Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 17 | 9.817.795.000 | 0 | 0 | 17 | 9.817.795.000 | 0 | 0 |
Seleksi | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tender Cepat | 1 | 250.000.000 | 0 | 0 | 1 | 250.000.000 | 0 | 0 |
Total | 18 | 10.067.795.000 | 0 | 0 | 18 | 10.067.795.000 | 0 | 0 |
Persentase | 0 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Al-Fairuz Madinah, Kec. Kandangan (465,5 m) | Tender | Pekerjaan Konstruksi | 4244282 | 27445748 | APBD | 475,000,000 | 474,951,419 | 470,952,836 | 470,952,836 | 470,952,836 | 470,952,836 | 0 | 0 | 2021-02-15 16:00:00 | 2021-03-01 | 2021-03-10 | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 4,047,164 | 0.85 % | |
2 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Mega Gerilya Asri, Karang Jawa Muka, Kec. Padang Batung (435,5 m) | Tender | Pekerjaan Konstruksi | 4247282 | 27445527 | APBD | 800,000,000 | 799,981,577 | 789,470,301 | 789,470,301 | 788,500,000 | 788,500,000 | 0 | 0 | 2021-02-15 08:00:00 | 2021-02-25 | 2021-03-08 | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 10,529,699 | 1.32 % | |
3 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKPLH) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268282 | 28309672 | APBD | 165,370,000 | 165,315,582 | 152,130,000 | 152,130,000 | 152,130,000 | 152,130,000 | 0 | 0 | 2021-04-16 09:00:00 | 2021-05-27 | 2021-06-08 | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 13,240,000 | 8.01 % | |
4 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKTL) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4432282 | 28309845 | APBD | 195,000,000 | 194,983,028 | 186,655,700 | 186,655,700 | 185,995,700 | 185,995,700 | 0 | 0 | 2021-03-30 15:00:00 | 2021-05-04 | 2021-05-24 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 8,344,300 | 4.28 % | |
5 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan H. Abdul Hasan (jalan kebun tembus Pantai Paku) (870 m) | Tender | Pekerjaan Konstruksi | 4718282 | 27388048 | APBD | 360,000,000 | 359,440,341 | 356,444,060 | 356,444,060 | 356,197,600 | 356,197,600 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-10 | 2021-07-15 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,555,940 | 0.99 % | |
6 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Lingkungan Desa Pandulangan (400 m) | Tender | Pekerjaan Konstruksi | 4734282 | 27388035 | APBD | 354,575,000 | 354,150,580 | 346,475,520 | 346,475,520 | 346,405,000 | 346,405,000 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-10 | 2021-07-15 | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 8,099,480 | 2.28 % | |
7 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Samirang Bakarung (1200 m) | Tender | Pekerjaan Konstruksi | 4736282 | 27388040 | APBD | 700,000,000 | 699,482,681 | 692,500,263 | 692,500,263 | 692,000,000 | 692,000,000 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-09 | 2021-07-14 | 02.746.832.1-733.000 | CV. RIVINA | 02.746.832.1-733.000 | CV. RIVINA | 7,499,737 | 1.07 % | |
8 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Pantai Ulin,Pembangunan PJU Desa Amparaya,Pembangunan PJU Desa Garunggang,Pembangunan PJU Desa Asam - Desa Sirih Hulu,Pembangunan PJU Desa Tibung Raya, Desa Amawang Kanan dan Desa Kapuh,Pembangunan PJU Jl. Halalang,Pembangunan PJU Desa Malutu sampai Desa Paharuangan,Pembangunan PJU Desa Taniran Selatan,Pembangunan PJU Jl. Halayung Desa Ulin,Pembangunan PJU Desa Bamban,Pembangunan PJU Desa Paring Agung,Pembangunan PJU Jalan Hanau,Pembangunan PJU Desa Baluti Jl. Padang Rasau | Tender | Pekerjaan Konstruksi | 4900282 | 27421155;27421254;27421325;27421525;27421773;27422239;27433038;27433171;27433231;27433370;27433589;27433659;27433773 | APBD | 1,186,825,000 | 1,145,444,080 | 1,135,244,825 | 1,135,244,825 | 1,135,000,000 | 1,135,000,000 | 0 | 0 | 2021-08-16 08:00:00 | 2021-08-23 | 2021-08-31 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 51,580,175 | 4.35 % | |
9 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Daha Selatan,Rehabilitasi PJU Daha Utara,Rehabilitasi PJU Longawang,Rehabilitasi PJU Banyu Barau,Rehab PJU Sungai Raya,Rehab PJU Muara Banta,Rehab PJU Kota Kandangan | Tender | Pekerjaan Konstruksi | 4901282 | 27422387;27422570;27422641;27432342;27432586;27432697;27432957 | APBD | 653,000,000 | 636,915,730 | 631,792,205 | 631,792,205 | 631,600,000 | 631,600,000 | 0 | 0 | 2021-08-16 08:00:00 | 2021-08-23 | 2021-08-31 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 21,207,795 | 3.25 % | |
10 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Tender Cepat | Pengadaan Barang | 5035282 | 27449351 | APBD | 250,000,000 | 250,000,000 | 204,999,950 | 204,999,950 | 204,999,950 | 225,000,000 | 0 | 0 | 2021-08-16 11:00:00 | 2021-08-23 | 2021-10-06 | 94.316.406.1-401.000 | PILAR PRATAMA. CV | 75.363.080.5-216.000 | CV. MATIINU BERDIKARI | 45,000,050 | 18 % | |
11 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Gerbang Batas Kabupaten HSS - HST | Tender | Pekerjaan Konstruksi | 5150282 | 27420306 | APBD | 500,000,000 | 499,973,511 | 487,427,182 | 487,427,182 | 487,153,200 | 487,153,200 | 0 | 0 | 2021-09-15 12:00:00 | 2021-09-23 | 2021-10-05 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 12,572,818 | 2.51 % | |
12 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Griya Sandaga Binjai, Kel. Jambu Hilir, Kec. Kandangan (560 m) | Tender | Pekerjaan Konstruksi | 5157282 | 27446077 | APBD | 700,000,000 | 699,976,120 | 696,000,034 | 696,000,034 | 695,500,000 | 695,500,000 | 0 | 0 | 2021-08-30 08:00:00 | 2021-09-06 | 2021-09-13 | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 3,999,966 | 0.57 % | |
13 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Halaman Pondok Pesantren Puteri Dalam Pagar | Tender | Pekerjaan Konstruksi | 5399282 | 30137148 | APBDP | 485,000,000 | 484,941,493 | 484,007,451 | 484,007,451 | 483,500,000 | 483,500,000 | 0 | 0 | 2021-10-27 08:00:00 | 2021-11-02 | 2021-11-09 | 03.063.051.1-731.000 | CV. CHAI CHEL | 03.063.051.1-731.000 | CV. CHAI CHEL | 992,549 | 0.2 % | |
14 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02. Desa Hulu Banyu Kec. Loksado | Tender | Pekerjaan Konstruksi | 5405282 | 30136876 | APBDP | 400,000,000 | 399,839,951 | 396,337,931 | 396,337,931 | 396,202,000 | 396,202,000 | 0 | 0 | 2021-10-25 08:00:00 | 2021-10-29 | 2021-11-04 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,662,069 | 0.92 % | |
15 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Teluk Pinang Indah, Kec. Sungai Raya (725 m) | Tender | Pekerjaan Konstruksi | 5422282 | 27447013 | APBD | 1,180,000,000 | 1,177,199,752 | 1,172,618,081 | 1,172,618,081 | 1,172,166,000 | 1,172,166,000 | 0 | 0 | 2021-10-18 09:30:00 | 2021-10-25 | 2021-11-01 | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 7,381,919 | 0.63 % | |
16 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan TPU Daha Selatan Desa Banjarbaru | Tender | Pekerjaan Konstruksi | 5536282 | 30252199 | APBD | 249,775,000 | 249,774,009 | 248,500,071 | 248,500,071 | 248,463,200 | 248,463,200 | 0 | 0 | 2021-10-29 10:00:00 | 2021-11-04 | 2021-11-10 | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 1,274,929 | 0.51 % | |
17 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 05 Kel. Kandangan Kota Kec. Kandangan, Pembuatan/Peningkatan PSU Permukiman RT. 08 Kel. Kandangan Kota Kec. Kandangan | Tender | Pekerjaan Konstruksi | 5548282 | 30136990;30137006 | APBDP | 317,000,000 | 314,975,502 | 307,034,083 | 307,034,083 | 306,946,000 | 306,946,000 | 0 | 0 | 2021-10-29 11:00:00 | 2021-11-05 | 2021-11-09 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 9,965,917 | 3.14 % | |
18 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Suku Cadang Alat Berat TPA,Belanja Jasa Service Alat Berat TPA | Tender | Jasa Lainnya | 5600282 | 30378496;30378625 | APBDP | 1,096,250,000 | 1,095,441,964 | 1,078,000,000 | 1,078,000,000 | 1,074,000,000 | 1,074,000,000 | 0 | 0 | 2021-11-11 10:00:00 | 2021-11-18 | 2021-11-23 | 83.686.512.1-733.000 | cv. rezqi al mubarak | 83.686.512.1-733.000 | cv. rezqi al mubarak | 18,250,000 | 1.66 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Al-Fairuz Madinah, Kec. Kandangan (465,5 m) | Tender | Pekerjaan Konstruksi | 4244282 | 27445748 | APBD | 475,000,000 | 474,951,419 | 470,952,836 | 470,952,836 | 470,952,836 | 470,952,836 | 0 | 0 | 2021-02-15 16:00:00 | 2021-03-01 | 2021-03-10 | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 4,047,164 | 0.85 % | |
2 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Mega Gerilya Asri, Karang Jawa Muka, Kec. Padang Batung (435,5 m) | Tender | Pekerjaan Konstruksi | 4247282 | 27445527 | APBD | 800,000,000 | 799,981,577 | 789,470,301 | 789,470,301 | 788,500,000 | 788,500,000 | 0 | 0 | 2021-02-15 08:00:00 | 2021-02-25 | 2021-03-08 | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 10,529,699 | 1.32 % | |
3 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKPLH) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268282 | 28309672 | APBD | 165,370,000 | 165,315,582 | 152,130,000 | 152,130,000 | 152,130,000 | 152,130,000 | 0 | 0 | 2021-04-16 09:00:00 | 2021-05-27 | 2021-06-08 | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 13,240,000 | 8.01 % | |
4 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKTL) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4432282 | 28309845 | APBD | 195,000,000 | 194,983,028 | 186,655,700 | 186,655,700 | 185,995,700 | 185,995,700 | 0 | 0 | 2021-03-30 15:00:00 | 2021-05-04 | 2021-05-24 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 8,344,300 | 4.28 % | |
5 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan H. Abdul Hasan (jalan kebun tembus Pantai Paku) (870 m) | Tender | Pekerjaan Konstruksi | 4718282 | 27388048 | APBD | 360,000,000 | 359,440,341 | 356,444,060 | 356,444,060 | 356,197,600 | 356,197,600 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-10 | 2021-07-15 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,555,940 | 0.99 % | |
6 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Lingkungan Desa Pandulangan (400 m) | Tender | Pekerjaan Konstruksi | 4734282 | 27388035 | APBD | 354,575,000 | 354,150,580 | 346,475,520 | 346,475,520 | 346,405,000 | 346,405,000 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-10 | 2021-07-15 | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 8,099,480 | 2.28 % | |
7 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Samirang Bakarung (1200 m) | Tender | Pekerjaan Konstruksi | 4736282 | 27388040 | APBD | 700,000,000 | 699,482,681 | 692,500,263 | 692,500,263 | 692,000,000 | 692,000,000 | 0 | 0 | 2021-07-01 08:00:00 | 2021-07-09 | 2021-07-14 | 02.746.832.1-733.000 | CV. RIVINA | 02.746.832.1-733.000 | CV. RIVINA | 7,499,737 | 1.07 % | |
8 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Pantai Ulin,Pembangunan PJU Desa Amparaya,Pembangunan PJU Desa Garunggang,Pembangunan PJU Desa Asam - Desa Sirih Hulu,Pembangunan PJU Desa Tibung Raya, Desa Amawang Kanan dan Desa Kapuh,Pembangunan PJU Jl. Halalang,Pembangunan PJU Desa Malutu sampai Desa Paharuangan,Pembangunan PJU Desa Taniran Selatan,Pembangunan PJU Jl. Halayung Desa Ulin,Pembangunan PJU Desa Bamban,Pembangunan PJU Desa Paring Agung,Pembangunan PJU Jalan Hanau,Pembangunan PJU Desa Baluti Jl. Padang Rasau | Tender | Pekerjaan Konstruksi | 4900282 | 27421155;27421254;27421325;27421525;27421773;27422239;27433038;27433171;27433231;27433370;27433589;27433659;27433773 | APBD | 1,186,825,000 | 1,145,444,080 | 1,135,244,825 | 1,135,244,825 | 1,135,000,000 | 1,135,000,000 | 0 | 0 | 2021-08-16 08:00:00 | 2021-08-23 | 2021-08-31 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 51,580,175 | 4.35 % | |
9 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Daha Selatan,Rehabilitasi PJU Daha Utara,Rehabilitasi PJU Longawang,Rehabilitasi PJU Banyu Barau,Rehab PJU Sungai Raya,Rehab PJU Muara Banta,Rehab PJU Kota Kandangan | Tender | Pekerjaan Konstruksi | 4901282 | 27422387;27422570;27422641;27432342;27432586;27432697;27432957 | APBD | 653,000,000 | 636,915,730 | 631,792,205 | 631,792,205 | 631,600,000 | 631,600,000 | 0 | 0 | 2021-08-16 08:00:00 | 2021-08-23 | 2021-08-31 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 21,207,795 | 3.25 % | |
10 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Gerbang Batas Kabupaten HSS - HST | Tender | Pekerjaan Konstruksi | 5150282 | 27420306 | APBD | 500,000,000 | 499,973,511 | 487,427,182 | 487,427,182 | 487,153,200 | 487,153,200 | 0 | 0 | 2021-09-15 12:00:00 | 2021-09-23 | 2021-10-05 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 12,572,818 | 2.51 % | |
11 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Griya Sandaga Binjai, Kel. Jambu Hilir, Kec. Kandangan (560 m) | Tender | Pekerjaan Konstruksi | 5157282 | 27446077 | APBD | 700,000,000 | 699,976,120 | 696,000,034 | 696,000,034 | 695,500,000 | 695,500,000 | 0 | 0 | 2021-08-30 08:00:00 | 2021-09-06 | 2021-09-13 | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 3,999,966 | 0.57 % | |
12 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Halaman Pondok Pesantren Puteri Dalam Pagar | Tender | Pekerjaan Konstruksi | 5399282 | 30137148 | APBDP | 485,000,000 | 484,941,493 | 484,007,451 | 484,007,451 | 483,500,000 | 483,500,000 | 0 | 0 | 2021-10-27 08:00:00 | 2021-11-02 | 2021-11-09 | 03.063.051.1-731.000 | CV. CHAI CHEL | 03.063.051.1-731.000 | CV. CHAI CHEL | 992,549 | 0.2 % | |
13 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02. Desa Hulu Banyu Kec. Loksado | Tender | Pekerjaan Konstruksi | 5405282 | 30136876 | APBDP | 400,000,000 | 399,839,951 | 396,337,931 | 396,337,931 | 396,202,000 | 396,202,000 | 0 | 0 | 2021-10-25 08:00:00 | 2021-10-29 | 2021-11-04 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,662,069 | 0.92 % | |
14 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Teluk Pinang Indah, Kec. Sungai Raya (725 m) | Tender | Pekerjaan Konstruksi | 5422282 | 27447013 | APBD | 1,180,000,000 | 1,177,199,752 | 1,172,618,081 | 1,172,618,081 | 1,172,166,000 | 1,172,166,000 | 0 | 0 | 2021-10-18 09:30:00 | 2021-10-25 | 2021-11-01 | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 7,381,919 | 0.63 % | |
15 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan TPU Daha Selatan Desa Banjarbaru | Tender | Pekerjaan Konstruksi | 5536282 | 30252199 | APBD | 249,775,000 | 249,774,009 | 248,500,071 | 248,500,071 | 248,463,200 | 248,463,200 | 0 | 0 | 2021-10-29 10:00:00 | 2021-11-04 | 2021-11-10 | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 1,274,929 | 0.51 % | |
16 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 05 Kel. Kandangan Kota Kec. Kandangan, Pembuatan/Peningkatan PSU Permukiman RT. 08 Kel. Kandangan Kota Kec. Kandangan | Tender | Pekerjaan Konstruksi | 5548282 | 30136990;30137006 | APBDP | 317,000,000 | 314,975,502 | 307,034,083 | 307,034,083 | 306,946,000 | 306,946,000 | 0 | 0 | 2021-10-29 11:00:00 | 2021-11-05 | 2021-11-09 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 9,965,917 | 3.14 % | |
17 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Suku Cadang Alat Berat TPA,Belanja Jasa Service Alat Berat TPA | Tender | Jasa Lainnya | 5600282 | 30378496;30378625 | APBDP | 1,096,250,000 | 1,095,441,964 | 1,078,000,000 | 1,078,000,000 | 1,074,000,000 | 1,074,000,000 | 0 | 0 | 2021-11-11 10:00:00 | 2021-11-18 | 2021-11-23 | 83.686.512.1-733.000 | cv. rezqi al mubarak | 83.686.512.1-733.000 | cv. rezqi al mubarak | 18,250,000 | 1.66 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Tender Cepat | Pengadaan Barang | 5035282 | 27449351 | APBD | 250,000,000 | 250,000,000 | 204,999,950 | 204,999,950 | 204,999,950 | 225,000,000 | 0 | 0 | 2021-08-16 11:00:00 | 2021-08-23 | 2021-10-06 | 94.316.406.1-401.000 | PILAR PRATAMA. CV | 75.363.080.5-216.000 | CV. MATIINU BERDIKARI | 45,000,050 | 18 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Al-Fairuz Madinah, Kec. Kandangan (465,5 m) | Tender | Pekerjaan Konstruksi | 4244282 | 27445748 | 475,000,000 | 474,951,419 | 470,952,836 | 470,952,836 | 0 | 0 | 2021-02-15 16:00:00 | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | CV. MANDIRI SUKSES ABADI | 4,047,164 | 0.85 % | |
2 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Mega Gerilya Asri, Karang Jawa Muka, Kec. Padang Batung (435,5 m) | Tender | Pekerjaan Konstruksi | 4247282 | 27445527 | 800,000,000 | 799,981,577 | 789,470,301 | 788,500,000 | 0 | 0 | 2021-02-15 08:00:00 | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | CV. Risfa Harapan Utama | 10,529,699 | 1.32 % | |
3 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKPLH) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4268282 | 28309672 | 165,370,000 | 165,315,582 | 152,130,000 | 152,130,000 | 0 | 0 | 2021-04-16 09:00:00 | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 02.883.347.3-731.000 | CV. DAYA UTAMA KONSULTAN | 13,240,000 | 8.01 % | |
4 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Jasa Konsultansi Lainnya-Jasa Konsultansi Lingkungan (IKTL) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 4432282 | 28309845 | 195,000,000 | 194,983,028 | 186,655,700 | 185,995,700 | 0 | 0 | 2021-03-30 15:00:00 | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | CV. TIKA KREATIF DESAIN KONSULTAN | 8,344,300 | 4.28 % | |
5 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan H. Abdul Hasan (jalan kebun tembus Pantai Paku) (870 m) | Tender | Pekerjaan Konstruksi | 4718282 | 27388048 | 360,000,000 | 359,440,341 | 356,444,060 | 356,197,600 | 0 | 0 | 2021-07-01 08:00:00 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,555,940 | 0.99 % | |
6 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Lingkungan Desa Pandulangan (400 m) | Tender | Pekerjaan Konstruksi | 4734282 | 27388035 | 354,575,000 | 354,150,580 | 346,475,520 | 346,405,000 | 0 | 0 | 2021-07-01 08:00:00 | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | CV. AGUNG MANDIRI | 8,099,480 | 2.28 % | |
7 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | 1.04.03.2.03.03 Pembuatan/Peningkatan Jalan Samirang Bakarung (1200 m) | Tender | Pekerjaan Konstruksi | 4736282 | 27388040 | 700,000,000 | 699,482,681 | 692,500,263 | 692,000,000 | 0 | 0 | 2021-07-01 08:00:00 | 02.746.832.1-733.000 | CV. RIVINA | 02.746.832.1-733.000 | CV. RIVINA | 7,499,737 | 1.07 % | |
8 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Pantai Ulin,Pembangunan PJU Desa Amparaya,Pembangunan PJU Desa Garunggang,Pembangunan PJU Desa Asam - Desa Sirih Hulu,Pembangunan PJU Desa Tibung Raya, Desa Amawang Kanan dan Desa Kapuh,Pembangunan PJU Jl. Halalang,Pembangunan PJU Desa Malutu sampai Desa Paharuangan,Pembangunan PJU Desa Taniran Selatan,Pembangunan PJU Jl. Halayung Desa Ulin,Pembangunan PJU Desa Bamban,Pembangunan PJU Desa Paring Agung,Pembangunan PJU Jalan Hanau,Pembangunan PJU Desa Baluti Jl. Padang Rasau | Tender | Pekerjaan Konstruksi | 4900282 | 27421155;27421254;27421325;27421525;27421773;27422239;27433038;27433171;27433231;27433370;27433589;27433659;27433773 | 1,186,825,000 | 1,145,444,080 | 1,135,244,825 | 1,135,000,000 | 0 | 0 | 2021-08-16 08:00:00 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 51,580,175 | 4.35 % | |
9 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Daha Selatan,Rehabilitasi PJU Daha Utara,Rehabilitasi PJU Longawang,Rehabilitasi PJU Banyu Barau,Rehab PJU Sungai Raya,Rehab PJU Muara Banta,Rehab PJU Kota Kandangan | Tender | Pekerjaan Konstruksi | 4901282 | 27422387;27422570;27422641;27432342;27432586;27432697;27432957 | 653,000,000 | 636,915,730 | 631,792,205 | 631,600,000 | 0 | 0 | 2021-08-16 08:00:00 | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 02.753.947.7-732.000 | CV. Putra Borneo Mandiri | 21,207,795 | 3.25 % | |
10 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Tender Cepat | Pengadaan Barang | 5035282 | 27449351 | 250,000,000 | 250,000,000 | 204,999,950 | 225,000,000 | 0 | 0 | 2021-08-16 11:00:00 | 94.316.406.1-401.000 | PILAR PRATAMA. CV | 75.363.080.5-216.000 | CV. MATIINU BERDIKARI | 45,000,050 | 18 % | |
11 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Gerbang Batas Kabupaten HSS - HST | Tender | Pekerjaan Konstruksi | 5150282 | 27420306 | 500,000,000 | 499,973,511 | 487,427,182 | 487,153,200 | 0 | 0 | 2021-09-15 12:00:00 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 12,572,818 | 2.51 % | |
12 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Griya Sandaga Binjai, Kel. Jambu Hilir, Kec. Kandangan (560 m) | Tender | Pekerjaan Konstruksi | 5157282 | 27446077 | 700,000,000 | 699,976,120 | 696,000,034 | 695,500,000 | 0 | 0 | 2021-08-30 08:00:00 | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | CV. HARUS MANDIRI | 3,999,966 | 0.57 % | |
13 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Halaman Pondok Pesantren Puteri Dalam Pagar | Tender | Pekerjaan Konstruksi | 5399282 | 30137148 | 485,000,000 | 484,941,493 | 484,007,451 | 483,500,000 | 0 | 0 | 2021-10-27 08:00:00 | 03.063.051.1-731.000 | CV. CHAI CHEL | 03.063.051.1-731.000 | CV. CHAI CHEL | 992,549 | 0.2 % | |
14 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman Jalan Lingkungan RT 02. Desa Hulu Banyu Kec. Loksado | Tender | Pekerjaan Konstruksi | 5405282 | 30136876 | 400,000,000 | 399,839,951 | 396,337,931 | 396,202,000 | 0 | 0 | 2021-10-25 08:00:00 | 02.675.485.3-733.000 | CV. An-Nidha | 02.675.485.3-733.000 | CV. An-Nidha | 3,662,069 | 0.92 % | |
15 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penataan PSU Perumahan Teluk Pinang Indah, Kec. Sungai Raya (725 m) | Tender | Pekerjaan Konstruksi | 5422282 | 27447013 | 1,180,000,000 | 1,177,199,752 | 1,172,618,081 | 1,172,166,000 | 0 | 0 | 2021-10-18 09:30:00 | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | CV. BERKAT TAQWA | 7,381,919 | 0.63 % | |
16 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan TPU Daha Selatan Desa Banjarbaru | Tender | Pekerjaan Konstruksi | 5536282 | 30252199 | 249,775,000 | 249,774,009 | 248,500,071 | 248,463,200 | 0 | 0 | 2021-10-29 10:00:00 | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | CV. Wahana Alam Hantatar | 1,274,929 | 0.51 % | |
17 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan PSU Permukiman RT. 05 Kel. Kandangan Kota Kec. Kandangan, Pembuatan/Peningkatan PSU Permukiman RT. 08 Kel. Kandangan Kota Kec. Kandangan | Tender | Pekerjaan Konstruksi | 5548282 | 30136990;30137006 | 317,000,000 | 314,975,502 | 307,034,083 | 306,946,000 | 0 | 0 | 2021-10-29 11:00:00 | O2.960.123.4-733.000 | CV.BARUTAMA | O2.960.123.4-733.000 | CV.BARUTAMA | 9,965,917 | 3.14 % | |
18 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Suku Cadang Alat Berat TPA,Belanja Jasa Service Alat Berat TPA | Tender | Jasa Lainnya | 5600282 | 30378496;30378625 | 1,096,250,000 | 1,095,441,964 | 1,078,000,000 | 1,074,000,000 | 0 | 0 | 2021-11-11 10:00:00 | 83.686.512.1-733.000 | cv. rezqi al mubarak | 83.686.512.1-733.000 | cv. rezqi al mubarak | 18,250,000 | 1.66 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |