-11-26 | CV.BERKAH IHSAN KAMIL | 27.128.123.0-733.000 | 1,928,638 | 1.27 % | |
985 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007620000 | 52806052 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-21 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
986 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Tumbukan banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007678000 | 52806070 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
987 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007700000 | 52806082 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
988 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10007732000 | 52806097 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-16 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
989 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Telaga Langsat Kec. Telaga Langsat (Pembangunan Bronjong Dengan Susunan 4 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007845000 | 52701432 | 198,262,275 | 198,249,144 | 198,193,644 | 198,193,644 | 197,881,734 | 197,881,700 | 197,881,700 | 197,881,700 | 2024-11-17 | CV. KATIBURA | 53.260.332.1-733.000 | 68,631 | 0.03 % | |
990 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Desa Lokbinuang Rt.02 Kec. Telaga langsat (Pembangunan Bronjong Dengan Susunan 3 Tingkat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10007852000 | 52701473 | 198,711,044 | 198,696,744 | 198,641,245 | 198,641,245 | 198,279,385 | 198,279,300 | 198,279,300 | 198,279,300 | 2024-11-17 | CV. KATIBURA | 53.260.332.1-733.000 | 69,799 | 0.04 % | |
991 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Tambak Bitin Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008250000 | 52806106 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
992 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008254000 | 52806114 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
993 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Taluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008257000 | 52806142 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
994 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Taniran Kubah Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008258000 | 52806152 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
995 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Sungai Alakat Lokbahan Desa Malilingin Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008263000 | 52806163 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
996 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008266000 | 52811893 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
997 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008269000 | 52811952 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
998 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Desa Ambutun Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008270000 | 52812008 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
999 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Hariti Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008276000 | 52812284 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1000 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008281000 | 52812398 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-23 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1001 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perluasan SPAM Desa Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008287000 | 52813361 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,829,600 | 14,829,600 | 14,829,600 | 14,829,600 | 2024-11-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1002 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan PMA Desa Lumpangi Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008292000 | 52813608 | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-11-26 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 0 | 0 % | |
1003 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Modal Rumah Negara Golongan III (Rehab Rumah Dinas) | Pengadaan Langsung | Pekerjaan Konstruksi | 10008512000 | 53461522 | 179,112,000 | 179,078,323 | 177,782,360 | 177,782,360 | 177,000,000 | 0 | 0 | 0 | 2024-11-28 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,329,640 | 0.74 % | |
1004 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pembangunan Halaman (Paving Block) SMP Negeri 1 Angkinang dan Pengawasan Pembangunan WC SMP Negeri 4 Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008741000 | 52754715 | 25,000,000 | 24,999,997 | 24,944,501 | 24,944,501 | 24,919,500 | 24,919,500 | 24,919,500 | 24,919,500 | 2024-11-17 | CV.RAMA GRAHA CONSULTANT | 70.874.872.8-733.000 | 55,499 | 0.22 % | |
1005 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Selasar Ruang Kelas SMP Negeri 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008742000 | 52754617 | 10,000,000 | 10,000,000 | 9,977,800 | 9,977,800 | 9,973,350 | 9,973,350 | 9,973,350 | 9,973,350 | 2024-11-17 | Wing Rastafarindo | 03.282.590.3-732.000 | 22,200 | 0.22 % | |
1006 | 2024 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC Guru, Rehabilitasi Selasar Ruang BK, dan Rehabilitasi Ruang UKS SMP Negeri 1 Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008743000 | 52754449 | 10,000,000 | 10,000,000 | 9,966,700 | 9,966,700 | 9,956,700 | 9,956,700 | 9,956,700 | 9,956,700 | 2024-11-17 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 33,300 | 0.33 % | |
1007 | 2024 | Sekretariat DPRD | Konsultan Perencanaan pemasangan Paving blok Rumah Jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009202000 | 53241215 | 10,000,000 | 10,000,000 | 9,962,250 | 9,962,250 | 9,962,250 | 0 | 0 | 0 | 2024-11-20 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 37,750 | 0.38 % | |
1008 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPAM Desa Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 10009483000 | 52811955 | 187,419,914 | 187,419,000 | 187,151,162 | 187,151,162 | 186,651,661 | 186,651,661 | 186,651,661 | 186,651,661 | 2024-11-23 | cv. nurulillah | 50.826.160.9-733.000 | 268,752 | 0.14 % | |
1009 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Pekerjaan Konstruksi | 10009576000 | 53480499 | 103,000,000 | 98,531,739 | 98,474,710 | 98,474,710 | 98,430,562 | 98,430,562 | 98,430,562 | 98,430,562 | 2024-11-20 | CV. RAFI KARYA KONSTRUKSI | 62.931.531.8-733.000 | 4,525,290 | 4.39 % | |
1010 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Revaluasi Nilai Wajar Tanah dan/atau Bangunan dan/atau Kendaraan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10009774000 | 53372617 | 160,000,000 | 98,400,124 | 97,902,000 | 97,902,000 | 97,000,000 | 0 | 0 | 0 | 2024-11-20 | KJPP Rizki Djunaedy dan Rekan Cabang Pontianak | 21.065.097.4-701.001 | 62,098,000 | 38.81 % | |
1011 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Gedung Kantor DISPERA KPLH | Pengadaan Langsung | Pekerjaan Konstruksi | 10009889000 | 47466586 | 129,914,400 | 129,900,000 | 129,800,475 | 129,800,475 | 129,711,674 | 129,711,674 | 100 | 129,711,674 | 2024-11-22 | CV. MAJAPAHIT | 02.910.439.5-732.000 | 113,925 | 0.09 % | |
1012 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Rumah Anggrek | Pengadaan Langsung | Pekerjaan Konstruksi | 10010319000 | 53191016 | 190,500,000 | 190,430,000 | 190,141,717 | 190,141,717 | 187,838,467 | 187,838,467 | 100 | 187,838,467 | 2024-11-22 | CV. KHALIF | 81.540.809.1-733.000 | 358,283 | 0.19 % | |
1013 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 10010356000 | 53205445 | 197,470,000 | 197,390,000 | 197,361,834 | 197,361,834 | 197,195,334 | 197,195,334 | 100 | 197,195,334 | 2024-11-28 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 108,166 | 0.05 % | |
1014 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier Desa Tabihi (DI.Kambas) Kec. Padang Batung (Pembangunan Saluran Irigasi Dengan Pasangan Batu Tinggi 50 cm) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010454000 | 52701932 | 197,571,582 | 197,548,337 | 197,492,838 | 197,492,838 | 197,278,608 | 197,278,600 | 197,278,600 | 197,278,600 | 2024-12-01 | CV. LUTFI BERSAUDARA | 62.935.983.7-733.000 | 78,744 | 0.04 % | |
1015 | 2024 | Dinas Perdagangan | Belanja Modal Pagar (Rehab Pagar Kantor Sekretariat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010465000 | 53493807 | 149,894,400 | 149,870,348 | 149,814,848 | 149,814,848 | 149,454,597 | 149,454,597 | 149,454,597 | 149,454,597 | 2024-11-19 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 79,552 | 0.05 % | |
1016 | 2024 | Dinas Perdagangan | Belanja Bangunan Gedung Kantor (Rehap Gedung Kantor Sekretariat) | Pengadaan Langsung | Pekerjaan Konstruksi | 10010472000 | 53493822 | 199,999,800 | 199,964,398 | 199,931,098 | 199,931,098 | 199,420,498 | 199,420,498 | 199,420,498 | 199,420,498 | 2024-11-19 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 68,702 | 0.03 % | |
1017 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Panggandingan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10011047000 | 52806115 | 185,389,897 | 185,383,588 | 185,353,325 | 185,353,325 | 184,923,046 | 184,923,046 | 184,923,046 | 184,923,046 | 2024-11-20 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 36,572 | 0.02 % | |
1018 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Kurdi RT.01 Desa Bangkau Kec. Kandangan (Normalisasi Sungai dengan Lebar Sungai 5 Meter) | Pengadaan Langsung | Pekerjaan Konstruksi | 10011066000 | 52701666 | 195,791,640 | 195,783,420 | 195,727,920 | 195,727,920 | 195,339,420 | 195,339,400 | 195,339,400 | 195,339,400 | 2024-11-20 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 63,720 | 0.03 % | |
1019 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Gagah Lurus, Kel. Kandangan Kota, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011391000 | 53199630 | 10,000,000 | 9,916,000 | 9,817,086 | 9,817,086 | 9,815,976 | 9,815,976 | 100 | 9,815,976 | 2024-11-25 | CV. Sector Engineering | 03.775.104.7-735.000 | 182,914 | 1.83 % | |
1020 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Kec. Kandangan (Jalan Majelis Ash-Shofa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011399000 | 53199773 | 20,000,000 | 19,865,000 | 19,756,890 | 19,756,890 | 19,745,790 | 19,745,790 | 100 | 19,745,790 | 2024-11-21 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 243,110 | 1.22 % | |
1021 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Jambu Hilir RT.08 Kec. Kandangan (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011404000 | 53199781 | 20,000,000 | 19,865,000 | 19,849,020 | 19,849,020 | 19,837,920 | 19,837,920 | 100 | 19,837,920 | 2024-11-28 | PT. PILETEKA PLAN TATA | 95.363.613.1-732.000 | 150,980 | 0.75 % | |
1022 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Ds. Baluti, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011408000 | 53199492 | 20,000,000 | 19,865,000 | 19,769,655 | 19,769,655 | 19,758,555 | 19,758,555 | 100 | 19,758,555 | 2024-11-26 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 230,345 | 1.15 % | |
1023 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Gg. Rahmah dan sekitarnya RT. 03 Kel. Kandangan Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011418000 | 53199647 | 15,000,000 | 14,891,000 | 14,791,392 | 14,791,392 | 14,780,292 | 14,780,292 | 100 | 14,780,292 | 2024-11-26 | Wing Rastafarindo | 03.282.590.3-732.000 | 208,608 | 1.39 % | |
1024 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Mangunang RT. 01 Ds. Sungai Raya Utara, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011423000 | 53199532 | 10,000,000 | 9,916,000 | 9,712,500 | 9,712,500 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-25 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 287,500 | 2.88 % | |
1025 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl. Sungai Panjang RT. 01 dan 03 Ds. Gambah Dalam Barat, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011433000 | 53199515 | 15,000,000 | 14,891,000 | 14,791,392 | 14,791,392 | 14,780,292 | 14,780,292 | 100 | 14,780,292 | 2024-11-25 | LINE BORNEO CONSULTANT, CV | 90.545.998.8-735.000 | 208,608 | 1.39 % | |
1026 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Al Muttaqin Ds. Tibung Raya, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011435000 | 53199728 | 15,000,000 | 14,890,000 | 14,816,280 | 14,816,280 | 14,810,730 | 14,810,730 | 100 | 14,810,730 | 2024-11-22 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 183,720 | 1.22 % | |
1027 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT 08 Desa Baluti Kec. Kandangan (Tembus Jalan Teratai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011452000 | 53199480 | 10,000,000 | 9,916,000 | 9,817,086 | 9,817,086 | 9,817,086 | 9,817,086 | 100 | 9,817,086 | 2024-11-26 | Wing Rastafarindo | 03.282.590.3-732.000 | 182,914 | 1.83 % | |
1028 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 03 Ds. Pakan Dalam, Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011462000 | 53199559 | 10,000,000 | 9,916,000 | 9,886,770 | 9,886,770 | 9,875,670 | 9,875,670 | 100 | 9,875,670 | 2024-11-21 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 113,230 | 1.13 % | |
1029 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Seberang Mesjid Quba Desa Amawang Kanan RT.01 (LANJUTAN) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011465000 | 53199788 | 10,000,000 | 9,916,000 | 9,712,500 | 9,712,500 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-11-21 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 287,500 | 2.88 % | |
1030 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan Samping Gedung MUI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011678000 | 52834921 | 15,000,000 | 15,000,000 | 14,990,001 | 14,990,001 | 14,774,100 | 0 | 0 | 0 | 2024-11-26 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 9,999 | 0.07 % | |
1031 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10011698000 | 52814894 | 198,959,859 | 198,942,741 | 198,759,434 | 198,759,434 | 198,470,834 | 198,470,834 | 198,470,834 | 198,470,834 | 2024-11-24 | FADWI UTAMA | 94.246.044.5-733.000 | 200,425 | 0.1 % | |
1032 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Kantor, Rumah Jabatan Kajari dan Mushola Kejari Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011788000 | 52833192 | 35,000,000 | 35,000,000 | 34,950,500 | 34,950,500 | 34,715,250 | 34,715,250 | 34,715,250 | 34,715,250 | 2024-12-02 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 49,500 | 0.14 % | |
1033 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Saluran Drainase Di Ruko Sudi Singgah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011855000 | 52732501 | 15,000,000 | 15,000,000 | 14,979,999 | 14,979,999 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-02 | CV. IDEAL SEJATI Consulindo | 50.626.848.1-731.000 | 20,001 | 0.13 % | |
1034 | 2024 | Sekretariat Daerah | Jasa Konsultansi Perencanaan Rehab Parkir Mobil di Rumah Jabatan Bupati dan Rehab Halaman Gedung PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012082000 | 53269652;53270326 | 40,000,000 | 40,000,000 | 39,627,000 | 39,627,000 | 39,627,000 | 0 | 0 | 0 | 2024-11-20 | cv.akmalindo | 02.531.482.4-731.000 | 373,000 | 0.93 % | |
1035 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Pendopo Wabup dan Rehab Rumah Jabatan Wabup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012143000 | 53269126;53269258 | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 40,000,000 | 0 | 0 | 0 | 2024-11-20 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
1036 | 2024 | Sekretariat Daerah | Belanja Modal Asrama | Pengadaan Langsung | Pekerjaan Konstruksi | 10012553000 | 53274201 | 199,977,000 | 199,779,309 | 199,612,807 | 199,612,807 | 199,612,807 | 199,612,800 | 199,612,800 | 199,612,800 | 2024-11-21 | cv. nurulillah | 50.826.160.9-733.000 | 364,193 | 0.18 % | |
1037 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan di Yayasan Tarbiyatul Furqon Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012566000 | 52784490 | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-21 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
1038 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Penggantian Jembatan Menuju Majelis Raudhatul Firdaus Kec. Padang Batung (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10012583000 | 52784612 | 15,000,000 | 14,997,000 | 14,925,060 | 14,925,060 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-11-21 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 74,940 | 0.5 % | |
1039 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10012844000 | 52806096 | 185,389,897 | 185,300,920 | 184,317,628 | 184,317,628 | 184,045,678 | 184,045,678 | 184,045,678 | 184,045,678 | 2024-11-22 | Lingga Perkasa | 20.558.364.4-733.000 | 1,072,269 | 0.58 % | |
1040 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10013099000 | 52793494 | 198,959,859 | 198,955,237 | 198,626,680 | 198,626,680 | 198,537,880 | 198,537,880 | 198,537,880 | 198,537,880 | 2024-11-24 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 333,179 | 0.17 % | |
1041 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Sungai Balum Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013118000 | 52791187 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1042 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013130000 | 52834360 | 200,000,000 | 199,999,800 | 199,471,440 | 199,471,440 | 199,427,040 | 199,427,040 | 199,427,040 | 199,427,040 | 2024-11-22 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 528,560 | 0.26 % | |
1043 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tumbukan Banyu Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013131000 | 52785228 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1044 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Tambangan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013157000 | 52792028 | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1045 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Siang Gantung Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013177000 | 52793489 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1046 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Samuda Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013199000 | 52791096 | 30,000,000 | 30,000,000 | 29,953,350 | 29,953,350 | 29,725,800 | 29,725,800 | 29,725,800 | 29,725,800 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 46,650 | 0.16 % | |
1047 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Kayu Abang Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013228000 | 52733453 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1048 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Baruh Kembang Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013249000 | 52784908 | 30,000,000 | 30,000,000 | 29,940,000 | 29,940,000 | 29,703,600 | 29,703,600 | 29,703,600 | 29,703,600 | 2024-11-30 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 60,000 | 0.2 % | |
1049 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013262000 | 52792291 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,500 | 0.37 % | |
1050 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perluasan SPAM Ponpes Tarbiyatul Furqon Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013280000 | 52806053 | 119,267,218 | 119,230,229 | 119,112,139 | 119,112,139 | 118,962,622 | 118,962,622 | 118,962,622 | 118,962,622 | 2024-11-21 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 155,079 | 0.13 % | |
1051 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013298000 | 52793810 | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1052 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10013323000 | 52736903 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1053 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Banjarbaru Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013961000 | 52793816 | 198,959,859 | 198,903,501 | 198,768,187 | 198,768,187 | 198,324,189 | 198,324,189 | 198,324,189 | 198,324,189 | 2024-11-24 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 191,672 | 0.1 % | |
1054 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Banua Hanyar Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10013964000 | 52792282 | 198,959,859 | 198,914,791 | 198,662,700 | 198,662,700 | 198,290,852 | 198,290,852 | 198,290,852 | 198,290,852 | 2024-11-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 297,159 | 0.15 % | |
1055 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013981000 | 52793710 | 198,959,859 | 198,911,713 | 198,879,129 | 198,879,129 | 198,745,929 | 198,745,929 | 198,745,929 | 198,745,929 | 2024-11-24 | CV. ROYAL FORTUNA | 21.248.732.6-733.000 | 80,730 | 0.04 % | |
1056 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10013997000 | 52793117 | 198,959,859 | 198,944,784 | 197,729,262 | 197,729,262 | 197,546,112 | 197,546,112 | 197,546,112 | 197,546,112 | 2024-11-24 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 1,230,597 | 0.62 % | |
1057 | 2024 | Dinas Perikanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Nasihat dan Pra Desain Arsitektural | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014283000 | 53208019 | 100,000,000 | 97,900,000 | 97,707,750 | 97,707,750 | 97,500,000 | 0 | 0 | 0 | 2024-11-26 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,292,250 | 2.29 % | |
1058 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10014365000 | 52783777 | 196,819,416 | 196,815,657 | 196,510,642 | 196,510,642 | 196,116,594 | 196,116,594 | 196,116,594 | 196,116,594 | 2024-11-24 | cv. nurulillah | 50.826.160.9-733.000 | 308,774 | 0.16 % | |
1059 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10014423000 | 52792114 | 198,959,859 | 198,959,363 | 198,848,349 | 198,848,349 | 198,436,983 | 198,436,983 | 198,436,983 | 198,436,983 | 2024-11-24 | CV.ALFARIZQI ALESHA ZHAFRAN | 80.336.960.2-733.000 | 111,510 | 0.06 % | |
1060 | 2024 | Dinas Perpustakaan Dan Kearsipan | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014437000 | 52948956 | 10,000,000 | 10,000,000 | 9,901,200 | 9,901,200 | 9,900,090 | 9,901,200 | 9,901,200 | 9,901,200 | 2024-11-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 98,800 | 0.99 % | |
1061 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD (Bersuci, Berwudhu, Mandi) Ponpes Dalam Pagar Putra, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014448000 | 52783774 | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 55,499 | 0.37 % | |
1062 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pekapuran Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014470000 | 52792110 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-24 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 55,500 | 0.37 % | |
1063 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi SPAM Desa Sungai Raya Utara Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 10016651000 | 52812403 | 187,419,914 | 187,417,185 | 187,080,716 | 187,080,716 | 186,803,214 | 186,803,214 | 186,803,214 | 186,803,214 | 2024-11-26 | CV. ST REVIRA ZAYN | 99.812.699.9-731.000 | 339,198 | 0.18 % | |
1064 | 2024 | Sekretariat DPRD | Belanja Modal Rumah Negara Golongan I | Pengadaan Langsung | Pekerjaan Konstruksi | 10016652000 | 53236046 | 97,600,000 | 97,600,000 | 97,369,882 | 97,369,882 | 97,369,882 | 0 | 0 | 0 | 2024-12-12 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 230,118 | 0.24 % | |
1065 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Pakan Dalam Keminting Batu, Kec. Daha Utara Dan Ruas Tumbukan Banyu - Banua Hanyar, Kec. Daha Selatan (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10016693000 | 53516658 | 199,350,000 | 199,350,000 | 199,302,580 | 199,302,580 | 199,000,000 | 199,000,000 | 199,000,000 | 199,000,000 | 2024-11-28 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 47,420 | 0.02 % | |
1066 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perluasan SPAM Jaringan Perpipaan Desa Amawang Kiri Muka Kecamatan Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016707000 | 52812832 | 100,000,000 | 99,795,938 | 99,018,938 | 99,018,938 | 98,856,600 | 98,856,600 | 98,856,600 | 98,856,600 | 2024-12-01 | Indoplan Mega Sarana | 41.563.380.9-732.000 | 981,063 | 0.98 % | |
1067 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Pekerjaan Konstruksi | 10016734000 | 52826612 | 200,000,000 | 199,908,070 | 199,854,965 | 199,854,965 | 199,752,290 | 199,752,290 | 199,752,290 | 199,752,290 | 2024-12-01 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 145,035 | 0.07 % | |
1068 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Gambah Luar Muka Kec. Kandangan dan RT. 01 - 02 Desa Angkinang Selatan Kec Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016741000 | 53518755 | 20,000,000 | 19,833,000 | 19,811,773 | 19,811,773 | 19,800,673 | 19,800,673 | 100 | 19,800,673 | 2024-11-25 | CV. RAYHANI | 75.410.426.3-733.000 | 188,227 | 0.94 % | |
1069 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Muning Baru dan RT. 02 Desa Bayanan Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016766000 | 53518734 | 20,000,000 | 19,833,000 | 19,811,773 | 19,811,773 | 19,800,673 | 19,800,673 | 100 | 19,800,673 | 2024-11-25 | CV. RAYHANI | 75.410.426.3-733.000 | 188,227 | 0.94 % | |
1070 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Desa Pandan Sari dan RT. 02 Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016786000 | 53518744 | 20,000,000 | 19,833,000 | 19,773,540 | 19,773,540 | 19,762,440 | 19,762,440 | 100 | 19,762,440 | 2024-11-25 | CV JASA REKA ARTISTIKA | 04.970.100.6-733.000 | 226,460 | 1.13 % | |
1071 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Peningkatan PSU Perumahan Bumi Banua Griya Persada Desa Gambah Luar Muka | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016808000 | 53188369 | 15,000,000 | 15,000,000 | 14,923,761 | 14,923,761 | 14,912,661 | 14,912,661 | 14,912,661 | 14,912,661 | 2024-11-28 | Haded Barakat Utama | 95.529.593.6-732.000 | 76,239 | 0.51 % | |
1072 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman RT. 07 Kel. Kandangan Barat Kec. Kandangan dan RT. 03 Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016814000 | 53518761 | 20,000,000 | 19,833,000 | 19,720,238 | 19,720,238 | 19,710,248 | 19,710,248 | 100 | 19,710,248 | 2024-11-25 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 279,762 | 1.4 % | |
1073 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Jl.Parigi Desa Wasah Hulu - Desa Ulin | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10016846000 | 53199797 | 45,000,000 | 29,810,000 | 29,726,744 | 29,726,744 | 29,715,644 | 29,715,644 | 100 | 29,715,644 | 2024-12-03 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 15,273,257 | 33.94 % | |
1074 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10016924000 | 52790982 | 198,959,859 | 198,943,568 | 198,790,380 | 198,790,380 | 198,436,766 | 198,436,766 | 198,436,766 | 198,436,766 | 2024-11-30 | CV. ALESHA BERSAUDARA | 60.324.668.7-733.000 | 169,479 | 0.09 % | |
1075 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10017010000 | 52791371 | 164,016,180 | 164,003,782 | 163,760,298 | 163,760,298 | 163,467,256 | 163,467,256 | 163,467,256 | 163,467,256 | 2024-12-01 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 255,882 | 0.16 % | |
1076 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 10017034000 | 52833106 | 200,000,000 | 199,820,316 | 199,582,616 | 199,582,616 | 199,451,636 | 199,451,636 | 199,451,636 | 199,451,636 | 2024-12-01 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 417,384 | 0.21 % | |
1077 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Paramaian Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017036000 | 52790998 | 15,000,000 | 15,000,000 | 14,944,501 | 14,944,501 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 55,499 | 0.37 % | |
1078 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017052000 | 52791373 | 15,000,000 | 15,000,000 | 14,985,000 | 14,985,000 | 14,751,900 | 14,751,900 | 14,751,900 | 14,751,900 | 2024-12-01 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 15,000 | 0.1 % | |
1079 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017070000 | 52791273 | 15,000,000 | 15,000,000 | 14,996,100 | 14,996,100 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-30 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 3,900 | 0.03 % | |
1080 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017083000 | 52784650 | 15,000,000 | 15,000,000 | 14,996,100 | 14,996,100 | 14,763,000 | 14,763,000 | 14,763,000 | 14,763,000 | 2024-11-30 | CV. PANCA KARYA PRATAMA | 94.756.583.4-733.000 | 3,900 | 0.03 % | |
1081 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Ruang Sekretariat Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017094000 | 52826636 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,722,500 | 14,722,500 | 14,722,500 | 14,722,500 | 2024-12-03 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
1082 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung BNN Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017118000 | 52833104 | 15,000,000 | 15,000,000 | 14,858,693 | 14,858,693 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 141,307 | 0.94 % | |
1083 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembuatan Lahan Parkir Mesjid Nurul Muslimin Desa Hamayung Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017128000 | 52834362 | 15,000,000 | 15,000,000 | 14,858,693 | 14,858,693 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 141,307 | 0.94 % | |
1084 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Pasungkan Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10017513000 | 52791277 | 198,959,859 | 198,956,260 | 198,787,066 | 198,787,066 | 198,225,880 | 198,225,880 | 198,225,880 | 198,225,880 | 2024-11-30 | CV. BERKAH BERSAMA AS-SALAM | 99.831.501.4-733.000 | 172,793 | 0.09 % | |
1085 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Sungai Garuda Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 10017531000 | 52784619 | 198,959,859 | 198,955,052 | 198,949,281 | 198,949,281 | 198,744,152 | 198,744,152 | 198,744,152 | 198,744,152 | 2024-11-30 | CV. BUKIT SIRKUIT DAMAI | 50.303.413.4-733.000 | 10,578 | 0.01 % | |
1086 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Peningkatan Rumah Jabatan Kapolres Kab HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017594000 | 52833319 | 35,000,000 | 35,000,000 | 34,743,000 | 34,743,000 | 34,722,500 | 34,722,500 | 34,722,500 | 34,722,500 | 2024-12-03 | cv.akmalindo | 02.531.482.4-731.000 | 257,000 | 0.73 % | |
1087 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Ruang Kantin Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10017606000 | 52834007 | 45,000,000 | 45,000,000 | 44,733,000 | 44,733,000 | 44,677,500 | 44,677,500 | 44,677,500 | 44,677,500 | 2024-12-03 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 267,000 | 0.59 % | |
1088 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pemeliharaan Sumur Bor TPA | Pengadaan Langsung | Pekerjaan Konstruksi | 10018414000 | 53186333 | 80,000,000 | 76,083,419 | 75,849,948 | 75,849,948 | 75,006,937 | 75,006,937 | 75,006,937 | 75,006,937 | 2024-11-29 | CV. AL QAWS | 70.619.811.6-733.000 | 4,150,052 | 5.19 % | |
1089 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 10018588000 | 52736785 | 198,959,859 | 198,872,495 | 198,662,743 | 198,662,743 | 198,440,743 | 198,440,743 | 198,440,743 | 198,440,743 | 2024-12-01 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 297,116 | 0.15 % | |
1090 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 10018809000 | 52834343 | 172,800,000 | 172,790,960 | 172,652,609 | 172,652,609 | 172,474,831 | 172,474,831 | 172,474,831 | 172,474,831 | 2024-11-30 | cv. nurulillah | 50.826.160.9-733.000 | 147,391 | 0.09 % | |
1091 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 10018888000 | 52736295 | 198,959,859 | 198,958,290 | 198,876,877 | 198,876,877 | 198,443,545 | 198,443,545 | 198,443,545 | 198,443,545 | 2024-12-02 | FADWI UTAMA | 94.246.044.5-733.000 | 82,982 | 0.04 % | |
1092 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10018974000 | 52793387 | 196,819,416 | 196,734,151 | 196,613,315 | 196,613,315 | 196,572,800 | 196,572,800 | 196,572,800 | 196,572,800 | 2024-11-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 206,101 | 0.1 % | |
1093 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019046000 | 52187301 | 15,000,000 | 15,000,000 | 14,735,250 | 14,735,250 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-05 | cv.akmalindo | 02.531.482.4-731.000 | 264,750 | 1.77 % | |
1094 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Pakan Dalam Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019047000 | 52793713 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
1095 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Teluk Labak Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019054000 | 52793143 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-12-01 | CV. AFAPASTA CONSULTANT | 02.303.631.2-731.000 | 150,000 | 1 % | |
1096 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Bangkau Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019057000 | 52793386 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-26 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1097 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Polsek Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019066000 | 52856036 | 35,000,000 | 35,000,000 | 34,874,813 | 34,874,813 | 34,654,200 | 34,654,200 | 34,654,200 | 34,654,200 | 2024-12-03 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,188 | 0.36 % | |
1098 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPALD JAGAT di Desa Baruh Jaya Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019070000 | 52736405 | 15,000,000 | 15,000,000 | 14,960,580 | 14,960,580 | 14,796,300 | 14,796,300 | 14,796,300 | 14,796,300 | 2024-11-30 | CV. MITRA BANUA MANDIRI | 66.402.823.0-731.000 | 39,420 | 0.26 % | |
1099 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan R'ehabilitasi Bangunan MTQ Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019080000 | 52834345 | 15,000,000 | 15,000,000 | 14,850,000 | 14,850,000 | 14,740,800 | 14,740,800 | 14,740,800 | 14,740,800 | 2024-12-05 | cv.akmalindo | 02.531.482.4-731.000 | 150,000 | 1 % | |
1100 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Renovasi Gedung Aula Bhayangkara (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10019085000 | 53494535 | 150,000,000 | 142,756,189 | 142,699,449 | 142,699,449 | 142,537,567 | 142,537,567 | 142,537,567 | 142,537,567 | 2024-12-03 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | 7,300,551 | 4.87 % | |
1101 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengawasan Konsultan Pembuatan/Peningkatan PSU Permukiman Komplek Permata Bidadari RT. 04 Ds. Hamalau, Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10019659000 | 53199669 | 20,000,000 | 19,865,000 | 19,800,995 | 19,800,995 | 19,789,895 | 19,789,895 | 100 | 19,789,895 | 2024-11-29 | cv.nawasena konsultan | 62.243.237.5-731.000 | 199,005 | 1 % | |
1102 | 2024 | Sekretariat Daerah | Rehab Parkir Mobil Jabatan Bupati | Pengadaan Langsung | Pekerjaan Konstruksi | 10020202000 | 53274352 | 198,330,000 | 198,330,000 | 198,244,382 | 198,244,382 | 198,098,001 | 0 | 0 | 0 | 2024-12-08 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 85,618 | 0.04 % | |
1103 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan SPAM Kelurahan Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10020862000 | 52794344 | 15,000,000 | 15,000,000 | 14,944,500 | 14,944,500 | 14,774,100 | 14,774,100 | 14,774,100 | 14,774,100 | 2024-11-30 | CV. ARTWORK DESIGN CONSULTANT | 61.785.051.6-732.000 | 55,500 | 0.37 % | |
1104 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jl. Amawang Muka - Getek dan Jl. Angkakai (Jl. Sungai Hambawang) Kec. Kandangan (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10020961000 | 52785560 | 70,000,000 | 69,980,100 | 68,298,300 | 68,298,300 | 68,200,000 | 68,200,000 | 68,200,000 | 68,200,000 | 2024-12-02 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 1,701,700 | 2.43 % | |
1105 | 2024 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Perencanaan Rehab Berat Rumah Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021195000 | 53469606 | 75,000,000 | 60,000,000 | 59,718,841 | 59,718,841 | 59,600,000 | 0 | 0 | 0 | 2024-12-02 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 15,281,159 | 20.37 % | |
1106 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi Pengawasan Pembangunan Rumah Anggrek | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021835000 | 53253968 | 10,000,000 | 10,000,000 | 9,768,000 | 9,768,000 | 9,712,500 | 9,712,500 | 100 | 9,712,500 | 2024-12-05 | cv.akmalindo | 02.531.482.4-731.000 | 232,000 | 2.32 % | |
1107 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultansi Pengawasan Pembuatan Drainase TPA Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10021851000 | 53268867 | 10,000,000 | 10,000,000 | 9,872,586 | 9,872,586 | 9,768,000 | 9,768,000 | 100 | 9,768,000 | 2024-12-02 | Genetik kreatif Konsultan | 99.241.406.0-735.000 | 127,414 | 1.27 % | |
1108 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022004000 | 52805918 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-03 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 237,000 | 1.58 % | |
1109 | 2024 | Dinas Perdagangan | Pengawasan Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022009000 | 52804724 | 15,000,000 | 15,000,000 | 14,763,000 | 14,763,000 | 14,652,000 | 14,652,000 | 14,652,000 | 14,652,000 | 2024-12-03 | cv.akmalindo | 02.531.482.4-731.000 | 237,000 | 1.58 % | |
1110 | 2024 | Dinas Perdagangan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 10022014000 | 52791044 | 150,000,000 | 149,996,780 | 149,941,280 | 149,941,280 | 149,767,010 | 149,767,010 | 149,767,010 | 149,767,010 | 2024-12-03 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 58,720 | 0.04 % | |
1111 | 2024 | Dinas Perdagangan | Pekerjaan Pemasangan Paving Blok Pasar Taniran Tahap ke-2 Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 10022019000 | 52805913 | 196,200,000 | 196,197,368 | 196,003,635 | 196,003,635 | 195,706,377 | 195,706,377 | 195,706,377 | 195,706,377 | 2024-12-03 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 196,365 | 0.1 % | |
1112 | 2024 | Dinas Perdagangan | Pemasangan Paving Blok Depan Pasar Rakyat Terpadu 2 Kandangan, Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 10022023000 | 52804699 | 161,950,020 | 161,941,113 | 161,678,905 | 161,678,905 | 161,369,797 | 161,369,797 | 161,369,797 | 161,369,797 | 2024-12-03 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 271,115 | 0.17 % | |
1113 | 2024 | Sekretariat Daerah | Rehab Halaman Gedung PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 10022183000 | 53579473 | 199,430,000 | 199,430,000 | 199,328,692 | 199,328,692 | 199,328,692 | 0 | 0 | 0 | 2024-12-08 | cv. nurulillah | 50.826.160.9-733.000 | 101,308 | 0.05 % | |
1114 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Lapangan Tugu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022185000 | 53268905 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 20,000,000 | 0 | 0 | 0 | 2024-12-04 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 0 | 0 % | |
1115 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Drainase Desa Batang Kulur Kiri Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022372000 | 52783802 | 15,000,000 | 14,997,000 | 14,886,168 | 14,886,168 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-12-02 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 113,832 | 0.76 % | |
1116 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Ds. Paring Agung Kec. Sungai Raya (Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan Konstruksi Teknik Sipil Transportasi, Kategori 1) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10022380000 | 52783694 | 15,000,000 | 14,997,000 | 14,886,168 | 14,886,168 | 14,800,000 | 14,800,000 | 14,800,000 | 14,800,000 | 2024-12-02 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 113,832 | 0.76 % | |
1117 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Urugan dan Pembangunan Pagar Belakang Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10023689000 | 52833704 | 95,000,000 | 94,845,726 | 94,721,850 | 94,721,850 | 94,577,550 | 94,577,550 | 94,577,550 | 94,577,550 | 2024-12-03 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 278,150 | 0.29 % | |
1118 | 2024 | Dinas Sosial | Belanja Jasa Konsultansi Pengawasan Arsitektur - Jasa Konsultan Pengawasan Pemasangan Paving Blok di Halaman Ruang Tunggu di TMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10023798000 | 48000748 | 35,000,000 | 25,000,000 | 24,642,000 | 24,642,000 | 24,630,900 | 0 | 0 | 0 | 2024-12-05 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 10,358,000 | 29.59 % | |
1119 | 2024 | Dinas Kesehatan | Pemeliharaan IPAL Puskesmas | Pengadaan Langsung | Pekerjaan Konstruksi | 10024820000 | 53180127 | 247,671,500 | 194,250,000 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 193,972,500 | 2024-12-11 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 53,699,000 | 21.68 % | |
1120 | 2024 | Dinas Pemuda Olahraga dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural (Perubahan) ( Konsultan Perencanaan Objek Wisata Air Panas Tanuhi ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10024923000 | 53391011 | 100,000,000 | 99,997,770 | 99,716,850 | 99,716,850 | 99,666,900 | 0 | 0 | 0 | 2024-12-04 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 283,150 | 0.28 % | |
1121 | 2024 | Sekretariat Daerah | Pembuatan Menara + Tandon Air | Pengadaan Langsung | Pekerjaan Konstruksi | 10025652000 | 53579317 | 99,525,600 | 99,488,400 | 99,432,887 | 99,432,887 | 99,432,887 | 0 | 0 | 0 | 2024-12-05 | FADWI UTAMA | 94.246.044.5-733.000 | 92,713 | 0.09 % | |
1122 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Ayitih Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10025689000 | 53600665 | 101,351,000 | 101,350,000 | 101,246,096 | 101,246,096 | 101,200,000 | 101,200,000 | 101,200,000 | 101,200,000 | 2024-12-06 | CV. SEGAWIAN BERKAH MANDIRI | 60.223.053.4-733.000 | 104,904 | 0.1 % | |
1123 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Ruas Makam Habib Lumpangi, Kec. Loksado (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10025704000 | 53600668 | 200,000,000 | 199,999,000 | 199,902,161 | 199,902,161 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-12-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 97,839 | 0.05 % | |
1124 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Utilitas Jaringan Listrik Kawasan Perkantoran Kab. HSS Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10026465000 | 52834337 | 100,000,000 | 100,000,000 | 99,083,904 | 99,083,904 | 99,056,400 | 99,056,400 | 99,056,400 | 99,056,400 | 2024-12-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 916,096 | 0.92 % | |
1125 | 2024 | Puskesmas Negara | Belanja Modal Gedung dan Bangunan BLUD | Pengadaan Langsung | Pekerjaan Konstruksi | 10026548000 | 53183116 | 82,000,000 | 78,930,559 | 78,816,077 | 78,816,077 | 78,616,281 | 78,616,200 | 78,616,200 | 78,616,200 | 2024-12-07 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 3,183,923 | 3.88 % | |
1126 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Hamalau - Anjiran, Jl. Desa Kapuh Tengah, Padang Batung - Batu Laki - Malilingin dan Simp. 3 Bukuanin - Riam Talo (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10026550000 | 53654177 | 200,000,000 | 199,995,000 | 199,929,168 | 199,929,168 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-12-17 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 70,832 | 0.04 % | |
1127 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pendataan Bangunan Gedung di HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026665000 | 53661591 | 70,000,000 | 69,883,380 | 69,883,380 | 69,883,380 | 69,439,380 | 69,439,380 | 69,439,380 | 69,439,380 | 2024-12-07 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 116,620 | 0.17 % | |
1128 | 2024 | Sekretariat Daerah | Jasa Konsultansi Pengawasan Rehab Parkir Mobil di Rumah Jabatan Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027331000 | 53269433 | 15,000,000 | 15,000,000 | 14,925,060 | 14,925,060 | 14,925,060 | 0 | 0 | 0 | 2024-12-11 | CV. Berkah Desain Konsultan | 96.938.414.8-736.000 | 74,940 | 0.5 % | |
1129 | 2024 | Sekretariat Daerah | Pengawasan Rehab Halaman Gedung PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027332000 | 53270813 | 15,000,000 | 15,000,000 | 14,607,600 | 14,607,600 | 14,607,600 | 0 | 0 | 0 | 2024-12-11 | RAHMAT BANUA KONSULTAN | 91.105.222.3-733.000 | 392,400 | 2.62 % | |
1130 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultansi Pengawasan Rehab Pagar Tumah Jabatan dan Pembuatan Menara+Tandon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027333000 | 53206615;53269851 | 55,000,000 | 54,997,525 | 54,612,000 | 54,612,000 | 54,612,000 | 0 | 0 | 0 | 2024-12-09 | cv.akmalindo | 02.531.482.4-731.000 | 388,000 | 0.71 % | |
1131 | 2024 | Sekretariat Daerah | Belanja Jasa Konsultasi Perencanaan Rehab Pendopo Bupati | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027335000 | 53269085 | 50,000,000 | 50,000,000 | 49,975,808 | 49,975,808 | 49,975,808 | 0 | 0 | 0 | 2024-12-09 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 24,193 | 0.05 % | |
1132 | 2024 | Dinas Kesehatan | Pemasangan Paving Puskesmas Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 10027382000 | 53180478 | 137,250,000 | 137,200,000 | 137,160,076 | 137,160,076 | 137,160,076 | 137,160,000 | 137,160,000 | 137,160,000 | 2024-12-08 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 89,924 | 0.07 % | |
1133 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Rumah Jabatan dan Subdenpom VI/2-1 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10027524000 | 52833242 | 35,000,000 | 34,338,544 | 34,077,000 | 34,077,000 | 33,954,900 | 33,954,900 | 33,954,900 | 33,954,900 | 2024-12-09 | cv.akmalindo | 02.531.482.4-731.000 | 923,000 | 2.64 % | |
1134 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pengaman Badan Jalan di Ruas Jalan Desa Angkinang - Desa Mandala Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10028576000 | 53653306 | 85,000,000 | 84,997,000 | 84,875,169 | 84,875,169 | 84,300,000 | 84,300,000 | 84,300,000 | 84,300,000 | 2024-12-17 | CV.Bangun Banua | 93.708.167.7-733.000 | 124,831 | 0.15 % | |
1135 | 2024 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Bank Sampah dan Paving Halaman | Pengadaan Langsung | Pekerjaan Konstruksi | 10028753000 | 53670581 | 89,980,000 | 89,969,210 | 89,896,775 | 89,896,775 | 89,719,175 | 89,719,175 | 100 | 89,719,175 | 2024-12-12 | CV. KHALIF | 81.540.809.1-733.000 | 83,225 | 0.09 % | |
1136 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Ruas Jalan Jarau - Parandakan Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029095000 | 53654226 | 200,000,000 | 199,964,000 | 199,897,786 | 199,897,786 | 199,300,000 | 199,300,000 | 199,300,000 | 199,300,000 | 2024-12-18 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 102,214 | 0.05 % | |
1137 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Ruas Jalan Panggang Hijau Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029138000 | 53710070 | 200,000,000 | 199,999,000 | 199,900,209 | 199,900,209 | 199,800,000 | 199,800,000 | 199,800,000 | 199,800,000 | 2024-12-12 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 99,791 | 0.05 % | |
1138 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Ruas Jl. Kalaka Dayuh - Ds. Sungai Raya Utara Kec. Sungai Raya (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029271000 | 53698648 | 200,000,000 | 199,955,000 | 199,895,845 | 199,895,845 | 196,188,000 | 196,188,000 | 196,188,000 | 196,188,000 | 2024-12-12 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 104,155 | 0.05 % | |
1139 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jalan Ruas Jl. Sp. Bakarung Selatan - Sungai Kudung Kec. Angkinang (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10029325000 | 53722189 | 140,000,000 | 110,820,000 | 110,773,026 | 110,773,026 | 110,400,000 | 110,400,000 | 110,400,000 | 110,400,000 | 2024-12-20 | CV. SORAYA | 01.834.078.6-733.000 | 29,226,974 | 20.88 % | |
1140 | 2024 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan Sungai Pihaung / Sungai Tani | Pengadaan Langsung | Pekerjaan Konstruksi | 10030310000 | 53740896 | 50,172,500 | 50,056,035 | 50,022,379 | 50,022,379 | 50,000,800 | 0 | 0 | 0 | 2024-12-16 | CV. BANGUN YAMAN MANDIRI | 76.092.706.1-732.000 | 150,121 | 0.3 % | |
1141 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Oprit Jembatan Ruas Teluk Pinang - Pahampangan Utara Kec. Sungai Raya (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031019000 | 53811229 | 199,900,000 | 199,900,000 | 199,854,897 | 199,854,897 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-12-20 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 45,103 | 0.02 % | |
1142 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan Ds. Telaga Sili-Sili, Ds. Kandangan Kota dan Ds. Pahampangan Kec. Sungai Raya (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031215000 | 53810646 | 153,804,000 | 153,793,000 | 153,747,933 | 153,747,933 | 153,300,000 | 153,300,000 | 153,300,000 | 153,300,000 | 2024-12-20 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 56,067 | 0.04 % | |
1143 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jembatan Rahimin Kec. Daha Utara (Pemeliharaan Rutin Jembatan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031419000 | 53811830 | 182,437,670 | 182,437,000 | 182,370,844 | 182,370,844 | 182,000,000 | 182,000,000 | 182,000,000 | 182,000,000 | 2024-12-20 | CV. 21 PRATAMA | 40.164.391.1-733.000 | 66,826 | 0.04 % | |
1144 | 2024 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Rutin Jalan Ds. Sungai Balum Kec. Daha Barat (Pemeliharaan Rutin Jalan) | Pengadaan Langsung | Pekerjaan Konstruksi | 10031599000 | 53852269 | 200,000,000 | 199,963,000 | 199,908,252 | 199,908,252 | 199,500,000 | 199,500,000 | 199,500,000 | 199,500,000 | 2024-12-20 | CV. SORAYA | 01.834.078.6-733.000 | 91,748 | 0.05 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |