Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu |
Pengadaan Langsung | 1178 | 97.313.466.668 | 24 | 2.865.720.800 | 1178 | 97.313.466.668 | 0 | 0 |
Penunjukan Langsung | 8 | 676.000.000 | 0 | 0 | 8 | 676.000.000 | 0 | 0 |
Total | 1186 | 97.989.466.668 | 24 | 2.865.720.800 | 1186 | 97.989.466.668 | 0 | 0 |
Persentase | 2.02 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | Dinas Perikanan | Pengadaan alat tangkap untuk eks pengguna alat setrum | Pengadaan Langsung | Pengadaan Barang | 3078282 | 22920494 | APBD | 70,000,000 | 69,300,000 | 68,818,750 | 68,818,750 | 68,800,000 | 68,800,000 | 0 | 0 | 2019-12-31 | 2020-01-06 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,181,250 | 1.69 % | |
2 | 2020 | Dinas Perikanan | Pengadaan alat tangkap untuk eks pengguna alat setrum | Pengadaan Langsung | Pengadaan Barang | 3078282 | 22920494 | APBD | 70,000,000 | 69,300,000 | 68,818,750 | 68,818,750 | 68,800,000 | 68,800,000 | 0 | 0 | 2019-12-31 | 2020-01-06 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,181,250 | 1.69 % | |
3 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3090282 | 23327993 | APBD | 166,000,000 | 165,748,000 | 165,440,000 | 165,440,000 | 165,200,000 | 165,200,000 | 0 | 0 | 2020-01-09 | 2020-01-10 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 560,000 | 0.34 % | |
4 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3090282 | 23327993 | APBD | 166,000,000 | 165,748,000 | 165,440,000 | 165,440,000 | 165,200,000 | 165,200,000 | 0 | 0 | 2020-01-09 | 2020-01-10 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 560,000 | 0.34 % | |
5 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Konsultan pengawasan pembangunan Gedung Perpustakaan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3093282 | 23063579 | APBD | 75,000,000 | 74,978,750 | 74,525,000 | 74,525,000 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-01-14 | 2020-01-20 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 475,000 | 0.63 % | |
6 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Konsultan pengawasan pembangunan Gedung Perpustakaan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3093282 | 23063579 | APBD | 75,000,000 | 74,978,750 | 74,525,000 | 74,525,000 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-01-14 | 2020-01-20 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 475,000 | 0.63 % | |
7 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3094282 | 23414416 | APBD | 4,600,000 | 4,570,500 | 4,515,500 | 4,515,500 | 4,450,000 | 4,450,000 | 0 | 0 | 2020-01-10 | 2020-01-14 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 84,500 | 1.84 % | |
8 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3094282 | 23414416 | APBD | 4,600,000 | 4,570,500 | 4,515,500 | 4,515,500 | 4,450,000 | 4,450,000 | 0 | 0 | 2020-01-10 | 2020-01-14 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 84,500 | 1.84 % | |
9 | 2020 | Kecamatan Kandangan | Belanja Modal Peralatan dan Mesin Pengadaan Alat Pendingin | Pengadaan Langsung | Pengadaan Barang | 3097282 | 23462698 | APBD | 104,312,500 | 102,712,500 | 99,275,000 | 0 | 99,275,000 | 99,275,000 | 0 | 0 | 2020-01-18 | 2020-01-21 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 5,037,500 | 4.83 % | |
10 | 2020 | Kecamatan Kandangan | Belanja Modal Peralatan dan Mesin Pengadaan Alat Pendingin | Pengadaan Langsung | Pengadaan Barang | 3097282 | 23462698 | APBD | 104,312,500 | 102,712,500 | 99,275,000 | 0 | 99,275,000 | 99,275,000 | 0 | 0 | 2020-01-18 | 2020-01-21 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 5,037,500 | 4.83 % | |
11 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Sumur Bor Pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3098282 | 23764686 | APBD | 5,000,000 | 4,950,000 | 4,922,500 | 4,922,500 | 4,922,500 | 4,922,500 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 77,500 | 1.55 % | |
12 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Sumur Bor Pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3098282 | 23764686 | APBD | 5,000,000 | 4,950,000 | 4,922,500 | 4,922,500 | 4,922,500 | 4,922,500 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 77,500 | 1.55 % | |
13 | 2020 | Dinas Perdagangan | Perencanaan Pengecatan Blok B, Blok C, Blok D, Blok E, Ruko 16 Unit Toko 5 Unit di Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3099282 | 23828975 | APBD | 25,000,000 | 24,970,000 | 24,915,000 | 24,915,000 | 24,915,000 | 24,915,000 | 0 | 0 | 2020-01-20 | 2020-01-28 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 85,000 | 0.34 % | |
14 | 2020 | Dinas Perdagangan | Perencanaan Pengecatan Blok B, Blok C, Blok D, Blok E, Ruko 16 Unit Toko 5 Unit di Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3099282 | 23828975 | APBD | 25,000,000 | 24,970,000 | 24,915,000 | 24,915,000 | 24,915,000 | 24,915,000 | 0 | 0 | 2020-01-20 | 2020-01-28 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 85,000 | 0.34 % | |
15 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3100282 | 23828892 | APBD | 7,500,000 | 7,480,000 | 7,458,000 | 7,458,000 | 7,458,000 | 7,458,000 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 42,000 | 0.56 % | |
16 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3100282 | 23828892 | APBD | 7,500,000 | 7,480,000 | 7,458,000 | 7,458,000 | 7,458,000 | 7,458,000 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 42,000 | 0.56 % | |
17 | 2020 | Dinas Perdagangan | Perencanaan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3104282 | 23828445 | APBD | 7,000,000 | 6,985,000 | 6,941,000 | 6,941,000 | 6,941,000 | 6,941,000 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 59,000 | 0.84 % | |
18 | 2020 | Dinas Perdagangan | Perencanaan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3104282 | 23828445 | APBD | 7,000,000 | 6,985,000 | 6,941,000 | 6,941,000 | 6,941,000 | 6,941,000 | 0 | 0 | 2020-01-20 | 2020-01-27 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 59,000 | 0.84 % | |
19 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3107282 | 23544910 | APBD | 15,679,439 | 15,675,000 | 15,620,000 | 15,620,000 | 15,235,000 | 15,235,000 | 0 | 0 | 2020-01-24 | 2020-01-29 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 59,439 | 0.38 % | |
20 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3107282 | 23544910 | APBD | 15,679,439 | 15,675,000 | 15,620,000 | 15,620,000 | 15,235,000 | 15,235,000 | 0 | 0 | 2020-01-24 | 2020-01-29 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 59,439 | 0.38 % | |
21 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gedung Poliklinik/eks IGD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3109282 | 23544877 | APBD | 69,834,579 | 69,795,000 | 69,762,000 | 0 | 69,740,000 | 69,740,000 | 0 | 0 | 2020-01-23 | 2020-01-27 | CV. POLA ARSITEK KONSULTAN | 02.215.319.1-732.000 | 72,579 | 0.1 % | |
22 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gedung Poliklinik/eks IGD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3109282 | 23544877 | APBD | 69,834,579 | 69,795,000 | 69,762,000 | 0 | 69,740,000 | 69,740,000 | 0 | 0 | 2020-01-23 | 2020-01-27 | CV. POLA ARSITEK KONSULTAN | 02.215.319.1-732.000 | 72,579 | 0.1 % | |
23 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Konsultan Perencanaan Rumah Dinas Jl. Kamboja No 10 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3116282 | 23720170 | APBD | 35,700,000 | 11,852,500 | 11,819,500 | 0 | 11,522,500 | 0 | 0 | 0 | 2020-02-07 | 2020-02-17 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 23,880,500 | 66.89 % | |
24 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi Guru | Pengadaan Langsung | Pengadaan Barang | 3118282 | 23796837 | APBD | 200,000,000 | 199,870,000 | 199,490,500 | 199,490,500 | 199,350,000 | 199,350,000 | 0 | 0 | 2020-01-24 | 2020-01-27 | CV. INDO JAYA PERKASA | 66.729.000.1-733.000 | 509,500 | 0.25 % | |
25 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi Guru | Pengadaan Langsung | Pengadaan Barang | 3118282 | 23796837 | APBD | 200,000,000 | 199,870,000 | 199,490,500 | 199,490,500 | 199,350,000 | 199,350,000 | 0 | 0 | 2020-01-24 | 2020-01-27 | CV. INDO JAYA PERKASA | 66.729.000.1-733.000 | 509,500 | 0.25 % | |
26 | 2020 | Sekretariat Daerah | Pengadaan Kursi Rapat | Pengadaan Langsung | Pengadaan Barang | 3119282 | 23985900 | APBD | 243,000,000 | 168,740,000 | 168,520,000 | 168,520,000 | 168,520,000 | 168,520,000 | 0 | 0 | 2020-01-23 | 2020-01-28 | CV. DNS GEMILANG | 72.310.491.5-733.000 | 74,480,000 | 30.65 % | |
27 | 2020 | Sekretariat Daerah | Pengadaan Kursi Rapat | Pengadaan Langsung | Pengadaan Barang | 3119282 | 23985900 | APBD | 243,000,000 | 168,740,000 | 168,520,000 | 168,520,000 | 168,520,000 | 168,520,000 | 0 | 0 | 2020-01-23 | 2020-01-28 | CV. DNS GEMILANG | 72.310.491.5-733.000 | 74,480,000 | 30.65 % | |
28 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Habirau Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3120282 | 23782525 | APBD | 175,000,000 | 174,985,742 | 174,677,574 | 174,677,574 | 174,550,000 | 174,550,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 322,426 | 0.18 % | |
29 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Habirau Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3120282 | 23782525 | APBD | 175,000,000 | 174,985,742 | 174,677,574 | 174,677,574 | 174,550,000 | 174,550,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 322,426 | 0.18 % | |
30 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Sungai Pinang 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3121282 | 23782512 | APBD | 175,000,000 | 174,989,613 | 174,640,596 | 174,640,596 | 174,500,000 | 174,500,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 359,404 | 0.21 % | |
31 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Sungai Pinang 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3121282 | 23782512 | APBD | 175,000,000 | 174,989,613 | 174,640,596 | 174,640,596 | 174,500,000 | 174,500,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 359,404 | 0.21 % | |
32 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab halaman SDN Habirau Tengah 1 Kec.Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3122282 | 23752437 | APBD | 75,000,000 | 74,990,735 | 74,872,446 | 74,872,446 | 74,800,000 | 74,800,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 127,554 | 0.17 % | |
33 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab halaman SDN Habirau Tengah 1 Kec.Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3122282 | 23752437 | APBD | 75,000,000 | 74,990,735 | 74,872,446 | 74,872,446 | 74,800,000 | 74,800,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 127,554 | 0.17 % | |
34 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3124282 | 23545192 | APBD | 57,694,393 | 57,638,020 | 56,650,000 | 56,650,000 | 5,610,000 | 56,100,000 | 0 | 0 | 2020-01-27 | 2020-01-30 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,044,393 | 1.81 % | |
35 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3124282 | 23545192 | APBD | 57,694,393 | 57,638,020 | 56,650,000 | 56,650,000 | 5,610,000 | 56,100,000 | 0 | 0 | 2020-01-27 | 2020-01-30 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,044,393 | 1.81 % | |
36 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman SDN Hamayung Utara Kec.Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3125282 | 23752200 | APBD | 200,000,000 | 68,702,422 | 68,598,808 | 68,598,808 | 68,500,000 | 68,500,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. AMANDITA CIPTA PERSADA | 02.224.138.4-733.000 | 131,401,192 | 65.7 % | |
37 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman SDN Hamayung Utara Kec.Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3125282 | 23752200 | APBD | 200,000,000 | 68,702,422 | 68,598,808 | 68,598,808 | 68,500,000 | 68,500,000 | 0 | 0 | 2020-01-28 | 2020-01-31 | CV. AMANDITA CIPTA PERSADA | 02.224.138.4-733.000 | 131,401,192 | 65.7 % | |
38 | 2020 | Kecamatan Daha Barat | Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3126282 | 23469806 | APBD | 140,372,000 | 140,371,826 | 140,039,682 | 0 | 140,039,682 | 140,039,682 | 0 | 0 | 2020-03-11 | 2020-03-17 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 332,318 | 0.24 % | |
39 | 2020 | Kecamatan Daha Barat | Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3126282 | 23469806 | APBD | 140,372,000 | 140,371,826 | 140,039,682 | 0 | 140,039,682 | 140,039,682 | 0 | 0 | 2020-03-11 | 2020-03-17 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 332,318 | 0.24 % | |
40 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3132282 | 23544821 | APBD | 27,797,196 | 27,775,000 | 27,720,000 | 27,720,000 | 27,720,000 | 27,720,000 | 0 | 0 | 2020-01-30 | 2020-02-03 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 77,196 | 0.28 % | |
41 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3132282 | 23544821 | APBD | 27,797,196 | 27,775,000 | 27,720,000 | 27,720,000 | 27,720,000 | 27,720,000 | 0 | 0 | 2020-01-30 | 2020-02-03 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 77,196 | 0.28 % | |
42 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3133282 | 23544810 | APBD | 18,483,178 | 18,480,000 | 18,458,000 | 18,458,000 | 18,458,000 | 18,458,000 | 0 | 0 | 2020-01-30 | 2020-02-03 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 25,178 | 0.14 % | |
43 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3133282 | 23544810 | APBD | 18,483,178 | 18,480,000 | 18,458,000 | 18,458,000 | 18,458,000 | 18,458,000 | 0 | 0 | 2020-01-30 | 2020-02-03 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 25,178 | 0.14 % | |
44 | 2020 | Dinas Kesehatan | Pengawsan Pembangunan Poskesdes (DID = Rp27.000.000,00) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3134282 | 23429059 | APBD | 30,000,000 | 29,865,000 | 29,579,000 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-02-08 | 2020-02-12 | cv.akmalindo | 02.531.482.4-731.000 | 421,000 | 1.4 % | |
45 | 2020 | Dinas Kesehatan | Pengawsan Pembangunan Poskesdes (DID = Rp27.000.000,00) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3134282 | 23429059 | APBD | 30,000,000 | 29,865,000 | 29,579,000 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-02-08 | 2020-02-12 | cv.akmalindo | 02.531.482.4-731.000 | 421,000 | 1.4 % | |
46 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Belajar Pondok Pesantrean Darul Ulum Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3135282 | 23782570 | APBD | 195,000,000 | 194,999,560 | 193,988,660 | 193,988,660 | 193,800,000 | 193,800,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 1,011,340 | 0.52 % | |
47 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Belajar Pondok Pesantrean Darul Ulum Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3135282 | 23782570 | APBD | 195,000,000 | 194,999,560 | 193,988,660 | 193,988,660 | 193,800,000 | 193,800,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 1,011,340 | 0.52 % | |
48 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. JHB 4 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3137282 | 23793021 | APBD | 150,000,000 | 149,996,822 | 149,622,272 | 149,622,272 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | CV. KALTRA | 81.639.401.9-733.000 | 377,728 | 0.25 % | |
49 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. JHB 4 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3137282 | 23793021 | APBD | 150,000,000 | 149,996,822 | 149,622,272 | 149,622,272 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | CV. KALTRA | 81.639.401.9-733.000 | 377,728 | 0.25 % | |
50 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Kandangan Kota 7 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3138282 | 23792985 | APBD | 150,000,000 | 149,999,636 | 149,745,536 | 149,745,536 | 149,600,000 | 149,600,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | CV. KHALIF | 81.540.809.1-733.000 | 254,464 | 0.17 % | |
51 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Kandangan Kota 7 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3138282 | 23792985 | APBD | 150,000,000 | 149,999,636 | 149,745,536 | 149,745,536 | 149,600,000 | 149,600,000 | 0 | 0 | 2020-01-31 | 2020-02-04 | CV. KHALIF | 81.540.809.1-733.000 | 254,464 | 0.17 % | |
52 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3140282 | 23545182 | APBD | 37,142,991 | 37,125,000 | 36,483,700 | 36,483,700 | 36,483,700 | 36,483,700 | 0 | 0 | 2020-02-03 | 2020-02-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 659,291 | 1.78 % | |
53 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3140282 | 23545182 | APBD | 37,142,991 | 37,125,000 | 36,483,700 | 36,483,700 | 36,483,700 | 36,483,700 | 0 | 0 | 2020-02-03 | 2020-02-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 659,291 | 1.78 % | |
54 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3141282 | 23823662 | APBD | 115,000,000 | 114,991,082 | 114,299,787 | 114,299,787 | 114,200,000 | 114,200,000 | 0 | 0 | 2020-02-04 | 2020-02-07 | CV. Jaya Engineering | 02.941.119.6-734.000 | 700,213 | 0.61 % | |
55 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3141282 | 23823662 | APBD | 115,000,000 | 114,991,082 | 114,299,787 | 114,299,787 | 114,200,000 | 114,200,000 | 0 | 0 | 2020-02-04 | 2020-02-07 | CV. Jaya Engineering | 02.941.119.6-734.000 | 700,213 | 0.61 % | |
56 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3147282 | 23823644 | APBD | 3,500,000 | 3,500,000 | 3,454,000 | 3,454,000 | 3,400,000 | 3,400,000 | 0 | 0 | 2020-02-04 | 2020-02-07 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 46,000 | 1.31 % | |
57 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3147282 | 23823644 | APBD | 3,500,000 | 3,500,000 | 3,454,000 | 3,454,000 | 3,400,000 | 3,400,000 | 0 | 0 | 2020-02-04 | 2020-02-07 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 46,000 | 1.31 % | |
58 | 2020 | Sekretariat Daerah | Belanja pengadaan mebeleur untuk Kantor Setda Kab.HSS | Pengadaan Langsung | Pengadaan Barang | 3152282 | 23372681 | APBD | 200,000,000 | 199,929,400 | 199,650,000 | 199,650,000 | 199,174,800 | 199,174,800 | 0 | 0 | 2020-02-07 | 2020-02-12 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 350,000 | 0.18 % | |
59 | 2020 | Sekretariat Daerah | Belanja pengadaan mebeleur untuk Kantor Setda Kab.HSS | Pengadaan Langsung | Pengadaan Barang | 3152282 | 23372681 | APBD | 200,000,000 | 199,929,400 | 199,650,000 | 199,650,000 | 199,174,800 | 199,174,800 | 0 | 0 | 2020-02-07 | 2020-02-12 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 350,000 | 0.18 % | |
60 | 2020 | Dinas Perikanan | Disediakan Belanja Pakan Ikan | Pengadaan Langsung | Pengadaan Barang | 3153282 | 23467075 | APBD | 62,500,000 | 61,875,000 | 61,567,000 | 0 | 61,500,000 | 61,500,000 | 0 | 0 | 2020-02-11 | 2020-02-17 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 933,000 | 1.49 % | |
61 | 2020 | Dinas Perikanan | Disediakan Belanja Pakan Ikan | Pengadaan Langsung | Pengadaan Barang | 3153282 | 23467075 | APBD | 62,500,000 | 61,875,000 | 61,567,000 | 0 | 61,500,000 | 61,500,000 | 0 | 0 | 2020-02-11 | 2020-02-17 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 933,000 | 1.49 % | |
62 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3154282 | 23369120 | APBD | 150,000,000 | 148,609,723 | 148,554,723 | 0 | 148,550,705 | 148,550,705 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,445,277 | 0.96 % | |
63 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3154282 | 23369120 | APBD | 150,000,000 | 148,609,723 | 148,554,723 | 0 | 148,550,705 | 148,550,705 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,445,277 | 0.96 % | |
64 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3160282 | 23369714 | APBD | 150,000,000 | 148,665,729 | 148,590,491 | 148,590,491 | 148,586,537 | 148,586,537 | 0 | 0 | 2020-02-06 | 2020-02-13 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,409,509 | 0.94 % | |
65 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3160282 | 23369714 | APBD | 150,000,000 | 148,665,729 | 148,590,491 | 148,590,491 | 148,586,537 | 148,586,537 | 0 | 0 | 2020-02-06 | 2020-02-13 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,409,509 | 0.94 % | |
66 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3161282 | 23369532 | APBD | 150,000,000 | 148,732,157 | 148,700,589 | 0 | 148,696,635 | 148,696,635 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 1,299,411 | 0.87 % | |
67 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3161282 | 23369532 | APBD | 150,000,000 | 148,732,157 | 148,700,589 | 0 | 148,696,635 | 148,696,635 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 1,299,411 | 0.87 % | |
68 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3162282 | 23368640 | APBD | 150,000,000 | 148,699,926 | 148,680,165 | 148,680,165 | 148,676,211 | 148,676,211 | 0 | 0 | 2020-02-06 | 2020-02-13 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,319,835 | 0.88 % | |
69 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3162282 | 23368640 | APBD | 150,000,000 | 148,699,926 | 148,680,165 | 148,680,165 | 148,676,211 | 148,676,211 | 0 | 0 | 2020-02-06 | 2020-02-13 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,319,835 | 0.88 % | |
70 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3163282 | 23369361 | APBD | 150,000,000 | 148,839,829 | 148,165,540 | 148,165,540 | 148,160,099 | 148,160,099 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 1,834,460 | 1.22 % | |
71 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3163282 | 23369361 | APBD | 150,000,000 | 148,839,829 | 148,165,540 | 148,165,540 | 148,160,099 | 148,160,099 | 0 | 0 | 2020-02-07 | 2020-02-13 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 1,834,460 | 1.22 % | |
72 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meubelair Kursi Kerja (SMP) | Pengadaan Langsung | Pengadaan Barang | 3164282 | 24417202 | APBD | 198,750,000 | 198,750,000 | 198,511,500 | 198,511,500 | 198,400,000 | 198,400,000 | 0 | 0 | 2020-02-06 | 2020-02-07 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 238,500 | 0.12 % | |
73 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meubelair Kursi Kerja (SMP) | Pengadaan Langsung | Pengadaan Barang | 3164282 | 24417202 | APBD | 198,750,000 | 198,750,000 | 198,511,500 | 198,511,500 | 198,400,000 | 198,400,000 | 0 | 0 | 2020-02-06 | 2020-02-07 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 238,500 | 0.12 % | |
74 | 2020 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Pekerjaan Konstruksi | 3166282 | 24095503 | APBD | 150,000,000 | 148,000,000 | 147,178,462 | 147,178,462 | 147,000,000 | 147,000,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 2,821,538 | 1.88 % | |
75 | 2020 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Pekerjaan Konstruksi | 3166282 | 24095503 | APBD | 150,000,000 | 148,000,000 | 147,178,462 | 147,178,462 | 147,000,000 | 147,000,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 2,821,538 | 1.88 % | |
76 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3168282 | 24095867 | APBD | 4,500,000 | 4,500,000 | 4,488,000 | 4,488,000 | 4,400,000 | 4,400,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 12,000 | 0.27 % | |
77 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3168282 | 24095867 | APBD | 4,500,000 | 4,500,000 | 4,488,000 | 4,488,000 | 4,400,000 | 4,400,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 12,000 | 0.27 % | |
78 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan rehabilitasi sedang/berat PAUD/TK Pertiwi I Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3169282 | 24097272 | APBD | 2,400,000 | 2,400,000 | 2,365,000 | 2,365,000 | 2,300,000 | 2,300,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 35,000 | 1.46 % | |
79 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan rehabilitasi sedang/berat PAUD/TK Pertiwi I Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3169282 | 24097272 | APBD | 2,400,000 | 2,400,000 | 2,365,000 | 2,365,000 | 2,300,000 | 2,300,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 35,000 | 1.46 % | |
80 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3170282 | 23035554 | APBD | 40,000,000 | 39,710,000 | 39,545,000 | 39,545,000 | 39,270,000 | 39,270,000 | 0 | 0 | 2020-03-02 | 2020-03-16 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 455,000 | 1.14 % | |
81 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3170282 | 23035554 | APBD | 40,000,000 | 39,710,000 | 39,545,000 | 39,545,000 | 39,270,000 | 39,270,000 | 0 | 0 | 2020-03-02 | 2020-03-16 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 455,000 | 1.14 % | |
82 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3173282 | 23033419 | APBD | 38,000,000 | 37,977,500 | 37,702,500 | 37,702,500 | 37,427,500 | 37,427,500 | 0 | 0 | 2020-03-02 | 2020-03-16 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 297,500 | 0.78 % | |
83 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3173282 | 23033419 | APBD | 38,000,000 | 37,977,500 | 37,702,500 | 37,702,500 | 37,427,500 | 37,427,500 | 0 | 0 | 2020-03-02 | 2020-03-16 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 297,500 | 0.78 % | |
84 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3174282 | 24024200 | APBD | 9,000,000 | 8,989,750 | 8,958,620 | 8,958,620 | 8,958,620 | 8,958,620 | 0 | 0 | 2020-02-11 | 2020-02-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 41,380 | 0.46 % | |
85 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3174282 | 24024200 | APBD | 9,000,000 | 8,989,750 | 8,958,620 | 8,958,620 | 8,958,620 | 8,958,620 | 0 | 0 | 2020-02-11 | 2020-02-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 41,380 | 0.46 % | |
86 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Telaga Bidadari | Pengadaan Langsung | Pekerjaan Konstruksi | 3176282 | 23970218 | APBD | 75,000,000 | 74,089,061 | 73,975,184 | 0 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-02-20 | 2020-02-24 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 1,024,816 | 1.37 % | |
87 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Telaga Bidadari | Pengadaan Langsung | Pekerjaan Konstruksi | 3176282 | 23970218 | APBD | 75,000,000 | 74,089,061 | 73,975,184 | 0 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-02-20 | 2020-02-24 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 1,024,816 | 1.37 % | |
88 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Bahan pangan | Pengadaan Langsung | Pengadaan Barang | 3177282 | 24071368 | APBD | 55,000,000 | 54,976,625 | 54,857,000 | 0 | 54,800,000 | 54,800,000 | 0 | 0 | 2020-02-19 | 2020-02-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 143,000 | 0.26 % | |
89 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Bahan pangan | Pengadaan Langsung | Pengadaan Barang | 3177282 | 24071368 | APBD | 55,000,000 | 54,976,625 | 54,857,000 | 0 | 54,800,000 | 54,800,000 | 0 | 0 | 2020-02-19 | 2020-02-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 143,000 | 0.26 % | |
90 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Perencanaan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3179282 | 22919013 | APBD | 73,500,000 | 73,250,100 | 73,064,200 | 73,064,200 | 72,992,700 | 72,992,700 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 435,800 | 0.59 % | |
91 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Perencanaan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3179282 | 22919013 | APBD | 73,500,000 | 73,250,100 | 73,064,200 | 73,064,200 | 72,992,700 | 72,992,700 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 435,800 | 0.59 % | |
92 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3180282 | 22912847 | APBD | 25,000,000 | 24,722,500 | 24,535,500 | 24,535,500 | 24,359,500 | 24,359,500 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 464,500 | 1.86 % | |
93 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3180282 | 22912847 | APBD | 25,000,000 | 24,722,500 | 24,535,500 | 24,535,500 | 24,359,500 | 24,359,500 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 464,500 | 1.86 % | |
94 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3181282 | 22912972 | APBD | 25,000,000 | 24,722,500 | 24,524,500 | 24,524,500 | 24,343,000 | 24,343,000 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 475,500 | 1.9 % | |
95 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3181282 | 22912972 | APBD | 25,000,000 | 24,722,500 | 24,524,500 | 24,524,500 | 24,343,000 | 24,343,000 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 475,500 | 1.9 % | |
96 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3182282 | 23984071 | APBD | 30,000,000 | 29,890,892 | 29,787,492 | 29,787,492 | 29,787,000 | 29,787,000 | 0 | 0 | 2020-03-30 | 2020-04-02 | CV. KHALIF | 81.540.809.1-733.000 | 212,508 | 0.71 % | |
97 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3182282 | 23984071 | APBD | 30,000,000 | 29,890,892 | 29,787,492 | 29,787,492 | 29,787,000 | 29,787,000 | 0 | 0 | 2020-03-30 | 2020-04-02 | CV. KHALIF | 81.540.809.1-733.000 | 212,508 | 0.71 % | |
98 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3183282 | 23984038 | APBD | 40,000,000 | 39,890,275 | 39,890,275 | 0 | 39,890,000 | 39,890,000 | 0 | 0 | 2020-03-20 | 2020-03-24 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 109,725 | 0.27 % | |
99 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3183282 | 23984038 | APBD | 40,000,000 | 39,890,275 | 39,890,275 | 0 | 39,890,000 | 39,890,000 | 0 | 0 | 2020-03-20 | 2020-03-24 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 109,725 | 0.27 % | |
100 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3185282 | 22912580 | APBD | 10,000,000 | 9,956,100 | 9,853,800 | 9,853,800 | 9,779,000 | 9,779,000 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 146,200 | 1.46 % | |
101 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3185282 | 22912580 | APBD | 10,000,000 | 9,956,100 | 9,853,800 | 9,853,800 | 9,779,000 | 9,779,000 | 0 | 0 | 2020-02-14 | 2020-02-18 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 146,200 | 1.46 % | |
102 | 2020 | Dinas Kesehatan | belanja peralatan kebersihan dan bahan pembersih untuk PKM Ranap,belanja peralatan kebersihan dan bahan pembersih untuk PKM Non Ranap,belanja peralatan kebersihan dan bahan pembersih untuk Dinkes dan IFK | Pengadaan Langsung | Pengadaan Barang | 3186282 | 23984193;23984194;23984196 | APBD | 55,038,000 | 54,963,013 | 54,810,113 | 54,810,113 | 54,810,113 | 54,810,113 | 0 | 0 | 2020-03-12 | 2020-03-16 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 227,888 | 0.41 % | |
103 | 2020 | Dinas Kesehatan | belanja peralatan kebersihan dan bahan pembersih untuk PKM Ranap,belanja peralatan kebersihan dan bahan pembersih untuk PKM Non Ranap,belanja peralatan kebersihan dan bahan pembersih untuk Dinkes dan IFK | Pengadaan Langsung | Pengadaan Barang | 3186282 | 23984193;23984194;23984196 | APBD | 55,038,000 | 54,963,013 | 54,810,113 | 54,810,113 | 54,810,113 | 54,810,113 | 0 | 0 | 2020-03-12 | 2020-03-16 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 227,888 | 0.41 % | |
104 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3187282 | 24799527 | APBD | 22,250,000 | 22,177,100 | 22,122,100 | 22,122,100 | 22,012,100 | 22,012,100 | 0 | 0 | 2020-02-18 | 2020-02-20 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 127,900 | 0.57 % | |
105 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3187282 | 24799527 | APBD | 22,250,000 | 22,177,100 | 22,122,100 | 22,122,100 | 22,012,100 | 22,012,100 | 0 | 0 | 2020-02-18 | 2020-02-20 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 127,900 | 0.57 % | |
106 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Rehabilitasi Pintu Gerbang Batas Kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3188282 | 22974563 | APBD | 25,000,000 | 24,722,500 | 24,612,500 | 24,612,500 | 24,502,500 | 24,502,500 | 0 | 0 | 2020-02-18 | 2020-02-20 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 387,500 | 1.55 % | |
107 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Rehabilitasi Pintu Gerbang Batas Kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3188282 | 22974563 | APBD | 25,000,000 | 24,722,500 | 24,612,500 | 24,612,500 | 24,502,500 | 24,502,500 | 0 | 0 | 2020-02-18 | 2020-02-20 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 387,500 | 1.55 % | |
108 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan perencanaan teknis jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3190282 | 24304230 | APBD | 100,000,000 | 99,995,500 | 98,776,876 | 0 | 98,730,000 | 98,730,000 | 0 | 0 | 2020-02-19 | 2020-02-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,223,124 | 1.22 % | |
109 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan perencanaan teknis jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3190282 | 24304230 | APBD | 100,000,000 | 99,995,500 | 98,776,876 | 0 | 98,730,000 | 98,730,000 | 0 | 0 | 2020-02-19 | 2020-02-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,223,124 | 1.22 % | |
110 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Perencanaan) Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3192282 | 23846612 | APBD | 9,134,000 | 9,130,000 | 9,097,000 | 0 | 9,097,000 | 9,097,000 | 0 | 0 | 2020-02-24 | 2020-02-28 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 37,000 | 0.41 % | |
111 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Perencanaan) Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3192282 | 23846612 | APBD | 9,134,000 | 9,130,000 | 9,097,000 | 0 | 9,097,000 | 9,097,000 | 0 | 0 | 2020-02-24 | 2020-02-28 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 37,000 | 0.41 % | |
112 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3193282 | 22970246 | APBD | 100,000,000 | 99,770,000 | 99,363,000 | 99,363,000 | 99,088,000 | 99,088,000 | 0 | 0 | 2020-02-20 | 2020-02-25 | CV. e_Caracter | 75.998.700.1-733.000 | 637,000 | 0.64 % | |
113 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3193282 | 22970246 | APBD | 100,000,000 | 99,770,000 | 99,363,000 | 99,363,000 | 99,088,000 | 99,088,000 | 0 | 0 | 2020-02-20 | 2020-02-25 | CV. e_Caracter | 75.998.700.1-733.000 | 637,000 | 0.64 % | |
114 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas dan Atributnya | Pengadaan Langsung | Pengadaan Barang | 3195282 | 23738199 | APBD | 171,350,000 | 171,281,000 | 171,028,000 | 171,028,000 | 171,000,000 | 171,000,000 | 0 | 0 | 2020-02-24 | 2020-02-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 322,000 | 0.19 % | |
115 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas dan Atributnya | Pengadaan Langsung | Pengadaan Barang | 3195282 | 23738199 | APBD | 171,350,000 | 171,281,000 | 171,028,000 | 171,028,000 | 171,000,000 | 171,000,000 | 0 | 0 | 2020-02-24 | 2020-02-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 322,000 | 0.19 % | |
116 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan belanja pembelian bahan penjernih air untuk kolam renang Amandit Aquatic Center Kandangan | Pengadaan Langsung | Pengadaan Barang | 3196282 | 24241221 | APBD | 57,295,000 | 57,205,000 | 57,095,000 | 0 | 57,025,000 | 57,025,000 | 0 | 0 | 2020-02-28 | 2020-03-06 | CV. EL-ROSE & Co | 01.214.274.1-733.000 | 200,000 | 0.35 % | |
117 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan belanja pembelian bahan penjernih air untuk kolam renang Amandit Aquatic Center Kandangan | Pengadaan Langsung | Pengadaan Barang | 3196282 | 24241221 | APBD | 57,295,000 | 57,205,000 | 57,095,000 | 0 | 57,025,000 | 57,025,000 | 0 | 0 | 2020-02-28 | 2020-03-06 | CV. EL-ROSE & Co | 01.214.274.1-733.000 | 200,000 | 0.35 % | |
118 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan Belanja Pakaian Olahraga untuk Atlet, Pelatih ,Official , dan Panitia POPDA 2020 | Pengadaan Langsung | Pengadaan Barang | 3197282 | 24122674 | APBD | 128,000,000 | 127,916,800 | 127,723,200 | 0 | 127,723,200 | 127,723,200 | 0 | 0 | 2020-02-24 | 2020-03-02 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 276,800 | 0.22 % | |
119 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan Belanja Pakaian Olahraga untuk Atlet, Pelatih ,Official , dan Panitia POPDA 2020 | Pengadaan Langsung | Pengadaan Barang | 3197282 | 24122674 | APBD | 128,000,000 | 127,916,800 | 127,723,200 | 0 | 127,723,200 | 127,723,200 | 0 | 0 | 2020-02-24 | 2020-03-02 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 276,800 | 0.22 % | |
120 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN. Loksado Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3198282 | 23795689 | APBD | 90,000,000 | 89,996,021 | 89,760,054 | 89,760,054 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV.Bangun Banua | 93.708.167.7-733.000 | 239,946 | 0.27 % | |
121 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN. Loksado Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3198282 | 23795689 | APBD | 90,000,000 | 89,996,021 | 89,760,054 | 89,760,054 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV.Bangun Banua | 93.708.167.7-733.000 | 239,946 | 0.27 % | |
122 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN Panjambang Bahagia 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 3200282 | 23793055 | APBD | 150,000,000 | 149,999,808 | 149,653,746 | 149,653,746 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-02-27 | 2020-03-04 | CV. BORNEO KARYA BERSAMA | 02.614.008.7-731.000 | 346,254 | 0.23 % | |
123 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN Panjambang Bahagia 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 3200282 | 23793055 | APBD | 150,000,000 | 149,999,808 | 149,653,746 | 149,653,746 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-02-27 | 2020-03-04 | CV. BORNEO KARYA BERSAMA | 02.614.008.7-731.000 | 346,254 | 0.23 % | |
124 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Ida Manggala Kec.Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3202282 | 23795631 | APBD | 50,000,000 | 49,996,355 | 49,549,472 | 0 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV. GUMILANG | 02.746.828.9-732.000 | 450,528 | 0.9 % | |
125 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Ida Manggala Kec.Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3202282 | 23795631 | APBD | 50,000,000 | 49,996,355 | 49,549,472 | 0 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV. GUMILANG | 02.746.828.9-732.000 | 450,528 | 0.9 % | |
126 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Lapangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3204282 | 23890617 | APBD | 12,000,000 | 11,990,000 | 11,902,000 | 11,902,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 98,000 | 0.82 % | |
127 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Lapangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3204282 | 23890617 | APBD | 12,000,000 | 11,990,000 | 11,902,000 | 11,902,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 98,000 | 0.82 % | |
128 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat PAUD/ TK Pertiwi I Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3205282 | 24097339 | APBD | 80,000,000 | 77,500,000 | 77,111,137 | 77,111,137 | 77,000,000 | 77,000,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV. An-Nidha | 02.675.485.3-733.000 | 2,888,863 | 3.61 % | |
129 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat PAUD/ TK Pertiwi I Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3205282 | 24097339 | APBD | 80,000,000 | 77,500,000 | 77,111,137 | 77,111,137 | 77,000,000 | 77,000,000 | 0 | 0 | 2020-02-26 | 2020-03-03 | CV. An-Nidha | 02.675.485.3-733.000 | 2,888,863 | 3.61 % | |
130 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3206282 | 23823594 | APBD | 7,800,000 | 7,771,500 | 7,564,700 | 7,564,700 | 7,450,000 | 7,450,000 | 0 | 0 | 2020-02-26 | 2020-03-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 235,300 | 3.02 % | |
131 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3206282 | 23823594 | APBD | 7,800,000 | 7,771,500 | 7,564,700 | 7,564,700 | 7,450,000 | 7,450,000 | 0 | 0 | 2020-02-26 | 2020-03-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 235,300 | 3.02 % | |
132 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN Tambangan 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3207282 | 23782546 | APBD | 145,000,000 | 144,990,116 | 144,411,120 | 144,411,120 | 144,300,000 | 144,300,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 588,880 | 0.41 % | |
133 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN Tambangan 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3207282 | 23782546 | APBD | 145,000,000 | 144,990,116 | 144,411,120 | 144,411,120 | 144,300,000 | 144,300,000 | 0 | 0 | 2020-02-26 | 2020-02-28 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 588,880 | 0.41 % | |
134 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan AC Kamar, Aula Rapat dan Cafetaria Hotel Rakat Mufakat | Pengadaan Langsung | Pengadaan Barang | 3208282 | 23892005 | APBD | 82,500,000 | 82,500,000 | 82,456,000 | 0 | 82,329,500 | 82,329,500 | 0 | 0 | 2020-02-28 | 2020-03-06 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 44,000 | 0.05 % | |
135 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan AC Kamar, Aula Rapat dan Cafetaria Hotel Rakat Mufakat | Pengadaan Langsung | Pengadaan Barang | 3208282 | 23892005 | APBD | 82,500,000 | 82,500,000 | 82,456,000 | 0 | 82,329,500 | 82,329,500 | 0 | 0 | 2020-02-28 | 2020-03-06 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 44,000 | 0.05 % | |
136 | 2020 | Sekretariat Daerah | Cetak Buku Laporan Keterangan Pertanggungjawaban dan Laporan Penyelenggaraan Pemerintahan Daerah Kab. HSS 2019 | Pengadaan Langsung | Jasa Lainnya | 3211282 | 25160345 | APBD | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 0 | 0 | 2020-03-03 | 2020-03-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 0 | 0 % | |
137 | 2020 | Sekretariat Daerah | Cetak Buku Laporan Keterangan Pertanggungjawaban dan Laporan Penyelenggaraan Pemerintahan Daerah Kab. HSS 2019 | Pengadaan Langsung | Jasa Lainnya | 3211282 | 25160345 | APBD | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 0 | 0 | 2020-03-03 | 2020-03-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 0 | 0 % | |
138 | 2020 | Dinas Pendidikan dan Kebudayaan | pembuatan pagar SDN Sirih Hulu Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3214282 | 23782109 | APBD | 150,000,000 | 149,998,229 | 149,699,964 | 149,699,964 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-03-03 | 2020-03-05 | CV. RAFIBUN | 70.890.381.0-731.000 | 300,036 | 0.2 % | |
139 | 2020 | Dinas Pendidikan dan Kebudayaan | pembuatan pagar SDN Sirih Hulu Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3214282 | 23782109 | APBD | 150,000,000 | 149,998,229 | 149,699,964 | 149,699,964 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-03-03 | 2020-03-05 | CV. RAFIBUN | 70.890.381.0-731.000 | 300,036 | 0.2 % | |
140 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3215282 | 23752257 | APBD | 44,800,000 | 44,755,500 | 44,605,000 | 44,605,000 | 44,500,000 | 44,500,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 195,000 | 0.44 % | |
141 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3215282 | 23752257 | APBD | 44,800,000 | 44,755,500 | 44,605,000 | 44,605,000 | 44,500,000 | 44,500,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 195,000 | 0.44 % | |
142 | 2020 | Dinas Perikanan | Jasa Desain perencanaan untuk kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3216282 | 24926292 | APBD | 10,000,000 | 9,999,000 | 9,982,500 | 0 | 9,982,000 | 9,982,000 | 0 | 0 | 2020-03-04 | 2020-03-09 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 17,500 | 0.18 % | |
143 | 2020 | Dinas Perikanan | Jasa Desain perencanaan untuk kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3216282 | 24926292 | APBD | 10,000,000 | 9,999,000 | 9,982,500 | 0 | 9,982,000 | 9,982,000 | 0 | 0 | 2020-03-04 | 2020-03-09 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 17,500 | 0.18 % | |
144 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Mesjid di Kawasan Islamic Center Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3220282 | 23329082 | APBD | 84,750,000 | 84,711,000 | 84,557,000 | 84,557,000 | 84,403,000 | 84,403,000 | 0 | 0 | 2020-03-27 | 2020-03-30 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 193,000 | 0.23 % | |
145 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Mesjid di Kawasan Islamic Center Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3220282 | 23329082 | APBD | 84,750,000 | 84,711,000 | 84,557,000 | 84,557,000 | 84,403,000 | 84,403,000 | 0 | 0 | 2020-03-27 | 2020-03-30 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 193,000 | 0.23 % | |
146 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | disediakan untuk jasa konsultansi perencanaan Pengembangan UPT Logam Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3222282 | 23360411 | APBD | 48,900,000 | 48,823,100 | 48,565,000 | 0 | 48,500,000 | 48,500,000 | 0 | 0 | 2020-03-04 | 2020-03-09 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 335,000 | 0.69 % | |
147 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | disediakan untuk jasa konsultansi perencanaan Pengembangan UPT Logam Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3222282 | 23360411 | APBD | 48,900,000 | 48,823,100 | 48,565,000 | 0 | 48,500,000 | 48,500,000 | 0 | 0 | 2020-03-04 | 2020-03-09 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 335,000 | 0.69 % | |
148 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Operasi dan Pemeliharaan Jaringan Irigasi D.I Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3223282 | 23369845 | APBD | 150,406,200 | 150,295,646 | 150,000,292 | 0 | 149,999,577 | 149,999,577 | 0 | 0 | 2020-03-05 | 2020-03-11 | CV. Haratai Permai | 02.089.737.7-733.000 | 405,908 | 0.27 % | |
149 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Operasi dan Pemeliharaan Jaringan Irigasi D.I Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3223282 | 23369845 | APBD | 150,406,200 | 150,295,646 | 150,000,292 | 0 | 149,999,577 | 149,999,577 | 0 | 0 | 2020-03-05 | 2020-03-11 | CV. Haratai Permai | 02.089.737.7-733.000 | 405,908 | 0.27 % | |
150 | 2020 | Dinas Perdagangan | Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Pekerjaan Konstruksi | 3224282 | 23828911 | APBD | 125,000,000 | 124,997,163 | 124,775,045 | 124,775,045 | 124,700,000 | 124,700,000 | 0 | 0 | 2020-03-09 | 2020-03-16 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 224,955 | 0.18 % | |
151 | 2020 | Dinas Perdagangan | Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Pekerjaan Konstruksi | 3224282 | 23828911 | APBD | 125,000,000 | 124,997,163 | 124,775,045 | 124,775,045 | 124,700,000 | 124,700,000 | 0 | 0 | 2020-03-09 | 2020-03-16 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 224,955 | 0.18 % | |
152 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3225282 | 23792826 | APBD | 38,000,000 | 37,977,500 | 37,840,000 | 37,840,000 | 37,700,000 | 37,700,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 160,000 | 0.42 % | |
153 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3225282 | 23792826 | APBD | 38,000,000 | 37,977,500 | 37,840,000 | 37,840,000 | 37,700,000 | 37,700,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 160,000 | 0.42 % | |
154 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3226282 | 23795405 | APBD | 16,800,000 | 16,799,200 | 16,676,000 | 0 | 16,500,000 | 16,500,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 124,000 | 0.74 % | |
155 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3226282 | 23795405 | APBD | 16,800,000 | 16,799,200 | 16,676,000 | 0 | 16,500,000 | 16,500,000 | 0 | 0 | 2020-03-06 | 2020-03-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 124,000 | 0.74 % | |
156 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3228282 | 23374460 | APBD | 8,000,000 | 7,969,500 | 7,925,500 | 7,925,500 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-03-18 | 2020-03-25 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 74,500 | 0.93 % | |
157 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3228282 | 23374460 | APBD | 8,000,000 | 7,969,500 | 7,925,500 | 7,925,500 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-03-18 | 2020-03-25 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 74,500 | 0.93 % | |
158 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3229282 | 23782084 | APBD | 6,000,000 | 5,989,500 | 5,857,500 | 5,857,500 | 5,800,000 | 5,800,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 142,500 | 2.38 % | |
159 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3229282 | 23782084 | APBD | 6,000,000 | 5,989,500 | 5,857,500 | 5,857,500 | 5,800,000 | 5,800,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 142,500 | 2.38 % | |
160 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3230282 | 23782560 | APBD | 7,800,000 | 7,755,000 | 7,667,000 | 7,667,000 | 7,600,000 | 7,600,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 133,000 | 1.71 % | |
161 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3230282 | 23782560 | APBD | 7,800,000 | 7,755,000 | 7,667,000 | 7,667,000 | 7,600,000 | 7,600,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 133,000 | 1.71 % | |
162 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3231282 | 23782498 | APBD | 29,800,000 | 29,756,650 | 29,606,500 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 193,500 | 0.65 % | |
163 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3231282 | 23782498 | APBD | 29,800,000 | 29,756,650 | 29,606,500 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-03-07 | 2020-03-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 193,500 | 0.65 % | |
164 | 2020 | Dinas Perdagangan | Pekerjaan Pembuatan Sumur Bor pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3232282 | 23764995 | APBD | 100,000,000 | 99,998,306 | 99,891,441 | 99,891,441 | 99,890,000 | 99,890,000 | 0 | 0 | 2020-03-05 | 2020-03-11 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 108,559 | 0.11 % | |
165 | 2020 | Dinas Perdagangan | Pekerjaan Pembuatan Sumur Bor pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3232282 | 23764995 | APBD | 100,000,000 | 99,998,306 | 99,891,441 | 99,891,441 | 99,890,000 | 99,890,000 | 0 | 0 | 2020-03-05 | 2020-03-11 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 108,559 | 0.11 % | |
166 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Lapangan | Pengadaan Langsung | Pengadaan Barang | 3236282 | 23083962 | APBD | 202,485,000 | 199,578,720 | 199,169,520 | 199,169,520 | 199,013,650 | 199,013,650 | 0 | 0 | 2020-03-16 | 2020-03-18 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 3,315,480 | 1.64 % | |
167 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Lapangan | Pengadaan Langsung | Pengadaan Barang | 3236282 | 23083962 | APBD | 202,485,000 | 199,578,720 | 199,169,520 | 199,169,520 | 199,013,650 | 199,013,650 | 0 | 0 | 2020-03-16 | 2020-03-18 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 3,315,480 | 1.64 % | |
168 | 2020 | Dinas Pendidikan dan Kebudayaan | peninggian halaman SDN Anjiran Kecamatan Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3239282 | 23752148 | APBD | 110,000,000 | 110,000,000 | 109,775,317 | 109,775,317 | 109,600,000 | 109,600,000 | 0 | 0 | 2020-03-08 | 2020-03-11 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 224,683 | 0.2 % | |
169 | 2020 | Dinas Pendidikan dan Kebudayaan | peninggian halaman SDN Anjiran Kecamatan Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3239282 | 23752148 | APBD | 110,000,000 | 110,000,000 | 109,775,317 | 109,775,317 | 109,600,000 | 109,600,000 | 0 | 0 | 2020-03-08 | 2020-03-11 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 224,683 | 0.2 % | |
170 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Muraddiyah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3240282 | 23823670 | APBD | 27,000,000 | 26,994,000 | 26,889,500 | 26,889,500 | 26,750,000 | 26,750,000 | 0 | 0 | 2020-03-10 | 2020-03-13 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 110,500 | 0.41 % | |
171 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Muraddiyah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3240282 | 23823670 | APBD | 27,000,000 | 26,994,000 | 26,889,500 | 26,889,500 | 26,750,000 | 26,750,000 | 0 | 0 | 2020-03-10 | 2020-03-13 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 110,500 | 0.41 % | |
172 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehab Ruang Kantor Dispera KPLH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3241282 | 22938724 | APBD | 12,000,000 | 11,990,000 | 11,710,545 | 11,710,545 | 11,600,545 | 11,600,545 | 0 | 0 | 2020-04-07 | 2020-04-15 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 289,455 | 2.41 % | |
173 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehab Ruang Kantor Dispera KPLH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3241282 | 22938724 | APBD | 12,000,000 | 11,990,000 | 11,710,545 | 11,710,545 | 11,600,545 | 11,600,545 | 0 | 0 | 2020-04-07 | 2020-04-15 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 289,455 | 2.41 % | |
174 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Tempat Parkir Kendaraan Operasional | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3242282 | 22939084 | APBD | 7,000,000 | 6,985,000 | 6,814,830 | 6,814,830 | 6,759,830 | 6,759,830 | 0 | 0 | 2020-04-07 | 2020-04-15 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 185,170 | 2.65 % | |
175 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Tempat Parkir Kendaraan Operasional | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3242282 | 22939084 | APBD | 7,000,000 | 6,985,000 | 6,814,830 | 6,814,830 | 6,759,830 | 6,759,830 | 0 | 0 | 2020-04-07 | 2020-04-15 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 185,170 | 2.65 % | |
176 | 2020 | Dinas Ketahanan Pangan | Rehab Lumbung Pangan Masyarakat Desa Muning Tengah Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3243282 | 25278427 | APBD | 50,000,000 | 49,997,057 | 49,830,127 | 49,830,127 | 49,830,127 | 49,830,127 | 0 | 0 | 2020-03-26 | 2020-03-31 | CV.Bangun Banua | 93.708.167.7-733.000 | 169,873 | 0.34 % | |
177 | 2020 | Dinas Ketahanan Pangan | Rehab Lumbung Pangan Masyarakat Desa Muning Tengah Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3243282 | 25278427 | APBD | 50,000,000 | 49,997,057 | 49,830,127 | 49,830,127 | 49,830,127 | 49,830,127 | 0 | 0 | 2020-03-26 | 2020-03-31 | CV.Bangun Banua | 93.708.167.7-733.000 | 169,873 | 0.34 % | |
178 | 2020 | Dinas Perdagangan | Perencanaan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3245282 | 25293671 | APBD | 15,000,000 | 14,960,000 | 14,899,500 | 14,899,500 | 14,899,500 | 14,899,500 | 0 | 0 | 2020-03-12 | 2020-03-19 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 100,500 | 0.67 % | |
179 | 2020 | Dinas Perdagangan | Perencanaan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3245282 | 25293671 | APBD | 15,000,000 | 14,960,000 | 14,899,500 | 14,899,500 | 14,899,500 | 14,899,500 | 0 | 0 | 2020-03-12 | 2020-03-19 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 100,500 | 0.67 % | |
180 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Pelampung Keselamatan Bamboo Rafting | Pengadaan Langsung | Pengadaan Barang | 3251282 | 23891258 | APBD | 105,000,000 | 104,999,997 | 104,808,000 | 0 | 104,808,000 | 104,808,000 | 0 | 0 | 2020-03-12 | 2020-03-17 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 192,000 | 0.18 % | |
181 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Pelampung Keselamatan Bamboo Rafting | Pengadaan Langsung | Pengadaan Barang | 3251282 | 23891258 | APBD | 105,000,000 | 104,999,997 | 104,808,000 | 0 | 104,808,000 | 104,808,000 | 0 | 0 | 2020-03-12 | 2020-03-17 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 192,000 | 0.18 % | |
182 | 2020 | Dinas Perpustakaan Dan Kearsipan | Pembangunan Pagar Perpustakaan Simpur (DID) | Pengadaan Langsung | Jasa Lainnya | 3252282 | 23063575 | APBD | 187,000,000 | 186,952,639 | 186,633,657 | 0 | 186,633,657 | 0 | 0 | 0 | 2020-03-26 | 2020-04-01 | CV. KHALIF | 81.540.809.1-733.000 | 366,343 | 0.2 % | |
183 | 2020 | Kecamatan Kandangan | Jasa Pengawasan Pagar Kantor, Pembuatan Pintu Gerbang, Pembuatan Tempat Parkir dan Pengadaan Paving Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3254282 | 24152535 | APBD | 10,080,000 | 10,067,750 | 10,043,000 | 0 | 10,043,000 | 10,043,000 | 0 | 0 | 2020-03-12 | 2020-03-16 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 37,000 | 0.37 % | |
184 | 2020 | Kecamatan Kandangan | Jasa Pengawasan Pagar Kantor, Pembuatan Pintu Gerbang, Pembuatan Tempat Parkir dan Pengadaan Paving Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3254282 | 24152535 | APBD | 10,080,000 | 10,067,750 | 10,043,000 | 0 | 10,043,000 | 10,043,000 | 0 | 0 | 2020-03-12 | 2020-03-16 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 37,000 | 0.37 % | |
185 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3255282 | 23823611 | APBD | 14,235,000 | 14,234,000 | 14,179,000 | 14,179,000 | 14,000,000 | 14,000,000 | 0 | 0 | 2020-03-12 | 2020-03-17 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 56,000 | 0.39 % | |
186 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3255282 | 23823611 | APBD | 14,235,000 | 14,234,000 | 14,179,000 | 14,179,000 | 14,000,000 | 14,000,000 | 0 | 0 | 2020-03-12 | 2020-03-17 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 56,000 | 0.39 % | |
187 | 2020 | Dinas Pertanian | Jasa Perencanaan (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3258282 | 25298287 | APBD | 44,021,750 | 44,021,450 | 43,989,000 | 43,989,000 | 43,989,000 | 43,989,000 | 0 | 0 | 2020-03-14 | 2020-03-23 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 32,750 | 0.07 % | |
188 | 2020 | Dinas Pertanian | Jasa Perencanaan (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3258282 | 25298287 | APBD | 44,021,750 | 44,021,450 | 43,989,000 | 43,989,000 | 43,989,000 | 43,989,000 | 0 | 0 | 2020-03-14 | 2020-03-23 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 32,750 | 0.07 % | |
189 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan sumur bor pada pasar terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3261282 | 23765237 | APBD | 5,000,000 | 4,950,000 | 4,917,000 | 4,917,000 | 4,917,000 | 4,917,000 | 0 | 0 | 2020-03-13 | 2020-03-23 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 83,000 | 1.66 % | |
190 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan sumur bor pada pasar terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3261282 | 23765237 | APBD | 5,000,000 | 4,950,000 | 4,917,000 | 4,917,000 | 4,917,000 | 4,917,000 | 0 | 0 | 2020-03-13 | 2020-03-23 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 83,000 | 1.66 % | |
191 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Konsultan Perencanaan Rumah Dinas Jl. Batuah 32 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3262282 | 23720170 | APBD | 35,700,000 | 11,852,500 | 11,845,900 | 0 | 11,845,900 | 0 | 0 | 0 | 2020-03-13 | 2020-03-20 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 23,854,100 | 66.82 % | |
192 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencana Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3266282 | 23543967 | APBD | 8,362,617 | 8,360,000 | 8,239,000 | 8,239,000 | 8,239,000 | 8,239,000 | 0 | 0 | 2020-03-23 | 2020-03-27 | cv.akmalindo | 02.531.482.4-731.000 | 123,617 | 1.48 % | |
193 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencana Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3266282 | 23543967 | APBD | 8,362,617 | 8,360,000 | 8,239,000 | 8,239,000 | 8,239,000 | 8,239,000 | 0 | 0 | 2020-03-23 | 2020-03-27 | cv.akmalindo | 02.531.482.4-731.000 | 123,617 | 1.48 % | |
194 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | pembangunan gedung perluasan ruang Tata Usaha | Pengadaan Langsung | Pekerjaan Konstruksi | 3267282 | 24504508 | APBD | 55,000,000 | 54,963,069 | 54,544,334 | 54,544,334 | 54,300,000 | 54,300,000 | 0 | 0 | 2020-03-16 | 2020-03-18 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 455,666 | 0.83 % | |
195 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | pembangunan gedung perluasan ruang Tata Usaha | Pengadaan Langsung | Pekerjaan Konstruksi | 3267282 | 24504508 | APBD | 55,000,000 | 54,963,069 | 54,544,334 | 54,544,334 | 54,300,000 | 54,300,000 | 0 | 0 | 2020-03-16 | 2020-03-18 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 455,666 | 0.83 % | |
196 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan mebeluer sekolah (PAUD) | Pengadaan Langsung | Pengadaan Barang | 3268282 | 24103885 | APBD | 128,700,000 | 125,066,799 | 124,781,800 | 124,781,800 | 124,650,000 | 124,650,000 | 0 | 0 | 2020-03-18 | 2020-03-23 | CV. RIVINA | 02.746.832.1-733.000 | 3,918,200 | 3.04 % | |
197 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan mebeluer sekolah (PAUD) | Pengadaan Langsung | Pengadaan Barang | 3268282 | 24103885 | APBD | 128,700,000 | 125,066,799 | 124,781,800 | 124,781,800 | 124,650,000 | 124,650,000 | 0 | 0 | 2020-03-18 | 2020-03-23 | CV. RIVINA | 02.746.832.1-733.000 | 3,918,200 | 3.04 % | |
198 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Malutu Kec.Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3269282 | 23795574 | APBD | 50,000,000 | 49,997,560 | 49,755,560 | 49,755,560 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-03-16 | 2020-03-19 | CV. LALUNA DANA | 02.237.179.3-733.000 | 244,440 | 0.49 % | |
199 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Malutu Kec.Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3269282 | 23795574 | APBD | 50,000,000 | 49,997,560 | 49,755,560 | 49,755,560 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-03-16 | 2020-03-19 | CV. LALUNA DANA | 02.237.179.3-733.000 | 244,440 | 0.49 % | |
200 | 2020 | Dinas Perdagangan | Pengawasan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3270282 | 23828515 | APBD | 9,500,000 | 9,460,000 | 9,438,000 | 9,438,000 | 9,438,000 | 9,438,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,000 | 0.65 % | |
201 | 2020 | Dinas Perdagangan | Pengawasan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3270282 | 23828515 | APBD | 9,500,000 | 9,460,000 | 9,438,000 | 9,438,000 | 9,438,000 | 9,438,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,000 | 0.65 % | |
202 | 2020 | Dinas Ketahanan Pangan | Biaya Pembelian Gabah Cadangan Pangan Pemerintah yang dititipkan di Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3271282 | 25283109 | APBD | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV.DITA | 02.242.686.0-733.000 | 200,000 | 0.3 % | |
203 | 2020 | Dinas Ketahanan Pangan | Biaya Pembelian Gabah Cadangan Pangan Pemerintah yang dititipkan di Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3271282 | 25283109 | APBD | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV.DITA | 02.242.686.0-733.000 | 200,000 | 0.3 % | |
204 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3274282 | 23828943 | APBD | 5,000,000 | 4,950,000 | 4,900,500 | 4,900,500 | 4,900,000 | 4,900,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 99,500 | 1.99 % | |
205 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3274282 | 23828943 | APBD | 5,000,000 | 4,950,000 | 4,900,500 | 4,900,500 | 4,900,000 | 4,900,000 | 0 | 0 | 2020-03-17 | 2020-03-24 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 99,500 | 1.99 % | |
206 | 2020 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3276282 | 23469849 | APBD | 5,615,000 | 5,610,000 | 5,599,000 | 0 | 5,599,000 | 5,599,000 | 0 | 0 | 2020-03-24 | 2020-03-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 16,000 | 0.28 % | |
207 | 2020 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3276282 | 23469849 | APBD | 5,615,000 | 5,610,000 | 5,599,000 | 0 | 5,599,000 | 5,599,000 | 0 | 0 | 2020-03-24 | 2020-03-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 16,000 | 0.28 % | |
208 | 2020 | Dinas Sosial | Belanja Modal Rehab Rumah Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 3277282 | 23359233 | APBD | 195,800,000 | 195,313,358 | 194,928,358 | 0 | 194,928,300 | 194,928,300 | 0 | 0 | 2020-03-24 | 2020-04-03 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 871,642 | 0.45 % | |
209 | 2020 | Dinas Sosial | Belanja Modal Rehab Rumah Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 3277282 | 23359233 | APBD | 195,800,000 | 195,313,358 | 194,928,358 | 0 | 194,928,300 | 194,928,300 | 0 | 0 | 2020-03-24 | 2020-04-03 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 871,642 | 0.45 % | |
210 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Menara Air dan Kolam Penampungan Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3280282 | 25106092 | APBD | 30,000,000 | 29,997,000 | 29,700,000 | 0 | 29,700,000 | 29,700,000 | 0 | 0 | 2020-03-18 | 2020-03-26 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 300,000 | 1 % | |
211 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Menara Air dan Kolam Penampungan Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3280282 | 25106092 | APBD | 30,000,000 | 29,997,000 | 29,700,000 | 0 | 29,700,000 | 29,700,000 | 0 | 0 | 2020-03-18 | 2020-03-26 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 300,000 | 1 % | |
212 | 2020 | Dinas Ketahanan Pangan | Pembangunan Gudang Beras Poktan Budi Bakti Desa Gambah Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3282282 | 25278515 | APBD | 180,000,000 | 179,058,482 | 178,763,417 | 178,763,417 | 178,664,000 | 178,664,000 | 0 | 0 | 2020-03-23 | 2020-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 1,236,583 | 0.69 % | |
213 | 2020 | Dinas Ketahanan Pangan | Pembangunan Gudang Beras Poktan Budi Bakti Desa Gambah Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3282282 | 25278515 | APBD | 180,000,000 | 179,058,482 | 178,763,417 | 178,763,417 | 178,664,000 | 178,664,000 | 0 | 0 | 2020-03-23 | 2020-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 1,236,583 | 0.69 % | |
214 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Rehab Lumbung Pangan Masyarakat Desa Muning Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3283282 | 25284030 | APBD | 2,500,000 | 2,500,000 | 2,491,500 | 2,491,500 | 2,436,500 | 2,436,500 | 0 | 0 | 2020-03-18 | 2020-03-26 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 8,500 | 0.34 % | |
215 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Rehab Lumbung Pangan Masyarakat Desa Muning Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3283282 | 25284030 | APBD | 2,500,000 | 2,500,000 | 2,491,500 | 2,491,500 | 2,436,500 | 2,436,500 | 0 | 0 | 2020-03-18 | 2020-03-26 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 8,500 | 0.34 % | |
216 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Rehab Lumbung Pangan Masyarakat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3285282 | 25284102 | APBD | 2,500,000 | 2,500,000 | 2,464,000 | 2,464,000 | 2,420,000 | 2,420,000 | 0 | 0 | 2020-03-18 | 2020-03-26 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 36,000 | 1.44 % | |
217 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Rehab Lumbung Pangan Masyarakat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3285282 | 25284102 | APBD | 2,500,000 | 2,500,000 | 2,464,000 | 2,464,000 | 2,420,000 | 2,420,000 | 0 | 0 | 2020-03-18 | 2020-03-26 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 36,000 | 1.44 % | |
218 | 2020 | Kecamatan Kandangan | Belanja Modal Pembangunan Taman PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3286282 | 23447629 | APBD | 171,100,000 | 165,996,600 | 168,058,180 | 0 | 168,058,180 | 168,058,180 | 0 | 0 | 2020-03-19 | 2020-03-20 | Muda Membangun | 73.702.709.4-733.000 | 3,041,820 | 1.78 % | |
219 | 2020 | Kecamatan Kandangan | Belanja Modal Pembangunan Taman PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3286282 | 23447629 | APBD | 171,100,000 | 165,996,600 | 168,058,180 | 0 | 168,058,180 | 168,058,180 | 0 | 0 | 2020-03-19 | 2020-03-20 | Muda Membangun | 73.702.709.4-733.000 | 3,041,820 | 1.78 % | |
220 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3287282 | 25280784 | APBD | 7,000,000 | 7,000,000 | 6,965,530 | 6,965,530 | 6,855,530 | 6,855,530 | 0 | 0 | 2020-03-18 | 2020-03-26 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 34,470 | 0.49 % | |
221 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3287282 | 25280784 | APBD | 7,000,000 | 7,000,000 | 6,965,530 | 6,965,530 | 6,855,530 | 6,855,530 | 0 | 0 | 2020-03-18 | 2020-03-26 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 34,470 | 0.49 % | |
222 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Pengadaan Alat Penyimpanan Perlengkapan Kantor, Personal Komputer dan Peralatan Personal Komputer | Pengadaan Langsung | Pengadaan Barang | 3288282 | 25374611 | APBD | 86,900,000 | 85,228,000 | 83,034,600 | 83,034,600 | 83,034,600 | 83,034,600 | 0 | 0 | 2020-03-19 | 2020-03-24 | CV. HITRO | 02.918.384.5-733.000 | 3,865,400 | 4.45 % | |
223 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Pengadaan Alat Penyimpanan Perlengkapan Kantor, Personal Komputer dan Peralatan Personal Komputer | Pengadaan Langsung | Pengadaan Barang | 3288282 | 25374611 | APBD | 86,900,000 | 85,228,000 | 83,034,600 | 83,034,600 | 83,034,600 | 83,034,600 | 0 | 0 | 2020-03-19 | 2020-03-24 | CV. HITRO | 02.918.384.5-733.000 | 3,865,400 | 4.45 % | |
224 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Malinau Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3289282 | 23792901 | APBD | 150,000,000 | 149,999,394 | 149,569,084 | 149,569,084 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-04-05 | 2020-04-06 | CV. KALTRA | 81.639.401.9-733.000 | 430,916 | 0.29 % | |
225 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Malinau Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3289282 | 23792901 | APBD | 150,000,000 | 149,999,394 | 149,569,084 | 149,569,084 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-04-05 | 2020-04-06 | CV. KALTRA | 81.639.401.9-733.000 | 430,916 | 0.29 % | |
226 | 2020 | Dinas Perikanan | Disediakan belanja bahan dan peralatan demplot budidaya ikan sistem net tancap | Pengadaan Langsung | Pengadaan Barang | 3291282 | 23468773 | APBD | 65,400,000 | 65,340,000 | 65,054,000 | 65,054,000 | 65,000,000 | 65,000,000 | 0 | 0 | 2020-03-20 | 2020-03-26 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 346,000 | 0.53 % | |
227 | 2020 | Dinas Perikanan | Disediakan belanja bahan dan peralatan demplot budidaya ikan sistem net tancap | Pengadaan Langsung | Pengadaan Barang | 3291282 | 23468773 | APBD | 65,400,000 | 65,340,000 | 65,054,000 | 65,054,000 | 65,000,000 | 65,000,000 | 0 | 0 | 2020-03-20 | 2020-03-26 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 346,000 | 0.53 % | |
228 | 2020 | Dinas Pertanian | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3294282 | 24125415 | APBD | 54,830,680 | 54,826,551 | 54,572,650 | 0 | 54,572,650 | 54,572,650 | 0 | 0 | 2020-03-24 | 2020-03-30 | CV. MEDIACOM | 02.675.170.1-733.000 | 258,030 | 0.47 % | |
229 | 2020 | Dinas Pertanian | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3294282 | 24125415 | APBD | 54,830,680 | 54,826,551 | 54,572,650 | 0 | 54,572,650 | 54,572,650 | 0 | 0 | 2020-03-24 | 2020-03-30 | CV. MEDIACOM | 02.675.170.1-733.000 | 258,030 | 0.47 % | |
230 | 2020 | Dinas Pertanian | Pengadaan Belanja Bahan dan Pakan Ternak Sapi | Pengadaan Langsung | Pengadaan Barang | 3295282 | 24144945 | APBD | 149,937,500 | 145,382,050 | 145,066,405 | 0 | 145,066,405 | 145,066,405 | 0 | 0 | 2020-03-24 | 2020-03-30 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,871,095 | 3.25 % | |
231 | 2020 | Dinas Pertanian | Pengadaan Belanja Bahan dan Pakan Ternak Sapi | Pengadaan Langsung | Pengadaan Barang | 3295282 | 24144945 | APBD | 149,937,500 | 145,382,050 | 145,066,405 | 0 | 145,066,405 | 145,066,405 | 0 | 0 | 2020-03-24 | 2020-03-30 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,871,095 | 3.25 % | |
232 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman dan Drainase SDN. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3297282 | 23752492 | APBD | 100,000,000 | 99,994,386 | 99,712,425 | 99,712,425 | 99,525,000 | 99,525,000 | 0 | 0 | 2020-03-23 | 2020-03-24 | CV.SHAFIRA MULIA | 75.896.565.8-733.000 | 287,575 | 0.29 % | |
233 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman dan Drainase SDN. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3297282 | 23752492 | APBD | 100,000,000 | 99,994,386 | 99,712,425 | 99,712,425 | 99,525,000 | 99,525,000 | 0 | 0 | 2020-03-23 | 2020-03-24 | CV.SHAFIRA MULIA | 75.896.565.8-733.000 | 287,575 | 0.29 % | |
234 | 2020 | Dinas Sosial | pengadaan bahan bantuan sembako/pangan bagi lanjut usia miskin/terlantar | Pengadaan Langsung | Pengadaan Barang | 3298282 | 23491332 | APBD | 70,000,000 | 70,000,000 | 69,800,000 | 0 | 69,800,000 | 69,800,000 | 0 | 0 | 2020-03-24 | 2020-04-03 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 200,000 | 0.29 % | |
235 | 2020 | Dinas Sosial | pengadaan bahan bantuan sembako/pangan bagi lanjut usia miskin/terlantar | Pengadaan Langsung | Pengadaan Barang | 3298282 | 23491332 | APBD | 70,000,000 | 70,000,000 | 69,800,000 | 0 | 69,800,000 | 69,800,000 | 0 | 0 | 2020-03-24 | 2020-04-03 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 200,000 | 0.29 % | |
236 | 2020 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan - Pengadaan Bagunan dan Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 3299282 | 25254980 | APBD | 172,000,000 | 171,452,299 | 171,205,984 | 0 | 171,205,984 | 171,205,984 | 0 | 0 | 2020-03-26 | 2020-03-27 | CV. KALTRA | 81.639.401.9-733.000 | 794,016 | 0.46 % | |
237 | 2020 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan - Pengadaan Bagunan dan Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 3299282 | 25254980 | APBD | 172,000,000 | 171,452,299 | 171,205,984 | 0 | 171,205,984 | 171,205,984 | 0 | 0 | 2020-03-26 | 2020-03-27 | CV. KALTRA | 81.639.401.9-733.000 | 794,016 | 0.46 % | |
238 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Kandangan Kota 2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3300282 | 23795509 | APBD | 90,000,000 | 89,999,577 | 89,790,962 | 89,790,962 | 89,600,000 | 89,600,000 | 0 | 0 | 2020-03-25 | 2020-03-26 | CV. HAFIZA | 02.394.003.4-733.000 | 209,038 | 0.23 % | |
239 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Kandangan Kota 2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3300282 | 23795509 | APBD | 90,000,000 | 89,999,577 | 89,790,962 | 89,790,962 | 89,600,000 | 89,600,000 | 0 | 0 | 2020-03-25 | 2020-03-26 | CV. HAFIZA | 02.394.003.4-733.000 | 209,038 | 0.23 % | |
240 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Ibadah SDN. KK2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3301282 | 23792946 | APBD | 100,000,000 | 99,995,461 | 99,580,615 | 99,580,615 | 99,400,000 | 99,400,000 | 0 | 0 | 2020-03-25 | 2020-03-26 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 419,385 | 0.42 % | |
241 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Ibadah SDN. KK2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3301282 | 23792946 | APBD | 100,000,000 | 99,995,461 | 99,580,615 | 99,580,615 | 99,400,000 | 99,400,000 | 0 | 0 | 2020-03-25 | 2020-03-26 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 419,385 | 0.42 % | |
242 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan CCTV Online Instalasi Lengkap dan LCD Proyektor Set di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3303282 | 25464699 | APBD | 90,000,000 | 89,996,500 | 89,892,000 | 0 | 89,892,000 | 89,892,000 | 0 | 0 | 2020-03-27 | 2020-04-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 108,000 | 0.12 % | |
243 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan CCTV Online Instalasi Lengkap dan LCD Proyektor Set di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3303282 | 25464699 | APBD | 90,000,000 | 89,996,500 | 89,892,000 | 0 | 89,892,000 | 89,892,000 | 0 | 0 | 2020-03-27 | 2020-04-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 108,000 | 0.12 % | |
244 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3305282 | 23359662 | APBD | 11,000,000 | 10,450,000 | 10,428,000 | 0 | 10,428,000 | 10,428,000 | 0 | 0 | 2020-03-26 | 2020-03-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 572,000 | 5.2 % | |
245 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3305282 | 23359662 | APBD | 11,000,000 | 10,450,000 | 10,428,000 | 0 | 10,428,000 | 10,428,000 | 0 | 0 | 2020-03-26 | 2020-03-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 572,000 | 5.2 % | |
246 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3306282 | 24533384 | APBD | 11,000,000 | 10,978,000 | 10,890,000 | 10,890,000 | 10,780,000 | 10,780,000 | 0 | 0 | 2020-03-27 | 2020-03-31 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 110,000 | 1 % | |
247 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3306282 | 24533384 | APBD | 11,000,000 | 10,978,000 | 10,890,000 | 10,890,000 | 10,780,000 | 10,780,000 | 0 | 0 | 2020-03-27 | 2020-03-31 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 110,000 | 1 % | |
248 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan peningkatan/rehabilitasi jalan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3311282 | 23349378 | APBD | 100,000,000 | 99,962,500 | 99,352,000 | 99,352,000 | 99,055,000 | 99,055,000 | 0 | 0 | 2020-05-04 | 2020-05-11 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 648,000 | 0.65 % | |
249 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan peningkatan/rehabilitasi jalan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3311282 | 23349378 | APBD | 100,000,000 | 99,962,500 | 99,352,000 | 99,352,000 | 99,055,000 | 99,055,000 | 0 | 0 | 2020-05-04 | 2020-05-11 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 648,000 | 0.65 % | |
250 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman SDN Kalumpang Selatan Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3312282 | 23752085 | APBD | 195,000,000 | 194,945,173 | 194,783,201 | 194,783,201 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-03-28 | 2020-03-30 | CV.DITA | 02.242.686.0-733.000 | 216,799 | 0.11 % | |
251 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman SDN Kalumpang Selatan Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3312282 | 23752085 | APBD | 195,000,000 | 194,945,173 | 194,783,201 | 194,783,201 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-03-28 | 2020-03-30 | CV.DITA | 02.242.686.0-733.000 | 216,799 | 0.11 % | |
252 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 3314282 | 22948150 | APBD | 200,000,000 | 199,416,800 | 198,987,800 | 198,987,800 | 198,822,800 | 198,822,800 | 0 | 0 | 2020-03-28 | 2020-03-31 | CV. An-Nidha | 02.675.485.3-733.000 | 1,012,200 | 0.51 % | |
253 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 3314282 | 22948150 | APBD | 200,000,000 | 199,416,800 | 198,987,800 | 198,987,800 | 198,822,800 | 198,822,800 | 0 | 0 | 2020-03-28 | 2020-03-31 | CV. An-Nidha | 02.675.485.3-733.000 | 1,012,200 | 0.51 % | |
254 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 3315282 | 22952315 | APBD | 200,000,000 | 199,787,500 | 199,276,000 | 199,276,000 | 198,973,500 | 198,973,500 | 0 | 0 | 2020-03-30 | 2020-03-31 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 724,000 | 0.36 % | |
255 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 3315282 | 22952315 | APBD | 200,000,000 | 199,787,500 | 199,276,000 | 199,276,000 | 198,973,500 | 198,973,500 | 0 | 0 | 2020-03-30 | 2020-03-31 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 724,000 | 0.36 % | |
256 | 2020 | Dinas Pendidikan dan Kebudayaan | Pemasangan jaringan internit gygabyte lan dan wifi hotspot | Pengadaan Langsung | Jasa Lainnya | 3316282 | 23822868 | APBD | 136,714,000 | 136,583,700 | 135,759,140 | 135,759,140 | 135,600,000 | 135,600,000 | 0 | 0 | 2020-03-30 | 2020-03-30 | CV. e_Caracter | 75.998.700.1-733.000 | 954,860 | 0.7 % | |
257 | 2020 | Dinas Pendidikan dan Kebudayaan | Pemasangan jaringan internit gygabyte lan dan wifi hotspot | Pengadaan Langsung | Jasa Lainnya | 3316282 | 23822868 | APBD | 136,714,000 | 136,583,700 | 135,759,140 | 135,759,140 | 135,600,000 | 135,600,000 | 0 | 0 | 2020-03-30 | 2020-03-30 | CV. e_Caracter | 75.998.700.1-733.000 | 954,860 | 0.7 % | |
258 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt. 01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3320282 | 23381475 | APBD | 20,000,000 | 19,987,000 | 19,982,050 | 0 | 19,977,100 | 19,977,100 | 0 | 0 | 2020-04-07 | 2020-04-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 17,950 | 0.09 % | |
259 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt. 01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3320282 | 23381475 | APBD | 20,000,000 | 19,987,000 | 19,982,050 | 0 | 19,977,100 | 19,977,100 | 0 | 0 | 2020-04-07 | 2020-04-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 17,950 | 0.09 % | |
260 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3322282 | 23356856 | APBD | 10,000,000 | 9,927,500 | 9,922,000 | 9,922,000 | 9,916,500 | 9,916,500 | 0 | 0 | 2020-04-07 | 2020-04-10 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 78,000 | 0.78 % | |
261 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3322282 | 23356856 | APBD | 10,000,000 | 9,927,500 | 9,922,000 | 9,922,000 | 9,916,500 | 9,916,500 | 0 | 0 | 2020-04-07 | 2020-04-10 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 78,000 | 0.78 % | |
262 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Meubelair Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3324282 | 23891267 | APBD | 74,500,000 | 74,492,000 | 74,399,600 | 0 | 74,399,600 | 74,399,600 | 0 | 0 | 2020-03-31 | 2020-04-08 | CV.DITA | 02.242.686.0-733.000 | 100,400 | 0.13 % | |
263 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Meubelair Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3324282 | 23891267 | APBD | 74,500,000 | 74,492,000 | 74,399,600 | 0 | 74,399,600 | 74,399,600 | 0 | 0 | 2020-03-31 | 2020-04-08 | CV.DITA | 02.242.686.0-733.000 | 100,400 | 0.13 % | |
264 | 2020 | Dinas Ketahanan Pangan | Rehab/Perbaikan gedung kantor Dinas Ketahanan Pangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3326282 | 24005272 | APBD | 53,000,000 | 52,975,153 | 52,796,953 | 52,796,953 | 52,796,000 | 52,796,000 | 0 | 0 | 2020-04-01 | 2020-04-07 | CV. AL MADINAH | 66.139.132.6-733.000 | 203,047 | 0.38 % | |
265 | 2020 | Dinas Ketahanan Pangan | Rehab/Perbaikan gedung kantor Dinas Ketahanan Pangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3326282 | 24005272 | APBD | 53,000,000 | 52,975,153 | 52,796,953 | 52,796,953 | 52,796,000 | 52,796,000 | 0 | 0 | 2020-04-01 | 2020-04-07 | CV. AL MADINAH | 66.139.132.6-733.000 | 203,047 | 0.38 % | |
266 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3327282 | 23544863 | APBD | 11,759,579 | 11,748,000 | 11,726,000 | 11,726,000 | 11,627,000 | 11,627,000 | 0 | 0 | 2020-03-31 | 2020-04-03 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 33,579 | 0.29 % | |
267 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3327282 | 23544863 | APBD | 11,759,579 | 11,748,000 | 11,726,000 | 11,726,000 | 11,627,000 | 11,627,000 | 0 | 0 | 2020-03-31 | 2020-04-03 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 33,579 | 0.29 % | |
268 | 2020 | Dinas Perdagangan | Pengawasan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3336282 | 25293740 | APBD | 18,000,000 | 17,930,000 | 17,864,000 | 17,864,000 | 17,864,000 | 17,864,000 | 0 | 0 | 2020-04-14 | 2020-04-24 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 136,000 | 0.76 % | |
269 | 2020 | Dinas Perdagangan | Pengawasan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3336282 | 25293740 | APBD | 18,000,000 | 17,930,000 | 17,864,000 | 17,864,000 | 17,864,000 | 17,864,000 | 0 | 0 | 2020-04-14 | 2020-04-24 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 136,000 | 0.76 % | |
270 | 2020 | Kecamatan Daha Utara | Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3337282 | 23359688 | APBD | 160,000,000 | 159,902,548 | 159,779,735 | 0 | 159,779,735 | 159,779,735 | 0 | 0 | 2020-04-01 | 2020-04-06 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 220,265 | 0.14 % | |
271 | 2020 | Kecamatan Daha Utara | Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3337282 | 23359688 | APBD | 160,000,000 | 159,902,548 | 159,779,735 | 0 | 159,779,735 | 159,779,735 | 0 | 0 | 2020-04-01 | 2020-04-06 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 220,265 | 0.14 % | |
272 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bibit Tanaman Bambu Pagar TPA | Pengadaan Langsung | Pengadaan Barang | 3340282 | 23041817 | APBD | 110,000,000 | 70,750,000 | 70,600,000 | 70,600,000 | 70,500,000 | 70,500,000 | 0 | 0 | 2020-04-03 | 2020-04-07 | KARYA DWI CHADE | 75.416.433.3-733.000 | 39,400,000 | 35.82 % | |
273 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bibit Tanaman Bambu Pagar TPA | Pengadaan Langsung | Pengadaan Barang | 3340282 | 23041817 | APBD | 110,000,000 | 70,750,000 | 70,600,000 | 70,600,000 | 70,500,000 | 70,500,000 | 0 | 0 | 2020-04-03 | 2020-04-07 | KARYA DWI CHADE | 75.416.433.3-733.000 | 39,400,000 | 35.82 % | |
274 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Pick Up Dump Sampah | Pengadaan Langsung | Pengadaan Barang | 3341282 | 22993134 | APBD | 190,000,000 | 190,000,000 | 189,850,000 | 189,850,000 | 189,800,000 | 189,800,000 | 0 | 0 | 2020-04-03 | 2020-04-07 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | 150,000 | 0.08 % | |
275 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Pick Up Dump Sampah | Pengadaan Langsung | Pengadaan Barang | 3341282 | 22993134 | APBD | 190,000,000 | 190,000,000 | 189,850,000 | 189,850,000 | 189,800,000 | 189,800,000 | 0 | 0 | 2020-04-03 | 2020-04-07 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | 150,000 | 0.08 % | |
276 | 2020 | Dinas Pertanian | Belanja Bahan Pemeliharaan Kebun Hijauan Makanan Ternak (HMT) | Pengadaan Langsung | Pengadaan Barang | 3342282 | 24144944 | APBD | 34,600,000 | 34,465,200 | 34,332,100 | 0 | 34,332,100 | 34,332,100 | 0 | 0 | 2020-04-04 | 2020-04-08 | FADWI UTAMA | 94.246.044.5-733.000 | 267,900 | 0.77 % | |
277 | 2020 | Dinas Pertanian | Belanja Bahan Pemeliharaan Kebun Hijauan Makanan Ternak (HMT) | Pengadaan Langsung | Pengadaan Barang | 3342282 | 24144944 | APBD | 34,600,000 | 34,465,200 | 34,332,100 | 0 | 34,332,100 | 34,332,100 | 0 | 0 | 2020-04-04 | 2020-04-08 | FADWI UTAMA | 94.246.044.5-733.000 | 267,900 | 0.77 % | |
278 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Petugas Pemelihara Taman | Pengadaan Langsung | Pengadaan Barang | 3344282 | 22972703 | APBD | 102,285,000 | 101,262,150 | 101,083,950 | 101,083,950 | 100,994,850 | 100,994,850 | 0 | 0 | 2020-04-04 | 2020-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 1,201,050 | 1.17 % | |
279 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Petugas Pemelihara Taman | Pengadaan Langsung | Pengadaan Barang | 3344282 | 22972703 | APBD | 102,285,000 | 101,262,150 | 101,083,950 | 101,083,950 | 100,994,850 | 100,994,850 | 0 | 0 | 2020-04-04 | 2020-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 1,201,050 | 1.17 % | |
280 | 2020 | Dinas Sosial | Belanja bahan bantuan sembako /pangan bagi penyandang disabilitas | Pengadaan Langsung | Pengadaan Barang | 3345282 | 23490785 | APBD | 56,000,000 | 56,000,000 | 55,820,000 | 0 | 55,620,000 | 55,620,000 | 0 | 0 | 2020-04-06 | 2020-04-15 | CV. AMANDITA | 01.834.025.7-733.000 | 180,000 | 0.32 % | |
281 | 2020 | Dinas Sosial | Belanja bahan bantuan sembako /pangan bagi penyandang disabilitas | Pengadaan Langsung | Pengadaan Barang | 3345282 | 23490785 | APBD | 56,000,000 | 56,000,000 | 55,820,000 | 0 | 55,620,000 | 55,620,000 | 0 | 0 | 2020-04-06 | 2020-04-15 | CV. AMANDITA | 01.834.025.7-733.000 | 180,000 | 0.32 % | |
282 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penambahan Tanaman Taman Palidangan | Pengadaan Langsung | Pengadaan Barang | 3346282 | 22973542 | APBD | 100,000,000 | 99,220,000 | 99,096,800 | 99,096,800 | 99,001,100 | 99,001,100 | 0 | 0 | 2020-04-04 | 2020-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 903,200 | 0.9 % | |
283 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penambahan Tanaman Taman Palidangan | Pengadaan Langsung | Pengadaan Barang | 3346282 | 22973542 | APBD | 100,000,000 | 99,220,000 | 99,096,800 | 99,096,800 | 99,001,100 | 99,001,100 | 0 | 0 | 2020-04-04 | 2020-04-07 | CV. e_Caracter | 75.998.700.1-733.000 | 903,200 | 0.9 % | |
284 | 2020 | Sekretariat Daerah | Konsultan Pengawasan Rehab ruang Bagian Protokol dan Kehumasan dan Bagian Kesra Setda HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3348282 | 23644102 | APBD | 7,000,000 | 6,996,000 | 6,820,000 | 0 | 6,820,000 | 6,820,000 | 0 | 0 | 2020-04-06 | 2020-04-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 180,000 | 2.57 % | |
285 | 2020 | Sekretariat Daerah | Konsultan Pengawasan Rehab ruang Bagian Protokol dan Kehumasan dan Bagian Kesra Setda HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3348282 | 23644102 | APBD | 7,000,000 | 6,996,000 | 6,820,000 | 0 | 6,820,000 | 6,820,000 | 0 | 0 | 2020-04-06 | 2020-04-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 180,000 | 2.57 % | |
286 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Kerja (Pengembangan Hutan Kota Menjadi Hutan Edukasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3353282 | 23093891 | APBD | 15,000,000 | 14,985,850 | 14,883,000 | 14,883,000 | 14,883,000 | 14,883,000 | 0 | 0 | 2020-04-07 | 2020-04-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 117,000 | 0.78 % | |
287 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Kerja (Pengembangan Hutan Kota Menjadi Hutan Edukasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3353282 | 23093891 | APBD | 15,000,000 | 14,985,850 | 14,883,000 | 14,883,000 | 14,883,000 | 14,883,000 | 0 | 0 | 2020-04-07 | 2020-04-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 117,000 | 0.78 % | |
288 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Pengadaan Peralatan dan Pelengkapan Kantor | Pengadaan Langsung | Pengadaan Barang | 3356282 | 24194308;24194309;24194310;24194311;24194312;24194313;24194314;24194315;24194316 | APBD | 209,000,000 | 146,625,000 | 139,220,000 | 0 | 139,220,000 | 139,220,000 | 0 | 0 | 2020-04-07 | 2020-04-10 | CV. HITRO | 02.918.384.5-733.000 | 69,780,000 | 33.39 % | |
289 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Pengadaan Peralatan dan Pelengkapan Kantor | Pengadaan Langsung | Pengadaan Barang | 3356282 | 24194308;24194309;24194310;24194311;24194312;24194313;24194314;24194315;24194316 | APBD | 209,000,000 | 146,625,000 | 139,220,000 | 0 | 139,220,000 | 139,220,000 | 0 | 0 | 2020-04-07 | 2020-04-10 | CV. HITRO | 02.918.384.5-733.000 | 69,780,000 | 33.39 % | |
290 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi (Pengukuran) Bidang Tanah Jalan Lingkungan | Pengadaan Langsung | Jasa Lainnya | 3357282 | 22993595 | APBD | 68,000,000 | 68,000,000 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-04-07 | 2020-04-14 | CV. SENTRATECS | 01.719.362.4-732.000 | 2,000,000 | 2.94 % | |
291 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi (Pengukuran) Bidang Tanah Jalan Lingkungan | Pengadaan Langsung | Jasa Lainnya | 3357282 | 22993595 | APBD | 68,000,000 | 68,000,000 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-04-07 | 2020-04-14 | CV. SENTRATECS | 01.719.362.4-732.000 | 2,000,000 | 2.94 % | |
292 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman panggung SDN Sungai Jarum kec.Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3358282 | 23752382 | APBD | 195,000,000 | 194,862,583 | 194,610,436 | 194,610,436 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-23 | 2020-04-28 | cv. bumi mandiri | 02.089.892.0-733.000 | 389,564 | 0.2 % | |
293 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman panggung SDN Sungai Jarum kec.Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3358282 | 23752382 | APBD | 195,000,000 | 194,862,583 | 194,610,436 | 194,610,436 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-23 | 2020-04-28 | cv. bumi mandiri | 02.089.892.0-733.000 | 389,564 | 0.2 % | |
294 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 3359282 | 22948794 | APBD | 200,000,000 | 194,166,830 | 193,110,610 | 193,110,610 | 192,810,000 | 192,810,000 | 0 | 0 | 2020-04-08 | 2020-04-13 | cv mentari teknik | 03.183.412.0-731.000 | 6,889,390 | 3.44 % | |
295 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 3359282 | 22948794 | APBD | 200,000,000 | 194,166,830 | 193,110,610 | 193,110,610 | 192,810,000 | 192,810,000 | 0 | 0 | 2020-04-08 | 2020-04-13 | cv mentari teknik | 03.183.412.0-731.000 | 6,889,390 | 3.44 % | |
296 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pengadaan Lemari Alat dan Obat Kontrasepsi (Alokon) | Pengadaan Langsung | Pengadaan Barang | 3360282 | 25471423 | APBD | 182,000,000 | 176,790,900 | 176,147,400 | 0 | 174,200,000 | 174,200,000 | 0 | 0 | 2020-04-18 | 2020-04-30 | CV.BORNEO AUFA JAYA | 31.670.522.7-731.000 | 5,852,600 | 3.22 % | |
297 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pengadaan Lemari Alat dan Obat Kontrasepsi (Alokon) | Pengadaan Langsung | Pengadaan Barang | 3360282 | 25471423 | APBD | 182,000,000 | 176,790,900 | 176,147,400 | 0 | 174,200,000 | 174,200,000 | 0 | 0 | 2020-04-18 | 2020-04-30 | CV.BORNEO AUFA JAYA | 31.670.522.7-731.000 | 5,852,600 | 3.22 % | |
298 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawas Pembangunan Taman PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3362282 | 23448594 | APBD | 7,200,000 | 7,194,000 | 7,145,600 | 0 | 7,145,600 | 7,145,600 | 0 | 0 | 2020-04-13 | 2020-04-14 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 54,400 | 0.76 % | |
299 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawas Pembangunan Taman PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3362282 | 23448594 | APBD | 7,200,000 | 7,194,000 | 7,145,600 | 0 | 7,145,600 | 7,145,600 | 0 | 0 | 2020-04-13 | 2020-04-14 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 54,400 | 0.76 % | |
300 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan penggantian jembatan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3364282 | 23373440 | APBD | 100,000,000 | 99,770,000 | 99,297,000 | 99,297,000 | 99,077,000 | 99,077,000 | 0 | 0 | 2020-05-04 | 2020-05-11 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 703,000 | 0.7 % | |
301 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan penggantian jembatan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3364282 | 23373440 | APBD | 100,000,000 | 99,770,000 | 99,297,000 | 99,297,000 | 99,077,000 | 99,077,000 | 0 | 0 | 2020-05-04 | 2020-05-11 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 703,000 | 0.7 % | |
302 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3365282 | 22978515 | APBD | 88,035,200 | 88,035,200 | 87,945,000 | 0 | 87,945,000 | 87,945,000 | 0 | 0 | 2020-04-14 | 2020-04-21 | CV. KALTRA | 81.639.401.9-733.000 | 90,200 | 0.1 % | |
303 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3365282 | 22978515 | APBD | 88,035,200 | 88,035,200 | 87,945,000 | 0 | 87,945,000 | 87,945,000 | 0 | 0 | 2020-04-14 | 2020-04-21 | CV. KALTRA | 81.639.401.9-733.000 | 90,200 | 0.1 % | |
304 | 2020 | Dinas Pertanian | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3366282 | 24118900 | APBD | 179,750,000 | 148,574,250 | 148,445,000 | 148,445,000 | 148,445,000 | 148,445,000 | 0 | 0 | 2020-04-13 | 2020-04-16 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 31,305,000 | 17.42 % | |
305 | 2020 | Dinas Pertanian | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3366282 | 24118900 | APBD | 179,750,000 | 148,574,250 | 148,445,000 | 148,445,000 | 148,445,000 | 148,445,000 | 0 | 0 | 2020-04-13 | 2020-04-16 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 31,305,000 | 17.42 % | |
306 | 2020 | Dinas Pertanian | Belanja Bibit / Benih Tanaman Melon | Pengadaan Langsung | Pengadaan Barang | 3367282 | 24144863 | APBD | 50,600,000 | 18,597,700 | 18,577,900 | 18,577,900 | 18,577,900 | 18,577,900 | 0 | 0 | 2020-04-13 | 2020-04-15 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 32,022,100 | 63.28 % | |
307 | 2020 | Dinas Pertanian | Belanja Bibit / Benih Tanaman Melon | Pengadaan Langsung | Pengadaan Barang | 3367282 | 24144863 | APBD | 50,600,000 | 18,597,700 | 18,577,900 | 18,577,900 | 18,577,900 | 18,577,900 | 0 | 0 | 2020-04-13 | 2020-04-15 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 32,022,100 | 63.28 % | |
308 | 2020 | Dinas Pertanian | Pengadaan Sapi Bali Betina | Pengadaan Langsung | Pengadaan Barang | 3368282 | 24144942 | APBD | 110,000,000 | 108,100,000 | 108,000,000 | 108,000,000 | 108,000,000 | 108,000,000 | 0 | 0 | 2020-04-13 | 2020-04-23 | CV.DITA | 02.242.686.0-733.000 | 2,000,000 | 1.82 % | |
309 | 2020 | Dinas Pertanian | Pengadaan Sapi Bali Betina | Pengadaan Langsung | Pengadaan Barang | 3368282 | 24144942 | APBD | 110,000,000 | 108,100,000 | 108,000,000 | 108,000,000 | 108,000,000 | 108,000,000 | 0 | 0 | 2020-04-13 | 2020-04-23 | CV.DITA | 02.242.686.0-733.000 | 2,000,000 | 1.82 % | |
310 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pembangunan Mess Penjaga TPA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3370282 | 24618310 | APBD | 25,000,000 | 24,915,000 | 24,799,500 | 24,799,500 | 24,656,500 | 24,656,500 | 0 | 0 | 2020-04-15 | 2020-04-17 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 200,500 | 0.8 % | |
311 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pembangunan Mess Penjaga TPA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3370282 | 24618310 | APBD | 25,000,000 | 24,915,000 | 24,799,500 | 24,799,500 | 24,656,500 | 24,656,500 | 0 | 0 | 2020-04-15 | 2020-04-17 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 200,500 | 0.8 % | |
312 | 2020 | Kecamatan Daha Utara | Disediakan Belanja Modal Pengadaan Pembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3371282 | 23359488 | APBD | 176,500,000 | 176,495,440 | 176,202,821 | 0 | 176,202,821 | 176,202,821 | 0 | 0 | 2020-04-22 | 2020-04-24 | cv. bumi mandiri | 02.089.892.0-733.000 | 297,179 | 0.17 % | |
313 | 2020 | Kecamatan Daha Utara | Disediakan Belanja Modal Pengadaan Pembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3371282 | 23359488 | APBD | 176,500,000 | 176,495,440 | 176,202,821 | 0 | 176,202,821 | 176,202,821 | 0 | 0 | 2020-04-22 | 2020-04-24 | cv. bumi mandiri | 02.089.892.0-733.000 | 297,179 | 0.17 % | |
314 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Kayu Abang | Pengadaan Langsung | Pekerjaan Konstruksi | 3372282 | 22911035 | APBD | 155,000,000 | 154,941,318 | 154,008,280 | 154,008,280 | 153,850,000 | 153,850,000 | 0 | 0 | 2020-04-15 | 2020-04-17 | cv mentari teknik | 03.183.412.0-731.000 | 991,720 | 0.64 % | |
315 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Kayu Abang | Pengadaan Langsung | Pekerjaan Konstruksi | 3372282 | 22911035 | APBD | 155,000,000 | 154,941,318 | 154,008,280 | 154,008,280 | 153,850,000 | 153,850,000 | 0 | 0 | 2020-04-15 | 2020-04-17 | cv mentari teknik | 03.183.412.0-731.000 | 991,720 | 0.64 % | |
316 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Pengawasan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3373282 | 22918951 | APBD | 58,800,000 | 58,740,000 | 58,608,000 | 58,608,000 | 58,465,000 | 58,465,000 | 0 | 0 | 2020-04-15 | 2020-04-17 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 192,000 | 0.33 % | |
317 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Pengawasan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3373282 | 22918951 | APBD | 58,800,000 | 58,740,000 | 58,608,000 | 58,608,000 | 58,465,000 | 58,465,000 | 0 | 0 | 2020-04-15 | 2020-04-17 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 192,000 | 0.33 % | |
318 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3375282 | 23372767 | APBD | 200,000,000 | 199,710,487 | 199,682,986 | 199,682,987 | 199,627,816 | 199,627,816 | 0 | 0 | 2020-04-16 | 2020-04-23 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 317,014 | 0.16 % | |
319 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3375282 | 23372767 | APBD | 200,000,000 | 199,710,487 | 199,682,986 | 199,682,987 | 199,627,816 | 199,627,816 | 0 | 0 | 2020-04-16 | 2020-04-23 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 317,014 | 0.16 % | |
320 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3379282 | 22911190 | APBD | 125,000,000 | 124,972,936 | 124,270,952 | 124,270,952 | 124,050,000 | 124,050,000 | 0 | 0 | 2020-04-16 | 2020-04-21 | cv mentari teknik | 03.183.412.0-731.000 | 729,048 | 0.58 % | |
321 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3379282 | 22911190 | APBD | 125,000,000 | 124,972,936 | 124,270,952 | 124,270,952 | 124,050,000 | 124,050,000 | 0 | 0 | 2020-04-16 | 2020-04-21 | cv mentari teknik | 03.183.412.0-731.000 | 729,048 | 0.58 % | |
322 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Jl. Tembok Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 3380282 | 22911473 | APBD | 45,000,000 | 44,924,198 | 44,773,289 | 44,773,289 | 44,560,000 | 44,560,000 | 0 | 0 | 2020-04-16 | 2020-04-21 | cv mentari teknik | 03.183.412.0-731.000 | 226,711 | 0.5 % | |
323 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Jl. Tembok Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 3380282 | 22911473 | APBD | 45,000,000 | 44,924,198 | 44,773,289 | 44,773,289 | 44,560,000 | 44,560,000 | 0 | 0 | 2020-04-16 | 2020-04-21 | cv mentari teknik | 03.183.412.0-731.000 | 226,711 | 0.5 % | |
324 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Rehab Cottage Model Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3381282 | 25596581 | APBD | 25,000,000 | 24,970,000 | 24,640,000 | 0 | 24,640,000 | 24,640,000 | 0 | 0 | 2020-04-17 | 2020-04-24 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 360,000 | 1.44 % | |
325 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Rehab Cottage Model Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3381282 | 25596581 | APBD | 25,000,000 | 24,970,000 | 24,640,000 | 0 | 24,640,000 | 24,640,000 | 0 | 0 | 2020-04-17 | 2020-04-24 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 360,000 | 1.44 % | |
326 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan Taman | Pengadaan Langsung | Pekerjaan Konstruksi | 3382282 | 22983844 | APBD | 200,000,000 | 199,885,620 | 199,404,802 | 199,404,802 | 199,194,800 | 199,194,800 | 0 | 0 | 2020-04-17 | 2020-04-21 | CV. KALI BARU | 01.434.974.0-733.000 | 595,198 | 0.3 % | |
327 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan Taman | Pengadaan Langsung | Pekerjaan Konstruksi | 3382282 | 22983844 | APBD | 200,000,000 | 199,885,620 | 199,404,802 | 199,404,802 | 199,194,800 | 199,194,800 | 0 | 0 | 2020-04-17 | 2020-04-21 | CV. KALI BARU | 01.434.974.0-733.000 | 595,198 | 0.3 % | |
328 | 2020 | Dinas Pertanian | Belanja Bibit Kayu Manis, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3385282 | 25576841 | APBD | 38,400,000 | 37,830,648 | 37,616,130 | 37,616,130 | 37,616,130 | 37,616,130 | 0 | 0 | 2020-04-17 | 2020-04-22 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 783,870 | 2.04 % | |
329 | 2020 | Dinas Pertanian | Belanja Bibit Kayu Manis, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3385282 | 25576841 | APBD | 38,400,000 | 37,830,648 | 37,616,130 | 37,616,130 | 37,616,130 | 37,616,130 | 0 | 0 | 2020-04-17 | 2020-04-22 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 783,870 | 2.04 % | |
330 | 2020 | Dinas Pertanian | Belanja Bibit Kelapa Genjah, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3386282 | 25576831 | APBD | 37,610,000 | 37,317,500 | 37,155,000 | 37,155,000 | 37,155,000 | 37,155,000 | 0 | 0 | 2020-04-17 | 2020-04-21 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 455,000 | 1.21 % | |
331 | 2020 | Dinas Pertanian | Belanja Bibit Kelapa Genjah, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3386282 | 25576831 | APBD | 37,610,000 | 37,317,500 | 37,155,000 | 37,155,000 | 37,155,000 | 37,155,000 | 0 | 0 | 2020-04-17 | 2020-04-21 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 455,000 | 1.21 % | |
332 | 2020 | Dinas Kesehatan | Belanja Cetak (BOK Kabupaten) | Pengadaan Langsung | Pengadaan Barang | 3387282 | 25578544 | APBD | 140,935,000 | 122,506,500 | 122,056,500 | 0 | 121,706,500 | 121,706,500 | 0 | 0 | 2020-04-18 | 2020-04-30 | CV. MOCCA | 70.565.542.1-732.000 | 18,878,500 | 13.4 % | |
333 | 2020 | Dinas Kesehatan | Belanja Cetak (BOK Kabupaten) | Pengadaan Langsung | Pengadaan Barang | 3387282 | 25578544 | APBD | 140,935,000 | 122,506,500 | 122,056,500 | 0 | 121,706,500 | 121,706,500 | 0 | 0 | 2020-04-18 | 2020-04-30 | CV. MOCCA | 70.565.542.1-732.000 | 18,878,500 | 13.4 % | |
334 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3388282 | 25587187 | APBD | 9,000,000 | 5,964,750 | 5,896,000 | 5,896,000 | 5,825,000 | 5,825,000 | 0 | 0 | 2020-04-20 | 2020-04-22 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,104,000 | 34.49 % | |
335 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3388282 | 25587187 | APBD | 9,000,000 | 5,964,750 | 5,896,000 | 5,896,000 | 5,825,000 | 5,825,000 | 0 | 0 | 2020-04-20 | 2020-04-22 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,104,000 | 34.49 % | |
336 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pembuatan Jalan Masuk bagi Pengguna Kursi Roda/Disabilitas Balai Penyuluhan KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3389282 | 25540697 | APBD | 152,500,000 | 152,362,000 | 151,812,419 | 0 | 151,566,000 | 151,566,000 | 0 | 0 | 2020-04-19 | 2020-04-30 | cv. semar | 02.050.851.1-733.000 | 687,581 | 0.45 % | |
337 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pembuatan Jalan Masuk bagi Pengguna Kursi Roda/Disabilitas Balai Penyuluhan KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3389282 | 25540697 | APBD | 152,500,000 | 152,362,000 | 151,812,419 | 0 | 151,566,000 | 151,566,000 | 0 | 0 | 2020-04-19 | 2020-04-30 | cv. semar | 02.050.851.1-733.000 | 687,581 | 0.45 % | |
338 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Air Terjun Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3390282 | 23891260 | APBD | 50,000,000 | 49,940,000 | 49,830,000 | 0 | 49,830,000 | 49,830,000 | 0 | 0 | 2020-04-20 | 2020-04-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.34 % | |
339 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Air Terjun Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3390282 | 23891260 | APBD | 50,000,000 | 49,940,000 | 49,830,000 | 0 | 49,830,000 | 49,830,000 | 0 | 0 | 2020-04-20 | 2020-04-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.34 % | |
340 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Dukungan DAK Fisik 2020) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3391282 | 25595279 | APBD | 60,000,000 | 59,950,000 | 59,840,000 | 0 | 59,840,000 | 59,840,000 | 0 | 0 | 2020-04-20 | 2020-04-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 160,000 | 0.27 % | |
341 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Dukungan DAK Fisik 2020) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3391282 | 25595279 | APBD | 60,000,000 | 59,950,000 | 59,840,000 | 0 | 59,840,000 | 59,840,000 | 0 | 0 | 2020-04-20 | 2020-04-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 160,000 | 0.27 % | |
342 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Kec. Sungai Raya dan Padang Batung Tahun 2020 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3392282 | 25377806 | APBDP | 50,000,000 | 48,235,000 | 48,125,000 | 48,125,000 | 47,870,000 | 47,870,000 | 0 | 0 | 2020-05-09 | 2020-05-13 | CV. TALENTA ART | 01.585.423.5-733.000 | 1,875,000 | 3.75 % | |
343 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Kec. Sungai Raya dan Padang Batung Tahun 2020 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3392282 | 25377806 | APBDP | 50,000,000 | 48,235,000 | 48,125,000 | 48,125,000 | 47,870,000 | 47,870,000 | 0 | 0 | 2020-05-09 | 2020-05-13 | CV. TALENTA ART | 01.585.423.5-733.000 | 1,875,000 | 3.75 % | |
344 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Sarang Halang - Paring Agung (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3393282 | 22911887 | APBD | 200,000,000 | 199,944,633 | 198,979,635 | 198,979,635 | 198,750,000 | 198,750,000 | 0 | 0 | 2020-04-21 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 1,020,365 | 0.51 % | |
345 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Sarang Halang - Paring Agung (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3393282 | 22911887 | APBD | 200,000,000 | 199,944,633 | 198,979,635 | 198,979,635 | 198,750,000 | 198,750,000 | 0 | 0 | 2020-04-21 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 1,020,365 | 0.51 % | |
346 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3394282 | 22911556 | APBD | 190,000,000 | 189,942,205 | 189,049,100 | 189,049,100 | 188,850,000 | 188,850,000 | 0 | 0 | 2020-04-21 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 950,900 | 0.5 % | |
347 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3394282 | 22911556 | APBD | 190,000,000 | 189,942,205 | 189,049,100 | 189,049,100 | 188,850,000 | 188,850,000 | 0 | 0 | 2020-04-21 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 950,900 | 0.5 % | |
348 | 2020 | Sekretariat DPRD | Rehab Toilet Kantor lantai dasar dan Gudang | Pengadaan Langsung | Pekerjaan Konstruksi | 3396282 | 23501047 | APBD | 57,020,000 | 57,000,786 | 55,081,286 | 0 | 55,081,200 | 55,081,200 | 0 | 0 | 2020-04-20 | 2020-04-27 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,938,714 | 3.4 % | |
349 | 2020 | Sekretariat DPRD | Rehab Toilet Kantor lantai dasar dan Gudang | Pengadaan Langsung | Pekerjaan Konstruksi | 3396282 | 23501047 | APBD | 57,020,000 | 57,000,786 | 55,081,286 | 0 | 55,081,200 | 55,081,200 | 0 | 0 | 2020-04-20 | 2020-04-27 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,938,714 | 3.4 % | |
350 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Gambah Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 3397282 | 22910498 | APBD | 150,000,000 | 149,933,810 | 149,231,870 | 149,231,870 | 149,078,000 | 149,078,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 768,130 | 0.51 % | |
351 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Gambah Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 3397282 | 22910498 | APBD | 150,000,000 | 149,933,810 | 149,231,870 | 149,231,870 | 149,078,000 | 149,078,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 768,130 | 0.51 % | |
352 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3398282 | 22911302 | APBD | 105,000,000 | 104,981,743 | 104,473,052 | 104,473,052 | 104,270,000 | 104,270,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 526,948 | 0.5 % | |
353 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3398282 | 22911302 | APBD | 105,000,000 | 104,981,743 | 104,473,052 | 104,473,052 | 104,270,000 | 104,270,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 526,948 | 0.5 % | |
354 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Sungai Tumpahan Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3399282 | 23381230 | APBD | 15,000,000 | 14,960,000 | 14,877,500 | 14,877,500 | 14,872,000 | 14,872,000 | 0 | 0 | 2020-05-05 | 2020-05-13 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 122,500 | 0.82 % | |
355 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Sungai Tumpahan Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3399282 | 23381230 | APBD | 15,000,000 | 14,960,000 | 14,877,500 | 14,877,500 | 14,872,000 | 14,872,000 | 0 | 0 | 2020-05-05 | 2020-05-13 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 122,500 | 0.82 % | |
356 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3400282 | 23381068 | APBD | 20,000,000 | 19,987,000 | 19,976,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 24,000 | 0.12 % | |
357 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3400282 | 23381068 | APBD | 20,000,000 | 19,987,000 | 19,976,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 24,000 | 0.12 % | |
358 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjongn Belakang Mesjid Al Mutazikirin Jembatan Merah RT. 02 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3401282 | 23381136 | APBD | 15,000,000 | 14,960,000 | 14,696,000 | 0 | 14,690,500 | 14,690,500 | 0 | 0 | 2020-04-24 | 2020-04-29 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 304,000 | 2.03 % | |
359 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjongn Belakang Mesjid Al Mutazikirin Jembatan Merah RT. 02 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3401282 | 23381136 | APBD | 15,000,000 | 14,960,000 | 14,696,000 | 0 | 14,690,500 | 14,690,500 | 0 | 0 | 2020-04-24 | 2020-04-29 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 304,000 | 2.03 % | |
360 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3402282 | 23381329 | APBD | 15,000,000 | 14,960,000 | 14,696,000 | 14,696,000 | 14,630,000 | 14,630,000 | 0 | 0 | 2020-04-28 | 2020-05-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 304,000 | 2.03 % | |
361 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3402282 | 23381329 | APBD | 15,000,000 | 14,960,000 | 14,696,000 | 14,696,000 | 14,630,000 | 14,630,000 | 0 | 0 | 2020-04-28 | 2020-05-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 304,000 | 2.03 % | |
362 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 07 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3403282 | 23381043 | APBD | 15,000,000 | 14,960,000 | 14,956,700 | 0 | 14,954,500 | 14,954,500 | 0 | 0 | 2020-04-23 | 2020-04-29 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 43,300 | 0.29 % | |
363 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 07 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3403282 | 23381043 | APBD | 15,000,000 | 14,960,000 | 14,956,700 | 0 | 14,954,500 | 14,954,500 | 0 | 0 | 2020-04-23 | 2020-04-29 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 43,300 | 0.29 % | |
364 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 08 (Muara Banta) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3404282 | 23381029 | APBD | 15,000,000 | 14,960,000 | 14,685,220 | 14,685,220 | 14,685,000 | 14,685,000 | 0 | 0 | 2020-04-23 | 2020-04-29 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 314,780 | 2.1 % | |
365 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 08 (Muara Banta) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3404282 | 23381029 | APBD | 15,000,000 | 14,960,000 | 14,685,220 | 14,685,220 | 14,685,000 | 14,685,000 | 0 | 0 | 2020-04-23 | 2020-04-29 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 314,780 | 2.1 % | |
366 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Sungai Kupang RT. 01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3405282 | 23381002 | APBD | 15,000,000 | 14,960,000 | 14,674,000 | 0 | 14,668,500 | 14,668,500 | 0 | 0 | 2020-04-29 | 2020-05-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 326,000 | 2.17 % | |
367 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Sungai Kupang RT. 01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3405282 | 23381002 | APBD | 15,000,000 | 14,960,000 | 14,674,000 | 0 | 14,668,500 | 14,668,500 | 0 | 0 | 2020-04-29 | 2020-05-05 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 326,000 | 2.17 % | |
368 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar Lingkungan Komplek Majelis Guru Upik Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3406282 | 23381437 | APBD | 15,000,000 | 14,960,000 | 14,788,180 | 14,788,180 | 14,782,680 | 14,782,680 | 0 | 0 | 2020-04-23 | 2020-04-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,820 | 1.41 % | |
369 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar Lingkungan Komplek Majelis Guru Upik Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3406282 | 23381437 | APBD | 15,000,000 | 14,960,000 | 14,788,180 | 14,788,180 | 14,782,680 | 14,782,680 | 0 | 0 | 2020-04-23 | 2020-04-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,820 | 1.41 % | |
370 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jalan menuju Stadion 2 Desember (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3407282 | 23376318 | APBD | 100,000,000 | 68,640,110 | 68,287,395 | 68,287,395 | 68,100,000 | 68,100,000 | 0 | 0 | 2020-07-08 | 2020-07-10 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 31,712,605 | 31.71 % | |
371 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jalan menuju Stadion 2 Desember (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3407282 | 23376318 | APBD | 100,000,000 | 68,640,110 | 68,287,395 | 68,287,395 | 68,100,000 | 68,100,000 | 0 | 0 | 2020-07-08 | 2020-07-10 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 31,712,605 | 31.71 % | |
372 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan Loklahung Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409282 | 23376801 | APBD | 50,000,000 | 49,824,170 | 49,584,700 | 49,584,700 | 49,584,700 | 49,584,700 | 0 | 0 | 2020-07-16 | 2020-07-21 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,300 | 0.83 % | |
373 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan Loklahung Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409282 | 23376801 | APBD | 50,000,000 | 49,824,170 | 49,584,700 | 49,584,700 | 49,584,700 | 49,584,700 | 0 | 0 | 2020-07-16 | 2020-07-21 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,300 | 0.83 % | |
374 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Wasah Tengah Sungai Tarap (178) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3410282 | 23369988 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | Wing Rastafarindo | 03.282.590.3-732.000 | 470,812 | 0.94 % | |
375 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Wasah Tengah Sungai Tarap (178) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3410282 | 23369988 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | Wing Rastafarindo | 03.282.590.3-732.000 | 470,812 | 0.94 % | |
376 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sungai Kacil Kapuh Padang (191) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412282 | 23348885 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,150,000 | 49,150,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | cv.mitra talenta prima | 02.746.658.0-733.000 | 500,000 | 1 % | |
377 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sungai Kacil Kapuh Padang (191) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412282 | 23348885 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,150,000 | 49,150,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | cv.mitra talenta prima | 02.746.658.0-733.000 | 500,000 | 1 % | |
378 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Muning Dalam Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3414282 | 23353547 | APBD | 10,000,000 | 9,988,000 | 9,795,500 | 9,795,500 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-05-26 | 2020-06-03 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 204,500 | 2.05 % | |
379 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Muning Dalam Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3414282 | 23353547 | APBD | 10,000,000 | 9,988,000 | 9,795,500 | 9,795,500 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-05-26 | 2020-06-03 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 204,500 | 2.05 % | |
380 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengurugan Halaman Samping dan Pembuatan Pagar TPST 3R Baluti | Pengadaan Langsung | Pekerjaan Konstruksi | 3415282 | 24532361 | APBD | 180,000,000 | 179,780,471 | 179,879,697 | 179,879,697 | 179,550,000 | 179,550,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 120,303 | 0.07 % | |
381 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengurugan Halaman Samping dan Pembuatan Pagar TPST 3R Baluti | Pengadaan Langsung | Pekerjaan Konstruksi | 3415282 | 24532361 | APBD | 180,000,000 | 179,780,471 | 179,879,697 | 179,879,697 | 179,550,000 | 179,550,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 120,303 | 0.07 % | |
382 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Hadiah barang (SD) | Pengadaan Langsung | Pengadaan Barang | 3419282 | 23797371 | APBD | 195,000,000 | 194,975,000 | 194,645,000 | 194,645,000 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-24 | 2020-04-27 | FADWI UTAMA | 94.246.044.5-733.000 | 355,000 | 0.18 % | |
383 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Hadiah barang (SD) | Pengadaan Langsung | Pengadaan Barang | 3419282 | 23797371 | APBD | 195,000,000 | 194,975,000 | 194,645,000 | 194,645,000 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-24 | 2020-04-27 | FADWI UTAMA | 94.246.044.5-733.000 | 355,000 | 0.18 % | |
384 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3420282 | 24533539 | APBD | 8,000,000 | 7,969,500 | 7,898,000 | 7,898,000 | 7,799,000 | 7,799,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 102,000 | 1.28 % | |
385 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3420282 | 24533539 | APBD | 8,000,000 | 7,969,500 | 7,898,000 | 7,898,000 | 7,799,000 | 7,799,000 | 0 | 0 | 2020-04-24 | 2020-04-28 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 102,000 | 1.28 % | |
386 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3425282 | 25635360 | APBD | 9,360,000 | 9,350,000 | 9,306,000 | 9,306,000 | 9,200,000 | 9,200,000 | 0 | 0 | 2020-04-25 | 2020-04-28 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 54,000 | 0.58 % | |
387 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3425282 | 25635360 | APBD | 9,360,000 | 9,350,000 | 9,306,000 | 9,306,000 | 9,200,000 | 9,200,000 | 0 | 0 | 2020-04-25 | 2020-04-28 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 54,000 | 0.58 % | |
388 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat SMPN 1 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3426282 | 23823603 | APBD | 195,000,000 | 194,982,754 | 194,764,006 | 194,764,006 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-04-25 | 2020-04-28 | CV. AL MADINAH | 66.139.132.6-733.000 | 235,994 | 0.12 % | |
389 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat SMPN 1 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3426282 | 23823603 | APBD | 195,000,000 | 194,982,754 | 194,764,006 | 194,764,006 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-04-25 | 2020-04-28 | CV. AL MADINAH | 66.139.132.6-733.000 | 235,994 | 0.12 % | |
390 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultasi PengawasanPembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3427282 | 23359486 | APBD | 7,050,000 | 7,040,000 | 6,930,000 | 0 | 6,930,000 | 6,930,000 | 0 | 0 | 2020-04-27 | 2020-04-28 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 120,000 | 1.7 % | |
391 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultasi PengawasanPembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3427282 | 23359486 | APBD | 7,050,000 | 7,040,000 | 6,930,000 | 0 | 6,930,000 | 6,930,000 | 0 | 0 | 2020-04-27 | 2020-04-28 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 120,000 | 1.7 % | |
392 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Pengawasan Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3428282 | 23359636 | APBD | 11,000,000 | 11,000,000 | 10,879,000 | 0 | 10,879,000 | 10,879,000 | 0 | 0 | 2020-04-27 | 2020-04-28 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 121,000 | 1.1 % | |
393 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Pengawasan Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3428282 | 23359636 | APBD | 11,000,000 | 11,000,000 | 10,879,000 | 0 | 10,879,000 | 10,879,000 | 0 | 0 | 2020-04-27 | 2020-04-28 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 121,000 | 1.1 % | |
394 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3431282 | 23374005 | APBD | 6,000,000 | 5,984,000 | 5,912,500 | 5,912,500 | 5,852,000 | 5,852,000 | 0 | 0 | 2020-05-05 | 2020-05-11 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 87,500 | 1.46 % | |
395 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3431282 | 23374005 | APBD | 6,000,000 | 5,984,000 | 5,912,500 | 5,912,500 | 5,852,000 | 5,852,000 | 0 | 0 | 2020-05-05 | 2020-05-11 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 87,500 | 1.46 % | |
396 | 2020 | Dinas Pertanian | Pengadaan bibit-benih tanaman cabe, tomat & bawang merah | Pengadaan Langsung | Pengadaan Barang | 3440282 | 24144830;24144831;24144832 | APBD | 112,052,000 | 107,462,863 | 107,362,900 | 107,362,900 | 107,362,900 | 107,362,900 | 0 | 0 | 2020-05-02 | 2020-05-06 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,689,100 | 4.18 % | |
397 | 2020 | Dinas Pertanian | Pengadaan bibit-benih tanaman cabe, tomat & bawang merah | Pengadaan Langsung | Pengadaan Barang | 3440282 | 24144830;24144831;24144832 | APBD | 112,052,000 | 107,462,863 | 107,362,900 | 107,362,900 | 107,362,900 | 107,362,900 | 0 | 0 | 2020-05-02 | 2020-05-06 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,689,100 | 4.18 % | |
398 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3441282 | 23823585 | APBD | 5,850,000 | 5,841,000 | 5,666,980 | 5,666,980 | 5,600,000 | 5,600,000 | 0 | 0 | 2020-05-04 | 2020-05-05 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 183,020 | 3.13 % | |
399 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3441282 | 23823585 | APBD | 5,850,000 | 5,841,000 | 5,666,980 | 5,666,980 | 5,600,000 | 5,600,000 | 0 | 0 | 2020-05-04 | 2020-05-05 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 183,020 | 3.13 % | |
400 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3444282 | 23357791 | APBD | 10,000,000 | 9,916,500 | 9,696,500 | 9,696,500 | 9,691,000 | 9,691,000 | 0 | 0 | 2020-05-11 | 2020-05-15 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 303,500 | 3.04 % | |
401 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3444282 | 23357791 | APBD | 10,000,000 | 9,916,500 | 9,696,500 | 9,696,500 | 9,691,000 | 9,691,000 | 0 | 0 | 2020-05-11 | 2020-05-15 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 303,500 | 3.04 % | |
402 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | belanja pengawasan pekerjaan Rehabilitasi Dinas PMPTSP Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445282 | 24204164 | APBD | 13,000,000 | 12,650,000 | 12,600,500 | 0 | 12,600,500 | 0 | 0 | 0 | 2020-05-05 | 2020-05-11 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 399,500 | 3.07 % | |
403 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai dari raba atau sampah di Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3448282 | 25612920 | APBD | 100,000,000 | 99,950,568 | 99,896,921 | 99,896,921 | 99,885,000 | 99,885,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 103,079 | 0.1 % | |
404 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai dari raba atau sampah di Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3448282 | 25612920 | APBD | 100,000,000 | 99,950,568 | 99,896,921 | 99,896,921 | 99,885,000 | 99,885,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 103,079 | 0.1 % | |
405 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan perencanaan rehab ringan ruang ibadah/mushalla dan ruang sanitasi/WC kantor Disporapar HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449282 | 24150577 | APBD | 8,000,000 | 7,997,000 | 7,887,000 | 0 | 7,887,000 | 7,887,000 | 0 | 0 | 2020-05-07 | 2020-05-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 113,000 | 1.41 % | |
406 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan perencanaan rehab ringan ruang ibadah/mushalla dan ruang sanitasi/WC kantor Disporapar HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449282 | 24150577 | APBD | 8,000,000 | 7,997,000 | 7,887,000 | 0 | 7,887,000 | 7,887,000 | 0 | 0 | 2020-05-07 | 2020-05-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 113,000 | 1.41 % | |
407 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sirih 1 Kec.Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3454282 | 23795294 | APBD | 50,000,000 | 49,999,809 | 49,948,827 | 49,948,827 | 49,900,000 | 49,900,000 | 0 | 0 | 2020-05-08 | 2020-05-12 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 51,173 | 0.1 % | |
408 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sirih 1 Kec.Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3454282 | 23795294 | APBD | 50,000,000 | 49,999,809 | 49,948,827 | 49,948,827 | 49,900,000 | 49,900,000 | 0 | 0 | 2020-05-08 | 2020-05-12 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 51,173 | 0.1 % | |
409 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455282 | 23357381 | APBD | 10,000,000 | 9,916,500 | 9,718,500 | 9,718,500 | 9,713,000 | 9,713,000 | 0 | 0 | 2020-05-11 | 2020-05-14 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 281,500 | 2.82 % | |
410 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455282 | 23357381 | APBD | 10,000,000 | 9,916,500 | 9,718,500 | 9,718,500 | 9,713,000 | 9,713,000 | 0 | 0 | 2020-05-11 | 2020-05-14 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 281,500 | 2.82 % | |
411 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456282 | 23356717 | APBD | 15,000,000 | 14,982,000 | 14,685,000 | 14,685,000 | 14,682,800 | 14,682,800 | 0 | 0 | 2020-05-11 | 2020-05-14 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 315,000 | 2.1 % | |
412 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456282 | 23356717 | APBD | 15,000,000 | 14,982,000 | 14,685,000 | 14,685,000 | 14,682,800 | 14,682,800 | 0 | 0 | 2020-05-11 | 2020-05-14 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 315,000 | 2.1 % | |
413 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3459282 | 23376006 | APBD | 150,000,000 | 149,982,715 | 149,862,237 | 149,848,290 | 149,805,000 | 149,805,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | CV. YONIA | 02.089.778.1-733.000 | 137,763 | 0.09 % | |
414 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3459282 | 23376006 | APBD | 150,000,000 | 149,982,715 | 149,862,237 | 149,848,290 | 149,805,000 | 149,805,000 | 0 | 0 | 2020-05-12 | 2020-05-18 | CV. YONIA | 02.089.778.1-733.000 | 137,763 | 0.09 % | |
415 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai Desa Lokbinuang sampai Sungai Taniran Kubah | Pengadaan Langsung | Pekerjaan Konstruksi | 3462282 | 23352126 | APBD | 98,900,000 | 98,880,364 | 98,803,832 | 98,803,832 | 98,781,832 | 98,781,832 | 0 | 0 | 2020-05-14 | 2020-05-19 | CV. An-Nidha | 02.675.485.3-733.000 | 96,168 | 0.1 % | |
416 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai Desa Lokbinuang sampai Sungai Taniran Kubah | Pengadaan Langsung | Pekerjaan Konstruksi | 3462282 | 23352126 | APBD | 98,900,000 | 98,880,364 | 98,803,832 | 98,803,832 | 98,781,832 | 98,781,832 | 0 | 0 | 2020-05-14 | 2020-05-19 | CV. An-Nidha | 02.675.485.3-733.000 | 96,168 | 0.1 % | |
417 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malinau Kamawakan Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466282 | 23348603 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,500,000 | 49,500,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
418 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malinau Kamawakan Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466282 | 23348603 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,500,000 | 49,500,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
419 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3473282 | 23351960 | APBD | 200,000,000 | 199,967,509 | 199,747,509 | 0 | 199,742,009 | 199,742,009 | 0 | 0 | 2020-05-18 | 2020-05-27 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 252,491 | 0.13 % | |
420 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3473282 | 23351960 | APBD | 200,000,000 | 199,967,509 | 199,747,509 | 0 | 199,742,009 | 199,742,009 | 0 | 0 | 2020-05-18 | 2020-05-27 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 252,491 | 0.13 % | |
421 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Pekapuran Kecil Tambangan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3474282 | 23372870 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
422 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Pekapuran Kecil Tambangan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3474282 | 23372870 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-07-24 | 2020-07-30 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
423 | 2020 | Kecamatan Simpur | Pembuatan pagar rumah jabatan camat | Pengadaan Langsung | Pekerjaan Konstruksi | 3475282 | 25739545 | APBD | 176,904,550 | 176,056,737 | 175,271,980 | 0 | 175,271,980 | 175,271,980 | 0 | 0 | 2020-06-05 | 2020-06-08 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,632,570 | 0.92 % | |
424 | 2020 | Kecamatan Simpur | Pembuatan pagar rumah jabatan camat | Pengadaan Langsung | Pekerjaan Konstruksi | 3475282 | 25739545 | APBD | 176,904,550 | 176,056,737 | 175,271,980 | 0 | 175,271,980 | 175,271,980 | 0 | 0 | 2020-06-05 | 2020-06-08 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,632,570 | 0.92 % | |
425 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan pengawasan/supervisi jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476282 | 24304552 | APBD | 100,000,000 | 99,990,000 | 98,834,560 | 98,834,560 | 98,834,560 | 98,834,560 | 0 | 0 | 2020-05-23 | 2020-05-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,165,440 | 1.17 % | |
426 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan pengawasan/supervisi jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476282 | 24304552 | APBD | 100,000,000 | 99,990,000 | 98,834,560 | 98,834,560 | 98,834,560 | 98,834,560 | 0 | 0 | 2020-05-23 | 2020-05-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,165,440 | 1.17 % | |
427 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479282 | 23381083 | APBD | 10,000,000 | 9,999,000 | 9,955,000 | 9,955,000 | 9,952,800 | 9,952,800 | 0 | 0 | 2020-06-05 | 2020-06-12 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 45,000 | 0.45 % | |
428 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479282 | 23381083 | APBD | 10,000,000 | 9,999,000 | 9,955,000 | 9,955,000 | 9,952,800 | 9,952,800 | 0 | 0 | 2020-06-05 | 2020-06-12 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 45,000 | 0.45 % | |
429 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480282 | 23545228 | APBD | 43,270,794 | 43,236,570 | 42,672,273 | 42,672,273 | 42,672,000 | 42,672,000 | 0 | 0 | 2020-08-19 | 2020-08-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 598,522 | 1.38 % | |
430 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480282 | 23545228 | APBD | 43,270,794 | 43,236,570 | 42,672,273 | 42,672,273 | 42,672,000 | 42,672,000 | 0 | 0 | 2020-08-19 | 2020-08-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 598,522 | 1.38 % | |
431 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3481282 | 23374981 | APBD | 180,000,000 | 179,587,630 | 178,175,169 | 178,175,169 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-06-08 | 2020-06-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,824,831 | 1.01 % | |
432 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3481282 | 23374981 | APBD | 180,000,000 | 179,587,630 | 178,175,169 | 178,175,169 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-06-08 | 2020-06-11 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,824,831 | 1.01 % | |
433 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan di desa Bago Tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482282 | 23372203 | APBD | 50,000,000 | 49,824,170 | 49,525,300 | 49,525,300 | 49,525,000 | 49,525,000 | 0 | 0 | 2020-07-22 | 2020-07-28 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 474,700 | 0.95 % | |
434 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan di desa Bago Tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482282 | 23372203 | APBD | 50,000,000 | 49,824,170 | 49,525,300 | 49,525,300 | 49,525,000 | 49,525,000 | 0 | 0 | 2020-07-22 | 2020-07-28 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 474,700 | 0.95 % | |
435 | 2020 | Dinas Perhubungan | Pengadaan Rambu-Rambu Lalu Lintas | Pengadaan Langsung | Pengadaan Barang | 3483282 | 25777613 | APBD | 35,800,000 | 35,797,300 | 35,585,000 | 0 | 35,585,000 | 35,585,000 | 0 | 0 | 2020-06-02 | 2020-06-08 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 215,000 | 0.6 % | |
436 | 2020 | Dinas Perhubungan | Pengadaan Rambu-Rambu Lalu Lintas | Pengadaan Langsung | Pengadaan Barang | 3483282 | 25777613 | APBD | 35,800,000 | 35,797,300 | 35,585,000 | 0 | 35,585,000 | 35,585,000 | 0 | 0 | 2020-06-02 | 2020-06-08 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 215,000 | 0.6 % | |
437 | 2020 | Dinas Pertanian | Pengembangan Jagung Hibrida | Pengadaan Langsung | Pengadaan Barang | 3492282 | 24120050 | APBD | 72,400,000 | 65,199,200 | 65,076,000 | 65,076,000 | 65,076,000 | 65,076,000 | 0 | 0 | 2020-06-02 | 2020-06-09 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 7,324,000 | 10.12 % | |
438 | 2020 | Dinas Pertanian | Pengembangan Jagung Hibrida | Pengadaan Langsung | Pengadaan Barang | 3492282 | 24120050 | APBD | 72,400,000 | 65,199,200 | 65,076,000 | 65,076,000 | 65,076,000 | 65,076,000 | 0 | 0 | 2020-06-02 | 2020-06-09 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 7,324,000 | 10.12 % | |
439 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3495282 | 23372542 | APBD | 196,850,000 | 195,336,135 | 195,332,835 | 0 | 195,330,636 | 195,330,636 | 0 | 0 | 2020-06-05 | 2020-06-09 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 1,517,165 | 0.77 % | |
440 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3495282 | 23372542 | APBD | 196,850,000 | 195,336,135 | 195,332,835 | 0 | 195,330,636 | 195,330,636 | 0 | 0 | 2020-06-05 | 2020-06-09 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 1,517,165 | 0.77 % | |
441 | 2020 | Dinas Kesehatan | Perbaikan pagar dan tempat parkir Puskesmas Wasah | Pengadaan Langsung | Pekerjaan Konstruksi | 3496282 | 23970079 | APBD | 150,000,000 | 149,971,766 | 149,555,298 | 0 | 149,555,000 | 149,555,000 | 0 | 0 | 2020-07-02 | 2020-07-07 | CV. AISY | 75.132.070.6-733.000 | 444,702 | 0.3 % | |
442 | 2020 | Dinas Kesehatan | Perbaikan pagar dan tempat parkir Puskesmas Wasah | Pengadaan Langsung | Pekerjaan Konstruksi | 3496282 | 23970079 | APBD | 150,000,000 | 149,971,766 | 149,555,298 | 0 | 149,555,000 | 149,555,000 | 0 | 0 | 2020-07-02 | 2020-07-07 | CV. AISY | 75.132.070.6-733.000 | 444,702 | 0.3 % | |
443 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Haritas Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3497282 | 23368973 | APBD | 199,500,000 | 199,499,004 | 199,336,464 | 199,336,464 | 199,188,000 | 199,188,000 | 0 | 0 | 2020-06-10 | 2020-06-15 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 163,536 | 0.08 % | |
444 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Haritas Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3497282 | 23368973 | APBD | 199,500,000 | 199,499,004 | 199,336,464 | 199,336,464 | 199,188,000 | 199,188,000 | 0 | 0 | 2020-06-10 | 2020-06-15 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 163,536 | 0.08 % | |
445 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Telaga Bidadari - Desa Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 3501282 | 22949603 | APBD | 110,000,000 | 109,952,709 | 109,160,323 | 109,160,323 | 108,960,000 | 108,960,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | cv mentari teknik | 03.183.412.0-731.000 | 839,677 | 0.76 % | |
446 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Telaga Bidadari - Desa Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 3501282 | 22949603 | APBD | 110,000,000 | 109,952,709 | 109,160,323 | 109,160,323 | 108,960,000 | 108,960,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | cv mentari teknik | 03.183.412.0-731.000 | 839,677 | 0.76 % | |
447 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3502282 | 22994446 | APBD | 75,000,000 | 74,938,230 | 74,429,830 | 74,429,830 | 74,300,000 | 74,300,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 570,170 | 0.76 % | |
448 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3502282 | 22994446 | APBD | 75,000,000 | 74,938,230 | 74,429,830 | 74,429,830 | 74,300,000 | 74,300,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 570,170 | 0.76 % | |
449 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Ambarai - Desa Madang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3503282 | 22994154 | APBD | 65,000,000 | 64,916,636 | 64,543,102 | 64,543,102 | 64,335,000 | 64,335,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | cv mentari teknik | 03.183.412.0-731.000 | 456,898 | 0.7 % | |
450 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Ambarai - Desa Madang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3503282 | 22994154 | APBD | 65,000,000 | 64,916,636 | 64,543,102 | 64,543,102 | 64,335,000 | 64,335,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | cv mentari teknik | 03.183.412.0-731.000 | 456,898 | 0.7 % | |
451 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3504282 | 22950891 | APBD | 17,800,000 | 17,765,000 | 17,600,000 | 17,600,000 | 17,535,000 | 17,535,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 200,000 | 1.12 % | |
452 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3504282 | 22950891 | APBD | 17,800,000 | 17,765,000 | 17,600,000 | 17,600,000 | 17,535,000 | 17,535,000 | 0 | 0 | 2020-06-10 | 2020-06-12 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 200,000 | 1.12 % | |
453 | 2020 | Dinas Pertanian | Pengembangan Kacang Tanah | Pengadaan Langsung | Pengadaan Barang | 3505282 | 25745784 | APBD | 159,775,000 | 137,358,375 | 137,196,675 | 137,196,675 | 137,196,675 | 137,196,675 | 0 | 0 | 2020-06-10 | 2020-06-15 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 22,578,325 | 14.13 % | |
454 | 2020 | Dinas Pertanian | Pengembangan Kacang Tanah | Pengadaan Langsung | Pengadaan Barang | 3505282 | 25745784 | APBD | 159,775,000 | 137,358,375 | 137,196,675 | 137,196,675 | 137,196,675 | 137,196,675 | 0 | 0 | 2020-06-10 | 2020-06-15 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 22,578,325 | 14.13 % | |
455 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3507282 | 23368433 | APBD | 199,325,000 | 199,268,642 | 198,858,634 | 198,858,634 | 198,650,000 | 198,650,000 | 0 | 0 | 2020-06-16 | 2020-06-19 | CV.ASYA | 01.424.566.6-733.000 | 466,366 | 0.23 % | |
456 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3507282 | 23368433 | APBD | 199,325,000 | 199,268,642 | 198,858,634 | 198,858,634 | 198,650,000 | 198,650,000 | 0 | 0 | 2020-06-16 | 2020-06-19 | CV.ASYA | 01.424.566.6-733.000 | 466,366 | 0.23 % | |
457 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510282 | 23373527 | APBD | 6,000,000 | 5,885,000 | 5,882,800 | 0 | 5,879,500 | 5,879,500 | 0 | 0 | 2020-06-11 | 2020-06-16 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 117,200 | 1.95 % | |
458 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510282 | 23373527 | APBD | 6,000,000 | 5,885,000 | 5,882,800 | 0 | 5,879,500 | 5,879,500 | 0 | 0 | 2020-06-11 | 2020-06-16 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 117,200 | 1.95 % | |
459 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3511282 | 23969958 | APBD | 80,000,000 | 79,788,500 | 79,237,250 | 0 | 79,237,250 | 79,237,250 | 0 | 0 | 2020-07-06 | 2020-07-09 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 762,750 | 0.95 % | |
460 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3511282 | 23969958 | APBD | 80,000,000 | 79,788,500 | 79,237,250 | 0 | 79,237,250 | 79,237,250 | 0 | 0 | 2020-07-06 | 2020-07-09 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 762,750 | 0.95 % | |
461 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bakarung (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3517282 | 23352688 | APBD | 100,000,000 | 99,987,203 | 99,986,103 | 99,986,103 | 99,982,703 | 99,982,703 | 0 | 0 | 2020-06-17 | 2020-06-18 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 13,897 | 0.01 % | |
462 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bakarung (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3517282 | 23352688 | APBD | 100,000,000 | 99,987,203 | 99,986,103 | 99,986,103 | 99,982,703 | 99,982,703 | 0 | 0 | 2020-06-17 | 2020-06-18 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 13,897 | 0.01 % | |
463 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3518282 | 24275833 | APBD | 10,600,000 | 10,583,012 | 10,522,512 | 0 | 10,522,500 | 10,522,500 | 0 | 0 | 2020-06-22 | 2020-06-26 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 77,488 | 0.73 % | |
464 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3518282 | 24275833 | APBD | 10,600,000 | 10,583,012 | 10,522,512 | 0 | 10,522,500 | 10,522,500 | 0 | 0 | 2020-06-22 | 2020-06-26 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 77,488 | 0.73 % | |
465 | 2020 | Sekretariat DPRD | Belanja Pakaian Dinas Anggota DPRD Periode 2019-2024 | Pengadaan Langsung | Pengadaan Barang | 3519282 | 23500030;23500031;23500032;23500033 | APBD | 163,500,000 | 163,500,000 | 162,300,000 | 0 | 162,300,000 | 0 | 0 | 0 | 2020-06-18 | 2020-06-26 | CV. AL MADINAH | 66.139.132.6-733.000 | 1,200,000 | 0.73 % | |
466 | 2020 | Sekretariat DPRD | Belanja Pakaian Dinas Anggota DPRD Periode 2019-2024 | Pengadaan Langsung | Pengadaan Barang | 3519282 | 23500030;23500031;23500032;23500033 | APBD | 163,500,000 | 163,500,000 | 162,300,000 | 0 | 162,300,000 | 0 | 0 | 0 | 2020-06-18 | 2020-06-26 | CV. AL MADINAH | 66.139.132.6-733.000 | 1,200,000 | 0.73 % | |
467 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Jambu Hulu - Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 3520282 | 22994657 | APBD | 150,000,000 | 149,595,230 | 148,977,438 | 148,977,438 | 148,820,000 | 148,820,000 | 0 | 0 | 2020-06-19 | 2020-06-23 | cv mentari teknik | 03.183.412.0-731.000 | 1,022,562 | 0.68 % | |
468 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Jambu Hulu - Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 3520282 | 22994657 | APBD | 150,000,000 | 149,595,230 | 148,977,438 | 148,977,438 | 148,820,000 | 148,820,000 | 0 | 0 | 2020-06-19 | 2020-06-23 | cv mentari teknik | 03.183.412.0-731.000 | 1,022,562 | 0.68 % | |
469 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Gambir - Desa Sungai Damang | Pengadaan Langsung | Pekerjaan Konstruksi | 3521282 | 22994320 | APBD | 45,000,000 | 44,908,789 | 44,496,332 | 44,496,332 | 44,345,000 | 44,345,000 | 0 | 0 | 2020-06-19 | 2020-06-23 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 503,668 | 1.12 % | |
470 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Gambir - Desa Sungai Damang | Pengadaan Langsung | Pekerjaan Konstruksi | 3521282 | 22994320 | APBD | 45,000,000 | 44,908,789 | 44,496,332 | 44,496,332 | 44,345,000 | 44,345,000 | 0 | 0 | 2020-06-19 | 2020-06-23 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 503,668 | 1.12 % | |
471 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3532282 | 23352029 | APBD | 183,900,000 | 183,867,598 | 183,537,598 | 183,537,598 | 183,427,598 | 183,427,598 | 0 | 0 | 2020-06-24 | 2020-06-30 | CV.ASYA | 01.424.566.6-733.000 | 362,402 | 0.2 % | |
472 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3532282 | 23352029 | APBD | 183,900,000 | 183,867,598 | 183,537,598 | 183,537,598 | 183,427,598 | 183,427,598 | 0 | 0 | 2020-06-24 | 2020-06-30 | CV.ASYA | 01.424.566.6-733.000 | 362,402 | 0.2 % | |
473 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3535282 | 25814721 | APBD | 134,000,000 | 133,981,728 | 133,899,228 | 133,899,228 | 133,888,228 | 133,888,228 | 0 | 0 | 2020-06-25 | 2020-06-30 | Muda Membangun | 73.702.709.4-733.000 | 100,772 | 0.08 % | |
474 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3535282 | 25814721 | APBD | 134,000,000 | 133,981,728 | 133,899,228 | 133,899,228 | 133,888,228 | 133,888,228 | 0 | 0 | 2020-06-25 | 2020-06-30 | Muda Membangun | 73.702.709.4-733.000 | 100,772 | 0.08 % | |
475 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Bangunan Bank Sampah Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 3536282 | 24550473 | APBD | 150,000,000 | 149,958,975 | 149,501,843 | 149,501,843 | 149,390,000 | 149,390,000 | 0 | 0 | 2020-06-25 | 2020-06-29 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 498,157 | 0.33 % | |
476 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Bangunan Bank Sampah Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 3536282 | 24550473 | APBD | 150,000,000 | 149,958,975 | 149,501,843 | 149,501,843 | 149,390,000 | 149,390,000 | 0 | 0 | 2020-06-25 | 2020-06-29 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 498,157 | 0.33 % | |
477 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Gerobak Sampah | Pengadaan Langsung | Pengadaan Barang | 3537282 | 23040448 | APBD | 100,000,000 | 99,875,000 | 99,800,000 | 99,800,000 | 99,625,000 | 99,625,000 | 0 | 0 | 2020-06-25 | 2020-06-29 | FADWI UTAMA | 94.246.044.5-733.000 | 200,000 | 0.2 % | |
478 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Gerobak Sampah | Pengadaan Langsung | Pengadaan Barang | 3537282 | 23040448 | APBD | 100,000,000 | 99,875,000 | 99,800,000 | 99,800,000 | 99,625,000 | 99,625,000 | 0 | 0 | 2020-06-25 | 2020-06-29 | FADWI UTAMA | 94.246.044.5-733.000 | 200,000 | 0.2 % | |
479 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Hamayung Hakurung, Kec. Daha Utara (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3538282 | 23348458 | APBD | 200,000,000 | 199,898,050 | 199,650,602 | 199,650,602 | 198,986,000 | 198,986,000 | 0 | 0 | 2020-06-25 | 2020-06-30 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 349,398 | 0.17 % | |
480 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Hamayung Hakurung, Kec. Daha Utara (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3538282 | 23348458 | APBD | 200,000,000 | 199,898,050 | 199,650,602 | 199,650,602 | 198,986,000 | 198,986,000 | 0 | 0 | 2020-06-25 | 2020-06-30 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 349,398 | 0.17 % | |
481 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan gorong gorong di Jl. Teluk Pinang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3539282 | 23368300 | APBD | 100,000,000 | 99,878,440 | 99,491,673 | 99,491,673 | 99,228,200 | 99,228,200 | 0 | 0 | 2020-06-25 | 2020-06-30 | cv. bumi mandiri | 02.089.892.0-733.000 | 508,327 | 0.51 % | |
482 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan gorong gorong di Jl. Teluk Pinang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3539282 | 23368300 | APBD | 100,000,000 | 99,878,440 | 99,491,673 | 99,491,673 | 99,228,200 | 99,228,200 | 0 | 0 | 2020-06-25 | 2020-06-30 | cv. bumi mandiri | 02.089.892.0-733.000 | 508,327 | 0.51 % | |
483 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Pengawasan (DAU Tambahan)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543282 | 25884197 | APBD | 6,055,000 | 6,035,480 | 5,980,150 | 0 | 5,980,150 | 5,980,150 | 0 | 0 | 2020-06-25 | 2020-06-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 74,850 | 1.24 % | |
484 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Pengawasan (DAU Tambahan)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543282 | 25884197 | APBD | 6,055,000 | 6,035,480 | 5,980,150 | 0 | 5,980,150 | 5,980,150 | 0 | 0 | 2020-06-25 | 2020-06-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 74,850 | 1.24 % | |
485 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 3544282 | 23970286 | APBD | 185,000,000 | 179,633,363 | 179,103,072 | 179,103,072 | 179,000,000 | 179,000,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | CV. YONIA | 02.089.778.1-733.000 | 5,896,928 | 3.19 % | |
486 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 3544282 | 23970286 | APBD | 185,000,000 | 179,633,363 | 179,103,072 | 179,103,072 | 179,000,000 | 179,000,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | CV. YONIA | 02.089.778.1-733.000 | 5,896,928 | 3.19 % | |
487 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3545282 | 25587192 | APBD | 6,000,000 | 5,999,988 | 5,900,451 | 5,900,451 | 5,750,000 | 5,750,000 | 0 | 0 | 2020-06-30 | 2020-07-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 99,549 | 1.66 % | |
488 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3545282 | 25587192 | APBD | 6,000,000 | 5,999,988 | 5,900,451 | 5,900,451 | 5,750,000 | 5,750,000 | 0 | 0 | 2020-06-30 | 2020-07-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 99,549 | 1.66 % | |
489 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548282 | 23544829 | APBD | 20,847,897 | 20,815,506 | 20,785,600 | 20,785,600 | 20,785,600 | 20,785,600 | 0 | 0 | 2020-07-02 | 2020-07-06 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,297 | 0.3 % | |
490 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548282 | 23544829 | APBD | 20,847,897 | 20,815,506 | 20,785,600 | 20,785,600 | 20,785,600 | 20,785,600 | 0 | 0 | 2020-07-02 | 2020-07-06 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,297 | 0.3 % | |
491 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bak Sampah Beroda 120 L | Pengadaan Langsung | Pengadaan Barang | 3550282 | 23033687 | APBD | 60,000,000 | 59,750,000 | 59,650,000 | 59,650,000 | 59,500,000 | 59,500,000 | 0 | 0 | 2020-07-02 | 2020-07-06 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 350,000 | 0.58 % | |
492 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bak Sampah Beroda 120 L | Pengadaan Langsung | Pengadaan Barang | 3550282 | 23033687 | APBD | 60,000,000 | 59,750,000 | 59,650,000 | 59,650,000 | 59,500,000 | 59,500,000 | 0 | 0 | 2020-07-02 | 2020-07-06 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 350,000 | 0.58 % | |
493 | 2020 | Kecamatan Kandangan | Pengadaan Mesin dan Peralatan Pemadam Kebakaran Portable | Pengadaan Langsung | Pengadaan Barang | 3551282 | 24283538 | APBD | 75,000,000 | 74,700,000 | 74,670,000 | 0 | 74,670,000 | 74,670,000 | 0 | 0 | 2020-07-02 | 2020-07-10 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 330,000 | 0.44 % | |
494 | 2020 | Kecamatan Kandangan | Pengadaan Mesin dan Peralatan Pemadam Kebakaran Portable | Pengadaan Langsung | Pengadaan Barang | 3551282 | 24283538 | APBD | 75,000,000 | 74,700,000 | 74,670,000 | 0 | 74,670,000 | 74,670,000 | 0 | 0 | 2020-07-02 | 2020-07-10 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 330,000 | 0.44 % | |
495 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3552282 | 23544933 | APBD | 10,000,000 | 9,937,436 | 9,898,900 | 9,898,900 | 9,898,900 | 9,898,900 | 0 | 0 | 2020-07-13 | 2020-07-17 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 101,100 | 1.01 % | |
496 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3552282 | 23544933 | APBD | 10,000,000 | 9,937,436 | 9,898,900 | 9,898,900 | 9,898,900 | 9,898,900 | 0 | 0 | 2020-07-13 | 2020-07-17 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 101,100 | 1.01 % | |
497 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Pengadaan Langsung | Pengadaan Barang | 3553282 | 25178367 | APBD | 150,000,000 | 147,750,000 | 147,450,000 | 147,450,000 | 147,300,000 | 147,300,000 | 0 | 0 | 2020-07-06 | 2020-07-09 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 2,550,000 | 1.7 % | |
498 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Pengadaan Langsung | Pengadaan Barang | 3553282 | 25178367 | APBD | 150,000,000 | 147,750,000 | 147,450,000 | 147,450,000 | 147,300,000 | 147,300,000 | 0 | 0 | 2020-07-06 | 2020-07-09 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 2,550,000 | 1.7 % | |
499 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan gorong gorong di Jl. Teluk Pinang, Siring Pasangan Batu Jalan Haritas dan Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554282 | 23369141 | APBD | 36,000,000 | 34,882,100 | 34,710,500 | 34,710,500 | 34,550,000 | 34,550,000 | 0 | 0 | 2020-07-08 | 2020-07-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,289,500 | 3.58 % | |
500 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan gorong gorong di Jl. Teluk Pinang, Siring Pasangan Batu Jalan Haritas dan Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554282 | 23369141 | APBD | 36,000,000 | 34,882,100 | 34,710,500 | 34,710,500 | 34,550,000 | 34,550,000 | 0 | 0 | 2020-07-08 | 2020-07-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,289,500 | 3.58 % | |
501 | 2020 | Sekretariat Daerah | Pengadaan Laptop dan Printer Scan | Pengadaan Langsung | Pengadaan Barang | 3555282 | 25911417;25912035 | APBD | 61,872,000 | 61,872,000 | 61,800,000 | 0 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-07-06 | 2020-07-14 | CV. HITRO | 02.918.384.5-733.000 | 72,000 | 0.12 % | |
502 | 2020 | Sekretariat Daerah | Pengadaan Laptop dan Printer Scan | Pengadaan Langsung | Pengadaan Barang | 3555282 | 25911417;25912035 | APBD | 61,872,000 | 61,872,000 | 61,800,000 | 0 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-07-06 | 2020-07-14 | CV. HITRO | 02.918.384.5-733.000 | 72,000 | 0.12 % | |
503 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bakarung (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3556282 | 23355526 | APBD | 4,800,000 | 4,800,000 | 4,798,001 | 4,798,000 | 4,793,600 | 4,793,600 | 0 | 0 | 2020-08-03 | 2020-08-05 | Jamilah | 14.427.417.2-733.000 | 1,999 | 0.04 % | |
504 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bakarung (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3556282 | 23355526 | APBD | 4,800,000 | 4,800,000 | 4,798,001 | 4,798,000 | 4,793,600 | 4,793,600 | 0 | 0 | 2020-08-03 | 2020-08-05 | Jamilah | 14.427.417.2-733.000 | 1,999 | 0.04 % | |
505 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Samuda Bajayau, Kec. Daha Barat (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3559282 | 23348775 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 500,000 | 1 % | |
506 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Samuda Bajayau, Kec. Daha Barat (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3559282 | 23348775 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 500,000 | 1 % | |
507 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3560282 | 23370895 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | Wing Rastafarindo | 03.282.590.3-732.000 | 500,000 | 1 % | |
508 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3560282 | 23370895 | APBD | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | 2020-07-16 | Wing Rastafarindo | 03.282.590.3-732.000 | 500,000 | 1 % | |
509 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di ruas Bajayau - Bajayau Tengah Kec. Daha Barat, di Samuda Kec. Daha Selatan (lanjutan) dan di ruas Kalumpang - Baruh Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563282 | 25932527 | APBD | 51,300,000 | 42,574,840 | 42,130,000 | 42,130,000 | 42,000,000 | 42,000,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. FATAH CONSULINDO PANDANA | 74.073.449.6-733.000 | 9,170,000 | 17.88 % | |
510 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di ruas Bajayau - Bajayau Tengah Kec. Daha Barat, di Samuda Kec. Daha Selatan (lanjutan) dan di ruas Kalumpang - Baruh Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563282 | 25932527 | APBD | 51,300,000 | 42,574,840 | 42,130,000 | 42,130,000 | 42,000,000 | 42,000,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. FATAH CONSULINDO PANDANA | 74.073.449.6-733.000 | 9,170,000 | 17.88 % | |
511 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Hamayung Hakurung (lanjutan), Jl. Telaga Bidadari dan Pembuatan Drainase Jl. Bakarung Tabihi, Kec.Daha Utara/Sungai Raya/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3565282 | 23349289 | APBD | 48,000,000 | 45,895,300 | 45,666,500 | 45,666,500 | 45,500,000 | 45,500,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,333,500 | 4.86 % | |
512 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Hamayung Hakurung (lanjutan), Jl. Telaga Bidadari dan Pembuatan Drainase Jl. Bakarung Tabihi, Kec.Daha Utara/Sungai Raya/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3565282 | 23349289 | APBD | 48,000,000 | 45,895,300 | 45,666,500 | 45,666,500 | 45,500,000 | 45,500,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,333,500 | 4.86 % | |
513 | 2020 | Dinas Kesehatan | Pengadaan peralatan keamanan dan sarana penyimpanan IFK | Pengadaan Langsung | Pengadaan Barang | 3567282 | 25938189 | APBD | 199,877,000 | 179,720,000 | 179,608,000 | 179,608,000 | 179,508,000 | 179,508,000 | 0 | 0 | 2020-07-12 | 2020-07-17 | KARYA DWI CHADE | 75.416.433.3-733.000 | 20,269,000 | 10.14 % | |
514 | 2020 | Dinas Kesehatan | Pengadaan peralatan keamanan dan sarana penyimpanan IFK | Pengadaan Langsung | Pengadaan Barang | 3567282 | 25938189 | APBD | 199,877,000 | 179,720,000 | 179,608,000 | 179,608,000 | 179,508,000 | 179,508,000 | 0 | 0 | 2020-07-12 | 2020-07-17 | KARYA DWI CHADE | 75.416.433.3-733.000 | 20,269,000 | 10.14 % | |
515 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Dance Sports/ Multifungsi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568282 | 23329274 | APBD | 50,000,000 | 50,000,000 | 49,500,000 | 49,500,000 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-08-07 | 2020-08-12 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 1 % | |
516 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Dance Sports/ Multifungsi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568282 | 23329274 | APBD | 50,000,000 | 50,000,000 | 49,500,000 | 49,500,000 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-08-07 | 2020-08-12 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 1 % | |
517 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Olah Raga dan Seni (GOS) Aluh Idut Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569282 | 23329294 | APBD | 50,000,000 | 50,000,000 | 49,329,992 | 49,329,992 | 49,291,000 | 49,291,000 | 0 | 0 | 2020-07-23 | 2020-07-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 670,008 | 1.34 % | |
518 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Olah Raga dan Seni (GOS) Aluh Idut Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569282 | 23329294 | APBD | 50,000,000 | 50,000,000 | 49,329,992 | 49,329,992 | 49,291,000 | 49,291,000 | 0 | 0 | 2020-07-23 | 2020-07-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 670,008 | 1.34 % | |
519 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli Kawasan Stadion 2 Desember | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3570282 | 23329254 | APBD | 75,000,000 | 75,000,000 | 74,525,000 | 74,525,000 | 74,150,000 | 74,150,000 | 0 | 0 | 2020-07-28 | 2020-07-30 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 475,000 | 0.63 % | |
520 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli Kawasan Stadion 2 Desember | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3570282 | 23329254 | APBD | 75,000,000 | 75,000,000 | 74,525,000 | 74,525,000 | 74,150,000 | 74,150,000 | 0 | 0 | 2020-07-28 | 2020-07-30 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 475,000 | 0.63 % | |
521 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Siring Lahan Islamic Center (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572282 | 23329141 | APBD | 39,750,000 | 39,750,000 | 39,330,500 | 39,330,500 | 39,100,000 | 39,100,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 419,500 | 1.06 % | |
522 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Siring Lahan Islamic Center (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572282 | 23329141 | APBD | 39,750,000 | 39,750,000 | 39,330,500 | 39,330,500 | 39,100,000 | 39,100,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 419,500 | 1.06 % | |
523 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574282 | 22914049 | APBD | 8,000,000 | 7,933,475 | 7,862,041 | 7,862,041 | 7,773,000 | 7,773,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 137,959 | 1.72 % | |
524 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574282 | 22914049 | APBD | 8,000,000 | 7,933,475 | 7,862,041 | 7,862,041 | 7,773,000 | 7,773,000 | 0 | 0 | 2020-07-10 | 2020-07-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 137,959 | 1.72 % | |
525 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Tugu Desa Longawang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3575282 | 22910727 | APBD | 200,000,000 | 199,927,197 | 199,506,945 | 199,506,945 | 198,978,000 | 198,978,000 | 0 | 0 | 2020-07-13 | 2020-07-21 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 493,055 | 0.25 % | |
526 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Tugu Desa Longawang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3575282 | 22910727 | APBD | 200,000,000 | 199,927,197 | 199,506,945 | 199,506,945 | 198,978,000 | 198,978,000 | 0 | 0 | 2020-07-13 | 2020-07-21 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 493,055 | 0.25 % | |
527 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Bajayau Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3577282 | 23374546 | APBD | 198,000,000 | 196,168,777 | 194,857,193 | 194,857,193 | 194,846,168 | 194,846,168 | 0 | 0 | 2020-07-10 | 2020-07-15 | CV. LALUNA DANA | 02.237.179.3-733.000 | 3,142,807 | 1.59 % | |
528 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Bajayau Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3577282 | 23374546 | APBD | 198,000,000 | 196,168,777 | 194,857,193 | 194,857,193 | 194,846,168 | 194,846,168 | 0 | 0 | 2020-07-10 | 2020-07-15 | CV. LALUNA DANA | 02.237.179.3-733.000 | 3,142,807 | 1.59 % | |
529 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Lapangan SMPN 1 Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3582282 | 23890606 | APBD | 9,000,000 | 9,000,000 | 8,718,600 | 8,718,600 | 8,700,000 | 8,700,000 | 0 | 0 | 2020-07-11 | 2020-07-15 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 281,400 | 3.13 % | |
530 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Lapangan SMPN 1 Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3582282 | 23890606 | APBD | 9,000,000 | 9,000,000 | 8,718,600 | 8,718,600 | 8,700,000 | 8,700,000 | 0 | 0 | 2020-07-11 | 2020-07-15 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 281,400 | 3.13 % | |
531 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SMP) | Pengadaan Langsung | Pengadaan Barang | 3587282 | 25993851 | APBD | 84,000,000 | 82,480,000 | 81,637,600 | 81,637,600 | 81,500,000 | 81,500,000 | 0 | 0 | 2020-07-15 | 2020-07-16 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 2,362,400 | 2.81 % | |
532 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SMP) | Pengadaan Langsung | Pengadaan Barang | 3587282 | 25993851 | APBD | 84,000,000 | 82,480,000 | 81,637,600 | 81,637,600 | 81,500,000 | 81,500,000 | 0 | 0 | 2020-07-15 | 2020-07-16 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 2,362,400 | 2.81 % | |
533 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 3590282 | 25417846 | APBDP | 200,000,000 | 199,936,749 | 199,777,249 | 199,777,249 | 199,150,000 | 199,150,000 | 0 | 0 | 2020-08-07 | 2020-08-11 | CV. KARYA UTAMA | 02.215.867.9-732.000 | 222,751 | 0.11 % | |
534 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 3590282 | 25417846 | APBDP | 200,000,000 | 199,936,749 | 199,777,249 | 199,777,249 | 199,150,000 | 199,150,000 | 0 | 0 | 2020-08-07 | 2020-08-11 | CV. KARYA UTAMA | 02.215.867.9-732.000 | 222,751 | 0.11 % | |
535 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Media Pendidikan (SMP) | Pengadaan Langsung | Pengadaan Barang | 3591282 | 25993862 | APBD | 84,000,000 | 79,669,800 | 78,872,200 | 78,872,200 | 78,800,000 | 78,800,000 | 0 | 0 | 2020-07-13 | 2020-07-14 | CV. e_Caracter | 75.998.700.1-733.000 | 5,127,800 | 6.1 % | |
536 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Media Pendidikan (SMP) | Pengadaan Langsung | Pengadaan Barang | 3591282 | 25993862 | APBD | 84,000,000 | 79,669,800 | 78,872,200 | 78,872,200 | 78,800,000 | 78,800,000 | 0 | 0 | 2020-07-13 | 2020-07-14 | CV. e_Caracter | 75.998.700.1-733.000 | 5,127,800 | 6.1 % | |
537 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga/Praktek Sekolah Lain-lain (SD) | Pengadaan Langsung | Pengadaan Barang | 3592282 | 25993868 | APBD | 120,000,000 | 89,586,000 | 89,540,000 | 89,540,000 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. RIVINA | 02.746.832.1-733.000 | 30,460,000 | 25.38 % | |
538 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga/Praktek Sekolah Lain-lain (SD) | Pengadaan Langsung | Pengadaan Barang | 3592282 | 25993868 | APBD | 120,000,000 | 89,586,000 | 89,540,000 | 89,540,000 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. RIVINA | 02.746.832.1-733.000 | 30,460,000 | 25.38 % | |
539 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SD) | Pengadaan Langsung | Pengadaan Barang | 3593282 | 25993867 | APBD | 168,000,000 | 152,727,760 | 152,552,554 | 152,552,554 | 152,500,000 | 152,500,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. An-Nidha | 02.675.485.3-733.000 | 15,447,446 | 9.19 % | |
540 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SD) | Pengadaan Langsung | Pengadaan Barang | 3593282 | 25993867 | APBD | 168,000,000 | 152,727,760 | 152,552,554 | 152,552,554 | 152,500,000 | 152,500,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. An-Nidha | 02.675.485.3-733.000 | 15,447,446 | 9.19 % | |
541 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Permainan Edukatif (APE) PAUD | Pengadaan Langsung | Pengadaan Barang | 3594282 | 25993556 | APBD | 80,000,000 | 80,000,000 | 79,921,600 | 79,921,600 | 79,800,000 | 79,800,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. KHALIF | 81.540.809.1-733.000 | 78,400 | 0.1 % | |
542 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Permainan Edukatif (APE) PAUD | Pengadaan Langsung | Pengadaan Barang | 3594282 | 25993556 | APBD | 80,000,000 | 80,000,000 | 79,921,600 | 79,921,600 | 79,800,000 | 79,800,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. KHALIF | 81.540.809.1-733.000 | 78,400 | 0.1 % | |
543 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga IPA (SMP) | Pengadaan Langsung | Pengadaan Barang | 3596282 | 25993847 | APBD | 172,200,000 | 170,749,200 | 169,068,800 | 169,068,800 | 168,800,000 | 168,800,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. e_Caracter | 75.998.700.1-733.000 | 3,131,200 | 1.82 % | |
544 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga IPA (SMP) | Pengadaan Langsung | Pengadaan Barang | 3596282 | 25993847 | APBD | 172,200,000 | 170,749,200 | 169,068,800 | 169,068,800 | 168,800,000 | 168,800,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. e_Caracter | 75.998.700.1-733.000 | 3,131,200 | 1.82 % | |
545 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan drainase RT.7 | Pengadaan Langsung | Pengadaan Barang | 3598282 | 24032418 | APBD | 120,000,000 | 119,988,382 | 119,905,451 | 119,905,451 | 119,905,400 | 119,905,400 | 0 | 0 | 2020-07-13 | 2020-07-17 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 94,549 | 0.08 % | |
546 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan drainase RT.7 | Pengadaan Langsung | Pengadaan Barang | 3598282 | 24032418 | APBD | 120,000,000 | 119,988,382 | 119,905,451 | 119,905,451 | 119,905,400 | 119,905,400 | 0 | 0 | 2020-07-13 | 2020-07-17 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 94,549 | 0.08 % | |
547 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Kesenian | Pengadaan Langsung | Pengadaan Barang | 3603282 | 25993866 | APBD | 210,000,000 | 199,650,000 | 199,347,500 | 0 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,652,500 | 5.07 % | |
548 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Kesenian | Pengadaan Langsung | Pengadaan Barang | 3603282 | 25993866 | APBD | 210,000,000 | 199,650,000 | 199,347,500 | 0 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-07-14 | 2020-07-16 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,652,500 | 5.07 % | |
549 | 2020 | Dinas Pendidikan dan Kebudayaan | Peralatan Pendidikan TIK (PKBM Serumpun) | Pengadaan Langsung | Pengadaan Barang | 3604282 | 25993586 | APBD | 200,000,000 | 188,606,530 | 188,520,000 | 188,520,000 | 188,300,000 | 188,300,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 11,480,000 | 5.74 % | |
550 | 2020 | Dinas Pendidikan dan Kebudayaan | Peralatan Pendidikan TIK (PKBM Serumpun) | Pengadaan Langsung | Pengadaan Barang | 3604282 | 25993586 | APBD | 200,000,000 | 188,606,530 | 188,520,000 | 188,520,000 | 188,300,000 | 188,300,000 | 0 | 0 | 2020-07-16 | 2020-07-20 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 11,480,000 | 5.74 % | |
551 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Hamak Utara Kec. Telaga Langsat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605282 | 23367557 | APBD | 30,000,000 | 29,348,000 | 29,177,500 | 29,177,500 | 29,177,000 | 29,177,000 | 0 | 0 | 2020-07-23 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 822,500 | 2.74 % | |
552 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Hamak Utara Kec. Telaga Langsat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605282 | 23367557 | APBD | 30,000,000 | 29,348,000 | 29,177,500 | 29,177,500 | 29,177,000 | 29,177,000 | 0 | 0 | 2020-07-23 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 822,500 | 2.74 % | |
553 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607282 | 23970172 | APBD | 13,000,000 | 12,905,000 | 12,792,500 | 12,792,500 | 12,700,000 | 12,700,000 | 0 | 0 | 2020-07-21 | 2020-07-22 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 207,500 | 1.6 % | |
554 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607282 | 23970172 | APBD | 13,000,000 | 12,905,000 | 12,792,500 | 12,792,500 | 12,700,000 | 12,700,000 | 0 | 0 | 2020-07-21 | 2020-07-22 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 207,500 | 1.6 % | |
555 | 2020 | Dinas Pertanian | Pengadaan mesin dan sarana pengendalian dan pemadaman kebakaran lahan dan kebun (PPKLK) | Pengadaan Langsung | Pengadaan Barang | 3609282 | 24105960 | APBD | 80,417,500 | 80,355,000 | 80,080,000 | 80,080,000 | 80,080,000 | 80,080,000 | 0 | 0 | 2020-07-17 | 2020-07-22 | Muda Membangun | 73.702.709.4-733.000 | 337,500 | 0.42 % | |
556 | 2020 | Dinas Pertanian | Pengadaan mesin dan sarana pengendalian dan pemadaman kebakaran lahan dan kebun (PPKLK) | Pengadaan Langsung | Pengadaan Barang | 3609282 | 24105960 | APBD | 80,417,500 | 80,355,000 | 80,080,000 | 80,080,000 | 80,080,000 | 80,080,000 | 0 | 0 | 2020-07-17 | 2020-07-22 | Muda Membangun | 73.702.709.4-733.000 | 337,500 | 0.42 % | |
557 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | Belanja Jasa Konsultansi Pengawasan Pembangunan Gedung Promosi dan Pemasaran Online | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3610282 | 25980201 | APBD | 45,000,000 | 36,562,500 | 36,355,000 | 0 | 36,000,000 | 36,000,000 | 0 | 0 | 2020-07-29 | 2020-08-09 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 8,645,000 | 19.21 % | |
558 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | Belanja Jasa Konsultansi Pengawasan Pembangunan Gedung Promosi dan Pemasaran Online | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3610282 | 25980201 | APBD | 45,000,000 | 36,562,500 | 36,355,000 | 0 | 36,000,000 | 36,000,000 | 0 | 0 | 2020-07-29 | 2020-08-09 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 8,645,000 | 19.21 % | |
559 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3612282 | 25417899 | APBDP | 20,000,000 | 20,000,000 | 19,728,500 | 19,728,500 | 19,450,000 | 19,450,000 | 0 | 0 | 2020-08-07 | 2020-08-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 271,500 | 1.36 % | |
560 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3612282 | 25417899 | APBDP | 20,000,000 | 20,000,000 | 19,728,500 | 19,728,500 | 19,450,000 | 19,450,000 | 0 | 0 | 2020-08-07 | 2020-08-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 271,500 | 1.36 % | |
561 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3616282 | 23329057 | APBD | 20,000,000 | 20,000,000 | 19,877,000 | 19,877,000 | 19,650,000 | 19,650,000 | 0 | 0 | 2020-08-05 | 2020-08-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 123,000 | 0.62 % | |
562 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3616282 | 23329057 | APBD | 20,000,000 | 20,000,000 | 19,877,000 | 19,877,000 | 19,650,000 | 19,650,000 | 0 | 0 | 2020-08-05 | 2020-08-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 123,000 | 0.62 % | |
563 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3619282 | 23329940 | APBD | 15,000,000 | 15,000,000 | 14,821,190 | 14,821,190 | 14,795,000 | 14,795,000 | 0 | 0 | 2020-07-24 | 2020-07-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 178,810 | 1.19 % | |
564 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3619282 | 23329940 | APBD | 15,000,000 | 15,000,000 | 14,821,190 | 14,821,190 | 14,795,000 | 14,795,000 | 0 | 0 | 2020-07-24 | 2020-07-29 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 178,810 | 1.19 % | |
565 | 2020 | Dinas Sosial | Pemasangan Paving Blok untuk halaman Tugu 17 Mei | Pengadaan Langsung | Pekerjaan Konstruksi | 3621282 | 23414714 | APBD | 189,500,000 | 189,446,198 | 189,149,857 | 0 | 189,149,000 | 189,149,000 | 0 | 0 | 2020-07-23 | 2020-08-07 | CV. AISY | 75.132.070.6-733.000 | 350,143 | 0.18 % | |
566 | 2020 | Dinas Sosial | Pemasangan Paving Blok untuk halaman Tugu 17 Mei | Pengadaan Langsung | Pekerjaan Konstruksi | 3621282 | 23414714 | APBD | 189,500,000 | 189,446,198 | 189,149,857 | 0 | 189,149,000 | 189,149,000 | 0 | 0 | 2020-07-23 | 2020-08-07 | CV. AISY | 75.132.070.6-733.000 | 350,143 | 0.18 % | |
567 | 2020 | Dinas Perpustakaan Dan Kearsipan | Pengadaan Meubelur untuk Perpustakaan Daha Selatan | Pengadaan Langsung | Pengadaan Barang | 3622282 | 26029903 | APBD | 193,400,000 | 193,399,800 | 192,900,070 | 192,900,070 | 192,900,000 | 0 | 0 | 0 | 2020-08-05 | 2020-08-14 | CV.ASYA | 01.424.566.6-733.000 | 499,930 | 0.26 % | |
568 | 2020 | Dinas Kesehatan | Rehabilitasi Pustu Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 3624282 | 23969895 | APBD | 155,000,000 | 150,001,123 | 149,500,733 | 0 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-07-21 | 2020-07-24 | CV.ASYA | 01.424.566.6-733.000 | 5,499,267 | 3.55 % | |
569 | 2020 | Dinas Kesehatan | Rehabilitasi Pustu Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 3624282 | 23969895 | APBD | 155,000,000 | 150,001,123 | 149,500,733 | 0 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-07-21 | 2020-07-24 | CV.ASYA | 01.424.566.6-733.000 | 5,499,267 | 3.55 % | |
570 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Drainase di ruas Jl. Bakarung Tabihi (lanjutan) Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3625282 | 23349359 | APBD | 200,000,000 | 199,697,664 | 199,133,933 | 199,133,933 | 199,043,700 | 199,043,700 | 0 | 0 | 2020-09-04 | 2020-09-09 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 866,067 | 0.43 % | |
571 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Drainase di ruas Jl. Bakarung Tabihi (lanjutan) Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3625282 | 23349359 | APBD | 200,000,000 | 199,697,664 | 199,133,933 | 199,133,933 | 199,043,700 | 199,043,700 | 0 | 0 | 2020-09-04 | 2020-09-09 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 866,067 | 0.43 % | |
572 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan JUT RT. 011 dan JUT Sasanting RT.005 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3626282 | 24282643;25909339 | APBD | 62,800,000 | 62,799,930 | 62,747,289 | 62,747,289 | 62,747,200 | 62,747,200 | 0 | 0 | 2020-07-23 | 2020-07-30 | cv.ghea | 82.333.270.5-733.000 | 52,711 | 0.08 % | |
573 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan JUT RT. 011 dan JUT Sasanting RT.005 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3626282 | 24282643;25909339 | APBD | 62,800,000 | 62,799,930 | 62,747,289 | 62,747,289 | 62,747,200 | 62,747,200 | 0 | 0 | 2020-07-23 | 2020-07-30 | cv.ghea | 82.333.270.5-733.000 | 52,711 | 0.08 % | |
574 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan JUT Jln.By Pass RT.008, Jembatan JUT RT. 005,dan Titian RT.003 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3627282 | 24271198;24273286;24274005 | APBD | 75,000,000 | 74,998,577 | 74,863,107 | 74,863,107 | 74,863,100 | 74,863,100 | 0 | 0 | 2020-07-23 | 2020-07-30 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 136,893 | 0.18 % | |
575 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan JUT Jln.By Pass RT.008, Jembatan JUT RT. 005,dan Titian RT.003 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3627282 | 24271198;24273286;24274005 | APBD | 75,000,000 | 74,998,577 | 74,863,107 | 74,863,107 | 74,863,100 | 74,863,100 | 0 | 0 | 2020-07-23 | 2020-07-30 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 136,893 | 0.18 % | |
576 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3628282 | 23969854 | APBD | 18,000,000 | 17,875,000 | 17,809,000 | 0 | 17,500,000 | 17,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 191,000 | 1.06 % | |
577 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3628282 | 23969854 | APBD | 18,000,000 | 17,875,000 | 17,809,000 | 0 | 17,500,000 | 17,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 191,000 | 1.06 % | |
578 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3631282 | 23330151 | APBD | 200,000,000 | 199,997,833 | 199,677,254 | 199,677,253 | 199,677,253 | 199,677,253 | 0 | 0 | 2020-07-27 | 2020-07-29 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 322,746 | 0.16 % | |
579 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3631282 | 23330151 | APBD | 200,000,000 | 199,997,833 | 199,677,254 | 199,677,253 | 199,677,253 | 199,677,253 | 0 | 0 | 2020-07-27 | 2020-07-29 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 322,746 | 0.16 % | |
580 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Muning Tengah Batang Alai Kec. Daha Selatan (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3632282 | 23348418 | APBD | 50,000,000 | 49,824,170 | 49,300,000 | 49,300,000 | 49,050,000 | 49,050,000 | 0 | 0 | 2020-08-24 | 2020-08-28 | CV. SKALA MULTIREKA | 02.531.655.5-731.000 | 700,000 | 1.4 % | |
581 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Muning Tengah Batang Alai Kec. Daha Selatan (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3632282 | 23348418 | APBD | 50,000,000 | 49,824,170 | 49,300,000 | 49,300,000 | 49,050,000 | 49,050,000 | 0 | 0 | 2020-08-24 | 2020-08-28 | CV. SKALA MULTIREKA | 02.531.655.5-731.000 | 700,000 | 1.4 % | |
582 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3638282 | 23330156 | APBD | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
583 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3638282 | 23330156 | APBD | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
584 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639282 | 23330125 | APBD | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
585 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639282 | 23330125 | APBD | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
586 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3640282 | 23330153 | APBD | 12,425,000 | 12,425,000 | 12,155,000 | 12,155,000 | 12,050,000 | 12,050,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. ARUM CONSULINDO | 76.318.952.9-735.000 | 270,000 | 2.17 % | |
587 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3640282 | 23330153 | APBD | 12,425,000 | 12,425,000 | 12,155,000 | 12,155,000 | 12,050,000 | 12,050,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. ARUM CONSULINDO | 76.318.952.9-735.000 | 270,000 | 2.17 % | |
588 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3641282 | 23330115 | APBD | 25,000,000 | 25,000,000 | 24,755,500 | 24,755,500 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 244,500 | 0.98 % | |
589 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3641282 | 23330115 | APBD | 25,000,000 | 25,000,000 | 24,755,500 | 24,755,500 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-07-29 | 2020-08-03 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 244,500 | 0.98 % | |
590 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3643282 | 23544797 | APBD | 13,862,383 | 13,855,188 | 13,822,188 | 13,822,188 | 13,822,000 | 13,822,000 | 0 | 0 | 2020-07-29 | 2020-08-05 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 40,195 | 0.29 % | |
591 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3643282 | 23544797 | APBD | 13,862,383 | 13,855,188 | 13,822,188 | 13,822,188 | 13,822,000 | 13,822,000 | 0 | 0 | 2020-07-29 | 2020-08-05 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 40,195 | 0.29 % | |
592 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Tambangan Baruh Jaya (Lanjutan) Kec. Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3644282 | 23349339 | APBD | 35,000,000 | 34,882,100 | 34,639,000 | 34,639,000 | 34,500,000 | 34,500,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 361,000 | 1.03 % | |
593 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Tambangan Baruh Jaya (Lanjutan) Kec. Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3644282 | 23349339 | APBD | 35,000,000 | 34,882,100 | 34,639,000 | 34,639,000 | 34,500,000 | 34,500,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 361,000 | 1.03 % | |
594 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Renovasi Pagar,Penambahan Ruangan dan Penambahan Parkir Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3647282 | 23890450 | APBD | 75,000,000 | 74,996,347 | 74,932,778 | 74,932,778 | 74,932,700 | 74,932,700 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 67,222 | 0.09 % | |
595 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Renovasi Pagar,Penambahan Ruangan dan Penambahan Parkir Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3647282 | 23890450 | APBD | 75,000,000 | 74,996,347 | 74,932,778 | 74,932,778 | 74,932,700 | 74,932,700 | 0 | 0 | 2020-07-29 | 2020-08-03 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 67,222 | 0.09 % | |
596 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3648282 | 23356285 | APBD | 6,000,000 | 6,000,000 | 5,850,790 | 5,850,000 | 5,846,500 | 5,846,500 | 0 | 0 | 2020-07-30 | 2020-08-04 | konsultan | 75.077.609.8-733.000 | 149,210 | 2.49 % | |
597 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3648282 | 23356285 | APBD | 6,000,000 | 6,000,000 | 5,850,790 | 5,850,000 | 5,846,500 | 5,846,500 | 0 | 0 | 2020-07-30 | 2020-08-04 | konsultan | 75.077.609.8-733.000 | 149,210 | 2.49 % | |
598 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sianggantung Baru Kec. Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3651282 | 23348931 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | 2020-08-10 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
599 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sianggantung Baru Kec. Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3651282 | 23348931 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | 2020-08-10 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
600 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Suriangpati Kec. Kandangan (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3652282 | 23349114 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | 2020-08-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
601 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Suriangpati Kec. Kandangan (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3652282 | 23349114 | APBD | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | 2020-08-10 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
602 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Sungai Kajang Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3653282 | 25984451 | APBD | 80,700,000 | 80,700,000 | 80,184,500 | 80,184,500 | 80,179,000 | 80,179,000 | 0 | 0 | 2020-08-12 | 2020-08-19 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 515,500 | 0.64 % | |
603 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Sungai Kajang Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3653282 | 25984451 | APBD | 80,700,000 | 80,700,000 | 80,184,500 | 80,184,500 | 80,179,000 | 80,179,000 | 0 | 0 | 2020-08-12 | 2020-08-19 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 515,500 | 0.64 % | |
604 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Tambak Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3655282 | 23349073 | APBD | 50,000,000 | 45,950,300 | 45,763,300 | 45,763,300 | 45,760,000 | 45,760,000 | 0 | 0 | 2020-09-07 | 2020-09-13 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 4,236,700 | 8.47 % | |
605 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Tambak Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3655282 | 23349073 | APBD | 50,000,000 | 45,950,300 | 45,763,300 | 45,763,300 | 45,760,000 | 45,760,000 | 0 | 0 | 2020-09-07 | 2020-09-13 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 4,236,700 | 8.47 % | |
606 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Rawa Sianggantung Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3656282 | 25984497 | APBD | 25,000,000 | 25,000,000 | 21,354,500 | 0 | 21,349,000 | 21,349,000 | 0 | 0 | 2020-08-18 | 2020-08-25 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,645,500 | 14.58 % | |
607 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Rawa Sianggantung Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3656282 | 25984497 | APBD | 25,000,000 | 25,000,000 | 21,354,500 | 0 | 21,349,000 | 21,349,000 | 0 | 0 | 2020-08-18 | 2020-08-25 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,645,500 | 14.58 % | |
608 | 2020 | Kecamatan Kandangan | Belanja Penyediaan Sarana Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3657282 | 25909233 | APBD | 30,000,000 | 29,989,300 | 29,987,100 | 29,987,100 | 29,987,100 | 29,987,100 | 0 | 0 | 2020-08-04 | 2020-08-07 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 12,900 | 0.04 % | |
609 | 2020 | Kecamatan Kandangan | Belanja Penyediaan Sarana Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3657282 | 25909233 | APBD | 30,000,000 | 29,989,300 | 29,987,100 | 29,987,100 | 29,987,100 | 29,987,100 | 0 | 0 | 2020-08-04 | 2020-08-07 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 12,900 | 0.04 % | |
610 | 2020 | Kecamatan Kandangan | Belanja Jasa Pengawasan JUT, Jembatan dan Penyediaan Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659282 | 24276185 | APBD | 7,400,000 | 7,397,516 | 7,397,496 | 7,397,496 | 7,397,400 | 7,397,400 | 0 | 0 | 2020-08-04 | 2020-08-07 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 2,504 | 0.03 % | |
611 | 2020 | Kecamatan Kandangan | Belanja Jasa Pengawasan JUT, Jembatan dan Penyediaan Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659282 | 24276185 | APBD | 7,400,000 | 7,397,516 | 7,397,496 | 7,397,496 | 7,397,400 | 7,397,400 | 0 | 0 | 2020-08-04 | 2020-08-07 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 2,504 | 0.03 % | |
612 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3661282 | 23545256 | APBD | 27,857,243 | 27,772,342 | 27,480,842 | 27,480,842 | 27,480,000 | 27,480,000 | 0 | 0 | 2020-08-07 | 2020-08-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 376,401 | 1.35 % | |
613 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3661282 | 23545256 | APBD | 27,857,243 | 27,772,342 | 27,480,842 | 27,480,842 | 27,480,000 | 27,480,000 | 0 | 0 | 2020-08-07 | 2020-08-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 376,401 | 1.35 % | |
614 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Tirta Bahalayung Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3662282 | 25984492 | APBD | 82,940,000 | 82,940,000 | 82,932,850 | 82,932,850 | 82,927,000 | 82,927,000 | 0 | 0 | 2020-08-19 | 2020-08-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 7,150 | 0.01 % | |
615 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Tirta Bahalayung Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3662282 | 25984492 | APBD | 82,940,000 | 82,940,000 | 82,932,850 | 82,932,850 | 82,927,000 | 82,927,000 | 0 | 0 | 2020-08-19 | 2020-08-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 7,150 | 0.01 % | |
616 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I. H. Mahlan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3663282 | 25984485 | APBD | 21,360,000 | 21,360,000 | 21,358,900 | 21,358,900 | 21,354,500 | 21,354,500 | 0 | 0 | 2020-08-12 | 2020-08-18 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,100 | 0.01 % | |
617 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I. H. Mahlan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3663282 | 25984485 | APBD | 21,360,000 | 21,360,000 | 21,358,900 | 21,358,900 | 21,354,500 | 21,354,500 | 0 | 0 | 2020-08-12 | 2020-08-18 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,100 | 0.01 % | |
618 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3664282 | 23544891 | APBD | 150,000,000 | 149,997,256 | 149,854,489 | 149,854,489 | 149,854,000 | 149,854,000 | 0 | 0 | 2020-08-19 | 2020-08-26 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 145,511 | 0.1 % | |
619 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3664282 | 23544891 | APBD | 150,000,000 | 149,997,256 | 149,854,489 | 149,854,489 | 149,854,000 | 149,854,000 | 0 | 0 | 2020-08-19 | 2020-08-26 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 145,511 | 0.1 % | |
620 | 2020 | Kecamatan Simpur | konsultan pengawasan pembuatan pagar rumah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3666282 | 24108488 | APBD | 3,000,000 | 2,998,600 | 2,966,700 | 0 | 2,966,700 | 2,966,700 | 0 | 0 | 2020-08-10 | 2020-08-12 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 33,300 | 1.11 % | |
621 | 2020 | Kecamatan Simpur | konsultan pengawasan pembuatan pagar rumah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3666282 | 24108488 | APBD | 3,000,000 | 2,998,600 | 2,966,700 | 0 | 2,966,700 | 2,966,700 | 0 | 0 | 2020-08-10 | 2020-08-12 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 33,300 | 1.11 % | |
622 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Pekerjaan Konstruksi | 3667282 | 23329035 | APBD | 200,000,000 | 199,977,989 | 199,675,490 | 199,675,490 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | CV. PRIMA CIPTA SARANA | 02.575.622.2-731.000 | 324,510 | 0.16 % | |
623 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Pekerjaan Konstruksi | 3667282 | 23329035 | APBD | 200,000,000 | 199,977,989 | 199,675,490 | 199,675,490 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-08-11 | 2020-08-13 | CV. PRIMA CIPTA SARANA | 02.575.622.2-731.000 | 324,510 | 0.16 % | |
624 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Pekerjaan Konstruksi | 3668282 | 23543707 | APBD | 209,065,421 | 199,931,242 | 199,641,404 | 199,641,404 | 199,146,000 | 199,146,000 | 0 | 0 | 2020-09-04 | 2020-09-09 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 9,424,017 | 4.51 % | |
625 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Pekerjaan Konstruksi | 3668282 | 23543707 | APBD | 209,065,421 | 199,931,242 | 199,641,404 | 199,641,404 | 199,146,000 | 199,146,000 | 0 | 0 | 2020-09-04 | 2020-09-09 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 9,424,017 | 4.51 % | |
626 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3672282 | 23354495 | APBD | 10,000,000 | 10,000,000 | 9,792,200 | 0 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-09-08 | 2020-09-11 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 207,800 | 2.08 % | |
627 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3672282 | 23354495 | APBD | 10,000,000 | 10,000,000 | 9,792,200 | 0 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-09-08 | 2020-09-11 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 207,800 | 2.08 % | |
628 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Siti Hajar RT. 06 Kel. Kandangan Kota Kec. Kandangan (DID) (p=168m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3673282 | 23017419 | APBD | 145,000,000 | 144,164,524 | 143,733,904 | 143,733,904 | 143,683,904 | 143,683,904 | 0 | 0 | 2020-09-23 | 2020-09-30 | CV. ALBATROS | 01.222.160.2-733.000 | 1,266,096 | 0.87 % | |
629 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Siti Hajar RT. 06 Kel. Kandangan Kota Kec. Kandangan (DID) (p=168m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3673282 | 23017419 | APBD | 145,000,000 | 144,164,524 | 143,733,904 | 143,733,904 | 143,683,904 | 143,683,904 | 0 | 0 | 2020-09-23 | 2020-09-30 | CV. ALBATROS | 01.222.160.2-733.000 | 1,266,096 | 0.87 % | |
630 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3674282 | 23354605 | APBD | 10,000,000 | 10,000,000 | 9,788,900 | 9,788,900 | 9,784,500 | 9,784,500 | 0 | 0 | 2020-09-08 | 2020-09-11 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 211,100 | 2.11 % | |
631 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3674282 | 23354605 | APBD | 10,000,000 | 10,000,000 | 9,788,900 | 9,788,900 | 9,784,500 | 9,784,500 | 0 | 0 | 2020-09-08 | 2020-09-11 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 211,100 | 2.11 % | |
632 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Samuda Kec. Daha Selatan (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3675282 | 23374659 | APBD | 200,000,000 | 199,944,285 | 199,703,928 | 199,703,928 | 199,537,709 | 199,537,709 | 0 | 0 | 2020-08-10 | 2020-08-13 | cv. bumi mandiri | 02.089.892.0-733.000 | 296,072 | 0.15 % | |
633 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Samuda Kec. Daha Selatan (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3675282 | 23374659 | APBD | 200,000,000 | 199,944,285 | 199,703,928 | 199,703,928 | 199,537,709 | 199,537,709 | 0 | 0 | 2020-08-10 | 2020-08-13 | cv. bumi mandiri | 02.089.892.0-733.000 | 296,072 | 0.15 % | |
634 | 2020 | Kecamatan Kandangan | Belanja jasa perencanaan pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3677282 | 24021154 | APBD | 6,000,000 | 5,997,674 | 5,788,665 | 5,788,665 | 57,886,600 | 5,788,600 | 0 | 0 | 2020-08-11 | 2020-08-17 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,335 | 3.52 % | |
635 | 2020 | Kecamatan Kandangan | Belanja jasa perencanaan pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3677282 | 24021154 | APBD | 6,000,000 | 5,997,674 | 5,788,665 | 5,788,665 | 57,886,600 | 5,788,600 | 0 | 0 | 2020-08-11 | 2020-08-17 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,335 | 3.52 % | |
636 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3678282 | 23035736 | APBD | 23,000,000 | 22,848,100 | 22,627,000 | 22,627,000 | 22,572,000 | 22,572,000 | 0 | 0 | 2020-09-01 | 2020-09-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 373,000 | 1.62 % | |
637 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3678282 | 23035736 | APBD | 23,000,000 | 22,848,100 | 22,627,000 | 22,627,000 | 22,572,000 | 22,572,000 | 0 | 0 | 2020-09-01 | 2020-09-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 373,000 | 1.62 % | |
638 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Supervisi Perluasan SPAM perpipaan melalui pemanfaatan idle capacity Sistem Penyediaan Air Minum (SPAM) terbangun Kecamatan Sungai Raya, Desa Baru dan Desa Hariti (REGULER) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3683282 | 25987783 | APBD | 150,000,000 | 100,000,000 | 99,990,000 | 99,990,000 | 99,880,000 | 99,880,000 | 0 | 0 | 2020-08-24 | 2020-08-27 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 50,010,000 | 33.34 % | |
639 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Supervisi Perluasan SPAM perpipaan melalui pemanfaatan idle capacity Sistem Penyediaan Air Minum (SPAM) terbangun Kecamatan Sungai Raya, Desa Baru dan Desa Hariti (REGULER) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3683282 | 25987783 | APBD | 150,000,000 | 100,000,000 | 99,990,000 | 99,990,000 | 99,880,000 | 99,880,000 | 0 | 0 | 2020-08-24 | 2020-08-27 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 50,010,000 | 33.34 % | |
640 | 2020 | Dinas Perikanan | Jasa konsultan pengawas kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3684282 | 26014741 | APBD | 13,150,000 | 12,980,000 | 12,925,000 | 12,925,000 | 12,925,000 | 12,925,000 | 0 | 0 | 2020-08-18 | 2020-08-25 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 225,000 | 1.71 % | |
641 | 2020 | Dinas Perikanan | Jasa konsultan pengawas kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3684282 | 26014741 | APBD | 13,150,000 | 12,980,000 | 12,925,000 | 12,925,000 | 12,925,000 | 12,925,000 | 0 | 0 | 2020-08-18 | 2020-08-25 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 225,000 | 1.71 % | |
642 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3685282 | 23352794 | APBD | 176,000,000 | 175,975,202 | 175,892,702 | 175,892,702 | 175,887,202 | 175,887,202 | 0 | 0 | 2020-08-18 | 2020-08-26 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 107,298 | 0.06 % | |
643 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3685282 | 23352794 | APBD | 176,000,000 | 175,975,202 | 175,892,702 | 175,892,702 | 175,887,202 | 175,887,202 | 0 | 0 | 2020-08-18 | 2020-08-26 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 107,298 | 0.06 % | |
644 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3687282 | 23544927 | APBD | 7,000,000 | 6,974,515 | 6,936,015 | 6,936,015 | 6,936,000 | 6,936,000 | 0 | 0 | 2020-08-27 | 2020-09-01 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 63,985 | 0.91 % | |
645 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3687282 | 23544927 | APBD | 7,000,000 | 6,974,515 | 6,936,015 | 6,936,015 | 6,936,000 | 6,936,000 | 0 | 0 | 2020-08-27 | 2020-09-01 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 63,985 | 0.91 % | |
646 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawas Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3688282 | 23543920 | APBD | 6,271,962 | 6,252,968 | 6,191,900 | 6,191,900 | 6,191,900 | 6,191,900 | 0 | 0 | 2020-09-07 | 2020-09-10 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 80,062 | 1.28 % | |
647 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawas Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3688282 | 23543920 | APBD | 6,271,962 | 6,252,968 | 6,191,900 | 6,191,900 | 6,191,900 | 6,191,900 | 0 | 0 | 2020-09-07 | 2020-09-10 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 80,062 | 1.28 % | |
648 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Jambu Hulu Paku Pantai (Tambak Tamiang) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689282 | 23348699 | APBD | 30,000,000 | 29,626,410 | 29,447,000 | 29,447,000 | 29,400,000 | 29,400,000 | 0 | 0 | 2020-08-28 | 2020-09-04 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 553,000 | 1.84 % | |
649 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Jambu Hulu Paku Pantai (Tambak Tamiang) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689282 | 23348699 | APBD | 30,000,000 | 29,626,410 | 29,447,000 | 29,447,000 | 29,400,000 | 29,400,000 | 0 | 0 | 2020-08-28 | 2020-09-04 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 553,000 | 1.84 % | |
650 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Ruangan PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3693282 | 24543944 | APBD | 100,000,000 | 99,998,145 | 99,804,269 | 0 | 99,804,200 | 99,804,200 | 0 | 0 | 2020-09-03 | 2020-09-10 | cv. rukun damai | 01.203.952.5-733.000 | 195,731 | 0.2 % | |
651 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Ruangan PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3693282 | 24543944 | APBD | 100,000,000 | 99,998,145 | 99,804,269 | 0 | 99,804,200 | 99,804,200 | 0 | 0 | 2020-09-03 | 2020-09-10 | cv. rukun damai | 01.203.952.5-733.000 | 195,731 | 0.2 % | |
652 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695282 | 23330118 | APBD | 20,000,000 | 20,000,000 | 19,882,500 | 19,882,500 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-09-09 | 2020-09-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 117,500 | 0.59 % | |
653 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695282 | 23330118 | APBD | 20,000,000 | 20,000,000 | 19,882,500 | 19,882,500 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-09-09 | 2020-09-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 117,500 | 0.59 % | |
654 | 2020 | Kecamatan Kandangan | pembangunan pintu gerbang Majelis Zikir Mesjid Al Minah dan pembuatan lampu As Ma`ul Husna lingkungan mesjid Al Minah | Pengadaan Langsung | Pekerjaan Konstruksi | 3699282 | 24594450;24594517 | APBD | 200,000,000 | 199,599,547 | 199,329,207 | 0 | 199,329,200 | 199,329,200 | 0 | 0 | 2020-09-03 | 2020-09-11 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 670,793 | 0.34 % | |
655 | 2020 | Kecamatan Kandangan | pembangunan pintu gerbang Majelis Zikir Mesjid Al Minah dan pembuatan lampu As Ma`ul Husna lingkungan mesjid Al Minah | Pengadaan Langsung | Pekerjaan Konstruksi | 3699282 | 24594450;24594517 | APBD | 200,000,000 | 199,599,547 | 199,329,207 | 0 | 199,329,200 | 199,329,200 | 0 | 0 | 2020-09-03 | 2020-09-11 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 670,793 | 0.34 % | |
656 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3702282 | 24033327 | APBD | 120,000,000 | 119,892,007 | 119,747,885 | 119,747,885 | 119,747,800 | 119,747,800 | 0 | 0 | 2020-08-31 | 2020-09-04 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 252,115 | 0.21 % | |
657 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3702282 | 24033327 | APBD | 120,000,000 | 119,892,007 | 119,747,885 | 119,747,885 | 119,747,800 | 119,747,800 | 0 | 0 | 2020-08-31 | 2020-09-04 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 252,115 | 0.21 % | |
658 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3703282 | 26136092 | APBDP | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,177,000 | 45,177,000 | 0 | 0 | 2020-09-07 | 2020-09-10 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
659 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3703282 | 26136092 | APBDP | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,177,000 | 45,177,000 | 0 | 0 | 2020-09-07 | 2020-09-10 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
660 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3704282 | 26135435 | APBDP | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,260,000 | 45,260,000 | 0 | 0 | 2020-09-08 | 2020-09-15 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
661 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3704282 | 26135435 | APBDP | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,260,000 | 45,260,000 | 0 | 0 | 2020-09-08 | 2020-09-15 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
662 | 2020 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Sewa Komputer (Lanjutan) | Pengadaan Langsung | Jasa Lainnya | 3708282 | 22878938 | APBD | 400,000,000 | 130,896,000 | 130,896,000 | 0 | 130,302,000 | 130,302,000 | 0 | 0 | 2020-09-01 | 2020-09-07 | CV. HITRO | 02.918.384.5-733.000 | 269,104,000 | 67.28 % | |
663 | 2020 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Sewa Komputer (Lanjutan) | Pengadaan Langsung | Jasa Lainnya | 3708282 | 22878938 | APBD | 400,000,000 | 130,896,000 | 130,896,000 | 0 | 130,302,000 | 130,302,000 | 0 | 0 | 2020-09-01 | 2020-09-07 | CV. HITRO | 02.918.384.5-733.000 | 269,104,000 | 67.28 % | |
664 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC Untuk Masyarakat Miskin di Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3710282 | 24236148 | APBD | 77,000,000 | 59,500,000 | 59,466,442 | 59,466,442 | 59,466,000 | 59,466,000 | 0 | 0 | 2020-09-01 | 2020-09-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 17,533,558 | 22.77 % | |
665 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC Untuk Masyarakat Miskin di Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3710282 | 24236148 | APBD | 77,000,000 | 59,500,000 | 59,466,442 | 59,466,442 | 59,466,000 | 59,466,000 | 0 | 0 | 2020-09-01 | 2020-09-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 17,533,558 | 22.77 % | |
666 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC yang akan diserahkan kepada pihak ketiga/masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3711282 | 24543738 | APBD | 133,000,000 | 133,000,000 | 132,924,988 | 132,924,988 | 132,924,000 | 132,924,000 | 0 | 0 | 2020-09-01 | 2020-09-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 75,012 | 0.06 % | |
667 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC yang akan diserahkan kepada pihak ketiga/masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3711282 | 24543738 | APBD | 133,000,000 | 133,000,000 | 132,924,988 | 132,924,988 | 132,924,000 | 132,924,000 | 0 | 0 | 2020-09-01 | 2020-09-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 75,012 | 0.06 % | |
668 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mekar Subur Kel. Kandangan Utara Kec. Kandangan (DID) (p=270m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3712282 | 23033305 | APBD | 195,000,000 | 193,767,530 | 193,595,749 | 193,595,749 | 192,721,729 | 192,721,729 | 0 | 0 | 2020-09-02 | 2020-09-09 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,404,251 | 0.72 % | |
669 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mekar Subur Kel. Kandangan Utara Kec. Kandangan (DID) (p=270m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3712282 | 23033305 | APBD | 195,000,000 | 193,767,530 | 193,595,749 | 193,595,749 | 192,721,729 | 192,721,729 | 0 | 0 | 2020-09-02 | 2020-09-09 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,404,251 | 0.72 % | |
670 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Air Terjun Haratai (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3713282 | 26035335 | APBD | 25,000,000 | 24,970,000 | 24,860,000 | 0 | 24,860,000 | 24,860,000 | 0 | 0 | 2020-09-02 | 2020-09-10 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 140,000 | 0.56 % | |
671 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Air Terjun Haratai (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3713282 | 26035335 | APBD | 25,000,000 | 24,970,000 | 24,860,000 | 0 | 24,860,000 | 24,860,000 | 0 | 0 | 2020-09-02 | 2020-09-10 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 140,000 | 0.56 % | |
672 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3714282 | 26035498 | APBD | 35,000,000 | 34,980,000 | 34,870,000 | 0 | 34,870,000 | 34,870,000 | 0 | 0 | 2020-09-02 | 2020-09-10 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 130,000 | 0.37 % | |
673 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3714282 | 26035498 | APBD | 35,000,000 | 34,980,000 | 34,870,000 | 0 | 34,870,000 | 34,870,000 | 0 | 0 | 2020-09-02 | 2020-09-10 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 130,000 | 0.37 % | |
674 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Pekerjaan Konstruksi | 3715282 | 25621217 | APBD | 80,000,000 | 79,988,699 | 79,713,699 | 79,713,699 | 79,658,699 | 79,658,699 | 0 | 0 | 2020-09-03 | 2020-09-10 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 286,301 | 0.36 % | |
675 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Pekerjaan Konstruksi | 3715282 | 25621217 | APBD | 80,000,000 | 79,988,699 | 79,713,699 | 79,713,699 | 79,658,699 | 79,658,699 | 0 | 0 | 2020-09-03 | 2020-09-10 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 286,301 | 0.36 % | |
676 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3721282 | 23352577 | APBD | 55,000,000 | 54,976,586 | 54,725,010 | 54,725,000 | 54,714,000 | 54,714,000 | 0 | 0 | 2020-09-08 | 2020-09-11 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 274,990 | 0.5 % | |
677 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3721282 | 23352577 | APBD | 55,000,000 | 54,976,586 | 54,725,010 | 54,725,000 | 54,714,000 | 54,714,000 | 0 | 0 | 2020-09-08 | 2020-09-11 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 274,990 | 0.5 % | |
678 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723282 | 22914589 | APBD | 20,000,000 | 19,965,000 | 19,839,600 | 19,839,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | 2020-09-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 160,400 | 0.8 % | |
679 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723282 | 22914589 | APBD | 20,000,000 | 19,965,000 | 19,839,600 | 19,839,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | 2020-09-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 160,400 | 0.8 % | |
680 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3724282 | 22914286 | APBD | 20,000,000 | 19,965,000 | 19,850,600 | 19,850,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | 2020-09-15 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 149,400 | 0.75 % | |
681 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3724282 | 22914286 | APBD | 20,000,000 | 19,965,000 | 19,850,600 | 19,850,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | 2020-09-15 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 149,400 | 0.75 % | |
682 | 2020 | Dinas Perpustakaan Dan Kearsipan | AC 1 PK | Pengadaan Langsung | Pengadaan Barang | 3728282 | 25799720 | APBD | 85,000,000 | 84,150,000 | 83,963,000 | 83,963,000 | 83,963,000 | 0 | 0 | 0 | 2020-09-08 | 2020-09-17 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 1,037,000 | 1.22 % | |
683 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3729282 | 23356041 | APBD | 6,000,000 | 6,000,000 | 5,841,000 | 5,841,000 | 5,835,500 | 5,835,500 | 0 | 0 | 2020-09-09 | 2020-09-16 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 159,000 | 2.65 % | |
684 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3729282 | 23356041 | APBD | 6,000,000 | 6,000,000 | 5,841,000 | 5,841,000 | 5,835,500 | 5,835,500 | 0 | 0 | 2020-09-09 | 2020-09-16 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 159,000 | 2.65 % | |
685 | 2020 | Kecamatan Kandangan | Belanja Hibah/Bantuan Sosial Pemasangan Listrik Kepada Masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Jasa Lainnya | 3730282 | 24543680 | APBD | 96,200,000 | 88,498,190 | 88,477,840 | 88,477,840 | 88,477,100 | 88,477,100 | 0 | 0 | 2020-09-08 | 2020-09-14 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 7,722,160 | 8.03 % | |
686 | 2020 | Kecamatan Kandangan | Belanja Hibah/Bantuan Sosial Pemasangan Listrik Kepada Masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Jasa Lainnya | 3730282 | 24543680 | APBD | 96,200,000 | 88,498,190 | 88,477,840 | 88,477,840 | 88,477,100 | 88,477,100 | 0 | 0 | 2020-09-08 | 2020-09-14 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 7,722,160 | 8.03 % | |
687 | 2020 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Terpadu | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3732282 | 26155218 | APBDP | 18,800,000 | 18,791,829 | 18,417,829 | 0 | 18,417,800 | 18,417,800 | 0 | 0 | 2020-09-09 | 2020-09-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,171 | 2.03 % | |
688 | 2020 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Terpadu | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3732282 | 26155218 | APBDP | 18,800,000 | 18,791,829 | 18,417,829 | 0 | 18,417,800 | 18,417,800 | 0 | 0 | 2020-09-09 | 2020-09-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,171 | 2.03 % | |
689 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3733282 | 26155556 | APBDP | 48,800,000 | 48,785,568 | 48,417,068 | 0 | 48,417,000 | 48,417,000 | 0 | 0 | 2020-09-09 | 2020-09-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,932 | 0.78 % | |
690 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3733282 | 26155556 | APBDP | 48,800,000 | 48,785,568 | 48,417,068 | 0 | 48,417,000 | 48,417,000 | 0 | 0 | 2020-09-09 | 2020-09-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,932 | 0.78 % | |
691 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Hibah Buku Kepada Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3736282 | 26226284 | APBD | 75,000,000 | 74,580,000 | 74,514,000 | 74,514,000 | 74,514,000 | 0 | 0 | 0 | 2020-10-08 | 2020-10-16 | CV. HITRO | 02.918.384.5-733.000 | 486,000 | 0.65 % | |
692 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Pengembangan Padi Organik (100 Ha) | Pengadaan Langsung | Pengadaan Barang | 3740282 | 26231854 | APBD | 154,250,000 | 145,098,125 | 145,050,700 | 145,050,700 | 145,050,700 | 145,050,700 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,199,300 | 5.96 % | |
693 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Pengembangan Padi Organik (100 Ha) | Pengadaan Langsung | Pengadaan Barang | 3740282 | 26231854 | APBD | 154,250,000 | 145,098,125 | 145,050,700 | 145,050,700 | 145,050,700 | 145,050,700 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,199,300 | 5.96 % | |
694 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Penangkaran Padi (35 Ha) | Pengadaan Langsung | Pengadaan Barang | 3741282 | 26231808 | APBD | 33,250,000 | 31,657,500 | 31,636,500 | 31,636,500 | 31,636,500 | 31,636,500 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,613,500 | 4.85 % | |
695 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Penangkaran Padi (35 Ha) | Pengadaan Langsung | Pengadaan Barang | 3741282 | 26231808 | APBD | 33,250,000 | 31,657,500 | 31,636,500 | 31,636,500 | 31,636,500 | 31,636,500 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,613,500 | 4.85 % | |
696 | 2020 | Dinas Pertanian | Pengadaan Bahan-Bibit Tanaman Pisang dan Tanaman Hortikultura | Pengadaan Langsung | Pengadaan Barang | 3742282 | 24144864;24144865 | APBD | 113,712,500 | 96,137,640 | 95,960,250 | 95,960,250 | 95,960,250 | 95,960,250 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 17,752,250 | 15.61 % | |
697 | 2020 | Dinas Pertanian | Pengadaan Bahan-Bibit Tanaman Pisang dan Tanaman Hortikultura | Pengadaan Langsung | Pengadaan Barang | 3742282 | 24144864;24144865 | APBD | 113,712,500 | 96,137,640 | 95,960,250 | 95,960,250 | 95,960,250 | 95,960,250 | 0 | 0 | 2020-09-22 | 2020-09-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 17,752,250 | 15.61 % | |
698 | 2020 | Dinas Kesehatan | Pengurugan Halaman Puskesmas Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3743282 | 23970126 | APBD | 190,000,000 | 189,709,284 | 189,405,029 | 0 | 189,400,000 | 189,400,000 | 0 | 0 | 2020-10-19 | 2020-11-05 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 594,971 | 0.31 % | |
699 | 2020 | Dinas Kesehatan | Pengurugan Halaman Puskesmas Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3743282 | 23970126 | APBD | 190,000,000 | 189,709,284 | 189,405,029 | 0 | 189,400,000 | 189,400,000 | 0 | 0 | 2020-10-19 | 2020-11-05 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 594,971 | 0.31 % | |
700 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Gambah Dalam Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3744282 | 26174707 | APBDP | 37,000,000 | 36,970,453 | 36,900,811 | 36,900,811 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | 2020-10-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,189 | 0.27 % | |
701 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Gambah Dalam Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3744282 | 26174707 | APBDP | 37,000,000 | 36,970,453 | 36,900,811 | 36,900,811 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | 2020-10-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,189 | 0.27 % | |
702 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 3745282 | 26174706 | APBDP | 37,000,000 | 36,989,716 | 36,949,774 | 36,949,774 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | 2020-10-12 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 50,226 | 0.14 % | |
703 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 3745282 | 26174706 | APBDP | 37,000,000 | 36,989,716 | 36,949,774 | 36,949,774 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | 2020-10-12 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 50,226 | 0.14 % | |
704 | 2020 | Dinas Kesehatan | Disediakan Belanja Bahan Habis Pakai Laboratorium | Pengadaan Langsung | Pengadaan Barang | 3748282 | 24978481 | APBD | 200,000,000 | 199,239,700 | 199,200,000 | 0 | 199,000,000 | 199,000,000 | 0 | 0 | 2020-11-12 | 2020-11-20 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 800,000 | 0.4 % | |
705 | 2020 | Dinas Kesehatan | Disediakan Belanja Bahan Habis Pakai Laboratorium | Pengadaan Langsung | Pengadaan Barang | 3748282 | 24978481 | APBD | 200,000,000 | 199,239,700 | 199,200,000 | 0 | 199,000,000 | 199,000,000 | 0 | 0 | 2020-11-12 | 2020-11-20 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 800,000 | 0.4 % | |
706 | 2020 | Sekretariat DPRD | Belanja Jasa Konsultansi Jasa Appraisal (Penilaian) Tunjangan Perumahan dan Transportasi Anggota DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3749282 | 26218103 | APBDP | 80,000,000 | 79,750,000 | 79,600,000 | 0 | 79,600,000 | 79,600,000 | 0 | 0 | 2020-09-22 | 2020-09-25 | ARIEF NOVIARAKHMAN ZAGLADI | 71.144.356.4-731.000 | 400,000 | 0.5 % | |
707 | 2020 | Sekretariat DPRD | Belanja Jasa Konsultansi Jasa Appraisal (Penilaian) Tunjangan Perumahan dan Transportasi Anggota DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3749282 | 26218103 | APBDP | 80,000,000 | 79,750,000 | 79,600,000 | 0 | 79,600,000 | 79,600,000 | 0 | 0 | 2020-09-22 | 2020-09-25 | ARIEF NOVIARAKHMAN ZAGLADI | 71.144.356.4-731.000 | 400,000 | 0.5 % | |
708 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Telaga Bidadari Asam Cangkok Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3752282 | 23349153 | APBD | 187,325,000 | 183,626,418 | 183,481,936 | 183,481,936 | 183,250,000 | 183,250,000 | 0 | 0 | 2020-09-23 | 2020-09-25 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 3,843,064 | 2.05 % | |
709 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Telaga Bidadari Asam Cangkok Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3752282 | 23349153 | APBD | 187,325,000 | 183,626,418 | 183,481,936 | 183,481,936 | 183,250,000 | 183,250,000 | 0 | 0 | 2020-09-23 | 2020-09-25 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 3,843,064 | 2.05 % | |
710 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawasan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3753282 | 26245865 | APBDP | 3,200,000 | 3,199,829 | 3,137,129 | 0 | 3,137,129 | 3,137,129 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 62,872 | 1.96 % | |
711 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawasan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3753282 | 26245865 | APBDP | 3,200,000 | 3,199,829 | 3,137,129 | 0 | 3,137,129 | 3,137,129 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 62,872 | 1.96 % | |
712 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Mall Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3754282 | 26174498 | APBDP | 100,000,000 | 99,932,129 | 99,239,129 | 99,239,129 | 99,110,000 | 99,110,000 | 0 | 0 | 2020-10-07 | 2020-10-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 760,871 | 0.76 % | |
713 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Mall Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3754282 | 26174498 | APBDP | 100,000,000 | 99,932,129 | 99,239,129 | 99,239,129 | 99,110,000 | 99,110,000 | 0 | 0 | 2020-10-07 | 2020-10-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 760,871 | 0.76 % | |
714 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3755282 | 26174529 | APBDP | 85,000,000 | 84,810,000 | 84,584,500 | 84,584,500 | 84,491,000 | 84,491,000 | 0 | 0 | 2020-10-02 | 2020-10-06 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,500 | 0.49 % | |
715 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3755282 | 26174529 | APBDP | 85,000,000 | 84,810,000 | 84,584,500 | 84,584,500 | 84,491,000 | 84,491,000 | 0 | 0 | 2020-10-02 | 2020-10-06 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,500 | 0.49 % | |
716 | 2020 | Kecamatan Kandangan | Belanja Jasa Pemeliharaan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 3756282 | 26242331 | APBD;APBDP | 36,026,000 | 36,020,534 | 35,723,454 | 0 | 35,723,454 | 35,723,454 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. AISY | 75.132.070.6-733.000 | 302,546 | 0.84 % | |
717 | 2020 | Kecamatan Kandangan | Belanja Jasa Pemeliharaan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 3756282 | 26242331 | APBD;APBDP | 36,026,000 | 36,020,534 | 35,723,454 | 0 | 35,723,454 | 35,723,454 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. AISY | 75.132.070.6-733.000 | 302,546 | 0.84 % | |
718 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Pengadaan Tanah Bangunan Irigasi | Pengadaan Langsung | Jasa Lainnya | 3759282 | 25741053 | APBD | 80,000,000 | 79,893,000 | 79,420,000 | 79,420,000 | 79,255,000 | 79,255,000 | 0 | 0 | 2020-09-29 | 2020-10-06 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 580,000 | 0.73 % | |
719 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Pengadaan Tanah Bangunan Irigasi | Pengadaan Langsung | Jasa Lainnya | 3759282 | 25741053 | APBD | 80,000,000 | 79,893,000 | 79,420,000 | 79,420,000 | 79,255,000 | 79,255,000 | 0 | 0 | 2020-09-29 | 2020-10-06 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 580,000 | 0.73 % | |
720 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Sarana Pendidikan | Pengadaan Langsung | Jasa Lainnya | 3760282 | 26237924 | APBD | 49,250,000 | 22,825,000 | 22,704,000 | 22,704,000 | 22,495,000 | 22,495,000 | 0 | 0 | 2020-10-05 | 2020-10-07 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 26,546,000 | 53.9 % | |
721 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Sarana Pendidikan | Pengadaan Langsung | Jasa Lainnya | 3760282 | 26237924 | APBD | 49,250,000 | 22,825,000 | 22,704,000 | 22,704,000 | 22,495,000 | 22,495,000 | 0 | 0 | 2020-10-05 | 2020-10-07 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 26,546,000 | 53.9 % | |
722 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3761282 | 23035658 | APBDP | 21,000,000 | 20,814,372 | 20,486,400 | 0 | 20,422,600 | 20,422,600 | 0 | 0 | 2020-10-05 | 2020-10-12 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 513,600 | 2.45 % | |
723 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3761282 | 23035658 | APBDP | 21,000,000 | 20,814,372 | 20,486,400 | 0 | 20,422,600 | 20,422,600 | 0 | 0 | 2020-10-05 | 2020-10-12 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 513,600 | 2.45 % | |
724 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. SDN Jambu Hilir 3 dan Sekitarnya Kel. Jambu Hilir (p=150m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3764282 | 23033038 | APBDP | 120,000,000 | 119,852,233 | 119,600,196 | 0 | 119,488,000 | 119,488,000 | 0 | 0 | 2020-10-12 | 2020-10-16 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 399,804 | 0.33 % | |
725 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. SDN Jambu Hilir 3 dan Sekitarnya Kel. Jambu Hilir (p=150m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3764282 | 23033038 | APBDP | 120,000,000 | 119,852,233 | 119,600,196 | 0 | 119,488,000 | 119,488,000 | 0 | 0 | 2020-10-12 | 2020-10-16 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 399,804 | 0.33 % | |
726 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Yudha Negara Kel. Kandangan Kota Kec. Kandangan (p=100m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3765282 | 23017408 | APBDP | 100,000,000 | 99,852,814 | 98,807,132 | 0 | 98,698,000 | 98,698,000 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 1,192,868 | 1.19 % | |
727 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Yudha Negara Kel. Kandangan Kota Kec. Kandangan (p=100m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3765282 | 23017408 | APBDP | 100,000,000 | 99,852,814 | 98,807,132 | 0 | 98,698,000 | 98,698,000 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 1,192,868 | 1.19 % | |
728 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mirah, Gg. Papinya dan Sekitarnya Kel. Kandangan Kota Kec. Kandangan (p=300m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3766282 | 23017404 | APBDP | 140,000,000 | 139,817,456 | 138,381,886 | 0 | 138,273,000 | 138,273,000 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 1,618,114 | 1.16 % | |
729 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mirah, Gg. Papinya dan Sekitarnya Kel. Kandangan Kota Kec. Kandangan (p=300m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3766282 | 23017404 | APBDP | 140,000,000 | 139,817,456 | 138,381,886 | 0 | 138,273,000 | 138,273,000 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 1,618,114 | 1.16 % | |
730 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Dar Assalam, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3768282 | 26164008 | APBDP | 16,000,000 | 15,959,006 | 15,697,000 | 0 | 15,598,000 | 15,598,000 | 0 | 0 | 2020-10-13 | 2020-10-16 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 303,000 | 1.89 % | |
731 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Dar Assalam, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3768282 | 26164008 | APBDP | 16,000,000 | 15,959,006 | 15,697,000 | 0 | 15,598,000 | 15,598,000 | 0 | 0 | 2020-10-13 | 2020-10-16 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 303,000 | 1.89 % | |
732 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Pondok Jambu Asri, Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769282 | 26163976 | APBDP | 30,000,000 | 29,118,761 | 28,985,000 | 0 | 28,864,000 | 28,864,000 | 0 | 0 | 2020-10-12 | 2020-10-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,015,000 | 3.38 % | |
733 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Pondok Jambu Asri, Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769282 | 26163976 | APBDP | 30,000,000 | 29,118,761 | 28,985,000 | 0 | 28,864,000 | 28,864,000 | 0 | 0 | 2020-10-12 | 2020-10-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,015,000 | 3.38 % | |
734 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3778282 | 26302922 | APBDP | 8,000,000 | 7,997,395 | 7,750,600 | 7,750,600 | 7,750,600 | 7,750,600 | 0 | 0 | 2020-10-05 | 2020-10-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 249,400 | 3.12 % | |
735 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3778282 | 26302922 | APBDP | 8,000,000 | 7,997,395 | 7,750,600 | 7,750,600 | 7,750,600 | 7,750,600 | 0 | 0 | 2020-10-05 | 2020-10-09 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 249,400 | 3.12 % | |
736 | 2020 | RSUD Brigjen H. Hasan Basry | Rehab Ruangan Laboratorium PCR (DID Tambahan) | Penunjukan Langsung | Pekerjaan Konstruksi | 3779282 | 26300516 | APBD | 218,500,000 | 199,997,102 | 199,951,427 | 199,951,427 | 199,951,000 | 199,951,000 | 0 | 0 | 2020-10-09 | 2020-10-15 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 18,548,573 | 8.49 % | |
737 | 2020 | RSUD Brigjen H. Hasan Basry | Rehab Ruangan Laboratorium PCR (DID Tambahan) | Penunjukan Langsung | Pekerjaan Konstruksi | 3779282 | 26300516 | APBD | 218,500,000 | 199,997,102 | 199,951,427 | 199,951,427 | 199,951,000 | 199,951,000 | 0 | 0 | 2020-10-09 | 2020-10-15 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 18,548,573 | 8.49 % | |
738 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3790282 | 25621372 | APBD | 6,000,000 | 6,000,000 | 5,994,500 | 5,994,500 | 5,989,000 | 5,989,000 | 0 | 0 | 2020-10-14 | 2020-10-20 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.09 % | |
739 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3790282 | 25621372 | APBD | 6,000,000 | 6,000,000 | 5,994,500 | 5,994,500 | 5,989,000 | 5,989,000 | 0 | 0 | 2020-10-14 | 2020-10-20 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.09 % | |
740 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3791282 | 23355227 | APBD | 4,800,000 | 4,800,000 | 4,794,500 | 4,794,500 | 4,789,000 | 4,789,000 | 0 | 0 | 2020-10-14 | 2020-10-20 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.11 % | |
741 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3791282 | 23355227 | APBD | 4,800,000 | 4,800,000 | 4,794,500 | 4,794,500 | 4,789,000 | 4,789,000 | 0 | 0 | 2020-10-14 | 2020-10-20 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.11 % | |
742 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | jasa konsultansi perencanaan untuk rehabilitasi kebocoran saluran air kolam renang Amandit Aquatic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3867282 | 26186156 | APBD | 12,500,000 | 12,456,227 | 12,291,227 | 0 | 12,291,227 | 12,291,227 | 0 | 0 | 2020-10-06 | 2020-10-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 208,773 | 1.67 % | |
743 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | jasa konsultansi perencanaan untuk rehabilitasi kebocoran saluran air kolam renang Amandit Aquatic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3867282 | 26186156 | APBD | 12,500,000 | 12,456,227 | 12,291,227 | 0 | 12,291,227 | 12,291,227 | 0 | 0 | 2020-10-06 | 2020-10-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 208,773 | 1.67 % | |
744 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Belanja Modal Peralatan dan Mesin- pengadaan Alat Penyimpan Perlengkapan Kantor Brankas,Pembelian Televisi,Pengadaan laptop | Pengadaan Langsung | Pengadaan Barang | 3868282 | 26154658;26154812;26163647 | APBD;APBDP | 52,750,000 | 52,745,000 | 52,690,000 | 52,690,000 | 52,690,000 | 52,690,000 | 0 | 0 | 2020-10-07 | 2020-10-14 | CV. HITRO | 02.918.384.5-733.000 | 60,000 | 0.11 % | |
745 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Belanja Modal Peralatan dan Mesin- pengadaan Alat Penyimpan Perlengkapan Kantor Brankas,Pembelian Televisi,Pengadaan laptop | Pengadaan Langsung | Pengadaan Barang | 3868282 | 26154658;26154812;26163647 | APBD;APBDP | 52,750,000 | 52,745,000 | 52,690,000 | 52,690,000 | 52,690,000 | 52,690,000 | 0 | 0 | 2020-10-07 | 2020-10-14 | CV. HITRO | 02.918.384.5-733.000 | 60,000 | 0.11 % | |
746 | 2020 | Sekretariat DPRD | Pengadaan dan pemasangan wallpaper Kantor Sekretariat DPRD | Pengadaan Langsung | Pengadaan Barang | 3871282 | 26254181 | APBDP | 158,800,000 | 158,800,000 | 158,700,000 | 0 | 158,700,000 | 158,700,000 | 0 | 0 | 2020-10-12 | 2020-10-19 | Mahameru interior | 95.979.622.8-531.000 | 100,000 | 0.06 % | |
747 | 2020 | Sekretariat DPRD | Pengadaan dan pemasangan wallpaper Kantor Sekretariat DPRD | Pengadaan Langsung | Pengadaan Barang | 3871282 | 26254181 | APBDP | 158,800,000 | 158,800,000 | 158,700,000 | 0 | 158,700,000 | 158,700,000 | 0 | 0 | 2020-10-12 | 2020-10-19 | Mahameru interior | 95.979.622.8-531.000 | 100,000 | 0.06 % | |
748 | 2020 | Sekretariat DPRD | Pengadaan Genset Kantor Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 3872282 | 26242683 | APBDP | 195,000,000 | 194,959,875 | 192,489,000 | 0 | 192,489,000 | 192,489,000 | 0 | 0 | 2020-10-11 | 2020-10-19 | CV. AL MADINAH | 66.139.132.6-733.000 | 2,511,000 | 1.29 % | |
749 | 2020 | Sekretariat DPRD | Pengadaan Genset Kantor Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 3872282 | 26242683 | APBDP | 195,000,000 | 194,959,875 | 192,489,000 | 0 | 192,489,000 | 192,489,000 | 0 | 0 | 2020-10-11 | 2020-10-19 | CV. AL MADINAH | 66.139.132.6-733.000 | 2,511,000 | 1.29 % | |
750 | 2020 | Dinas Ketahanan Pangan | Biaya Perencanaan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873282 | 26331256 | APBDP | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 0 | 0 | 2020-10-13 | 2020-10-16 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 0 | 0 % | |
751 | 2020 | Dinas Ketahanan Pangan | Biaya Perencanaan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873282 | 26331256 | APBDP | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 0 | 0 | 2020-10-13 | 2020-10-16 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 0 | 0 % | |
752 | 2020 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Tauman Sistem Keramba | Pengadaan Langsung | Pekerjaan Konstruksi | 3874282 | 26138179 | APBD | 120,000,000 | 114,816,885 | 114,386,605 | 114,386,605 | 114,380,000 | 114,380,000 | 0 | 0 | 2020-10-09 | 2020-10-14 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 5,613,395 | 4.68 % | |
753 | 2020 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Tauman Sistem Keramba | Pengadaan Langsung | Pekerjaan Konstruksi | 3874282 | 26138179 | APBD | 120,000,000 | 114,816,885 | 114,386,605 | 114,386,605 | 114,380,000 | 114,380,000 | 0 | 0 | 2020-10-09 | 2020-10-14 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 5,613,395 | 4.68 % | |
754 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3875282 | 23330145 | APBD | 200,000,000 | 199,904,298 | 197,157,767 | 197,157,767 | 197,047,000 | 197,047,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV.DITA | 02.242.686.0-733.000 | 2,842,233 | 1.42 % | |
755 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3875282 | 23330145 | APBD | 200,000,000 | 199,904,298 | 197,157,767 | 197,157,767 | 197,047,000 | 197,047,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV.DITA | 02.242.686.0-733.000 | 2,842,233 | 1.42 % | |
756 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Paket Pekerjaan DID Tambahan Tahap 2 dan Pengaspalan halaman kantor (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3877282 | 26345401 | APBDP | 100,000,000 | 98,381,250 | 97,845,000 | 97,845,000 | 97,790,000 | 97,790,000 | 0 | 0 | 2020-10-09 | 2020-10-13 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,155,000 | 2.16 % | |
757 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Paket Pekerjaan DID Tambahan Tahap 2 dan Pengaspalan halaman kantor (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3877282 | 26345401 | APBDP | 100,000,000 | 98,381,250 | 97,845,000 | 97,845,000 | 97,790,000 | 97,790,000 | 0 | 0 | 2020-10-09 | 2020-10-13 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,155,000 | 2.16 % | |
758 | 2020 | Dinas Pertanian | Belanja jasa perencanaan Kegiatan (Rehab JITUT, Rehab BPP Simpur, Rehab BPP Daha Barat, Rehab Scereen House, Rehab RPH, Rehab Bak Air UPTD Hariti, Rehab Parkir Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3880282 | 26347199 | APBDP | 100,000,000 | 98,713,395 | 98,577,559 | 98,577,559 | 98,577,559 | 98,577,559 | 0 | 0 | 2020-10-10 | 2020-10-15 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 1,422,441 | 1.42 % | |
759 | 2020 | Dinas Pertanian | Belanja jasa perencanaan Kegiatan (Rehab JITUT, Rehab BPP Simpur, Rehab BPP Daha Barat, Rehab Scereen House, Rehab RPH, Rehab Bak Air UPTD Hariti, Rehab Parkir Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3880282 | 26347199 | APBDP | 100,000,000 | 98,713,395 | 98,577,559 | 98,577,559 | 98,577,559 | 98,577,559 | 0 | 0 | 2020-10-10 | 2020-10-15 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 1,422,441 | 1.42 % | |
760 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3883282 | 23330149 | APBD | 10,000,000 | 10,000,000 | 9,999,000 | 9,999,000 | 9,750,000 | 9,750,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 1,000 | 0.01 % | |
761 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3883282 | 23330149 | APBD | 10,000,000 | 10,000,000 | 9,999,000 | 9,999,000 | 9,750,000 | 9,750,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 1,000 | 0.01 % | |
762 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3884282 | 23330122 | APBD | 200,000,000 | 199,755,877 | 196,858,198 | 196,858,198 | 196,748,000 | 196,748,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV.DITA | 02.242.686.0-733.000 | 3,141,802 | 1.57 % | |
763 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3884282 | 23330122 | APBD | 200,000,000 | 199,755,877 | 196,858,198 | 196,858,198 | 196,748,000 | 196,748,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV.DITA | 02.242.686.0-733.000 | 3,141,802 | 1.57 % | |
764 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3885282 | 23330127 | APBD | 10,000,000 | 10,000,000 | 9,878,000 | 9,878,000 | 9,878,000 | 9,878,000 | 0 | 0 | 2020-10-13 | 2020-10-15 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 122,000 | 1.22 % | |
765 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3885282 | 23330127 | APBD | 10,000,000 | 10,000,000 | 9,878,000 | 9,878,000 | 9,878,000 | 9,878,000 | 0 | 0 | 2020-10-13 | 2020-10-15 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 122,000 | 1.22 % | |
766 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3886282 | 23329488 | APBD | 50,000,000 | 50,000,000 | 50,000,000 | 50,000,000 | 49,885,000 | 49,885,000 | 0 | 0 | 2020-11-04 | 2020-11-09 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 1 | 0 % | |
767 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3886282 | 23329488 | APBD | 50,000,000 | 50,000,000 | 50,000,000 | 50,000,000 | 49,885,000 | 49,885,000 | 0 | 0 | 2020-11-04 | 2020-11-09 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 1 | 0 % | |
768 | 2020 | Dinas Perdagangan | Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Pekerjaan Konstruksi | 3888282 | 26155241 | APBDP | 198,900,000 | 198,873,423 | 198,329,667 | 0 | 198,329,600 | 198,329,600 | 0 | 0 | 2020-10-12 | 2020-10-19 | P B B | 01.145.832.0-733.000 | 570,333 | 0.29 % | |
769 | 2020 | Dinas Perdagangan | Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Pekerjaan Konstruksi | 3888282 | 26155241 | APBDP | 198,900,000 | 198,873,423 | 198,329,667 | 0 | 198,329,600 | 198,329,600 | 0 | 0 | 2020-10-12 | 2020-10-19 | P B B | 01.145.832.0-733.000 | 570,333 | 0.29 % | |
770 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang/Berat SMPN 2 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3889282 | 23823574 | APBD | 7,000,000 | 7,000,000 | 6,875,000 | 6,875,000 | 6,800,000 | 6,800,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,000 | 1.79 % | |
771 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang/Berat SMPN 2 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3889282 | 23823574 | APBD | 7,000,000 | 7,000,000 | 6,875,000 | 6,875,000 | 6,800,000 | 6,800,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,000 | 1.79 % | |
772 | 2020 | Dinas Perdagangan | Perencanaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3891282 | 26346538 | APBDP | 18,900,000 | 18,891,400 | 18,715,400 | 0 | 18,715,400 | 18,715,400 | 0 | 0 | 2020-10-12 | 2020-10-19 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 184,600 | 0.98 % | |
773 | 2020 | Dinas Perdagangan | Perencanaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3891282 | 26346538 | APBDP | 18,900,000 | 18,891,400 | 18,715,400 | 0 | 18,715,400 | 18,715,400 | 0 | 0 | 2020-10-12 | 2020-10-19 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 184,600 | 0.98 % | |
774 | 2020 | Dinas Perdagangan | Perencanaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3892282 | 26346366 | APBDP | 18,900,000 | 18,722,000 | 18,546,000 | 0 | 18,546,000 | 18,546,000 | 0 | 0 | 2020-10-12 | 2020-10-19 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 354,000 | 1.87 % | |
775 | 2020 | Dinas Perdagangan | Perencanaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3892282 | 26346366 | APBDP | 18,900,000 | 18,722,000 | 18,546,000 | 0 | 18,546,000 | 18,546,000 | 0 | 0 | 2020-10-12 | 2020-10-19 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 354,000 | 1.87 % | |
776 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3893282 | 26155596 | APBDP | 33,800,000 | 33,799,999 | 33,259,532 | 0 | 33,259,500 | 33,259,500 | 0 | 0 | 2020-10-24 | 2020-11-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 540,468 | 1.6 % | |
777 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3893282 | 26155596 | APBDP | 33,800,000 | 33,799,999 | 33,259,532 | 0 | 33,259,500 | 33,259,500 | 0 | 0 | 2020-10-24 | 2020-11-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 540,468 | 1.6 % | |
778 | 2020 | Sekretariat DPRD | Rehab Ruang Kerja Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3894282 | 26254303 | APBDP | 38,800,000 | 38,799,596 | 38,200,405 | 0 | 38,200,400 | 38,200,400 | 0 | 0 | 2020-10-12 | 2020-10-19 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 599,595 | 1.55 % | |
779 | 2020 | Sekretariat DPRD | Rehab Ruang Kerja Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3894282 | 26254303 | APBDP | 38,800,000 | 38,799,596 | 38,200,405 | 0 | 38,200,400 | 38,200,400 | 0 | 0 | 2020-10-12 | 2020-10-19 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 599,595 | 1.55 % | |
780 | 2020 | Dinas Perdagangan | Pengawasan Pekerjaan Paving Blok Halaman Pasar Terpadu HM. Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3896282 | 26158143 | APBDP | 25,000,000 | 24,999,999 | 24,578,984 | 0 | 24,578,900 | 24,578,900 | 0 | 0 | 2020-10-24 | 2020-11-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 421,016 | 1.68 % | |
781 | 2020 | Dinas Perdagangan | Pengawasan Pekerjaan Paving Blok Halaman Pasar Terpadu HM. Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3896282 | 26158143 | APBDP | 25,000,000 | 24,999,999 | 24,578,984 | 0 | 24,578,900 | 24,578,900 | 0 | 0 | 2020-10-24 | 2020-11-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 421,016 | 1.68 % | |
782 | 2020 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3897282 | 26155262 | APBDP | 12,800,000 | 12,799,999 | 12,668,666 | 0 | 12,668,600 | 12,668,600 | 0 | 0 | 2020-10-12 | 2020-10-19 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 131,334 | 1.03 % | |
783 | 2020 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3897282 | 26155262 | APBDP | 12,800,000 | 12,799,999 | 12,668,666 | 0 | 12,668,600 | 12,668,600 | 0 | 0 | 2020-10-12 | 2020-10-19 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 131,334 | 1.03 % | |
784 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3900282 | 26201708 | APBDP | 3,000,000 | 3,000,000 | 2,915,000 | 2,915,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 85,000 | 2.83 % | |
785 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3900282 | 26201708 | APBDP | 3,000,000 | 3,000,000 | 2,915,000 | 2,915,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 85,000 | 2.83 % | |
786 | 2020 | Dinas Pendidikan dan Kebudayaan | perencanaan rehab dan pembangunan pagar SMP (SMPN 1 Kalumpang & SMPN 1 Sungai Raya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903282 | 26201714 | APBDP | 3,000,000 | 3,000,000 | 2,970,000 | 2,970,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 30,000 | 1 % | |
787 | 2020 | Dinas Pendidikan dan Kebudayaan | perencanaan rehab dan pembangunan pagar SMP (SMPN 1 Kalumpang & SMPN 1 Sungai Raya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903282 | 26201714 | APBDP | 3,000,000 | 3,000,000 | 2,970,000 | 2,970,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 30,000 | 1 % | |
788 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Ibnu Umar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3904282 | 23823686 | APBD | 17,100,000 | 17,000,000 | 16,720,000 | 16,720,000 | 15,345,000 | 15,345,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 380,000 | 2.22 % | |
789 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Ibnu Umar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3904282 | 23823686 | APBD | 17,100,000 | 17,000,000 | 16,720,000 | 16,720,000 | 15,345,000 | 15,345,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 380,000 | 2.22 % | |
790 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Baruh Jaya untuk mendukung peningkatan produksi pertanian di Kec. Daha Selatan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3906282 | 26073114 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 0 | 0 | 2020-10-19 | 2020-10-22 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 100,000 | 0.33 % | |
791 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Baruh Jaya untuk mendukung peningkatan produksi pertanian di Kec. Daha Selatan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3906282 | 26073114 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 0 | 0 | 2020-10-19 | 2020-10-22 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 100,000 | 0.33 % | |
792 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Desa Tanjung Selor Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3908282 | 23035812 | APBDP | 24,000,000 | 23,526,009 | 23,433,300 | 0 | 23,323,300 | 23,323,300 | 0 | 0 | 2020-10-12 | 2020-10-16 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 566,700 | 2.36 % | |
793 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Desa Tanjung Selor Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3908282 | 23035812 | APBDP | 24,000,000 | 23,526,009 | 23,433,300 | 0 | 23,323,300 | 23,323,300 | 0 | 0 | 2020-10-12 | 2020-10-16 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 566,700 | 2.36 % | |
794 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3909282 | 26283910 | APBDP | 12,000,000 | 12,000,000 | 11,825,000 | 11,825,000 | 11,700,000 | 11,700,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,000 | 1.46 % | |
795 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3909282 | 26283910 | APBDP | 12,000,000 | 12,000,000 | 11,825,000 | 11,825,000 | 11,700,000 | 11,700,000 | 0 | 0 | 2020-10-12 | 2020-10-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,000 | 1.46 % | |
796 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3910282 | 26138134 | APBDP | 199,500,000 | 199,470,830 | 199,000,074 | 199,000,074 | 198,996,884 | 198,996,884 | 0 | 0 | 2020-10-16 | 2020-10-21 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 499,926 | 0.25 % | |
797 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3910282 | 26138134 | APBDP | 199,500,000 | 199,470,830 | 199,000,074 | 199,000,074 | 198,996,884 | 198,996,884 | 0 | 0 | 2020-10-16 | 2020-10-21 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 499,926 | 0.25 % | |
798 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Simpur, Sungai Raya, Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3912282 | 26345406 | APBDP | 100,000,000 | 97,494,375 | 97,020,000 | 97,020,000 | 97,000,000 | 97,000,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,980,000 | 2.98 % | |
799 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Simpur, Sungai Raya, Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3912282 | 26345406 | APBDP | 100,000,000 | 97,494,375 | 97,020,000 | 97,020,000 | 97,000,000 | 97,000,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,980,000 | 2.98 % | |
800 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Pantai Harapan dan Sekitarnya Kelurahan Kandangan Kota (p=250m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3914282 | 23033165 | APBDP | 180,400,000 | 180,186,797 | 179,649,784 | 0 | 179,591,000 | 179,591,000 | 0 | 0 | 2020-10-12 | 2020-10-16 | cv.ghea | 82.333.270.5-733.000 | 750,216 | 0.42 % | |
801 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Pantai Harapan dan Sekitarnya Kelurahan Kandangan Kota (p=250m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3914282 | 23033165 | APBDP | 180,400,000 | 180,186,797 | 179,649,784 | 0 | 179,591,000 | 179,591,000 | 0 | 0 | 2020-10-12 | 2020-10-16 | cv.ghea | 82.333.270.5-733.000 | 750,216 | 0.42 % | |
802 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Kandangan, Angkinang, Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3915282 | 26345408 | APBDP | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 2,870,000 | 2.87 % | |
803 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Kandangan, Angkinang, Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3915282 | 26345408 | APBDP | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 2,870,000 | 2.87 % | |
804 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Loksado, Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3916282 | 26345410 | APBDP | 100,000,000 | 97,494,375 | 97,086,000 | 97,086,000 | 97,086,000 | 97,086,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,914,000 | 2.91 % | |
805 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Loksado, Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3916282 | 26345410 | APBDP | 100,000,000 | 97,494,375 | 97,086,000 | 97,086,000 | 97,086,000 | 97,086,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,914,000 | 2.91 % | |
806 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Daha Selatan, Daha Utara, Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3917282 | 26345407 | APBDP | 100,000,000 | 97,494,375 | 96,140,000 | 96,140,000 | 96,100,000 | 96,100,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 3,860,000 | 3.86 % | |
807 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Daha Selatan, Daha Utara, Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3917282 | 26345407 | APBDP | 100,000,000 | 97,494,375 | 96,140,000 | 96,140,000 | 96,100,000 | 96,100,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 3,860,000 | 3.86 % | |
808 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3918282 | 26345417 | APBDP | 100,000,000 | 97,494,375 | 96,800,000 | 96,800,000 | 96,750,000 | 96,750,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 3,200,000 | 3.2 % | |
809 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3918282 | 26345417 | APBDP | 100,000,000 | 97,494,375 | 96,800,000 | 96,800,000 | 96,750,000 | 96,750,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 3,200,000 | 3.2 % | |
810 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3919282 | 26345415 | APBDP | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,870,000 | 2.87 % | |
811 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3919282 | 26345415 | APBDP | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | 2020-11-02 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,870,000 | 2.87 % | |
812 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Ruas Jl. Tumbukan Banyu - Banua Hanyar dan Jl. Gerilya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3920282 | 26156807 | APBDP | 60,000,000 | 59,984,375 | 59,730,000 | 59,730,000 | 59,700,000 | 59,700,000 | 0 | 0 | 2020-11-09 | 2020-11-12 | cv. alfa banua estetika | 81.252.051.8-731.000 | 270,000 | 0.45 % | |
813 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Ruas Jl. Tumbukan Banyu - Banua Hanyar dan Jl. Gerilya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3920282 | 26156807 | APBDP | 60,000,000 | 59,984,375 | 59,730,000 | 59,730,000 | 59,700,000 | 59,700,000 | 0 | 0 | 2020-11-09 | 2020-11-12 | cv. alfa banua estetika | 81.252.051.8-731.000 | 270,000 | 0.45 % | |
814 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Jembatan Gantung Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3921282 | 23373274 | APBD | 100,000,000 | 96,603,837 | 96,305,000 | 96,305,000 | 96,305,000 | 96,305,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 3,695,000 | 3.7 % | |
815 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Jembatan Gantung Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3921282 | 23373274 | APBD | 100,000,000 | 96,603,837 | 96,305,000 | 96,305,000 | 96,305,000 | 96,305,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 3,695,000 | 3.7 % | |
816 | 2020 | Dinas Perikanan | Belanja bahan perlengkapan Demplot budidadaya ikan dalam kolam terpal bundar sistem bioflock | Pengadaan Langsung | Pengadaan Barang | 3923282 | 26140891 | APBD | 73,025,000 | 72,261,750 | 71,997,750 | 71,997,750 | 71,900,000 | 71,900,000 | 0 | 0 | 2020-10-13 | 2020-10-20 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,027,250 | 1.41 % | |
817 | 2020 | Dinas Perikanan | Belanja bahan perlengkapan Demplot budidadaya ikan dalam kolam terpal bundar sistem bioflock | Pengadaan Langsung | Pengadaan Barang | 3923282 | 26140891 | APBD | 73,025,000 | 72,261,750 | 71,997,750 | 71,997,750 | 71,900,000 | 71,900,000 | 0 | 0 | 2020-10-13 | 2020-10-20 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,027,250 | 1.41 % | |
818 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3926282 | 26346837 | APBDP | 13,900,000 | 13,899,998 | 13,860,000 | 0 | 13,860,000 | 13,860,000 | 0 | 0 | 2020-10-13 | 2020-10-19 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 40,000 | 0.29 % | |
819 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3926282 | 26346837 | APBDP | 13,900,000 | 13,899,998 | 13,860,000 | 0 | 13,860,000 | 13,860,000 | 0 | 0 | 2020-10-13 | 2020-10-19 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 40,000 | 0.29 % | |
820 | 2020 | Dinas Perdagangan | Pemeliharaan Rutin Pasar lingkup bidang pengelolaan pasar kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3927282 | 26374401 | APBDP | 200,000,000 | 198,753,864 | 198,621,779 | 0 | 198,621,700 | 198,621,700 | 0 | 0 | 2020-10-19 | 2020-10-26 | CV SURYA UTAMA | 01.222.174.3-733.000 | 1,378,221 | 0.69 % | |
821 | 2020 | Dinas Perdagangan | Pemeliharaan Rutin Pasar lingkup bidang pengelolaan pasar kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3927282 | 26374401 | APBDP | 200,000,000 | 198,753,864 | 198,621,779 | 0 | 198,621,700 | 198,621,700 | 0 | 0 | 2020-10-19 | 2020-10-26 | CV SURYA UTAMA | 01.222.174.3-733.000 | 1,378,221 | 0.69 % | |
822 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 3928282 | 26346792 | APBDP | 198,900,000 | 198,444,094 | 198,003,199 | 0 | 198,003,100 | 198,003,100 | 0 | 0 | 2020-10-13 | 2020-10-19 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 896,801 | 0.45 % | |
823 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 3928282 | 26346792 | APBDP | 198,900,000 | 198,444,094 | 198,003,199 | 0 | 198,003,100 | 198,003,100 | 0 | 0 | 2020-10-13 | 2020-10-19 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 896,801 | 0.45 % | |
824 | 2020 | Dinas Perdagangan | Pengawasan rehap atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3929282 | 26360796 | APBDP | 13,900,000 | 13,899,999 | 13,733,755 | 0 | 13,733,700 | 13,733,700 | 0 | 0 | 2020-11-11 | 2020-11-18 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 166,245 | 1.2 % | |
825 | 2020 | Dinas Perdagangan | Pengawasan rehap atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3929282 | 26360796 | APBDP | 13,900,000 | 13,899,999 | 13,733,755 | 0 | 13,733,700 | 13,733,700 | 0 | 0 | 2020-11-11 | 2020-11-18 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 166,245 | 1.2 % | |
826 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3930282 | 26346583 | APBDP | 13,900,000 | 13,899,999 | 13,683,773 | 0 | 13,683,700 | 13,683,700 | 0 | 0 | 2020-11-11 | 2020-11-18 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 216,227 | 1.56 % | |
827 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3930282 | 26346583 | APBDP | 13,900,000 | 13,899,999 | 13,683,773 | 0 | 13,683,700 | 13,683,700 | 0 | 0 | 2020-11-11 | 2020-11-18 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 216,227 | 1.56 % | |
828 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3931282 | 26141062 | APBDP | 8,000,000 | 8,000,000 | 7,920,000 | 7,920,000 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | Jamilah | 14.427.417.2-733.000 | 80,000 | 1 % | |
829 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3931282 | 26141062 | APBDP | 8,000,000 | 8,000,000 | 7,920,000 | 7,920,000 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-10-15 | 2020-10-21 | Jamilah | 14.427.417.2-733.000 | 80,000 | 1 % | |
830 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3932282 | 26138362 | APBDP | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-10-16 | 2020-10-21 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 100,000 | 1 % | |
831 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3932282 | 26138362 | APBDP | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-10-16 | 2020-10-21 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 100,000 | 1 % | |
832 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3933282 | 26212410 | APBDP | 25,000,000 | 24,850,000 | 24,750,000 | 24,750,000 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-10-14 | 2020-10-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 250,000 | 1 % | |
833 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3933282 | 26212410 | APBDP | 25,000,000 | 24,850,000 | 24,750,000 | 24,750,000 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-10-14 | 2020-10-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 250,000 | 1 % | |
834 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3934282 | 26138273 | APBDP | 10,000,000 | 10,000,000 | 9,996,580 | 0 | 9,994,600 | 9,994,600 | 0 | 0 | 2020-10-20 | 2020-10-22 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 3,420 | 0.03 % | |
835 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3934282 | 26138273 | APBDP | 10,000,000 | 10,000,000 | 9,996,580 | 0 | 9,994,600 | 9,994,600 | 0 | 0 | 2020-10-20 | 2020-10-22 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 3,420 | 0.03 % | |
836 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3935282 | 23330155 | APBD | 171,000,000 | 170,969,218 | 170,902,785 | 170,902,785 | 170,820,000 | 170,820,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 97,215 | 0.06 % | |
837 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3935282 | 23330155 | APBD | 171,000,000 | 170,969,218 | 170,902,785 | 170,902,785 | 170,820,000 | 170,820,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 97,215 | 0.06 % | |
838 | 2020 | Dinas Ketahanan Pangan | Rehab Lantai Jemur Lumbung Pangan Masyarakat Al-Barakah Desa Asam (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3936282 | 26330639 | APBDP | 22,900,000 | 22,891,649 | 22,733,123 | 22,733,123 | 22,232,000 | 22,232,000 | 0 | 0 | 2020-10-23 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 166,877 | 0.73 % | |
839 | 2020 | Dinas Ketahanan Pangan | Rehab Lantai Jemur Lumbung Pangan Masyarakat Al-Barakah Desa Asam (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3936282 | 26330639 | APBDP | 22,900,000 | 22,891,649 | 22,733,123 | 22,733,123 | 22,232,000 | 22,232,000 | 0 | 0 | 2020-10-23 | 2020-10-27 | CV. AISY | 75.132.070.6-733.000 | 166,877 | 0.73 % | |
840 | 2020 | Sekretariat Daerah | Pengadaan Pilar Batas Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3937282 | 26398767 | APBD | 70,000,000 | 69,931,510 | 69,821,510 | 0 | 69,821,500 | 69,821,500 | 0 | 0 | 2020-11-03 | 2020-11-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 178,490 | 0.25 % | |
841 | 2020 | Sekretariat Daerah | Pengadaan Pilar Batas Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3937282 | 26398767 | APBD | 70,000,000 | 69,931,510 | 69,821,510 | 0 | 69,821,500 | 69,821,500 | 0 | 0 | 2020-11-03 | 2020-11-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 178,490 | 0.25 % | |
842 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Pelayanan Publik Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3938282 | 26174499 | APBDP | 20,000,000 | 20,000,000 | 19,677,337 | 19,677,337 | 19,600,000 | 19,600,000 | 0 | 0 | 2020-10-16 | 2020-10-20 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 322,663 | 1.61 % | |
843 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Pelayanan Publik Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3938282 | 26174499 | APBDP | 20,000,000 | 20,000,000 | 19,677,337 | 19,677,337 | 19,600,000 | 19,600,000 | 0 | 0 | 2020-10-16 | 2020-10-20 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 322,663 | 1.61 % | |
844 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan/Rehabilitasi Saluran Drainase Jalan Al Falah Kel. Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3939282 | 26165268 | APBDP | 70,000,000 | 70,000,000 | 69,256,877 | 69,256,877 | 69,200,000 | 69,200,000 | 0 | 0 | 2020-10-23 | 2020-10-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 743,123 | 1.06 % | |
845 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan/Rehabilitasi Saluran Drainase Jalan Al Falah Kel. Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3939282 | 26165268 | APBDP | 70,000,000 | 70,000,000 | 69,256,877 | 69,256,877 | 69,200,000 | 69,200,000 | 0 | 0 | 2020-10-23 | 2020-10-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 743,123 | 1.06 % | |
846 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Pondok Pesantren Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3940282 | 26165262 | APBDP | 50,000,000 | 50,000,000 | 49,720,000 | 49,720,000 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-10-21 | 2020-10-26 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 280,000 | 0.56 % | |
847 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Pondok Pesantren Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3940282 | 26165262 | APBDP | 50,000,000 | 50,000,000 | 49,720,000 | 49,720,000 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-10-21 | 2020-10-26 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 280,000 | 0.56 % | |
848 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Ponpes Tarbiyatul Furqon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3941282 | 26162723 | APBDP | 50,000,000 | 50,000,000 | 49,665,000 | 49,665,000 | 49,600,000 | 49,600,000 | 0 | 0 | 2020-10-21 | 2020-10-26 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 335,000 | 0.67 % | |
849 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Ponpes Tarbiyatul Furqon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3941282 | 26162723 | APBDP | 50,000,000 | 50,000,000 | 49,665,000 | 49,665,000 | 49,600,000 | 49,600,000 | 0 | 0 | 2020-10-21 | 2020-10-26 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 335,000 | 0.67 % | |
850 | 2020 | Dinas Kesehatan | Belanja jaringan pipa gas distribusi (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 3942282 | 26162796 | APBD | 180,000,000 | 179,987,500 | 179,500,200 | 0 | 179,500,000 | 179,500,000 | 0 | 0 | 2020-10-21 | 2020-10-23 | CV. YONIA | 02.089.778.1-733.000 | 499,800 | 0.28 % | |
851 | 2020 | Dinas Kesehatan | Belanja jaringan pipa gas distribusi (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 3942282 | 26162796 | APBD | 180,000,000 | 179,987,500 | 179,500,200 | 0 | 179,500,000 | 179,500,000 | 0 | 0 | 2020-10-21 | 2020-10-23 | CV. YONIA | 02.089.778.1-733.000 | 499,800 | 0.28 % | |
852 | 2020 | Dinas Pertanian | Pengadaan Bibit Aren Genjah, Herbisida dan PMLT,Pengadaan bibit aren genjah (plasi 10%) | Pengadaan Langsung | Pengadaan Barang | 3945282 | 24110506;25744292;25744312 | APBD | 56,790,000 | 55,440,000 | 54,846,000 | 54,846,000 | 54,846,000 | 54,846,000 | 0 | 0 | 2020-10-16 | 2020-10-22 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 1,944,000 | 3.42 % | |
853 | 2020 | Dinas Pertanian | Pengadaan Bibit Aren Genjah, Herbisida dan PMLT,Pengadaan bibit aren genjah (plasi 10%) | Pengadaan Langsung | Pengadaan Barang | 3945282 | 24110506;25744292;25744312 | APBD | 56,790,000 | 55,440,000 | 54,846,000 | 54,846,000 | 54,846,000 | 54,846,000 | 0 | 0 | 2020-10-16 | 2020-10-22 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 1,944,000 | 3.42 % | |
854 | 2020 | Dinas Pertanian | Pengadaan Bibit Karet Unggul Okulasi, Herbisida dan PMLT | Pengadaan Langsung | Pengadaan Barang | 3946282 | 25744837;25744849;25744873 | APBD | 68,600,000 | 67,650,000 | 67,375,000 | 67,375,000 | 67,375,000 | 67,375,000 | 0 | 0 | 2020-10-16 | 2020-10-21 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 1,225,000 | 1.79 % | |
855 | 2020 | Dinas Pertanian | Pengadaan Bibit Karet Unggul Okulasi, Herbisida dan PMLT | Pengadaan Langsung | Pengadaan Barang | 3946282 | 25744837;25744849;25744873 | APBD | 68,600,000 | 67,650,000 | 67,375,000 | 67,375,000 | 67,375,000 | 67,375,000 | 0 | 0 | 2020-10-16 | 2020-10-21 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 1,225,000 | 1.79 % | |
856 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengb. Kelapa Genjah dan Pemeliharaan Kebun Kelapa | Pengadaan Langsung | Pengadaan Barang | 3947282 | 24110656;24110657 | APBD | 30,510,000 | 30,368,250 | 30,294,000 | 30,294,000 | 30,294,000 | 30,294,000 | 0 | 0 | 2020-10-16 | 2020-10-20 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 216,000 | 0.71 % | |
857 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengb. Kelapa Genjah dan Pemeliharaan Kebun Kelapa | Pengadaan Langsung | Pengadaan Barang | 3947282 | 24110656;24110657 | APBD | 30,510,000 | 30,368,250 | 30,294,000 | 30,294,000 | 30,294,000 | 30,294,000 | 0 | 0 | 2020-10-16 | 2020-10-20 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 216,000 | 0.71 % | |
858 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Pekerjaan Konstruksi | 3948282 | 26139676 | APBDP | 200,000,000 | 199,395,702 | 198,882,438 | 198,882,438 | 198,849,000 | 198,849,000 | 0 | 0 | 2020-10-19 | 2020-10-22 | FADWI UTAMA | 94.246.044.5-733.000 | 1,117,562 | 0.56 % | |
859 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Pekerjaan Konstruksi | 3948282 | 26139676 | APBDP | 200,000,000 | 199,395,702 | 198,882,438 | 198,882,438 | 198,849,000 | 198,849,000 | 0 | 0 | 2020-10-19 | 2020-10-22 | FADWI UTAMA | 94.246.044.5-733.000 | 1,117,562 | 0.56 % | |
860 | 2020 | Sekretariat DPRD | Perencanaan Rehab Jendela dan Ventilasi Ruang Rapat DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3950282 | 26261191 | APBDP | 12,000,000 | 11,998,388 | 11,900,683 | 0 | 11,900,600 | 11,900,600 | 0 | 0 | 2020-10-17 | 2020-10-22 | Angga Isnarreza | 70.689.929.1-733.000 | 99,317 | 0.83 % | |
861 | 2020 | Sekretariat DPRD | Perencanaan Rehab Jendela dan Ventilasi Ruang Rapat DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3950282 | 26261191 | APBDP | 12,000,000 | 11,998,388 | 11,900,683 | 0 | 11,900,600 | 11,900,600 | 0 | 0 | 2020-10-17 | 2020-10-22 | Angga Isnarreza | 70.689.929.1-733.000 | 99,317 | 0.83 % | |
862 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Perencanaan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3952282 | 26178424 | APBDP | 6,000,000 | 5,999,623 | 5,875,839 | 0 | 5,875,800 | 5,875,800 | 0 | 0 | 2020-10-18 | 2020-10-23 | Angga Isnarreza | 70.689.929.1-733.000 | 124,161 | 2.07 % | |
863 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Perencanaan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3952282 | 26178424 | APBDP | 6,000,000 | 5,999,623 | 5,875,839 | 0 | 5,875,800 | 5,875,800 | 0 | 0 | 2020-10-18 | 2020-10-23 | Angga Isnarreza | 70.689.929.1-733.000 | 124,161 | 2.07 % | |
864 | 2020 | Dinas Komunikasi dan Informatika | Pemeliharaan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3953282 | 23869240 | APBD | 27,500,000 | 27,456,931 | 27,126,931 | 0 | 27,126,931 | 27,126,931 | 0 | 0 | 2020-10-19 | 2020-10-21 | CV. KHALIF | 81.540.809.1-733.000 | 373,069 | 1.36 % | |
865 | 2020 | Dinas Komunikasi dan Informatika | Pemeliharaan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3953282 | 23869240 | APBD | 27,500,000 | 27,456,931 | 27,126,931 | 0 | 27,126,931 | 27,126,931 | 0 | 0 | 2020-10-19 | 2020-10-21 | CV. KHALIF | 81.540.809.1-733.000 | 373,069 | 1.36 % | |
866 | 2020 | Dinas Kesehatan | Pembuataan Pagar Samping PKM Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3955282 | 26174710 | APBDP | 75,000,000 | 74,963,957 | 74,513,302 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | CV. JAYA ABADI | 02.237.609.9-733.000 | 486,698 | 0.65 % | |
867 | 2020 | Dinas Kesehatan | Pembuataan Pagar Samping PKM Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3955282 | 26174710 | APBDP | 75,000,000 | 74,963,957 | 74,513,302 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | CV. JAYA ABADI | 02.237.609.9-733.000 | 486,698 | 0.65 % | |
868 | 2020 | Dinas Kesehatan | Pengawasan Pembuatan Pagar Puskemas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3956282 | 26174713 | APBDP | 10,000,000 | 9,955,000 | 9,922,000 | 0 | 9,500,000 | 9,500,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | cv.akmalindo | 02.531.482.4-731.000 | 78,000 | 0.78 % | |
869 | 2020 | Dinas Kesehatan | Pengawasan Pembuatan Pagar Puskemas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3956282 | 26174713 | APBDP | 10,000,000 | 9,955,000 | 9,922,000 | 0 | 9,500,000 | 9,500,000 | 0 | 0 | 2020-10-20 | 2020-10-26 | cv.akmalindo | 02.531.482.4-731.000 | 78,000 | 0.78 % | |
870 | 2020 | Dinas Perikanan | Belanja bahan dan peralatan Perlengkapan Demplot budidaya ikan Dalam kolam terpal Bundar sistem biopflock | Pengadaan Langsung | Pengadaan Barang | 3960282 | 26140727 | APBD | 65,350,000 | 62,040,000 | 61,880,500 | 61,880,500 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-10-19 | 2020-10-26 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 3,469,500 | 5.31 % | |
871 | 2020 | Dinas Perikanan | Belanja bahan dan peralatan Perlengkapan Demplot budidaya ikan Dalam kolam terpal Bundar sistem biopflock | Pengadaan Langsung | Pengadaan Barang | 3960282 | 26140727 | APBD | 65,350,000 | 62,040,000 | 61,880,500 | 61,880,500 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-10-19 | 2020-10-26 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 3,469,500 | 5.31 % | |
872 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 3961282 | 23329930 | APBD | 200,000,000 | 199,917,077 | 199,310,319 | 199,310,319 | 199,172,000 | 199,172,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV RIZKY BANUA | 02.089.856.5-733.000 | 689,681 | 0.34 % | |
873 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 3961282 | 23329930 | APBD | 200,000,000 | 199,917,077 | 199,310,319 | 199,310,319 | 199,172,000 | 199,172,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | CV RIZKY BANUA | 02.089.856.5-733.000 | 689,681 | 0.34 % | |
874 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962282 | 23329946 | APBD | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,740,000 | 9,740,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 254,129 | 2.54 % | |
875 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962282 | 23329946 | APBD | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,740,000 | 9,740,000 | 0 | 0 | 2020-10-20 | 2020-10-23 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 254,129 | 2.54 % | |
876 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Goa Berangin (81) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964282 | 26216701 | APBDP | 50,000,000 | 49,152,243 | 48,950,000 | 48,950,000 | 48,880,000 | 48,880,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,050,000 | 2.1 % | |
877 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Goa Berangin (81) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964282 | 26216701 | APBDP | 50,000,000 | 49,152,243 | 48,950,000 | 48,950,000 | 48,880,000 | 48,880,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,050,000 | 2.1 % | |
878 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3965282 | 26136077 | APBDP | 50,000,000 | 49,152,243 | 48,750,000 | 48,750,000 | 48,700,000 | 48,700,000 | 0 | 0 | 2020-11-10 | 2020-11-16 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 1,250,000 | 2.5 % | |
879 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3965282 | 26136077 | APBDP | 50,000,000 | 49,152,243 | 48,750,000 | 48,750,000 | 48,700,000 | 48,700,000 | 0 | 0 | 2020-11-10 | 2020-11-16 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 1,250,000 | 2.5 % | |
880 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Tabihi Telaga Langsat (106) Kec. Padang Batung/ Telaga Langsat (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966282 | 26216885 | APBDP | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | cv.mitra talenta prima | 02.746.658.0-733.000 | 909,750 | 1.82 % | |
881 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Tabihi Telaga Langsat (106) Kec. Padang Batung/ Telaga Langsat (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966282 | 26216885 | APBDP | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | cv.mitra talenta prima | 02.746.658.0-733.000 | 909,750 | 1.82 % | |
882 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan menuju Balai Benih Ikan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967282 | 26153086 | APBDP | 40,000,000 | 37,304,182 | 37,119,500 | 37,119,500 | 37,100,000 | 37,100,000 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,880,500 | 7.2 % | |
883 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan menuju Balai Benih Ikan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967282 | 26153086 | APBDP | 40,000,000 | 37,304,182 | 37,119,500 | 37,119,500 | 37,100,000 | 37,100,000 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,880,500 | 7.2 % | |
884 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Sarang Nyamuk Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968282 | 26153253 | APBDP | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-11 | 2020-11-13 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 909,750 | 1.82 % | |
885 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Sarang Nyamuk Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968282 | 26153253 | APBDP | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-11 | 2020-11-13 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 909,750 | 1.82 % | |
886 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 3969282 | 26139635 | APBDP | 200,000,000 | 199,013,443 | 198,842,149 | 198,842,149 | 198,781,649 | 198,781,649 | 0 | 0 | 2020-11-11 | 2020-11-12 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,157,851 | 0.58 % | |
887 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 3969282 | 26139635 | APBDP | 200,000,000 | 199,013,443 | 198,842,149 | 198,842,149 | 198,781,649 | 198,781,649 | 0 | 0 | 2020-11-11 | 2020-11-12 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,157,851 | 0.58 % | |
888 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3970282 | 26141131 | APBDP | 200,000,000 | 198,680,377 | 198,496,127 | 198,496,127 | 198,372,769 | 198,372,769 | 0 | 0 | 2020-10-27 | 2020-11-02 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,503,873 | 0.75 % | |
889 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3970282 | 26141131 | APBDP | 200,000,000 | 198,680,377 | 198,496,127 | 198,496,127 | 198,372,769 | 198,372,769 | 0 | 0 | 2020-10-27 | 2020-11-02 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,503,873 | 0.75 % | |
890 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 3971282 | 26140885 | APBDP | 199,700,000 | 199,095,248 | 198,820,248 | 198,820,248 | 198,193,146 | 198,193,146 | 0 | 0 | 2020-10-27 | 2020-11-02 | cv. rukun damai | 01.203.952.5-733.000 | 879,752 | 0.44 % | |
891 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 3971282 | 26140885 | APBDP | 199,700,000 | 199,095,248 | 198,820,248 | 198,820,248 | 198,193,146 | 198,193,146 | 0 | 0 | 2020-10-27 | 2020-11-02 | cv. rukun damai | 01.203.952.5-733.000 | 879,752 | 0.44 % | |
892 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3976282 | 26422353 | APBDP | 120,000,000 | 119,977,245 | 119,867,245 | 119,867,245 | 119,867,244 | 119,867,244 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV.DITA | 02.242.686.0-733.000 | 132,755 | 0.11 % | |
893 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3976282 | 26422353 | APBDP | 120,000,000 | 119,977,245 | 119,867,245 | 119,867,245 | 119,867,244 | 119,867,244 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV.DITA | 02.242.686.0-733.000 | 132,755 | 0.11 % | |
894 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3977282 | 26138170 | APBDP | 199,800,000 | 199,768,795 | 199,251,502 | 199,251,502 | 199,196,502 | 199,196,502 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 548,498 | 0.27 % | |
895 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3977282 | 26138170 | APBDP | 199,800,000 | 199,768,795 | 199,251,502 | 199,251,502 | 199,196,502 | 199,196,502 | 0 | 0 | 2020-10-21 | 2020-10-27 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 548,498 | 0.27 % | |
896 | 2020 | Kecamatan Padang Batung | Konsultan Perencanaan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978282 | 26156762 | APBDP | 3,000,000 | 2,995,300 | 2,940,300 | 0 | 2,940,300 | 2,940,300 | 0 | 0 | 2020-10-21 | 2020-10-26 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 59,700 | 1.99 % | |
897 | 2020 | Kecamatan Padang Batung | Konsultan Perencanaan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978282 | 26156762 | APBDP | 3,000,000 | 2,995,300 | 2,940,300 | 0 | 2,940,300 | 2,940,300 | 0 | 0 | 2020-10-21 | 2020-10-26 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 59,700 | 1.99 % | |
898 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas KH. Anwari Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3979282 | 26216753 | APBDP | 194,400,000 | 194,319,123 | 194,279,303 | 194,279,303 | 194,187,783 | 194,187,783 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,697 | 0.06 % | |
899 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas KH. Anwari Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3979282 | 26216753 | APBDP | 194,400,000 | 194,319,123 | 194,279,303 | 194,279,303 | 194,187,783 | 194,187,783 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,697 | 0.06 % | |
900 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980282 | 26138345 | APBDP | 10,000,000 | 10,000,000 | 9,906,500 | 9,906,500 | 9,903,300 | 9,903,300 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 93,500 | 0.94 % | |
901 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980282 | 26138345 | APBDP | 10,000,000 | 10,000,000 | 9,906,500 | 9,906,500 | 9,903,300 | 9,903,300 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 93,500 | 0.94 % | |
902 | 2020 | Dinas Perhubungan | Perencanaan Pembangunan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3983282 | 26423479 | APBDP | 7,000,000 | 6,993,261 | 6,985,000 | 0 | 6,985,000 | 6,985,000 | 0 | 0 | 2020-10-24 | 2020-11-04 | DODY WIJAYA | 15.516.787.7-733.000 | 15,000 | 0.21 % | |
903 | 2020 | Dinas Perhubungan | Perencanaan Pembangunan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3983282 | 26423479 | APBDP | 7,000,000 | 6,993,261 | 6,985,000 | 0 | 6,985,000 | 6,985,000 | 0 | 0 | 2020-10-24 | 2020-11-04 | DODY WIJAYA | 15.516.787.7-733.000 | 15,000 | 0.21 % | |
904 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Jangkang, Kalumpang Baruh, dan KH.Anwari Kec. Kandangan/Kalumpang/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985282 | 26216741 | APBDP | 36,000,000 | 35,410,473 | 35,241,250 | 35,241,250 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 758,750 | 2.11 % | |
905 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Jangkang, Kalumpang Baruh, dan KH.Anwari Kec. Kandangan/Kalumpang/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985282 | 26216741 | APBDP | 36,000,000 | 35,410,473 | 35,241,250 | 35,241,250 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 758,750 | 2.11 % | |
906 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan depan MTsN Angkinang, menuju MIN Gala Gala Kec. Telaga Langsat dan Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986282 | 26155053 | APBDP | 36,000,000 | 35,410,473 | 35,243,450 | 35,243,450 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 756,550 | 2.1 % | |
907 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan depan MTsN Angkinang, menuju MIN Gala Gala Kec. Telaga Langsat dan Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986282 | 26155053 | APBDP | 36,000,000 | 35,410,473 | 35,243,450 | 35,243,450 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 756,550 | 2.1 % | |
908 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3987282 | 26138321 | APBDP | 150,000,000 | 149,968,664 | 149,621,217 | 0 | 149,957,000 | 149,374,000 | 0 | 0 | 2020-10-22 | 2020-10-23 | CV. ALBATROS | 01.222.160.2-733.000 | 378,783 | 0.25 % | |
909 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3987282 | 26138321 | APBDP | 150,000,000 | 149,968,664 | 149,621,217 | 0 | 149,957,000 | 149,374,000 | 0 | 0 | 2020-10-22 | 2020-10-23 | CV. ALBATROS | 01.222.160.2-733.000 | 378,783 | 0.25 % | |
910 | 2020 | Dinas Perhubungan | Pengawasan Pekerjaan Pembangunan Dermaga Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3988282 | 26434568 | APBDP | 10,000,000 | 9,949,859 | 9,900,000 | 0 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-11-17 | 2020-11-24 | DODY WIJAYA | 15.516.787.7-733.000 | 100,000 | 1 % | |
911 | 2020 | Dinas Perhubungan | Pengawasan Pekerjaan Pembangunan Dermaga Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3988282 | 26434568 | APBDP | 10,000,000 | 9,949,859 | 9,900,000 | 0 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-11-17 | 2020-11-24 | DODY WIJAYA | 15.516.787.7-733.000 | 100,000 | 1 % | |
912 | 2020 | RSUD Brigjen H. Hasan Basry | Mesin Pengolah Sampah | Pengadaan Langsung | Pengadaan Barang | 3990282 | 26302964 | APBDP | 190,000,000 | 190,000,000 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 0 | 0 | 2020-10-22 | 2020-10-27 | PT.PARAHYANGAN TEKNIKA PERSADA | 84.802.805.6-444.000 | 500,000 | 0.26 % | |
913 | 2020 | RSUD Brigjen H. Hasan Basry | Mesin Pengolah Sampah | Pengadaan Langsung | Pengadaan Barang | 3990282 | 26302964 | APBDP | 190,000,000 | 190,000,000 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 0 | 0 | 2020-10-22 | 2020-10-27 | PT.PARAHYANGAN TEKNIKA PERSADA | 84.802.805.6-444.000 | 500,000 | 0.26 % | |
914 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991282 | 26138173 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,935,000 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
915 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991282 | 26138173 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,935,000 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
916 | 2020 | Dinas Ketahanan Pangan | Belanja Paket Bioflok untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 3992282 | 26332180 | APBDP | 209,412,000 | 198,632,610 | 198,434,610 | 198,434,610 | 198,434,610 | 198,434,610 | 0 | 0 | 2020-11-03 | 2020-11-05 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,977,390 | 5.24 % | |
917 | 2020 | Dinas Ketahanan Pangan | Belanja Paket Bioflok untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 3992282 | 26332180 | APBDP | 209,412,000 | 198,632,610 | 198,434,610 | 198,434,610 | 198,434,610 | 198,434,610 | 0 | 0 | 2020-11-03 | 2020-11-05 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,977,390 | 5.24 % | |
918 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3993282 | 26447423 | APBDP | 183,200,000 | 183,119,624 | 183,076,724 | 183,076,724 | 183,011,604 | 183,011,604 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV SURYA UTAMA | 01.222.174.3-733.000 | 123,276 | 0.07 % | |
919 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3993282 | 26447423 | APBDP | 183,200,000 | 183,119,624 | 183,076,724 | 183,076,724 | 183,011,604 | 183,011,604 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV SURYA UTAMA | 01.222.174.3-733.000 | 123,276 | 0.07 % | |
920 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3995282 | 26174486 | APBDP | 60,000,000 | 60,000,000 | 59,741,000 | 59,741,000 | 59,664,000 | 59,664,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 259,000 | 0.43 % | |
921 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3995282 | 26174486 | APBDP | 60,000,000 | 60,000,000 | 59,741,000 | 59,741,000 | 59,664,000 | 59,664,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 259,000 | 0.43 % | |
922 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3996282 | 26155227 | APBDP | 15,000,000 | 15,000,000 | 14,894,000 | 14,894,000 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 106,000 | 0.71 % | |
923 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3996282 | 26155227 | APBDP | 15,000,000 | 15,000,000 | 14,894,000 | 14,894,000 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 106,000 | 0.71 % | |
924 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3997282 | 26155140 | APBDP | 183,200,000 | 183,198,840 | 183,149,340 | 183,149,340 | 183,024,000 | 183,024,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. SORAYA | 01.834.078.6-733.000 | 50,660 | 0.03 % | |
925 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3997282 | 26155140 | APBDP | 183,200,000 | 183,198,840 | 183,149,340 | 183,149,340 | 183,024,000 | 183,024,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. SORAYA | 01.834.078.6-733.000 | 50,660 | 0.03 % | |
926 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998282 | 26446572 | APBDP | 15,000,000 | 15,000,000 | 14,899,500 | 14,899,500 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 100,500 | 0.67 % | |
927 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998282 | 26446572 | APBDP | 15,000,000 | 15,000,000 | 14,899,500 | 14,899,500 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-12 | 2020-11-17 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 100,500 | 0.67 % | |
928 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3999282 | 26183227 | APBDP | 20,000,000 | 20,000,000 | 19,750,000 | 19,750,000 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-11-19 | 2020-11-23 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 250,000 | 1.25 % | |
929 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3999282 | 26183227 | APBDP | 20,000,000 | 20,000,000 | 19,750,000 | 19,750,000 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-11-19 | 2020-11-23 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 250,000 | 1.25 % | |
930 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4000282 | 26138224 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
931 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4000282 | 26138224 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
932 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001282 | 26183950 | APBDP | 15,000,000 | 15,000,000 | 14,905,000 | 14,905,000 | 14,900,000 | 14,900,000 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 95,000 | 0.63 % | |
933 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001282 | 26183950 | APBDP | 15,000,000 | 15,000,000 | 14,905,000 | 14,905,000 | 14,900,000 | 14,900,000 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 95,000 | 0.63 % | |
934 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4003282 | 26138436 | APBDP | 125,000,000 | 124,981,917 | 124,500,082 | 124,500,082 | 124,496,782 | 124,496,782 | 0 | 0 | 2020-10-22 | 2020-10-27 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 499,918 | 0.4 % | |
935 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4003282 | 26138436 | APBDP | 125,000,000 | 124,981,917 | 124,500,082 | 124,500,082 | 124,496,782 | 124,496,782 | 0 | 0 | 2020-10-22 | 2020-10-27 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 499,918 | 0.4 % | |
936 | 2020 | Dinas Kesehatan | Paving Bangsal Isolasi RSDS (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4004282 | 26458671 | APBDP | 190,000,000 | 189,991,311 | 189,557,020 | 0 | 189,000,000 | 189,000,000 | 0 | 0 | 2020-11-02 | 2020-11-03 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 442,980 | 0.23 % | |
937 | 2020 | Dinas Kesehatan | Paving Bangsal Isolasi RSDS (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4004282 | 26458671 | APBDP | 190,000,000 | 189,991,311 | 189,557,020 | 0 | 189,000,000 | 189,000,000 | 0 | 0 | 2020-11-02 | 2020-11-03 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 442,980 | 0.23 % | |
938 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 4008282 | 26140985 | APBDP | 199,780,000 | 198,763,234 | 198,008,981 | 198,008,981 | 197,784,280 | 197,784,280 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,771,019 | 0.89 % | |
939 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 4008282 | 26140985 | APBDP | 199,780,000 | 198,763,234 | 198,008,981 | 198,008,981 | 197,784,280 | 197,784,280 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,771,019 | 0.89 % | |
940 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4010282 | 23330158 | APBD | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,550,000 | 9,550,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 254,129 | 2.54 % | |
941 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4010282 | 23330158 | APBD | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,550,000 | 9,550,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 254,129 | 2.54 % | |
942 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengembangan Kayu Manis dan Pemeliharaan Kebun Kayu Manis | Pengadaan Langsung | Pengadaan Barang | 4014282 | 24110743;24110744 | APBD | 27,090,000 | 26,977,500 | 26,829,000 | 26,829,000 | 26,829,000 | 26,829,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 261,000 | 0.96 % | |
943 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengembangan Kayu Manis dan Pemeliharaan Kebun Kayu Manis | Pengadaan Langsung | Pengadaan Barang | 4014282 | 24110743;24110744 | APBD | 27,090,000 | 26,977,500 | 26,829,000 | 26,829,000 | 26,829,000 | 26,829,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 261,000 | 0.96 % | |
944 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4017282 | 26156826 | APBDP | 183,200,000 | 183,023,978 | 182,523,996 | 182,523,996 | 182,433,900 | 182,433,900 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV. IZDIHAAR | 74.677.682.2-733.000 | 676,004 | 0.37 % | |
945 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4017282 | 26156826 | APBDP | 183,200,000 | 183,023,978 | 182,523,996 | 182,523,996 | 182,433,900 | 182,433,900 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV. IZDIHAAR | 74.677.682.2-733.000 | 676,004 | 0.37 % | |
946 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4018282 | 26136054 | APBDP | 200,000,000 | 199,980,275 | 199,896,675 | 199,896,675 | 199,830,675 | 199,830,675 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 103,325 | 0.05 % | |
947 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4018282 | 26136054 | APBDP | 200,000,000 | 199,980,275 | 199,896,675 | 199,896,675 | 199,830,675 | 199,830,675 | 0 | 0 | 2020-10-27 | 2020-11-04 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 103,325 | 0.05 % | |
948 | 2020 | Sekretariat Daerah | Pengadaan Sterilizer | Pengadaan Langsung | Pengadaan Barang | 4020282 | 26480638 | APBDP | 70,000,000 | 69,960,000 | 69,784,000 | 0 | 69,784,000 | 69,784,000 | 0 | 0 | 2020-10-24 | 2020-11-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 216,000 | 0.31 % | |
949 | 2020 | Sekretariat Daerah | Pengadaan Sterilizer | Pengadaan Langsung | Pengadaan Barang | 4020282 | 26480638 | APBDP | 70,000,000 | 69,960,000 | 69,784,000 | 0 | 69,784,000 | 69,784,000 | 0 | 0 | 2020-10-24 | 2020-11-04 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 216,000 | 0.31 % | |
950 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4022282 | 26138307 | APBDP | 6,000,000 | 6,000,000 | 5,868,500 | 5,868,500 | 5,868,500 | 5,868,500 | 0 | 0 | 2020-10-26 | 2020-10-27 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 131,500 | 2.19 % | |
951 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4022282 | 26138307 | APBDP | 6,000,000 | 6,000,000 | 5,868,500 | 5,868,500 | 5,868,500 | 5,868,500 | 0 | 0 | 2020-10-26 | 2020-10-27 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 131,500 | 2.19 % | |
952 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4023282 | 26140912 | APBDP | 6,000,000 | 6,000,000 | 5,967,500 | 5,967,500 | 5,967,500 | 5,967,500 | 0 | 0 | 2020-11-02 | 2020-11-04 | Jamilah | 14.427.417.2-733.000 | 32,500 | 0.54 % | |
953 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4023282 | 26140912 | APBDP | 6,000,000 | 6,000,000 | 5,967,500 | 5,967,500 | 5,967,500 | 5,967,500 | 0 | 0 | 2020-11-02 | 2020-11-04 | Jamilah | 14.427.417.2-733.000 | 32,500 | 0.54 % | |
954 | 2020 | Dinas Komunikasi dan Informatika | Pengembangan Sistem Pendingin Data Center,Pengembangan sistem monitoring Data Center | Pengadaan Langsung | Pengadaan Barang | 4024282 | 26184899;26222465 | APBDP | 124,408,287 | 124,256,000 | 124,135,000 | 0 | 124,135,000 | 124,135,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,287 | 0.22 % | |
955 | 2020 | Dinas Komunikasi dan Informatika | Pengembangan Sistem Pendingin Data Center,Pengembangan sistem monitoring Data Center | Pengadaan Langsung | Pengadaan Barang | 4024282 | 26184899;26222465 | APBDP | 124,408,287 | 124,256,000 | 124,135,000 | 0 | 124,135,000 | 124,135,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,287 | 0.22 % | |
956 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4025282 | 26139688 | APBDP | 10,000,000 | 10,000,000 | 9,997,800 | 9,997,800 | 9,994,500 | 9,994,500 | 0 | 0 | 2020-10-27 | 2020-11-02 | Agus Rahmat | 54.988.617.4-731.000 | 2,200 | 0.02 % | |
957 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4025282 | 26139688 | APBDP | 10,000,000 | 10,000,000 | 9,997,800 | 9,997,800 | 9,994,500 | 9,994,500 | 0 | 0 | 2020-10-27 | 2020-11-02 | Agus Rahmat | 54.988.617.4-731.000 | 2,200 | 0.02 % | |
958 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Daha Selatan, Daha Utara dan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4027282 | 26152813 | APBDP | 80,000,000 | 79,681,250 | 78,947,000 | 78,947,000 | 78,870,000 | 78,870,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,053,000 | 1.32 % | |
959 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Daha Selatan, Daha Utara dan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4027282 | 26152813 | APBDP | 80,000,000 | 79,681,250 | 78,947,000 | 78,947,000 | 78,870,000 | 78,870,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,053,000 | 1.32 % | |
960 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Sungai Raya, Simpur, Padang Batung dan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4028282 | 26345419 | APBDP | 100,000,000 | 99,893,750 | 98,857,000 | 98,857,000 | 98,780,000 | 98,780,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,143,000 | 1.14 % | |
961 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Sungai Raya, Simpur, Padang Batung dan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4028282 | 26345419 | APBDP | 100,000,000 | 99,893,750 | 98,857,000 | 98,857,000 | 98,780,000 | 98,780,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,143,000 | 1.14 % | |
962 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Kec. Sungai Raya dan Pemeliharaan Berkala Th. 2021 Jl. Kec. Telaga Langsat dan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4029282 | 26156817 | APBDP | 45,000,000 | 44,976,250 | 44,418,000 | 44,418,000 | 44,330,000 | 44,330,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 582,000 | 1.29 % | |
963 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Kec. Sungai Raya dan Pemeliharaan Berkala Th. 2021 Jl. Kec. Telaga Langsat dan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4029282 | 26156817 | APBDP | 45,000,000 | 44,976,250 | 44,418,000 | 44,418,000 | 44,330,000 | 44,330,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 582,000 | 1.29 % | |
964 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4030282 | 26135086 | APBDP | 50,000,000 | 49,757,243 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 300,000 | 0.6 % | |
965 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4030282 | 26135086 | APBDP | 50,000,000 | 49,757,243 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 300,000 | 0.6 % | |
966 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan ex. Terminal sedan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4031282 | 26156780 | APBDP | 33,000,000 | 32,897,248 | 32,747,550 | 32,747,550 | 32,700,000 | 32,700,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 252,450 | 0.77 % | |
967 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan ex. Terminal sedan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4031282 | 26156780 | APBDP | 33,000,000 | 32,897,248 | 32,747,550 | 32,747,550 | 32,700,000 | 32,700,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 252,450 | 0.77 % | |
968 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kodim, Kantor Kejari, Rumah Dinas Kajari, dan Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4033282 | 26443857 | APBDP | 30,000,000 | 29,845,475 | 29,500,000 | 29,500,000 | 29,450,000 | 29,450,000 | 0 | 0 | 2020-11-12 | 2020-11-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 500,000 | 1.67 % | |
969 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kodim, Kantor Kejari, Rumah Dinas Kajari, dan Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4033282 | 26443857 | APBDP | 30,000,000 | 29,845,475 | 29,500,000 | 29,500,000 | 29,450,000 | 29,450,000 | 0 | 0 | 2020-11-12 | 2020-11-18 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 500,000 | 1.67 % | |
970 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4037282 | 26141086 | APBDP | 6,000,000 | 6,000,000 | 5,997,250 | 5,997,250 | 5,994,500 | 5,994,500 | 0 | 0 | 2020-11-02 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.05 % | |
971 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4037282 | 26141086 | APBDP | 6,000,000 | 6,000,000 | 5,997,250 | 5,997,250 | 5,994,500 | 5,994,500 | 0 | 0 | 2020-11-02 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.05 % | |
972 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4038282 | 26139755 | APBDP | 7,000,000 | 7,000,000 | 6,997,250 | 6,997,250 | 6,994,500 | 6,994,500 | 0 | 0 | 2020-11-02 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.04 % | |
973 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4038282 | 26139755 | APBDP | 7,000,000 | 7,000,000 | 6,997,250 | 6,997,250 | 6,994,500 | 6,994,500 | 0 | 0 | 2020-11-02 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.04 % | |
974 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4039282 | 26138236 | APBDP | 176,000,000 | 175,972,392 | 175,752,392 | 175,752,392 | 175,697,000 | 175,697,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | cv. bumi mandiri | 02.089.892.0-733.000 | 247,608 | 0.14 % | |
975 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4039282 | 26138236 | APBDP | 176,000,000 | 175,972,392 | 175,752,392 | 175,752,392 | 175,697,000 | 175,697,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | cv. bumi mandiri | 02.089.892.0-733.000 | 247,608 | 0.14 % | |
976 | 2020 | Dinas Ketahanan Pangan | Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4041282 | 26330675 | APBDP | 111,700,000 | 111,593,368 | 111,200,066 | 111,200,066 | 111,200,000 | 111,200,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. KALI BARU | 01.434.974.0-733.000 | 499,934 | 0.45 % | |
977 | 2020 | Dinas Ketahanan Pangan | Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4041282 | 26330675 | APBDP | 111,700,000 | 111,593,368 | 111,200,066 | 111,200,066 | 111,200,000 | 111,200,000 | 0 | 0 | 2020-10-26 | 2020-10-27 | CV. KALI BARU | 01.434.974.0-733.000 | 499,934 | 0.45 % | |
978 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4043282 | 26139713 | APBDP | 200,000,000 | 199,120,572 | 198,983,071 | 198,983,071 | 198,977,000 | 198,977,000 | 0 | 0 | 2020-10-27 | 2020-10-27 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,016,929 | 0.51 % | |
979 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4043282 | 26139713 | APBDP | 200,000,000 | 199,120,572 | 198,983,071 | 198,983,071 | 198,977,000 | 198,977,000 | 0 | 0 | 2020-10-27 | 2020-10-27 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,016,929 | 0.51 % | |
980 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putera Kab. HSS Amuk Hantarukung di Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4044282 | 26174506 | APBDP | 100,000,000 | 96,140,000 | 95,150,000 | 95,150,000 | 94,950,000 | 94,950,000 | 0 | 0 | 2020-11-02 | 2020-11-06 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 4,850,000 | 4.85 % | |
981 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putera Kab. HSS Amuk Hantarukung di Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4044282 | 26174506 | APBDP | 100,000,000 | 96,140,000 | 95,150,000 | 95,150,000 | 94,950,000 | 94,950,000 | 0 | 0 | 2020-11-02 | 2020-11-06 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 4,850,000 | 4.85 % | |
982 | 2020 | Dinas Perhubungan | Pembuatan marka jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 4045282 | 26471530 | APBDP | 167,400,000 | 167,331,241 | 167,313,164 | 0 | 167,313,100 | 167,313,100 | 0 | 0 | 2020-11-03 | 2020-11-10 | cv.ghea | 82.333.270.5-733.000 | 86,836 | 0.05 % | |
983 | 2020 | Dinas Perhubungan | Pembuatan marka jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 4045282 | 26471530 | APBDP | 167,400,000 | 167,331,241 | 167,313,164 | 0 | 167,313,100 | 167,313,100 | 0 | 0 | 2020-11-03 | 2020-11-10 | cv.ghea | 82.333.270.5-733.000 | 86,836 | 0.05 % | |
984 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Pembangunan Parkir Mobil Damkar | Pengadaan Langsung | Pekerjaan Konstruksi | 4046282 | 26460006 | APBDP | 20,000,000 | 19,994,480 | 19,902,080 | 0 | 19,902,080 | 19,902,080 | 0 | 0 | 2020-11-03 | 2020-11-06 | FADWI UTAMA | 94.246.044.5-733.000 | 97,920 | 0.49 % | |
985 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Pembangunan Parkir Mobil Damkar | Pengadaan Langsung | Pekerjaan Konstruksi | 4046282 | 26460006 | APBDP | 20,000,000 | 19,994,480 | 19,902,080 | 0 | 19,902,080 | 19,902,080 | 0 | 0 | 2020-11-03 | 2020-11-06 | FADWI UTAMA | 94.246.044.5-733.000 | 97,920 | 0.49 % | |
986 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4047282 | 26138326 | APBDP | 150,000,000 | 149,979,109 | 149,781,109 | 149,781,109 | 149,770,000 | 149,770,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 218,891 | 0.15 % | |
987 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4047282 | 26138326 | APBDP | 150,000,000 | 149,979,109 | 149,781,109 | 149,781,109 | 149,770,000 | 149,770,000 | 0 | 0 | 2020-10-27 | 2020-11-03 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 218,891 | 0.15 % | |
988 | 2020 | Dinas Ketahanan Pangan | Biaya Pengawasan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4048282 | 26331321 | APBDP | 8,050,000 | 8,050,000 | 7,947,500 | 7,947,500 | 7,947,500 | 7,947,500 | 0 | 0 | 2020-10-27 | 2020-11-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 102,500 | 1.27 % | |
989 | 2020 | Dinas Ketahanan Pangan | Biaya Pengawasan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4048282 | 26331321 | APBDP | 8,050,000 | 8,050,000 | 7,947,500 | 7,947,500 | 7,947,500 | 7,947,500 | 0 | 0 | 2020-10-27 | 2020-11-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 102,500 | 1.27 % | |
990 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan menuju MIN Gala gala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4049282 | 26154960 | APBDP | 199,900,000 | 173,270,252 | 173,089,341 | 173,089,341 | 172,820,000 | 172,820,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | cv. bumi mandiri | 02.089.892.0-733.000 | 26,810,659 | 13.41 % | |
991 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan menuju MIN Gala gala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4049282 | 26154960 | APBDP | 199,900,000 | 173,270,252 | 173,089,341 | 173,089,341 | 172,820,000 | 172,820,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | cv. bumi mandiri | 02.089.892.0-733.000 | 26,810,659 | 13.41 % | |
992 | 2020 | Dinas Perhubungan | Pembuatan Marka Getar | Pengadaan Langsung | Pekerjaan Konstruksi | 4052282 | 26471652 | APBDP | 200,000,000 | 199,980,838 | 199,774,698 | 0 | 199,774,600 | 199,774,600 | 0 | 0 | 2020-11-03 | 2020-11-10 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 225,302 | 0.11 % | |
993 | 2020 | Dinas Perhubungan | Pembuatan Marka Getar | Pengadaan Langsung | Pekerjaan Konstruksi | 4052282 | 26471652 | APBDP | 200,000,000 | 199,980,838 | 199,774,698 | 0 | 199,774,600 | 199,774,600 | 0 | 0 | 2020-11-03 | 2020-11-10 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 225,302 | 0.11 % | |
994 | 2020 | Dinas Perhubungan | Pengadaan Kapal Feri Penyeberangan | Pengadaan Langsung | Pengadaan Barang | 4053282 | 26423231 | APBDP | 174,900,000 | 174,900,000 | 174,790,000 | 0 | 174,790,000 | 174,790,000 | 0 | 0 | 2020-11-03 | 2020-11-09 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 110,000 | 0.06 % | |
995 | 2020 | Dinas Perhubungan | Pengadaan Kapal Feri Penyeberangan | Pengadaan Langsung | Pengadaan Barang | 4053282 | 26423231 | APBDP | 174,900,000 | 174,900,000 | 174,790,000 | 0 | 174,790,000 | 174,790,000 | 0 | 0 | 2020-11-03 | 2020-11-09 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 110,000 | 0.06 % | |
996 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 4054282 | 26283899 | APBDP | 110,000,000 | 109,833,431 | 109,609,335 | 109,609,335 | 109,499,000 | 109,499,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 390,665 | 0.36 % | |
997 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 4054282 | 26283899 | APBDP | 110,000,000 | 109,833,431 | 109,609,335 | 109,609,335 | 109,499,000 | 109,499,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 390,665 | 0.36 % | |
998 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4055282 | 26283882 | APBDP | 70,000,000 | 69,858,452 | 69,734,327 | 69,734,327 | 69,700,000 | 69,700,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 265,673 | 0.38 % | |
999 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4055282 | 26283882 | APBDP | 70,000,000 | 69,858,452 | 69,734,327 | 69,734,327 | 69,700,000 | 69,700,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 265,673 | 0.38 % | |
1000 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SMPN 1 Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4056282 | 23890595 | APBD | 150,000,000 | 149,972,766 | 149,845,400 | 149,845,395 | 149,737,000 | 149,737,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. KHALIF | 81.540.809.1-733.000 | 154,600 | 0.1 % | |
1001 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SMPN 1 Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4056282 | 23890595 | APBD | 150,000,000 | 149,972,766 | 149,845,400 | 149,845,395 | 149,737,000 | 149,737,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. KHALIF | 81.540.809.1-733.000 | 154,600 | 0.1 % | |
1002 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4059282 | 26138376 | APBDP | 6,000,000 | 6,000,000 | 5,991,000 | 0 | 5,990,000 | 5,990,000 | 0 | 0 | 2020-11-02 | 2020-11-04 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 9,000 | 0.15 % | |
1003 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4059282 | 26138376 | APBDP | 6,000,000 | 6,000,000 | 5,991,000 | 0 | 5,990,000 | 5,990,000 | 0 | 0 | 2020-11-02 | 2020-11-04 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 9,000 | 0.15 % | |
1004 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hamayung hakurung Kec. Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4060282 | 26139168 | APBDP | 20,000,000 | 20,000,000 | 19,900,533 | 0 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | 2020-11-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,467 | 0.5 % | |
1005 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hamayung hakurung Kec. Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4060282 | 26139168 | APBDP | 20,000,000 | 20,000,000 | 19,900,533 | 0 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | 2020-11-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,467 | 0.5 % | |
1006 | 2020 | Dinas Kesehatan | Renovasi Poliklinik untuk menghadapi new normal (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4062282 | 26458847 | APBDP | 140,000,000 | 139,895,343 | 139,656,391 | 0 | 139,500,000 | 139,500,000 | 0 | 0 | 2020-11-18 | 2020-11-19 | CV. KALI BARU | 01.434.974.0-733.000 | 343,610 | 0.25 % | |
1007 | 2020 | Dinas Kesehatan | Renovasi Poliklinik untuk menghadapi new normal (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4062282 | 26458847 | APBDP | 140,000,000 | 139,895,343 | 139,656,391 | 0 | 139,500,000 | 139,500,000 | 0 | 0 | 2020-11-18 | 2020-11-19 | CV. KALI BARU | 01.434.974.0-733.000 | 343,610 | 0.25 % | |
1008 | 2020 | Dinas Kesehatan | Pembuatan Pagar PKM Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4065282 | 26174712 | APBDP | 75,000,000 | 74,964,191 | 74,500,761 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-11-03 | 2020-11-04 | CV. JAYA ABADI | 02.237.609.9-733.000 | 499,239 | 0.67 % | |
1009 | 2020 | Dinas Kesehatan | Pembuatan Pagar PKM Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4065282 | 26174712 | APBDP | 75,000,000 | 74,964,191 | 74,500,761 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-11-03 | 2020-11-04 | CV. JAYA ABADI | 02.237.609.9-733.000 | 499,239 | 0.67 % | |
1010 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Jangkang Kec. Kandangan (DID Rp53.093.000,00) | Pengadaan Langsung | Pekerjaan Konstruksi | 4066282 | 26216732 | APBDP | 100,000,000 | 99,972,863 | 99,758,572 | 99,758,572 | 99,478,700 | 99,478,700 | 0 | 0 | 2020-11-06 | 2020-11-11 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 241,428 | 0.24 % | |
1011 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Jangkang Kec. Kandangan (DID Rp53.093.000,00) | Pengadaan Langsung | Pekerjaan Konstruksi | 4066282 | 26216732 | APBDP | 100,000,000 | 99,972,863 | 99,758,572 | 99,758,572 | 99,478,700 | 99,478,700 | 0 | 0 | 2020-11-06 | 2020-11-11 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 241,428 | 0.24 % | |
1012 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gambut di ds. Karang bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4069282 | 26139531 | APBDP | 20,000,000 | 20,000,000 | 19,999,100 | 19,999,100 | 19,911,120 | 19,911,120 | 0 | 0 | 2020-11-03 | 2020-11-05 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 900 | 0 % | |
1013 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gambut di ds. Karang bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4069282 | 26139531 | APBDP | 20,000,000 | 20,000,000 | 19,999,100 | 19,999,100 | 19,911,120 | 19,911,120 | 0 | 0 | 2020-11-03 | 2020-11-05 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 900 | 0 % | |
1014 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing RT.11 Belakang Poskamling Kel.Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4070282 | 26138625 | APBDP | 20,000,000 | 20,000,000 | 19,900,540 | 19,900,540 | 19,899,000 | 19,899,000 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 99,460 | 0.5 % | |
1015 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing RT.11 Belakang Poskamling Kel.Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4070282 | 26138625 | APBDP | 20,000,000 | 20,000,000 | 19,900,540 | 19,900,540 | 19,899,000 | 19,899,000 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 99,460 | 0.5 % | |
1016 | 2020 | Sekretariat DPRD | Rehab Ventilasi Ruang Rapat DPRD | Penunjukan Langsung | Pekerjaan Konstruksi | 4071282 | 26444288 | APBDP | 51,900,000 | 51,899,629 | 51,499,646 | 0 | 51,499,600 | 51,499,600 | 0 | 0 | 2020-11-02 | 2020-11-06 | CV. JAYA ABADI | 02.237.609.9-733.000 | 400,354 | 0.77 % | |
1017 | 2020 | Sekretariat DPRD | Rehab Ventilasi Ruang Rapat DPRD | Penunjukan Langsung | Pekerjaan Konstruksi | 4071282 | 26444288 | APBDP | 51,900,000 | 51,899,629 | 51,499,646 | 0 | 51,499,600 | 51,499,600 | 0 | 0 | 2020-11-02 | 2020-11-06 | CV. JAYA ABADI | 02.237.609.9-733.000 | 400,354 | 0.77 % | |
1018 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SMPN 8 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4072282 | 26283878 | APBDP | 150,000,000 | 149,832,320 | 149,416,737 | 149,416,737 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | cv. bumi mandiri | 02.089.892.0-733.000 | 583,263 | 0.39 % | |
1019 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SMPN 8 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4072282 | 26283878 | APBDP | 150,000,000 | 149,832,320 | 149,416,737 | 149,416,737 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | cv. bumi mandiri | 02.089.892.0-733.000 | 583,263 | 0.39 % | |
1020 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4073282 | 26138523 | APBDP | 4,925,000 | 4,922,250 | 4,922,250 | 4,922,250 | 4,919,500 | 4,919,500 | 0 | 0 | 2020-11-03 | 2020-11-05 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.06 % | |
1021 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4073282 | 26138523 | APBDP | 4,925,000 | 4,922,250 | 4,922,250 | 4,922,250 | 4,919,500 | 4,919,500 | 0 | 0 | 2020-11-03 | 2020-11-05 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.06 % | |
1022 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4074282 | 26201690 | APBDP | 70,000,000 | 69,847,909 | 69,727,990 | 69,727,990 | 69,690,000 | 69,690,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 272,010 | 0.39 % | |
1023 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4074282 | 26201690 | APBDP | 70,000,000 | 69,847,909 | 69,727,990 | 69,727,990 | 69,690,000 | 69,690,000 | 0 | 0 | 2020-11-17 | 2020-11-23 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 272,010 | 0.39 % | |
1024 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4075282 | 26138468 | APBDP | 10,000,000 | 10,000,000 | 9,867,000 | 9,867,000 | 9,861,500 | 9,861,500 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 133,000 | 1.33 % | |
1025 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4075282 | 26138468 | APBDP | 10,000,000 | 10,000,000 | 9,867,000 | 9,867,000 | 9,861,500 | 9,861,500 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 133,000 | 1.33 % | |
1026 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Awang RT.02 Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4076282 | 26139136 | APBDP | 20,000,000 | 20,000,000 | 19,900,523 | 19,900,523 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,478 | 0.5 % | |
1027 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Awang RT.02 Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4076282 | 26139136 | APBDP | 20,000,000 | 20,000,000 | 19,900,523 | 19,900,523 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,478 | 0.5 % | |
1028 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Daerah Irigasi Rawa Sungai Taniran Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4077282 | 26229709 | APBDP | 20,000,000 | 20,000,000 | 19,866,000 | 19,866,000 | 19,866,000 | 19,866,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 134,000 | 0.67 % | |
1029 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Daerah Irigasi Rawa Sungai Taniran Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4077282 | 26229709 | APBDP | 20,000,000 | 20,000,000 | 19,866,000 | 19,866,000 | 19,866,000 | 19,866,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 134,000 | 0.67 % | |
1030 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di ds. Amawang kiri Muka Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4078282 | 26138642 | APBDP | 20,000,000 | 20,000,000 | 19,881,200 | 19,881,200 | 19,881,180 | 19,881,180 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 118,800 | 0.59 % | |
1031 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di ds. Amawang kiri Muka Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4078282 | 26138642 | APBDP | 20,000,000 | 20,000,000 | 19,881,200 | 19,881,200 | 19,881,180 | 19,881,180 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 118,800 | 0.59 % | |
1032 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Tajun (Padang Sangkuang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4079282 | 26139112 | APBDP | 20,000,000 | 20,000,000 | 19,965,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1033 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Tajun (Padang Sangkuang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4079282 | 26139112 | APBDP | 20,000,000 | 20,000,000 | 19,965,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1034 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hanyar Desa Tebing tinggi sampai garis rantau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4080282 | 26139405 | APBDP | 20,000,000 | 20,000,000 | 19,965,000 | 19,965,000 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1035 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hanyar Desa Tebing tinggi sampai garis rantau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4080282 | 26139405 | APBDP | 20,000,000 | 20,000,000 | 19,965,000 | 19,965,000 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | 2020-11-06 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1036 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gang Pendidikan MIN Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081282 | 26139423 | APBDP | 20,000,000 | 20,000,000 | 19,976,000 | 19,976,000 | 19,976,000 | 19,976,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 24,000 | 0.12 % | |
1037 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gang Pendidikan MIN Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081282 | 26139423 | APBDP | 20,000,000 | 20,000,000 | 19,976,000 | 19,976,000 | 19,976,000 | 19,976,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 24,000 | 0.12 % | |
1038 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Bangkau Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4082282 | 26139453 | APBDP | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,877,000 | 19,877,000 | 0 | 0 | 2020-11-05 | 2020-11-10 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 112,000 | 0.56 % | |
1039 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Bangkau Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4082282 | 26139453 | APBDP | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,877,000 | 19,877,000 | 0 | 0 | 2020-11-05 | 2020-11-10 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 112,000 | 0.56 % | |
1040 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Desa Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4083282 | 26138565 | APBDP | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-11-04 | 2020-11-05 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 112,000 | 0.56 % | |
1041 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Desa Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4083282 | 26138565 | APBDP | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-11-04 | 2020-11-05 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 112,000 | 0.56 % | |
1042 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Irigasi Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4084282 | 26229723 | APBDP | 20,000,000 | 20,000,000 | 19,960,209 | 19,960,209 | 19,960,000 | 19,960,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 39,791 | 0.2 % | |
1043 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Irigasi Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4084282 | 26229723 | APBDP | 20,000,000 | 20,000,000 | 19,960,209 | 19,960,209 | 19,960,000 | 19,960,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 39,791 | 0.2 % | |
1044 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4085282 | 26216694 | APBDP | 186,850,000 | 186,543,474 | 185,006,800 | 185,006,800 | 185,000,000 | 185,000,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,843,200 | 0.99 % | |
1045 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4085282 | 26216694 | APBDP | 186,850,000 | 186,543,474 | 185,006,800 | 185,006,800 | 185,000,000 | 185,000,000 | 0 | 0 | 2020-11-13 | 2020-11-17 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,843,200 | 0.99 % | |
1046 | 2020 | Dinas Perikanan | Pengadaan Pakan Ikan, Bibit Ikan dan Blower Untuk Budidaya Ikan Dalam Kolam | Pengadaan Langsung | Pengadaan Barang | 4086282 | 26504954 | APBD | 189,475,000 | 180,169,000 | 180,105,310 | 180,105,310 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-11-04 | 2020-11-10 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,369,690 | 4.95 % | |
1047 | 2020 | Dinas Perikanan | Pengadaan Pakan Ikan, Bibit Ikan dan Blower Untuk Budidaya Ikan Dalam Kolam | Pengadaan Langsung | Pengadaan Barang | 4086282 | 26504954 | APBD | 189,475,000 | 180,169,000 | 180,105,310 | 180,105,310 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-11-04 | 2020-11-10 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,369,690 | 4.95 % | |
1048 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Mandapai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4088282 | 26210411 | APBDP | 50,000,000 | 49,979,304 | 49,872,248 | 49,872,248 | 49,707,248 | 0 | 0 | 0 | 2020-11-17 | 2020-11-20 | CV. SHINTA | 01.124.041.3-733.000 | 127,752 | 0.26 % | |
1049 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Mandapai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4088282 | 26210411 | APBDP | 50,000,000 | 49,979,304 | 49,872,248 | 49,872,248 | 49,707,248 | 0 | 0 | 0 | 2020-11-17 | 2020-11-20 | CV. SHINTA | 01.124.041.3-733.000 | 127,752 | 0.26 % | |
1050 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Muara Ulang 1 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 4089282 | 26212287 | APBDP | 50,000,000 | 49,984,533 | 49,613,129 | 49,613,129 | 49,519,629 | 49,519,629 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 386,871 | 0.77 % | |
1051 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Muara Ulang 1 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 4089282 | 26212287 | APBDP | 50,000,000 | 49,984,533 | 49,613,129 | 49,613,129 | 49,519,629 | 49,519,629 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 386,871 | 0.77 % | |
1052 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi kebocoran saluran air Kolam Renang Amandit Aquatic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 4090282 | 26165616 | APBD | 177,500,000 | 177,427,207 | 177,384,129 | 0 | 175,831,800 | 175,831,800 | 0 | 0 | 2020-11-04 | 2020-11-11 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 115,871 | 0.07 % | |
1053 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi kebocoran saluran air Kolam Renang Amandit Aquatic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 4090282 | 26165616 | APBD | 177,500,000 | 177,427,207 | 177,384,129 | 0 | 175,831,800 | 175,831,800 | 0 | 0 | 2020-11-04 | 2020-11-11 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 115,871 | 0.07 % | |
1054 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Pandulangan 2 Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4091282 | 26210375 | APBDP | 50,000,000 | 49,979,304 | 49,894,648 | 49,894,648 | 49,784,648 | 49,784,648 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. LALUNA DANA | 02.237.179.3-733.000 | 105,352 | 0.21 % | |
1055 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Pandulangan 2 Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4091282 | 26210375 | APBDP | 50,000,000 | 49,979,304 | 49,894,648 | 49,894,648 | 49,784,648 | 49,784,648 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. LALUNA DANA | 02.237.179.3-733.000 | 105,352 | 0.21 % | |
1056 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sungai Paring Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4092282 | 26210432 | APBDP | 50,000,000 | 49,896,087 | 49,635,761 | 49,635,761 | 49,552,267 | 49,552,267 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. AMANDITA | 01.834.025.7-733.000 | 364,239 | 0.73 % | |
1057 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sungai Paring Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4092282 | 26210432 | APBDP | 50,000,000 | 49,896,087 | 49,635,761 | 49,635,761 | 49,552,267 | 49,552,267 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV. AMANDITA | 01.834.025.7-733.000 | 364,239 | 0.73 % | |
1058 | 2020 | Dinas Kesehatan | Penambahan selasar penghubung bangsal Isolasi (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4093282 | 26458960 | APBDP | 185,000,000 | 184,560,160 | 184,455,910 | 0 | 184,400,000 | 184,400,000 | 0 | 0 | 2020-11-04 | 2020-11-05 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 544,090 | 0.29 % | |
1059 | 2020 | Dinas Kesehatan | Penambahan selasar penghubung bangsal Isolasi (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4093282 | 26458960 | APBDP | 185,000,000 | 184,560,160 | 184,455,910 | 0 | 184,400,000 | 184,400,000 | 0 | 0 | 2020-11-04 | 2020-11-05 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 544,090 | 0.29 % | |
1060 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan depan MTsN. Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4094282 | 26154949 | APBDP | 200,000,000 | 198,512,101 | 198,259,116 | 198,259,116 | 198,110,000 | 198,110,000 | 0 | 0 | 2020-11-06 | 2020-11-11 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,740,884 | 0.87 % | |
1061 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan depan MTsN. Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4094282 | 26154949 | APBDP | 200,000,000 | 198,512,101 | 198,259,116 | 198,259,116 | 198,110,000 | 198,110,000 | 0 | 0 | 2020-11-06 | 2020-11-11 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,740,884 | 0.87 % | |
1062 | 2020 | Sekretariat DPRD | Belanja Rehab Frame Baliho | Pengadaan Langsung | Pekerjaan Konstruksi | 4095282 | 26242355 | APBDP | 75,000,000 | 74,980,574 | 74,825,474 | 0 | 74,825,400 | 74,825,400 | 0 | 0 | 2020-11-05 | 2020-11-11 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 174,526 | 0.23 % | |
1063 | 2020 | Sekretariat DPRD | Belanja Rehab Frame Baliho | Pengadaan Langsung | Pekerjaan Konstruksi | 4095282 | 26242355 | APBDP | 75,000,000 | 74,980,574 | 74,825,474 | 0 | 74,825,400 | 74,825,400 | 0 | 0 | 2020-11-05 | 2020-11-11 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 174,526 | 0.23 % | |
1064 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Perencanaan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4096282 | 26222873 | APBD | 8,000,000 | 7,988,640 | 7,741,853 | 7,741,853 | 7,730,000 | 7,730,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 258,147 | 3.23 % | |
1065 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Perencanaan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4096282 | 26222873 | APBD | 8,000,000 | 7,988,640 | 7,741,853 | 7,741,853 | 7,730,000 | 7,730,000 | 0 | 0 | 2020-11-05 | 2020-11-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 258,147 | 3.23 % | |
1066 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4097282 | 26154987 | APBDP | 199,900,000 | 199,238,803 | 199,033,186 | 199,033,186 | 198,999,000 | 198,999,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 866,814 | 0.43 % | |
1067 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4097282 | 26154987 | APBDP | 199,900,000 | 199,238,803 | 199,033,186 | 199,033,186 | 198,999,000 | 198,999,000 | 0 | 0 | 2020-11-06 | 2020-11-10 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 866,814 | 0.43 % | |
1068 | 2020 | Dinas Perdagangan | Pekerjaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4098282 | 26360836 | APBDP | 198,900,000 | 198,581,524 | 198,471,106 | 0 | 198,471,100 | 198,471,100 | 0 | 0 | 2020-11-11 | 2020-11-17 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 428,894 | 0.22 % | |
1069 | 2020 | Dinas Perdagangan | Pekerjaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4098282 | 26360836 | APBDP | 198,900,000 | 198,581,524 | 198,471,106 | 0 | 198,471,100 | 198,471,100 | 0 | 0 | 2020-11-11 | 2020-11-17 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 428,894 | 0.22 % | |
1070 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4099282 | 26359713 | APBD | 198,900,000 | 198,855,144 | 198,800,144 | 0 | 198,800,000 | 198,800,000 | 0 | 0 | 2020-11-06 | 2020-11-13 | CV. AL MADINAH | 66.139.132.6-733.000 | 99,856 | 0.05 % | |
1071 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4099282 | 26359713 | APBD | 198,900,000 | 198,855,144 | 198,800,144 | 0 | 198,800,000 | 198,800,000 | 0 | 0 | 2020-11-06 | 2020-11-13 | CV. AL MADINAH | 66.139.132.6-733.000 | 99,856 | 0.05 % | |
1072 | 2020 | RSUD Brigjen H. Hasan Basry | Air Purifier Ruang Isolasi | Pengadaan Langsung | Pengadaan Barang | 4100282 | 26480441 | APBD | 70,000,000 | 70,000,000 | 69,481,440 | 69,481,440 | 69,481,440 | 0 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 518,560 | 0.74 % | |
1073 | 2020 | Kecamatan Padang Batung | Belanja Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Pekerjaan Konstruksi | 4101282 | 24090262 | APBDP | 93,000,000 | 92,999,373 | 92,700,148 | 0 | 92,700,148 | 92,700,148 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. AISY | 75.132.070.6-733.000 | 299,852 | 0.32 % | |
1074 | 2020 | Kecamatan Padang Batung | Belanja Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Pekerjaan Konstruksi | 4101282 | 24090262 | APBDP | 93,000,000 | 92,999,373 | 92,700,148 | 0 | 92,700,148 | 92,700,148 | 0 | 0 | 2020-11-06 | 2020-11-09 | CV. AISY | 75.132.070.6-733.000 | 299,852 | 0.32 % | |
1075 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4102282 | 26236028 | APBDP | 10,000,000 | 10,000,000 | 9,985,000 | 0 | 9,980,000 | 9,980,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.15 % | |
1076 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4102282 | 26236028 | APBDP | 10,000,000 | 10,000,000 | 9,985,000 | 0 | 9,980,000 | 9,980,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.15 % | |
1077 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Jembatan Pelayanan dan Gorong gorong di sekitar Jaringan Irigasi Gumbil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4103282 | 26229701 | APBDP | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1078 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Jembatan Pelayanan dan Gorong gorong di sekitar Jaringan Irigasi Gumbil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4103282 | 26229701 | APBDP | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1079 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Belakang mesjid desa Padang batung Kec.Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4105282 | 26138602 | APBDP | 20,000,000 | 20,000,000 | 19,904,500 | 19,904,500 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 95,500 | 0.48 % | |
1080 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Belakang mesjid desa Padang batung Kec.Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4105282 | 26138602 | APBDP | 20,000,000 | 20,000,000 | 19,904,500 | 19,904,500 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 95,500 | 0.48 % | |
1081 | 2020 | Sekretariat Daerah | Belanja Pakaian Sasirangan dalam rangka Kegiatan Pemerintah Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 4106282 | 26161576 | APBDP | 96,000,000 | 70,000,000 | 68,600,000 | 0 | 68,600,000 | 0 | 0 | 0 | 2020-11-09 | 2020-11-16 | CV.Bangun Banua | 93.708.167.7-733.000 | 27,400,000 | 28.54 % | |
1082 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Alkes IGD Ponek - Platelet Agiator + Incubator | Pengadaan Langsung | Pengadaan Barang | 4108282 | 23544731 | APBD | 225,000,000 | 175,000,000 | 174,460,000 | 174,460,000 | 174,460,000 | 0 | 0 | 0 | 2020-11-09 | 2020-11-13 | PT. Prima Alkesindo Nusantara | 01.813.894.1-046.000 | 50,540,000 | 22.46 % | |
1083 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Banua hanyar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4109282 | 26139096 | APBDP | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-09 | 2020-11-11 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1084 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Banua hanyar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4109282 | 26139096 | APBDP | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-09 | 2020-11-11 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1085 | 2020 | Dinas Kesehatan | Disediakan Belanja Perbekalan Kesehatan RSUD Daha Sejahtera | Pengadaan Langsung | Pengadaan Barang | 4111282 | 24978617 | APBD | 180,000,000 | 179,970,500 | 179,800,500 | 0 | 179,800,500 | 179,800,500 | 0 | 0 | 2020-11-13 | 2020-11-20 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | 199,500 | 0.11 % | |
1086 | 2020 | Dinas Kesehatan | Disediakan Belanja Perbekalan Kesehatan RSUD Daha Sejahtera | Pengadaan Langsung | Pengadaan Barang | 4111282 | 24978617 | APBD | 180,000,000 | 179,970,500 | 179,800,500 | 0 | 179,800,500 | 179,800,500 | 0 | 0 | 2020-11-13 | 2020-11-20 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | 199,500 | 0.11 % | |
1087 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt.01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4112282 | 26142542 | APBDP | 15,000,000 | 15,000,000 | 14,998,500 | 14,998,500 | 14,997,400 | 14,997,400 | 0 | 0 | 2020-11-09 | 2020-11-10 | SAIPUL BAHRI | 16.805.961.6-733.000 | 1,500 | 0.01 % | |
1088 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt.01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4112282 | 26142542 | APBDP | 15,000,000 | 15,000,000 | 14,998,500 | 14,998,500 | 14,997,400 | 14,997,400 | 0 | 0 | 2020-11-09 | 2020-11-10 | SAIPUL BAHRI | 16.805.961.6-733.000 | 1,500 | 0.01 % | |
1089 | 2020 | Kecamatan Angkinang | Belanja Konsultan Perencana perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4113282 | 26566258 | APBDP | 3,000,000 | 2,995,300 | 2,871,000 | 0 | 2,871,000 | 2,871,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 129,000 | 4.3 % | |
1090 | 2020 | Kecamatan Angkinang | Belanja Konsultan Perencana perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4113282 | 26566258 | APBDP | 3,000,000 | 2,995,300 | 2,871,000 | 0 | 2,871,000 | 2,871,000 | 0 | 0 | 2020-11-10 | 2020-11-12 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 129,000 | 4.3 % | |
1091 | 2020 | Dinas Komunikasi dan Informatika | Pengadaan peralatan Server Data Center | Pengadaan Langsung | Pengadaan Barang | 4114282 | 26461703 | APBDP | 164,899,970 | 164,791,000 | 164,560,000 | 0 | 164,560,000 | 164,560,000 | 0 | 0 | 2020-11-10 | 2020-11-11 | FADWI UTAMA | 94.246.044.5-733.000 | 339,970 | 0.21 % | |
1092 | 2020 | Dinas Komunikasi dan Informatika | Pengadaan peralatan Server Data Center | Pengadaan Langsung | Pengadaan Barang | 4114282 | 26461703 | APBDP | 164,899,970 | 164,791,000 | 164,560,000 | 0 | 164,560,000 | 164,560,000 | 0 | 0 | 2020-11-10 | 2020-11-11 | FADWI UTAMA | 94.246.044.5-733.000 | 339,970 | 0.21 % | |
1093 | 2020 | Sekretariat Daerah | Belanja Perencanaan Rehab Ruangan Bagian Umum,Bendahara Rutin,Tempat Parkir Mobjab,Rehab Lap.Lamang,Pendopo Bupati,WC dan Gedung Kesenian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4115282 | 26145783 | APBDP | 101,200,000 | 99,797,500 | 99,647,790 | 99,647,790 | 99,647,700 | 99,647,700 | 0 | 0 | 2020-11-12 | 2020-11-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,552,210 | 1.53 % | |
1094 | 2020 | Sekretariat Daerah | Belanja Perencanaan Rehab Ruangan Bagian Umum,Bendahara Rutin,Tempat Parkir Mobjab,Rehab Lap.Lamang,Pendopo Bupati,WC dan Gedung Kesenian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4115282 | 26145783 | APBDP | 101,200,000 | 99,797,500 | 99,647,790 | 99,647,790 | 99,647,700 | 99,647,700 | 0 | 0 | 2020-11-12 | 2020-11-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,552,210 | 1.53 % | |
1095 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4116282 | 26139651 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-11-11 | 2020-11-12 | konsultan | 75.077.609.8-733.000 | 6,500 | 0.07 % | |
1096 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4116282 | 26139651 | APBDP | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-11-11 | 2020-11-12 | konsultan | 75.077.609.8-733.000 | 6,500 | 0.07 % | |
1097 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sedang/berat ruang kelas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119282 | 26215992 | APBDP | 108,750,000 | 35,970,000 | 35,695,000 | 35,695,000 | 35,650,000 | 35,650,000 | 0 | 0 | 2020-11-20 | 2020-11-25 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 73,055,000 | 67.18 % | |
1098 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sedang/berat ruang kelas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119282 | 26215992 | APBDP | 108,750,000 | 35,970,000 | 35,695,000 | 35,695,000 | 35,650,000 | 35,650,000 | 0 | 0 | 2020-11-20 | 2020-11-25 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 73,055,000 | 67.18 % | |
1099 | 2020 | Sekretariat Daerah | Pengadaan Frame Baliho | Pengadaan Langsung | Pengadaan Barang | 4120282 | 23922105 | APBD | 70,000,000 | 70,000,000 | 69,905,000 | 0 | 69,905,000 | 69,905,000 | 0 | 0 | 2020-11-10 | 2020-11-16 | KARYA DWI CHADE | 75.416.433.3-733.000 | 95,000 | 0.14 % | |
1100 | 2020 | Sekretariat Daerah | Pengadaan Frame Baliho | Pengadaan Langsung | Pengadaan Barang | 4120282 | 23922105 | APBD | 70,000,000 | 70,000,000 | 69,905,000 | 0 | 69,905,000 | 69,905,000 | 0 | 0 | 2020-11-10 | 2020-11-16 | KARYA DWI CHADE | 75.416.433.3-733.000 | 95,000 | 0.14 % | |
1101 | 2020 | Dinas Pertanian | Pengadaan Kambing Kacang dan Konsentrat | Pengadaan Langsung | Pengadaan Barang | 4121282 | 24145370;26142901 | APBD | 68,300,000 | 67,725,000 | 67,525,000 | 67,525,000 | 67,525,000 | 67,525,000 | 0 | 0 | 2020-11-12 | 2020-11-16 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 775,000 | 1.13 % | |
1102 | 2020 | Dinas Pertanian | Pengadaan Kambing Kacang dan Konsentrat | Pengadaan Langsung | Pengadaan Barang | 4121282 | 24145370;26142901 | APBD | 68,300,000 | 67,725,000 | 67,525,000 | 67,525,000 | 67,525,000 | 67,525,000 | 0 | 0 | 2020-11-12 | 2020-11-16 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 775,000 | 1.13 % | |
1103 | 2020 | Dinas Perhubungan | Pengadaan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4122282 | 26423338 | APBDP | 115,000,000 | 114,990,428 | 114,737,946 | 0 | 114,737,900 | 114,737,900 | 0 | 0 | 2020-11-16 | 2020-11-20 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 262,054 | 0.23 % | |
1104 | 2020 | Dinas Perhubungan | Pengadaan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4122282 | 26423338 | APBDP | 115,000,000 | 114,990,428 | 114,737,946 | 0 | 114,737,900 | 114,737,900 | 0 | 0 | 2020-11-16 | 2020-11-20 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 262,054 | 0.23 % | |
1105 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi pagar SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4125282 | 23890585 | APBD | 150,000,000 | 149,894,388 | 149,809,020 | 149,809,020 | 149,699,000 | 149,699,000 | 0 | 0 | 2020-11-12 | 2020-11-16 | cv.ghea | 82.333.270.5-733.000 | 190,980 | 0.13 % | |
1106 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi pagar SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4125282 | 23890585 | APBD | 150,000,000 | 149,894,388 | 149,809,020 | 149,809,020 | 149,699,000 | 149,699,000 | 0 | 0 | 2020-11-12 | 2020-11-16 | cv.ghea | 82.333.270.5-733.000 | 190,980 | 0.13 % | |
1107 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja pembangunan WC/ Toilet | Pengadaan Langsung | Pekerjaan Konstruksi | 4127282 | 26177279 | APBDP | 80,000,000 | 79,993,986 | 79,858,686 | 0 | 79,858,600 | 0 | 0 | 0 | 2020-11-16 | 2020-11-23 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 141,314 | 0.18 % | |
1108 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 4128282 | 26181257;26181281;26181482;26181554;26181608;26181810 | APBDP | 186,399,800 | 76,774,800 | 76,574,800 | 0 | 76,574,800 | 0 | 0 | 0 | 2020-11-16 | 2020-11-24 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 109,825,000 | 58.92 % | |
1109 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Pengawasan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4129282 | 26178480 | APBDP | 5,000,000 | 4,998,320 | 4,943,084 | 0 | 4,943,000 | 0 | 0 | 0 | 2020-11-16 | 2020-11-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 56,916 | 1.14 % | |
1110 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan counsule outlet O2 dan wall bed head (DID Tambahan Tahap 2) | Pengadaan Langsung | Pengadaan Barang | 4130282 | 26658707 | APBD | 187,000,000 | 187,000,000 | 186,813,000 | 186,813,000 | 186,813,000 | 0 | 0 | 0 | 2020-11-23 | 2020-11-27 | PT.CITRA TEKNIK MEDICA | 80.747.020.8-422.000 | 187,000 | 0.1 % | |
1111 | 2020 | RSUD Brigjen H. Hasan Basry | Partisi Gedung 3 lantai (DID Tambahan Tahap 2) | Pengadaan Langsung | Pekerjaan Konstruksi | 4131282 | 26655209 | APBD | 133,400,000 | 133,222,233 | 133,034,726 | 133,034,726 | 133,034,726 | 0 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 365,274 | 0.27 % | |
1112 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kantor Sekretariat Daerah, Pendopo, dan Rumah Dinas Ketua DPRD Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4132282 | 26443898 | APBDP | 30,000,000 | 29,845,475 | 29,700,000 | 29,700,000 | 29,650,000 | 29,650,000 | 0 | 0 | 2020-11-16 | 2020-11-19 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 300,000 | 1 % | |
1113 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kantor Sekretariat Daerah, Pendopo, dan Rumah Dinas Ketua DPRD Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4132282 | 26443898 | APBDP | 30,000,000 | 29,845,475 | 29,700,000 | 29,700,000 | 29,650,000 | 29,650,000 | 0 | 0 | 2020-11-16 | 2020-11-19 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 300,000 | 1 % | |
1114 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja hadiah penghargaan | Pengadaan Langsung | Pengadaan Barang | 4133282 | 26178902 | APBD | 80,500,000 | 80,500,000 | 77,970,000 | 0 | 77,970,000 | 77,970,000 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 2,530,000 | 3.14 % | |
1115 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja hadiah penghargaan | Pengadaan Langsung | Pengadaan Barang | 4133282 | 26178902 | APBD | 80,500,000 | 80,500,000 | 77,970,000 | 0 | 77,970,000 | 77,970,000 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 2,530,000 | 3.14 % | |
1116 | 2020 | Kecamatan Padang Batung | Belanjan Konsultan Pengawasan Pagar Gedung Kantor Sisi kanan dan kiri dan Belanja Pintu Pagar Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4134282 | 26156759 | APBDP | 12,000,000 | 11,998,745 | 11,909,920 | 0 | 11,909,920 | 11,909,920 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 90,080 | 0.75 % | |
1117 | 2020 | Kecamatan Padang Batung | Belanjan Konsultan Pengawasan Pagar Gedung Kantor Sisi kanan dan kiri dan Belanja Pintu Pagar Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4134282 | 26156759 | APBDP | 12,000,000 | 11,998,745 | 11,909,920 | 0 | 11,909,920 | 11,909,920 | 0 | 0 | 2020-11-16 | 2020-11-18 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 90,080 | 0.75 % | |
1118 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Jalan Bakarung Rantauan Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4136282 | 26156758 | APBDP | 30,000,000 | 29,405,475 | 29,313,900 | 29,313,900 | 29,270,000 | 29,270,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | Wing Rastafarindo | 03.282.590.3-732.000 | 686,100 | 2.29 % | |
1119 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Jalan Bakarung Rantauan Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4136282 | 26156758 | APBDP | 30,000,000 | 29,405,475 | 29,313,900 | 29,313,900 | 29,270,000 | 29,270,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | Wing Rastafarindo | 03.282.590.3-732.000 | 686,100 | 2.29 % | |
1120 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Madang - Ambutun untuk jalur pengangkutan hasil pertanian di Kec. Telaga Langsat (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4138282 | 26326972 | APBDP | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | cv.mitra talenta prima | 02.746.658.0-733.000 | 992,250 | 1.98 % | |
1121 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Madang - Ambutun untuk jalur pengangkutan hasil pertanian di Kec. Telaga Langsat (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4138282 | 26326972 | APBDP | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | cv.mitra talenta prima | 02.746.658.0-733.000 | 992,250 | 1.98 % | |
1122 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi siswa SD | Pengadaan Langsung | Pengadaan Barang | 4139282 | 26202736 | APBDP | 200,000,000 | 199,650,000 | 199,408,000 | 199,408,000 | 199,214,400 | 199,214,400 | 0 | 0 | 2020-11-20 | 2020-11-25 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.3 % | |
1123 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi siswa SD | Pengadaan Langsung | Pengadaan Barang | 4139282 | 26202736 | APBDP | 200,000,000 | 199,650,000 | 199,408,000 | 199,408,000 | 199,214,400 | 199,214,400 | 0 | 0 | 2020-11-20 | 2020-11-25 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.3 % | |
1124 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Bakarung Tengah - Karang Jawa dan Jalan Kandangan Hulu - Sp. Tabihi untuk jalur pengangkutan hasil pertanian / perkebunan di Kecamatan Padang Batung / Angkinang (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4140282 | 26326889 | APBDP | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 992,250 | 1.98 % | |
1125 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Bakarung Tengah - Karang Jawa dan Jalan Kandangan Hulu - Sp. Tabihi untuk jalur pengangkutan hasil pertanian / perkebunan di Kecamatan Padang Batung / Angkinang (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4140282 | 26326889 | APBDP | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | 2020-11-20 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 992,250 | 1.98 % | |
1126 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | di sediakan utk Makanan Khas Daerah promosi untuk kegiatan hari jadi Kab.HSS Th.2019 | Pengadaan Langsung | Pengadaan Barang | 4141282 | 23370131 | APBDP | 74,550,000 | 71,242,875 | 71,060,000 | 0 | 70,851,000 | 70,851,000 | 0 | 0 | 2020-11-19 | 2020-11-24 | FADWI UTAMA | 94.246.044.5-733.000 | 3,490,000 | 4.68 % | |
1127 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | di sediakan utk Makanan Khas Daerah promosi untuk kegiatan hari jadi Kab.HSS Th.2019 | Pengadaan Langsung | Pengadaan Barang | 4141282 | 23370131 | APBDP | 74,550,000 | 71,242,875 | 71,060,000 | 0 | 70,851,000 | 70,851,000 | 0 | 0 | 2020-11-19 | 2020-11-24 | FADWI UTAMA | 94.246.044.5-733.000 | 3,490,000 | 4.68 % | |
1128 | 2020 | Dinas Ketahanan Pangan | Pembuatan Hidroponik untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 4142282 | 26332091 | APBDP | 58,197,425 | 57,248,620 | 57,177,120 | 57,177,120 | 57,177,000 | 57,177,000 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV.DITA | 02.242.686.0-733.000 | 1,020,305 | 1.75 % | |
1129 | 2020 | Dinas Ketahanan Pangan | Pembuatan Hidroponik untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 4142282 | 26332091 | APBDP | 58,197,425 | 57,248,620 | 57,177,120 | 57,177,120 | 57,177,000 | 57,177,000 | 0 | 0 | 2020-11-23 | 2020-11-27 | CV.DITA | 02.242.686.0-733.000 | 1,020,305 | 1.75 % | |
1130 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Anjiran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4143282 | 26210529 | APBDP | 50,000,000 | 49,974,388 | 49,857,488 | 49,857,488 | 49,681,488 | 49,681,488 | 0 | 0 | 2020-11-17 | 2020-11-20 | CV. LALUNA DANA | 02.237.179.3-733.000 | 142,512 | 0.29 % | |
1131 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Anjiran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4143282 | 26210529 | APBDP | 50,000,000 | 49,974,388 | 49,857,488 | 49,857,488 | 49,681,488 | 49,681,488 | 0 | 0 | 2020-11-17 | 2020-11-20 | CV. LALUNA DANA | 02.237.179.3-733.000 | 142,512 | 0.29 % | |
1132 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Alat Praktik dan peraga Siswa (PAUD) | Pengadaan Langsung | Pengadaan Barang | 4144282 | 24108210 | APBD | 136,000,000 | 135,999,600 | 135,852,000 | 135,852,000 | 135,852,000 | 135,852,000 | 0 | 0 | 2020-11-20 | 2020-11-24 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 148,000 | 0.11 % | |
1133 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Alat Praktik dan peraga Siswa (PAUD) | Pengadaan Langsung | Pengadaan Barang | 4144282 | 24108210 | APBD | 136,000,000 | 135,999,600 | 135,852,000 | 135,852,000 | 135,852,000 | 135,852,000 | 0 | 0 | 2020-11-20 | 2020-11-24 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 148,000 | 0.11 % | |
1134 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4146282 | 26201704 | APBDP | 3,000,000 | 2,999,700 | 2,926,000 | 2,926,000 | 2,926,000 | 2,926,000 | 0 | 0 | 2020-11-30 | 2020-12-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 74,000 | 2.47 % | |
1135 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4146282 | 26201704 | APBDP | 3,000,000 | 2,999,700 | 2,926,000 | 2,926,000 | 2,926,000 | 2,926,000 | 0 | 0 | 2020-11-30 | 2020-12-02 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 74,000 | 2.47 % | |
1136 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4147282 | 26283920 | APBDP | 9,000,000 | 8,938,314 | 8,853,900 | 8,853,900 | 8,853,900 | 8,853,900 | 0 | 0 | 2020-11-30 | 2020-12-02 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 146,100 | 1.62 % | |
1137 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4147282 | 26283920 | APBDP | 9,000,000 | 8,938,314 | 8,853,900 | 8,853,900 | 8,853,900 | 8,853,900 | 0 | 0 | 2020-11-30 | 2020-12-02 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 146,100 | 1.62 % | |
1138 | 2020 | Dinas Pendidikan dan Kebudayaan | pengawasan rehab dan pembangunan pagar SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4149282 | 26201716 | APBDP | 2,100,000 | 2,095,500 | 2,073,390 | 2,073,390 | 2,073,390 | 2,073,390 | 0 | 0 | 2020-12-07 | 2020-12-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 26,610 | 1.27 % | |
1139 | 2020 | Dinas Pendidikan dan Kebudayaan | pengawasan rehab dan pembangunan pagar SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4149282 | 26201716 | APBDP | 2,100,000 | 2,095,500 | 2,073,390 | 2,073,390 | 2,073,390 | 2,073,390 | 0 | 0 | 2020-12-07 | 2020-12-10 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 26,610 | 1.27 % | |
1140 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengurukan Halaman SKB ) | Pengadaan Langsung | Pekerjaan Konstruksi | 4150282 | 26222841 | APBD | 200,000,000 | 198,826,371 | 198,197,211 | 198,197,211 | 198,120,000 | 198,120,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV. An-Nidha | 02.675.485.3-733.000 | 1,802,789 | 0.9 % | |
1141 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengurukan Halaman SKB ) | Pengadaan Langsung | Pekerjaan Konstruksi | 4150282 | 26222841 | APBD | 200,000,000 | 198,826,371 | 198,197,211 | 198,197,211 | 198,120,000 | 198,120,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV. An-Nidha | 02.675.485.3-733.000 | 1,802,789 | 0.9 % | |
1142 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan pembangunan sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4154282 | 26203134 | APBDP | 125,750,000 | 97,405,000 | 97,307,650 | 97,307,650 | 97,250,000 | 97,250,000 | 0 | 0 | 2020-11-21 | 2020-11-25 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 28,442,350 | 22.62 % | |
1143 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan pembangunan sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4154282 | 26203134 | APBDP | 125,750,000 | 97,405,000 | 97,307,650 | 97,307,650 | 97,250,000 | 97,250,000 | 0 | 0 | 2020-11-21 | 2020-11-25 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 28,442,350 | 22.62 % | |
1144 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi (Perencanaan) Kegiatan Penggantian Jembatan Tahun 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4155282 | 26156964 | APBDP | 60,000,000 | 59,104,375 | 58,817,000 | 58,817,000 | 58,800,000 | 58,800,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,183,000 | 1.97 % | |
1145 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi (Perencanaan) Kegiatan Penggantian Jembatan Tahun 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4155282 | 26156964 | APBDP | 60,000,000 | 59,104,375 | 58,817,000 | 58,817,000 | 58,800,000 | 58,800,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,183,000 | 1.97 % | |
1146 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Jalan masuk dan pembangunan tempat parkir museum rakyat Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 4157282 | 26729823 | APBD | 80,750,000 | 80,727,300 | 80,595,718 | 80,595,718 | 80,399,935 | 80,399,935 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 154,282 | 0.19 % | |
1147 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Jalan masuk dan pembangunan tempat parkir museum rakyat Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 4157282 | 26729823 | APBD | 80,750,000 | 80,727,300 | 80,595,718 | 80,595,718 | 80,399,935 | 80,399,935 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 154,282 | 0.19 % | |
1148 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4158282 | 26212344 | APBDP | 17,500,000 | 17,435,220 | 17,352,720 | 17,352,720 | 17,300,000 | 17,300,000 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 147,280 | 0.84 % | |
1149 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4158282 | 26212344 | APBDP | 17,500,000 | 17,435,220 | 17,352,720 | 17,352,720 | 17,300,000 | 17,300,000 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 147,280 | 0.84 % | |
1150 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4159282 | 26203167 | APBDP | 40,000,000 | 14,937,780 | 14,855,280 | 14,855,280 | 14,805,000 | 14,805,000 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 25,144,720 | 62.86 % | |
1151 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4159282 | 26203167 | APBDP | 40,000,000 | 14,937,780 | 14,855,280 | 14,855,280 | 14,805,000 | 14,805,000 | 0 | 0 | 2020-11-23 | 2020-11-26 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 25,144,720 | 62.86 % | |
1152 | 2020 | Kecamatan Padang Batung | Konsultan Pengawasan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4160282 | 26156764 | APBDP | 4,000,000 | 3,996,520 | 3,927,000 | 0 | 3,927,000 | 3,927,000 | 0 | 0 | 2020-11-24 | 2020-11-26 | cv.akmalindo | 02.531.482.4-731.000 | 73,000 | 1.83 % | |
1153 | 2020 | Kecamatan Padang Batung | Konsultan Pengawasan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4160282 | 26156764 | APBDP | 4,000,000 | 3,996,520 | 3,927,000 | 0 | 3,927,000 | 3,927,000 | 0 | 0 | 2020-11-24 | 2020-11-26 | cv.akmalindo | 02.531.482.4-731.000 | 73,000 | 1.83 % | |
1154 | 2020 | Kecamatan Angkinang | Belanja Modal Perbaikan Halaman Kantor Camat Angkinang | Pengadaan Langsung | Pengadaan Barang | 4161282 | 26171786 | APBDP | 70,000,000 | 69,996,740 | 69,860,306 | 0 | 69,860,306 | 69,860,306 | 0 | 0 | 2020-11-24 | 2020-11-26 | FADWI UTAMA | 94.246.044.5-733.000 | 139,694 | 0.2 % | |
1155 | 2020 | Kecamatan Angkinang | Belanja Modal Perbaikan Halaman Kantor Camat Angkinang | Pengadaan Langsung | Pengadaan Barang | 4161282 | 26171786 | APBDP | 70,000,000 | 69,996,740 | 69,860,306 | 0 | 69,860,306 | 69,860,306 | 0 | 0 | 2020-11-24 | 2020-11-26 | FADWI UTAMA | 94.246.044.5-733.000 | 139,694 | 0.2 % | |
1156 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Pengadaan Barang | 4163282 | 26703399 | APBDP | 200,000,000 | 199,980,000 | 199,650,000 | 199,650,000 | 199,650,000 | 199,650,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV.STEPHAN JAYA | 83.280.683.0-731.000 | 350,000 | 0.18 % | |
1157 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Pengadaan Barang | 4163282 | 26703399 | APBDP | 200,000,000 | 199,980,000 | 199,650,000 | 199,650,000 | 199,650,000 | 199,650,000 | 0 | 0 | 2020-11-24 | 2020-11-27 | CV.STEPHAN JAYA | 83.280.683.0-731.000 | 350,000 | 0.18 % | |
1158 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Pengadaan Desain dan Interior | Pengadaan Langsung | Pengadaan Barang | 4164282 | 26178509 | APBDP | 75,000,000 | 74,999,650 | 74,997,588 | 0 | 74,997,500 | 0 | 0 | 0 | 2020-11-24 | 2020-11-30 | KARYA DWI CHADE | 75.416.433.3-733.000 | 2,413 | 0 % | |
1159 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Pengadaan Karcis, Blanko dan SPTPD | Pengadaan Langsung | Pengadaan Barang | 4165282 | 26532318 | APBD | 234,950,000 | 146,240,270 | 146,238,070 | 0 | 146,238,000 | 0 | 0 | 0 | 2020-11-25 | 2020-12-01 | PD. ABADI | 04.137.933.0-731.000 | 88,711,930 | 37.76 % | |
1160 | 2020 | Dinas Kesehatan | Pengadaan Masker Bedah (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4169282 | 26458477 | APBD | 701,313,400 | 77,077,000 | 77,077,000 | 0 | 77,077,000 | 77,077,000 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT. YAMHATEVY PARAN MANDIRI | 01.879.157.4-731.000 | 624,236,400 | 89.01 % | |
1161 | 2020 | Dinas Kesehatan | Pengadaan Masker Bedah (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4169282 | 26458477 | APBD | 701,313,400 | 77,077,000 | 77,077,000 | 0 | 77,077,000 | 77,077,000 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT. YAMHATEVY PARAN MANDIRI | 01.879.157.4-731.000 | 624,236,400 | 89.01 % | |
1162 | 2020 | Dinas Kesehatan | Pengadaan masker N95, sarung tangan steril, sarung tangan obgyn, nurse cap, hand sanitizer dan pulse oximeter (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4171282 | 26458477 | APBD | 701,313,400 | 192,071,400 | 190,874,420 | 0 | 190,685,220 | 190,685,220 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 510,438,980 | 72.78 % | |
1163 | 2020 | Dinas Kesehatan | Pengadaan masker N95, sarung tangan steril, sarung tangan obgyn, nurse cap, hand sanitizer dan pulse oximeter (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4171282 | 26458477 | APBD | 701,313,400 | 192,071,400 | 190,874,420 | 0 | 190,685,220 | 190,685,220 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 510,438,980 | 72.78 % | |
1164 | 2020 | Dinas Kesehatan | Pengadaan gown (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4172282 | 26162578 | APBD | 142,800,000 | 142,800,000 | 142,621,500 | 0 | 142,550,100 | 142,550,100 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT. BAHANA KARYA MAHLITA | 31.631.382.4-732.000 | 178,500 | 0.13 % | |
1165 | 2020 | Dinas Kesehatan | Pengadaan gown (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4172282 | 26162578 | APBD | 142,800,000 | 142,800,000 | 142,621,500 | 0 | 142,550,100 | 142,550,100 | 0 | 0 | 2020-12-02 | 2020-12-10 | PT. BAHANA KARYA MAHLITA | 31.631.382.4-732.000 | 178,500 | 0.13 % | |
1166 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengawasan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4174282 | 26223355 | APBD | 6,000,000 | 5,453,857 | 4,899,321 | 4,899,321 | 4,899,321 | 4,899,321 | 0 | 0 | 2020-12-03 | 2020-12-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,100,679 | 18.34 % | |
1167 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengawasan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4174282 | 26223355 | APBD | 6,000,000 | 5,453,857 | 4,899,321 | 4,899,321 | 4,899,321 | 4,899,321 | 0 | 0 | 2020-12-03 | 2020-12-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,100,679 | 18.34 % | |
1168 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Trafo dan Penambahan Daya Listrik di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Lainnya | 4175282 | 26151426 | APBDP | 55,000,000 | 54,999,450 | 54,968,375 | 0 | 54,968,375 | 54,968,375 | 0 | 0 | 2020-12-01 | 2020-12-07 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 31,625 | 0.06 % | |
1169 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Trafo dan Penambahan Daya Listrik di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Lainnya | 4175282 | 26151426 | APBDP | 55,000,000 | 54,999,450 | 54,968,375 | 0 | 54,968,375 | 54,968,375 | 0 | 0 | 2020-12-01 | 2020-12-07 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 31,625 | 0.06 % | |
1170 | 2020 | Kecamatan Angkinang | Belanja Konsultan Pengawas Perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4177282 | 26566221 | APBDP | 2,250,000 | 2,200,000 | 2,035,000 | 0 | 2,035,000 | 2,035,000 | 0 | 0 | 2020-12-08 | 2020-12-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 215,000 | 9.56 % | |
1171 | 2020 | Kecamatan Angkinang | Belanja Konsultan Pengawas Perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4177282 | 26566221 | APBDP | 2,250,000 | 2,200,000 | 2,035,000 | 0 | 2,035,000 | 2,035,000 | 0 | 0 | 2020-12-08 | 2020-12-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 215,000 | 9.56 % | |
1172 | 2020 | Kecamatan Sungai Raya | Bangunan Arsip | Pengadaan Langsung | Pekerjaan Konstruksi | 4179282 | 26165840 | APBD | 48,800,000 | 48,788,064 | 48,653,188 | 0 | 48,653,188 | 48,653,188 | 0 | 0 | 2020-12-04 | 2020-12-04 | CV. AISY | 75.132.070.6-733.000 | 146,812 | 0.3 % | |
1173 | 2020 | Kecamatan Sungai Raya | Bangunan Arsip | Pengadaan Langsung | Pekerjaan Konstruksi | 4179282 | 26165840 | APBD | 48,800,000 | 48,788,064 | 48,653,188 | 0 | 48,653,188 | 48,653,188 | 0 | 0 | 2020-12-04 | 2020-12-04 | CV. AISY | 75.132.070.6-733.000 | 146,812 | 0.3 % | |
1174 | 2020 | Dinas Komunikasi dan Informatika | Pembuatan Aplikasi E Comerce | Pengadaan Langsung | Jasa Lainnya | 4181282 | 26465740 | APBDP | 98,800,000 | 98,560,000 | 98,208,000 | 0 | 98,208,000 | 98,208,000 | 0 | 0 | 2020-12-07 | 2020-12-11 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.6 % | |
1175 | 2020 | Dinas Komunikasi dan Informatika | Pembuatan Aplikasi E Comerce | Pengadaan Langsung | Jasa Lainnya | 4181282 | 26465740 | APBDP | 98,800,000 | 98,560,000 | 98,208,000 | 0 | 98,208,000 | 98,208,000 | 0 | 0 | 2020-12-07 | 2020-12-11 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.6 % | |
1176 | 2020 | Sekretariat Daerah | Pengadaan Buku Profil dan Majalah | Pengadaan Langsung | Jasa Lainnya | 4184282 | 23944794;23944842 | APBD | 120,000,000 | 120,000,000 | 119,845,000 | 0 | 119,845,000 | 0 | 0 | 0 | 2020-12-14 | 2020-12-17 | CV.MAYANG AGUNG SARI | 03.025.889.1-731.000 | 155,000 | 0.13 % | |
1177 | 2020 | Sekretariat Daerah | Pengadaan Buku Agenda | Pengadaan Langsung | Pengadaan Barang | 4185282 | 23923316 | APBD | 60,000,000 | 60,000,000 | 59,994,000 | 0 | 59,994,000 | 59,994,000 | 0 | 0 | 2020-12-12 | 2020-12-17 | KARYA DWI CHADE | 75.416.433.3-733.000 | 6,000 | 0.01 % | |
1178 | 2020 | Sekretariat Daerah | Pengadaan Buku Agenda | Pengadaan Langsung | Pengadaan Barang | 4185282 | 23923316 | APBD | 60,000,000 | 60,000,000 | 59,994,000 | 0 | 59,994,000 | 59,994,000 | 0 | 0 | 2020-12-12 | 2020-12-17 | KARYA DWI CHADE | 75.416.433.3-733.000 | 6,000 | 0.01 % | |
1179 | 2020 | Kecamatan Angkinang | Belanja Pemeliharaan Gedung Takraw | Pengadaan Langsung | Pekerjaan Konstruksi | 4188282 | 26171924 | APBDP | 25,000,000 | 24,945,585 | 24,785,182 | 0 | 24,785,182 | 24,785,182 | 0 | 0 | 2020-12-16 | 2020-12-17 | CV. AISY | 75.132.070.6-733.000 | 214,818 | 0.86 % | |
1180 | 2020 | Kecamatan Angkinang | Belanja Pemeliharaan Gedung Takraw | Pengadaan Langsung | Pekerjaan Konstruksi | 4188282 | 26171924 | APBDP | 25,000,000 | 24,945,585 | 24,785,182 | 0 | 24,785,182 | 24,785,182 | 0 | 0 | 2020-12-16 | 2020-12-17 | CV. AISY | 75.132.070.6-733.000 | 214,818 | 0.86 % | |
1181 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Reagent PCR (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4192282 | 26480392 | APBD | 201,171,000 | 199,314,500 | 198,214,584 | 198,214,584 | 198,214,000 | 0 | 0 | 0 | 2020-12-21 | 2020-12-23 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 2,956,416 | 1.47 % | |
1182 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Reagent PCR (DID Tambahan Tahap 2) | Pengadaan Langsung | Pengadaan Barang | 4193282 | 26557609 | APBDP | 200,000,000 | 199,314,500 | 198,214,584 | 198,214,584 | 198,214,000 | 0 | 0 | 0 | 2020-12-21 | 2020-12-23 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 1,785,416 | 0.89 % | |
1183 | 2020 | Kecamatan Simpur | tambah daya dan instalasi listrik | Pengadaan Langsung | Jasa Lainnya | 4194282 | 26473444 | APBDP | 71,415,400 | 68,479,554 | 68,397,054 | 0 | 68,397,054 | 68,397,054 | 0 | 0 | 2020-12-23 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 3,018,346 | 4.23 % | |
1184 | 2020 | Kecamatan Simpur | tambah daya dan instalasi listrik | Pengadaan Langsung | Jasa Lainnya | 4194282 | 26473444 | APBDP | 71,415,400 | 68,479,554 | 68,397,054 | 0 | 68,397,054 | 68,397,054 | 0 | 0 | 2020-12-23 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 3,018,346 | 4.23 % | |
1185 | 2020 | Kecamatan Simpur | instalasi dan tambah daya listrik | Pengadaan Langsung | Jasa Lainnya | 4195282 | 26471230 | APBDP | 70,000,000 | 69,570,270 | 69,020,270 | 0 | 69,020,270 | 69,020,270 | 0 | 0 | 2020-12-23 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 979,730 | 1.4 % | |
1186 | 2020 | Kecamatan Simpur | instalasi dan tambah daya listrik | Pengadaan Langsung | Jasa Lainnya | 4195282 | 26471230 | APBDP | 70,000,000 | 69,570,270 | 69,020,270 | 0 | 69,020,270 | 69,020,270 | 0 | 0 | 2020-12-23 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 979,730 | 1.4 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | Dinas Perikanan | Pengadaan alat tangkap untuk eks pengguna alat setrum | Pengadaan Langsung | Pengadaan Barang | 3078282 | 22920494 | 70,000,000 | 69,300,000 | 68,818,750 | 68,818,750 | 68,800,000 | 68,800,000 | 0 | 0 | 2019-12-31 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,181,250 | 1.69 % | |
2 | 2020 | Dinas Perikanan | Pengadaan alat tangkap untuk eks pengguna alat setrum | Pengadaan Langsung | Pengadaan Barang | 3078282 | 22920494 | 70,000,000 | 69,300,000 | 68,818,750 | 68,818,750 | 68,800,000 | 68,800,000 | 0 | 0 | 2019-12-31 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,181,250 | 1.69 % | |
3 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3090282 | 23327993 | 166,000,000 | 165,748,000 | 165,440,000 | 165,440,000 | 165,200,000 | 165,200,000 | 0 | 0 | 2020-01-09 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 560,000 | 0.34 % | |
4 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3090282 | 23327993 | 166,000,000 | 165,748,000 | 165,440,000 | 165,440,000 | 165,200,000 | 165,200,000 | 0 | 0 | 2020-01-09 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 560,000 | 0.34 % | |
5 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Konsultan pengawasan pembangunan Gedung Perpustakaan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3093282 | 23063579 | 75,000,000 | 74,978,750 | 74,525,000 | 74,525,000 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-01-14 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 475,000 | 0.63 % | |
6 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Konsultan pengawasan pembangunan Gedung Perpustakaan Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3093282 | 23063579 | 75,000,000 | 74,978,750 | 74,525,000 | 74,525,000 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-01-14 | CV. Dharma Cipta Pratama | 02.050.569.9-731.000 | 475,000 | 0.63 % | |
7 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3094282 | 23414416 | 4,600,000 | 4,570,500 | 4,515,500 | 4,515,500 | 4,450,000 | 4,450,000 | 0 | 0 | 2020-01-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 84,500 | 1.84 % | |
8 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3094282 | 23414416 | 4,600,000 | 4,570,500 | 4,515,500 | 4,515,500 | 4,450,000 | 4,450,000 | 0 | 0 | 2020-01-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 84,500 | 1.84 % | |
9 | 2020 | Kecamatan Kandangan | Belanja Modal Peralatan dan Mesin Pengadaan Alat Pendingin | Pengadaan Langsung | Pengadaan Barang | 3097282 | 23462698 | 104,312,500 | 102,712,500 | 99,275,000 | 0 | 99,275,000 | 99,275,000 | 0 | 0 | 2020-01-18 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 5,037,500 | 4.83 % | |
10 | 2020 | Kecamatan Kandangan | Belanja Modal Peralatan dan Mesin Pengadaan Alat Pendingin | Pengadaan Langsung | Pengadaan Barang | 3097282 | 23462698 | 104,312,500 | 102,712,500 | 99,275,000 | 0 | 99,275,000 | 99,275,000 | 0 | 0 | 2020-01-18 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 5,037,500 | 4.83 % | |
11 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Sumur Bor Pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3098282 | 23764686 | 5,000,000 | 4,950,000 | 4,922,500 | 4,922,500 | 4,922,500 | 4,922,500 | 0 | 0 | 2020-01-20 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 77,500 | 1.55 % | |
12 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Sumur Bor Pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3098282 | 23764686 | 5,000,000 | 4,950,000 | 4,922,500 | 4,922,500 | 4,922,500 | 4,922,500 | 0 | 0 | 2020-01-20 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 77,500 | 1.55 % | |
13 | 2020 | Dinas Perdagangan | Perencanaan Pengecatan Blok B, Blok C, Blok D, Blok E, Ruko 16 Unit Toko 5 Unit di Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3099282 | 23828975 | 25,000,000 | 24,970,000 | 24,915,000 | 24,915,000 | 24,915,000 | 24,915,000 | 0 | 0 | 2020-01-20 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 85,000 | 0.34 % | |
14 | 2020 | Dinas Perdagangan | Perencanaan Pengecatan Blok B, Blok C, Blok D, Blok E, Ruko 16 Unit Toko 5 Unit di Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3099282 | 23828975 | 25,000,000 | 24,970,000 | 24,915,000 | 24,915,000 | 24,915,000 | 24,915,000 | 0 | 0 | 2020-01-20 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 85,000 | 0.34 % | |
15 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3100282 | 23828892 | 7,500,000 | 7,480,000 | 7,458,000 | 7,458,000 | 7,458,000 | 7,458,000 | 0 | 0 | 2020-01-20 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 42,000 | 0.56 % | |
16 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3100282 | 23828892 | 7,500,000 | 7,480,000 | 7,458,000 | 7,458,000 | 7,458,000 | 7,458,000 | 0 | 0 | 2020-01-20 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 42,000 | 0.56 % | |
17 | 2020 | Dinas Perdagangan | Perencanaan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3104282 | 23828445 | 7,000,000 | 6,985,000 | 6,941,000 | 6,941,000 | 6,941,000 | 6,941,000 | 0 | 0 | 2020-01-20 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 59,000 | 0.84 % | |
18 | 2020 | Dinas Perdagangan | Perencanaan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3104282 | 23828445 | 7,000,000 | 6,985,000 | 6,941,000 | 6,941,000 | 6,941,000 | 6,941,000 | 0 | 0 | 2020-01-20 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 59,000 | 0.84 % | |
19 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3107282 | 23544910 | 15,679,439 | 15,675,000 | 15,620,000 | 15,620,000 | 15,235,000 | 15,235,000 | 0 | 0 | 2020-01-24 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 59,439 | 0.38 % | |
20 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3107282 | 23544910 | 15,679,439 | 15,675,000 | 15,620,000 | 15,620,000 | 15,235,000 | 15,235,000 | 0 | 0 | 2020-01-24 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 59,439 | 0.38 % | |
21 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gedung Poliklinik/eks IGD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3109282 | 23544877 | 69,834,579 | 69,795,000 | 69,762,000 | 0 | 69,740,000 | 69,740,000 | 0 | 0 | 2020-01-23 | CV. POLA ARSITEK KONSULTAN | 02.215.319.1-732.000 | 72,579 | 0.1 % | |
22 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gedung Poliklinik/eks IGD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3109282 | 23544877 | 69,834,579 | 69,795,000 | 69,762,000 | 0 | 69,740,000 | 69,740,000 | 0 | 0 | 2020-01-23 | CV. POLA ARSITEK KONSULTAN | 02.215.319.1-732.000 | 72,579 | 0.1 % | |
23 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Konsultan Perencanaan Rumah Dinas Jl. Kamboja No 10 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3116282 | 23720170 | 35,700,000 | 11,852,500 | 11,819,500 | 0 | 11,522,500 | 0 | 0 | 0 | 2020-02-07 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 23,880,500 | 66.89 % | |
24 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi Guru | Pengadaan Langsung | Pengadaan Barang | 3118282 | 23796837 | 200,000,000 | 199,870,000 | 199,490,500 | 199,490,500 | 199,350,000 | 199,350,000 | 0 | 0 | 2020-01-24 | CV. INDO JAYA PERKASA | 66.729.000.1-733.000 | 509,500 | 0.25 % | |
25 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi Guru | Pengadaan Langsung | Pengadaan Barang | 3118282 | 23796837 | 200,000,000 | 199,870,000 | 199,490,500 | 199,490,500 | 199,350,000 | 199,350,000 | 0 | 0 | 2020-01-24 | CV. INDO JAYA PERKASA | 66.729.000.1-733.000 | 509,500 | 0.25 % | |
26 | 2020 | Sekretariat Daerah | Pengadaan Kursi Rapat | Pengadaan Langsung | Pengadaan Barang | 3119282 | 23985900 | 243,000,000 | 168,740,000 | 168,520,000 | 168,520,000 | 168,520,000 | 168,520,000 | 0 | 0 | 2020-01-23 | CV. DNS GEMILANG | 72.310.491.5-733.000 | 74,480,000 | 30.65 % | |
27 | 2020 | Sekretariat Daerah | Pengadaan Kursi Rapat | Pengadaan Langsung | Pengadaan Barang | 3119282 | 23985900 | 243,000,000 | 168,740,000 | 168,520,000 | 168,520,000 | 168,520,000 | 168,520,000 | 0 | 0 | 2020-01-23 | CV. DNS GEMILANG | 72.310.491.5-733.000 | 74,480,000 | 30.65 % | |
28 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Habirau Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3120282 | 23782525 | 175,000,000 | 174,985,742 | 174,677,574 | 174,677,574 | 174,550,000 | 174,550,000 | 0 | 0 | 2020-01-28 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 322,426 | 0.18 % | |
29 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Habirau Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3120282 | 23782525 | 175,000,000 | 174,985,742 | 174,677,574 | 174,677,574 | 174,550,000 | 174,550,000 | 0 | 0 | 2020-01-28 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 322,426 | 0.18 % | |
30 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Sungai Pinang 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3121282 | 23782512 | 175,000,000 | 174,989,613 | 174,640,596 | 174,640,596 | 174,500,000 | 174,500,000 | 0 | 0 | 2020-01-28 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 359,404 | 0.21 % | |
31 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN. Sungai Pinang 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3121282 | 23782512 | 175,000,000 | 174,989,613 | 174,640,596 | 174,640,596 | 174,500,000 | 174,500,000 | 0 | 0 | 2020-01-28 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 359,404 | 0.21 % | |
32 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab halaman SDN Habirau Tengah 1 Kec.Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3122282 | 23752437 | 75,000,000 | 74,990,735 | 74,872,446 | 74,872,446 | 74,800,000 | 74,800,000 | 0 | 0 | 2020-01-28 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 127,554 | 0.17 % | |
33 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab halaman SDN Habirau Tengah 1 Kec.Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3122282 | 23752437 | 75,000,000 | 74,990,735 | 74,872,446 | 74,872,446 | 74,800,000 | 74,800,000 | 0 | 0 | 2020-01-28 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 127,554 | 0.17 % | |
34 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3124282 | 23545192 | 57,694,393 | 57,638,020 | 56,650,000 | 56,650,000 | 5,610,000 | 56,100,000 | 0 | 0 | 2020-01-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,044,393 | 1.81 % | |
35 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3124282 | 23545192 | 57,694,393 | 57,638,020 | 56,650,000 | 56,650,000 | 5,610,000 | 56,100,000 | 0 | 0 | 2020-01-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,044,393 | 1.81 % | |
36 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman SDN Hamayung Utara Kec.Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3125282 | 23752200 | 200,000,000 | 68,702,422 | 68,598,808 | 68,598,808 | 68,500,000 | 68,500,000 | 0 | 0 | 2020-01-28 | CV. AMANDITA CIPTA PERSADA | 02.224.138.4-733.000 | 131,401,192 | 65.7 % | |
37 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman SDN Hamayung Utara Kec.Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3125282 | 23752200 | 200,000,000 | 68,702,422 | 68,598,808 | 68,598,808 | 68,500,000 | 68,500,000 | 0 | 0 | 2020-01-28 | CV. AMANDITA CIPTA PERSADA | 02.224.138.4-733.000 | 131,401,192 | 65.7 % | |
38 | 2020 | Kecamatan Daha Barat | Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3126282 | 23469806 | 140,372,000 | 140,371,826 | 140,039,682 | 0 | 140,039,682 | 140,039,682 | 0 | 0 | 2020-03-11 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 332,318 | 0.24 % | |
39 | 2020 | Kecamatan Daha Barat | Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3126282 | 23469806 | 140,372,000 | 140,371,826 | 140,039,682 | 0 | 140,039,682 | 140,039,682 | 0 | 0 | 2020-03-11 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 332,318 | 0.24 % | |
40 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3132282 | 23544821 | 27,797,196 | 27,775,000 | 27,720,000 | 27,720,000 | 27,720,000 | 27,720,000 | 0 | 0 | 2020-01-30 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 77,196 | 0.28 % | |
41 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3132282 | 23544821 | 27,797,196 | 27,775,000 | 27,720,000 | 27,720,000 | 27,720,000 | 27,720,000 | 0 | 0 | 2020-01-30 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 77,196 | 0.28 % | |
42 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3133282 | 23544810 | 18,483,178 | 18,480,000 | 18,458,000 | 18,458,000 | 18,458,000 | 18,458,000 | 0 | 0 | 2020-01-30 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 25,178 | 0.14 % | |
43 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3133282 | 23544810 | 18,483,178 | 18,480,000 | 18,458,000 | 18,458,000 | 18,458,000 | 18,458,000 | 0 | 0 | 2020-01-30 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 25,178 | 0.14 % | |
44 | 2020 | Dinas Kesehatan | Pengawsan Pembangunan Poskesdes (DID = Rp27.000.000,00) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3134282 | 23429059 | 30,000,000 | 29,865,000 | 29,579,000 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-02-08 | cv.akmalindo | 02.531.482.4-731.000 | 421,000 | 1.4 % | |
45 | 2020 | Dinas Kesehatan | Pengawsan Pembangunan Poskesdes (DID = Rp27.000.000,00) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3134282 | 23429059 | 30,000,000 | 29,865,000 | 29,579,000 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-02-08 | cv.akmalindo | 02.531.482.4-731.000 | 421,000 | 1.4 % | |
46 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Belajar Pondok Pesantrean Darul Ulum Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3135282 | 23782570 | 195,000,000 | 194,999,560 | 193,988,660 | 193,988,660 | 193,800,000 | 193,800,000 | 0 | 0 | 2020-01-31 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 1,011,340 | 0.52 % | |
47 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Belajar Pondok Pesantrean Darul Ulum Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3135282 | 23782570 | 195,000,000 | 194,999,560 | 193,988,660 | 193,988,660 | 193,800,000 | 193,800,000 | 0 | 0 | 2020-01-31 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 1,011,340 | 0.52 % | |
48 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. JHB 4 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3137282 | 23793021 | 150,000,000 | 149,996,822 | 149,622,272 | 149,622,272 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-01-31 | CV. KALTRA | 81.639.401.9-733.000 | 377,728 | 0.25 % | |
49 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. JHB 4 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3137282 | 23793021 | 150,000,000 | 149,996,822 | 149,622,272 | 149,622,272 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-01-31 | CV. KALTRA | 81.639.401.9-733.000 | 377,728 | 0.25 % | |
50 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Kandangan Kota 7 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3138282 | 23792985 | 150,000,000 | 149,999,636 | 149,745,536 | 149,745,536 | 149,600,000 | 149,600,000 | 0 | 0 | 2020-01-31 | CV. KHALIF | 81.540.809.1-733.000 | 254,464 | 0.17 % | |
51 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Kandangan Kota 7 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3138282 | 23792985 | 150,000,000 | 149,999,636 | 149,745,536 | 149,745,536 | 149,600,000 | 149,600,000 | 0 | 0 | 2020-01-31 | CV. KHALIF | 81.540.809.1-733.000 | 254,464 | 0.17 % | |
52 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3140282 | 23545182 | 37,142,991 | 37,125,000 | 36,483,700 | 36,483,700 | 36,483,700 | 36,483,700 | 0 | 0 | 2020-02-03 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 659,291 | 1.78 % | |
53 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3140282 | 23545182 | 37,142,991 | 37,125,000 | 36,483,700 | 36,483,700 | 36,483,700 | 36,483,700 | 0 | 0 | 2020-02-03 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 659,291 | 1.78 % | |
54 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3141282 | 23823662 | 115,000,000 | 114,991,082 | 114,299,787 | 114,299,787 | 114,200,000 | 114,200,000 | 0 | 0 | 2020-02-04 | CV. Jaya Engineering | 02.941.119.6-734.000 | 700,213 | 0.61 % | |
55 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3141282 | 23823662 | 115,000,000 | 114,991,082 | 114,299,787 | 114,299,787 | 114,200,000 | 114,200,000 | 0 | 0 | 2020-02-04 | CV. Jaya Engineering | 02.941.119.6-734.000 | 700,213 | 0.61 % | |
56 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3147282 | 23823644 | 3,500,000 | 3,500,000 | 3,454,000 | 3,454,000 | 3,400,000 | 3,400,000 | 0 | 0 | 2020-02-04 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 46,000 | 1.31 % | |
57 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3147282 | 23823644 | 3,500,000 | 3,500,000 | 3,454,000 | 3,454,000 | 3,400,000 | 3,400,000 | 0 | 0 | 2020-02-04 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 46,000 | 1.31 % | |
58 | 2020 | Sekretariat Daerah | Belanja pengadaan mebeleur untuk Kantor Setda Kab.HSS | Pengadaan Langsung | Pengadaan Barang | 3152282 | 23372681 | 200,000,000 | 199,929,400 | 199,650,000 | 199,650,000 | 199,174,800 | 199,174,800 | 0 | 0 | 2020-02-07 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 350,000 | 0.18 % | |
59 | 2020 | Sekretariat Daerah | Belanja pengadaan mebeleur untuk Kantor Setda Kab.HSS | Pengadaan Langsung | Pengadaan Barang | 3152282 | 23372681 | 200,000,000 | 199,929,400 | 199,650,000 | 199,650,000 | 199,174,800 | 199,174,800 | 0 | 0 | 2020-02-07 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 350,000 | 0.18 % | |
60 | 2020 | Dinas Perikanan | Disediakan Belanja Pakan Ikan | Pengadaan Langsung | Pengadaan Barang | 3153282 | 23467075 | 62,500,000 | 61,875,000 | 61,567,000 | 0 | 61,500,000 | 61,500,000 | 0 | 0 | 2020-02-11 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 933,000 | 1.49 % | |
61 | 2020 | Dinas Perikanan | Disediakan Belanja Pakan Ikan | Pengadaan Langsung | Pengadaan Barang | 3153282 | 23467075 | 62,500,000 | 61,875,000 | 61,567,000 | 0 | 61,500,000 | 61,500,000 | 0 | 0 | 2020-02-11 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 933,000 | 1.49 % | |
62 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3154282 | 23369120 | 150,000,000 | 148,609,723 | 148,554,723 | 0 | 148,550,705 | 148,550,705 | 0 | 0 | 2020-02-07 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,445,277 | 0.96 % | |
63 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3154282 | 23369120 | 150,000,000 | 148,609,723 | 148,554,723 | 0 | 148,550,705 | 148,550,705 | 0 | 0 | 2020-02-07 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,445,277 | 0.96 % | |
64 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3160282 | 23369714 | 150,000,000 | 148,665,729 | 148,590,491 | 148,590,491 | 148,586,537 | 148,586,537 | 0 | 0 | 2020-02-06 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,409,509 | 0.94 % | |
65 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3160282 | 23369714 | 150,000,000 | 148,665,729 | 148,590,491 | 148,590,491 | 148,586,537 | 148,586,537 | 0 | 0 | 2020-02-06 | CV. Haratai Permai | 02.089.737.7-733.000 | 1,409,509 | 0.94 % | |
66 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3161282 | 23369532 | 150,000,000 | 148,732,157 | 148,700,589 | 0 | 148,696,635 | 148,696,635 | 0 | 0 | 2020-02-07 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 1,299,411 | 0.87 % | |
67 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3161282 | 23369532 | 150,000,000 | 148,732,157 | 148,700,589 | 0 | 148,696,635 | 148,696,635 | 0 | 0 | 2020-02-07 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 1,299,411 | 0.87 % | |
68 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3162282 | 23368640 | 150,000,000 | 148,699,926 | 148,680,165 | 148,680,165 | 148,676,211 | 148,676,211 | 0 | 0 | 2020-02-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,319,835 | 0.88 % | |
69 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3162282 | 23368640 | 150,000,000 | 148,699,926 | 148,680,165 | 148,680,165 | 148,676,211 | 148,676,211 | 0 | 0 | 2020-02-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,319,835 | 0.88 % | |
70 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3163282 | 23369361 | 150,000,000 | 148,839,829 | 148,165,540 | 148,165,540 | 148,160,099 | 148,160,099 | 0 | 0 | 2020-02-07 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 1,834,460 | 1.22 % | |
71 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Pemeliharaan Jaringan Irigasi Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3163282 | 23369361 | 150,000,000 | 148,839,829 | 148,165,540 | 148,165,540 | 148,160,099 | 148,160,099 | 0 | 0 | 2020-02-07 | CV. ADINDA LESTARI | 02.918.003.1-733.000 | 1,834,460 | 1.22 % | |
72 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meubelair Kursi Kerja (SMP) | Pengadaan Langsung | Pengadaan Barang | 3164282 | 24417202 | 198,750,000 | 198,750,000 | 198,511,500 | 198,511,500 | 198,400,000 | 198,400,000 | 0 | 0 | 2020-02-06 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 238,500 | 0.12 % | |
73 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meubelair Kursi Kerja (SMP) | Pengadaan Langsung | Pengadaan Barang | 3164282 | 24417202 | 198,750,000 | 198,750,000 | 198,511,500 | 198,511,500 | 198,400,000 | 198,400,000 | 0 | 0 | 2020-02-06 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 238,500 | 0.12 % | |
74 | 2020 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Pekerjaan Konstruksi | 3166282 | 24095503 | 150,000,000 | 148,000,000 | 147,178,462 | 147,178,462 | 147,000,000 | 147,000,000 | 0 | 0 | 2020-02-26 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 2,821,538 | 1.88 % | |
75 | 2020 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Pekerjaan Konstruksi | 3166282 | 24095503 | 150,000,000 | 148,000,000 | 147,178,462 | 147,178,462 | 147,000,000 | 147,000,000 | 0 | 0 | 2020-02-26 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 2,821,538 | 1.88 % | |
76 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3168282 | 24095867 | 4,500,000 | 4,500,000 | 4,488,000 | 4,488,000 | 4,400,000 | 4,400,000 | 0 | 0 | 2020-02-26 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 12,000 | 0.27 % | |
77 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Penambahan ruang kelas sekolah (PAUD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3168282 | 24095867 | 4,500,000 | 4,500,000 | 4,488,000 | 4,488,000 | 4,400,000 | 4,400,000 | 0 | 0 | 2020-02-26 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 12,000 | 0.27 % | |
78 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan rehabilitasi sedang/berat PAUD/TK Pertiwi I Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3169282 | 24097272 | 2,400,000 | 2,400,000 | 2,365,000 | 2,365,000 | 2,300,000 | 2,300,000 | 0 | 0 | 2020-02-26 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 35,000 | 1.46 % | |
79 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan rehabilitasi sedang/berat PAUD/TK Pertiwi I Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3169282 | 24097272 | 2,400,000 | 2,400,000 | 2,365,000 | 2,365,000 | 2,300,000 | 2,300,000 | 0 | 0 | 2020-02-26 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 35,000 | 1.46 % | |
80 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3170282 | 23035554 | 40,000,000 | 39,710,000 | 39,545,000 | 39,545,000 | 39,270,000 | 39,270,000 | 0 | 0 | 2020-03-02 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 455,000 | 1.14 % | |
81 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3170282 | 23035554 | 40,000,000 | 39,710,000 | 39,545,000 | 39,545,000 | 39,270,000 | 39,270,000 | 0 | 0 | 2020-03-02 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 455,000 | 1.14 % | |
82 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3173282 | 23033419 | 38,000,000 | 37,977,500 | 37,702,500 | 37,702,500 | 37,427,500 | 37,427,500 | 0 | 0 | 2020-03-02 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 297,500 | 0.78 % | |
83 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3173282 | 23033419 | 38,000,000 | 37,977,500 | 37,702,500 | 37,702,500 | 37,427,500 | 37,427,500 | 0 | 0 | 2020-03-02 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 297,500 | 0.78 % | |
84 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3174282 | 24024200 | 9,000,000 | 8,989,750 | 8,958,620 | 8,958,620 | 8,958,620 | 8,958,620 | 0 | 0 | 2020-02-11 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 41,380 | 0.46 % | |
85 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3174282 | 24024200 | 9,000,000 | 8,989,750 | 8,958,620 | 8,958,620 | 8,958,620 | 8,958,620 | 0 | 0 | 2020-02-11 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 41,380 | 0.46 % | |
86 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Telaga Bidadari | Pengadaan Langsung | Pekerjaan Konstruksi | 3176282 | 23970218 | 75,000,000 | 74,089,061 | 73,975,184 | 0 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-02-20 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 1,024,816 | 1.37 % | |
87 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Telaga Bidadari | Pengadaan Langsung | Pekerjaan Konstruksi | 3176282 | 23970218 | 75,000,000 | 74,089,061 | 73,975,184 | 0 | 73,975,000 | 73,975,000 | 0 | 0 | 2020-02-20 | CV. CENTRA KARYA | 02.089.935.7-733.000 | 1,024,816 | 1.37 % | |
88 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Bahan pangan | Pengadaan Langsung | Pengadaan Barang | 3177282 | 24071368 | 55,000,000 | 54,976,625 | 54,857,000 | 0 | 54,800,000 | 54,800,000 | 0 | 0 | 2020-02-19 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 143,000 | 0.26 % | |
89 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Bahan pangan | Pengadaan Langsung | Pengadaan Barang | 3177282 | 24071368 | 55,000,000 | 54,976,625 | 54,857,000 | 0 | 54,800,000 | 54,800,000 | 0 | 0 | 2020-02-19 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 143,000 | 0.26 % | |
90 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Perencanaan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3179282 | 22919013 | 73,500,000 | 73,250,100 | 73,064,200 | 73,064,200 | 72,992,700 | 72,992,700 | 0 | 0 | 2020-02-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 435,800 | 0.59 % | |
91 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Perencanaan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3179282 | 22919013 | 73,500,000 | 73,250,100 | 73,064,200 | 73,064,200 | 72,992,700 | 72,992,700 | 0 | 0 | 2020-02-14 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 435,800 | 0.59 % | |
92 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3180282 | 22912847 | 25,000,000 | 24,722,500 | 24,535,500 | 24,535,500 | 24,359,500 | 24,359,500 | 0 | 0 | 2020-02-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 464,500 | 1.86 % | |
93 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3180282 | 22912847 | 25,000,000 | 24,722,500 | 24,535,500 | 24,535,500 | 24,359,500 | 24,359,500 | 0 | 0 | 2020-02-14 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 464,500 | 1.86 % | |
94 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3181282 | 22912972 | 25,000,000 | 24,722,500 | 24,524,500 | 24,524,500 | 24,343,000 | 24,343,000 | 0 | 0 | 2020-02-14 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 475,500 | 1.9 % | |
95 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3181282 | 22912972 | 25,000,000 | 24,722,500 | 24,524,500 | 24,524,500 | 24,343,000 | 24,343,000 | 0 | 0 | 2020-02-14 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 475,500 | 1.9 % | |
96 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3182282 | 23984071 | 30,000,000 | 29,890,892 | 29,787,492 | 29,787,492 | 29,787,000 | 29,787,000 | 0 | 0 | 2020-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 212,508 | 0.71 % | |
97 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3182282 | 23984071 | 30,000,000 | 29,890,892 | 29,787,492 | 29,787,492 | 29,787,000 | 29,787,000 | 0 | 0 | 2020-03-30 | CV. KHALIF | 81.540.809.1-733.000 | 212,508 | 0.71 % | |
98 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3183282 | 23984038 | 40,000,000 | 39,890,275 | 39,890,275 | 0 | 39,890,000 | 39,890,000 | 0 | 0 | 2020-03-20 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 109,725 | 0.27 % | |
99 | 2020 | Dinas Kesehatan | Rehabilitasi Rumah Dinas PKM Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3183282 | 23984038 | 40,000,000 | 39,890,275 | 39,890,275 | 0 | 39,890,000 | 39,890,000 | 0 | 0 | 2020-03-20 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 109,725 | 0.27 % | |
100 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3185282 | 22912580 | 10,000,000 | 9,956,100 | 9,853,800 | 9,853,800 | 9,779,000 | 9,779,000 | 0 | 0 | 2020-02-14 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 146,200 | 1.46 % | |
101 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3185282 | 22912580 | 10,000,000 | 9,956,100 | 9,853,800 | 9,853,800 | 9,779,000 | 9,779,000 | 0 | 0 | 2020-02-14 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 146,200 | 1.46 % | |
102 | 2020 | Dinas Kesehatan | belanja peralatan kebersihan dan bahan pembersih untuk PKM Ranap,belanja peralatan kebersihan dan bahan pembersih untuk PKM Non Ranap,belanja peralatan kebersihan dan bahan pembersih untuk Dinkes dan IFK | Pengadaan Langsung | Pengadaan Barang | 3186282 | 23984193;23984194;23984196 | 55,038,000 | 54,963,013 | 54,810,113 | 54,810,113 | 54,810,113 | 54,810,113 | 0 | 0 | 2020-03-12 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 227,888 | 0.41 % | |
103 | 2020 | Dinas Kesehatan | belanja peralatan kebersihan dan bahan pembersih untuk PKM Ranap,belanja peralatan kebersihan dan bahan pembersih untuk PKM Non Ranap,belanja peralatan kebersihan dan bahan pembersih untuk Dinkes dan IFK | Pengadaan Langsung | Pengadaan Barang | 3186282 | 23984193;23984194;23984196 | 55,038,000 | 54,963,013 | 54,810,113 | 54,810,113 | 54,810,113 | 54,810,113 | 0 | 0 | 2020-03-12 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 227,888 | 0.41 % | |
104 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3187282 | 24799527 | 22,250,000 | 22,177,100 | 22,122,100 | 22,122,100 | 22,012,100 | 22,012,100 | 0 | 0 | 2020-02-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 127,900 | 0.57 % | |
105 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3187282 | 24799527 | 22,250,000 | 22,177,100 | 22,122,100 | 22,122,100 | 22,012,100 | 22,012,100 | 0 | 0 | 2020-02-18 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 127,900 | 0.57 % | |
106 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Rehabilitasi Pintu Gerbang Batas Kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3188282 | 22974563 | 25,000,000 | 24,722,500 | 24,612,500 | 24,612,500 | 24,502,500 | 24,502,500 | 0 | 0 | 2020-02-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 387,500 | 1.55 % | |
107 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Konsultan Perencanaan Rehabilitasi Pintu Gerbang Batas Kabupaten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3188282 | 22974563 | 25,000,000 | 24,722,500 | 24,612,500 | 24,612,500 | 24,502,500 | 24,502,500 | 0 | 0 | 2020-02-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 387,500 | 1.55 % | |
108 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan perencanaan teknis jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3190282 | 24304230 | 100,000,000 | 99,995,500 | 98,776,876 | 0 | 98,730,000 | 98,730,000 | 0 | 0 | 2020-02-19 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,223,124 | 1.22 % | |
109 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan perencanaan teknis jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3190282 | 24304230 | 100,000,000 | 99,995,500 | 98,776,876 | 0 | 98,730,000 | 98,730,000 | 0 | 0 | 2020-02-19 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,223,124 | 1.22 % | |
110 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Perencanaan) Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3192282 | 23846612 | 9,134,000 | 9,130,000 | 9,097,000 | 0 | 9,097,000 | 9,097,000 | 0 | 0 | 2020-02-24 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 37,000 | 0.41 % | |
111 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Perencanaan) Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3192282 | 23846612 | 9,134,000 | 9,130,000 | 9,097,000 | 0 | 9,097,000 | 9,097,000 | 0 | 0 | 2020-02-24 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 37,000 | 0.41 % | |
112 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3193282 | 22970246 | 100,000,000 | 99,770,000 | 99,363,000 | 99,363,000 | 99,088,000 | 99,088,000 | 0 | 0 | 2020-02-20 | CV. e_Caracter | 75.998.700.1-733.000 | 637,000 | 0.64 % | |
113 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3193282 | 22970246 | 100,000,000 | 99,770,000 | 99,363,000 | 99,363,000 | 99,088,000 | 99,088,000 | 0 | 0 | 2020-02-20 | CV. e_Caracter | 75.998.700.1-733.000 | 637,000 | 0.64 % | |
114 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas dan Atributnya | Pengadaan Langsung | Pengadaan Barang | 3195282 | 23738199 | 171,350,000 | 171,281,000 | 171,028,000 | 171,028,000 | 171,000,000 | 171,000,000 | 0 | 0 | 2020-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 322,000 | 0.19 % | |
115 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Belanja Pakaian Dinas dan Atributnya | Pengadaan Langsung | Pengadaan Barang | 3195282 | 23738199 | 171,350,000 | 171,281,000 | 171,028,000 | 171,028,000 | 171,000,000 | 171,000,000 | 0 | 0 | 2020-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 322,000 | 0.19 % | |
116 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan belanja pembelian bahan penjernih air untuk kolam renang Amandit Aquatic Center Kandangan | Pengadaan Langsung | Pengadaan Barang | 3196282 | 24241221 | 57,295,000 | 57,205,000 | 57,095,000 | 0 | 57,025,000 | 57,025,000 | 0 | 0 | 2020-02-28 | CV. EL-ROSE & Co | 01.214.274.1-733.000 | 200,000 | 0.35 % | |
117 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan belanja pembelian bahan penjernih air untuk kolam renang Amandit Aquatic Center Kandangan | Pengadaan Langsung | Pengadaan Barang | 3196282 | 24241221 | 57,295,000 | 57,205,000 | 57,095,000 | 0 | 57,025,000 | 57,025,000 | 0 | 0 | 2020-02-28 | CV. EL-ROSE & Co | 01.214.274.1-733.000 | 200,000 | 0.35 % | |
118 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan Belanja Pakaian Olahraga untuk Atlet, Pelatih ,Official , dan Panitia POPDA 2020 | Pengadaan Langsung | Pengadaan Barang | 3197282 | 24122674 | 128,000,000 | 127,916,800 | 127,723,200 | 0 | 127,723,200 | 127,723,200 | 0 | 0 | 2020-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 276,800 | 0.22 % | |
119 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Disediakan Belanja Pakaian Olahraga untuk Atlet, Pelatih ,Official , dan Panitia POPDA 2020 | Pengadaan Langsung | Pengadaan Barang | 3197282 | 24122674 | 128,000,000 | 127,916,800 | 127,723,200 | 0 | 127,723,200 | 127,723,200 | 0 | 0 | 2020-02-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 276,800 | 0.22 % | |
120 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN. Loksado Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3198282 | 23795689 | 90,000,000 | 89,996,021 | 89,760,054 | 89,760,054 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-02-26 | CV.Bangun Banua | 93.708.167.7-733.000 | 239,946 | 0.27 % | |
121 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN. Loksado Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3198282 | 23795689 | 90,000,000 | 89,996,021 | 89,760,054 | 89,760,054 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-02-26 | CV.Bangun Banua | 93.708.167.7-733.000 | 239,946 | 0.27 % | |
122 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN Panjambang Bahagia 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 3200282 | 23793055 | 150,000,000 | 149,999,808 | 149,653,746 | 149,653,746 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-02-27 | CV. BORNEO KARYA BERSAMA | 02.614.008.7-731.000 | 346,254 | 0.23 % | |
123 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN Panjambang Bahagia 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 3200282 | 23793055 | 150,000,000 | 149,999,808 | 149,653,746 | 149,653,746 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-02-27 | CV. BORNEO KARYA BERSAMA | 02.614.008.7-731.000 | 346,254 | 0.23 % | |
124 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Ida Manggala Kec.Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3202282 | 23795631 | 50,000,000 | 49,996,355 | 49,549,472 | 0 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-02-26 | CV. GUMILANG | 02.746.828.9-732.000 | 450,528 | 0.9 % | |
125 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Ida Manggala Kec.Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3202282 | 23795631 | 50,000,000 | 49,996,355 | 49,549,472 | 0 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-02-26 | CV. GUMILANG | 02.746.828.9-732.000 | 450,528 | 0.9 % | |
126 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Lapangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3204282 | 23890617 | 12,000,000 | 11,990,000 | 11,902,000 | 11,902,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2020-02-26 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 98,000 | 0.82 % | |
127 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Lapangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3204282 | 23890617 | 12,000,000 | 11,990,000 | 11,902,000 | 11,902,000 | 11,800,000 | 11,800,000 | 0 | 0 | 2020-02-26 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 98,000 | 0.82 % | |
128 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat PAUD/ TK Pertiwi I Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3205282 | 24097339 | 80,000,000 | 77,500,000 | 77,111,137 | 77,111,137 | 77,000,000 | 77,000,000 | 0 | 0 | 2020-02-26 | CV. An-Nidha | 02.675.485.3-733.000 | 2,888,863 | 3.61 % | |
129 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat PAUD/ TK Pertiwi I Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3205282 | 24097339 | 80,000,000 | 77,500,000 | 77,111,137 | 77,111,137 | 77,000,000 | 77,000,000 | 0 | 0 | 2020-02-26 | CV. An-Nidha | 02.675.485.3-733.000 | 2,888,863 | 3.61 % | |
130 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3206282 | 23823594 | 7,800,000 | 7,771,500 | 7,564,700 | 7,564,700 | 7,450,000 | 7,450,000 | 0 | 0 | 2020-02-26 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 235,300 | 3.02 % | |
131 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3206282 | 23823594 | 7,800,000 | 7,771,500 | 7,564,700 | 7,564,700 | 7,450,000 | 7,450,000 | 0 | 0 | 2020-02-26 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 235,300 | 3.02 % | |
132 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN Tambangan 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3207282 | 23782546 | 145,000,000 | 144,990,116 | 144,411,120 | 144,411,120 | 144,300,000 | 144,300,000 | 0 | 0 | 2020-02-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 588,880 | 0.41 % | |
133 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab sedang ruang kelas SDN Tambangan 1 Kec. Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3207282 | 23782546 | 145,000,000 | 144,990,116 | 144,411,120 | 144,411,120 | 144,300,000 | 144,300,000 | 0 | 0 | 2020-02-26 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 588,880 | 0.41 % | |
134 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan AC Kamar, Aula Rapat dan Cafetaria Hotel Rakat Mufakat | Pengadaan Langsung | Pengadaan Barang | 3208282 | 23892005 | 82,500,000 | 82,500,000 | 82,456,000 | 0 | 82,329,500 | 82,329,500 | 0 | 0 | 2020-02-28 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 44,000 | 0.05 % | |
135 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan AC Kamar, Aula Rapat dan Cafetaria Hotel Rakat Mufakat | Pengadaan Langsung | Pengadaan Barang | 3208282 | 23892005 | 82,500,000 | 82,500,000 | 82,456,000 | 0 | 82,329,500 | 82,329,500 | 0 | 0 | 2020-02-28 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 44,000 | 0.05 % | |
136 | 2020 | Sekretariat Daerah | Cetak Buku Laporan Keterangan Pertanggungjawaban dan Laporan Penyelenggaraan Pemerintahan Daerah Kab. HSS 2019 | Pengadaan Langsung | Jasa Lainnya | 3211282 | 25160345 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 0 | 0 | 2020-03-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 0 | 0 % | |
137 | 2020 | Sekretariat Daerah | Cetak Buku Laporan Keterangan Pertanggungjawaban dan Laporan Penyelenggaraan Pemerintahan Daerah Kab. HSS 2019 | Pengadaan Langsung | Jasa Lainnya | 3211282 | 25160345 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 90,000,000 | 0 | 0 | 2020-03-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 0 | 0 % | |
138 | 2020 | Dinas Pendidikan dan Kebudayaan | pembuatan pagar SDN Sirih Hulu Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3214282 | 23782109 | 150,000,000 | 149,998,229 | 149,699,964 | 149,699,964 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-03-03 | CV. RAFIBUN | 70.890.381.0-731.000 | 300,036 | 0.2 % | |
139 | 2020 | Dinas Pendidikan dan Kebudayaan | pembuatan pagar SDN Sirih Hulu Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3214282 | 23782109 | 150,000,000 | 149,998,229 | 149,699,964 | 149,699,964 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-03-03 | CV. RAFIBUN | 70.890.381.0-731.000 | 300,036 | 0.2 % | |
140 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3215282 | 23752257 | 44,800,000 | 44,755,500 | 44,605,000 | 44,605,000 | 44,500,000 | 44,500,000 | 0 | 0 | 2020-03-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 195,000 | 0.44 % | |
141 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3215282 | 23752257 | 44,800,000 | 44,755,500 | 44,605,000 | 44,605,000 | 44,500,000 | 44,500,000 | 0 | 0 | 2020-03-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 195,000 | 0.44 % | |
142 | 2020 | Dinas Perikanan | Jasa Desain perencanaan untuk kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3216282 | 24926292 | 10,000,000 | 9,999,000 | 9,982,500 | 0 | 9,982,000 | 9,982,000 | 0 | 0 | 2020-03-04 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 17,500 | 0.18 % | |
143 | 2020 | Dinas Perikanan | Jasa Desain perencanaan untuk kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3216282 | 24926292 | 10,000,000 | 9,999,000 | 9,982,500 | 0 | 9,982,000 | 9,982,000 | 0 | 0 | 2020-03-04 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 17,500 | 0.18 % | |
144 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Mesjid di Kawasan Islamic Center Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3220282 | 23329082 | 84,750,000 | 84,711,000 | 84,557,000 | 84,557,000 | 84,403,000 | 84,403,000 | 0 | 0 | 2020-03-27 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 193,000 | 0.23 % | |
145 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Mesjid di Kawasan Islamic Center Tahap I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3220282 | 23329082 | 84,750,000 | 84,711,000 | 84,557,000 | 84,557,000 | 84,403,000 | 84,403,000 | 0 | 0 | 2020-03-27 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 193,000 | 0.23 % | |
146 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | disediakan untuk jasa konsultansi perencanaan Pengembangan UPT Logam Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3222282 | 23360411 | 48,900,000 | 48,823,100 | 48,565,000 | 0 | 48,500,000 | 48,500,000 | 0 | 0 | 2020-03-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 335,000 | 0.69 % | |
147 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | disediakan untuk jasa konsultansi perencanaan Pengembangan UPT Logam Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3222282 | 23360411 | 48,900,000 | 48,823,100 | 48,565,000 | 0 | 48,500,000 | 48,500,000 | 0 | 0 | 2020-03-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 335,000 | 0.69 % | |
148 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Operasi dan Pemeliharaan Jaringan Irigasi D.I Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3223282 | 23369845 | 150,406,200 | 150,295,646 | 150,000,292 | 0 | 149,999,577 | 149,999,577 | 0 | 0 | 2020-03-05 | CV. Haratai Permai | 02.089.737.7-733.000 | 405,908 | 0.27 % | |
149 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Belanja Operasi dan Pemeliharaan Jaringan Irigasi D.I Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3223282 | 23369845 | 150,406,200 | 150,295,646 | 150,000,292 | 0 | 149,999,577 | 149,999,577 | 0 | 0 | 2020-03-05 | CV. Haratai Permai | 02.089.737.7-733.000 | 405,908 | 0.27 % | |
150 | 2020 | Dinas Perdagangan | Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Pekerjaan Konstruksi | 3224282 | 23828911 | 125,000,000 | 124,997,163 | 124,775,045 | 124,775,045 | 124,700,000 | 124,700,000 | 0 | 0 | 2020-03-09 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 224,955 | 0.18 % | |
151 | 2020 | Dinas Perdagangan | Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Pekerjaan Konstruksi | 3224282 | 23828911 | 125,000,000 | 124,997,163 | 124,775,045 | 124,775,045 | 124,700,000 | 124,700,000 | 0 | 0 | 2020-03-09 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 224,955 | 0.18 % | |
152 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3225282 | 23792826 | 38,000,000 | 37,977,500 | 37,840,000 | 37,840,000 | 37,700,000 | 37,700,000 | 0 | 0 | 2020-03-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 160,000 | 0.42 % | |
153 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3225282 | 23792826 | 38,000,000 | 37,977,500 | 37,840,000 | 37,840,000 | 37,700,000 | 37,700,000 | 0 | 0 | 2020-03-06 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 160,000 | 0.42 % | |
154 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3226282 | 23795405 | 16,800,000 | 16,799,200 | 16,676,000 | 0 | 16,500,000 | 16,500,000 | 0 | 0 | 2020-03-06 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 124,000 | 0.74 % | |
155 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3226282 | 23795405 | 16,800,000 | 16,799,200 | 16,676,000 | 0 | 16,500,000 | 16,500,000 | 0 | 0 | 2020-03-06 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 124,000 | 0.74 % | |
156 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3228282 | 23374460 | 8,000,000 | 7,969,500 | 7,925,500 | 7,925,500 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-03-18 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 74,500 | 0.93 % | |
157 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3228282 | 23374460 | 8,000,000 | 7,969,500 | 7,925,500 | 7,925,500 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-03-18 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 74,500 | 0.93 % | |
158 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3229282 | 23782084 | 6,000,000 | 5,989,500 | 5,857,500 | 5,857,500 | 5,800,000 | 5,800,000 | 0 | 0 | 2020-03-07 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 142,500 | 2.38 % | |
159 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3229282 | 23782084 | 6,000,000 | 5,989,500 | 5,857,500 | 5,857,500 | 5,800,000 | 5,800,000 | 0 | 0 | 2020-03-07 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 142,500 | 2.38 % | |
160 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3230282 | 23782560 | 7,800,000 | 7,755,000 | 7,667,000 | 7,667,000 | 7,600,000 | 7,600,000 | 0 | 0 | 2020-03-07 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 133,000 | 1.71 % | |
161 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3230282 | 23782560 | 7,800,000 | 7,755,000 | 7,667,000 | 7,667,000 | 7,600,000 | 7,600,000 | 0 | 0 | 2020-03-07 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 133,000 | 1.71 % | |
162 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3231282 | 23782498 | 29,800,000 | 29,756,650 | 29,606,500 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-03-07 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 193,500 | 0.65 % | |
163 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3231282 | 23782498 | 29,800,000 | 29,756,650 | 29,606,500 | 0 | 29,500,000 | 29,500,000 | 0 | 0 | 2020-03-07 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 193,500 | 0.65 % | |
164 | 2020 | Dinas Perdagangan | Pekerjaan Pembuatan Sumur Bor pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3232282 | 23764995 | 100,000,000 | 99,998,306 | 99,891,441 | 99,891,441 | 99,890,000 | 99,890,000 | 0 | 0 | 2020-03-05 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 108,559 | 0.11 % | |
165 | 2020 | Dinas Perdagangan | Pekerjaan Pembuatan Sumur Bor pada Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3232282 | 23764995 | 100,000,000 | 99,998,306 | 99,891,441 | 99,891,441 | 99,890,000 | 99,890,000 | 0 | 0 | 2020-03-05 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 108,559 | 0.11 % | |
166 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Lapangan | Pengadaan Langsung | Pengadaan Barang | 3236282 | 23083962 | 202,485,000 | 199,578,720 | 199,169,520 | 199,169,520 | 199,013,650 | 199,013,650 | 0 | 0 | 2020-03-16 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 3,315,480 | 1.64 % | |
167 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Lapangan | Pengadaan Langsung | Pengadaan Barang | 3236282 | 23083962 | 202,485,000 | 199,578,720 | 199,169,520 | 199,169,520 | 199,013,650 | 199,013,650 | 0 | 0 | 2020-03-16 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 3,315,480 | 1.64 % | |
168 | 2020 | Dinas Pendidikan dan Kebudayaan | peninggian halaman SDN Anjiran Kecamatan Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3239282 | 23752148 | 110,000,000 | 110,000,000 | 109,775,317 | 109,775,317 | 109,600,000 | 109,600,000 | 0 | 0 | 2020-03-08 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 224,683 | 0.2 % | |
169 | 2020 | Dinas Pendidikan dan Kebudayaan | peninggian halaman SDN Anjiran Kecamatan Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3239282 | 23752148 | 110,000,000 | 110,000,000 | 109,775,317 | 109,775,317 | 109,600,000 | 109,600,000 | 0 | 0 | 2020-03-08 | CV. MEDIA PRIMA | 02.019.251.4-733.000 | 224,683 | 0.2 % | |
170 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Muraddiyah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3240282 | 23823670 | 27,000,000 | 26,994,000 | 26,889,500 | 26,889,500 | 26,750,000 | 26,750,000 | 0 | 0 | 2020-03-10 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 110,500 | 0.41 % | |
171 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Muraddiyah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3240282 | 23823670 | 27,000,000 | 26,994,000 | 26,889,500 | 26,889,500 | 26,750,000 | 26,750,000 | 0 | 0 | 2020-03-10 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 110,500 | 0.41 % | |
172 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehab Ruang Kantor Dispera KPLH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3241282 | 22938724 | 12,000,000 | 11,990,000 | 11,710,545 | 11,710,545 | 11,600,545 | 11,600,545 | 0 | 0 | 2020-04-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 289,455 | 2.41 % | |
173 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehab Ruang Kantor Dispera KPLH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3241282 | 22938724 | 12,000,000 | 11,990,000 | 11,710,545 | 11,710,545 | 11,600,545 | 11,600,545 | 0 | 0 | 2020-04-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 289,455 | 2.41 % | |
174 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Tempat Parkir Kendaraan Operasional | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3242282 | 22939084 | 7,000,000 | 6,985,000 | 6,814,830 | 6,814,830 | 6,759,830 | 6,759,830 | 0 | 0 | 2020-04-07 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 185,170 | 2.65 % | |
175 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Tempat Parkir Kendaraan Operasional | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3242282 | 22939084 | 7,000,000 | 6,985,000 | 6,814,830 | 6,814,830 | 6,759,830 | 6,759,830 | 0 | 0 | 2020-04-07 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 185,170 | 2.65 % | |
176 | 2020 | Dinas Ketahanan Pangan | Rehab Lumbung Pangan Masyarakat Desa Muning Tengah Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3243282 | 25278427 | 50,000,000 | 49,997,057 | 49,830,127 | 49,830,127 | 49,830,127 | 49,830,127 | 0 | 0 | 2020-03-26 | CV.Bangun Banua | 93.708.167.7-733.000 | 169,873 | 0.34 % | |
177 | 2020 | Dinas Ketahanan Pangan | Rehab Lumbung Pangan Masyarakat Desa Muning Tengah Kecamatan Daha Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3243282 | 25278427 | 50,000,000 | 49,997,057 | 49,830,127 | 49,830,127 | 49,830,127 | 49,830,127 | 0 | 0 | 2020-03-26 | CV.Bangun Banua | 93.708.167.7-733.000 | 169,873 | 0.34 % | |
178 | 2020 | Dinas Perdagangan | Perencanaan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3245282 | 25293671 | 15,000,000 | 14,960,000 | 14,899,500 | 14,899,500 | 14,899,500 | 14,899,500 | 0 | 0 | 2020-03-12 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 100,500 | 0.67 % | |
179 | 2020 | Dinas Perdagangan | Perencanaan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3245282 | 25293671 | 15,000,000 | 14,960,000 | 14,899,500 | 14,899,500 | 14,899,500 | 14,899,500 | 0 | 0 | 2020-03-12 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 100,500 | 0.67 % | |
180 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Pelampung Keselamatan Bamboo Rafting | Pengadaan Langsung | Pengadaan Barang | 3251282 | 23891258 | 105,000,000 | 104,999,997 | 104,808,000 | 0 | 104,808,000 | 104,808,000 | 0 | 0 | 2020-03-12 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 192,000 | 0.18 % | |
181 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Pelampung Keselamatan Bamboo Rafting | Pengadaan Langsung | Pengadaan Barang | 3251282 | 23891258 | 105,000,000 | 104,999,997 | 104,808,000 | 0 | 104,808,000 | 104,808,000 | 0 | 0 | 2020-03-12 | CV. YUDA PRATAMA | 02.050.597.0-733.000 | 192,000 | 0.18 % | |
182 | 2020 | Dinas Perpustakaan Dan Kearsipan | Pembangunan Pagar Perpustakaan Simpur (DID) | Pengadaan Langsung | Jasa Lainnya | 3252282 | 23063575 | 187,000,000 | 186,952,639 | 186,633,657 | 0 | 186,633,657 | 0 | 0 | 0 | 2020-03-26 | CV. KHALIF | 81.540.809.1-733.000 | 366,343 | 0.2 % | |
183 | 2020 | Kecamatan Kandangan | Jasa Pengawasan Pagar Kantor, Pembuatan Pintu Gerbang, Pembuatan Tempat Parkir dan Pengadaan Paving Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3254282 | 24152535 | 10,080,000 | 10,067,750 | 10,043,000 | 0 | 10,043,000 | 10,043,000 | 0 | 0 | 2020-03-12 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 37,000 | 0.37 % | |
184 | 2020 | Kecamatan Kandangan | Jasa Pengawasan Pagar Kantor, Pembuatan Pintu Gerbang, Pembuatan Tempat Parkir dan Pengadaan Paving Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3254282 | 24152535 | 10,080,000 | 10,067,750 | 10,043,000 | 0 | 10,043,000 | 10,043,000 | 0 | 0 | 2020-03-12 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 37,000 | 0.37 % | |
185 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3255282 | 23823611 | 14,235,000 | 14,234,000 | 14,179,000 | 14,179,000 | 14,000,000 | 14,000,000 | 0 | 0 | 2020-03-12 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 56,000 | 0.39 % | |
186 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3255282 | 23823611 | 14,235,000 | 14,234,000 | 14,179,000 | 14,179,000 | 14,000,000 | 14,000,000 | 0 | 0 | 2020-03-12 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 56,000 | 0.39 % | |
187 | 2020 | Dinas Pertanian | Jasa Perencanaan (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3258282 | 25298287 | 44,021,750 | 44,021,450 | 43,989,000 | 43,989,000 | 43,989,000 | 43,989,000 | 0 | 0 | 2020-03-14 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 32,750 | 0.07 % | |
188 | 2020 | Dinas Pertanian | Jasa Perencanaan (DAK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3258282 | 25298287 | 44,021,750 | 44,021,450 | 43,989,000 | 43,989,000 | 43,989,000 | 43,989,000 | 0 | 0 | 2020-03-14 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 32,750 | 0.07 % | |
189 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan sumur bor pada pasar terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3261282 | 23765237 | 5,000,000 | 4,950,000 | 4,917,000 | 4,917,000 | 4,917,000 | 4,917,000 | 0 | 0 | 2020-03-13 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 83,000 | 1.66 % | |
190 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan sumur bor pada pasar terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3261282 | 23765237 | 5,000,000 | 4,950,000 | 4,917,000 | 4,917,000 | 4,917,000 | 4,917,000 | 0 | 0 | 2020-03-13 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 83,000 | 1.66 % | |
191 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Konsultan Perencanaan Rumah Dinas Jl. Batuah 32 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3262282 | 23720170 | 35,700,000 | 11,852,500 | 11,845,900 | 0 | 11,845,900 | 0 | 0 | 0 | 2020-03-13 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 23,854,100 | 66.82 % | |
192 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencana Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3266282 | 23543967 | 8,362,617 | 8,360,000 | 8,239,000 | 8,239,000 | 8,239,000 | 8,239,000 | 0 | 0 | 2020-03-23 | cv.akmalindo | 02.531.482.4-731.000 | 123,617 | 1.48 % | |
193 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencana Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3266282 | 23543967 | 8,362,617 | 8,360,000 | 8,239,000 | 8,239,000 | 8,239,000 | 8,239,000 | 0 | 0 | 2020-03-23 | cv.akmalindo | 02.531.482.4-731.000 | 123,617 | 1.48 % | |
194 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | pembangunan gedung perluasan ruang Tata Usaha | Pengadaan Langsung | Pekerjaan Konstruksi | 3267282 | 24504508 | 55,000,000 | 54,963,069 | 54,544,334 | 54,544,334 | 54,300,000 | 54,300,000 | 0 | 0 | 2020-03-16 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 455,666 | 0.83 % | |
195 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | pembangunan gedung perluasan ruang Tata Usaha | Pengadaan Langsung | Pekerjaan Konstruksi | 3267282 | 24504508 | 55,000,000 | 54,963,069 | 54,544,334 | 54,544,334 | 54,300,000 | 54,300,000 | 0 | 0 | 2020-03-16 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 455,666 | 0.83 % | |
196 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan mebeluer sekolah (PAUD) | Pengadaan Langsung | Pengadaan Barang | 3268282 | 24103885 | 128,700,000 | 125,066,799 | 124,781,800 | 124,781,800 | 124,650,000 | 124,650,000 | 0 | 0 | 2020-03-18 | CV. RIVINA | 02.746.832.1-733.000 | 3,918,200 | 3.04 % | |
197 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan mebeluer sekolah (PAUD) | Pengadaan Langsung | Pengadaan Barang | 3268282 | 24103885 | 128,700,000 | 125,066,799 | 124,781,800 | 124,781,800 | 124,650,000 | 124,650,000 | 0 | 0 | 2020-03-18 | CV. RIVINA | 02.746.832.1-733.000 | 3,918,200 | 3.04 % | |
198 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Malutu Kec.Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3269282 | 23795574 | 50,000,000 | 49,997,560 | 49,755,560 | 49,755,560 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-03-16 | CV. LALUNA DANA | 02.237.179.3-733.000 | 244,440 | 0.49 % | |
199 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Malutu Kec.Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3269282 | 23795574 | 50,000,000 | 49,997,560 | 49,755,560 | 49,755,560 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-03-16 | CV. LALUNA DANA | 02.237.179.3-733.000 | 244,440 | 0.49 % | |
200 | 2020 | Dinas Perdagangan | Pengawasan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3270282 | 23828515 | 9,500,000 | 9,460,000 | 9,438,000 | 9,438,000 | 9,438,000 | 9,438,000 | 0 | 0 | 2020-03-17 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,000 | 0.65 % | |
201 | 2020 | Dinas Perdagangan | Pengawasan Pembangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3270282 | 23828515 | 9,500,000 | 9,460,000 | 9,438,000 | 9,438,000 | 9,438,000 | 9,438,000 | 0 | 0 | 2020-03-17 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,000 | 0.65 % | |
202 | 2020 | Dinas Ketahanan Pangan | Biaya Pembelian Gabah Cadangan Pangan Pemerintah yang dititipkan di Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3271282 | 25283109 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-03-17 | CV.DITA | 02.242.686.0-733.000 | 200,000 | 0.3 % | |
203 | 2020 | Dinas Ketahanan Pangan | Biaya Pembelian Gabah Cadangan Pangan Pemerintah yang dititipkan di Lumbung Pangan Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3271282 | 25283109 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-03-17 | CV.DITA | 02.242.686.0-733.000 | 200,000 | 0.3 % | |
204 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3274282 | 23828943 | 5,000,000 | 4,950,000 | 4,900,500 | 4,900,500 | 4,900,000 | 4,900,000 | 0 | 0 | 2020-03-17 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 99,500 | 1.99 % | |
205 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi Belakang Blok B Pasar Nagara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3274282 | 23828943 | 5,000,000 | 4,950,000 | 4,900,500 | 4,900,500 | 4,900,000 | 4,900,000 | 0 | 0 | 2020-03-17 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 99,500 | 1.99 % | |
206 | 2020 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3276282 | 23469849 | 5,615,000 | 5,610,000 | 5,599,000 | 0 | 5,599,000 | 5,599,000 | 0 | 0 | 2020-03-24 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 16,000 | 0.28 % | |
207 | 2020 | Kecamatan Daha Barat | Belanja Jasa Konsultan Pengawasan Rehab Berat rumah dinas jabatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3276282 | 23469849 | 5,615,000 | 5,610,000 | 5,599,000 | 0 | 5,599,000 | 5,599,000 | 0 | 0 | 2020-03-24 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 16,000 | 0.28 % | |
208 | 2020 | Dinas Sosial | Belanja Modal Rehab Rumah Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 3277282 | 23359233 | 195,800,000 | 195,313,358 | 194,928,358 | 0 | 194,928,300 | 194,928,300 | 0 | 0 | 2020-03-24 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 871,642 | 0.45 % | |
209 | 2020 | Dinas Sosial | Belanja Modal Rehab Rumah Singgah | Pengadaan Langsung | Pekerjaan Konstruksi | 3277282 | 23359233 | 195,800,000 | 195,313,358 | 194,928,358 | 0 | 194,928,300 | 194,928,300 | 0 | 0 | 2020-03-24 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 871,642 | 0.45 % | |
210 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Menara Air dan Kolam Penampungan Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3280282 | 25106092 | 30,000,000 | 29,997,000 | 29,700,000 | 0 | 29,700,000 | 29,700,000 | 0 | 0 | 2020-03-18 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 300,000 | 1 % | |
211 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Menara Air dan Kolam Penampungan Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3280282 | 25106092 | 30,000,000 | 29,997,000 | 29,700,000 | 0 | 29,700,000 | 29,700,000 | 0 | 0 | 2020-03-18 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 300,000 | 1 % | |
212 | 2020 | Dinas Ketahanan Pangan | Pembangunan Gudang Beras Poktan Budi Bakti Desa Gambah Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3282282 | 25278515 | 180,000,000 | 179,058,482 | 178,763,417 | 178,763,417 | 178,664,000 | 178,664,000 | 0 | 0 | 2020-03-23 | CV. KHALIF | 81.540.809.1-733.000 | 1,236,583 | 0.69 % | |
213 | 2020 | Dinas Ketahanan Pangan | Pembangunan Gudang Beras Poktan Budi Bakti Desa Gambah Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3282282 | 25278515 | 180,000,000 | 179,058,482 | 178,763,417 | 178,763,417 | 178,664,000 | 178,664,000 | 0 | 0 | 2020-03-23 | CV. KHALIF | 81.540.809.1-733.000 | 1,236,583 | 0.69 % | |
214 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Rehab Lumbung Pangan Masyarakat Desa Muning Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3283282 | 25284030 | 2,500,000 | 2,500,000 | 2,491,500 | 2,491,500 | 2,436,500 | 2,436,500 | 0 | 0 | 2020-03-18 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 8,500 | 0.34 % | |
215 | 2020 | Dinas Ketahanan Pangan | Konsultan Perencanaan Rehab Lumbung Pangan Masyarakat Desa Muning Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3283282 | 25284030 | 2,500,000 | 2,500,000 | 2,491,500 | 2,491,500 | 2,436,500 | 2,436,500 | 0 | 0 | 2020-03-18 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 8,500 | 0.34 % | |
216 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Rehab Lumbung Pangan Masyarakat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3285282 | 25284102 | 2,500,000 | 2,500,000 | 2,464,000 | 2,464,000 | 2,420,000 | 2,420,000 | 0 | 0 | 2020-03-18 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 36,000 | 1.44 % | |
217 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Rehab Lumbung Pangan Masyarakat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3285282 | 25284102 | 2,500,000 | 2,500,000 | 2,464,000 | 2,464,000 | 2,420,000 | 2,420,000 | 0 | 0 | 2020-03-18 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 36,000 | 1.44 % | |
218 | 2020 | Kecamatan Kandangan | Belanja Modal Pembangunan Taman PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3286282 | 23447629 | 171,100,000 | 165,996,600 | 168,058,180 | 0 | 168,058,180 | 168,058,180 | 0 | 0 | 2020-03-19 | Muda Membangun | 73.702.709.4-733.000 | 3,041,820 | 1.78 % | |
219 | 2020 | Kecamatan Kandangan | Belanja Modal Pembangunan Taman PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3286282 | 23447629 | 171,100,000 | 165,996,600 | 168,058,180 | 0 | 168,058,180 | 168,058,180 | 0 | 0 | 2020-03-19 | Muda Membangun | 73.702.709.4-733.000 | 3,041,820 | 1.78 % | |
220 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3287282 | 25280784 | 7,000,000 | 7,000,000 | 6,965,530 | 6,965,530 | 6,855,530 | 6,855,530 | 0 | 0 | 2020-03-18 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 34,470 | 0.49 % | |
221 | 2020 | Dinas Ketahanan Pangan | Konsultan Pengawasan Pembangunan Gudang Beras Poktan Budi Bakti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3287282 | 25280784 | 7,000,000 | 7,000,000 | 6,965,530 | 6,965,530 | 6,855,530 | 6,855,530 | 0 | 0 | 2020-03-18 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 34,470 | 0.49 % | |
222 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Pengadaan Alat Penyimpanan Perlengkapan Kantor, Personal Komputer dan Peralatan Personal Komputer | Pengadaan Langsung | Pengadaan Barang | 3288282 | 25374611 | 86,900,000 | 85,228,000 | 83,034,600 | 83,034,600 | 83,034,600 | 83,034,600 | 0 | 0 | 2020-03-19 | CV. HITRO | 02.918.384.5-733.000 | 3,865,400 | 4.45 % | |
223 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Pengadaan Alat Penyimpanan Perlengkapan Kantor, Personal Komputer dan Peralatan Personal Komputer | Pengadaan Langsung | Pengadaan Barang | 3288282 | 25374611 | 86,900,000 | 85,228,000 | 83,034,600 | 83,034,600 | 83,034,600 | 83,034,600 | 0 | 0 | 2020-03-19 | CV. HITRO | 02.918.384.5-733.000 | 3,865,400 | 4.45 % | |
224 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Malinau Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3289282 | 23792901 | 150,000,000 | 149,999,394 | 149,569,084 | 149,569,084 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-04-05 | CV. KALTRA | 81.639.401.9-733.000 | 430,916 | 0.29 % | |
225 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Ibadah SDN. Malinau Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3289282 | 23792901 | 150,000,000 | 149,999,394 | 149,569,084 | 149,569,084 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-04-05 | CV. KALTRA | 81.639.401.9-733.000 | 430,916 | 0.29 % | |
226 | 2020 | Dinas Perikanan | Disediakan belanja bahan dan peralatan demplot budidaya ikan sistem net tancap | Pengadaan Langsung | Pengadaan Barang | 3291282 | 23468773 | 65,400,000 | 65,340,000 | 65,054,000 | 65,054,000 | 65,000,000 | 65,000,000 | 0 | 0 | 2020-03-20 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 346,000 | 0.53 % | |
227 | 2020 | Dinas Perikanan | Disediakan belanja bahan dan peralatan demplot budidaya ikan sistem net tancap | Pengadaan Langsung | Pengadaan Barang | 3291282 | 23468773 | 65,400,000 | 65,340,000 | 65,054,000 | 65,054,000 | 65,000,000 | 65,000,000 | 0 | 0 | 2020-03-20 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 346,000 | 0.53 % | |
228 | 2020 | Dinas Pertanian | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3294282 | 24125415 | 54,830,680 | 54,826,551 | 54,572,650 | 0 | 54,572,650 | 54,572,650 | 0 | 0 | 2020-03-24 | CV. MEDIACOM | 02.675.170.1-733.000 | 258,030 | 0.47 % | |
229 | 2020 | Dinas Pertanian | Belanja Alat Tulis Kantor | Pengadaan Langsung | Pengadaan Barang | 3294282 | 24125415 | 54,830,680 | 54,826,551 | 54,572,650 | 0 | 54,572,650 | 54,572,650 | 0 | 0 | 2020-03-24 | CV. MEDIACOM | 02.675.170.1-733.000 | 258,030 | 0.47 % | |
230 | 2020 | Dinas Pertanian | Pengadaan Belanja Bahan dan Pakan Ternak Sapi | Pengadaan Langsung | Pengadaan Barang | 3295282 | 24144945 | 149,937,500 | 145,382,050 | 145,066,405 | 0 | 145,066,405 | 145,066,405 | 0 | 0 | 2020-03-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,871,095 | 3.25 % | |
231 | 2020 | Dinas Pertanian | Pengadaan Belanja Bahan dan Pakan Ternak Sapi | Pengadaan Langsung | Pengadaan Barang | 3295282 | 24144945 | 149,937,500 | 145,382,050 | 145,066,405 | 0 | 145,066,405 | 145,066,405 | 0 | 0 | 2020-03-24 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,871,095 | 3.25 % | |
232 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman dan Drainase SDN. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3297282 | 23752492 | 100,000,000 | 99,994,386 | 99,712,425 | 99,712,425 | 99,525,000 | 99,525,000 | 0 | 0 | 2020-03-23 | CV.SHAFIRA MULIA | 75.896.565.8-733.000 | 287,575 | 0.29 % | |
233 | 2020 | Dinas Pendidikan dan Kebudayaan | Peninggian Halaman dan Drainase SDN. Tabihi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3297282 | 23752492 | 100,000,000 | 99,994,386 | 99,712,425 | 99,712,425 | 99,525,000 | 99,525,000 | 0 | 0 | 2020-03-23 | CV.SHAFIRA MULIA | 75.896.565.8-733.000 | 287,575 | 0.29 % | |
234 | 2020 | Dinas Sosial | pengadaan bahan bantuan sembako/pangan bagi lanjut usia miskin/terlantar | Pengadaan Langsung | Pengadaan Barang | 3298282 | 23491332 | 70,000,000 | 70,000,000 | 69,800,000 | 0 | 69,800,000 | 69,800,000 | 0 | 0 | 2020-03-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 200,000 | 0.29 % | |
235 | 2020 | Dinas Sosial | pengadaan bahan bantuan sembako/pangan bagi lanjut usia miskin/terlantar | Pengadaan Langsung | Pengadaan Barang | 3298282 | 23491332 | 70,000,000 | 70,000,000 | 69,800,000 | 0 | 69,800,000 | 69,800,000 | 0 | 0 | 2020-03-24 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 200,000 | 0.29 % | |
236 | 2020 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan - Pengadaan Bagunan dan Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 3299282 | 25254980 | 172,000,000 | 171,452,299 | 171,205,984 | 0 | 171,205,984 | 171,205,984 | 0 | 0 | 2020-03-26 | CV. KALTRA | 81.639.401.9-733.000 | 794,016 | 0.46 % | |
237 | 2020 | Kecamatan Kandangan | Belanja Modal Gedung dan Bangunan - Pengadaan Bagunan dan Tempat Kerja | Pengadaan Langsung | Pekerjaan Konstruksi | 3299282 | 25254980 | 172,000,000 | 171,452,299 | 171,205,984 | 0 | 171,205,984 | 171,205,984 | 0 | 0 | 2020-03-26 | CV. KALTRA | 81.639.401.9-733.000 | 794,016 | 0.46 % | |
238 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Kandangan Kota 2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3300282 | 23795509 | 90,000,000 | 89,999,577 | 89,790,962 | 89,790,962 | 89,600,000 | 89,600,000 | 0 | 0 | 2020-03-25 | CV. HAFIZA | 02.394.003.4-733.000 | 209,038 | 0.23 % | |
239 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan WC SDN Kandangan Kota 2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3300282 | 23795509 | 90,000,000 | 89,999,577 | 89,790,962 | 89,790,962 | 89,600,000 | 89,600,000 | 0 | 0 | 2020-03-25 | CV. HAFIZA | 02.394.003.4-733.000 | 209,038 | 0.23 % | |
240 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Ibadah SDN. KK2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3301282 | 23792946 | 100,000,000 | 99,995,461 | 99,580,615 | 99,580,615 | 99,400,000 | 99,400,000 | 0 | 0 | 2020-03-25 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 419,385 | 0.42 % | |
241 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Ruang Ibadah SDN. KK2 Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3301282 | 23792946 | 100,000,000 | 99,995,461 | 99,580,615 | 99,580,615 | 99,400,000 | 99,400,000 | 0 | 0 | 2020-03-25 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 419,385 | 0.42 % | |
242 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan CCTV Online Instalasi Lengkap dan LCD Proyektor Set di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3303282 | 25464699 | 90,000,000 | 89,996,500 | 89,892,000 | 0 | 89,892,000 | 89,892,000 | 0 | 0 | 2020-03-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 108,000 | 0.12 % | |
243 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan CCTV Online Instalasi Lengkap dan LCD Proyektor Set di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3303282 | 25464699 | 90,000,000 | 89,996,500 | 89,892,000 | 0 | 89,892,000 | 89,892,000 | 0 | 0 | 2020-03-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 108,000 | 0.12 % | |
244 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3305282 | 23359662 | 11,000,000 | 10,450,000 | 10,428,000 | 0 | 10,428,000 | 10,428,000 | 0 | 0 | 2020-03-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 572,000 | 5.2 % | |
245 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3305282 | 23359662 | 11,000,000 | 10,450,000 | 10,428,000 | 0 | 10,428,000 | 10,428,000 | 0 | 0 | 2020-03-26 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 572,000 | 5.2 % | |
246 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3306282 | 24533384 | 11,000,000 | 10,978,000 | 10,890,000 | 10,890,000 | 10,780,000 | 10,780,000 | 0 | 0 | 2020-03-27 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 110,000 | 1 % | |
247 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3306282 | 24533384 | 11,000,000 | 10,978,000 | 10,890,000 | 10,890,000 | 10,780,000 | 10,780,000 | 0 | 0 | 2020-03-27 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 110,000 | 1 % | |
248 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan peningkatan/rehabilitasi jalan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3311282 | 23349378 | 100,000,000 | 99,962,500 | 99,352,000 | 99,352,000 | 99,055,000 | 99,055,000 | 0 | 0 | 2020-05-04 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 648,000 | 0.65 % | |
249 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan peningkatan/rehabilitasi jalan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3311282 | 23349378 | 100,000,000 | 99,962,500 | 99,352,000 | 99,352,000 | 99,055,000 | 99,055,000 | 0 | 0 | 2020-05-04 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 648,000 | 0.65 % | |
250 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman SDN Kalumpang Selatan Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3312282 | 23752085 | 195,000,000 | 194,945,173 | 194,783,201 | 194,783,201 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-03-28 | CV.DITA | 02.242.686.0-733.000 | 216,799 | 0.11 % | |
251 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman SDN Kalumpang Selatan Kecamatan Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3312282 | 23752085 | 195,000,000 | 194,945,173 | 194,783,201 | 194,783,201 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-03-28 | CV.DITA | 02.242.686.0-733.000 | 216,799 | 0.11 % | |
252 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 3314282 | 22948150 | 200,000,000 | 199,416,800 | 198,987,800 | 198,987,800 | 198,822,800 | 198,822,800 | 0 | 0 | 2020-03-28 | CV. An-Nidha | 02.675.485.3-733.000 | 1,012,200 | 0.51 % | |
253 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Pemeliharaan PJU | Pengadaan Langsung | Pengadaan Barang | 3314282 | 22948150 | 200,000,000 | 199,416,800 | 198,987,800 | 198,987,800 | 198,822,800 | 198,822,800 | 0 | 0 | 2020-03-28 | CV. An-Nidha | 02.675.485.3-733.000 | 1,012,200 | 0.51 % | |
254 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 3315282 | 22952315 | 200,000,000 | 199,787,500 | 199,276,000 | 199,276,000 | 198,973,500 | 198,973,500 | 0 | 0 | 2020-03-30 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 724,000 | 0.36 % | |
255 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bibit Pohon Peneduh dan Tanaman Hias | Pengadaan Langsung | Pengadaan Barang | 3315282 | 22952315 | 200,000,000 | 199,787,500 | 199,276,000 | 199,276,000 | 198,973,500 | 198,973,500 | 0 | 0 | 2020-03-30 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 724,000 | 0.36 % | |
256 | 2020 | Dinas Pendidikan dan Kebudayaan | Pemasangan jaringan internit gygabyte lan dan wifi hotspot | Pengadaan Langsung | Jasa Lainnya | 3316282 | 23822868 | 136,714,000 | 136,583,700 | 135,759,140 | 135,759,140 | 135,600,000 | 135,600,000 | 0 | 0 | 2020-03-30 | CV. e_Caracter | 75.998.700.1-733.000 | 954,860 | 0.7 % | |
257 | 2020 | Dinas Pendidikan dan Kebudayaan | Pemasangan jaringan internit gygabyte lan dan wifi hotspot | Pengadaan Langsung | Jasa Lainnya | 3316282 | 23822868 | 136,714,000 | 136,583,700 | 135,759,140 | 135,759,140 | 135,600,000 | 135,600,000 | 0 | 0 | 2020-03-30 | CV. e_Caracter | 75.998.700.1-733.000 | 954,860 | 0.7 % | |
258 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt. 01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3320282 | 23381475 | 20,000,000 | 19,987,000 | 19,982,050 | 0 | 19,977,100 | 19,977,100 | 0 | 0 | 2020-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 17,950 | 0.09 % | |
259 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt. 01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3320282 | 23381475 | 20,000,000 | 19,987,000 | 19,982,050 | 0 | 19,977,100 | 19,977,100 | 0 | 0 | 2020-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 17,950 | 0.09 % | |
260 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3322282 | 23356856 | 10,000,000 | 9,927,500 | 9,922,000 | 9,922,000 | 9,916,500 | 9,916,500 | 0 | 0 | 2020-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 78,000 | 0.78 % | |
261 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3322282 | 23356856 | 10,000,000 | 9,927,500 | 9,922,000 | 9,922,000 | 9,916,500 | 9,916,500 | 0 | 0 | 2020-04-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 78,000 | 0.78 % | |
262 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Meubelair Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3324282 | 23891267 | 74,500,000 | 74,492,000 | 74,399,600 | 0 | 74,399,600 | 74,399,600 | 0 | 0 | 2020-03-31 | CV.DITA | 02.242.686.0-733.000 | 100,400 | 0.13 % | |
263 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pengadaan Meubelair Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Pengadaan Barang | 3324282 | 23891267 | 74,500,000 | 74,492,000 | 74,399,600 | 0 | 74,399,600 | 74,399,600 | 0 | 0 | 2020-03-31 | CV.DITA | 02.242.686.0-733.000 | 100,400 | 0.13 % | |
264 | 2020 | Dinas Ketahanan Pangan | Rehab/Perbaikan gedung kantor Dinas Ketahanan Pangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3326282 | 24005272 | 53,000,000 | 52,975,153 | 52,796,953 | 52,796,953 | 52,796,000 | 52,796,000 | 0 | 0 | 2020-04-01 | CV. AL MADINAH | 66.139.132.6-733.000 | 203,047 | 0.38 % | |
265 | 2020 | Dinas Ketahanan Pangan | Rehab/Perbaikan gedung kantor Dinas Ketahanan Pangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3326282 | 24005272 | 53,000,000 | 52,975,153 | 52,796,953 | 52,796,953 | 52,796,000 | 52,796,000 | 0 | 0 | 2020-04-01 | CV. AL MADINAH | 66.139.132.6-733.000 | 203,047 | 0.38 % | |
266 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3327282 | 23544863 | 11,759,579 | 11,748,000 | 11,726,000 | 11,726,000 | 11,627,000 | 11,627,000 | 0 | 0 | 2020-03-31 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 33,579 | 0.29 % | |
267 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Selasar IGD dengan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3327282 | 23544863 | 11,759,579 | 11,748,000 | 11,726,000 | 11,726,000 | 11,627,000 | 11,627,000 | 0 | 0 | 2020-03-31 | CV. KARYASA CONSULINDO | 01.860.308.4-731.000 | 33,579 | 0.29 % | |
268 | 2020 | Dinas Perdagangan | Pengawasan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3336282 | 25293740 | 18,000,000 | 17,930,000 | 17,864,000 | 17,864,000 | 17,864,000 | 17,864,000 | 0 | 0 | 2020-04-14 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 136,000 | 0.76 % | |
269 | 2020 | Dinas Perdagangan | Pengawasan Perkerasan Lanjutan Halaman Pasar Terpadu HM Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3336282 | 25293740 | 18,000,000 | 17,930,000 | 17,864,000 | 17,864,000 | 17,864,000 | 17,864,000 | 0 | 0 | 2020-04-14 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 136,000 | 0.76 % | |
270 | 2020 | Kecamatan Daha Utara | Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3337282 | 23359688 | 160,000,000 | 159,902,548 | 159,779,735 | 0 | 159,779,735 | 159,779,735 | 0 | 0 | 2020-04-01 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 220,265 | 0.14 % | |
271 | 2020 | Kecamatan Daha Utara | Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3337282 | 23359688 | 160,000,000 | 159,902,548 | 159,779,735 | 0 | 159,779,735 | 159,779,735 | 0 | 0 | 2020-04-01 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 220,265 | 0.14 % | |
272 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bibit Tanaman Bambu Pagar TPA | Pengadaan Langsung | Pengadaan Barang | 3340282 | 23041817 | 110,000,000 | 70,750,000 | 70,600,000 | 70,600,000 | 70,500,000 | 70,500,000 | 0 | 0 | 2020-04-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 39,400,000 | 35.82 % | |
273 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bibit Tanaman Bambu Pagar TPA | Pengadaan Langsung | Pengadaan Barang | 3340282 | 23041817 | 110,000,000 | 70,750,000 | 70,600,000 | 70,600,000 | 70,500,000 | 70,500,000 | 0 | 0 | 2020-04-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 39,400,000 | 35.82 % | |
274 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Pick Up Dump Sampah | Pengadaan Langsung | Pengadaan Barang | 3341282 | 22993134 | 190,000,000 | 190,000,000 | 189,850,000 | 189,850,000 | 189,800,000 | 189,800,000 | 0 | 0 | 2020-04-03 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | 150,000 | 0.08 % | |
275 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Pick Up Dump Sampah | Pengadaan Langsung | Pengadaan Barang | 3341282 | 22993134 | 190,000,000 | 190,000,000 | 189,850,000 | 189,850,000 | 189,800,000 | 189,800,000 | 0 | 0 | 2020-04-03 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | 150,000 | 0.08 % | |
276 | 2020 | Dinas Pertanian | Belanja Bahan Pemeliharaan Kebun Hijauan Makanan Ternak (HMT) | Pengadaan Langsung | Pengadaan Barang | 3342282 | 24144944 | 34,600,000 | 34,465,200 | 34,332,100 | 0 | 34,332,100 | 34,332,100 | 0 | 0 | 2020-04-04 | FADWI UTAMA | 94.246.044.5-733.000 | 267,900 | 0.77 % | |
277 | 2020 | Dinas Pertanian | Belanja Bahan Pemeliharaan Kebun Hijauan Makanan Ternak (HMT) | Pengadaan Langsung | Pengadaan Barang | 3342282 | 24144944 | 34,600,000 | 34,465,200 | 34,332,100 | 0 | 34,332,100 | 34,332,100 | 0 | 0 | 2020-04-04 | FADWI UTAMA | 94.246.044.5-733.000 | 267,900 | 0.77 % | |
278 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Petugas Pemelihara Taman | Pengadaan Langsung | Pengadaan Barang | 3344282 | 22972703 | 102,285,000 | 101,262,150 | 101,083,950 | 101,083,950 | 100,994,850 | 100,994,850 | 0 | 0 | 2020-04-04 | CV. e_Caracter | 75.998.700.1-733.000 | 1,201,050 | 1.17 % | |
279 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Pakaian Kerja Petugas Pemelihara Taman | Pengadaan Langsung | Pengadaan Barang | 3344282 | 22972703 | 102,285,000 | 101,262,150 | 101,083,950 | 101,083,950 | 100,994,850 | 100,994,850 | 0 | 0 | 2020-04-04 | CV. e_Caracter | 75.998.700.1-733.000 | 1,201,050 | 1.17 % | |
280 | 2020 | Dinas Sosial | Belanja bahan bantuan sembako /pangan bagi penyandang disabilitas | Pengadaan Langsung | Pengadaan Barang | 3345282 | 23490785 | 56,000,000 | 56,000,000 | 55,820,000 | 0 | 55,620,000 | 55,620,000 | 0 | 0 | 2020-04-06 | CV. AMANDITA | 01.834.025.7-733.000 | 180,000 | 0.32 % | |
281 | 2020 | Dinas Sosial | Belanja bahan bantuan sembako /pangan bagi penyandang disabilitas | Pengadaan Langsung | Pengadaan Barang | 3345282 | 23490785 | 56,000,000 | 56,000,000 | 55,820,000 | 0 | 55,620,000 | 55,620,000 | 0 | 0 | 2020-04-06 | CV. AMANDITA | 01.834.025.7-733.000 | 180,000 | 0.32 % | |
282 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penambahan Tanaman Taman Palidangan | Pengadaan Langsung | Pengadaan Barang | 3346282 | 22973542 | 100,000,000 | 99,220,000 | 99,096,800 | 99,096,800 | 99,001,100 | 99,001,100 | 0 | 0 | 2020-04-04 | CV. e_Caracter | 75.998.700.1-733.000 | 903,200 | 0.9 % | |
283 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penambahan Tanaman Taman Palidangan | Pengadaan Langsung | Pengadaan Barang | 3346282 | 22973542 | 100,000,000 | 99,220,000 | 99,096,800 | 99,096,800 | 99,001,100 | 99,001,100 | 0 | 0 | 2020-04-04 | CV. e_Caracter | 75.998.700.1-733.000 | 903,200 | 0.9 % | |
284 | 2020 | Sekretariat Daerah | Konsultan Pengawasan Rehab ruang Bagian Protokol dan Kehumasan dan Bagian Kesra Setda HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3348282 | 23644102 | 7,000,000 | 6,996,000 | 6,820,000 | 0 | 6,820,000 | 6,820,000 | 0 | 0 | 2020-04-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 180,000 | 2.57 % | |
285 | 2020 | Sekretariat Daerah | Konsultan Pengawasan Rehab ruang Bagian Protokol dan Kehumasan dan Bagian Kesra Setda HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3348282 | 23644102 | 7,000,000 | 6,996,000 | 6,820,000 | 0 | 6,820,000 | 6,820,000 | 0 | 0 | 2020-04-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 180,000 | 2.57 % | |
286 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Kerja (Pengembangan Hutan Kota Menjadi Hutan Edukasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3353282 | 23093891 | 15,000,000 | 14,985,850 | 14,883,000 | 14,883,000 | 14,883,000 | 14,883,000 | 0 | 0 | 2020-04-07 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 117,000 | 0.78 % | |
287 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Kerja (Pengembangan Hutan Kota Menjadi Hutan Edukasi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3353282 | 23093891 | 15,000,000 | 14,985,850 | 14,883,000 | 14,883,000 | 14,883,000 | 14,883,000 | 0 | 0 | 2020-04-07 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 117,000 | 0.78 % | |
288 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Pengadaan Peralatan dan Pelengkapan Kantor | Pengadaan Langsung | Pengadaan Barang | 3356282 | 24194308;24194309;24194310;24194311;24194312;24194313;24194314;24194315;24194316 | 209,000,000 | 146,625,000 | 139,220,000 | 0 | 139,220,000 | 139,220,000 | 0 | 0 | 2020-04-07 | CV. HITRO | 02.918.384.5-733.000 | 69,780,000 | 33.39 % | |
289 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Pengadaan Peralatan dan Pelengkapan Kantor | Pengadaan Langsung | Pengadaan Barang | 3356282 | 24194308;24194309;24194310;24194311;24194312;24194313;24194314;24194315;24194316 | 209,000,000 | 146,625,000 | 139,220,000 | 0 | 139,220,000 | 139,220,000 | 0 | 0 | 2020-04-07 | CV. HITRO | 02.918.384.5-733.000 | 69,780,000 | 33.39 % | |
290 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi (Pengukuran) Bidang Tanah Jalan Lingkungan | Pengadaan Langsung | Jasa Lainnya | 3357282 | 22993595 | 68,000,000 | 68,000,000 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-04-07 | CV. SENTRATECS | 01.719.362.4-732.000 | 2,000,000 | 2.94 % | |
291 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Jasa Inventarisasi (Pengukuran) Bidang Tanah Jalan Lingkungan | Pengadaan Langsung | Jasa Lainnya | 3357282 | 22993595 | 68,000,000 | 68,000,000 | 66,000,000 | 66,000,000 | 65,800,000 | 65,800,000 | 0 | 0 | 2020-04-07 | CV. SENTRATECS | 01.719.362.4-732.000 | 2,000,000 | 2.94 % | |
292 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman panggung SDN Sungai Jarum kec.Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3358282 | 23752382 | 195,000,000 | 194,862,583 | 194,610,436 | 194,610,436 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-23 | cv. bumi mandiri | 02.089.892.0-733.000 | 389,564 | 0.2 % | |
293 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembuatan halaman panggung SDN Sungai Jarum kec.Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3358282 | 23752382 | 195,000,000 | 194,862,583 | 194,610,436 | 194,610,436 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-23 | cv. bumi mandiri | 02.089.892.0-733.000 | 389,564 | 0.2 % | |
294 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 3359282 | 22948794 | 200,000,000 | 194,166,830 | 193,110,610 | 193,110,610 | 192,810,000 | 192,810,000 | 0 | 0 | 2020-04-08 | cv mentari teknik | 03.183.412.0-731.000 | 6,889,390 | 3.44 % | |
295 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan PJU | Pengadaan Langsung | Pekerjaan Konstruksi | 3359282 | 22948794 | 200,000,000 | 194,166,830 | 193,110,610 | 193,110,610 | 192,810,000 | 192,810,000 | 0 | 0 | 2020-04-08 | cv mentari teknik | 03.183.412.0-731.000 | 6,889,390 | 3.44 % | |
296 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pengadaan Lemari Alat dan Obat Kontrasepsi (Alokon) | Pengadaan Langsung | Pengadaan Barang | 3360282 | 25471423 | 182,000,000 | 176,790,900 | 176,147,400 | 0 | 174,200,000 | 174,200,000 | 0 | 0 | 2020-04-18 | CV.BORNEO AUFA JAYA | 31.670.522.7-731.000 | 5,852,600 | 3.22 % | |
297 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pengadaan Lemari Alat dan Obat Kontrasepsi (Alokon) | Pengadaan Langsung | Pengadaan Barang | 3360282 | 25471423 | 182,000,000 | 176,790,900 | 176,147,400 | 0 | 174,200,000 | 174,200,000 | 0 | 0 | 2020-04-18 | CV.BORNEO AUFA JAYA | 31.670.522.7-731.000 | 5,852,600 | 3.22 % | |
298 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawas Pembangunan Taman PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3362282 | 23448594 | 7,200,000 | 7,194,000 | 7,145,600 | 0 | 7,145,600 | 7,145,600 | 0 | 0 | 2020-04-13 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 54,400 | 0.76 % | |
299 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawas Pembangunan Taman PKK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3362282 | 23448594 | 7,200,000 | 7,194,000 | 7,145,600 | 0 | 7,145,600 | 7,145,600 | 0 | 0 | 2020-04-13 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 54,400 | 0.76 % | |
300 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan penggantian jembatan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3364282 | 23373440 | 100,000,000 | 99,770,000 | 99,297,000 | 99,297,000 | 99,077,000 | 99,077,000 | 0 | 0 | 2020-05-04 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 703,000 | 0.7 % | |
301 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi perencanaan penggantian jembatan DAK 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3364282 | 23373440 | 100,000,000 | 99,770,000 | 99,297,000 | 99,297,000 | 99,077,000 | 99,077,000 | 0 | 0 | 2020-05-04 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 703,000 | 0.7 % | |
302 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3365282 | 22978515 | 88,035,200 | 88,035,200 | 87,945,000 | 0 | 87,945,000 | 87,945,000 | 0 | 0 | 2020-04-14 | CV. KALTRA | 81.639.401.9-733.000 | 90,200 | 0.1 % | |
303 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3365282 | 22978515 | 88,035,200 | 88,035,200 | 87,945,000 | 0 | 87,945,000 | 87,945,000 | 0 | 0 | 2020-04-14 | CV. KALTRA | 81.639.401.9-733.000 | 90,200 | 0.1 % | |
304 | 2020 | Dinas Pertanian | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3366282 | 24118900 | 179,750,000 | 148,574,250 | 148,445,000 | 148,445,000 | 148,445,000 | 148,445,000 | 0 | 0 | 2020-04-13 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 31,305,000 | 17.42 % | |
305 | 2020 | Dinas Pertanian | Belanja Bahan Kimia dan Pupuk | Pengadaan Langsung | Pengadaan Barang | 3366282 | 24118900 | 179,750,000 | 148,574,250 | 148,445,000 | 148,445,000 | 148,445,000 | 148,445,000 | 0 | 0 | 2020-04-13 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 31,305,000 | 17.42 % | |
306 | 2020 | Dinas Pertanian | Belanja Bibit / Benih Tanaman Melon | Pengadaan Langsung | Pengadaan Barang | 3367282 | 24144863 | 50,600,000 | 18,597,700 | 18,577,900 | 18,577,900 | 18,577,900 | 18,577,900 | 0 | 0 | 2020-04-13 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 32,022,100 | 63.28 % | |
307 | 2020 | Dinas Pertanian | Belanja Bibit / Benih Tanaman Melon | Pengadaan Langsung | Pengadaan Barang | 3367282 | 24144863 | 50,600,000 | 18,597,700 | 18,577,900 | 18,577,900 | 18,577,900 | 18,577,900 | 0 | 0 | 2020-04-13 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 32,022,100 | 63.28 % | |
308 | 2020 | Dinas Pertanian | Pengadaan Sapi Bali Betina | Pengadaan Langsung | Pengadaan Barang | 3368282 | 24144942 | 110,000,000 | 108,100,000 | 108,000,000 | 108,000,000 | 108,000,000 | 108,000,000 | 0 | 0 | 2020-04-13 | CV.DITA | 02.242.686.0-733.000 | 2,000,000 | 1.82 % | |
309 | 2020 | Dinas Pertanian | Pengadaan Sapi Bali Betina | Pengadaan Langsung | Pengadaan Barang | 3368282 | 24144942 | 110,000,000 | 108,100,000 | 108,000,000 | 108,000,000 | 108,000,000 | 108,000,000 | 0 | 0 | 2020-04-13 | CV.DITA | 02.242.686.0-733.000 | 2,000,000 | 1.82 % | |
310 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pembangunan Mess Penjaga TPA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3370282 | 24618310 | 25,000,000 | 24,915,000 | 24,799,500 | 24,799,500 | 24,656,500 | 24,656,500 | 0 | 0 | 2020-04-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 200,500 | 0.8 % | |
311 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencana Pembangunan Mess Penjaga TPA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3370282 | 24618310 | 25,000,000 | 24,915,000 | 24,799,500 | 24,799,500 | 24,656,500 | 24,656,500 | 0 | 0 | 2020-04-15 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 200,500 | 0.8 % | |
312 | 2020 | Kecamatan Daha Utara | Disediakan Belanja Modal Pengadaan Pembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3371282 | 23359488 | 176,500,000 | 176,495,440 | 176,202,821 | 0 | 176,202,821 | 176,202,821 | 0 | 0 | 2020-04-22 | cv. bumi mandiri | 02.089.892.0-733.000 | 297,179 | 0.17 % | |
313 | 2020 | Kecamatan Daha Utara | Disediakan Belanja Modal Pengadaan Pembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3371282 | 23359488 | 176,500,000 | 176,495,440 | 176,202,821 | 0 | 176,202,821 | 176,202,821 | 0 | 0 | 2020-04-22 | cv. bumi mandiri | 02.089.892.0-733.000 | 297,179 | 0.17 % | |
314 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Kayu Abang | Pengadaan Langsung | Pekerjaan Konstruksi | 3372282 | 22911035 | 155,000,000 | 154,941,318 | 154,008,280 | 154,008,280 | 153,850,000 | 153,850,000 | 0 | 0 | 2020-04-15 | cv mentari teknik | 03.183.412.0-731.000 | 991,720 | 0.64 % | |
315 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Kayu Abang | Pengadaan Langsung | Pekerjaan Konstruksi | 3372282 | 22911035 | 155,000,000 | 154,941,318 | 154,008,280 | 154,008,280 | 153,850,000 | 153,850,000 | 0 | 0 | 2020-04-15 | cv mentari teknik | 03.183.412.0-731.000 | 991,720 | 0.64 % | |
316 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Pengawasan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3373282 | 22918951 | 58,800,000 | 58,740,000 | 58,608,000 | 58,608,000 | 58,465,000 | 58,465,000 | 0 | 0 | 2020-04-15 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 192,000 | 0.33 % | |
317 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Konsultan Pengawasan Pembangunan PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3373282 | 22918951 | 58,800,000 | 58,740,000 | 58,608,000 | 58,608,000 | 58,465,000 | 58,465,000 | 0 | 0 | 2020-04-15 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 192,000 | 0.33 % | |
318 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3375282 | 23372767 | 200,000,000 | 199,710,487 | 199,682,986 | 199,682,987 | 199,627,816 | 199,627,816 | 0 | 0 | 2020-04-16 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 317,014 | 0.16 % | |
319 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3375282 | 23372767 | 200,000,000 | 199,710,487 | 199,682,986 | 199,682,987 | 199,627,816 | 199,627,816 | 0 | 0 | 2020-04-16 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 317,014 | 0.16 % | |
320 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3379282 | 22911190 | 125,000,000 | 124,972,936 | 124,270,952 | 124,270,952 | 124,050,000 | 124,050,000 | 0 | 0 | 2020-04-16 | cv mentari teknik | 03.183.412.0-731.000 | 729,048 | 0.58 % | |
321 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3379282 | 22911190 | 125,000,000 | 124,972,936 | 124,270,952 | 124,270,952 | 124,050,000 | 124,050,000 | 0 | 0 | 2020-04-16 | cv mentari teknik | 03.183.412.0-731.000 | 729,048 | 0.58 % | |
322 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Jl. Tembok Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 3380282 | 22911473 | 45,000,000 | 44,924,198 | 44,773,289 | 44,773,289 | 44,560,000 | 44,560,000 | 0 | 0 | 2020-04-16 | cv mentari teknik | 03.183.412.0-731.000 | 226,711 | 0.5 % | |
323 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Jl. Tembok Lama | Pengadaan Langsung | Pekerjaan Konstruksi | 3380282 | 22911473 | 45,000,000 | 44,924,198 | 44,773,289 | 44,773,289 | 44,560,000 | 44,560,000 | 0 | 0 | 2020-04-16 | cv mentari teknik | 03.183.412.0-731.000 | 226,711 | 0.5 % | |
324 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Rehab Cottage Model Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3381282 | 25596581 | 25,000,000 | 24,970,000 | 24,640,000 | 0 | 24,640,000 | 24,640,000 | 0 | 0 | 2020-04-17 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 360,000 | 1.44 % | |
325 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Rehab Cottage Model Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3381282 | 25596581 | 25,000,000 | 24,970,000 | 24,640,000 | 0 | 24,640,000 | 24,640,000 | 0 | 0 | 2020-04-17 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 360,000 | 1.44 % | |
326 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan Taman | Pengadaan Langsung | Pekerjaan Konstruksi | 3382282 | 22983844 | 200,000,000 | 199,885,620 | 199,404,802 | 199,404,802 | 199,194,800 | 199,194,800 | 0 | 0 | 2020-04-17 | CV. KALI BARU | 01.434.974.0-733.000 | 595,198 | 0.3 % | |
327 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Rutin Pemeliharaan Taman | Pengadaan Langsung | Pekerjaan Konstruksi | 3382282 | 22983844 | 200,000,000 | 199,885,620 | 199,404,802 | 199,404,802 | 199,194,800 | 199,194,800 | 0 | 0 | 2020-04-17 | CV. KALI BARU | 01.434.974.0-733.000 | 595,198 | 0.3 % | |
328 | 2020 | Dinas Pertanian | Belanja Bibit Kayu Manis, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3385282 | 25576841 | 38,400,000 | 37,830,648 | 37,616,130 | 37,616,130 | 37,616,130 | 37,616,130 | 0 | 0 | 2020-04-17 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 783,870 | 2.04 % | |
329 | 2020 | Dinas Pertanian | Belanja Bibit Kayu Manis, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3385282 | 25576841 | 38,400,000 | 37,830,648 | 37,616,130 | 37,616,130 | 37,616,130 | 37,616,130 | 0 | 0 | 2020-04-17 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 783,870 | 2.04 % | |
330 | 2020 | Dinas Pertanian | Belanja Bibit Kelapa Genjah, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3386282 | 25576831 | 37,610,000 | 37,317,500 | 37,155,000 | 37,155,000 | 37,155,000 | 37,155,000 | 0 | 0 | 2020-04-17 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 455,000 | 1.21 % | |
331 | 2020 | Dinas Pertanian | Belanja Bibit Kelapa Genjah, Polybag dan Bahan untuk Pembuatan Bibit | Pengadaan Langsung | Pengadaan Barang | 3386282 | 25576831 | 37,610,000 | 37,317,500 | 37,155,000 | 37,155,000 | 37,155,000 | 37,155,000 | 0 | 0 | 2020-04-17 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 455,000 | 1.21 % | |
332 | 2020 | Dinas Kesehatan | Belanja Cetak (BOK Kabupaten) | Pengadaan Langsung | Pengadaan Barang | 3387282 | 25578544 | 140,935,000 | 122,506,500 | 122,056,500 | 0 | 121,706,500 | 121,706,500 | 0 | 0 | 2020-04-18 | CV. MOCCA | 70.565.542.1-732.000 | 18,878,500 | 13.4 % | |
333 | 2020 | Dinas Kesehatan | Belanja Cetak (BOK Kabupaten) | Pengadaan Langsung | Pengadaan Barang | 3387282 | 25578544 | 140,935,000 | 122,506,500 | 122,056,500 | 0 | 121,706,500 | 121,706,500 | 0 | 0 | 2020-04-18 | CV. MOCCA | 70.565.542.1-732.000 | 18,878,500 | 13.4 % | |
334 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3388282 | 25587187 | 9,000,000 | 5,964,750 | 5,896,000 | 5,896,000 | 5,825,000 | 5,825,000 | 0 | 0 | 2020-04-20 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,104,000 | 34.49 % | |
335 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Perencanaan Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3388282 | 25587187 | 9,000,000 | 5,964,750 | 5,896,000 | 5,896,000 | 5,825,000 | 5,825,000 | 0 | 0 | 2020-04-20 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,104,000 | 34.49 % | |
336 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pembuatan Jalan Masuk bagi Pengguna Kursi Roda/Disabilitas Balai Penyuluhan KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3389282 | 25540697 | 152,500,000 | 152,362,000 | 151,812,419 | 0 | 151,566,000 | 151,566,000 | 0 | 0 | 2020-04-19 | cv. semar | 02.050.851.1-733.000 | 687,581 | 0.45 % | |
337 | 2020 | Dinas Pengendalian Penduduk, Keluarga Berencana, Pemberdayaan Perempuan dan Perlindungan Anak | Pembuatan Jalan Masuk bagi Pengguna Kursi Roda/Disabilitas Balai Penyuluhan KKB Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3389282 | 25540697 | 152,500,000 | 152,362,000 | 151,812,419 | 0 | 151,566,000 | 151,566,000 | 0 | 0 | 2020-04-19 | cv. semar | 02.050.851.1-733.000 | 687,581 | 0.45 % | |
338 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Air Terjun Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3390282 | 23891260 | 50,000,000 | 49,940,000 | 49,830,000 | 0 | 49,830,000 | 49,830,000 | 0 | 0 | 2020-04-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.34 % | |
339 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Air Terjun Haratai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3390282 | 23891260 | 50,000,000 | 49,940,000 | 49,830,000 | 0 | 49,830,000 | 49,830,000 | 0 | 0 | 2020-04-20 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 170,000 | 0.34 % | |
340 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Dukungan DAK Fisik 2020) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3391282 | 25595279 | 60,000,000 | 59,950,000 | 59,840,000 | 0 | 59,840,000 | 59,840,000 | 0 | 0 | 2020-04-20 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 160,000 | 0.27 % | |
341 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Perencanaan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Dukungan DAK Fisik 2020) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3391282 | 25595279 | 60,000,000 | 59,950,000 | 59,840,000 | 0 | 59,840,000 | 59,840,000 | 0 | 0 | 2020-04-20 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 160,000 | 0.27 % | |
342 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Kec. Sungai Raya dan Padang Batung Tahun 2020 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3392282 | 25377806 | 50,000,000 | 48,235,000 | 48,125,000 | 48,125,000 | 47,870,000 | 47,870,000 | 0 | 0 | 2020-05-09 | CV. TALENTA ART | 01.585.423.5-733.000 | 1,875,000 | 3.75 % | |
343 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Peningkatan Jalan Kec. Sungai Raya dan Padang Batung Tahun 2020 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3392282 | 25377806 | 50,000,000 | 48,235,000 | 48,125,000 | 48,125,000 | 47,870,000 | 47,870,000 | 0 | 0 | 2020-05-09 | CV. TALENTA ART | 01.585.423.5-733.000 | 1,875,000 | 3.75 % | |
344 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Sarang Halang - Paring Agung (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3393282 | 22911887 | 200,000,000 | 199,944,633 | 198,979,635 | 198,979,635 | 198,750,000 | 198,750,000 | 0 | 0 | 2020-04-21 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 1,020,365 | 0.51 % | |
345 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Sarang Halang - Paring Agung (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3393282 | 22911887 | 200,000,000 | 199,944,633 | 198,979,635 | 198,979,635 | 198,750,000 | 198,750,000 | 0 | 0 | 2020-04-21 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 1,020,365 | 0.51 % | |
346 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3394282 | 22911556 | 190,000,000 | 189,942,205 | 189,049,100 | 189,049,100 | 188,850,000 | 188,850,000 | 0 | 0 | 2020-04-21 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 950,900 | 0.5 % | |
347 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3394282 | 22911556 | 190,000,000 | 189,942,205 | 189,049,100 | 189,049,100 | 188,850,000 | 188,850,000 | 0 | 0 | 2020-04-21 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 950,900 | 0.5 % | |
348 | 2020 | Sekretariat DPRD | Rehab Toilet Kantor lantai dasar dan Gudang | Pengadaan Langsung | Pekerjaan Konstruksi | 3396282 | 23501047 | 57,020,000 | 57,000,786 | 55,081,286 | 0 | 55,081,200 | 55,081,200 | 0 | 0 | 2020-04-20 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,938,714 | 3.4 % | |
349 | 2020 | Sekretariat DPRD | Rehab Toilet Kantor lantai dasar dan Gudang | Pengadaan Langsung | Pekerjaan Konstruksi | 3396282 | 23501047 | 57,020,000 | 57,000,786 | 55,081,286 | 0 | 55,081,200 | 55,081,200 | 0 | 0 | 2020-04-20 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,938,714 | 3.4 % | |
350 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Gambah Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 3397282 | 22910498 | 150,000,000 | 149,933,810 | 149,231,870 | 149,231,870 | 149,078,000 | 149,078,000 | 0 | 0 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 768,130 | 0.51 % | |
351 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Desa Gambah Dalam | Pengadaan Langsung | Pekerjaan Konstruksi | 3397282 | 22910498 | 150,000,000 | 149,933,810 | 149,231,870 | 149,231,870 | 149,078,000 | 149,078,000 | 0 | 0 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 768,130 | 0.51 % | |
352 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3398282 | 22911302 | 105,000,000 | 104,981,743 | 104,473,052 | 104,473,052 | 104,270,000 | 104,270,000 | 0 | 0 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 526,948 | 0.5 % | |
353 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan PJU Kecamatan Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3398282 | 22911302 | 105,000,000 | 104,981,743 | 104,473,052 | 104,473,052 | 104,270,000 | 104,270,000 | 0 | 0 | 2020-04-24 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 526,948 | 0.5 % | |
354 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Sungai Tumpahan Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3399282 | 23381230 | 15,000,000 | 14,960,000 | 14,877,500 | 14,877,500 | 14,872,000 | 14,872,000 | 0 | 0 | 2020-05-05 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 122,500 | 0.82 % | |
355 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Sungai Tumpahan Desa Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3399282 | 23381230 | 15,000,000 | 14,960,000 | 14,877,500 | 14,877,500 | 14,872,000 | 14,872,000 | 0 | 0 | 2020-05-05 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 122,500 | 0.82 % | |
356 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3400282 | 23381068 | 20,000,000 | 19,987,000 | 19,976,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-05-12 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 24,000 | 0.12 % | |
357 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 04 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3400282 | 23381068 | 20,000,000 | 19,987,000 | 19,976,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-05-12 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 24,000 | 0.12 % | |
358 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjongn Belakang Mesjid Al Mutazikirin Jembatan Merah RT. 02 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3401282 | 23381136 | 15,000,000 | 14,960,000 | 14,696,000 | 0 | 14,690,500 | 14,690,500 | 0 | 0 | 2020-04-24 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 304,000 | 2.03 % | |
359 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjongn Belakang Mesjid Al Mutazikirin Jembatan Merah RT. 02 Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3401282 | 23381136 | 15,000,000 | 14,960,000 | 14,696,000 | 0 | 14,690,500 | 14,690,500 | 0 | 0 | 2020-04-24 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 304,000 | 2.03 % | |
360 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3402282 | 23381329 | 15,000,000 | 14,960,000 | 14,696,000 | 14,696,000 | 14,630,000 | 14,630,000 | 0 | 0 | 2020-04-28 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 304,000 | 2.03 % | |
361 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3402282 | 23381329 | 15,000,000 | 14,960,000 | 14,696,000 | 14,696,000 | 14,630,000 | 14,630,000 | 0 | 0 | 2020-04-28 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 304,000 | 2.03 % | |
362 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 07 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3403282 | 23381043 | 15,000,000 | 14,960,000 | 14,956,700 | 0 | 14,954,500 | 14,954,500 | 0 | 0 | 2020-04-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 43,300 | 0.29 % | |
363 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Kandangan Kota RT. 07 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3403282 | 23381043 | 15,000,000 | 14,960,000 | 14,956,700 | 0 | 14,954,500 | 14,954,500 | 0 | 0 | 2020-04-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 43,300 | 0.29 % | |
364 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 08 (Muara Banta) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3404282 | 23381029 | 15,000,000 | 14,960,000 | 14,685,220 | 14,685,220 | 14,685,000 | 14,685,000 | 0 | 0 | 2020-04-23 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 314,780 | 2.1 % | |
365 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT. 08 (Muara Banta) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3404282 | 23381029 | 15,000,000 | 14,960,000 | 14,685,220 | 14,685,220 | 14,685,000 | 14,685,000 | 0 | 0 | 2020-04-23 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 314,780 | 2.1 % | |
366 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Sungai Kupang RT. 01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3405282 | 23381002 | 15,000,000 | 14,960,000 | 14,674,000 | 0 | 14,668,500 | 14,668,500 | 0 | 0 | 2020-04-29 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 326,000 | 2.17 % | |
367 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Sungai Kupang RT. 01 Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3405282 | 23381002 | 15,000,000 | 14,960,000 | 14,674,000 | 0 | 14,668,500 | 14,668,500 | 0 | 0 | 2020-04-29 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 326,000 | 2.17 % | |
368 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar Lingkungan Komplek Majelis Guru Upik Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3406282 | 23381437 | 15,000,000 | 14,960,000 | 14,788,180 | 14,788,180 | 14,782,680 | 14,782,680 | 0 | 0 | 2020-04-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,820 | 1.41 % | |
369 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar Lingkungan Komplek Majelis Guru Upik Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3406282 | 23381437 | 15,000,000 | 14,960,000 | 14,788,180 | 14,788,180 | 14,782,680 | 14,782,680 | 0 | 0 | 2020-04-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,820 | 1.41 % | |
370 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jalan menuju Stadion 2 Desember (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3407282 | 23376318 | 100,000,000 | 68,640,110 | 68,287,395 | 68,287,395 | 68,100,000 | 68,100,000 | 0 | 0 | 2020-07-08 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 31,712,605 | 31.71 % | |
371 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jalan menuju Stadion 2 Desember (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3407282 | 23376318 | 100,000,000 | 68,640,110 | 68,287,395 | 68,287,395 | 68,100,000 | 68,100,000 | 0 | 0 | 2020-07-08 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 31,712,605 | 31.71 % | |
372 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan Loklahung Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409282 | 23376801 | 50,000,000 | 49,824,170 | 49,584,700 | 49,584,700 | 49,584,700 | 49,584,700 | 0 | 0 | 2020-07-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,300 | 0.83 % | |
373 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Jembatan Loklahung Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3409282 | 23376801 | 50,000,000 | 49,824,170 | 49,584,700 | 49,584,700 | 49,584,700 | 49,584,700 | 0 | 0 | 2020-07-16 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,300 | 0.83 % | |
374 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Wasah Tengah Sungai Tarap (178) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3410282 | 23369988 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-07-24 | Wing Rastafarindo | 03.282.590.3-732.000 | 470,812 | 0.94 % | |
375 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Wasah Tengah Sungai Tarap (178) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3410282 | 23369988 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-07-24 | Wing Rastafarindo | 03.282.590.3-732.000 | 470,812 | 0.94 % | |
376 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sungai Kacil Kapuh Padang (191) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412282 | 23348885 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,150,000 | 49,150,000 | 0 | 0 | 2020-07-13 | cv.mitra talenta prima | 02.746.658.0-733.000 | 500,000 | 1 % | |
377 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sungai Kacil Kapuh Padang (191) Kec. Simpur (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3412282 | 23348885 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,150,000 | 49,150,000 | 0 | 0 | 2020-07-13 | cv.mitra talenta prima | 02.746.658.0-733.000 | 500,000 | 1 % | |
378 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Muning Dalam Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3414282 | 23353547 | 10,000,000 | 9,988,000 | 9,795,500 | 9,795,500 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-05-26 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 204,500 | 2.05 % | |
379 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Muning Dalam Kec. Daha Selatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3414282 | 23353547 | 10,000,000 | 9,988,000 | 9,795,500 | 9,795,500 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-05-26 | CV. Mitra Arsindo Consultant | 76.278.662.2-732.000 | 204,500 | 2.05 % | |
380 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengurugan Halaman Samping dan Pembuatan Pagar TPST 3R Baluti | Pengadaan Langsung | Pekerjaan Konstruksi | 3415282 | 24532361 | 180,000,000 | 179,780,471 | 179,879,697 | 179,879,697 | 179,550,000 | 179,550,000 | 0 | 0 | 2020-04-24 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 120,303 | 0.07 % | |
381 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengurugan Halaman Samping dan Pembuatan Pagar TPST 3R Baluti | Pengadaan Langsung | Pekerjaan Konstruksi | 3415282 | 24532361 | 180,000,000 | 179,780,471 | 179,879,697 | 179,879,697 | 179,550,000 | 179,550,000 | 0 | 0 | 2020-04-24 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 120,303 | 0.07 % | |
382 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Hadiah barang (SD) | Pengadaan Langsung | Pengadaan Barang | 3419282 | 23797371 | 195,000,000 | 194,975,000 | 194,645,000 | 194,645,000 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-24 | FADWI UTAMA | 94.246.044.5-733.000 | 355,000 | 0.18 % | |
383 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Hadiah barang (SD) | Pengadaan Langsung | Pengadaan Barang | 3419282 | 23797371 | 195,000,000 | 194,975,000 | 194,645,000 | 194,645,000 | 194,500,000 | 194,500,000 | 0 | 0 | 2020-04-24 | FADWI UTAMA | 94.246.044.5-733.000 | 355,000 | 0.18 % | |
384 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3420282 | 24533539 | 8,000,000 | 7,969,500 | 7,898,000 | 7,898,000 | 7,799,000 | 7,799,000 | 0 | 0 | 2020-04-24 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 102,000 | 1.28 % | |
385 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pengurugan halaman samping dan pembuatan pagar TPST 3R Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3420282 | 24533539 | 8,000,000 | 7,969,500 | 7,898,000 | 7,898,000 | 7,799,000 | 7,799,000 | 0 | 0 | 2020-04-24 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 102,000 | 1.28 % | |
386 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3425282 | 25635360 | 9,360,000 | 9,350,000 | 9,306,000 | 9,306,000 | 9,200,000 | 9,200,000 | 0 | 0 | 2020-04-25 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 54,000 | 0.58 % | |
387 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3425282 | 25635360 | 9,360,000 | 9,350,000 | 9,306,000 | 9,306,000 | 9,200,000 | 9,200,000 | 0 | 0 | 2020-04-25 | CV. NAZWA BERKAH TEKNIK | 74.312.702.9-731.000 | 54,000 | 0.58 % | |
388 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat SMPN 1 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3426282 | 23823603 | 195,000,000 | 194,982,754 | 194,764,006 | 194,764,006 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-04-25 | CV. AL MADINAH | 66.139.132.6-733.000 | 235,994 | 0.12 % | |
389 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Sedang/Berat SMPN 1 Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3426282 | 23823603 | 195,000,000 | 194,982,754 | 194,764,006 | 194,764,006 | 194,600,000 | 194,600,000 | 0 | 0 | 2020-04-25 | CV. AL MADINAH | 66.139.132.6-733.000 | 235,994 | 0.12 % | |
390 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultasi PengawasanPembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3427282 | 23359486 | 7,050,000 | 7,040,000 | 6,930,000 | 0 | 6,930,000 | 6,930,000 | 0 | 0 | 2020-04-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 120,000 | 1.7 % | |
391 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultasi PengawasanPembuatan Paving Halaman Kantor Kecamatan Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3427282 | 23359486 | 7,050,000 | 7,040,000 | 6,930,000 | 0 | 6,930,000 | 6,930,000 | 0 | 0 | 2020-04-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 120,000 | 1.7 % | |
392 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Pengawasan Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3428282 | 23359636 | 11,000,000 | 11,000,000 | 10,879,000 | 0 | 10,879,000 | 10,879,000 | 0 | 0 | 2020-04-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 121,000 | 1.1 % | |
393 | 2020 | Kecamatan Daha Utara | Belanja Jasa Konsultan Pengawasan Rehab Aula Kecamatan Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3428282 | 23359636 | 11,000,000 | 11,000,000 | 10,879,000 | 0 | 10,879,000 | 10,879,000 | 0 | 0 | 2020-04-27 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 121,000 | 1.1 % | |
394 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3431282 | 23374005 | 6,000,000 | 5,984,000 | 5,912,500 | 5,912,500 | 5,852,000 | 5,852,000 | 0 | 0 | 2020-05-05 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 87,500 | 1.46 % | |
395 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan tanggul Batas Tanah Pada Daerah Irigasi Gumbil Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3431282 | 23374005 | 6,000,000 | 5,984,000 | 5,912,500 | 5,912,500 | 5,852,000 | 5,852,000 | 0 | 0 | 2020-05-05 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 87,500 | 1.46 % | |
396 | 2020 | Dinas Pertanian | Pengadaan bibit-benih tanaman cabe, tomat & bawang merah | Pengadaan Langsung | Pengadaan Barang | 3440282 | 24144830;24144831;24144832 | 112,052,000 | 107,462,863 | 107,362,900 | 107,362,900 | 107,362,900 | 107,362,900 | 0 | 0 | 2020-05-02 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,689,100 | 4.18 % | |
397 | 2020 | Dinas Pertanian | Pengadaan bibit-benih tanaman cabe, tomat & bawang merah | Pengadaan Langsung | Pengadaan Barang | 3440282 | 24144830;24144831;24144832 | 112,052,000 | 107,462,863 | 107,362,900 | 107,362,900 | 107,362,900 | 107,362,900 | 0 | 0 | 2020-05-02 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 4,689,100 | 4.18 % | |
398 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3441282 | 23823585 | 5,850,000 | 5,841,000 | 5,666,980 | 5,666,980 | 5,600,000 | 5,600,000 | 0 | 0 | 2020-05-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 183,020 | 3.13 % | |
399 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan SMPN 1 Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3441282 | 23823585 | 5,850,000 | 5,841,000 | 5,666,980 | 5,666,980 | 5,600,000 | 5,600,000 | 0 | 0 | 2020-05-04 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 183,020 | 3.13 % | |
400 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3444282 | 23357791 | 10,000,000 | 9,916,500 | 9,696,500 | 9,696,500 | 9,691,000 | 9,691,000 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 303,500 | 3.04 % | |
401 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3444282 | 23357791 | 10,000,000 | 9,916,500 | 9,696,500 | 9,696,500 | 9,691,000 | 9,691,000 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 303,500 | 3.04 % | |
402 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | belanja pengawasan pekerjaan Rehabilitasi Dinas PMPTSP Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3445282 | 24204164 | 13,000,000 | 12,650,000 | 12,600,500 | 0 | 12,600,500 | 0 | 0 | 0 | 2020-05-05 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 399,500 | 3.07 % | |
403 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai dari raba atau sampah di Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3448282 | 25612920 | 100,000,000 | 99,950,568 | 99,896,921 | 99,896,921 | 99,885,000 | 99,885,000 | 0 | 0 | 2020-05-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 103,079 | 0.1 % | |
404 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai dari raba atau sampah di Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3448282 | 25612920 | 100,000,000 | 99,950,568 | 99,896,921 | 99,896,921 | 99,885,000 | 99,885,000 | 0 | 0 | 2020-05-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 103,079 | 0.1 % | |
405 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan perencanaan rehab ringan ruang ibadah/mushalla dan ruang sanitasi/WC kantor Disporapar HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449282 | 24150577 | 8,000,000 | 7,997,000 | 7,887,000 | 0 | 7,887,000 | 7,887,000 | 0 | 0 | 2020-05-07 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 113,000 | 1.41 % | |
406 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Konsultan perencanaan rehab ringan ruang ibadah/mushalla dan ruang sanitasi/WC kantor Disporapar HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3449282 | 24150577 | 8,000,000 | 7,997,000 | 7,887,000 | 0 | 7,887,000 | 7,887,000 | 0 | 0 | 2020-05-07 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 113,000 | 1.41 % | |
407 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sirih 1 Kec.Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3454282 | 23795294 | 50,000,000 | 49,999,809 | 49,948,827 | 49,948,827 | 49,900,000 | 49,900,000 | 0 | 0 | 2020-05-08 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 51,173 | 0.1 % | |
408 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sirih 1 Kec.Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3454282 | 23795294 | 50,000,000 | 49,999,809 | 49,948,827 | 49,948,827 | 49,900,000 | 49,900,000 | 0 | 0 | 2020-05-08 | CV. MULTI MEDIA PERSADA | 02.918.025.4-733.000 | 51,173 | 0.1 % | |
409 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455282 | 23357381 | 10,000,000 | 9,916,500 | 9,718,500 | 9,718,500 | 9,713,000 | 9,713,000 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 281,500 | 2.82 % | |
410 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3455282 | 23357381 | 10,000,000 | 9,916,500 | 9,718,500 | 9,718,500 | 9,713,000 | 9,713,000 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 281,500 | 2.82 % | |
411 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456282 | 23356717 | 15,000,000 | 14,982,000 | 14,685,000 | 14,685,000 | 14,682,800 | 14,682,800 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 315,000 | 2.1 % | |
412 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3456282 | 23356717 | 15,000,000 | 14,982,000 | 14,685,000 | 14,685,000 | 14,682,800 | 14,682,800 | 0 | 0 | 2020-05-11 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 315,000 | 2.1 % | |
413 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3459282 | 23376006 | 150,000,000 | 149,982,715 | 149,862,237 | 149,848,290 | 149,805,000 | 149,805,000 | 0 | 0 | 2020-05-12 | CV. YONIA | 02.089.778.1-733.000 | 137,763 | 0.09 % | |
414 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3459282 | 23376006 | 150,000,000 | 149,982,715 | 149,862,237 | 149,848,290 | 149,805,000 | 149,805,000 | 0 | 0 | 2020-05-12 | CV. YONIA | 02.089.778.1-733.000 | 137,763 | 0.09 % | |
415 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai Desa Lokbinuang sampai Sungai Taniran Kubah | Pengadaan Langsung | Pekerjaan Konstruksi | 3462282 | 23352126 | 98,900,000 | 98,880,364 | 98,803,832 | 98,803,832 | 98,781,832 | 98,781,832 | 0 | 0 | 2020-05-14 | CV. An-Nidha | 02.675.485.3-733.000 | 96,168 | 0.1 % | |
416 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Sungai Desa Lokbinuang sampai Sungai Taniran Kubah | Pengadaan Langsung | Pekerjaan Konstruksi | 3462282 | 23352126 | 98,900,000 | 98,880,364 | 98,803,832 | 98,803,832 | 98,781,832 | 98,781,832 | 0 | 0 | 2020-05-14 | CV. An-Nidha | 02.675.485.3-733.000 | 96,168 | 0.1 % | |
417 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malinau Kamawakan Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466282 | 23348603 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,500,000 | 49,500,000 | 0 | 0 | 2020-07-24 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
418 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malinau Kamawakan Kec. Loksado (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3466282 | 23348603 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,500,000 | 49,500,000 | 0 | 0 | 2020-07-24 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
419 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3473282 | 23351960 | 200,000,000 | 199,967,509 | 199,747,509 | 0 | 199,742,009 | 199,742,009 | 0 | 0 | 2020-05-18 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 252,491 | 0.13 % | |
420 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3473282 | 23351960 | 200,000,000 | 199,967,509 | 199,747,509 | 0 | 199,742,009 | 199,742,009 | 0 | 0 | 2020-05-18 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 252,491 | 0.13 % | |
421 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Pekapuran Kecil Tambangan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3474282 | 23372870 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-07-24 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
422 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Pekapuran Kecil Tambangan Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3474282 | 23372870 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,450,000 | 49,450,000 | 0 | 0 | 2020-07-24 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
423 | 2020 | Kecamatan Simpur | Pembuatan pagar rumah jabatan camat | Pengadaan Langsung | Pekerjaan Konstruksi | 3475282 | 25739545 | 176,904,550 | 176,056,737 | 175,271,980 | 0 | 175,271,980 | 175,271,980 | 0 | 0 | 2020-06-05 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,632,570 | 0.92 % | |
424 | 2020 | Kecamatan Simpur | Pembuatan pagar rumah jabatan camat | Pengadaan Langsung | Pekerjaan Konstruksi | 3475282 | 25739545 | 176,904,550 | 176,056,737 | 175,271,980 | 0 | 175,271,980 | 175,271,980 | 0 | 0 | 2020-06-05 | NATA NUSA BORNEO | 81.380.022.4-733.000 | 1,632,570 | 0.92 % | |
425 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan pengawasan/supervisi jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476282 | 24304552 | 100,000,000 | 99,990,000 | 98,834,560 | 98,834,560 | 98,834,560 | 98,834,560 | 0 | 0 | 2020-05-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,165,440 | 1.17 % | |
426 | 2020 | BADAN PENANGGULANGAN BENCANA KESATUAN BANGSA DAN POLITIK | Belanja jasa konsultan pengawasan/supervisi jembatan danau kasai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3476282 | 24304552 | 100,000,000 | 99,990,000 | 98,834,560 | 98,834,560 | 98,834,560 | 98,834,560 | 0 | 0 | 2020-05-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,165,440 | 1.17 % | |
427 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479282 | 23381083 | 10,000,000 | 9,999,000 | 9,955,000 | 9,955,000 | 9,952,800 | 9,952,800 | 0 | 0 | 2020-06-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 45,000 | 0.45 % | |
428 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing di Sekitar MTsN Simpur Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3479282 | 23381083 | 10,000,000 | 9,999,000 | 9,955,000 | 9,955,000 | 9,952,800 | 9,952,800 | 0 | 0 | 2020-06-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 45,000 | 0.45 % | |
429 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480282 | 23545228 | 43,270,794 | 43,236,570 | 42,672,273 | 42,672,273 | 42,672,000 | 42,672,000 | 0 | 0 | 2020-08-19 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 598,522 | 1.38 % | |
430 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pengadaan Paving Blok Halaman Depan IGD dan Gedung 3 Lantai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3480282 | 23545228 | 43,270,794 | 43,236,570 | 42,672,273 | 42,672,273 | 42,672,000 | 42,672,000 | 0 | 0 | 2020-08-19 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 598,522 | 1.38 % | |
431 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3481282 | 23374981 | 180,000,000 | 179,587,630 | 178,175,169 | 178,175,169 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-06-08 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,824,831 | 1.01 % | |
432 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Kalumpang Baruh Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3481282 | 23374981 | 180,000,000 | 179,587,630 | 178,175,169 | 178,175,169 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-06-08 | CV. HARUS MANDIRI | 02.746.558.2-733.000 | 1,824,831 | 1.01 % | |
433 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan di desa Bago Tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482282 | 23372203 | 50,000,000 | 49,824,170 | 49,525,300 | 49,525,300 | 49,525,000 | 49,525,000 | 0 | 0 | 2020-07-22 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 474,700 | 0.95 % | |
434 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan di desa Bago Tanggul Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3482282 | 23372203 | 50,000,000 | 49,824,170 | 49,525,300 | 49,525,300 | 49,525,000 | 49,525,000 | 0 | 0 | 2020-07-22 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 474,700 | 0.95 % | |
435 | 2020 | Dinas Perhubungan | Pengadaan Rambu-Rambu Lalu Lintas | Pengadaan Langsung | Pengadaan Barang | 3483282 | 25777613 | 35,800,000 | 35,797,300 | 35,585,000 | 0 | 35,585,000 | 35,585,000 | 0 | 0 | 2020-06-02 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 215,000 | 0.6 % | |
436 | 2020 | Dinas Perhubungan | Pengadaan Rambu-Rambu Lalu Lintas | Pengadaan Langsung | Pengadaan Barang | 3483282 | 25777613 | 35,800,000 | 35,797,300 | 35,585,000 | 0 | 35,585,000 | 35,585,000 | 0 | 0 | 2020-06-02 | KARYA NISA MANDIRI | 83.780.647.0-733.000 | 215,000 | 0.6 % | |
437 | 2020 | Dinas Pertanian | Pengembangan Jagung Hibrida | Pengadaan Langsung | Pengadaan Barang | 3492282 | 24120050 | 72,400,000 | 65,199,200 | 65,076,000 | 65,076,000 | 65,076,000 | 65,076,000 | 0 | 0 | 2020-06-02 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 7,324,000 | 10.12 % | |
438 | 2020 | Dinas Pertanian | Pengembangan Jagung Hibrida | Pengadaan Langsung | Pengadaan Barang | 3492282 | 24120050 | 72,400,000 | 65,199,200 | 65,076,000 | 65,076,000 | 65,076,000 | 65,076,000 | 0 | 0 | 2020-06-02 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 7,324,000 | 10.12 % | |
439 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3495282 | 23372542 | 196,850,000 | 195,336,135 | 195,332,835 | 0 | 195,330,636 | 195,330,636 | 0 | 0 | 2020-06-05 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 1,517,165 | 0.77 % | |
440 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3495282 | 23372542 | 196,850,000 | 195,336,135 | 195,332,835 | 0 | 195,330,636 | 195,330,636 | 0 | 0 | 2020-06-05 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 1,517,165 | 0.77 % | |
441 | 2020 | Dinas Kesehatan | Perbaikan pagar dan tempat parkir Puskesmas Wasah | Pengadaan Langsung | Pekerjaan Konstruksi | 3496282 | 23970079 | 150,000,000 | 149,971,766 | 149,555,298 | 0 | 149,555,000 | 149,555,000 | 0 | 0 | 2020-07-02 | CV. AISY | 75.132.070.6-733.000 | 444,702 | 0.3 % | |
442 | 2020 | Dinas Kesehatan | Perbaikan pagar dan tempat parkir Puskesmas Wasah | Pengadaan Langsung | Pekerjaan Konstruksi | 3496282 | 23970079 | 150,000,000 | 149,971,766 | 149,555,298 | 0 | 149,555,000 | 149,555,000 | 0 | 0 | 2020-07-02 | CV. AISY | 75.132.070.6-733.000 | 444,702 | 0.3 % | |
443 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Haritas Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3497282 | 23368973 | 199,500,000 | 199,499,004 | 199,336,464 | 199,336,464 | 199,188,000 | 199,188,000 | 0 | 0 | 2020-06-10 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 163,536 | 0.08 % | |
444 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu Jalan Haritas Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3497282 | 23368973 | 199,500,000 | 199,499,004 | 199,336,464 | 199,336,464 | 199,188,000 | 199,188,000 | 0 | 0 | 2020-06-10 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 163,536 | 0.08 % | |
445 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Telaga Bidadari - Desa Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 3501282 | 22949603 | 110,000,000 | 109,952,709 | 109,160,323 | 109,160,323 | 108,960,000 | 108,960,000 | 0 | 0 | 2020-06-10 | cv mentari teknik | 03.183.412.0-731.000 | 839,677 | 0.76 % | |
446 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Telaga Bidadari - Desa Kapuh | Pengadaan Langsung | Pekerjaan Konstruksi | 3501282 | 22949603 | 110,000,000 | 109,952,709 | 109,160,323 | 109,160,323 | 108,960,000 | 108,960,000 | 0 | 0 | 2020-06-10 | cv mentari teknik | 03.183.412.0-731.000 | 839,677 | 0.76 % | |
447 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3502282 | 22994446 | 75,000,000 | 74,938,230 | 74,429,830 | 74,429,830 | 74,300,000 | 74,300,000 | 0 | 0 | 2020-06-10 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 570,170 | 0.76 % | |
448 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Kecamatan Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3502282 | 22994446 | 75,000,000 | 74,938,230 | 74,429,830 | 74,429,830 | 74,300,000 | 74,300,000 | 0 | 0 | 2020-06-10 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 570,170 | 0.76 % | |
449 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Ambarai - Desa Madang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3503282 | 22994154 | 65,000,000 | 64,916,636 | 64,543,102 | 64,543,102 | 64,335,000 | 64,335,000 | 0 | 0 | 2020-06-10 | cv mentari teknik | 03.183.412.0-731.000 | 456,898 | 0.7 % | |
450 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Ambarai - Desa Madang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3503282 | 22994154 | 65,000,000 | 64,916,636 | 64,543,102 | 64,543,102 | 64,335,000 | 64,335,000 | 0 | 0 | 2020-06-10 | cv mentari teknik | 03.183.412.0-731.000 | 456,898 | 0.7 % | |
451 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3504282 | 22950891 | 17,800,000 | 17,765,000 | 17,600,000 | 17,600,000 | 17,535,000 | 17,535,000 | 0 | 0 | 2020-06-10 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 200,000 | 1.12 % | |
452 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Rehabilitasi PJU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3504282 | 22950891 | 17,800,000 | 17,765,000 | 17,600,000 | 17,600,000 | 17,535,000 | 17,535,000 | 0 | 0 | 2020-06-10 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 200,000 | 1.12 % | |
453 | 2020 | Dinas Pertanian | Pengembangan Kacang Tanah | Pengadaan Langsung | Pengadaan Barang | 3505282 | 25745784 | 159,775,000 | 137,358,375 | 137,196,675 | 137,196,675 | 137,196,675 | 137,196,675 | 0 | 0 | 2020-06-10 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 22,578,325 | 14.13 % | |
454 | 2020 | Dinas Pertanian | Pengembangan Kacang Tanah | Pengadaan Langsung | Pengadaan Barang | 3505282 | 25745784 | 159,775,000 | 137,358,375 | 137,196,675 | 137,196,675 | 137,196,675 | 137,196,675 | 0 | 0 | 2020-06-10 | CV. NAJMY MEGAKARYA MULIA | 73.743.338.3-733.000 | 22,578,325 | 14.13 % | |
455 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3507282 | 23368433 | 199,325,000 | 199,268,642 | 198,858,634 | 198,858,634 | 198,650,000 | 198,650,000 | 0 | 0 | 2020-06-16 | CV.ASYA | 01.424.566.6-733.000 | 466,366 | 0.23 % | |
456 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3507282 | 23368433 | 199,325,000 | 199,268,642 | 198,858,634 | 198,858,634 | 198,650,000 | 198,650,000 | 0 | 0 | 2020-06-16 | CV.ASYA | 01.424.566.6-733.000 | 466,366 | 0.23 % | |
457 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510282 | 23373527 | 6,000,000 | 5,885,000 | 5,882,800 | 0 | 5,879,500 | 5,879,500 | 0 | 0 | 2020-06-11 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 117,200 | 1.95 % | |
458 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier Usulan Kelompok Tani Tunas Harapan dan Kelompok Tani Harapan Masa Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3510282 | 23373527 | 6,000,000 | 5,885,000 | 5,882,800 | 0 | 5,879,500 | 5,879,500 | 0 | 0 | 2020-06-11 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 117,200 | 1.95 % | |
459 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3511282 | 23969958 | 80,000,000 | 79,788,500 | 79,237,250 | 0 | 79,237,250 | 79,237,250 | 0 | 0 | 2020-07-06 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 762,750 | 0.95 % | |
460 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Puskesmas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3511282 | 23969958 | 80,000,000 | 79,788,500 | 79,237,250 | 0 | 79,237,250 | 79,237,250 | 0 | 0 | 2020-07-06 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 762,750 | 0.95 % | |
461 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bakarung (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3517282 | 23352688 | 100,000,000 | 99,987,203 | 99,986,103 | 99,986,103 | 99,982,703 | 99,982,703 | 0 | 0 | 2020-06-17 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 13,897 | 0.01 % | |
462 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bakarung (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3517282 | 23352688 | 100,000,000 | 99,987,203 | 99,986,103 | 99,986,103 | 99,982,703 | 99,982,703 | 0 | 0 | 2020-06-17 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 13,897 | 0.01 % | |
463 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3518282 | 24275833 | 10,600,000 | 10,583,012 | 10,522,512 | 0 | 10,522,500 | 10,522,500 | 0 | 0 | 2020-06-22 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 77,488 | 0.73 % | |
464 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3518282 | 24275833 | 10,600,000 | 10,583,012 | 10,522,512 | 0 | 10,522,500 | 10,522,500 | 0 | 0 | 2020-06-22 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 77,488 | 0.73 % | |
465 | 2020 | Sekretariat DPRD | Belanja Pakaian Dinas Anggota DPRD Periode 2019-2024 | Pengadaan Langsung | Pengadaan Barang | 3519282 | 23500030;23500031;23500032;23500033 | 163,500,000 | 163,500,000 | 162,300,000 | 0 | 162,300,000 | 0 | 0 | 0 | 2020-06-18 | CV. AL MADINAH | 66.139.132.6-733.000 | 1,200,000 | 0.73 % | |
466 | 2020 | Sekretariat DPRD | Belanja Pakaian Dinas Anggota DPRD Periode 2019-2024 | Pengadaan Langsung | Pengadaan Barang | 3519282 | 23500030;23500031;23500032;23500033 | 163,500,000 | 163,500,000 | 162,300,000 | 0 | 162,300,000 | 0 | 0 | 0 | 2020-06-18 | CV. AL MADINAH | 66.139.132.6-733.000 | 1,200,000 | 0.73 % | |
467 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Jambu Hulu - Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 3520282 | 22994657 | 150,000,000 | 149,595,230 | 148,977,438 | 148,977,438 | 148,820,000 | 148,820,000 | 0 | 0 | 2020-06-19 | cv mentari teknik | 03.183.412.0-731.000 | 1,022,562 | 0.68 % | |
468 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Jambu Hulu - Tanah Bangkang | Pengadaan Langsung | Pekerjaan Konstruksi | 3520282 | 22994657 | 150,000,000 | 149,595,230 | 148,977,438 | 148,977,438 | 148,820,000 | 148,820,000 | 0 | 0 | 2020-06-19 | cv mentari teknik | 03.183.412.0-731.000 | 1,022,562 | 0.68 % | |
469 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Gambir - Desa Sungai Damang | Pengadaan Langsung | Pekerjaan Konstruksi | 3521282 | 22994320 | 45,000,000 | 44,908,789 | 44,496,332 | 44,496,332 | 44,345,000 | 44,345,000 | 0 | 0 | 2020-06-19 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 503,668 | 1.12 % | |
470 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi PJU Desa Gambir - Desa Sungai Damang | Pengadaan Langsung | Pekerjaan Konstruksi | 3521282 | 22994320 | 45,000,000 | 44,908,789 | 44,496,332 | 44,496,332 | 44,345,000 | 44,345,000 | 0 | 0 | 2020-06-19 | CAHAYA EMPAT PILAR | 15.816.244.6-731.000 | 503,668 | 1.12 % | |
471 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3532282 | 23352029 | 183,900,000 | 183,867,598 | 183,537,598 | 183,537,598 | 183,427,598 | 183,427,598 | 0 | 0 | 2020-06-24 | CV.ASYA | 01.424.566.6-733.000 | 362,402 | 0.2 % | |
472 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3532282 | 23352029 | 183,900,000 | 183,867,598 | 183,537,598 | 183,537,598 | 183,427,598 | 183,427,598 | 0 | 0 | 2020-06-24 | CV.ASYA | 01.424.566.6-733.000 | 362,402 | 0.2 % | |
473 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3535282 | 25814721 | 134,000,000 | 133,981,728 | 133,899,228 | 133,899,228 | 133,888,228 | 133,888,228 | 0 | 0 | 2020-06-25 | Muda Membangun | 73.702.709.4-733.000 | 100,772 | 0.08 % | |
474 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 3535282 | 25814721 | 134,000,000 | 133,981,728 | 133,899,228 | 133,899,228 | 133,888,228 | 133,888,228 | 0 | 0 | 2020-06-25 | Muda Membangun | 73.702.709.4-733.000 | 100,772 | 0.08 % | |
475 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Bangunan Bank Sampah Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 3536282 | 24550473 | 150,000,000 | 149,958,975 | 149,501,843 | 149,501,843 | 149,390,000 | 149,390,000 | 0 | 0 | 2020-06-25 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 498,157 | 0.33 % | |
476 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rehabilitasi Bangunan Bank Sampah Induk | Pengadaan Langsung | Pekerjaan Konstruksi | 3536282 | 24550473 | 150,000,000 | 149,958,975 | 149,501,843 | 149,501,843 | 149,390,000 | 149,390,000 | 0 | 0 | 2020-06-25 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 498,157 | 0.33 % | |
477 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Gerobak Sampah | Pengadaan Langsung | Pengadaan Barang | 3537282 | 23040448 | 100,000,000 | 99,875,000 | 99,800,000 | 99,800,000 | 99,625,000 | 99,625,000 | 0 | 0 | 2020-06-25 | FADWI UTAMA | 94.246.044.5-733.000 | 200,000 | 0.2 % | |
478 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Gerobak Sampah | Pengadaan Langsung | Pengadaan Barang | 3537282 | 23040448 | 100,000,000 | 99,875,000 | 99,800,000 | 99,800,000 | 99,625,000 | 99,625,000 | 0 | 0 | 2020-06-25 | FADWI UTAMA | 94.246.044.5-733.000 | 200,000 | 0.2 % | |
479 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Hamayung Hakurung, Kec. Daha Utara (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3538282 | 23348458 | 200,000,000 | 199,898,050 | 199,650,602 | 199,650,602 | 198,986,000 | 198,986,000 | 0 | 0 | 2020-06-25 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 349,398 | 0.17 % | |
480 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jalan Hamayung Hakurung, Kec. Daha Utara (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3538282 | 23348458 | 200,000,000 | 199,898,050 | 199,650,602 | 199,650,602 | 198,986,000 | 198,986,000 | 0 | 0 | 2020-06-25 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 349,398 | 0.17 % | |
481 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan gorong gorong di Jl. Teluk Pinang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3539282 | 23368300 | 100,000,000 | 99,878,440 | 99,491,673 | 99,491,673 | 99,228,200 | 99,228,200 | 0 | 0 | 2020-06-25 | cv. bumi mandiri | 02.089.892.0-733.000 | 508,327 | 0.51 % | |
482 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan gorong gorong di Jl. Teluk Pinang Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3539282 | 23368300 | 100,000,000 | 99,878,440 | 99,491,673 | 99,491,673 | 99,228,200 | 99,228,200 | 0 | 0 | 2020-06-25 | cv. bumi mandiri | 02.089.892.0-733.000 | 508,327 | 0.51 % | |
483 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Pengawasan (DAU Tambahan)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543282 | 25884197 | 6,055,000 | 6,035,480 | 5,980,150 | 0 | 5,980,150 | 5,980,150 | 0 | 0 | 2020-06-25 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 74,850 | 1.24 % | |
484 | 2020 | Kecamatan Kandangan | Belanja Jasa Perencanaan dan Pengawasan (Konsultan Pengawasan (DAU Tambahan)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3543282 | 25884197 | 6,055,000 | 6,035,480 | 5,980,150 | 0 | 5,980,150 | 5,980,150 | 0 | 0 | 2020-06-25 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 74,850 | 1.24 % | |
485 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 3544282 | 23970286 | 185,000,000 | 179,633,363 | 179,103,072 | 179,103,072 | 179,000,000 | 179,000,000 | 0 | 0 | 2020-07-13 | CV. YONIA | 02.089.778.1-733.000 | 5,896,928 | 3.19 % | |
486 | 2020 | Dinas Kesehatan | Rehabilitasi Poskesdes Banua Hanyar | Pengadaan Langsung | Pekerjaan Konstruksi | 3544282 | 23970286 | 185,000,000 | 179,633,363 | 179,103,072 | 179,103,072 | 179,000,000 | 179,000,000 | 0 | 0 | 2020-07-13 | CV. YONIA | 02.089.778.1-733.000 | 5,896,928 | 3.19 % | |
487 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3545282 | 25587192 | 6,000,000 | 5,999,988 | 5,900,451 | 5,900,451 | 5,750,000 | 5,750,000 | 0 | 0 | 2020-06-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 99,549 | 1.66 % | |
488 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Rehabilitasi Bank Sampah Induk | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3545282 | 25587192 | 6,000,000 | 5,999,988 | 5,900,451 | 5,900,451 | 5,750,000 | 5,750,000 | 0 | 0 | 2020-06-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 99,549 | 1.66 % | |
489 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548282 | 23544829 | 20,847,897 | 20,815,506 | 20,785,600 | 20,785,600 | 20,785,600 | 20,785,600 | 0 | 0 | 2020-07-02 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,297 | 0.3 % | |
490 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Gedung Workshop IPSRS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3548282 | 23544829 | 20,847,897 | 20,815,506 | 20,785,600 | 20,785,600 | 20,785,600 | 20,785,600 | 0 | 0 | 2020-07-02 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 62,297 | 0.3 % | |
491 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bak Sampah Beroda 120 L | Pengadaan Langsung | Pengadaan Barang | 3550282 | 23033687 | 60,000,000 | 59,750,000 | 59,650,000 | 59,650,000 | 59,500,000 | 59,500,000 | 0 | 0 | 2020-07-02 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 350,000 | 0.58 % | |
492 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Bak Sampah Beroda 120 L | Pengadaan Langsung | Pengadaan Barang | 3550282 | 23033687 | 60,000,000 | 59,750,000 | 59,650,000 | 59,650,000 | 59,500,000 | 59,500,000 | 0 | 0 | 2020-07-02 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 350,000 | 0.58 % | |
493 | 2020 | Kecamatan Kandangan | Pengadaan Mesin dan Peralatan Pemadam Kebakaran Portable | Pengadaan Langsung | Pengadaan Barang | 3551282 | 24283538 | 75,000,000 | 74,700,000 | 74,670,000 | 0 | 74,670,000 | 74,670,000 | 0 | 0 | 2020-07-02 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 330,000 | 0.44 % | |
494 | 2020 | Kecamatan Kandangan | Pengadaan Mesin dan Peralatan Pemadam Kebakaran Portable | Pengadaan Langsung | Pengadaan Barang | 3551282 | 24283538 | 75,000,000 | 74,700,000 | 74,670,000 | 0 | 74,670,000 | 74,670,000 | 0 | 0 | 2020-07-02 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 330,000 | 0.44 % | |
495 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3552282 | 23544933 | 10,000,000 | 9,937,436 | 9,898,900 | 9,898,900 | 9,898,900 | 9,898,900 | 0 | 0 | 2020-07-13 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 101,100 | 1.01 % | |
496 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3552282 | 23544933 | 10,000,000 | 9,937,436 | 9,898,900 | 9,898,900 | 9,898,900 | 9,898,900 | 0 | 0 | 2020-07-13 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 101,100 | 1.01 % | |
497 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Pengadaan Langsung | Pengadaan Barang | 3553282 | 25178367 | 150,000,000 | 147,750,000 | 147,450,000 | 147,450,000 | 147,300,000 | 147,300,000 | 0 | 0 | 2020-07-06 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 2,550,000 | 1.7 % | |
498 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pengadaan Kontainer Sampah | Pengadaan Langsung | Pengadaan Barang | 3553282 | 25178367 | 150,000,000 | 147,750,000 | 147,450,000 | 147,450,000 | 147,300,000 | 147,300,000 | 0 | 0 | 2020-07-06 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 2,550,000 | 1.7 % | |
499 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan gorong gorong di Jl. Teluk Pinang, Siring Pasangan Batu Jalan Haritas dan Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554282 | 23369141 | 36,000,000 | 34,882,100 | 34,710,500 | 34,710,500 | 34,550,000 | 34,550,000 | 0 | 0 | 2020-07-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,289,500 | 3.58 % | |
500 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perbaikan gorong gorong di Jl. Teluk Pinang, Siring Pasangan Batu Jalan Haritas dan Perbaikan drainase di Desa Batang Kulur Kiri Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3554282 | 23369141 | 36,000,000 | 34,882,100 | 34,710,500 | 34,710,500 | 34,550,000 | 34,550,000 | 0 | 0 | 2020-07-08 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,289,500 | 3.58 % | |
501 | 2020 | Sekretariat Daerah | Pengadaan Laptop dan Printer Scan | Pengadaan Langsung | Pengadaan Barang | 3555282 | 25911417;25912035 | 61,872,000 | 61,872,000 | 61,800,000 | 0 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-07-06 | CV. HITRO | 02.918.384.5-733.000 | 72,000 | 0.12 % | |
502 | 2020 | Sekretariat Daerah | Pengadaan Laptop dan Printer Scan | Pengadaan Langsung | Pengadaan Barang | 3555282 | 25911417;25912035 | 61,872,000 | 61,872,000 | 61,800,000 | 0 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-07-06 | CV. HITRO | 02.918.384.5-733.000 | 72,000 | 0.12 % | |
503 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bakarung (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3556282 | 23355526 | 4,800,000 | 4,800,000 | 4,798,001 | 4,798,000 | 4,793,600 | 4,793,600 | 0 | 0 | 2020-08-03 | Jamilah | 14.427.417.2-733.000 | 1,999 | 0.04 % | |
504 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bakarung (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3556282 | 23355526 | 4,800,000 | 4,800,000 | 4,798,001 | 4,798,000 | 4,793,600 | 4,793,600 | 0 | 0 | 2020-08-03 | Jamilah | 14.427.417.2-733.000 | 1,999 | 0.04 % | |
505 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Samuda Bajayau, Kec. Daha Barat (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3559282 | 23348775 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 500,000 | 1 % | |
506 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Samuda Bajayau, Kec. Daha Barat (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3559282 | 23348775 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 500,000 | 1 % | |
507 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3560282 | 23370895 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | Wing Rastafarindo | 03.282.590.3-732.000 | 500,000 | 1 % | |
508 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penanganan Longsor di Desa Jelatang Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3560282 | 23370895 | 50,000,000 | 49,824,170 | 49,500,000 | 49,500,000 | 49,100,000 | 49,100,000 | 0 | 0 | 2020-07-13 | Wing Rastafarindo | 03.282.590.3-732.000 | 500,000 | 1 % | |
509 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di ruas Bajayau - Bajayau Tengah Kec. Daha Barat, di Samuda Kec. Daha Selatan (lanjutan) dan di ruas Kalumpang - Baruh Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563282 | 25932527 | 51,300,000 | 42,574,840 | 42,130,000 | 42,130,000 | 42,000,000 | 42,000,000 | 0 | 0 | 2020-07-10 | CV. FATAH CONSULINDO PANDANA | 74.073.449.6-733.000 | 9,170,000 | 17.88 % | |
510 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di ruas Bajayau - Bajayau Tengah Kec. Daha Barat, di Samuda Kec. Daha Selatan (lanjutan) dan di ruas Kalumpang - Baruh Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3563282 | 25932527 | 51,300,000 | 42,574,840 | 42,130,000 | 42,130,000 | 42,000,000 | 42,000,000 | 0 | 0 | 2020-07-10 | CV. FATAH CONSULINDO PANDANA | 74.073.449.6-733.000 | 9,170,000 | 17.88 % | |
511 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Hamayung Hakurung (lanjutan), Jl. Telaga Bidadari dan Pembuatan Drainase Jl. Bakarung Tabihi, Kec.Daha Utara/Sungai Raya/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3565282 | 23349289 | 48,000,000 | 45,895,300 | 45,666,500 | 45,666,500 | 45,500,000 | 45,500,000 | 0 | 0 | 2020-07-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,333,500 | 4.86 % | |
512 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Hamayung Hakurung (lanjutan), Jl. Telaga Bidadari dan Pembuatan Drainase Jl. Bakarung Tabihi, Kec.Daha Utara/Sungai Raya/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3565282 | 23349289 | 48,000,000 | 45,895,300 | 45,666,500 | 45,666,500 | 45,500,000 | 45,500,000 | 0 | 0 | 2020-07-10 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,333,500 | 4.86 % | |
513 | 2020 | Dinas Kesehatan | Pengadaan peralatan keamanan dan sarana penyimpanan IFK | Pengadaan Langsung | Pengadaan Barang | 3567282 | 25938189 | 199,877,000 | 179,720,000 | 179,608,000 | 179,608,000 | 179,508,000 | 179,508,000 | 0 | 0 | 2020-07-12 | KARYA DWI CHADE | 75.416.433.3-733.000 | 20,269,000 | 10.14 % | |
514 | 2020 | Dinas Kesehatan | Pengadaan peralatan keamanan dan sarana penyimpanan IFK | Pengadaan Langsung | Pengadaan Barang | 3567282 | 25938189 | 199,877,000 | 179,720,000 | 179,608,000 | 179,608,000 | 179,508,000 | 179,508,000 | 0 | 0 | 2020-07-12 | KARYA DWI CHADE | 75.416.433.3-733.000 | 20,269,000 | 10.14 % | |
515 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Dance Sports/ Multifungsi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568282 | 23329274 | 50,000,000 | 50,000,000 | 49,500,000 | 49,500,000 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-08-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 1 % | |
516 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Dance Sports/ Multifungsi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3568282 | 23329274 | 50,000,000 | 50,000,000 | 49,500,000 | 49,500,000 | 49,445,000 | 49,445,000 | 0 | 0 | 2020-08-07 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 500,000 | 1 % | |
517 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Olah Raga dan Seni (GOS) Aluh Idut Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569282 | 23329294 | 50,000,000 | 50,000,000 | 49,329,992 | 49,329,992 | 49,291,000 | 49,291,000 | 0 | 0 | 2020-07-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 670,008 | 1.34 % | |
518 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rehabilitasi Gedung Olah Raga dan Seni (GOS) Aluh Idut Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3569282 | 23329294 | 50,000,000 | 50,000,000 | 49,329,992 | 49,329,992 | 49,291,000 | 49,291,000 | 0 | 0 | 2020-07-23 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 670,008 | 1.34 % | |
519 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli Kawasan Stadion 2 Desember | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3570282 | 23329254 | 75,000,000 | 75,000,000 | 74,525,000 | 74,525,000 | 74,150,000 | 74,150,000 | 0 | 0 | 2020-07-28 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 475,000 | 0.63 % | |
520 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Lapangan Voli Kawasan Stadion 2 Desember | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3570282 | 23329254 | 75,000,000 | 75,000,000 | 74,525,000 | 74,525,000 | 74,150,000 | 74,150,000 | 0 | 0 | 2020-07-28 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 475,000 | 0.63 % | |
521 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Siring Lahan Islamic Center (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572282 | 23329141 | 39,750,000 | 39,750,000 | 39,330,500 | 39,330,500 | 39,100,000 | 39,100,000 | 0 | 0 | 2020-08-11 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 419,500 | 1.06 % | |
522 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Siring Lahan Islamic Center (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3572282 | 23329141 | 39,750,000 | 39,750,000 | 39,330,500 | 39,330,500 | 39,100,000 | 39,100,000 | 0 | 0 | 2020-08-11 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 419,500 | 1.06 % | |
523 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574282 | 22914049 | 8,000,000 | 7,933,475 | 7,862,041 | 7,862,041 | 7,773,000 | 7,773,000 | 0 | 0 | 2020-07-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 137,959 | 1.72 % | |
524 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan Tugu Desa Longawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3574282 | 22914049 | 8,000,000 | 7,933,475 | 7,862,041 | 7,862,041 | 7,773,000 | 7,773,000 | 0 | 0 | 2020-07-10 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 137,959 | 1.72 % | |
525 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Tugu Desa Longawang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3575282 | 22910727 | 200,000,000 | 199,927,197 | 199,506,945 | 199,506,945 | 198,978,000 | 198,978,000 | 0 | 0 | 2020-07-13 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 493,055 | 0.25 % | |
526 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Tugu Desa Longawang (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3575282 | 22910727 | 200,000,000 | 199,927,197 | 199,506,945 | 199,506,945 | 198,978,000 | 198,978,000 | 0 | 0 | 2020-07-13 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 493,055 | 0.25 % | |
527 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Bajayau Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3577282 | 23374546 | 198,000,000 | 196,168,777 | 194,857,193 | 194,857,193 | 194,846,168 | 194,846,168 | 0 | 0 | 2020-07-10 | CV. LALUNA DANA | 02.237.179.3-733.000 | 3,142,807 | 1.59 % | |
528 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas Bajayau Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3577282 | 23374546 | 198,000,000 | 196,168,777 | 194,857,193 | 194,857,193 | 194,846,168 | 194,846,168 | 0 | 0 | 2020-07-10 | CV. LALUNA DANA | 02.237.179.3-733.000 | 3,142,807 | 1.59 % | |
529 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Lapangan SMPN 1 Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3582282 | 23890606 | 9,000,000 | 9,000,000 | 8,718,600 | 8,718,600 | 8,700,000 | 8,700,000 | 0 | 0 | 2020-07-11 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 281,400 | 3.13 % | |
530 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi Lapangan SMPN 1 Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3582282 | 23890606 | 9,000,000 | 9,000,000 | 8,718,600 | 8,718,600 | 8,700,000 | 8,700,000 | 0 | 0 | 2020-07-11 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 281,400 | 3.13 % | |
531 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SMP) | Pengadaan Langsung | Pengadaan Barang | 3587282 | 25993851 | 84,000,000 | 82,480,000 | 81,637,600 | 81,637,600 | 81,500,000 | 81,500,000 | 0 | 0 | 2020-07-15 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 2,362,400 | 2.81 % | |
532 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SMP) | Pengadaan Langsung | Pengadaan Barang | 3587282 | 25993851 | 84,000,000 | 82,480,000 | 81,637,600 | 81,637,600 | 81,500,000 | 81,500,000 | 0 | 0 | 2020-07-15 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 2,362,400 | 2.81 % | |
533 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 3590282 | 25417846 | 200,000,000 | 199,936,749 | 199,777,249 | 199,777,249 | 199,150,000 | 199,150,000 | 0 | 0 | 2020-08-07 | CV. KARYA UTAMA | 02.215.867.9-732.000 | 222,751 | 0.11 % | |
534 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 3590282 | 25417846 | 200,000,000 | 199,936,749 | 199,777,249 | 199,777,249 | 199,150,000 | 199,150,000 | 0 | 0 | 2020-08-07 | CV. KARYA UTAMA | 02.215.867.9-732.000 | 222,751 | 0.11 % | |
535 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Media Pendidikan (SMP) | Pengadaan Langsung | Pengadaan Barang | 3591282 | 25993862 | 84,000,000 | 79,669,800 | 78,872,200 | 78,872,200 | 78,800,000 | 78,800,000 | 0 | 0 | 2020-07-13 | CV. e_Caracter | 75.998.700.1-733.000 | 5,127,800 | 6.1 % | |
536 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Media Pendidikan (SMP) | Pengadaan Langsung | Pengadaan Barang | 3591282 | 25993862 | 84,000,000 | 79,669,800 | 78,872,200 | 78,872,200 | 78,800,000 | 78,800,000 | 0 | 0 | 2020-07-13 | CV. e_Caracter | 75.998.700.1-733.000 | 5,127,800 | 6.1 % | |
537 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga/Praktek Sekolah Lain-lain (SD) | Pengadaan Langsung | Pengadaan Barang | 3592282 | 25993868 | 120,000,000 | 89,586,000 | 89,540,000 | 89,540,000 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-07-14 | CV. RIVINA | 02.746.832.1-733.000 | 30,460,000 | 25.38 % | |
538 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga/Praktek Sekolah Lain-lain (SD) | Pengadaan Langsung | Pengadaan Barang | 3592282 | 25993868 | 120,000,000 | 89,586,000 | 89,540,000 | 89,540,000 | 89,500,000 | 89,500,000 | 0 | 0 | 2020-07-14 | CV. RIVINA | 02.746.832.1-733.000 | 30,460,000 | 25.38 % | |
539 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SD) | Pengadaan Langsung | Pengadaan Barang | 3593282 | 25993867 | 168,000,000 | 152,727,760 | 152,552,554 | 152,552,554 | 152,500,000 | 152,500,000 | 0 | 0 | 2020-07-16 | CV. An-Nidha | 02.675.485.3-733.000 | 15,447,446 | 9.19 % | |
540 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Olahraga (SD) | Pengadaan Langsung | Pengadaan Barang | 3593282 | 25993867 | 168,000,000 | 152,727,760 | 152,552,554 | 152,552,554 | 152,500,000 | 152,500,000 | 0 | 0 | 2020-07-16 | CV. An-Nidha | 02.675.485.3-733.000 | 15,447,446 | 9.19 % | |
541 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Permainan Edukatif (APE) PAUD | Pengadaan Langsung | Pengadaan Barang | 3594282 | 25993556 | 80,000,000 | 80,000,000 | 79,921,600 | 79,921,600 | 79,800,000 | 79,800,000 | 0 | 0 | 2020-07-14 | CV. KHALIF | 81.540.809.1-733.000 | 78,400 | 0.1 % | |
542 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Permainan Edukatif (APE) PAUD | Pengadaan Langsung | Pengadaan Barang | 3594282 | 25993556 | 80,000,000 | 80,000,000 | 79,921,600 | 79,921,600 | 79,800,000 | 79,800,000 | 0 | 0 | 2020-07-14 | CV. KHALIF | 81.540.809.1-733.000 | 78,400 | 0.1 % | |
543 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga IPA (SMP) | Pengadaan Langsung | Pengadaan Barang | 3596282 | 25993847 | 172,200,000 | 170,749,200 | 169,068,800 | 169,068,800 | 168,800,000 | 168,800,000 | 0 | 0 | 2020-07-16 | CV. e_Caracter | 75.998.700.1-733.000 | 3,131,200 | 1.82 % | |
544 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga IPA (SMP) | Pengadaan Langsung | Pengadaan Barang | 3596282 | 25993847 | 172,200,000 | 170,749,200 | 169,068,800 | 169,068,800 | 168,800,000 | 168,800,000 | 0 | 0 | 2020-07-16 | CV. e_Caracter | 75.998.700.1-733.000 | 3,131,200 | 1.82 % | |
545 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan drainase RT.7 | Pengadaan Langsung | Pengadaan Barang | 3598282 | 24032418 | 120,000,000 | 119,988,382 | 119,905,451 | 119,905,451 | 119,905,400 | 119,905,400 | 0 | 0 | 2020-07-13 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 94,549 | 0.08 % | |
546 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan drainase RT.7 | Pengadaan Langsung | Pengadaan Barang | 3598282 | 24032418 | 120,000,000 | 119,988,382 | 119,905,451 | 119,905,451 | 119,905,400 | 119,905,400 | 0 | 0 | 2020-07-13 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 94,549 | 0.08 % | |
547 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Kesenian | Pengadaan Langsung | Pengadaan Barang | 3603282 | 25993866 | 210,000,000 | 199,650,000 | 199,347,500 | 0 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-07-14 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,652,500 | 5.07 % | |
548 | 2020 | Dinas Pendidikan dan Kebudayaan | Alat Peraga Kesenian | Pengadaan Langsung | Pengadaan Barang | 3603282 | 25993866 | 210,000,000 | 199,650,000 | 199,347,500 | 0 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-07-14 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,652,500 | 5.07 % | |
549 | 2020 | Dinas Pendidikan dan Kebudayaan | Peralatan Pendidikan TIK (PKBM Serumpun) | Pengadaan Langsung | Pengadaan Barang | 3604282 | 25993586 | 200,000,000 | 188,606,530 | 188,520,000 | 188,520,000 | 188,300,000 | 188,300,000 | 0 | 0 | 2020-07-16 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 11,480,000 | 5.74 % | |
550 | 2020 | Dinas Pendidikan dan Kebudayaan | Peralatan Pendidikan TIK (PKBM Serumpun) | Pengadaan Langsung | Pengadaan Barang | 3604282 | 25993586 | 200,000,000 | 188,606,530 | 188,520,000 | 188,520,000 | 188,300,000 | 188,300,000 | 0 | 0 | 2020-07-16 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 11,480,000 | 5.74 % | |
551 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Hamak Utara Kec. Telaga Langsat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605282 | 23367557 | 30,000,000 | 29,348,000 | 29,177,500 | 29,177,500 | 29,177,000 | 29,177,000 | 0 | 0 | 2020-07-23 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 822,500 | 2.74 % | |
552 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Hamak Utara Kec. Telaga Langsat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3605282 | 23367557 | 30,000,000 | 29,348,000 | 29,177,500 | 29,177,500 | 29,177,000 | 29,177,000 | 0 | 0 | 2020-07-23 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 822,500 | 2.74 % | |
553 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607282 | 23970172 | 13,000,000 | 12,905,000 | 12,792,500 | 12,792,500 | 12,700,000 | 12,700,000 | 0 | 0 | 2020-07-21 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 207,500 | 1.6 % | |
554 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Poskesdes | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3607282 | 23970172 | 13,000,000 | 12,905,000 | 12,792,500 | 12,792,500 | 12,700,000 | 12,700,000 | 0 | 0 | 2020-07-21 | CV. SUKMAREKA YASAPRANATA | 02.090.100.5-731.000 | 207,500 | 1.6 % | |
555 | 2020 | Dinas Pertanian | Pengadaan mesin dan sarana pengendalian dan pemadaman kebakaran lahan dan kebun (PPKLK) | Pengadaan Langsung | Pengadaan Barang | 3609282 | 24105960 | 80,417,500 | 80,355,000 | 80,080,000 | 80,080,000 | 80,080,000 | 80,080,000 | 0 | 0 | 2020-07-17 | Muda Membangun | 73.702.709.4-733.000 | 337,500 | 0.42 % | |
556 | 2020 | Dinas Pertanian | Pengadaan mesin dan sarana pengendalian dan pemadaman kebakaran lahan dan kebun (PPKLK) | Pengadaan Langsung | Pengadaan Barang | 3609282 | 24105960 | 80,417,500 | 80,355,000 | 80,080,000 | 80,080,000 | 80,080,000 | 80,080,000 | 0 | 0 | 2020-07-17 | Muda Membangun | 73.702.709.4-733.000 | 337,500 | 0.42 % | |
557 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | Belanja Jasa Konsultansi Pengawasan Pembangunan Gedung Promosi dan Pemasaran Online | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3610282 | 25980201 | 45,000,000 | 36,562,500 | 36,355,000 | 0 | 36,000,000 | 36,000,000 | 0 | 0 | 2020-07-29 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 8,645,000 | 19.21 % | |
558 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | Belanja Jasa Konsultansi Pengawasan Pembangunan Gedung Promosi dan Pemasaran Online | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3610282 | 25980201 | 45,000,000 | 36,562,500 | 36,355,000 | 0 | 36,000,000 | 36,000,000 | 0 | 0 | 2020-07-29 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 8,645,000 | 19.21 % | |
559 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3612282 | 25417899 | 20,000,000 | 20,000,000 | 19,728,500 | 19,728,500 | 19,450,000 | 19,450,000 | 0 | 0 | 2020-08-07 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 271,500 | 1.36 % | |
560 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Pembangunan Sekretariat Islamic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3612282 | 25417899 | 20,000,000 | 20,000,000 | 19,728,500 | 19,728,500 | 19,450,000 | 19,450,000 | 0 | 0 | 2020-08-07 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 271,500 | 1.36 % | |
561 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3616282 | 23329057 | 20,000,000 | 20,000,000 | 19,877,000 | 19,877,000 | 19,650,000 | 19,650,000 | 0 | 0 | 2020-08-05 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 123,000 | 0.62 % | |
562 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3616282 | 23329057 | 20,000,000 | 20,000,000 | 19,877,000 | 19,877,000 | 19,650,000 | 19,650,000 | 0 | 0 | 2020-08-05 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 123,000 | 0.62 % | |
563 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3619282 | 23329940 | 15,000,000 | 15,000,000 | 14,821,190 | 14,821,190 | 14,795,000 | 14,795,000 | 0 | 0 | 2020-07-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 178,810 | 1.19 % | |
564 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3619282 | 23329940 | 15,000,000 | 15,000,000 | 14,821,190 | 14,821,190 | 14,795,000 | 14,795,000 | 0 | 0 | 2020-07-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 178,810 | 1.19 % | |
565 | 2020 | Dinas Sosial | Pemasangan Paving Blok untuk halaman Tugu 17 Mei | Pengadaan Langsung | Pekerjaan Konstruksi | 3621282 | 23414714 | 189,500,000 | 189,446,198 | 189,149,857 | 0 | 189,149,000 | 189,149,000 | 0 | 0 | 2020-07-23 | CV. AISY | 75.132.070.6-733.000 | 350,143 | 0.18 % | |
566 | 2020 | Dinas Sosial | Pemasangan Paving Blok untuk halaman Tugu 17 Mei | Pengadaan Langsung | Pekerjaan Konstruksi | 3621282 | 23414714 | 189,500,000 | 189,446,198 | 189,149,857 | 0 | 189,149,000 | 189,149,000 | 0 | 0 | 2020-07-23 | CV. AISY | 75.132.070.6-733.000 | 350,143 | 0.18 % | |
567 | 2020 | Dinas Perpustakaan Dan Kearsipan | Pengadaan Meubelur untuk Perpustakaan Daha Selatan | Pengadaan Langsung | Pengadaan Barang | 3622282 | 26029903 | 193,400,000 | 193,399,800 | 192,900,070 | 192,900,070 | 192,900,000 | 0 | 0 | 0 | 2020-08-05 | CV.ASYA | 01.424.566.6-733.000 | 499,930 | 0.26 % | |
568 | 2020 | Dinas Kesehatan | Rehabilitasi Pustu Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 3624282 | 23969895 | 155,000,000 | 150,001,123 | 149,500,733 | 0 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-07-21 | CV.ASYA | 01.424.566.6-733.000 | 5,499,267 | 3.55 % | |
569 | 2020 | Dinas Kesehatan | Rehabilitasi Pustu Samuda | Pengadaan Langsung | Pekerjaan Konstruksi | 3624282 | 23969895 | 155,000,000 | 150,001,123 | 149,500,733 | 0 | 149,500,000 | 149,500,000 | 0 | 0 | 2020-07-21 | CV.ASYA | 01.424.566.6-733.000 | 5,499,267 | 3.55 % | |
570 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Drainase di ruas Jl. Bakarung Tabihi (lanjutan) Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3625282 | 23349359 | 200,000,000 | 199,697,664 | 199,133,933 | 199,133,933 | 199,043,700 | 199,043,700 | 0 | 0 | 2020-09-04 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 866,067 | 0.43 % | |
571 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembuatan Drainase di ruas Jl. Bakarung Tabihi (lanjutan) Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3625282 | 23349359 | 200,000,000 | 199,697,664 | 199,133,933 | 199,133,933 | 199,043,700 | 199,043,700 | 0 | 0 | 2020-09-04 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 866,067 | 0.43 % | |
572 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan JUT RT. 011 dan JUT Sasanting RT.005 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3626282 | 24282643;25909339 | 62,800,000 | 62,799,930 | 62,747,289 | 62,747,289 | 62,747,200 | 62,747,200 | 0 | 0 | 2020-07-23 | cv.ghea | 82.333.270.5-733.000 | 52,711 | 0.08 % | |
573 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan JUT RT. 011 dan JUT Sasanting RT.005 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3626282 | 24282643;25909339 | 62,800,000 | 62,799,930 | 62,747,289 | 62,747,289 | 62,747,200 | 62,747,200 | 0 | 0 | 2020-07-23 | cv.ghea | 82.333.270.5-733.000 | 52,711 | 0.08 % | |
574 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan JUT Jln.By Pass RT.008, Jembatan JUT RT. 005,dan Titian RT.003 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3627282 | 24271198;24273286;24274005 | 75,000,000 | 74,998,577 | 74,863,107 | 74,863,107 | 74,863,100 | 74,863,100 | 0 | 0 | 2020-07-23 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 136,893 | 0.18 % | |
575 | 2020 | Kecamatan Kandangan | Belanja Pemeliharaan Jembatan JUT Jln.By Pass RT.008, Jembatan JUT RT. 005,dan Titian RT.003 Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3627282 | 24271198;24273286;24274005 | 75,000,000 | 74,998,577 | 74,863,107 | 74,863,107 | 74,863,100 | 74,863,100 | 0 | 0 | 2020-07-23 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 136,893 | 0.18 % | |
576 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3628282 | 23969854 | 18,000,000 | 17,875,000 | 17,809,000 | 0 | 17,500,000 | 17,500,000 | 0 | 0 | 2020-07-29 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 191,000 | 1.06 % | |
577 | 2020 | Dinas Kesehatan | Pengawasan Rehabilitasi Pustu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3628282 | 23969854 | 18,000,000 | 17,875,000 | 17,809,000 | 0 | 17,500,000 | 17,500,000 | 0 | 0 | 2020-07-29 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 191,000 | 1.06 % | |
578 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3631282 | 23330151 | 200,000,000 | 199,997,833 | 199,677,254 | 199,677,253 | 199,677,253 | 199,677,253 | 0 | 0 | 2020-07-27 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 322,746 | 0.16 % | |
579 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3631282 | 23330151 | 200,000,000 | 199,997,833 | 199,677,254 | 199,677,253 | 199,677,253 | 199,677,253 | 0 | 0 | 2020-07-27 | CV. SHAKINDAI 79 | 83.521.789.4-733.000 | 322,746 | 0.16 % | |
580 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Muning Tengah Batang Alai Kec. Daha Selatan (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3632282 | 23348418 | 50,000,000 | 49,824,170 | 49,300,000 | 49,300,000 | 49,050,000 | 49,050,000 | 0 | 0 | 2020-08-24 | CV. SKALA MULTIREKA | 02.531.655.5-731.000 | 700,000 | 1.4 % | |
581 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Muning Tengah Batang Alai Kec. Daha Selatan (lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3632282 | 23348418 | 50,000,000 | 49,824,170 | 49,300,000 | 49,300,000 | 49,050,000 | 49,050,000 | 0 | 0 | 2020-08-24 | CV. SKALA MULTIREKA | 02.531.655.5-731.000 | 700,000 | 1.4 % | |
582 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3638282 | 23330156 | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
583 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3638282 | 23330156 | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
584 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639282 | 23330125 | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
585 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3639282 | 23330125 | 15,000,000 | 15,000,000 | 14,806,000 | 14,806,000 | 14,500,000 | 14,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 194,000 | 1.29 % | |
586 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3640282 | 23330153 | 12,425,000 | 12,425,000 | 12,155,000 | 12,155,000 | 12,050,000 | 12,050,000 | 0 | 0 | 2020-07-29 | CV. ARUM CONSULINDO | 76.318.952.9-735.000 | 270,000 | 2.17 % | |
587 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Merah Djohansyah (Depan Rutan Kelas II Kandangan) Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3640282 | 23330153 | 12,425,000 | 12,425,000 | 12,155,000 | 12,155,000 | 12,050,000 | 12,050,000 | 0 | 0 | 2020-07-29 | CV. ARUM CONSULINDO | 76.318.952.9-735.000 | 270,000 | 2.17 % | |
588 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3641282 | 23330115 | 25,000,000 | 25,000,000 | 24,755,500 | 24,755,500 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 244,500 | 0.98 % | |
589 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3641282 | 23330115 | 25,000,000 | 25,000,000 | 24,755,500 | 24,755,500 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-07-29 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 244,500 | 0.98 % | |
590 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3643282 | 23544797 | 13,862,383 | 13,855,188 | 13,822,188 | 13,822,188 | 13,822,000 | 13,822,000 | 0 | 0 | 2020-07-29 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 40,195 | 0.29 % | |
591 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Pagar Depan Rumah Sakit (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3643282 | 23544797 | 13,862,383 | 13,855,188 | 13,822,188 | 13,822,188 | 13,822,000 | 13,822,000 | 0 | 0 | 2020-07-29 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 40,195 | 0.29 % | |
592 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Tambangan Baruh Jaya (Lanjutan) Kec. Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3644282 | 23349339 | 35,000,000 | 34,882,100 | 34,639,000 | 34,639,000 | 34,500,000 | 34,500,000 | 0 | 0 | 2020-08-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 361,000 | 1.03 % | |
593 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Tambangan Baruh Jaya (Lanjutan) Kec. Daha Utara (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3644282 | 23349339 | 35,000,000 | 34,882,100 | 34,639,000 | 34,639,000 | 34,500,000 | 34,500,000 | 0 | 0 | 2020-08-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 361,000 | 1.03 % | |
594 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Renovasi Pagar,Penambahan Ruangan dan Penambahan Parkir Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3647282 | 23890450 | 75,000,000 | 74,996,347 | 74,932,778 | 74,932,778 | 74,932,700 | 74,932,700 | 0 | 0 | 2020-07-29 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 67,222 | 0.09 % | |
595 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Renovasi Pagar,Penambahan Ruangan dan Penambahan Parkir Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3647282 | 23890450 | 75,000,000 | 74,996,347 | 74,932,778 | 74,932,778 | 74,932,700 | 74,932,700 | 0 | 0 | 2020-07-29 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 67,222 | 0.09 % | |
596 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3648282 | 23356285 | 6,000,000 | 6,000,000 | 5,850,790 | 5,850,000 | 5,846,500 | 5,846,500 | 0 | 0 | 2020-07-30 | konsultan | 75.077.609.8-733.000 | 149,210 | 2.49 % | |
597 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Garunggang Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3648282 | 23356285 | 6,000,000 | 6,000,000 | 5,850,790 | 5,850,000 | 5,846,500 | 5,846,500 | 0 | 0 | 2020-07-30 | konsultan | 75.077.609.8-733.000 | 149,210 | 2.49 % | |
598 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sianggantung Baru Kec. Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3651282 | 23348931 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
599 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Sianggantung Baru Kec. Daha Barat (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3651282 | 23348931 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | cv.mitra talenta prima | 02.746.658.0-733.000 | 470,812 | 0.94 % | |
600 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Suriangpati Kec. Kandangan (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3652282 | 23349114 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
601 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Suriangpati Kec. Kandangan (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3652282 | 23349114 | 50,000,000 | 49,824,170 | 49,529,189 | 49,529,189 | 49,529,000 | 49,529,000 | 0 | 0 | 2020-08-04 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 470,812 | 0.94 % | |
602 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Sungai Kajang Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3653282 | 25984451 | 80,700,000 | 80,700,000 | 80,184,500 | 80,184,500 | 80,179,000 | 80,179,000 | 0 | 0 | 2020-08-12 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 515,500 | 0.64 % | |
603 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jaringan Irigasi D.I.R Sungai Kajang Kec. Kandangan (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3653282 | 25984451 | 80,700,000 | 80,700,000 | 80,184,500 | 80,184,500 | 80,179,000 | 80,179,000 | 0 | 0 | 2020-08-12 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 515,500 | 0.64 % | |
604 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Tambak Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3655282 | 23349073 | 50,000,000 | 45,950,300 | 45,763,300 | 45,763,300 | 45,760,000 | 45,760,000 | 0 | 0 | 2020-09-07 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 4,236,700 | 8.47 % | |
605 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Tambak Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3655282 | 23349073 | 50,000,000 | 45,950,300 | 45,763,300 | 45,763,300 | 45,760,000 | 45,760,000 | 0 | 0 | 2020-09-07 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 4,236,700 | 8.47 % | |
606 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Rawa Sianggantung Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3656282 | 25984497 | 25,000,000 | 25,000,000 | 21,354,500 | 0 | 21,349,000 | 21,349,000 | 0 | 0 | 2020-08-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,645,500 | 14.58 % | |
607 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Rawa Sianggantung Kec.Daha barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3656282 | 25984497 | 25,000,000 | 25,000,000 | 21,354,500 | 0 | 21,349,000 | 21,349,000 | 0 | 0 | 2020-08-18 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 3,645,500 | 14.58 % | |
608 | 2020 | Kecamatan Kandangan | Belanja Penyediaan Sarana Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3657282 | 25909233 | 30,000,000 | 29,989,300 | 29,987,100 | 29,987,100 | 29,987,100 | 29,987,100 | 0 | 0 | 2020-08-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 12,900 | 0.04 % | |
609 | 2020 | Kecamatan Kandangan | Belanja Penyediaan Sarana Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3657282 | 25909233 | 30,000,000 | 29,989,300 | 29,987,100 | 29,987,100 | 29,987,100 | 29,987,100 | 0 | 0 | 2020-08-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 12,900 | 0.04 % | |
610 | 2020 | Kecamatan Kandangan | Belanja Jasa Pengawasan JUT, Jembatan dan Penyediaan Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659282 | 24276185 | 7,400,000 | 7,397,516 | 7,397,496 | 7,397,496 | 7,397,400 | 7,397,400 | 0 | 0 | 2020-08-04 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 2,504 | 0.03 % | |
611 | 2020 | Kecamatan Kandangan | Belanja Jasa Pengawasan JUT, Jembatan dan Penyediaan Air Bersih Kelurahan Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3659282 | 24276185 | 7,400,000 | 7,397,516 | 7,397,496 | 7,397,496 | 7,397,400 | 7,397,400 | 0 | 0 | 2020-08-04 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 2,504 | 0.03 % | |
612 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3661282 | 23545256 | 27,857,243 | 27,772,342 | 27,480,842 | 27,480,842 | 27,480,000 | 27,480,000 | 0 | 0 | 2020-08-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 376,401 | 1.35 % | |
613 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Rehabilitasi Gudang Aset Menjadi Gedung Instalasi Gizi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3661282 | 23545256 | 27,857,243 | 27,772,342 | 27,480,842 | 27,480,842 | 27,480,000 | 27,480,000 | 0 | 0 | 2020-08-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 376,401 | 1.35 % | |
614 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Tirta Bahalayung Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3662282 | 25984492 | 82,940,000 | 82,940,000 | 82,932,850 | 82,932,850 | 82,927,000 | 82,927,000 | 0 | 0 | 2020-08-19 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 7,150 | 0.01 % | |
615 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I.R Tirta Bahalayung Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3662282 | 25984492 | 82,940,000 | 82,940,000 | 82,932,850 | 82,932,850 | 82,927,000 | 82,927,000 | 0 | 0 | 2020-08-19 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 7,150 | 0.01 % | |
616 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I. H. Mahlan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3663282 | 25984485 | 21,360,000 | 21,360,000 | 21,358,900 | 21,358,900 | 21,354,500 | 21,354,500 | 0 | 0 | 2020-08-12 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,100 | 0.01 % | |
617 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa konsultansi pengawasan Rehabilitasi Jaringan Irigasi D.I. H. Mahlan Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3663282 | 25984485 | 21,360,000 | 21,360,000 | 21,358,900 | 21,358,900 | 21,354,500 | 21,354,500 | 0 | 0 | 2020-08-12 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 1,100 | 0.01 % | |
618 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3664282 | 23544891 | 150,000,000 | 149,997,256 | 149,854,489 | 149,854,489 | 149,854,000 | 149,854,000 | 0 | 0 | 2020-08-19 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 145,511 | 0.1 % | |
619 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3664282 | 23544891 | 150,000,000 | 149,997,256 | 149,854,489 | 149,854,489 | 149,854,000 | 149,854,000 | 0 | 0 | 2020-08-19 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 145,511 | 0.1 % | |
620 | 2020 | Kecamatan Simpur | konsultan pengawasan pembuatan pagar rumah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3666282 | 24108488 | 3,000,000 | 2,998,600 | 2,966,700 | 0 | 2,966,700 | 2,966,700 | 0 | 0 | 2020-08-10 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 33,300 | 1.11 % | |
621 | 2020 | Kecamatan Simpur | konsultan pengawasan pembuatan pagar rumah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3666282 | 24108488 | 3,000,000 | 2,998,600 | 2,966,700 | 0 | 2,966,700 | 2,966,700 | 0 | 0 | 2020-08-10 | CV. HIKMAH MULIA KONSULTAN | 75.120.735.8-732.000 | 33,300 | 1.11 % | |
622 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Pekerjaan Konstruksi | 3667282 | 23329035 | 200,000,000 | 199,977,989 | 199,675,490 | 199,675,490 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-08-11 | CV. PRIMA CIPTA SARANA | 02.575.622.2-731.000 | 324,510 | 0.16 % | |
623 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Lanjutan Perluasan Bangunan Asrama Puteri Kab. HSS di Malang | Pengadaan Langsung | Pekerjaan Konstruksi | 3667282 | 23329035 | 200,000,000 | 199,977,989 | 199,675,490 | 199,675,490 | 199,200,000 | 199,200,000 | 0 | 0 | 2020-08-11 | CV. PRIMA CIPTA SARANA | 02.575.622.2-731.000 | 324,510 | 0.16 % | |
624 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Pekerjaan Konstruksi | 3668282 | 23543707 | 209,065,421 | 199,931,242 | 199,641,404 | 199,641,404 | 199,146,000 | 199,146,000 | 0 | 0 | 2020-09-04 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 9,424,017 | 4.51 % | |
625 | 2020 | RSUD Brigjen H. Hasan Basry | Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Pekerjaan Konstruksi | 3668282 | 23543707 | 209,065,421 | 199,931,242 | 199,641,404 | 199,641,404 | 199,146,000 | 199,146,000 | 0 | 0 | 2020-09-04 | CV. Wahana Alam Hantatar | 02.393.886.3-733.000 | 9,424,017 | 4.51 % | |
626 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3672282 | 23354495 | 10,000,000 | 10,000,000 | 9,792,200 | 0 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-09-08 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 207,800 | 2.08 % | |
627 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Mandala Murung Mesjid Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3672282 | 23354495 | 10,000,000 | 10,000,000 | 9,792,200 | 0 | 9,790,000 | 9,790,000 | 0 | 0 | 2020-09-08 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 207,800 | 2.08 % | |
628 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Siti Hajar RT. 06 Kel. Kandangan Kota Kec. Kandangan (DID) (p=168m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3673282 | 23017419 | 145,000,000 | 144,164,524 | 143,733,904 | 143,733,904 | 143,683,904 | 143,683,904 | 0 | 0 | 2020-09-23 | CV. ALBATROS | 01.222.160.2-733.000 | 1,266,096 | 0.87 % | |
629 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Siti Hajar RT. 06 Kel. Kandangan Kota Kec. Kandangan (DID) (p=168m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3673282 | 23017419 | 145,000,000 | 144,164,524 | 143,733,904 | 143,733,904 | 143,683,904 | 143,683,904 | 0 | 0 | 2020-09-23 | CV. ALBATROS | 01.222.160.2-733.000 | 1,266,096 | 0.87 % | |
630 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3674282 | 23354605 | 10,000,000 | 10,000,000 | 9,788,900 | 9,788,900 | 9,784,500 | 9,784,500 | 0 | 0 | 2020-09-08 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 211,100 | 2.11 % | |
631 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Desa Bajayau Tengah Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3674282 | 23354605 | 10,000,000 | 10,000,000 | 9,788,900 | 9,788,900 | 9,784,500 | 9,784,500 | 0 | 0 | 2020-09-08 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 211,100 | 2.11 % | |
632 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Samuda Kec. Daha Selatan (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3675282 | 23374659 | 200,000,000 | 199,944,285 | 199,703,928 | 199,703,928 | 199,537,709 | 199,537,709 | 0 | 0 | 2020-08-10 | cv. bumi mandiri | 02.089.892.0-733.000 | 296,072 | 0.15 % | |
633 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Samuda Kec. Daha Selatan (lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3675282 | 23374659 | 200,000,000 | 199,944,285 | 199,703,928 | 199,703,928 | 199,537,709 | 199,537,709 | 0 | 0 | 2020-08-10 | cv. bumi mandiri | 02.089.892.0-733.000 | 296,072 | 0.15 % | |
634 | 2020 | Kecamatan Kandangan | Belanja jasa perencanaan pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3677282 | 24021154 | 6,000,000 | 5,997,674 | 5,788,665 | 5,788,665 | 57,886,600 | 5,788,600 | 0 | 0 | 2020-08-11 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,335 | 3.52 % | |
635 | 2020 | Kecamatan Kandangan | Belanja jasa perencanaan pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3677282 | 24021154 | 6,000,000 | 5,997,674 | 5,788,665 | 5,788,665 | 57,886,600 | 5,788,600 | 0 | 0 | 2020-08-11 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 211,335 | 3.52 % | |
636 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3678282 | 23035736 | 23,000,000 | 22,848,100 | 22,627,000 | 22,627,000 | 22,572,000 | 22,572,000 | 0 | 0 | 2020-09-01 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 373,000 | 1.62 % | |
637 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Jambu Hilir & Kel. Kandangan Utara, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3678282 | 23035736 | 23,000,000 | 22,848,100 | 22,627,000 | 22,627,000 | 22,572,000 | 22,572,000 | 0 | 0 | 2020-09-01 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 373,000 | 1.62 % | |
638 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Supervisi Perluasan SPAM perpipaan melalui pemanfaatan idle capacity Sistem Penyediaan Air Minum (SPAM) terbangun Kecamatan Sungai Raya, Desa Baru dan Desa Hariti (REGULER) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3683282 | 25987783 | 150,000,000 | 100,000,000 | 99,990,000 | 99,990,000 | 99,880,000 | 99,880,000 | 0 | 0 | 2020-08-24 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 50,010,000 | 33.34 % | |
639 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Supervisi Perluasan SPAM perpipaan melalui pemanfaatan idle capacity Sistem Penyediaan Air Minum (SPAM) terbangun Kecamatan Sungai Raya, Desa Baru dan Desa Hariti (REGULER) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3683282 | 25987783 | 150,000,000 | 100,000,000 | 99,990,000 | 99,990,000 | 99,880,000 | 99,880,000 | 0 | 0 | 2020-08-24 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 50,010,000 | 33.34 % | |
640 | 2020 | Dinas Perikanan | Jasa konsultan pengawas kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3684282 | 26014741 | 13,150,000 | 12,980,000 | 12,925,000 | 12,925,000 | 12,925,000 | 12,925,000 | 0 | 0 | 2020-08-18 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 225,000 | 1.71 % | |
641 | 2020 | Dinas Perikanan | Jasa konsultan pengawas kegiatan kontraktual | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3684282 | 26014741 | 13,150,000 | 12,980,000 | 12,925,000 | 12,925,000 | 12,925,000 | 12,925,000 | 0 | 0 | 2020-08-18 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 225,000 | 1.71 % | |
642 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3685282 | 23352794 | 176,000,000 | 175,975,202 | 175,892,702 | 175,892,702 | 175,887,202 | 175,887,202 | 0 | 0 | 2020-08-18 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 107,298 | 0.06 % | |
643 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 3685282 | 23352794 | 176,000,000 | 175,975,202 | 175,892,702 | 175,892,702 | 175,887,202 | 175,887,202 | 0 | 0 | 2020-08-18 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 107,298 | 0.06 % | |
644 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3687282 | 23544927 | 7,000,000 | 6,974,515 | 6,936,015 | 6,936,015 | 6,936,000 | 6,936,000 | 0 | 0 | 2020-08-27 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 63,985 | 0.91 % | |
645 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawasan Pembangunan Tempat Pencucian Mobil (Dana DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3687282 | 23544927 | 7,000,000 | 6,974,515 | 6,936,015 | 6,936,015 | 6,936,000 | 6,936,000 | 0 | 0 | 2020-08-27 | CV. CIPTA BUDITAMA | 01.585.194.2-731.000 | 63,985 | 0.91 % | |
646 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawas Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3688282 | 23543920 | 6,271,962 | 6,252,968 | 6,191,900 | 6,191,900 | 6,191,900 | 6,191,900 | 0 | 0 | 2020-09-07 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 80,062 | 1.28 % | |
647 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Pengawas Pembangunan Reservoar Unit Hemodialisis | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3688282 | 23543920 | 6,271,962 | 6,252,968 | 6,191,900 | 6,191,900 | 6,191,900 | 6,191,900 | 0 | 0 | 2020-09-07 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 80,062 | 1.28 % | |
648 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Jambu Hulu Paku Pantai (Tambak Tamiang) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689282 | 23348699 | 30,000,000 | 29,626,410 | 29,447,000 | 29,447,000 | 29,400,000 | 29,400,000 | 0 | 0 | 2020-08-28 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 553,000 | 1.84 % | |
649 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan Jambu Hulu Paku Pantai (Tambak Tamiang) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3689282 | 23348699 | 30,000,000 | 29,626,410 | 29,447,000 | 29,447,000 | 29,400,000 | 29,400,000 | 0 | 0 | 2020-08-28 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 553,000 | 1.84 % | |
650 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Ruangan PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3693282 | 24543944 | 100,000,000 | 99,998,145 | 99,804,269 | 0 | 99,804,200 | 99,804,200 | 0 | 0 | 2020-09-03 | cv. rukun damai | 01.203.952.5-733.000 | 195,731 | 0.2 % | |
651 | 2020 | Kecamatan Kandangan | Pengadaan Bangunan Gedung Ruangan PKK | Pengadaan Langsung | Pekerjaan Konstruksi | 3693282 | 24543944 | 100,000,000 | 99,998,145 | 99,804,269 | 0 | 99,804,200 | 99,804,200 | 0 | 0 | 2020-09-03 | cv. rukun damai | 01.203.952.5-733.000 | 195,731 | 0.2 % | |
652 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695282 | 23330118 | 20,000,000 | 20,000,000 | 19,882,500 | 19,882,500 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-09-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 117,500 | 0.59 % | |
653 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Desa Kapuh Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3695282 | 23330118 | 20,000,000 | 20,000,000 | 19,882,500 | 19,882,500 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-09-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 117,500 | 0.59 % | |
654 | 2020 | Kecamatan Kandangan | pembangunan pintu gerbang Majelis Zikir Mesjid Al Minah dan pembuatan lampu As Ma`ul Husna lingkungan mesjid Al Minah | Pengadaan Langsung | Pekerjaan Konstruksi | 3699282 | 24594450;24594517 | 200,000,000 | 199,599,547 | 199,329,207 | 0 | 199,329,200 | 199,329,200 | 0 | 0 | 2020-09-03 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 670,793 | 0.34 % | |
655 | 2020 | Kecamatan Kandangan | pembangunan pintu gerbang Majelis Zikir Mesjid Al Minah dan pembuatan lampu As Ma`ul Husna lingkungan mesjid Al Minah | Pengadaan Langsung | Pekerjaan Konstruksi | 3699282 | 24594450;24594517 | 200,000,000 | 199,599,547 | 199,329,207 | 0 | 199,329,200 | 199,329,200 | 0 | 0 | 2020-09-03 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 670,793 | 0.34 % | |
656 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3702282 | 24033327 | 120,000,000 | 119,892,007 | 119,747,885 | 119,747,885 | 119,747,800 | 119,747,800 | 0 | 0 | 2020-08-31 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 252,115 | 0.21 % | |
657 | 2020 | Kecamatan Kandangan | Belanja pemeliharaan jalan RT 7 gang Pondok dan Dahlia Kelurahan Kandangan Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3702282 | 24033327 | 120,000,000 | 119,892,007 | 119,747,885 | 119,747,885 | 119,747,800 | 119,747,800 | 0 | 0 | 2020-08-31 | cv. rezqi al mubarak | 83.686.512.1-733.000 | 252,115 | 0.21 % | |
658 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3703282 | 26136092 | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,177,000 | 45,177,000 | 0 | 0 | 2020-09-07 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
659 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3703282 | 26136092 | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,177,000 | 45,177,000 | 0 | 0 | 2020-09-07 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
660 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3704282 | 26135435 | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,260,000 | 45,260,000 | 0 | 0 | 2020-09-08 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
661 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3704282 | 26135435 | 50,000,000 | 45,359,419 | 45,265,413 | 45,265,413 | 45,260,000 | 45,260,000 | 0 | 0 | 2020-09-08 | KARYA TEKNIK MUDA | 66.269.046.0-733.000 | 4,734,588 | 9.47 % | |
662 | 2020 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Sewa Komputer (Lanjutan) | Pengadaan Langsung | Jasa Lainnya | 3708282 | 22878938 | 400,000,000 | 130,896,000 | 130,896,000 | 0 | 130,302,000 | 130,302,000 | 0 | 0 | 2020-09-01 | CV. HITRO | 02.918.384.5-733.000 | 269,104,000 | 67.28 % | |
663 | 2020 | Badan Kepegawaian dan Pengembangan Sumber Daya Manusia | Belanja Sewa Komputer (Lanjutan) | Pengadaan Langsung | Jasa Lainnya | 3708282 | 22878938 | 400,000,000 | 130,896,000 | 130,896,000 | 0 | 130,302,000 | 130,302,000 | 0 | 0 | 2020-09-01 | CV. HITRO | 02.918.384.5-733.000 | 269,104,000 | 67.28 % | |
664 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC Untuk Masyarakat Miskin di Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3710282 | 24236148 | 77,000,000 | 59,500,000 | 59,466,442 | 59,466,442 | 59,466,000 | 59,466,000 | 0 | 0 | 2020-09-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 17,533,558 | 22.77 % | |
665 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC Untuk Masyarakat Miskin di Kelurahan Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3710282 | 24236148 | 77,000,000 | 59,500,000 | 59,466,442 | 59,466,442 | 59,466,000 | 59,466,000 | 0 | 0 | 2020-09-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 17,533,558 | 22.77 % | |
666 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC yang akan diserahkan kepada pihak ketiga/masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3711282 | 24543738 | 133,000,000 | 133,000,000 | 132,924,988 | 132,924,988 | 132,924,000 | 132,924,000 | 0 | 0 | 2020-09-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 75,012 | 0.06 % | |
667 | 2020 | Kecamatan Kandangan | Belanja Pembuatan WC yang akan diserahkan kepada pihak ketiga/masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3711282 | 24543738 | 133,000,000 | 133,000,000 | 132,924,988 | 132,924,988 | 132,924,000 | 132,924,000 | 0 | 0 | 2020-09-01 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 75,012 | 0.06 % | |
668 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mekar Subur Kel. Kandangan Utara Kec. Kandangan (DID) (p=270m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3712282 | 23033305 | 195,000,000 | 193,767,530 | 193,595,749 | 193,595,749 | 192,721,729 | 192,721,729 | 0 | 0 | 2020-09-02 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,404,251 | 0.72 % | |
669 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mekar Subur Kel. Kandangan Utara Kec. Kandangan (DID) (p=270m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3712282 | 23033305 | 195,000,000 | 193,767,530 | 193,595,749 | 193,595,749 | 192,721,729 | 192,721,729 | 0 | 0 | 2020-09-02 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 1,404,251 | 0.72 % | |
670 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Air Terjun Haratai (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3713282 | 26035335 | 25,000,000 | 24,970,000 | 24,860,000 | 0 | 24,860,000 | 24,860,000 | 0 | 0 | 2020-09-02 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 140,000 | 0.56 % | |
671 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Air Terjun Haratai (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3713282 | 26035335 | 25,000,000 | 24,970,000 | 24,860,000 | 0 | 24,860,000 | 24,860,000 | 0 | 0 | 2020-09-02 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 140,000 | 0.56 % | |
672 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3714282 | 26035498 | 35,000,000 | 34,980,000 | 34,870,000 | 0 | 34,870,000 | 34,870,000 | 0 | 0 | 2020-09-02 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 130,000 | 0.37 % | |
673 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Jasa Konsultan Pengawasan Pembangunan Sarana Kawasan Objek Wisata Air Panas Tanuhi (Penunjang DAK Fisik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3714282 | 26035498 | 35,000,000 | 34,980,000 | 34,870,000 | 0 | 34,870,000 | 34,870,000 | 0 | 0 | 2020-09-02 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 130,000 | 0.37 % | |
674 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Pekerjaan Konstruksi | 3715282 | 25621217 | 80,000,000 | 79,988,699 | 79,713,699 | 79,713,699 | 79,658,699 | 79,658,699 | 0 | 0 | 2020-09-03 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 286,301 | 0.36 % | |
675 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Pekerjaan Konstruksi | 3715282 | 25621217 | 80,000,000 | 79,988,699 | 79,713,699 | 79,713,699 | 79,658,699 | 79,658,699 | 0 | 0 | 2020-09-03 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 286,301 | 0.36 % | |
676 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3721282 | 23352577 | 55,000,000 | 54,976,586 | 54,725,010 | 54,725,000 | 54,714,000 | 54,714,000 | 0 | 0 | 2020-09-08 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 274,990 | 0.5 % | |
677 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Pekerjaan Konstruksi | 3721282 | 23352577 | 55,000,000 | 54,976,586 | 54,725,010 | 54,725,000 | 54,714,000 | 54,714,000 | 0 | 0 | 2020-09-08 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 274,990 | 0.5 % | |
678 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723282 | 22914589 | 20,000,000 | 19,965,000 | 19,839,600 | 19,839,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 160,400 | 0.8 % | |
679 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3723282 | 22914589 | 20,000,000 | 19,965,000 | 19,839,600 | 19,839,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 160,400 | 0.8 % | |
680 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3724282 | 22914286 | 20,000,000 | 19,965,000 | 19,850,600 | 19,850,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 149,400 | 0.75 % | |
681 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawasan Pembangunan RTH Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3724282 | 22914286 | 20,000,000 | 19,965,000 | 19,850,600 | 19,850,600 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-09-11 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 149,400 | 0.75 % | |
682 | 2020 | Dinas Perpustakaan Dan Kearsipan | AC 1 PK | Pengadaan Langsung | Pengadaan Barang | 3728282 | 25799720 | 85,000,000 | 84,150,000 | 83,963,000 | 83,963,000 | 83,963,000 | 0 | 0 | 0 | 2020-09-08 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 1,037,000 | 1.22 % | |
683 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3729282 | 23356041 | 6,000,000 | 6,000,000 | 5,841,000 | 5,841,000 | 5,835,500 | 5,835,500 | 0 | 0 | 2020-09-09 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 159,000 | 2.65 % | |
684 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Lokpaikat Sirih Hulu Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3729282 | 23356041 | 6,000,000 | 6,000,000 | 5,841,000 | 5,841,000 | 5,835,500 | 5,835,500 | 0 | 0 | 2020-09-09 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 159,000 | 2.65 % | |
685 | 2020 | Kecamatan Kandangan | Belanja Hibah/Bantuan Sosial Pemasangan Listrik Kepada Masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Jasa Lainnya | 3730282 | 24543680 | 96,200,000 | 88,498,190 | 88,477,840 | 88,477,840 | 88,477,100 | 88,477,100 | 0 | 0 | 2020-09-08 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 7,722,160 | 8.03 % | |
686 | 2020 | Kecamatan Kandangan | Belanja Hibah/Bantuan Sosial Pemasangan Listrik Kepada Masyarakat Kelurahan Kandangan Barat | Pengadaan Langsung | Jasa Lainnya | 3730282 | 24543680 | 96,200,000 | 88,498,190 | 88,477,840 | 88,477,840 | 88,477,100 | 88,477,100 | 0 | 0 | 2020-09-08 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 7,722,160 | 8.03 % | |
687 | 2020 | Dinas Perpustakaan Dan Kearsipan | Belanja Hibah Buku Kepada Masyarakat | Pengadaan Langsung | Pengadaan Barang | 3736282 | 26226284 | 75,000,000 | 74,580,000 | 74,514,000 | 74,514,000 | 74,514,000 | 0 | 0 | 0 | 2020-10-08 | CV. HITRO | 02.918.384.5-733.000 | 486,000 | 0.65 % | |
688 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Pengembangan Padi Organik (100 Ha) | Pengadaan Langsung | Pengadaan Barang | 3740282 | 26231854 | 154,250,000 | 145,098,125 | 145,050,700 | 145,050,700 | 145,050,700 | 145,050,700 | 0 | 0 | 2020-09-22 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,199,300 | 5.96 % | |
689 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Pengembangan Padi Organik (100 Ha) | Pengadaan Langsung | Pengadaan Barang | 3740282 | 26231854 | 154,250,000 | 145,098,125 | 145,050,700 | 145,050,700 | 145,050,700 | 145,050,700 | 0 | 0 | 2020-09-22 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,199,300 | 5.96 % | |
690 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Penangkaran Padi (35 Ha) | Pengadaan Langsung | Pengadaan Barang | 3741282 | 26231808 | 33,250,000 | 31,657,500 | 31,636,500 | 31,636,500 | 31,636,500 | 31,636,500 | 0 | 0 | 2020-09-22 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,613,500 | 4.85 % | |
691 | 2020 | Dinas Pertanian | Belanja Bahan/Material Belanja Bahan Pertanian untuk Penangkaran Padi (35 Ha) | Pengadaan Langsung | Pengadaan Barang | 3741282 | 26231808 | 33,250,000 | 31,657,500 | 31,636,500 | 31,636,500 | 31,636,500 | 31,636,500 | 0 | 0 | 2020-09-22 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,613,500 | 4.85 % | |
692 | 2020 | Dinas Pertanian | Pengadaan Bahan-Bibit Tanaman Pisang dan Tanaman Hortikultura | Pengadaan Langsung | Pengadaan Barang | 3742282 | 24144864;24144865 | 113,712,500 | 96,137,640 | 95,960,250 | 95,960,250 | 95,960,250 | 95,960,250 | 0 | 0 | 2020-09-22 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 17,752,250 | 15.61 % | |
693 | 2020 | Dinas Pertanian | Pengadaan Bahan-Bibit Tanaman Pisang dan Tanaman Hortikultura | Pengadaan Langsung | Pengadaan Barang | 3742282 | 24144864;24144865 | 113,712,500 | 96,137,640 | 95,960,250 | 95,960,250 | 95,960,250 | 95,960,250 | 0 | 0 | 2020-09-22 | CV. LIMA JANUARI LESTARI | 81.592.224.0-733.000 | 17,752,250 | 15.61 % | |
694 | 2020 | Dinas Kesehatan | Pengurugan Halaman Puskesmas Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3743282 | 23970126 | 190,000,000 | 189,709,284 | 189,405,029 | 0 | 189,400,000 | 189,400,000 | 0 | 0 | 2020-10-19 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 594,971 | 0.31 % | |
695 | 2020 | Dinas Kesehatan | Pengurugan Halaman Puskesmas Sungai Pinang | Pengadaan Langsung | Pekerjaan Konstruksi | 3743282 | 23970126 | 190,000,000 | 189,709,284 | 189,405,029 | 0 | 189,400,000 | 189,400,000 | 0 | 0 | 2020-10-19 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 594,971 | 0.31 % | |
696 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Gambah Dalam Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3744282 | 26174707 | 37,000,000 | 36,970,453 | 36,900,811 | 36,900,811 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,189 | 0.27 % | |
697 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Gambah Dalam Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3744282 | 26174707 | 37,000,000 | 36,970,453 | 36,900,811 | 36,900,811 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 99,189 | 0.27 % | |
698 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 3745282 | 26174706 | 37,000,000 | 36,989,716 | 36,949,774 | 36,949,774 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 50,226 | 0.14 % | |
699 | 2020 | Dinas Kesehatan | Pemasangan Paving dan Keramik Poskesdes Desa Baru | Pengadaan Langsung | Pekerjaan Konstruksi | 3745282 | 26174706 | 37,000,000 | 36,989,716 | 36,949,774 | 36,949,774 | 36,500,000 | 36,500,000 | 0 | 0 | 2020-10-06 | CV. Risfa Harapan Utama | 02.421.913.1-733.000 | 50,226 | 0.14 % | |
700 | 2020 | Dinas Kesehatan | Disediakan Belanja Bahan Habis Pakai Laboratorium | Pengadaan Langsung | Pengadaan Barang | 3748282 | 24978481 | 200,000,000 | 199,239,700 | 199,200,000 | 0 | 199,000,000 | 199,000,000 | 0 | 0 | 2020-11-12 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 800,000 | 0.4 % | |
701 | 2020 | Dinas Kesehatan | Disediakan Belanja Bahan Habis Pakai Laboratorium | Pengadaan Langsung | Pengadaan Barang | 3748282 | 24978481 | 200,000,000 | 199,239,700 | 199,200,000 | 0 | 199,000,000 | 199,000,000 | 0 | 0 | 2020-11-12 | PT. GRAHA MEDIKA MANDIRI | 01.860.371.2-731.000 | 800,000 | 0.4 % | |
702 | 2020 | Sekretariat DPRD | Belanja Jasa Konsultansi Jasa Appraisal (Penilaian) Tunjangan Perumahan dan Transportasi Anggota DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3749282 | 26218103 | 80,000,000 | 79,750,000 | 79,600,000 | 0 | 79,600,000 | 79,600,000 | 0 | 0 | 2020-09-22 | ARIEF NOVIARAKHMAN ZAGLADI | 71.144.356.4-731.000 | 400,000 | 0.5 % | |
703 | 2020 | Sekretariat DPRD | Belanja Jasa Konsultansi Jasa Appraisal (Penilaian) Tunjangan Perumahan dan Transportasi Anggota DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3749282 | 26218103 | 80,000,000 | 79,750,000 | 79,600,000 | 0 | 79,600,000 | 79,600,000 | 0 | 0 | 2020-09-22 | ARIEF NOVIARAKHMAN ZAGLADI | 71.144.356.4-731.000 | 400,000 | 0.5 % | |
704 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Telaga Bidadari Asam Cangkok Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3752282 | 23349153 | 187,325,000 | 183,626,418 | 183,481,936 | 183,481,936 | 183,250,000 | 183,250,000 | 0 | 0 | 2020-09-23 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 3,843,064 | 2.05 % | |
705 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Telaga Bidadari Asam Cangkok Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3752282 | 23349153 | 187,325,000 | 183,626,418 | 183,481,936 | 183,481,936 | 183,250,000 | 183,250,000 | 0 | 0 | 2020-09-23 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 3,843,064 | 2.05 % | |
706 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawasan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3753282 | 26245865 | 3,200,000 | 3,199,829 | 3,137,129 | 0 | 3,137,129 | 3,137,129 | 0 | 0 | 2020-10-12 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 62,872 | 1.96 % | |
707 | 2020 | Kecamatan Kandangan | Belanja Jasa Konsultan Pengawasan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3753282 | 26245865 | 3,200,000 | 3,199,829 | 3,137,129 | 0 | 3,137,129 | 3,137,129 | 0 | 0 | 2020-10-12 | CV. GAMBAR KONSULTAN | 01.879.445.3-731.000 | 62,872 | 1.96 % | |
708 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Mall Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3754282 | 26174498 | 100,000,000 | 99,932,129 | 99,239,129 | 99,239,129 | 99,110,000 | 99,110,000 | 0 | 0 | 2020-10-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 760,871 | 0.76 % | |
709 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Mall Pelayanan Publik Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3754282 | 26174498 | 100,000,000 | 99,932,129 | 99,239,129 | 99,239,129 | 99,110,000 | 99,110,000 | 0 | 0 | 2020-10-07 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 760,871 | 0.76 % | |
710 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3755282 | 26174529 | 85,000,000 | 84,810,000 | 84,584,500 | 84,584,500 | 84,491,000 | 84,491,000 | 0 | 0 | 2020-10-02 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,500 | 0.49 % | |
711 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3755282 | 26174529 | 85,000,000 | 84,810,000 | 84,584,500 | 84,584,500 | 84,491,000 | 84,491,000 | 0 | 0 | 2020-10-02 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 415,500 | 0.49 % | |
712 | 2020 | Kecamatan Kandangan | Belanja Jasa Pemeliharaan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 3756282 | 26242331 | 36,026,000 | 36,020,534 | 35,723,454 | 0 | 35,723,454 | 35,723,454 | 0 | 0 | 2020-10-12 | CV. AISY | 75.132.070.6-733.000 | 302,546 | 0.84 % | |
713 | 2020 | Kecamatan Kandangan | Belanja Jasa Pemeliharaan Gang dan Tangga ke Sungai Kelurahan Kandangan Kota | Pengadaan Langsung | Pekerjaan Konstruksi | 3756282 | 26242331 | 36,026,000 | 36,020,534 | 35,723,454 | 0 | 35,723,454 | 35,723,454 | 0 | 0 | 2020-10-12 | CV. AISY | 75.132.070.6-733.000 | 302,546 | 0.84 % | |
714 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Pengadaan Tanah Bangunan Irigasi | Pengadaan Langsung | Jasa Lainnya | 3759282 | 25741053 | 80,000,000 | 79,893,000 | 79,420,000 | 79,420,000 | 79,255,000 | 79,255,000 | 0 | 0 | 2020-09-29 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 580,000 | 0.73 % | |
715 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Pengadaan Tanah Bangunan Irigasi | Pengadaan Langsung | Jasa Lainnya | 3759282 | 25741053 | 80,000,000 | 79,893,000 | 79,420,000 | 79,420,000 | 79,255,000 | 79,255,000 | 0 | 0 | 2020-09-29 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 580,000 | 0.73 % | |
716 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Sarana Pendidikan | Pengadaan Langsung | Jasa Lainnya | 3760282 | 26237924 | 49,250,000 | 22,825,000 | 22,704,000 | 22,704,000 | 22,495,000 | 22,495,000 | 0 | 0 | 2020-10-05 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 26,546,000 | 53.9 % | |
717 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penilaian Harga Tanah (Apraisal) Sarana Pendidikan | Pengadaan Langsung | Jasa Lainnya | 3760282 | 26237924 | 49,250,000 | 22,825,000 | 22,704,000 | 22,704,000 | 22,495,000 | 22,495,000 | 0 | 0 | 2020-10-05 | Kantor Jasa Penilai Publik Satria Setiawan dan Rekan | 03.113.362.2-031.000 | 26,546,000 | 53.9 % | |
718 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3761282 | 23035658 | 21,000,000 | 20,814,372 | 20,486,400 | 0 | 20,422,600 | 20,422,600 | 0 | 0 | 2020-10-05 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 513,600 | 2.45 % | |
719 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Kel. Kandangan Kota Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3761282 | 23035658 | 21,000,000 | 20,814,372 | 20,486,400 | 0 | 20,422,600 | 20,422,600 | 0 | 0 | 2020-10-05 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 513,600 | 2.45 % | |
720 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. SDN Jambu Hilir 3 dan Sekitarnya Kel. Jambu Hilir (p=150m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3764282 | 23033038 | 120,000,000 | 119,852,233 | 119,600,196 | 0 | 119,488,000 | 119,488,000 | 0 | 0 | 2020-10-12 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 399,804 | 0.33 % | |
721 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. SDN Jambu Hilir 3 dan Sekitarnya Kel. Jambu Hilir (p=150m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3764282 | 23033038 | 120,000,000 | 119,852,233 | 119,600,196 | 0 | 119,488,000 | 119,488,000 | 0 | 0 | 2020-10-12 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 399,804 | 0.33 % | |
722 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Yudha Negara Kel. Kandangan Kota Kec. Kandangan (p=100m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3765282 | 23017408 | 100,000,000 | 99,852,814 | 98,807,132 | 0 | 98,698,000 | 98,698,000 | 0 | 0 | 2020-10-21 | CV. AISY | 75.132.070.6-733.000 | 1,192,868 | 1.19 % | |
723 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Yudha Negara Kel. Kandangan Kota Kec. Kandangan (p=100m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3765282 | 23017408 | 100,000,000 | 99,852,814 | 98,807,132 | 0 | 98,698,000 | 98,698,000 | 0 | 0 | 2020-10-21 | CV. AISY | 75.132.070.6-733.000 | 1,192,868 | 1.19 % | |
724 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mirah, Gg. Papinya dan Sekitarnya Kel. Kandangan Kota Kec. Kandangan (p=300m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3766282 | 23017404 | 140,000,000 | 139,817,456 | 138,381,886 | 0 | 138,273,000 | 138,273,000 | 0 | 0 | 2020-10-21 | CV. AISY | 75.132.070.6-733.000 | 1,618,114 | 1.16 % | |
725 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Mirah, Gg. Papinya dan Sekitarnya Kel. Kandangan Kota Kec. Kandangan (p=300m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3766282 | 23017404 | 140,000,000 | 139,817,456 | 138,381,886 | 0 | 138,273,000 | 138,273,000 | 0 | 0 | 2020-10-21 | CV. AISY | 75.132.070.6-733.000 | 1,618,114 | 1.16 % | |
726 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Dar Assalam, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3768282 | 26164008 | 16,000,000 | 15,959,006 | 15,697,000 | 0 | 15,598,000 | 15,598,000 | 0 | 0 | 2020-10-13 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 303,000 | 1.89 % | |
727 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Dar Assalam, Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3768282 | 26164008 | 16,000,000 | 15,959,006 | 15,697,000 | 0 | 15,598,000 | 15,598,000 | 0 | 0 | 2020-10-13 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 303,000 | 1.89 % | |
728 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Pondok Jambu Asri, Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769282 | 26163976 | 30,000,000 | 29,118,761 | 28,985,000 | 0 | 28,864,000 | 28,864,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,015,000 | 3.38 % | |
729 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Penataan PSU Perumahan Pondok Jambu Asri, Kel. Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769282 | 26163976 | 30,000,000 | 29,118,761 | 28,985,000 | 0 | 28,864,000 | 28,864,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,015,000 | 3.38 % | |
730 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3778282 | 26302922 | 8,000,000 | 7,997,395 | 7,750,600 | 7,750,600 | 7,750,600 | 7,750,600 | 0 | 0 | 2020-10-05 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 249,400 | 3.12 % | |
731 | 2020 | RSUD Brigjen H. Hasan Basry | Konsultan Perencanaan Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3778282 | 26302922 | 8,000,000 | 7,997,395 | 7,750,600 | 7,750,600 | 7,750,600 | 7,750,600 | 0 | 0 | 2020-10-05 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 249,400 | 3.12 % | |
732 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3790282 | 25621372 | 6,000,000 | 6,000,000 | 5,994,500 | 5,994,500 | 5,989,000 | 5,989,000 | 0 | 0 | 2020-10-14 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.09 % | |
733 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Amawang Kiri | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3790282 | 25621372 | 6,000,000 | 6,000,000 | 5,994,500 | 5,994,500 | 5,989,000 | 5,989,000 | 0 | 0 | 2020-10-14 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.09 % | |
734 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3791282 | 23355227 | 4,800,000 | 4,800,000 | 4,794,500 | 4,794,500 | 4,789,000 | 4,789,000 | 0 | 0 | 2020-10-14 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.11 % | |
735 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Tebing Tinggi (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3791282 | 23355227 | 4,800,000 | 4,800,000 | 4,794,500 | 4,794,500 | 4,789,000 | 4,789,000 | 0 | 0 | 2020-10-14 | Jamilah | 14.427.417.2-733.000 | 5,500 | 0.11 % | |
736 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | jasa konsultansi perencanaan untuk rehabilitasi kebocoran saluran air kolam renang Amandit Aquatic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3867282 | 26186156 | 12,500,000 | 12,456,227 | 12,291,227 | 0 | 12,291,227 | 12,291,227 | 0 | 0 | 2020-10-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 208,773 | 1.67 % | |
737 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | jasa konsultansi perencanaan untuk rehabilitasi kebocoran saluran air kolam renang Amandit Aquatic Center | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3867282 | 26186156 | 12,500,000 | 12,456,227 | 12,291,227 | 0 | 12,291,227 | 12,291,227 | 0 | 0 | 2020-10-06 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 208,773 | 1.67 % | |
738 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Belanja Modal Peralatan dan Mesin- pengadaan Alat Penyimpan Perlengkapan Kantor Brankas,Pembelian Televisi,Pengadaan laptop | Pengadaan Langsung | Pengadaan Barang | 3868282 | 26154658;26154812;26163647 | 52,750,000 | 52,745,000 | 52,690,000 | 52,690,000 | 52,690,000 | 52,690,000 | 0 | 0 | 2020-10-07 | CV. HITRO | 02.918.384.5-733.000 | 60,000 | 0.11 % | |
739 | 2020 | Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah | Belanja Modal Peralatan dan Mesin- pengadaan Alat Penyimpan Perlengkapan Kantor Brankas,Pembelian Televisi,Pengadaan laptop | Pengadaan Langsung | Pengadaan Barang | 3868282 | 26154658;26154812;26163647 | 52,750,000 | 52,745,000 | 52,690,000 | 52,690,000 | 52,690,000 | 52,690,000 | 0 | 0 | 2020-10-07 | CV. HITRO | 02.918.384.5-733.000 | 60,000 | 0.11 % | |
740 | 2020 | Sekretariat DPRD | Pengadaan dan pemasangan wallpaper Kantor Sekretariat DPRD | Pengadaan Langsung | Pengadaan Barang | 3871282 | 26254181 | 158,800,000 | 158,800,000 | 158,700,000 | 0 | 158,700,000 | 158,700,000 | 0 | 0 | 2020-10-12 | Mahameru interior | 95.979.622.8-531.000 | 100,000 | 0.06 % | |
741 | 2020 | Sekretariat DPRD | Pengadaan dan pemasangan wallpaper Kantor Sekretariat DPRD | Pengadaan Langsung | Pengadaan Barang | 3871282 | 26254181 | 158,800,000 | 158,800,000 | 158,700,000 | 0 | 158,700,000 | 158,700,000 | 0 | 0 | 2020-10-12 | Mahameru interior | 95.979.622.8-531.000 | 100,000 | 0.06 % | |
742 | 2020 | Sekretariat DPRD | Pengadaan Genset Kantor Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 3872282 | 26242683 | 195,000,000 | 194,959,875 | 192,489,000 | 0 | 192,489,000 | 192,489,000 | 0 | 0 | 2020-10-11 | CV. AL MADINAH | 66.139.132.6-733.000 | 2,511,000 | 1.29 % | |
743 | 2020 | Sekretariat DPRD | Pengadaan Genset Kantor Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 3872282 | 26242683 | 195,000,000 | 194,959,875 | 192,489,000 | 0 | 192,489,000 | 192,489,000 | 0 | 0 | 2020-10-11 | CV. AL MADINAH | 66.139.132.6-733.000 | 2,511,000 | 1.29 % | |
744 | 2020 | Dinas Ketahanan Pangan | Biaya Perencanaan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873282 | 26331256 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 0 | 0 | 2020-10-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 0 | 0 % | |
745 | 2020 | Dinas Ketahanan Pangan | Biaya Perencanaan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3873282 | 26331256 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 11,500,000 | 0 | 0 | 2020-10-13 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 0 | 0 % | |
746 | 2020 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Tauman Sistem Keramba | Pengadaan Langsung | Pekerjaan Konstruksi | 3874282 | 26138179 | 120,000,000 | 114,816,885 | 114,386,605 | 114,386,605 | 114,380,000 | 114,380,000 | 0 | 0 | 2020-10-09 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 5,613,395 | 4.68 % | |
747 | 2020 | Dinas Perikanan | Belanja Demplot Budidaya Ikan Tauman Sistem Keramba | Pengadaan Langsung | Pekerjaan Konstruksi | 3874282 | 26138179 | 120,000,000 | 114,816,885 | 114,386,605 | 114,386,605 | 114,380,000 | 114,380,000 | 0 | 0 | 2020-10-09 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 5,613,395 | 4.68 % | |
748 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3875282 | 23330145 | 200,000,000 | 199,904,298 | 197,157,767 | 197,157,767 | 197,047,000 | 197,047,000 | 0 | 0 | 2020-10-20 | CV.DITA | 02.242.686.0-733.000 | 2,842,233 | 1.42 % | |
749 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3875282 | 23330145 | 200,000,000 | 199,904,298 | 197,157,767 | 197,157,767 | 197,047,000 | 197,047,000 | 0 | 0 | 2020-10-20 | CV.DITA | 02.242.686.0-733.000 | 2,842,233 | 1.42 % | |
750 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Paket Pekerjaan DID Tambahan Tahap 2 dan Pengaspalan halaman kantor (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3877282 | 26345401 | 100,000,000 | 98,381,250 | 97,845,000 | 97,845,000 | 97,790,000 | 97,790,000 | 0 | 0 | 2020-10-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,155,000 | 2.16 % | |
751 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Paket Pekerjaan DID Tambahan Tahap 2 dan Pengaspalan halaman kantor (Perubahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3877282 | 26345401 | 100,000,000 | 98,381,250 | 97,845,000 | 97,845,000 | 97,790,000 | 97,790,000 | 0 | 0 | 2020-10-09 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,155,000 | 2.16 % | |
752 | 2020 | Dinas Pertanian | Belanja jasa perencanaan Kegiatan (Rehab JITUT, Rehab BPP Simpur, Rehab BPP Daha Barat, Rehab Scereen House, Rehab RPH, Rehab Bak Air UPTD Hariti, Rehab Parkir Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3880282 | 26347199 | 100,000,000 | 98,713,395 | 98,577,559 | 98,577,559 | 98,577,559 | 98,577,559 | 0 | 0 | 2020-10-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 1,422,441 | 1.42 % | |
753 | 2020 | Dinas Pertanian | Belanja jasa perencanaan Kegiatan (Rehab JITUT, Rehab BPP Simpur, Rehab BPP Daha Barat, Rehab Scereen House, Rehab RPH, Rehab Bak Air UPTD Hariti, Rehab Parkir Dinas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3880282 | 26347199 | 100,000,000 | 98,713,395 | 98,577,559 | 98,577,559 | 98,577,559 | 98,577,559 | 0 | 0 | 2020-10-10 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 1,422,441 | 1.42 % | |
754 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3883282 | 23330149 | 10,000,000 | 10,000,000 | 9,999,000 | 9,999,000 | 9,750,000 | 9,750,000 | 0 | 0 | 2020-11-12 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 1,000 | 0.01 % | |
755 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Perbaikan Saluran Air/Drainase Jl. Sekolah Islam Kel. Kandangan Barat Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3883282 | 23330149 | 10,000,000 | 10,000,000 | 9,999,000 | 9,999,000 | 9,750,000 | 9,750,000 | 0 | 0 | 2020-11-12 | CV. Arcoplan Engineering | 31.681.331.0-731.000 | 1,000 | 0.01 % | |
756 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3884282 | 23330122 | 200,000,000 | 199,755,877 | 196,858,198 | 196,858,198 | 196,748,000 | 196,748,000 | 0 | 0 | 2020-10-20 | CV.DITA | 02.242.686.0-733.000 | 3,141,802 | 1.57 % | |
757 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 3884282 | 23330122 | 200,000,000 | 199,755,877 | 196,858,198 | 196,858,198 | 196,748,000 | 196,748,000 | 0 | 0 | 2020-10-20 | CV.DITA | 02.242.686.0-733.000 | 3,141,802 | 1.57 % | |
758 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3885282 | 23330127 | 10,000,000 | 10,000,000 | 9,878,000 | 9,878,000 | 9,878,000 | 9,878,000 | 0 | 0 | 2020-10-13 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 122,000 | 1.22 % | |
759 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan saluran air (Drainase) Jalan Teratai RT.01 Desa Hamalau Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3885282 | 23330127 | 10,000,000 | 10,000,000 | 9,878,000 | 9,878,000 | 9,878,000 | 9,878,000 | 0 | 0 | 2020-10-13 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 122,000 | 1.22 % | |
760 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3886282 | 23329488 | 50,000,000 | 50,000,000 | 50,000,000 | 50,000,000 | 49,885,000 | 49,885,000 | 0 | 0 | 2020-11-04 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 1 | 0 % | |
761 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan Gedung Futsal Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3886282 | 23329488 | 50,000,000 | 50,000,000 | 50,000,000 | 50,000,000 | 49,885,000 | 49,885,000 | 0 | 0 | 2020-11-04 | CV. Firmitas Kurnia Konsultan | 90.460.200.0-732.000 | 1 | 0 % | |
762 | 2020 | Dinas Perdagangan | Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Pekerjaan Konstruksi | 3888282 | 26155241 | 198,900,000 | 198,873,423 | 198,329,667 | 0 | 198,329,600 | 198,329,600 | 0 | 0 | 2020-10-12 | P B B | 01.145.832.0-733.000 | 570,333 | 0.29 % | |
763 | 2020 | Dinas Perdagangan | Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Pekerjaan Konstruksi | 3888282 | 26155241 | 198,900,000 | 198,873,423 | 198,329,667 | 0 | 198,329,600 | 198,329,600 | 0 | 0 | 2020-10-12 | P B B | 01.145.832.0-733.000 | 570,333 | 0.29 % | |
764 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang/Berat SMPN 2 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3889282 | 23823574 | 7,000,000 | 7,000,000 | 6,875,000 | 6,875,000 | 6,800,000 | 6,800,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,000 | 1.79 % | |
765 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi Sedang/Berat SMPN 2 Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3889282 | 23823574 | 7,000,000 | 7,000,000 | 6,875,000 | 6,875,000 | 6,800,000 | 6,800,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 125,000 | 1.79 % | |
766 | 2020 | Dinas Perdagangan | Perencanaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3891282 | 26346538 | 18,900,000 | 18,891,400 | 18,715,400 | 0 | 18,715,400 | 18,715,400 | 0 | 0 | 2020-10-12 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 184,600 | 0.98 % | |
767 | 2020 | Dinas Perdagangan | Perencanaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3891282 | 26346538 | 18,900,000 | 18,891,400 | 18,715,400 | 0 | 18,715,400 | 18,715,400 | 0 | 0 | 2020-10-12 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 184,600 | 0.98 % | |
768 | 2020 | Dinas Perdagangan | Perencanaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3892282 | 26346366 | 18,900,000 | 18,722,000 | 18,546,000 | 0 | 18,546,000 | 18,546,000 | 0 | 0 | 2020-10-12 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 354,000 | 1.87 % | |
769 | 2020 | Dinas Perdagangan | Perencanaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3892282 | 26346366 | 18,900,000 | 18,722,000 | 18,546,000 | 0 | 18,546,000 | 18,546,000 | 0 | 0 | 2020-10-12 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 354,000 | 1.87 % | |
770 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3893282 | 26155596 | 33,800,000 | 33,799,999 | 33,259,532 | 0 | 33,259,500 | 33,259,500 | 0 | 0 | 2020-10-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 540,468 | 1.6 % | |
771 | 2020 | Dinas Perdagangan | Pengawasan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3893282 | 26155596 | 33,800,000 | 33,799,999 | 33,259,532 | 0 | 33,259,500 | 33,259,500 | 0 | 0 | 2020-10-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 540,468 | 1.6 % | |
772 | 2020 | Sekretariat DPRD | Rehab Ruang Kerja Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3894282 | 26254303 | 38,800,000 | 38,799,596 | 38,200,405 | 0 | 38,200,400 | 38,200,400 | 0 | 0 | 2020-10-12 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 599,595 | 1.55 % | |
773 | 2020 | Sekretariat DPRD | Rehab Ruang Kerja Sekretariat DPRD Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 3894282 | 26254303 | 38,800,000 | 38,799,596 | 38,200,405 | 0 | 38,200,400 | 38,200,400 | 0 | 0 | 2020-10-12 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 599,595 | 1.55 % | |
774 | 2020 | Dinas Perdagangan | Pengawasan Pekerjaan Paving Blok Halaman Pasar Terpadu HM. Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3896282 | 26158143 | 25,000,000 | 24,999,999 | 24,578,984 | 0 | 24,578,900 | 24,578,900 | 0 | 0 | 2020-10-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 421,016 | 1.68 % | |
775 | 2020 | Dinas Perdagangan | Pengawasan Pekerjaan Paving Blok Halaman Pasar Terpadu HM. Yusi Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3896282 | 26158143 | 25,000,000 | 24,999,999 | 24,578,984 | 0 | 24,578,900 | 24,578,900 | 0 | 0 | 2020-10-24 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 421,016 | 1.68 % | |
776 | 2020 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3897282 | 26155262 | 12,800,000 | 12,799,999 | 12,668,666 | 0 | 12,668,600 | 12,668,600 | 0 | 0 | 2020-10-12 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 131,334 | 1.03 % | |
777 | 2020 | Dinas Perdagangan | Pengawasan Rehab Drainase Pasar Terpadu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3897282 | 26155262 | 12,800,000 | 12,799,999 | 12,668,666 | 0 | 12,668,600 | 12,668,600 | 0 | 0 | 2020-10-12 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 131,334 | 1.03 % | |
778 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3900282 | 26201708 | 3,000,000 | 3,000,000 | 2,915,000 | 2,915,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 85,000 | 2.83 % | |
779 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3900282 | 26201708 | 3,000,000 | 3,000,000 | 2,915,000 | 2,915,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 85,000 | 2.83 % | |
780 | 2020 | Dinas Pendidikan dan Kebudayaan | perencanaan rehab dan pembangunan pagar SMP (SMPN 1 Kalumpang & SMPN 1 Sungai Raya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903282 | 26201714 | 3,000,000 | 3,000,000 | 2,970,000 | 2,970,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 30,000 | 1 % | |
781 | 2020 | Dinas Pendidikan dan Kebudayaan | perencanaan rehab dan pembangunan pagar SMP (SMPN 1 Kalumpang & SMPN 1 Sungai Raya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3903282 | 26201714 | 3,000,000 | 3,000,000 | 2,970,000 | 2,970,000 | 2,900,000 | 2,900,000 | 0 | 0 | 2020-10-12 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 30,000 | 1 % | |
782 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Ibnu Umar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3904282 | 23823686 | 17,100,000 | 17,000,000 | 16,720,000 | 16,720,000 | 15,345,000 | 15,345,000 | 0 | 0 | 2020-10-12 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 380,000 | 2.22 % | |
783 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Pesantren Ibnu Umar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3904282 | 23823686 | 17,100,000 | 17,000,000 | 16,720,000 | 16,720,000 | 15,345,000 | 15,345,000 | 0 | 0 | 2020-10-12 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 380,000 | 2.22 % | |
784 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Baruh Jaya untuk mendukung peningkatan produksi pertanian di Kec. Daha Selatan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3906282 | 26073114 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 0 | 0 | 2020-10-19 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 100,000 | 0.33 % | |
785 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Baruh Jaya untuk mendukung peningkatan produksi pertanian di Kec. Daha Selatan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3906282 | 26073114 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 0 | 0 | 2020-10-19 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 100,000 | 0.33 % | |
786 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Desa Tanjung Selor Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3908282 | 23035812 | 24,000,000 | 23,526,009 | 23,433,300 | 0 | 23,323,300 | 23,323,300 | 0 | 0 | 2020-10-12 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 566,700 | 2.36 % | |
787 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultan Pengawas Pembuatan/Peningkatan Jalan Lingkungan Desa Tanjung Selor Kec. Daha Barat (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3908282 | 23035812 | 24,000,000 | 23,526,009 | 23,433,300 | 0 | 23,323,300 | 23,323,300 | 0 | 0 | 2020-10-12 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 566,700 | 2.36 % | |
788 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3909282 | 26283910 | 12,000,000 | 12,000,000 | 11,825,000 | 11,825,000 | 11,700,000 | 11,700,000 | 0 | 0 | 2020-10-12 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,000 | 1.46 % | |
789 | 2020 | Dinas Pendidikan dan Kebudayaan | Perencanaan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3909282 | 26283910 | 12,000,000 | 12,000,000 | 11,825,000 | 11,825,000 | 11,700,000 | 11,700,000 | 0 | 0 | 2020-10-12 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 175,000 | 1.46 % | |
790 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3910282 | 26138134 | 199,500,000 | 199,470,830 | 199,000,074 | 199,000,074 | 198,996,884 | 198,996,884 | 0 | 0 | 2020-10-16 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 499,926 | 0.25 % | |
791 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Pekerjaan Konstruksi | 3910282 | 26138134 | 199,500,000 | 199,470,830 | 199,000,074 | 199,000,074 | 198,996,884 | 198,996,884 | 0 | 0 | 2020-10-16 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 499,926 | 0.25 % | |
792 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Simpur, Sungai Raya, Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3912282 | 26345406 | 100,000,000 | 97,494,375 | 97,020,000 | 97,020,000 | 97,000,000 | 97,000,000 | 0 | 0 | 2020-10-15 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,980,000 | 2.98 % | |
793 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Simpur, Sungai Raya, Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3912282 | 26345406 | 100,000,000 | 97,494,375 | 97,020,000 | 97,020,000 | 97,000,000 | 97,000,000 | 0 | 0 | 2020-10-15 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,980,000 | 2.98 % | |
794 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Pantai Harapan dan Sekitarnya Kelurahan Kandangan Kota (p=250m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3914282 | 23033165 | 180,400,000 | 180,186,797 | 179,649,784 | 0 | 179,591,000 | 179,591,000 | 0 | 0 | 2020-10-12 | cv.ghea | 82.333.270.5-733.000 | 750,216 | 0.42 % | |
795 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan/Peningkatan Jalan Lingkungan Gg. Pantai Harapan dan Sekitarnya Kelurahan Kandangan Kota (p=250m) | Pengadaan Langsung | Pekerjaan Konstruksi | 3914282 | 23033165 | 180,400,000 | 180,186,797 | 179,649,784 | 0 | 179,591,000 | 179,591,000 | 0 | 0 | 2020-10-12 | cv.ghea | 82.333.270.5-733.000 | 750,216 | 0.42 % | |
796 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Kandangan, Angkinang, Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3915282 | 26345408 | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 2,870,000 | 2.87 % | |
797 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Kandangan, Angkinang, Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3915282 | 26345408 | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 2,870,000 | 2.87 % | |
798 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Loksado, Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3916282 | 26345410 | 100,000,000 | 97,494,375 | 97,086,000 | 97,086,000 | 97,086,000 | 97,086,000 | 0 | 0 | 2020-10-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,914,000 | 2.91 % | |
799 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Loksado, Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3916282 | 26345410 | 100,000,000 | 97,494,375 | 97,086,000 | 97,086,000 | 97,086,000 | 97,086,000 | 0 | 0 | 2020-10-23 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 2,914,000 | 2.91 % | |
800 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Daha Selatan, Daha Utara, Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3917282 | 26345407 | 100,000,000 | 97,494,375 | 96,140,000 | 96,140,000 | 96,100,000 | 96,100,000 | 0 | 0 | 2020-10-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 3,860,000 | 3.86 % | |
801 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jalan di Kec. Daha Selatan, Daha Utara, Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3917282 | 26345407 | 100,000,000 | 97,494,375 | 96,140,000 | 96,140,000 | 96,100,000 | 96,100,000 | 0 | 0 | 2020-10-15 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 3,860,000 | 3.86 % | |
802 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3918282 | 26345417 | 100,000,000 | 97,494,375 | 96,800,000 | 96,800,000 | 96,750,000 | 96,750,000 | 0 | 0 | 2020-10-15 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 3,200,000 | 3.2 % | |
803 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3918282 | 26345417 | 100,000,000 | 97,494,375 | 96,800,000 | 96,800,000 | 96,750,000 | 96,750,000 | 0 | 0 | 2020-10-15 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 3,200,000 | 3.2 % | |
804 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3919282 | 26345415 | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,870,000 | 2.87 % | |
805 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Survey database Jembatan di Wilayah II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3919282 | 26345415 | 100,000,000 | 97,494,375 | 97,130,000 | 97,130,000 | 97,100,000 | 97,100,000 | 0 | 0 | 2020-10-23 | CV. RAMIER JAYA ARKANANTA | 80.562.640.5-731.000 | 2,870,000 | 2.87 % | |
806 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Ruas Jl. Tumbukan Banyu - Banua Hanyar dan Jl. Gerilya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3920282 | 26156807 | 60,000,000 | 59,984,375 | 59,730,000 | 59,730,000 | 59,700,000 | 59,700,000 | 0 | 0 | 2020-11-09 | cv. alfa banua estetika | 81.252.051.8-731.000 | 270,000 | 0.45 % | |
807 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Ruas Jl. Tumbukan Banyu - Banua Hanyar dan Jl. Gerilya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3920282 | 26156807 | 60,000,000 | 59,984,375 | 59,730,000 | 59,730,000 | 59,700,000 | 59,700,000 | 0 | 0 | 2020-11-09 | cv. alfa banua estetika | 81.252.051.8-731.000 | 270,000 | 0.45 % | |
808 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Jembatan Gantung Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3921282 | 23373274 | 100,000,000 | 96,603,837 | 96,305,000 | 96,305,000 | 96,305,000 | 96,305,000 | 0 | 0 | 2020-10-20 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 3,695,000 | 3.7 % | |
809 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Perencanaan Jembatan Gantung Durian Rabung Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3921282 | 23373274 | 100,000,000 | 96,603,837 | 96,305,000 | 96,305,000 | 96,305,000 | 96,305,000 | 0 | 0 | 2020-10-20 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 3,695,000 | 3.7 % | |
810 | 2020 | Dinas Perikanan | Belanja bahan perlengkapan Demplot budidadaya ikan dalam kolam terpal bundar sistem bioflock | Pengadaan Langsung | Pengadaan Barang | 3923282 | 26140891 | 73,025,000 | 72,261,750 | 71,997,750 | 71,997,750 | 71,900,000 | 71,900,000 | 0 | 0 | 2020-10-13 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,027,250 | 1.41 % | |
811 | 2020 | Dinas Perikanan | Belanja bahan perlengkapan Demplot budidadaya ikan dalam kolam terpal bundar sistem bioflock | Pengadaan Langsung | Pengadaan Barang | 3923282 | 26140891 | 73,025,000 | 72,261,750 | 71,997,750 | 71,997,750 | 71,900,000 | 71,900,000 | 0 | 0 | 2020-10-13 | CV. HATSMA PUTRA PRATAMA | 01.434.881.7-733.000 | 1,027,250 | 1.41 % | |
812 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3926282 | 26346837 | 13,900,000 | 13,899,998 | 13,860,000 | 0 | 13,860,000 | 13,860,000 | 0 | 0 | 2020-10-13 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 40,000 | 0.29 % | |
813 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3926282 | 26346837 | 13,900,000 | 13,899,998 | 13,860,000 | 0 | 13,860,000 | 13,860,000 | 0 | 0 | 2020-10-13 | CV. AL BANA KONSULTAN | 02.919.473.5-735.000 | 40,000 | 0.29 % | |
814 | 2020 | Dinas Perdagangan | Pemeliharaan Rutin Pasar lingkup bidang pengelolaan pasar kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3927282 | 26374401 | 200,000,000 | 198,753,864 | 198,621,779 | 0 | 198,621,700 | 198,621,700 | 0 | 0 | 2020-10-19 | CV SURYA UTAMA | 01.222.174.3-733.000 | 1,378,221 | 0.69 % | |
815 | 2020 | Dinas Perdagangan | Pemeliharaan Rutin Pasar lingkup bidang pengelolaan pasar kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3927282 | 26374401 | 200,000,000 | 198,753,864 | 198,621,779 | 0 | 198,621,700 | 198,621,700 | 0 | 0 | 2020-10-19 | CV SURYA UTAMA | 01.222.174.3-733.000 | 1,378,221 | 0.69 % | |
816 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 3928282 | 26346792 | 198,900,000 | 198,444,094 | 198,003,199 | 0 | 198,003,100 | 198,003,100 | 0 | 0 | 2020-10-13 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 896,801 | 0.45 % | |
817 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Pasar Nagara (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 3928282 | 26346792 | 198,900,000 | 198,444,094 | 198,003,199 | 0 | 198,003,100 | 198,003,100 | 0 | 0 | 2020-10-13 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 896,801 | 0.45 % | |
818 | 2020 | Dinas Perdagangan | Pengawasan rehap atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3929282 | 26360796 | 13,900,000 | 13,899,999 | 13,733,755 | 0 | 13,733,700 | 13,733,700 | 0 | 0 | 2020-11-11 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 166,245 | 1.2 % | |
819 | 2020 | Dinas Perdagangan | Pengawasan rehap atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3929282 | 26360796 | 13,900,000 | 13,899,999 | 13,733,755 | 0 | 13,733,700 | 13,733,700 | 0 | 0 | 2020-11-11 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 166,245 | 1.2 % | |
820 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3930282 | 26346583 | 13,900,000 | 13,899,999 | 13,683,773 | 0 | 13,683,700 | 13,683,700 | 0 | 0 | 2020-11-11 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 216,227 | 1.56 % | |
821 | 2020 | Dinas Perdagangan | Pengawasan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3930282 | 26346583 | 13,900,000 | 13,899,999 | 13,683,773 | 0 | 13,683,700 | 13,683,700 | 0 | 0 | 2020-11-11 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 216,227 | 1.56 % | |
822 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3931282 | 26141062 | 8,000,000 | 8,000,000 | 7,920,000 | 7,920,000 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-10-15 | Jamilah | 14.427.417.2-733.000 | 80,000 | 1 % | |
823 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3931282 | 26141062 | 8,000,000 | 8,000,000 | 7,920,000 | 7,920,000 | 7,920,000 | 7,920,000 | 0 | 0 | 2020-10-15 | Jamilah | 14.427.417.2-733.000 | 80,000 | 1 % | |
824 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3932282 | 26138362 | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-10-16 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 100,000 | 1 % | |
825 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3932282 | 26138362 | 10,000,000 | 10,000,000 | 9,900,000 | 9,900,000 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-10-16 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 100,000 | 1 % | |
826 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3933282 | 26212410 | 25,000,000 | 24,850,000 | 24,750,000 | 24,750,000 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 250,000 | 1 % | |
827 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3933282 | 26212410 | 25,000,000 | 24,850,000 | 24,750,000 | 24,750,000 | 24,500,000 | 24,500,000 | 0 | 0 | 2020-10-14 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 250,000 | 1 % | |
828 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3934282 | 26138273 | 10,000,000 | 10,000,000 | 9,996,580 | 0 | 9,994,600 | 9,994,600 | 0 | 0 | 2020-10-20 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 3,420 | 0.03 % | |
829 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultan Perencanaan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3934282 | 26138273 | 10,000,000 | 10,000,000 | 9,996,580 | 0 | 9,994,600 | 9,994,600 | 0 | 0 | 2020-10-20 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 3,420 | 0.03 % | |
830 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3935282 | 23330155 | 171,000,000 | 170,969,218 | 170,902,785 | 170,902,785 | 170,820,000 | 170,820,000 | 0 | 0 | 2020-10-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 97,215 | 0.06 % | |
831 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 3935282 | 23330155 | 171,000,000 | 170,969,218 | 170,902,785 | 170,902,785 | 170,820,000 | 170,820,000 | 0 | 0 | 2020-10-27 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 97,215 | 0.06 % | |
832 | 2020 | Dinas Ketahanan Pangan | Rehab Lantai Jemur Lumbung Pangan Masyarakat Al-Barakah Desa Asam (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3936282 | 26330639 | 22,900,000 | 22,891,649 | 22,733,123 | 22,733,123 | 22,232,000 | 22,232,000 | 0 | 0 | 2020-10-23 | CV. AISY | 75.132.070.6-733.000 | 166,877 | 0.73 % | |
833 | 2020 | Dinas Ketahanan Pangan | Rehab Lantai Jemur Lumbung Pangan Masyarakat Al-Barakah Desa Asam (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 3936282 | 26330639 | 22,900,000 | 22,891,649 | 22,733,123 | 22,733,123 | 22,232,000 | 22,232,000 | 0 | 0 | 2020-10-23 | CV. AISY | 75.132.070.6-733.000 | 166,877 | 0.73 % | |
834 | 2020 | Sekretariat Daerah | Pengadaan Pilar Batas Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3937282 | 26398767 | 70,000,000 | 69,931,510 | 69,821,510 | 0 | 69,821,500 | 69,821,500 | 0 | 0 | 2020-11-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 178,490 | 0.25 % | |
835 | 2020 | Sekretariat Daerah | Pengadaan Pilar Batas Kecamatan | Pengadaan Langsung | Pekerjaan Konstruksi | 3937282 | 26398767 | 70,000,000 | 69,931,510 | 69,821,510 | 0 | 69,821,500 | 69,821,500 | 0 | 0 | 2020-11-03 | KARYA DWI CHADE | 75.416.433.3-733.000 | 178,490 | 0.25 % | |
836 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Pelayanan Publik Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3938282 | 26174499 | 20,000,000 | 20,000,000 | 19,677,337 | 19,677,337 | 19,600,000 | 19,600,000 | 0 | 0 | 2020-10-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 322,663 | 1.61 % | |
837 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembuatan Pelayanan Publik Dinas PUTR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3938282 | 26174499 | 20,000,000 | 20,000,000 | 19,677,337 | 19,677,337 | 19,600,000 | 19,600,000 | 0 | 0 | 2020-10-16 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 322,663 | 1.61 % | |
838 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan/Rehabilitasi Saluran Drainase Jalan Al Falah Kel. Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3939282 | 26165268 | 70,000,000 | 70,000,000 | 69,256,877 | 69,256,877 | 69,200,000 | 69,200,000 | 0 | 0 | 2020-10-23 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 743,123 | 1.06 % | |
839 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan/Rehabilitasi Saluran Drainase Jalan Al Falah Kel. Kandangan Kota | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3939282 | 26165268 | 70,000,000 | 70,000,000 | 69,256,877 | 69,256,877 | 69,200,000 | 69,200,000 | 0 | 0 | 2020-10-23 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 743,123 | 1.06 % | |
840 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Pondok Pesantren Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3940282 | 26165262 | 50,000,000 | 50,000,000 | 49,720,000 | 49,720,000 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-10-21 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 280,000 | 0.56 % | |
841 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Pondok Pesantren Dalam Pagar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3940282 | 26165262 | 50,000,000 | 50,000,000 | 49,720,000 | 49,720,000 | 49,650,000 | 49,650,000 | 0 | 0 | 2020-10-21 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 280,000 | 0.56 % | |
842 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Ponpes Tarbiyatul Furqon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3941282 | 26162723 | 50,000,000 | 50,000,000 | 49,665,000 | 49,665,000 | 49,600,000 | 49,600,000 | 0 | 0 | 2020-10-21 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 335,000 | 0.67 % | |
843 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Pembangunan MCK di Ponpes Tarbiyatul Furqon | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3941282 | 26162723 | 50,000,000 | 50,000,000 | 49,665,000 | 49,665,000 | 49,600,000 | 49,600,000 | 0 | 0 | 2020-10-21 | ARCHITECTURE CONSULTANT ENGINEERING | 81.830.801.7-731.000 | 335,000 | 0.67 % | |
844 | 2020 | Dinas Kesehatan | Belanja jaringan pipa gas distribusi (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 3942282 | 26162796 | 180,000,000 | 179,987,500 | 179,500,200 | 0 | 179,500,000 | 179,500,000 | 0 | 0 | 2020-10-21 | CV. YONIA | 02.089.778.1-733.000 | 499,800 | 0.28 % | |
845 | 2020 | Dinas Kesehatan | Belanja jaringan pipa gas distribusi (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 3942282 | 26162796 | 180,000,000 | 179,987,500 | 179,500,200 | 0 | 179,500,000 | 179,500,000 | 0 | 0 | 2020-10-21 | CV. YONIA | 02.089.778.1-733.000 | 499,800 | 0.28 % | |
846 | 2020 | Dinas Pertanian | Pengadaan Bibit Aren Genjah, Herbisida dan PMLT,Pengadaan bibit aren genjah (plasi 10%) | Pengadaan Langsung | Pengadaan Barang | 3945282 | 24110506;25744292;25744312 | 56,790,000 | 55,440,000 | 54,846,000 | 54,846,000 | 54,846,000 | 54,846,000 | 0 | 0 | 2020-10-16 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 1,944,000 | 3.42 % | |
847 | 2020 | Dinas Pertanian | Pengadaan Bibit Aren Genjah, Herbisida dan PMLT,Pengadaan bibit aren genjah (plasi 10%) | Pengadaan Langsung | Pengadaan Barang | 3945282 | 24110506;25744292;25744312 | 56,790,000 | 55,440,000 | 54,846,000 | 54,846,000 | 54,846,000 | 54,846,000 | 0 | 0 | 2020-10-16 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 1,944,000 | 3.42 % | |
848 | 2020 | Dinas Pertanian | Pengadaan Bibit Karet Unggul Okulasi, Herbisida dan PMLT | Pengadaan Langsung | Pengadaan Barang | 3946282 | 25744837;25744849;25744873 | 68,600,000 | 67,650,000 | 67,375,000 | 67,375,000 | 67,375,000 | 67,375,000 | 0 | 0 | 2020-10-16 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 1,225,000 | 1.79 % | |
849 | 2020 | Dinas Pertanian | Pengadaan Bibit Karet Unggul Okulasi, Herbisida dan PMLT | Pengadaan Langsung | Pengadaan Barang | 3946282 | 25744837;25744849;25744873 | 68,600,000 | 67,650,000 | 67,375,000 | 67,375,000 | 67,375,000 | 67,375,000 | 0 | 0 | 2020-10-16 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 1,225,000 | 1.79 % | |
850 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengb. Kelapa Genjah dan Pemeliharaan Kebun Kelapa | Pengadaan Langsung | Pengadaan Barang | 3947282 | 24110656;24110657 | 30,510,000 | 30,368,250 | 30,294,000 | 30,294,000 | 30,294,000 | 30,294,000 | 0 | 0 | 2020-10-16 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 216,000 | 0.71 % | |
851 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengb. Kelapa Genjah dan Pemeliharaan Kebun Kelapa | Pengadaan Langsung | Pengadaan Barang | 3947282 | 24110656;24110657 | 30,510,000 | 30,368,250 | 30,294,000 | 30,294,000 | 30,294,000 | 30,294,000 | 0 | 0 | 2020-10-16 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 216,000 | 0.71 % | |
852 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Pekerjaan Konstruksi | 3948282 | 26139676 | 200,000,000 | 199,395,702 | 198,882,438 | 198,882,438 | 198,849,000 | 198,849,000 | 0 | 0 | 2020-10-19 | FADWI UTAMA | 94.246.044.5-733.000 | 1,117,562 | 0.56 % | |
853 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Pekerjaan Konstruksi | 3948282 | 26139676 | 200,000,000 | 199,395,702 | 198,882,438 | 198,882,438 | 198,849,000 | 198,849,000 | 0 | 0 | 2020-10-19 | FADWI UTAMA | 94.246.044.5-733.000 | 1,117,562 | 0.56 % | |
854 | 2020 | Sekretariat DPRD | Perencanaan Rehab Jendela dan Ventilasi Ruang Rapat DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3950282 | 26261191 | 12,000,000 | 11,998,388 | 11,900,683 | 0 | 11,900,600 | 11,900,600 | 0 | 0 | 2020-10-17 | Angga Isnarreza | 70.689.929.1-733.000 | 99,317 | 0.83 % | |
855 | 2020 | Sekretariat DPRD | Perencanaan Rehab Jendela dan Ventilasi Ruang Rapat DPRD | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3950282 | 26261191 | 12,000,000 | 11,998,388 | 11,900,683 | 0 | 11,900,600 | 11,900,600 | 0 | 0 | 2020-10-17 | Angga Isnarreza | 70.689.929.1-733.000 | 99,317 | 0.83 % | |
856 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Perencanaan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3952282 | 26178424 | 6,000,000 | 5,999,623 | 5,875,839 | 0 | 5,875,800 | 5,875,800 | 0 | 0 | 2020-10-18 | Angga Isnarreza | 70.689.929.1-733.000 | 124,161 | 2.07 % | |
857 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Perencanaan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3952282 | 26178424 | 6,000,000 | 5,999,623 | 5,875,839 | 0 | 5,875,800 | 5,875,800 | 0 | 0 | 2020-10-18 | Angga Isnarreza | 70.689.929.1-733.000 | 124,161 | 2.07 % | |
858 | 2020 | Dinas Komunikasi dan Informatika | Pemeliharaan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3953282 | 23869240 | 27,500,000 | 27,456,931 | 27,126,931 | 0 | 27,126,931 | 27,126,931 | 0 | 0 | 2020-10-19 | CV. KHALIF | 81.540.809.1-733.000 | 373,069 | 1.36 % | |
859 | 2020 | Dinas Komunikasi dan Informatika | Pemeliharaan Gedung Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 3953282 | 23869240 | 27,500,000 | 27,456,931 | 27,126,931 | 0 | 27,126,931 | 27,126,931 | 0 | 0 | 2020-10-19 | CV. KHALIF | 81.540.809.1-733.000 | 373,069 | 1.36 % | |
860 | 2020 | Dinas Kesehatan | Pembuataan Pagar Samping PKM Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3955282 | 26174710 | 75,000,000 | 74,963,957 | 74,513,302 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-10-20 | CV. JAYA ABADI | 02.237.609.9-733.000 | 486,698 | 0.65 % | |
861 | 2020 | Dinas Kesehatan | Pembuataan Pagar Samping PKM Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3955282 | 26174710 | 75,000,000 | 74,963,957 | 74,513,302 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-10-20 | CV. JAYA ABADI | 02.237.609.9-733.000 | 486,698 | 0.65 % | |
862 | 2020 | Dinas Kesehatan | Pengawasan Pembuatan Pagar Puskemas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3956282 | 26174713 | 10,000,000 | 9,955,000 | 9,922,000 | 0 | 9,500,000 | 9,500,000 | 0 | 0 | 2020-10-20 | cv.akmalindo | 02.531.482.4-731.000 | 78,000 | 0.78 % | |
863 | 2020 | Dinas Kesehatan | Pengawasan Pembuatan Pagar Puskemas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3956282 | 26174713 | 10,000,000 | 9,955,000 | 9,922,000 | 0 | 9,500,000 | 9,500,000 | 0 | 0 | 2020-10-20 | cv.akmalindo | 02.531.482.4-731.000 | 78,000 | 0.78 % | |
864 | 2020 | Dinas Perikanan | Belanja bahan dan peralatan Perlengkapan Demplot budidaya ikan Dalam kolam terpal Bundar sistem biopflock | Pengadaan Langsung | Pengadaan Barang | 3960282 | 26140727 | 65,350,000 | 62,040,000 | 61,880,500 | 61,880,500 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-10-19 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 3,469,500 | 5.31 % | |
865 | 2020 | Dinas Perikanan | Belanja bahan dan peralatan Perlengkapan Demplot budidaya ikan Dalam kolam terpal Bundar sistem biopflock | Pengadaan Langsung | Pengadaan Barang | 3960282 | 26140727 | 65,350,000 | 62,040,000 | 61,880,500 | 61,880,500 | 61,800,000 | 61,800,000 | 0 | 0 | 2020-10-19 | Cv. Bintang Meratus | 94.998.533.7-733.000 | 3,469,500 | 5.31 % | |
866 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 3961282 | 23329930 | 200,000,000 | 199,917,077 | 199,310,319 | 199,310,319 | 199,172,000 | 199,172,000 | 0 | 0 | 2020-10-20 | CV RIZKY BANUA | 02.089.856.5-733.000 | 689,681 | 0.34 % | |
867 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Pekerjaan Konstruksi | 3961282 | 23329930 | 200,000,000 | 199,917,077 | 199,310,319 | 199,310,319 | 199,172,000 | 199,172,000 | 0 | 0 | 2020-10-20 | CV RIZKY BANUA | 02.089.856.5-733.000 | 689,681 | 0.34 % | |
868 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962282 | 23329946 | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,740,000 | 9,740,000 | 0 | 0 | 2020-10-20 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 254,129 | 2.54 % | |
869 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pembangunan Venue balap sepeda di Desa Malutu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3962282 | 23329946 | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,740,000 | 9,740,000 | 0 | 0 | 2020-10-20 | PT. Multi Cipta Engineering | 02.242.562.3-733.000 | 254,129 | 2.54 % | |
870 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Goa Berangin (81) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964282 | 26216701 | 50,000,000 | 49,152,243 | 48,950,000 | 48,950,000 | 48,880,000 | 48,880,000 | 0 | 0 | 2020-11-06 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,050,000 | 2.1 % | |
871 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Malutu Goa Berangin (81) Kec. Padang Batung (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3964282 | 26216701 | 50,000,000 | 49,152,243 | 48,950,000 | 48,950,000 | 48,880,000 | 48,880,000 | 0 | 0 | 2020-11-06 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,050,000 | 2.1 % | |
872 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3965282 | 26136077 | 50,000,000 | 49,152,243 | 48,750,000 | 48,750,000 | 48,700,000 | 48,700,000 | 0 | 0 | 2020-11-10 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 1,250,000 | 2.5 % | |
873 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Balanti untuk jalur pengangkutan hasil pertanian di Kecamatan Kalumpang dan Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3965282 | 26136077 | 50,000,000 | 49,152,243 | 48,750,000 | 48,750,000 | 48,700,000 | 48,700,000 | 0 | 0 | 2020-11-10 | CV. NONO THE SAINS | 82.661.854.8-735.000 | 1,250,000 | 2.5 % | |
874 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Tabihi Telaga Langsat (106) Kec. Padang Batung/ Telaga Langsat (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966282 | 26216885 | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-05 | cv.mitra talenta prima | 02.746.658.0-733.000 | 909,750 | 1.82 % | |
875 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pelebaran ruas Jl. Tabihi Telaga Langsat (106) Kec. Padang Batung/ Telaga Langsat (Lanjutan) (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3966282 | 26216885 | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-05 | cv.mitra talenta prima | 02.746.658.0-733.000 | 909,750 | 1.82 % | |
876 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan menuju Balai Benih Ikan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967282 | 26153086 | 40,000,000 | 37,304,182 | 37,119,500 | 37,119,500 | 37,100,000 | 37,100,000 | 0 | 0 | 2020-11-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,880,500 | 7.2 % | |
877 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jalan menuju Balai Benih Ikan Kec. Sungai Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3967282 | 26153086 | 40,000,000 | 37,304,182 | 37,119,500 | 37,119,500 | 37,100,000 | 37,100,000 | 0 | 0 | 2020-11-09 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 2,880,500 | 7.2 % | |
878 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Sarang Nyamuk Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968282 | 26153253 | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 909,750 | 1.82 % | |
879 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Penggantian Jembatan Sarang Nyamuk Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3968282 | 26153253 | 50,000,000 | 49,152,243 | 49,090,250 | 49,090,250 | 49,000,000 | 49,000,000 | 0 | 0 | 2020-11-11 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 909,750 | 1.82 % | |
880 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 3969282 | 26139635 | 200,000,000 | 199,013,443 | 198,842,149 | 198,842,149 | 198,781,649 | 198,781,649 | 0 | 0 | 2020-11-11 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,157,851 | 0.58 % | |
881 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Pekerjaan Konstruksi | 3969282 | 26139635 | 200,000,000 | 199,013,443 | 198,842,149 | 198,842,149 | 198,781,649 | 198,781,649 | 0 | 0 | 2020-11-11 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,157,851 | 0.58 % | |
882 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3970282 | 26141131 | 200,000,000 | 198,680,377 | 198,496,127 | 198,496,127 | 198,372,769 | 198,372,769 | 0 | 0 | 2020-10-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,503,873 | 0.75 % | |
883 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3970282 | 26141131 | 200,000,000 | 198,680,377 | 198,496,127 | 198,496,127 | 198,372,769 | 198,372,769 | 0 | 0 | 2020-10-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 1,503,873 | 0.75 % | |
884 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 3971282 | 26140885 | 199,700,000 | 199,095,248 | 198,820,248 | 198,820,248 | 198,193,146 | 198,193,146 | 0 | 0 | 2020-10-27 | cv. rukun damai | 01.203.952.5-733.000 | 879,752 | 0.44 % | |
885 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Pekerjaan Konstruksi | 3971282 | 26140885 | 199,700,000 | 199,095,248 | 198,820,248 | 198,820,248 | 198,193,146 | 198,193,146 | 0 | 0 | 2020-10-27 | cv. rukun damai | 01.203.952.5-733.000 | 879,752 | 0.44 % | |
886 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3976282 | 26422353 | 120,000,000 | 119,977,245 | 119,867,245 | 119,867,245 | 119,867,244 | 119,867,244 | 0 | 0 | 2020-10-21 | CV.DITA | 02.242.686.0-733.000 | 132,755 | 0.11 % | |
887 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Pekerjaan Konstruksi | 3976282 | 26422353 | 120,000,000 | 119,977,245 | 119,867,245 | 119,867,245 | 119,867,244 | 119,867,244 | 0 | 0 | 2020-10-21 | CV.DITA | 02.242.686.0-733.000 | 132,755 | 0.11 % | |
888 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3977282 | 26138170 | 199,800,000 | 199,768,795 | 199,251,502 | 199,251,502 | 199,196,502 | 199,196,502 | 0 | 0 | 2020-10-21 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 548,498 | 0.27 % | |
889 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 3977282 | 26138170 | 199,800,000 | 199,768,795 | 199,251,502 | 199,251,502 | 199,196,502 | 199,196,502 | 0 | 0 | 2020-10-21 | CV. Rezky Iqbal Mandiri | 75.269.250.9-733.000 | 548,498 | 0.27 % | |
890 | 2020 | Kecamatan Padang Batung | Konsultan Perencanaan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978282 | 26156762 | 3,000,000 | 2,995,300 | 2,940,300 | 0 | 2,940,300 | 2,940,300 | 0 | 0 | 2020-10-21 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 59,700 | 1.99 % | |
891 | 2020 | Kecamatan Padang Batung | Konsultan Perencanaan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3978282 | 26156762 | 3,000,000 | 2,995,300 | 2,940,300 | 0 | 2,940,300 | 2,940,300 | 0 | 0 | 2020-10-21 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 59,700 | 1.99 % | |
892 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas KH. Anwari Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3979282 | 26216753 | 194,400,000 | 194,319,123 | 194,279,303 | 194,279,303 | 194,187,783 | 194,187,783 | 0 | 0 | 2020-10-27 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,697 | 0.06 % | |
893 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di ruas KH. Anwari Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3979282 | 26216753 | 194,400,000 | 194,319,123 | 194,279,303 | 194,279,303 | 194,187,783 | 194,187,783 | 0 | 0 | 2020-10-27 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 120,697 | 0.06 % | |
894 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980282 | 26138345 | 10,000,000 | 10,000,000 | 9,906,500 | 9,906,500 | 9,903,300 | 9,903,300 | 0 | 0 | 2020-11-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 93,500 | 0.94 % | |
895 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3980282 | 26138345 | 10,000,000 | 10,000,000 | 9,906,500 | 9,906,500 | 9,903,300 | 9,903,300 | 0 | 0 | 2020-11-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 93,500 | 0.94 % | |
896 | 2020 | Dinas Perhubungan | Perencanaan Pembangunan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3983282 | 26423479 | 7,000,000 | 6,993,261 | 6,985,000 | 0 | 6,985,000 | 6,985,000 | 0 | 0 | 2020-10-24 | DODY WIJAYA | 15.516.787.7-733.000 | 15,000 | 0.21 % | |
897 | 2020 | Dinas Perhubungan | Perencanaan Pembangunan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3983282 | 26423479 | 7,000,000 | 6,993,261 | 6,985,000 | 0 | 6,985,000 | 6,985,000 | 0 | 0 | 2020-10-24 | DODY WIJAYA | 15.516.787.7-733.000 | 15,000 | 0.21 % | |
898 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Jangkang, Kalumpang Baruh, dan KH.Anwari Kec. Kandangan/Kalumpang/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985282 | 26216741 | 36,000,000 | 35,410,473 | 35,241,250 | 35,241,250 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-12 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 758,750 | 2.11 % | |
899 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Jangkang, Kalumpang Baruh, dan KH.Anwari Kec. Kandangan/Kalumpang/Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3985282 | 26216741 | 36,000,000 | 35,410,473 | 35,241,250 | 35,241,250 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-12 | CV. TETRAWIDA UTAMA | 03.266.091.2-731.000 | 758,750 | 2.11 % | |
900 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan depan MTsN Angkinang, menuju MIN Gala Gala Kec. Telaga Langsat dan Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986282 | 26155053 | 36,000,000 | 35,410,473 | 35,243,450 | 35,243,450 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-16 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 756,550 | 2.1 % | |
901 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan depan MTsN Angkinang, menuju MIN Gala Gala Kec. Telaga Langsat dan Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3986282 | 26155053 | 36,000,000 | 35,410,473 | 35,243,450 | 35,243,450 | 35,200,000 | 35,200,000 | 0 | 0 | 2020-11-16 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 756,550 | 2.1 % | |
902 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3987282 | 26138321 | 150,000,000 | 149,968,664 | 149,621,217 | 0 | 149,957,000 | 149,374,000 | 0 | 0 | 2020-10-22 | CV. ALBATROS | 01.222.160.2-733.000 | 378,783 | 0.25 % | |
903 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing dengan Pasangan Bronjong Lingkungan Kantor Pengamat D.I. Telaga Langsat Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 3987282 | 26138321 | 150,000,000 | 149,968,664 | 149,621,217 | 0 | 149,957,000 | 149,374,000 | 0 | 0 | 2020-10-22 | CV. ALBATROS | 01.222.160.2-733.000 | 378,783 | 0.25 % | |
904 | 2020 | Dinas Perhubungan | Pengawasan Pekerjaan Pembangunan Dermaga Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3988282 | 26434568 | 10,000,000 | 9,949,859 | 9,900,000 | 0 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-11-17 | DODY WIJAYA | 15.516.787.7-733.000 | 100,000 | 1 % | |
905 | 2020 | Dinas Perhubungan | Pengawasan Pekerjaan Pembangunan Dermaga Feri Penyeberangan | Pengadaan Langsung | Jasa Konsultansi Perorangan | 3988282 | 26434568 | 10,000,000 | 9,949,859 | 9,900,000 | 0 | 9,900,000 | 9,900,000 | 0 | 0 | 2020-11-17 | DODY WIJAYA | 15.516.787.7-733.000 | 100,000 | 1 % | |
906 | 2020 | RSUD Brigjen H. Hasan Basry | Mesin Pengolah Sampah | Pengadaan Langsung | Pengadaan Barang | 3990282 | 26302964 | 190,000,000 | 190,000,000 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 0 | 0 | 2020-10-22 | PT.PARAHYANGAN TEKNIKA PERSADA | 84.802.805.6-444.000 | 500,000 | 0.26 % | |
907 | 2020 | RSUD Brigjen H. Hasan Basry | Mesin Pengolah Sampah | Pengadaan Langsung | Pengadaan Barang | 3990282 | 26302964 | 190,000,000 | 190,000,000 | 189,500,000 | 189,500,000 | 189,500,000 | 189,500,000 | 0 | 0 | 2020-10-22 | PT.PARAHYANGAN TEKNIKA PERSADA | 84.802.805.6-444.000 | 500,000 | 0.26 % | |
908 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991282 | 26138173 | 10,000,000 | 10,000,000 | 9,993,500 | 9,935,000 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
909 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Pandak Daun Kec. Daha Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3991282 | 26138173 | 10,000,000 | 10,000,000 | 9,993,500 | 9,935,000 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
910 | 2020 | Dinas Ketahanan Pangan | Belanja Paket Bioflok untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 3992282 | 26332180 | 209,412,000 | 198,632,610 | 198,434,610 | 198,434,610 | 198,434,610 | 198,434,610 | 0 | 0 | 2020-11-03 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,977,390 | 5.24 % | |
911 | 2020 | Dinas Ketahanan Pangan | Belanja Paket Bioflok untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 3992282 | 26332180 | 209,412,000 | 198,632,610 | 198,434,610 | 198,434,610 | 198,434,610 | 198,434,610 | 0 | 0 | 2020-11-03 | CV. BATU LAKI PERMAI | 01.424.553.4-733.000 | 10,977,390 | 5.24 % | |
912 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3993282 | 26447423 | 183,200,000 | 183,119,624 | 183,076,724 | 183,076,724 | 183,011,604 | 183,011,604 | 0 | 0 | 2020-10-27 | CV SURYA UTAMA | 01.222.174.3-733.000 | 123,276 | 0.07 % | |
913 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 3993282 | 26447423 | 183,200,000 | 183,119,624 | 183,076,724 | 183,076,724 | 183,011,604 | 183,011,604 | 0 | 0 | 2020-10-27 | CV SURYA UTAMA | 01.222.174.3-733.000 | 123,276 | 0.07 % | |
914 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3995282 | 26174486 | 60,000,000 | 60,000,000 | 59,741,000 | 59,741,000 | 59,664,000 | 59,664,000 | 0 | 0 | 2020-11-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 259,000 | 0.43 % | |
915 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Rumah Dinas Kapolres Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3995282 | 26174486 | 60,000,000 | 60,000,000 | 59,741,000 | 59,741,000 | 59,664,000 | 59,664,000 | 0 | 0 | 2020-11-05 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 259,000 | 0.43 % | |
916 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3996282 | 26155227 | 15,000,000 | 15,000,000 | 14,894,000 | 14,894,000 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-16 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 106,000 | 0.71 % | |
917 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3996282 | 26155227 | 15,000,000 | 15,000,000 | 14,894,000 | 14,894,000 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-16 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 106,000 | 0.71 % | |
918 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3997282 | 26155140 | 183,200,000 | 183,198,840 | 183,149,340 | 183,149,340 | 183,024,000 | 183,024,000 | 0 | 0 | 2020-10-27 | CV. SORAYA | 01.834.078.6-733.000 | 50,660 | 0.03 % | |
919 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Tanuhi - Ulang Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 3997282 | 26155140 | 183,200,000 | 183,198,840 | 183,149,340 | 183,149,340 | 183,024,000 | 183,024,000 | 0 | 0 | 2020-10-27 | CV. SORAYA | 01.834.078.6-733.000 | 50,660 | 0.03 % | |
920 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998282 | 26446572 | 15,000,000 | 15,000,000 | 14,899,500 | 14,899,500 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-12 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 100,500 | 0.67 % | |
921 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jembatan di Pagar Haur, Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3998282 | 26446572 | 15,000,000 | 15,000,000 | 14,899,500 | 14,899,500 | 14,850,000 | 14,850,000 | 0 | 0 | 2020-11-12 | CV. Arsimetriks Damais | 02.823.312.0-731.000 | 100,500 | 0.67 % | |
922 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3999282 | 26183227 | 20,000,000 | 20,000,000 | 19,750,000 | 19,750,000 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-11-19 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 250,000 | 1.25 % | |
923 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3999282 | 26183227 | 20,000,000 | 20,000,000 | 19,750,000 | 19,750,000 | 19,750,000 | 19,750,000 | 0 | 0 | 2020-11-19 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 250,000 | 1.25 % | |
924 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4000282 | 26138224 | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
925 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Bajayau Kec. Daha Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4000282 | 26138224 | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-10-26 | Agus Rahmat | 54.988.617.4-731.000 | 6,500 | 0.07 % | |
926 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001282 | 26183950 | 15,000,000 | 15,000,000 | 14,905,000 | 14,905,000 | 14,900,000 | 14,900,000 | 0 | 0 | 2020-11-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 95,000 | 0.63 % | |
927 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001282 | 26183950 | 15,000,000 | 15,000,000 | 14,905,000 | 14,905,000 | 14,900,000 | 14,900,000 | 0 | 0 | 2020-11-09 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 95,000 | 0.63 % | |
928 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4003282 | 26138436 | 125,000,000 | 124,981,917 | 124,500,082 | 124,500,082 | 124,496,782 | 124,496,782 | 0 | 0 | 2020-10-22 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 499,918 | 0.4 % | |
929 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4003282 | 26138436 | 125,000,000 | 124,981,917 | 124,500,082 | 124,500,082 | 124,496,782 | 124,496,782 | 0 | 0 | 2020-10-22 | CV. Jambu Sukses Mandiri | 74.494.051.1-733.000 | 499,918 | 0.4 % | |
930 | 2020 | Dinas Kesehatan | Paving Bangsal Isolasi RSDS (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4004282 | 26458671 | 190,000,000 | 189,991,311 | 189,557,020 | 0 | 189,000,000 | 189,000,000 | 0 | 0 | 2020-11-02 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 442,980 | 0.23 % | |
931 | 2020 | Dinas Kesehatan | Paving Bangsal Isolasi RSDS (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4004282 | 26458671 | 190,000,000 | 189,991,311 | 189,557,020 | 0 | 189,000,000 | 189,000,000 | 0 | 0 | 2020-11-02 | CV. KARYA PRIMA | 02.089.932.4-733.000 | 442,980 | 0.23 % | |
932 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 4008282 | 26140985 | 199,780,000 | 198,763,234 | 198,008,981 | 198,008,981 | 197,784,280 | 197,784,280 | 0 | 0 | 2020-10-26 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,771,019 | 0.89 % | |
933 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Pekerjaan Konstruksi | 4008282 | 26140985 | 199,780,000 | 198,763,234 | 198,008,981 | 198,008,981 | 197,784,280 | 197,784,280 | 0 | 0 | 2020-10-26 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 1,771,019 | 0.89 % | |
934 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4010282 | 23330158 | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,550,000 | 9,550,000 | 0 | 0 | 2020-11-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 254,129 | 2.54 % | |
935 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pengawasan Pemeliharaan Drainase Desa Tibung Raya Kec. Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4010282 | 23330158 | 10,000,000 | 10,000,000 | 9,745,871 | 9,745,871 | 9,550,000 | 9,550,000 | 0 | 0 | 2020-11-13 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 254,129 | 2.54 % | |
936 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengembangan Kayu Manis dan Pemeliharaan Kebun Kayu Manis | Pengadaan Langsung | Pengadaan Barang | 4014282 | 24110743;24110744 | 27,090,000 | 26,977,500 | 26,829,000 | 26,829,000 | 26,829,000 | 26,829,000 | 0 | 0 | 2020-10-26 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 261,000 | 0.96 % | |
937 | 2020 | Dinas Pertanian | Pengadaan Herbisida dan PMLT untuk Pengembangan Kayu Manis dan Pemeliharaan Kebun Kayu Manis | Pengadaan Langsung | Pengadaan Barang | 4014282 | 24110743;24110744 | 27,090,000 | 26,977,500 | 26,829,000 | 26,829,000 | 26,829,000 | 26,829,000 | 0 | 0 | 2020-10-26 | CV. ARIES KARYA ABADI | 73.748.713.2-733.000 | 261,000 | 0.96 % | |
938 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4017282 | 26156826 | 183,200,000 | 183,023,978 | 182,523,996 | 182,523,996 | 182,433,900 | 182,433,900 | 0 | 0 | 2020-10-27 | CV. IZDIHAAR | 74.677.682.2-733.000 | 676,004 | 0.37 % | |
939 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Siring Pasangan Batu di ruas Binjai ( Sirih Hulu ) Asam Seranggan, Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4017282 | 26156826 | 183,200,000 | 183,023,978 | 182,523,996 | 182,523,996 | 182,433,900 | 182,433,900 | 0 | 0 | 2020-10-27 | CV. IZDIHAAR | 74.677.682.2-733.000 | 676,004 | 0.37 % | |
940 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4018282 | 26136054 | 200,000,000 | 199,980,275 | 199,896,675 | 199,896,675 | 199,830,675 | 199,830,675 | 0 | 0 | 2020-10-27 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 103,325 | 0.05 % | |
941 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Sungai Mati untuk jalur pengangkutan hasil pertanian di Kecamatan Kandangan (DID Tambahan) | Pengadaan Langsung | Pekerjaan Konstruksi | 4018282 | 26136054 | 200,000,000 | 199,980,275 | 199,896,675 | 199,896,675 | 199,830,675 | 199,830,675 | 0 | 0 | 2020-10-27 | CV.REZKY KARYA MUDA | 82.550.615.7-733.000 | 103,325 | 0.05 % | |
942 | 2020 | Sekretariat Daerah | Pengadaan Sterilizer | Pengadaan Langsung | Pengadaan Barang | 4020282 | 26480638 | 70,000,000 | 69,960,000 | 69,784,000 | 0 | 69,784,000 | 69,784,000 | 0 | 0 | 2020-10-24 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 216,000 | 0.31 % | |
943 | 2020 | Sekretariat Daerah | Pengadaan Sterilizer | Pengadaan Langsung | Pengadaan Barang | 4020282 | 26480638 | 70,000,000 | 69,960,000 | 69,784,000 | 0 | 69,784,000 | 69,784,000 | 0 | 0 | 2020-10-24 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 216,000 | 0.31 % | |
944 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4022282 | 26138307 | 6,000,000 | 6,000,000 | 5,868,500 | 5,868,500 | 5,868,500 | 5,868,500 | 0 | 0 | 2020-10-26 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 131,500 | 2.19 % | |
945 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4022282 | 26138307 | 6,000,000 | 6,000,000 | 5,868,500 | 5,868,500 | 5,868,500 | 5,868,500 | 0 | 0 | 2020-10-26 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 131,500 | 2.19 % | |
946 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4023282 | 26140912 | 6,000,000 | 6,000,000 | 5,967,500 | 5,967,500 | 5,967,500 | 5,967,500 | 0 | 0 | 2020-11-02 | Jamilah | 14.427.417.2-733.000 | 32,500 | 0.54 % | |
947 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan jaringan Tersier Pada Kelompok Tani Berkat Mufakat Desa Tanah Bangkang RT.04 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4023282 | 26140912 | 6,000,000 | 6,000,000 | 5,967,500 | 5,967,500 | 5,967,500 | 5,967,500 | 0 | 0 | 2020-11-02 | Jamilah | 14.427.417.2-733.000 | 32,500 | 0.54 % | |
948 | 2020 | Dinas Komunikasi dan Informatika | Pengembangan Sistem Pendingin Data Center,Pengembangan sistem monitoring Data Center | Pengadaan Langsung | Pengadaan Barang | 4024282 | 26184899;26222465 | 124,408,287 | 124,256,000 | 124,135,000 | 0 | 124,135,000 | 124,135,000 | 0 | 0 | 2020-10-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,287 | 0.22 % | |
949 | 2020 | Dinas Komunikasi dan Informatika | Pengembangan Sistem Pendingin Data Center,Pengembangan sistem monitoring Data Center | Pengadaan Langsung | Pengadaan Barang | 4024282 | 26184899;26222465 | 124,408,287 | 124,256,000 | 124,135,000 | 0 | 124,135,000 | 124,135,000 | 0 | 0 | 2020-10-26 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 273,287 | 0.22 % | |
950 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4025282 | 26139688 | 10,000,000 | 10,000,000 | 9,997,800 | 9,997,800 | 9,994,500 | 9,994,500 | 0 | 0 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 2,200 | 0.02 % | |
951 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Pulau Besar Desa Asam | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4025282 | 26139688 | 10,000,000 | 10,000,000 | 9,997,800 | 9,997,800 | 9,994,500 | 9,994,500 | 0 | 0 | 2020-10-27 | Agus Rahmat | 54.988.617.4-731.000 | 2,200 | 0.02 % | |
952 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Daha Selatan, Daha Utara dan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4027282 | 26152813 | 80,000,000 | 79,681,250 | 78,947,000 | 78,947,000 | 78,870,000 | 78,870,000 | 0 | 0 | 2020-10-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,053,000 | 1.32 % | |
953 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Daha Selatan, Daha Utara dan Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4027282 | 26152813 | 80,000,000 | 79,681,250 | 78,947,000 | 78,947,000 | 78,870,000 | 78,870,000 | 0 | 0 | 2020-10-27 | CV.TRIWARSA ENGINEERING CONSULTANT | 01.474.121.9-731.000 | 1,053,000 | 1.32 % | |
954 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Sungai Raya, Simpur, Padang Batung dan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4028282 | 26345419 | 100,000,000 | 99,893,750 | 98,857,000 | 98,857,000 | 98,780,000 | 98,780,000 | 0 | 0 | 2020-10-27 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,143,000 | 1.14 % | |
955 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Peningkatan Jalan Th. 2021 Kec. Sungai Raya, Simpur, Padang Batung dan Loksado | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4028282 | 26345419 | 100,000,000 | 99,893,750 | 98,857,000 | 98,857,000 | 98,780,000 | 98,780,000 | 0 | 0 | 2020-10-27 | AMRI ARCHTEAM CONSULTANT, CV | 90.738.700.5-735.000 | 1,143,000 | 1.14 % | |
956 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Kec. Sungai Raya dan Pemeliharaan Berkala Th. 2021 Jl. Kec. Telaga Langsat dan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4029282 | 26156817 | 45,000,000 | 44,976,250 | 44,418,000 | 44,418,000 | 44,330,000 | 44,330,000 | 0 | 0 | 2020-10-27 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 582,000 | 1.29 % | |
957 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Jalan Th. 2021 Kec. Sungai Raya dan Pemeliharaan Berkala Th. 2021 Jl. Kec. Telaga Langsat dan Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4029282 | 26156817 | 45,000,000 | 44,976,250 | 44,418,000 | 44,418,000 | 44,330,000 | 44,330,000 | 0 | 0 | 2020-10-27 | CV. WAHANA TATA BANJARAN | 85.005.028.7-731.000 | 582,000 | 1.29 % | |
958 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4030282 | 26135086 | 50,000,000 | 49,757,243 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 0 | 0 | 2020-11-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 300,000 | 0.6 % | |
959 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Pasar Kec. Kandangan untuk penataan pasar menyesuaikan kondisi normal baru (DID Tambahan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4030282 | 26135086 | 50,000,000 | 49,757,243 | 49,700,000 | 49,700,000 | 49,700,000 | 49,700,000 | 0 | 0 | 2020-11-16 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 300,000 | 0.6 % | |
960 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan ex. Terminal sedan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4031282 | 26156780 | 33,000,000 | 32,897,248 | 32,747,550 | 32,747,550 | 32,700,000 | 32,700,000 | 0 | 0 | 2020-11-06 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 252,450 | 0.77 % | |
961 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan ex. Terminal sedan Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4031282 | 26156780 | 33,000,000 | 32,897,248 | 32,747,550 | 32,747,550 | 32,700,000 | 32,700,000 | 0 | 0 | 2020-11-06 | CV. RIDHO BANUA | 91.081.280.9-731.000 | 252,450 | 0.77 % | |
962 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kodim, Kantor Kejari, Rumah Dinas Kajari, dan Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4033282 | 26443857 | 30,000,000 | 29,845,475 | 29,500,000 | 29,500,000 | 29,450,000 | 29,450,000 | 0 | 0 | 2020-11-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 500,000 | 1.67 % | |
963 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kodim, Kantor Kejari, Rumah Dinas Kajari, dan Polres HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4033282 | 26443857 | 30,000,000 | 29,845,475 | 29,500,000 | 29,500,000 | 29,450,000 | 29,450,000 | 0 | 0 | 2020-11-12 | CV.MULTI TATA LAKSANA | 03.282.507.7-732.000 | 500,000 | 1.67 % | |
964 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4037282 | 26141086 | 6,000,000 | 6,000,000 | 5,997,250 | 5,997,250 | 5,994,500 | 5,994,500 | 0 | 0 | 2020-11-02 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.05 % | |
965 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang Irigasi Awang Bakarung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4037282 | 26141086 | 6,000,000 | 6,000,000 | 5,997,250 | 5,997,250 | 5,994,500 | 5,994,500 | 0 | 0 | 2020-11-02 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.05 % | |
966 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4038282 | 26139755 | 7,000,000 | 7,000,000 | 6,997,250 | 6,997,250 | 6,994,500 | 6,994,500 | 0 | 0 | 2020-11-02 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.04 % | |
967 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4038282 | 26139755 | 7,000,000 | 7,000,000 | 6,997,250 | 6,997,250 | 6,994,500 | 6,994,500 | 0 | 0 | 2020-11-02 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.04 % | |
968 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4039282 | 26138236 | 176,000,000 | 175,972,392 | 175,752,392 | 175,752,392 | 175,697,000 | 175,697,000 | 0 | 0 | 2020-10-26 | cv. bumi mandiri | 02.089.892.0-733.000 | 247,608 | 0.14 % | |
969 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Jaman (Desa Sirih menuju Tambingkar) Kec. Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4039282 | 26138236 | 176,000,000 | 175,972,392 | 175,752,392 | 175,752,392 | 175,697,000 | 175,697,000 | 0 | 0 | 2020-10-26 | cv. bumi mandiri | 02.089.892.0-733.000 | 247,608 | 0.14 % | |
970 | 2020 | Dinas Ketahanan Pangan | Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4041282 | 26330675 | 111,700,000 | 111,593,368 | 111,200,066 | 111,200,066 | 111,200,000 | 111,200,000 | 0 | 0 | 2020-10-26 | CV. KALI BARU | 01.434.974.0-733.000 | 499,934 | 0.45 % | |
971 | 2020 | Dinas Ketahanan Pangan | Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4041282 | 26330675 | 111,700,000 | 111,593,368 | 111,200,066 | 111,200,066 | 111,200,000 | 111,200,000 | 0 | 0 | 2020-10-26 | CV. KALI BARU | 01.434.974.0-733.000 | 499,934 | 0.45 % | |
972 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4043282 | 26139713 | 200,000,000 | 199,120,572 | 198,983,071 | 198,983,071 | 198,977,000 | 198,977,000 | 0 | 0 | 2020-10-27 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,016,929 | 0.51 % | |
973 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Pembangunan Saluran Tersier di kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4043282 | 26139713 | 200,000,000 | 199,120,572 | 198,983,071 | 198,983,071 | 198,977,000 | 198,977,000 | 0 | 0 | 2020-10-27 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,016,929 | 0.51 % | |
974 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putera Kab. HSS Amuk Hantarukung di Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4044282 | 26174506 | 100,000,000 | 96,140,000 | 95,150,000 | 95,150,000 | 94,950,000 | 94,950,000 | 0 | 0 | 2020-11-02 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 4,850,000 | 4.85 % | |
975 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Asrama Putera Kab. HSS Amuk Hantarukung di Jogjakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4044282 | 26174506 | 100,000,000 | 96,140,000 | 95,150,000 | 95,150,000 | 94,950,000 | 94,950,000 | 0 | 0 | 2020-11-02 | SADWA RAMA CONSULTANT | 03.025.627.5-731.000 | 4,850,000 | 4.85 % | |
976 | 2020 | Dinas Perhubungan | Pembuatan marka jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 4045282 | 26471530 | 167,400,000 | 167,331,241 | 167,313,164 | 0 | 167,313,100 | 167,313,100 | 0 | 0 | 2020-11-03 | cv.ghea | 82.333.270.5-733.000 | 86,836 | 0.05 % | |
977 | 2020 | Dinas Perhubungan | Pembuatan marka jalan | Pengadaan Langsung | Pekerjaan Konstruksi | 4045282 | 26471530 | 167,400,000 | 167,331,241 | 167,313,164 | 0 | 167,313,100 | 167,313,100 | 0 | 0 | 2020-11-03 | cv.ghea | 82.333.270.5-733.000 | 86,836 | 0.05 % | |
978 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Pembangunan Parkir Mobil Damkar | Pengadaan Langsung | Pekerjaan Konstruksi | 4046282 | 26460006 | 20,000,000 | 19,994,480 | 19,902,080 | 0 | 19,902,080 | 19,902,080 | 0 | 0 | 2020-11-03 | FADWI UTAMA | 94.246.044.5-733.000 | 97,920 | 0.49 % | |
979 | 2020 | Satuan Polisi Pamong Praja dan Pemadam Kebakaran | Pembangunan Parkir Mobil Damkar | Pengadaan Langsung | Pekerjaan Konstruksi | 4046282 | 26460006 | 20,000,000 | 19,994,480 | 19,902,080 | 0 | 19,902,080 | 19,902,080 | 0 | 0 | 2020-11-03 | FADWI UTAMA | 94.246.044.5-733.000 | 97,920 | 0.49 % | |
980 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4047282 | 26138326 | 150,000,000 | 149,979,109 | 149,781,109 | 149,781,109 | 149,770,000 | 149,770,000 | 0 | 0 | 2020-10-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 218,891 | 0.15 % | |
981 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Pekerjaan Konstruksi | 4047282 | 26138326 | 150,000,000 | 149,979,109 | 149,781,109 | 149,781,109 | 149,770,000 | 149,770,000 | 0 | 0 | 2020-10-27 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 218,891 | 0.15 % | |
982 | 2020 | Dinas Ketahanan Pangan | Biaya Pengawasan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4048282 | 26331321 | 8,050,000 | 8,050,000 | 7,947,500 | 7,947,500 | 7,947,500 | 7,947,500 | 0 | 0 | 2020-10-27 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 102,500 | 1.27 % | |
983 | 2020 | Dinas Ketahanan Pangan | Biaya Pengawasan Pembangunan Lumbung Pangan Masyarakat Melati Desa Bamban Selatan (DID) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4048282 | 26331321 | 8,050,000 | 8,050,000 | 7,947,500 | 7,947,500 | 7,947,500 | 7,947,500 | 0 | 0 | 2020-10-27 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 102,500 | 1.27 % | |
984 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan menuju MIN Gala gala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4049282 | 26154960 | 199,900,000 | 173,270,252 | 173,089,341 | 173,089,341 | 172,820,000 | 172,820,000 | 0 | 0 | 2020-11-13 | cv. bumi mandiri | 02.089.892.0-733.000 | 26,810,659 | 13.41 % | |
985 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan menuju MIN Gala gala Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4049282 | 26154960 | 199,900,000 | 173,270,252 | 173,089,341 | 173,089,341 | 172,820,000 | 172,820,000 | 0 | 0 | 2020-11-13 | cv. bumi mandiri | 02.089.892.0-733.000 | 26,810,659 | 13.41 % | |
986 | 2020 | Dinas Perhubungan | Pembuatan Marka Getar | Pengadaan Langsung | Pekerjaan Konstruksi | 4052282 | 26471652 | 200,000,000 | 199,980,838 | 199,774,698 | 0 | 199,774,600 | 199,774,600 | 0 | 0 | 2020-11-03 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 225,302 | 0.11 % | |
987 | 2020 | Dinas Perhubungan | Pembuatan Marka Getar | Pengadaan Langsung | Pekerjaan Konstruksi | 4052282 | 26471652 | 200,000,000 | 199,980,838 | 199,774,698 | 0 | 199,774,600 | 199,774,600 | 0 | 0 | 2020-11-03 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 225,302 | 0.11 % | |
988 | 2020 | Dinas Perhubungan | Pengadaan Kapal Feri Penyeberangan | Pengadaan Langsung | Pengadaan Barang | 4053282 | 26423231 | 174,900,000 | 174,900,000 | 174,790,000 | 0 | 174,790,000 | 174,790,000 | 0 | 0 | 2020-11-03 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 110,000 | 0.06 % | |
989 | 2020 | Dinas Perhubungan | Pengadaan Kapal Feri Penyeberangan | Pengadaan Langsung | Pengadaan Barang | 4053282 | 26423231 | 174,900,000 | 174,900,000 | 174,790,000 | 0 | 174,790,000 | 174,790,000 | 0 | 0 | 2020-11-03 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 110,000 | 0.06 % | |
990 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 4054282 | 26283899 | 110,000,000 | 109,833,431 | 109,609,335 | 109,609,335 | 109,499,000 | 109,499,000 | 0 | 0 | 2020-11-04 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 390,665 | 0.36 % | |
991 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Daha Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 4054282 | 26283899 | 110,000,000 | 109,833,431 | 109,609,335 | 109,609,335 | 109,499,000 | 109,499,000 | 0 | 0 | 2020-11-04 | CV. RIZKI PUTERA PERDANA | 75.851.728.8-733.000 | 390,665 | 0.36 % | |
992 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4055282 | 26283882 | 70,000,000 | 69,858,452 | 69,734,327 | 69,734,327 | 69,700,000 | 69,700,000 | 0 | 0 | 2020-11-17 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 265,673 | 0.38 % | |
993 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Tempat Ibadah SMPN 1 Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4055282 | 26283882 | 70,000,000 | 69,858,452 | 69,734,327 | 69,734,327 | 69,700,000 | 69,700,000 | 0 | 0 | 2020-11-17 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 265,673 | 0.38 % | |
994 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SMPN 1 Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4056282 | 23890595 | 150,000,000 | 149,972,766 | 149,845,400 | 149,845,395 | 149,737,000 | 149,737,000 | 0 | 0 | 2020-11-04 | CV. KHALIF | 81.540.809.1-733.000 | 154,600 | 0.1 % | |
995 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar SMPN 1 Kalumpang | Pengadaan Langsung | Pekerjaan Konstruksi | 4056282 | 23890595 | 150,000,000 | 149,972,766 | 149,845,400 | 149,845,395 | 149,737,000 | 149,737,000 | 0 | 0 | 2020-11-04 | CV. KHALIF | 81.540.809.1-733.000 | 154,600 | 0.1 % | |
996 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4059282 | 26138376 | 6,000,000 | 6,000,000 | 5,991,000 | 0 | 5,990,000 | 5,990,000 | 0 | 0 | 2020-11-02 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 9,000 | 0.15 % | |
997 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Normalisasi Sungai Halaban Amparaya Kec. Simpur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4059282 | 26138376 | 6,000,000 | 6,000,000 | 5,991,000 | 0 | 5,990,000 | 5,990,000 | 0 | 0 | 2020-11-02 | AKHMAD YAZIDI | 15.696.996.6-732.000 | 9,000 | 0.15 % | |
998 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hamayung hakurung Kec. Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4060282 | 26139168 | 20,000,000 | 20,000,000 | 19,900,533 | 0 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,467 | 0.5 % | |
999 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hamayung hakurung Kec. Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4060282 | 26139168 | 20,000,000 | 20,000,000 | 19,900,533 | 0 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,467 | 0.5 % | |
1000 | 2020 | Dinas Kesehatan | Renovasi Poliklinik untuk menghadapi new normal (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4062282 | 26458847 | 140,000,000 | 139,895,343 | 139,656,391 | 0 | 139,500,000 | 139,500,000 | 0 | 0 | 2020-11-18 | CV. KALI BARU | 01.434.974.0-733.000 | 343,610 | 0.25 % | |
1001 | 2020 | Dinas Kesehatan | Renovasi Poliklinik untuk menghadapi new normal (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4062282 | 26458847 | 140,000,000 | 139,895,343 | 139,656,391 | 0 | 139,500,000 | 139,500,000 | 0 | 0 | 2020-11-18 | CV. KALI BARU | 01.434.974.0-733.000 | 343,610 | 0.25 % | |
1002 | 2020 | Dinas Kesehatan | Pembuatan Pagar PKM Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4065282 | 26174712 | 75,000,000 | 74,964,191 | 74,500,761 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-11-03 | CV. JAYA ABADI | 02.237.609.9-733.000 | 499,239 | 0.67 % | |
1003 | 2020 | Dinas Kesehatan | Pembuatan Pagar PKM Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4065282 | 26174712 | 75,000,000 | 74,964,191 | 74,500,761 | 0 | 74,500,000 | 74,500,000 | 0 | 0 | 2020-11-03 | CV. JAYA ABADI | 02.237.609.9-733.000 | 499,239 | 0.67 % | |
1004 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Jangkang Kec. Kandangan (DID Rp53.093.000,00) | Pengadaan Langsung | Pekerjaan Konstruksi | 4066282 | 26216732 | 100,000,000 | 99,972,863 | 99,758,572 | 99,758,572 | 99,478,700 | 99,478,700 | 0 | 0 | 2020-11-06 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 241,428 | 0.24 % | |
1005 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan di Jangkang Kec. Kandangan (DID Rp53.093.000,00) | Pengadaan Langsung | Pekerjaan Konstruksi | 4066282 | 26216732 | 100,000,000 | 99,972,863 | 99,758,572 | 99,758,572 | 99,478,700 | 99,478,700 | 0 | 0 | 2020-11-06 | CV. BERKAT TAQWA | 01.209.214.4-733.000 | 241,428 | 0.24 % | |
1006 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gambut di ds. Karang bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4069282 | 26139531 | 20,000,000 | 20,000,000 | 19,999,100 | 19,999,100 | 19,911,120 | 19,911,120 | 0 | 0 | 2020-11-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 900 | 0 % | |
1007 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gambut di ds. Karang bulan Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4069282 | 26139531 | 20,000,000 | 20,000,000 | 19,999,100 | 19,999,100 | 19,911,120 | 19,911,120 | 0 | 0 | 2020-11-03 | MANDIRI cipta PRATAMA | 02.531.483.2-731.000 | 900 | 0 % | |
1008 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing RT.11 Belakang Poskamling Kel.Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4070282 | 26138625 | 20,000,000 | 20,000,000 | 19,900,540 | 19,900,540 | 19,899,000 | 19,899,000 | 0 | 0 | 2020-11-06 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 99,460 | 0.5 % | |
1009 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing RT.11 Belakang Poskamling Kel.Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4070282 | 26138625 | 20,000,000 | 20,000,000 | 19,900,540 | 19,900,540 | 19,899,000 | 19,899,000 | 0 | 0 | 2020-11-06 | CV. RAHMAT BANUA MANDIRI | 02.708.990.3-731.000 | 99,460 | 0.5 % | |
1010 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SMPN 8 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4072282 | 26283878 | 150,000,000 | 149,832,320 | 149,416,737 | 149,416,737 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-11-17 | cv. bumi mandiri | 02.089.892.0-733.000 | 583,263 | 0.39 % | |
1011 | 2020 | Dinas Pendidikan dan Kebudayaan | Pembangunan Tempat Ibadah SMPN 8 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4072282 | 26283878 | 150,000,000 | 149,832,320 | 149,416,737 | 149,416,737 | 149,350,000 | 149,350,000 | 0 | 0 | 2020-11-17 | cv. bumi mandiri | 02.089.892.0-733.000 | 583,263 | 0.39 % | |
1012 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4073282 | 26138523 | 4,925,000 | 4,922,250 | 4,922,250 | 4,922,250 | 4,919,500 | 4,919,500 | 0 | 0 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.06 % | |
1013 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing RT.05 LK.03 Desa Jambu Hilir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4073282 | 26138523 | 4,925,000 | 4,922,250 | 4,922,250 | 4,922,250 | 4,919,500 | 4,919,500 | 0 | 0 | 2020-11-03 | SAIPUL BAHRI | 16.805.961.6-733.000 | 2,750 | 0.06 % | |
1014 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4074282 | 26201690 | 70,000,000 | 69,847,909 | 69,727,990 | 69,727,990 | 69,690,000 | 69,690,000 | 0 | 0 | 2020-11-17 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 272,010 | 0.39 % | |
1015 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4074282 | 26201690 | 70,000,000 | 69,847,909 | 69,727,990 | 69,727,990 | 69,690,000 | 69,690,000 | 0 | 0 | 2020-11-17 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 272,010 | 0.39 % | |
1016 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4075282 | 26138468 | 10,000,000 | 10,000,000 | 9,867,000 | 9,867,000 | 9,861,500 | 9,861,500 | 0 | 0 | 2020-11-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 133,000 | 1.33 % | |
1017 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Perkuatan Tebing Desa Mawangi Kec. Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4075282 | 26138468 | 10,000,000 | 10,000,000 | 9,867,000 | 9,867,000 | 9,861,500 | 9,861,500 | 0 | 0 | 2020-11-06 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 133,000 | 1.33 % | |
1018 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Awang RT.02 Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4076282 | 26139136 | 20,000,000 | 20,000,000 | 19,900,523 | 19,900,523 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,478 | 0.5 % | |
1019 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Awang RT.02 Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4076282 | 26139136 | 20,000,000 | 20,000,000 | 19,900,523 | 19,900,523 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 99,478 | 0.5 % | |
1020 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Daerah Irigasi Rawa Sungai Taniran Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4077282 | 26229709 | 20,000,000 | 20,000,000 | 19,866,000 | 19,866,000 | 19,866,000 | 19,866,000 | 0 | 0 | 2020-11-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 134,000 | 0.67 % | |
1021 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Daerah Irigasi Rawa Sungai Taniran Kec.Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4077282 | 26229709 | 20,000,000 | 20,000,000 | 19,866,000 | 19,866,000 | 19,866,000 | 19,866,000 | 0 | 0 | 2020-11-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 134,000 | 0.67 % | |
1022 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di ds. Amawang kiri Muka Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4078282 | 26138642 | 20,000,000 | 20,000,000 | 19,881,200 | 19,881,200 | 19,881,180 | 19,881,180 | 0 | 0 | 2020-11-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 118,800 | 0.59 % | |
1023 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di ds. Amawang kiri Muka Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4078282 | 26138642 | 20,000,000 | 20,000,000 | 19,881,200 | 19,881,200 | 19,881,180 | 19,881,180 | 0 | 0 | 2020-11-05 | CV. MANDIRI TATA SARANA CONSULTANT | 02.708.989.5-731.000 | 118,800 | 0.59 % | |
1024 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Tajun (Padang Sangkuang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4079282 | 26139112 | 20,000,000 | 20,000,000 | 19,965,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1025 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Tajun (Padang Sangkuang) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4079282 | 26139112 | 20,000,000 | 20,000,000 | 19,965,000 | 0 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1026 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hanyar Desa Tebing tinggi sampai garis rantau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4080282 | 26139405 | 20,000,000 | 20,000,000 | 19,965,000 | 19,965,000 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1027 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai hanyar Desa Tebing tinggi sampai garis rantau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4080282 | 26139405 | 20,000,000 | 20,000,000 | 19,965,000 | 19,965,000 | 19,965,000 | 19,965,000 | 0 | 0 | 2020-11-04 | CV. EMPAT BELAS | 72.116.516.5-731.000 | 35,000 | 0.18 % | |
1028 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gang Pendidikan MIN Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081282 | 26139423 | 20,000,000 | 20,000,000 | 19,976,000 | 19,976,000 | 19,976,000 | 19,976,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 24,000 | 0.12 % | |
1029 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Gang Pendidikan MIN Kec.Daha utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4081282 | 26139423 | 20,000,000 | 20,000,000 | 19,976,000 | 19,976,000 | 19,976,000 | 19,976,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 24,000 | 0.12 % | |
1030 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Bangkau Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4082282 | 26139453 | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,877,000 | 19,877,000 | 0 | 0 | 2020-11-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 112,000 | 0.56 % | |
1031 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Bangkau Kec.Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4082282 | 26139453 | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,877,000 | 19,877,000 | 0 | 0 | 2020-11-05 | Prima Teknik Consulindo | 02.243.077.1-732.000 | 112,000 | 0.56 % | |
1032 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Desa Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4083282 | 26138565 | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-11-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 112,000 | 0.56 % | |
1033 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Desa Baluti | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4083282 | 26138565 | 20,000,000 | 20,000,000 | 19,888,000 | 19,888,000 | 19,800,000 | 19,800,000 | 0 | 0 | 2020-11-04 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 112,000 | 0.56 % | |
1034 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Irigasi Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4084282 | 26229723 | 20,000,000 | 20,000,000 | 19,960,209 | 19,960,209 | 19,960,000 | 19,960,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 39,791 | 0.2 % | |
1035 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Rehabilitasi Irigasi Karang Paci Kec. Kalumpang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4084282 | 26229723 | 20,000,000 | 20,000,000 | 19,960,209 | 19,960,209 | 19,960,000 | 19,960,000 | 0 | 0 | 2020-11-05 | CV. RAHMAT FAJAR BERSAUDARA | 03.062.560.2-731.000 | 39,791 | 0.2 % | |
1036 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4085282 | 26216694 | 186,850,000 | 186,543,474 | 185,006,800 | 185,006,800 | 185,000,000 | 185,000,000 | 0 | 0 | 2020-11-13 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,843,200 | 0.99 % | |
1037 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Peningkatan Jl. Haratai III Kec. Loksado (DID) | Pengadaan Langsung | Pekerjaan Konstruksi | 4085282 | 26216694 | 186,850,000 | 186,543,474 | 185,006,800 | 185,006,800 | 185,000,000 | 185,000,000 | 0 | 0 | 2020-11-13 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 1,843,200 | 0.99 % | |
1038 | 2020 | Dinas Perikanan | Pengadaan Pakan Ikan, Bibit Ikan dan Blower Untuk Budidaya Ikan Dalam Kolam | Pengadaan Langsung | Pengadaan Barang | 4086282 | 26504954 | 189,475,000 | 180,169,000 | 180,105,310 | 180,105,310 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-11-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,369,690 | 4.95 % | |
1039 | 2020 | Dinas Perikanan | Pengadaan Pakan Ikan, Bibit Ikan dan Blower Untuk Budidaya Ikan Dalam Kolam | Pengadaan Langsung | Pengadaan Barang | 4086282 | 26504954 | 189,475,000 | 180,169,000 | 180,105,310 | 180,105,310 | 178,000,000 | 178,000,000 | 0 | 0 | 2020-11-04 | CV. GLOBAL MITRA KARYA | 71.378.880.0-733.000 | 9,369,690 | 4.95 % | |
1040 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Mandapai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4088282 | 26210411 | 50,000,000 | 49,979,304 | 49,872,248 | 49,872,248 | 49,707,248 | 0 | 0 | 0 | 2020-11-17 | CV. SHINTA | 01.124.041.3-733.000 | 127,752 | 0.26 % | |
1041 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Mandapai Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4088282 | 26210411 | 50,000,000 | 49,979,304 | 49,872,248 | 49,872,248 | 49,707,248 | 0 | 0 | 0 | 2020-11-17 | CV. SHINTA | 01.124.041.3-733.000 | 127,752 | 0.26 % | |
1042 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Muara Ulang 1 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 4089282 | 26212287 | 50,000,000 | 49,984,533 | 49,613,129 | 49,613,129 | 49,519,629 | 49,519,629 | 0 | 0 | 2020-11-09 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 386,871 | 0.77 % | |
1043 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Muara Ulang 1 Kec. Loksado | Pengadaan Langsung | Pekerjaan Konstruksi | 4089282 | 26212287 | 50,000,000 | 49,984,533 | 49,613,129 | 49,613,129 | 49,519,629 | 49,519,629 | 0 | 0 | 2020-11-09 | CV. Putra Kulur Utama | 31.754.851.9-733.000 | 386,871 | 0.77 % | |
1044 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi kebocoran saluran air Kolam Renang Amandit Aquatic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 4090282 | 26165616 | 177,500,000 | 177,427,207 | 177,384,129 | 0 | 175,831,800 | 175,831,800 | 0 | 0 | 2020-11-04 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 115,871 | 0.07 % | |
1045 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Rehabilitasi kebocoran saluran air Kolam Renang Amandit Aquatic Center | Pengadaan Langsung | Pekerjaan Konstruksi | 4090282 | 26165616 | 177,500,000 | 177,427,207 | 177,384,129 | 0 | 175,831,800 | 175,831,800 | 0 | 0 | 2020-11-04 | cv. citra bangun nusantara | 75.056.867.7-733.000 | 115,871 | 0.07 % | |
1046 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Pandulangan 2 Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4091282 | 26210375 | 50,000,000 | 49,979,304 | 49,894,648 | 49,894,648 | 49,784,648 | 49,784,648 | 0 | 0 | 2020-11-09 | CV. LALUNA DANA | 02.237.179.3-733.000 | 105,352 | 0.21 % | |
1047 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Pandulangan 2 Kec. Telaga Langsat | Pengadaan Langsung | Pekerjaan Konstruksi | 4091282 | 26210375 | 50,000,000 | 49,979,304 | 49,894,648 | 49,894,648 | 49,784,648 | 49,784,648 | 0 | 0 | 2020-11-09 | CV. LALUNA DANA | 02.237.179.3-733.000 | 105,352 | 0.21 % | |
1048 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sungai Paring Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4092282 | 26210432 | 50,000,000 | 49,896,087 | 49,635,761 | 49,635,761 | 49,552,267 | 49,552,267 | 0 | 0 | 2020-11-09 | CV. AMANDITA | 01.834.025.7-733.000 | 364,239 | 0.73 % | |
1049 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Sungai Paring Dalam Kec. Kandangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4092282 | 26210432 | 50,000,000 | 49,896,087 | 49,635,761 | 49,635,761 | 49,552,267 | 49,552,267 | 0 | 0 | 2020-11-09 | CV. AMANDITA | 01.834.025.7-733.000 | 364,239 | 0.73 % | |
1050 | 2020 | Dinas Kesehatan | Penambahan selasar penghubung bangsal Isolasi (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4093282 | 26458960 | 185,000,000 | 184,560,160 | 184,455,910 | 0 | 184,400,000 | 184,400,000 | 0 | 0 | 2020-11-04 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 544,090 | 0.29 % | |
1051 | 2020 | Dinas Kesehatan | Penambahan selasar penghubung bangsal Isolasi (DID Tambahan Tahap II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4093282 | 26458960 | 185,000,000 | 184,560,160 | 184,455,910 | 0 | 184,400,000 | 184,400,000 | 0 | 0 | 2020-11-04 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 544,090 | 0.29 % | |
1052 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan depan MTsN. Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4094282 | 26154949 | 200,000,000 | 198,512,101 | 198,259,116 | 198,259,116 | 198,110,000 | 198,110,000 | 0 | 0 | 2020-11-06 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,740,884 | 0.87 % | |
1053 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan depan MTsN. Angkinang Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4094282 | 26154949 | 200,000,000 | 198,512,101 | 198,259,116 | 198,259,116 | 198,110,000 | 198,110,000 | 0 | 0 | 2020-11-06 | CV. AGUNG MANDIRI | 02.089.893.8-733.000 | 1,740,884 | 0.87 % | |
1054 | 2020 | Sekretariat DPRD | Belanja Rehab Frame Baliho | Pengadaan Langsung | Pekerjaan Konstruksi | 4095282 | 26242355 | 75,000,000 | 74,980,574 | 74,825,474 | 0 | 74,825,400 | 74,825,400 | 0 | 0 | 2020-11-05 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 174,526 | 0.23 % | |
1055 | 2020 | Sekretariat DPRD | Belanja Rehab Frame Baliho | Pengadaan Langsung | Pekerjaan Konstruksi | 4095282 | 26242355 | 75,000,000 | 74,980,574 | 74,825,474 | 0 | 74,825,400 | 74,825,400 | 0 | 0 | 2020-11-05 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 174,526 | 0.23 % | |
1056 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Perencanaan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4096282 | 26222873 | 8,000,000 | 7,988,640 | 7,741,853 | 7,741,853 | 7,730,000 | 7,730,000 | 0 | 0 | 2020-11-05 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 258,147 | 3.23 % | |
1057 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Perencanaan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4096282 | 26222873 | 8,000,000 | 7,988,640 | 7,741,853 | 7,741,853 | 7,730,000 | 7,730,000 | 0 | 0 | 2020-11-05 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 258,147 | 3.23 % | |
1058 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4097282 | 26154987 | 199,900,000 | 199,238,803 | 199,033,186 | 199,033,186 | 198,999,000 | 198,999,000 | 0 | 0 | 2020-11-06 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 866,814 | 0.43 % | |
1059 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Rehabilitasi Jembatan Gantung Kayu di Desa Jambu Hilir Kec. Padang Batung | Pengadaan Langsung | Pekerjaan Konstruksi | 4097282 | 26154987 | 199,900,000 | 199,238,803 | 199,033,186 | 199,033,186 | 198,999,000 | 198,999,000 | 0 | 0 | 2020-11-06 | CV.GAWI SABUMI MANDIRI | 02.237.733.7-733.000 | 866,814 | 0.43 % | |
1060 | 2020 | Dinas Perdagangan | Pekerjaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4098282 | 26360836 | 198,900,000 | 198,581,524 | 198,471,106 | 0 | 198,471,100 | 198,471,100 | 0 | 0 | 2020-11-11 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 428,894 | 0.22 % | |
1061 | 2020 | Dinas Perdagangan | Pekerjaan rehab atap Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4098282 | 26360836 | 198,900,000 | 198,581,524 | 198,471,106 | 0 | 198,471,100 | 198,471,100 | 0 | 0 | 2020-11-11 | CV. BERKAH KARYA BANUA | 94.551.363.8-733.000 | 428,894 | 0.22 % | |
1062 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4099282 | 26359713 | 198,900,000 | 198,855,144 | 198,800,144 | 0 | 198,800,000 | 198,800,000 | 0 | 0 | 2020-11-06 | CV. AL MADINAH | 66.139.132.6-733.000 | 99,856 | 0.05 % | |
1063 | 2020 | Dinas Perdagangan | Pekerjaan pengecatan Los Batu Pasar Kandangan (DID II) | Pengadaan Langsung | Pekerjaan Konstruksi | 4099282 | 26359713 | 198,900,000 | 198,855,144 | 198,800,144 | 0 | 198,800,000 | 198,800,000 | 0 | 0 | 2020-11-06 | CV. AL MADINAH | 66.139.132.6-733.000 | 99,856 | 0.05 % | |
1064 | 2020 | RSUD Brigjen H. Hasan Basry | Air Purifier Ruang Isolasi | Pengadaan Langsung | Pengadaan Barang | 4100282 | 26480441 | 70,000,000 | 70,000,000 | 69,481,440 | 69,481,440 | 69,481,440 | 0 | 0 | 0 | 2020-11-23 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 518,560 | 0.74 % | |
1065 | 2020 | Kecamatan Padang Batung | Belanja Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Pekerjaan Konstruksi | 4101282 | 24090262 | 93,000,000 | 92,999,373 | 92,700,148 | 0 | 92,700,148 | 92,700,148 | 0 | 0 | 2020-11-06 | CV. AISY | 75.132.070.6-733.000 | 299,852 | 0.32 % | |
1066 | 2020 | Kecamatan Padang Batung | Belanja Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Pekerjaan Konstruksi | 4101282 | 24090262 | 93,000,000 | 92,999,373 | 92,700,148 | 0 | 92,700,148 | 92,700,148 | 0 | 0 | 2020-11-06 | CV. AISY | 75.132.070.6-733.000 | 299,852 | 0.32 % | |
1067 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4102282 | 26236028 | 10,000,000 | 10,000,000 | 9,985,000 | 0 | 9,980,000 | 9,980,000 | 0 | 0 | 2020-11-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.15 % | |
1068 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Saluran Pembuang D.I Padang Batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4102282 | 26236028 | 10,000,000 | 10,000,000 | 9,985,000 | 0 | 9,980,000 | 9,980,000 | 0 | 0 | 2020-11-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 15,000 | 0.15 % | |
1069 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Jembatan Pelayanan dan Gorong gorong di sekitar Jaringan Irigasi Gumbil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4103282 | 26229701 | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1070 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Jembatan Pelayanan dan Gorong gorong di sekitar Jaringan Irigasi Gumbil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4103282 | 26229701 | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-10 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1071 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Belakang mesjid desa Padang batung Kec.Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4105282 | 26138602 | 20,000,000 | 20,000,000 | 19,904,500 | 19,904,500 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 95,500 | 0.48 % | |
1072 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan Perkuatan Tebing di Belakang mesjid desa Padang batung Kec.Padang batung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4105282 | 26138602 | 20,000,000 | 20,000,000 | 19,904,500 | 19,904,500 | 19,900,000 | 19,900,000 | 0 | 0 | 2020-11-10 | CV. Banuatama Teknik Consultant | 02.918.450.4-733.000 | 95,500 | 0.48 % | |
1073 | 2020 | Sekretariat Daerah | Belanja Pakaian Sasirangan dalam rangka Kegiatan Pemerintah Kab. HSS | Pengadaan Langsung | Pengadaan Barang | 4106282 | 26161576 | 96,000,000 | 70,000,000 | 68,600,000 | 0 | 68,600,000 | 0 | 0 | 0 | 2020-11-09 | CV.Bangun Banua | 93.708.167.7-733.000 | 27,400,000 | 28.54 % | |
1074 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Alkes IGD Ponek - Platelet Agiator + Incubator | Pengadaan Langsung | Pengadaan Barang | 4108282 | 23544731 | 225,000,000 | 175,000,000 | 174,460,000 | 174,460,000 | 174,460,000 | 0 | 0 | 0 | 2020-11-09 | PT. Prima Alkesindo Nusantara | 01.813.894.1-046.000 | 50,540,000 | 22.46 % | |
1075 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Banua hanyar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4109282 | 26139096 | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-09 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1076 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Perencanaan normalisasi Sungai Banua hanyar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4109282 | 26139096 | 20,000,000 | 20,000,000 | 19,960,200 | 0 | 19,950,000 | 19,950,000 | 0 | 0 | 2020-11-09 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 39,800 | 0.2 % | |
1077 | 2020 | Dinas Kesehatan | Disediakan Belanja Perbekalan Kesehatan RSUD Daha Sejahtera | Pengadaan Langsung | Pengadaan Barang | 4111282 | 24978617 | 180,000,000 | 179,970,500 | 179,800,500 | 0 | 179,800,500 | 179,800,500 | 0 | 0 | 2020-11-13 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | 199,500 | 0.11 % | |
1078 | 2020 | Dinas Kesehatan | Disediakan Belanja Perbekalan Kesehatan RSUD Daha Sejahtera | Pengadaan Langsung | Pengadaan Barang | 4111282 | 24978617 | 180,000,000 | 179,970,500 | 179,800,500 | 0 | 179,800,500 | 179,800,500 | 0 | 0 | 2020-11-13 | PT.KIMIA FARMA TRADING & DISTRIBUTION | 01.061.228.1-051.000 | 199,500 | 0.11 % | |
1079 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt.01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4112282 | 26142542 | 15,000,000 | 15,000,000 | 14,998,500 | 14,998,500 | 14,997,400 | 14,997,400 | 0 | 0 | 2020-11-09 | SAIPUL BAHRI | 16.805.961.6-733.000 | 1,500 | 0.01 % | |
1080 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi pengawasan Perkuatan Tebing dengan Pasangan Bronjong Desa Bakarung Rt.01 Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4112282 | 26142542 | 15,000,000 | 15,000,000 | 14,998,500 | 14,998,500 | 14,997,400 | 14,997,400 | 0 | 0 | 2020-11-09 | SAIPUL BAHRI | 16.805.961.6-733.000 | 1,500 | 0.01 % | |
1081 | 2020 | Kecamatan Angkinang | Belanja Konsultan Perencana perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4113282 | 26566258 | 3,000,000 | 2,995,300 | 2,871,000 | 0 | 2,871,000 | 2,871,000 | 0 | 0 | 2020-11-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 129,000 | 4.3 % | |
1082 | 2020 | Kecamatan Angkinang | Belanja Konsultan Perencana perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4113282 | 26566258 | 3,000,000 | 2,995,300 | 2,871,000 | 0 | 2,871,000 | 2,871,000 | 0 | 0 | 2020-11-10 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 129,000 | 4.3 % | |
1083 | 2020 | Dinas Komunikasi dan Informatika | Pengadaan peralatan Server Data Center | Pengadaan Langsung | Pengadaan Barang | 4114282 | 26461703 | 164,899,970 | 164,791,000 | 164,560,000 | 0 | 164,560,000 | 164,560,000 | 0 | 0 | 2020-11-10 | FADWI UTAMA | 94.246.044.5-733.000 | 339,970 | 0.21 % | |
1084 | 2020 | Dinas Komunikasi dan Informatika | Pengadaan peralatan Server Data Center | Pengadaan Langsung | Pengadaan Barang | 4114282 | 26461703 | 164,899,970 | 164,791,000 | 164,560,000 | 0 | 164,560,000 | 164,560,000 | 0 | 0 | 2020-11-10 | FADWI UTAMA | 94.246.044.5-733.000 | 339,970 | 0.21 % | |
1085 | 2020 | Sekretariat Daerah | Belanja Perencanaan Rehab Ruangan Bagian Umum,Bendahara Rutin,Tempat Parkir Mobjab,Rehab Lap.Lamang,Pendopo Bupati,WC dan Gedung Kesenian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4115282 | 26145783 | 101,200,000 | 99,797,500 | 99,647,790 | 99,647,790 | 99,647,700 | 99,647,700 | 0 | 0 | 2020-11-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,552,210 | 1.53 % | |
1086 | 2020 | Sekretariat Daerah | Belanja Perencanaan Rehab Ruangan Bagian Umum,Bendahara Rutin,Tempat Parkir Mobjab,Rehab Lap.Lamang,Pendopo Bupati,WC dan Gedung Kesenian | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4115282 | 26145783 | 101,200,000 | 99,797,500 | 99,647,790 | 99,647,790 | 99,647,700 | 99,647,700 | 0 | 0 | 2020-11-12 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 1,552,210 | 1.53 % | |
1087 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4116282 | 26139651 | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-11-11 | konsultan | 75.077.609.8-733.000 | 6,500 | 0.07 % | |
1088 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pembangunan Daerah Irigasi Tambingkar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4116282 | 26139651 | 10,000,000 | 10,000,000 | 9,993,500 | 9,993,500 | 9,988,000 | 9,988,000 | 0 | 0 | 2020-11-11 | konsultan | 75.077.609.8-733.000 | 6,500 | 0.07 % | |
1089 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sedang/berat ruang kelas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119282 | 26215992 | 108,750,000 | 35,970,000 | 35,695,000 | 35,695,000 | 35,650,000 | 35,650,000 | 0 | 0 | 2020-11-20 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 73,055,000 | 67.18 % | |
1090 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sedang/berat ruang kelas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4119282 | 26215992 | 108,750,000 | 35,970,000 | 35,695,000 | 35,695,000 | 35,650,000 | 35,650,000 | 0 | 0 | 2020-11-20 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 73,055,000 | 67.18 % | |
1091 | 2020 | Sekretariat Daerah | Pengadaan Frame Baliho | Pengadaan Langsung | Pengadaan Barang | 4120282 | 23922105 | 70,000,000 | 70,000,000 | 69,905,000 | 0 | 69,905,000 | 69,905,000 | 0 | 0 | 2020-11-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 95,000 | 0.14 % | |
1092 | 2020 | Sekretariat Daerah | Pengadaan Frame Baliho | Pengadaan Langsung | Pengadaan Barang | 4120282 | 23922105 | 70,000,000 | 70,000,000 | 69,905,000 | 0 | 69,905,000 | 69,905,000 | 0 | 0 | 2020-11-10 | KARYA DWI CHADE | 75.416.433.3-733.000 | 95,000 | 0.14 % | |
1093 | 2020 | Dinas Pertanian | Pengadaan Kambing Kacang dan Konsentrat | Pengadaan Langsung | Pengadaan Barang | 4121282 | 24145370;26142901 | 68,300,000 | 67,725,000 | 67,525,000 | 67,525,000 | 67,525,000 | 67,525,000 | 0 | 0 | 2020-11-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 775,000 | 1.13 % | |
1094 | 2020 | Dinas Pertanian | Pengadaan Kambing Kacang dan Konsentrat | Pengadaan Langsung | Pengadaan Barang | 4121282 | 24145370;26142901 | 68,300,000 | 67,725,000 | 67,525,000 | 67,525,000 | 67,525,000 | 67,525,000 | 0 | 0 | 2020-11-12 | CV. MANDIRI SUKSES ABADI | 02.675.390.5-733.000 | 775,000 | 1.13 % | |
1095 | 2020 | Dinas Perhubungan | Pengadaan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4122282 | 26423338 | 115,000,000 | 114,990,428 | 114,737,946 | 0 | 114,737,900 | 114,737,900 | 0 | 0 | 2020-11-16 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 262,054 | 0.23 % | |
1096 | 2020 | Dinas Perhubungan | Pengadaan Dermaga Kapal Feri Penyeberangan | Pengadaan Langsung | Pekerjaan Konstruksi | 4122282 | 26423338 | 115,000,000 | 114,990,428 | 114,737,946 | 0 | 114,737,900 | 114,737,900 | 0 | 0 | 2020-11-16 | CV. FERLITA DAHA | 02.590.666.0-733.000 | 262,054 | 0.23 % | |
1097 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi pagar SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4125282 | 23890585 | 150,000,000 | 149,894,388 | 149,809,020 | 149,809,020 | 149,699,000 | 149,699,000 | 0 | 0 | 2020-11-12 | cv.ghea | 82.333.270.5-733.000 | 190,980 | 0.13 % | |
1098 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi pagar SMPN 1 Sungai Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 4125282 | 23890585 | 150,000,000 | 149,894,388 | 149,809,020 | 149,809,020 | 149,699,000 | 149,699,000 | 0 | 0 | 2020-11-12 | cv.ghea | 82.333.270.5-733.000 | 190,980 | 0.13 % | |
1099 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja pembangunan WC/ Toilet | Pengadaan Langsung | Pekerjaan Konstruksi | 4127282 | 26177279 | 80,000,000 | 79,993,986 | 79,858,686 | 0 | 79,858,600 | 0 | 0 | 0 | 2020-11-16 | CV.AL-HUSAIN CONSTRUCTION GROUP | 85.829.234.5-735.000 | 141,314 | 0.18 % | |
1100 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Peralatan Kantor | Pengadaan Langsung | Pengadaan Barang | 4128282 | 26181257;26181281;26181482;26181554;26181608;26181810 | 186,399,800 | 76,774,800 | 76,574,800 | 0 | 76,574,800 | 0 | 0 | 0 | 2020-11-16 | CV. SUBUR LESTARI | 02.089.861.5-733.000 | 109,825,000 | 58.92 % | |
1101 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Pengawasan Pembangunan WC/Toilet | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4129282 | 26178480 | 5,000,000 | 4,998,320 | 4,943,084 | 0 | 4,943,000 | 0 | 0 | 0 | 2020-11-16 | CV. ALFARISI JASA KONSULTAN | 73.405.999.1-731.000 | 56,916 | 1.14 % | |
1102 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan counsule outlet O2 dan wall bed head (DID Tambahan Tahap 2) | Pengadaan Langsung | Pengadaan Barang | 4130282 | 26658707 | 187,000,000 | 187,000,000 | 186,813,000 | 186,813,000 | 186,813,000 | 0 | 0 | 0 | 2020-11-23 | PT.CITRA TEKNIK MEDICA | 80.747.020.8-422.000 | 187,000 | 0.1 % | |
1103 | 2020 | RSUD Brigjen H. Hasan Basry | Partisi Gedung 3 lantai (DID Tambahan Tahap 2) | Pengadaan Langsung | Pekerjaan Konstruksi | 4131282 | 26655209 | 133,400,000 | 133,222,233 | 133,034,726 | 133,034,726 | 133,034,726 | 0 | 0 | 0 | 2020-11-23 | CV Darma Sakti Indotama | 03.290.416.1-731.000 | 365,274 | 0.27 % | |
1104 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kantor Sekretariat Daerah, Pendopo, dan Rumah Dinas Ketua DPRD Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4132282 | 26443898 | 30,000,000 | 29,845,475 | 29,700,000 | 29,700,000 | 29,650,000 | 29,650,000 | 0 | 0 | 2020-11-16 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 300,000 | 1 % | |
1105 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Pengaspalan halaman Kantor Sekretariat Daerah, Pendopo, dan Rumah Dinas Ketua DPRD Kab. HSS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4132282 | 26443898 | 30,000,000 | 29,845,475 | 29,700,000 | 29,700,000 | 29,650,000 | 29,650,000 | 0 | 0 | 2020-11-16 | CV. National Geotechnic Consultant | 74.140.248.1-731.000 | 300,000 | 1 % | |
1106 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja hadiah penghargaan | Pengadaan Langsung | Pengadaan Barang | 4133282 | 26178902 | 80,500,000 | 80,500,000 | 77,970,000 | 0 | 77,970,000 | 77,970,000 | 0 | 0 | 2020-11-23 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 2,530,000 | 3.14 % | |
1107 | 2020 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja hadiah penghargaan | Pengadaan Langsung | Pengadaan Barang | 4133282 | 26178902 | 80,500,000 | 80,500,000 | 77,970,000 | 0 | 77,970,000 | 77,970,000 | 0 | 0 | 2020-11-23 | CV. HERZI MANDIRI JAYA | 76.398.159.4-733.000 | 2,530,000 | 3.14 % | |
1108 | 2020 | Kecamatan Padang Batung | Belanjan Konsultan Pengawasan Pagar Gedung Kantor Sisi kanan dan kiri dan Belanja Pintu Pagar Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4134282 | 26156759 | 12,000,000 | 11,998,745 | 11,909,920 | 0 | 11,909,920 | 11,909,920 | 0 | 0 | 2020-11-16 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 90,080 | 0.75 % | |
1109 | 2020 | Kecamatan Padang Batung | Belanjan Konsultan Pengawasan Pagar Gedung Kantor Sisi kanan dan kiri dan Belanja Pintu Pagar Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4134282 | 26156759 | 12,000,000 | 11,998,745 | 11,909,920 | 0 | 11,909,920 | 11,909,920 | 0 | 0 | 2020-11-16 | CV. GEOTEK INTERMEDIA CONSULTANT | 02.421.821.6-733.000 | 90,080 | 0.75 % | |
1110 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Jalan Bakarung Rantauan Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4136282 | 26156758 | 30,000,000 | 29,405,475 | 29,313,900 | 29,313,900 | 29,270,000 | 29,270,000 | 0 | 0 | 2020-11-16 | Wing Rastafarindo | 03.282.590.3-732.000 | 686,100 | 2.29 % | |
1111 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Jalan Bakarung Rantauan Kec. Angkinang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4136282 | 26156758 | 30,000,000 | 29,405,475 | 29,313,900 | 29,313,900 | 29,270,000 | 29,270,000 | 0 | 0 | 2020-11-16 | Wing Rastafarindo | 03.282.590.3-732.000 | 686,100 | 2.29 % | |
1112 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Madang - Ambutun untuk jalur pengangkutan hasil pertanian di Kec. Telaga Langsat (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4138282 | 26326972 | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | cv.mitra talenta prima | 02.746.658.0-733.000 | 992,250 | 1.98 % | |
1113 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Madang - Ambutun untuk jalur pengangkutan hasil pertanian di Kec. Telaga Langsat (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4138282 | 26326972 | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | cv.mitra talenta prima | 02.746.658.0-733.000 | 992,250 | 1.98 % | |
1114 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi siswa SD | Pengadaan Langsung | Pengadaan Barang | 4139282 | 26202736 | 200,000,000 | 199,650,000 | 199,408,000 | 199,408,000 | 199,214,400 | 199,214,400 | 0 | 0 | 2020-11-20 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.3 % | |
1115 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Meja dan Kursi siswa SD | Pengadaan Langsung | Pengadaan Barang | 4139282 | 26202736 | 200,000,000 | 199,650,000 | 199,408,000 | 199,408,000 | 199,214,400 | 199,214,400 | 0 | 0 | 2020-11-20 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.3 % | |
1116 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Bakarung Tengah - Karang Jawa dan Jalan Kandangan Hulu - Sp. Tabihi untuk jalur pengangkutan hasil pertanian / perkebunan di Kecamatan Padang Batung / Angkinang (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4140282 | 26326889 | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 992,250 | 1.98 % | |
1117 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi Pengawasan Rehabilitasi Jalan Bakarung Tengah - Karang Jawa dan Jalan Kandangan Hulu - Sp. Tabihi untuk jalur pengangkutan hasil pertanian / perkebunan di Kecamatan Padang Batung / Angkinang (DID Tambahan Tahap 2) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4140282 | 26326889 | 50,000,000 | 49,152,243 | 49,007,750 | 49,007,750 | 48,960,000 | 48,960,000 | 0 | 0 | 2020-11-16 | OZONE DIMENSI TEKNIK | 03.025.628.3-731.000 | 992,250 | 1.98 % | |
1118 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | di sediakan utk Makanan Khas Daerah promosi untuk kegiatan hari jadi Kab.HSS Th.2019 | Pengadaan Langsung | Pengadaan Barang | 4141282 | 23370131 | 74,550,000 | 71,242,875 | 71,060,000 | 0 | 70,851,000 | 70,851,000 | 0 | 0 | 2020-11-19 | FADWI UTAMA | 94.246.044.5-733.000 | 3,490,000 | 4.68 % | |
1119 | 2020 | Dinas Tenaga Kerja, Koperasi Usaha Kecil Menengah dan Perindustrian | di sediakan utk Makanan Khas Daerah promosi untuk kegiatan hari jadi Kab.HSS Th.2019 | Pengadaan Langsung | Pengadaan Barang | 4141282 | 23370131 | 74,550,000 | 71,242,875 | 71,060,000 | 0 | 70,851,000 | 70,851,000 | 0 | 0 | 2020-11-19 | FADWI UTAMA | 94.246.044.5-733.000 | 3,490,000 | 4.68 % | |
1120 | 2020 | Dinas Ketahanan Pangan | Pembuatan Hidroponik untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 4142282 | 26332091 | 58,197,425 | 57,248,620 | 57,177,120 | 57,177,120 | 57,177,000 | 57,177,000 | 0 | 0 | 2020-11-23 | CV.DITA | 02.242.686.0-733.000 | 1,020,305 | 1.75 % | |
1121 | 2020 | Dinas Ketahanan Pangan | Pembuatan Hidroponik untuk Diserahkan kepada Kelompok Wanita Tani (DID) | Pengadaan Langsung | Pengadaan Barang | 4142282 | 26332091 | 58,197,425 | 57,248,620 | 57,177,120 | 57,177,120 | 57,177,000 | 57,177,000 | 0 | 0 | 2020-11-23 | CV.DITA | 02.242.686.0-733.000 | 1,020,305 | 1.75 % | |
1122 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Anjiran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4143282 | 26210529 | 50,000,000 | 49,974,388 | 49,857,488 | 49,857,488 | 49,681,488 | 49,681,488 | 0 | 0 | 2020-11-17 | CV. LALUNA DANA | 02.237.179.3-733.000 | 142,512 | 0.29 % | |
1123 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi WC SDN Anjiran Kec. Angkinang | Pengadaan Langsung | Pekerjaan Konstruksi | 4143282 | 26210529 | 50,000,000 | 49,974,388 | 49,857,488 | 49,857,488 | 49,681,488 | 49,681,488 | 0 | 0 | 2020-11-17 | CV. LALUNA DANA | 02.237.179.3-733.000 | 142,512 | 0.29 % | |
1124 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Alat Praktik dan peraga Siswa (PAUD) | Pengadaan Langsung | Pengadaan Barang | 4144282 | 24108210 | 136,000,000 | 135,999,600 | 135,852,000 | 135,852,000 | 135,852,000 | 135,852,000 | 0 | 0 | 2020-11-20 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 148,000 | 0.11 % | |
1125 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengadaan Alat Praktik dan peraga Siswa (PAUD) | Pengadaan Langsung | Pengadaan Barang | 4144282 | 24108210 | 136,000,000 | 135,999,600 | 135,852,000 | 135,852,000 | 135,852,000 | 135,852,000 | 0 | 0 | 2020-11-20 | Sumber Makmur Sentosa | 02.421.829.9-733.000 | 148,000 | 0.11 % | |
1126 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4146282 | 26201704 | 3,000,000 | 2,999,700 | 2,926,000 | 2,926,000 | 2,926,000 | 2,926,000 | 0 | 0 | 2020-11-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 74,000 | 2.47 % | |
1127 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan Rehabilitasi WC SMPN 3 Kandangan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4146282 | 26201704 | 3,000,000 | 2,999,700 | 2,926,000 | 2,926,000 | 2,926,000 | 2,926,000 | 0 | 0 | 2020-11-30 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 74,000 | 2.47 % | |
1128 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4147282 | 26283920 | 9,000,000 | 8,938,314 | 8,853,900 | 8,853,900 | 8,853,900 | 8,853,900 | 0 | 0 | 2020-11-30 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 146,100 | 1.62 % | |
1129 | 2020 | Dinas Pendidikan dan Kebudayaan | Pengawasan (Pembangunan/Rehabilitasi ruang ibadah SMPN 8 Kandangan, SMPN 1 Padang Batung, SMPN 1 Daha Barat) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4147282 | 26283920 | 9,000,000 | 8,938,314 | 8,853,900 | 8,853,900 | 8,853,900 | 8,853,900 | 0 | 0 | 2020-11-30 | CV. ROHANA SULTARINDO | 02.708.764.2-731.000 | 146,100 | 1.62 % | |
1130 | 2020 | Dinas Pendidikan dan Kebudayaan | pengawasan rehab dan pembangunan pagar SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4149282 | 26201716 | 2,100,000 | 2,095,500 | 2,073,390 | 2,073,390 | 2,073,390 | 2,073,390 | 0 | 0 | 2020-12-07 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 26,610 | 1.27 % | |
1131 | 2020 | Dinas Pendidikan dan Kebudayaan | pengawasan rehab dan pembangunan pagar SMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4149282 | 26201716 | 2,100,000 | 2,095,500 | 2,073,390 | 2,073,390 | 2,073,390 | 2,073,390 | 0 | 0 | 2020-12-07 | CV.TOPAZ ENGINEERING | 83.889.517.5-731.000 | 26,610 | 1.27 % | |
1132 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengurukan Halaman SKB ) | Pengadaan Langsung | Pekerjaan Konstruksi | 4150282 | 26222841 | 200,000,000 | 198,826,371 | 198,197,211 | 198,197,211 | 198,120,000 | 198,120,000 | 0 | 0 | 2020-11-24 | CV. An-Nidha | 02.675.485.3-733.000 | 1,802,789 | 0.9 % | |
1133 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengurukan Halaman SKB ) | Pengadaan Langsung | Pekerjaan Konstruksi | 4150282 | 26222841 | 200,000,000 | 198,826,371 | 198,197,211 | 198,197,211 | 198,120,000 | 198,120,000 | 0 | 0 | 2020-11-24 | CV. An-Nidha | 02.675.485.3-733.000 | 1,802,789 | 0.9 % | |
1134 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan pembangunan sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4154282 | 26203134 | 125,750,000 | 97,405,000 | 97,307,650 | 97,307,650 | 97,250,000 | 97,250,000 | 0 | 0 | 2020-11-21 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 28,442,350 | 22.62 % | |
1135 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan pembangunan sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4154282 | 26203134 | 125,750,000 | 97,405,000 | 97,307,650 | 97,307,650 | 97,250,000 | 97,250,000 | 0 | 0 | 2020-11-21 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 28,442,350 | 22.62 % | |
1136 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi (Perencanaan) Kegiatan Penggantian Jembatan Tahun 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4155282 | 26156964 | 60,000,000 | 59,104,375 | 58,817,000 | 58,817,000 | 58,800,000 | 58,800,000 | 0 | 0 | 2020-11-24 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,183,000 | 1.97 % | |
1137 | 2020 | Dinas Pekerjaan Umum dan Tata Ruang | Jasa Konsultansi (Perencanaan) Kegiatan Penggantian Jembatan Tahun 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4155282 | 26156964 | 60,000,000 | 59,104,375 | 58,817,000 | 58,817,000 | 58,800,000 | 58,800,000 | 0 | 0 | 2020-11-24 | CV. RISCON SULTARINDO | 02.361.853.1-731.000 | 1,183,000 | 1.97 % | |
1138 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Jalan masuk dan pembangunan tempat parkir museum rakyat Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 4157282 | 26729823 | 80,750,000 | 80,727,300 | 80,595,718 | 80,595,718 | 80,399,935 | 80,399,935 | 0 | 0 | 2020-11-23 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 154,282 | 0.19 % | |
1139 | 2020 | Dinas Pendidikan dan Kebudayaan | Rehab Jalan masuk dan pembangunan tempat parkir museum rakyat Kab. HSS | Pengadaan Langsung | Pekerjaan Konstruksi | 4157282 | 26729823 | 80,750,000 | 80,727,300 | 80,595,718 | 80,595,718 | 80,399,935 | 80,399,935 | 0 | 0 | 2020-11-23 | CV. ANNISA MANDIRI CIPTA KARYA | 92.989.974.8-733.000 | 154,282 | 0.19 % | |
1140 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4158282 | 26212344 | 17,500,000 | 17,435,220 | 17,352,720 | 17,352,720 | 17,300,000 | 17,300,000 | 0 | 0 | 2020-11-23 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 147,280 | 0.84 % | |
1141 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Pengawasan Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4158282 | 26212344 | 17,500,000 | 17,435,220 | 17,352,720 | 17,352,720 | 17,300,000 | 17,300,000 | 0 | 0 | 2020-11-23 | CV. IDEA ADVINDO | 90.469.114.4-736.000 | 147,280 | 0.84 % | |
1142 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4159282 | 26203167 | 40,000,000 | 14,937,780 | 14,855,280 | 14,855,280 | 14,805,000 | 14,805,000 | 0 | 0 | 2020-11-23 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 25,144,720 | 62.86 % | |
1143 | 2020 | Dinas Pendidikan dan Kebudayaan | Konsultan Perencanaan rehab sarpras dan utilitas 2021 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4159282 | 26203167 | 40,000,000 | 14,937,780 | 14,855,280 | 14,855,280 | 14,805,000 | 14,805,000 | 0 | 0 | 2020-11-23 | CV.AHMAD BERSAUDARA ENGINEERING | 74.964.217.9-731.000 | 25,144,720 | 62.86 % | |
1144 | 2020 | Kecamatan Padang Batung | Konsultan Pengawasan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4160282 | 26156764 | 4,000,000 | 3,996,520 | 3,927,000 | 0 | 3,927,000 | 3,927,000 | 0 | 0 | 2020-11-24 | cv.akmalindo | 02.531.482.4-731.000 | 73,000 | 1.83 % | |
1145 | 2020 | Kecamatan Padang Batung | Konsultan Pengawasan Rehab Gedung Kantor Ruang Paten | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4160282 | 26156764 | 4,000,000 | 3,996,520 | 3,927,000 | 0 | 3,927,000 | 3,927,000 | 0 | 0 | 2020-11-24 | cv.akmalindo | 02.531.482.4-731.000 | 73,000 | 1.83 % | |
1146 | 2020 | Kecamatan Angkinang | Belanja Modal Perbaikan Halaman Kantor Camat Angkinang | Pengadaan Langsung | Pengadaan Barang | 4161282 | 26171786 | 70,000,000 | 69,996,740 | 69,860,306 | 0 | 69,860,306 | 69,860,306 | 0 | 0 | 2020-11-24 | FADWI UTAMA | 94.246.044.5-733.000 | 139,694 | 0.2 % | |
1147 | 2020 | Kecamatan Angkinang | Belanja Modal Perbaikan Halaman Kantor Camat Angkinang | Pengadaan Langsung | Pengadaan Barang | 4161282 | 26171786 | 70,000,000 | 69,996,740 | 69,860,306 | 0 | 69,860,306 | 69,860,306 | 0 | 0 | 2020-11-24 | FADWI UTAMA | 94.246.044.5-733.000 | 139,694 | 0.2 % | |
1148 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Pengadaan Barang | 4163282 | 26703399 | 200,000,000 | 199,980,000 | 199,650,000 | 199,650,000 | 199,650,000 | 199,650,000 | 0 | 0 | 2020-11-24 | CV.STEPHAN JAYA | 83.280.683.0-731.000 | 350,000 | 0.18 % | |
1149 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Peralatan dan Instalasi Gizi Baru | Pengadaan Langsung | Pengadaan Barang | 4163282 | 26703399 | 200,000,000 | 199,980,000 | 199,650,000 | 199,650,000 | 199,650,000 | 199,650,000 | 0 | 0 | 2020-11-24 | CV.STEPHAN JAYA | 83.280.683.0-731.000 | 350,000 | 0.18 % | |
1150 | 2020 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Pengadaan Desain dan Interior | Pengadaan Langsung | Pengadaan Barang | 4164282 | 26178509 | 75,000,000 | 74,999,650 | 74,997,588 | 0 | 74,997,500 | 0 | 0 | 0 | 2020-11-24 | KARYA DWI CHADE | 75.416.433.3-733.000 | 2,413 | 0 % | |
1151 | 2020 | Badan Pengelolaan Keuangan dan Pendapatan Daerah | Pengadaan Karcis, Blanko dan SPTPD | Pengadaan Langsung | Pengadaan Barang | 4165282 | 26532318 | 234,950,000 | 146,240,270 | 146,238,070 | 0 | 146,238,000 | 0 | 0 | 0 | 2020-11-25 | PD. ABADI | 04.137.933.0-731.000 | 88,711,930 | 37.76 % | |
1152 | 2020 | Dinas Kesehatan | Pengadaan Masker Bedah (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4169282 | 26458477 | 701,313,400 | 77,077,000 | 77,077,000 | 0 | 77,077,000 | 77,077,000 | 0 | 0 | 2020-12-02 | PT. YAMHATEVY PARAN MANDIRI | 01.879.157.4-731.000 | 624,236,400 | 89.01 % | |
1153 | 2020 | Dinas Kesehatan | Pengadaan Masker Bedah (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4169282 | 26458477 | 701,313,400 | 77,077,000 | 77,077,000 | 0 | 77,077,000 | 77,077,000 | 0 | 0 | 2020-12-02 | PT. YAMHATEVY PARAN MANDIRI | 01.879.157.4-731.000 | 624,236,400 | 89.01 % | |
1154 | 2020 | Dinas Kesehatan | Pengadaan masker N95, sarung tangan steril, sarung tangan obgyn, nurse cap, hand sanitizer dan pulse oximeter (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4171282 | 26458477 | 701,313,400 | 192,071,400 | 190,874,420 | 0 | 190,685,220 | 190,685,220 | 0 | 0 | 2020-12-02 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 510,438,980 | 72.78 % | |
1155 | 2020 | Dinas Kesehatan | Pengadaan masker N95, sarung tangan steril, sarung tangan obgyn, nurse cap, hand sanitizer dan pulse oximeter (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4171282 | 26458477 | 701,313,400 | 192,071,400 | 190,874,420 | 0 | 190,685,220 | 190,685,220 | 0 | 0 | 2020-12-02 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 510,438,980 | 72.78 % | |
1156 | 2020 | Dinas Kesehatan | Pengadaan gown (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4172282 | 26162578 | 142,800,000 | 142,800,000 | 142,621,500 | 0 | 142,550,100 | 142,550,100 | 0 | 0 | 2020-12-02 | PT. BAHANA KARYA MAHLITA | 31.631.382.4-732.000 | 178,500 | 0.13 % | |
1157 | 2020 | Dinas Kesehatan | Pengadaan gown (DID Tambahan II) | Pengadaan Langsung | Pengadaan Barang | 4172282 | 26162578 | 142,800,000 | 142,800,000 | 142,621,500 | 0 | 142,550,100 | 142,550,100 | 0 | 0 | 2020-12-02 | PT. BAHANA KARYA MAHLITA | 31.631.382.4-732.000 | 178,500 | 0.13 % | |
1158 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengawasan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4174282 | 26223355 | 6,000,000 | 5,453,857 | 4,899,321 | 4,899,321 | 4,899,321 | 4,899,321 | 0 | 0 | 2020-12-03 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,100,679 | 18.34 % | |
1159 | 2020 | Dinas Pendidikan dan Kebudayaan | Belanja Modal Gedung dan Bangunan Pengadaan Bangunan Gedung Tempat Pendidikan ( Pengawasan ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4174282 | 26223355 | 6,000,000 | 5,453,857 | 4,899,321 | 4,899,321 | 4,899,321 | 4,899,321 | 0 | 0 | 2020-12-03 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 1,100,679 | 18.34 % | |
1160 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Trafo dan Penambahan Daya Listrik di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Lainnya | 4175282 | 26151426 | 55,000,000 | 54,999,450 | 54,968,375 | 0 | 54,968,375 | 54,968,375 | 0 | 0 | 2020-12-01 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 31,625 | 0.06 % | |
1161 | 2020 | Dinas Pemuda Olahraga dan Pariwisata | Pemasangan Trafo dan Penambahan Daya Listrik di Objek Wisata Air Panas Tanuhi | Pengadaan Langsung | Jasa Lainnya | 4175282 | 26151426 | 55,000,000 | 54,999,450 | 54,968,375 | 0 | 54,968,375 | 54,968,375 | 0 | 0 | 2020-12-01 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 31,625 | 0.06 % | |
1162 | 2020 | Kecamatan Angkinang | Belanja Konsultan Pengawas Perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4177282 | 26566221 | 2,250,000 | 2,200,000 | 2,035,000 | 0 | 2,035,000 | 2,035,000 | 0 | 0 | 2020-12-08 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 215,000 | 9.56 % | |
1163 | 2020 | Kecamatan Angkinang | Belanja Konsultan Pengawas Perbaikan Halaman Kantor Camat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 4177282 | 26566221 | 2,250,000 | 2,200,000 | 2,035,000 | 0 | 2,035,000 | 2,035,000 | 0 | 0 | 2020-12-08 | CV. FATHIR AL MAEQALY ENGINEER | 66.562.725.3-731.000 | 215,000 | 9.56 % | |
1164 | 2020 | Kecamatan Sungai Raya | Bangunan Arsip | Pengadaan Langsung | Pekerjaan Konstruksi | 4179282 | 26165840 | 48,800,000 | 48,788,064 | 48,653,188 | 0 | 48,653,188 | 48,653,188 | 0 | 0 | 2020-12-04 | CV. AISY | 75.132.070.6-733.000 | 146,812 | 0.3 % | |
1165 | 2020 | Kecamatan Sungai Raya | Bangunan Arsip | Pengadaan Langsung | Pekerjaan Konstruksi | 4179282 | 26165840 | 48,800,000 | 48,788,064 | 48,653,188 | 0 | 48,653,188 | 48,653,188 | 0 | 0 | 2020-12-04 | CV. AISY | 75.132.070.6-733.000 | 146,812 | 0.3 % | |
1166 | 2020 | Dinas Komunikasi dan Informatika | Pembuatan Aplikasi E Comerce | Pengadaan Langsung | Jasa Lainnya | 4181282 | 26465740 | 98,800,000 | 98,560,000 | 98,208,000 | 0 | 98,208,000 | 98,208,000 | 0 | 0 | 2020-12-07 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.6 % | |
1167 | 2020 | Dinas Komunikasi dan Informatika | Pembuatan Aplikasi E Comerce | Pengadaan Langsung | Jasa Lainnya | 4181282 | 26465740 | 98,800,000 | 98,560,000 | 98,208,000 | 0 | 98,208,000 | 98,208,000 | 0 | 0 | 2020-12-07 | CV. AL QAWS | 70.619.811.6-733.000 | 592,000 | 0.6 % | |
1168 | 2020 | Sekretariat Daerah | Pengadaan Buku Profil dan Majalah | Pengadaan Langsung | Jasa Lainnya | 4184282 | 23944794;23944842 | 120,000,000 | 120,000,000 | 119,845,000 | 0 | 119,845,000 | 0 | 0 | 0 | 2020-12-14 | CV.MAYANG AGUNG SARI | 03.025.889.1-731.000 | 155,000 | 0.13 % | |
1169 | 2020 | Sekretariat Daerah | Pengadaan Buku Agenda | Pengadaan Langsung | Pengadaan Barang | 4185282 | 23923316 | 60,000,000 | 60,000,000 | 59,994,000 | 0 | 59,994,000 | 59,994,000 | 0 | 0 | 2020-12-12 | KARYA DWI CHADE | 75.416.433.3-733.000 | 6,000 | 0.01 % | |
1170 | 2020 | Sekretariat Daerah | Pengadaan Buku Agenda | Pengadaan Langsung | Pengadaan Barang | 4185282 | 23923316 | 60,000,000 | 60,000,000 | 59,994,000 | 0 | 59,994,000 | 59,994,000 | 0 | 0 | 2020-12-12 | KARYA DWI CHADE | 75.416.433.3-733.000 | 6,000 | 0.01 % | |
1171 | 2020 | Kecamatan Angkinang | Belanja Pemeliharaan Gedung Takraw | Pengadaan Langsung | Pekerjaan Konstruksi | 4188282 | 26171924 | 25,000,000 | 24,945,585 | 24,785,182 | 0 | 24,785,182 | 24,785,182 | 0 | 0 | 2020-12-16 | CV. AISY | 75.132.070.6-733.000 | 214,818 | 0.86 % | |
1172 | 2020 | Kecamatan Angkinang | Belanja Pemeliharaan Gedung Takraw | Pengadaan Langsung | Pekerjaan Konstruksi | 4188282 | 26171924 | 25,000,000 | 24,945,585 | 24,785,182 | 0 | 24,785,182 | 24,785,182 | 0 | 0 | 2020-12-16 | CV. AISY | 75.132.070.6-733.000 | 214,818 | 0.86 % | |
1173 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Reagent PCR (DID Tambahan) | Pengadaan Langsung | Pengadaan Barang | 4192282 | 26480392 | 201,171,000 | 199,314,500 | 198,214,584 | 198,214,584 | 198,214,000 | 0 | 0 | 0 | 2020-12-21 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 2,956,416 | 1.47 % | |
1174 | 2020 | RSUD Brigjen H. Hasan Basry | Pengadaan Reagent PCR (DID Tambahan Tahap 2) | Pengadaan Langsung | Pengadaan Barang | 4193282 | 26557609 | 200,000,000 | 199,314,500 | 198,214,584 | 198,214,584 | 198,214,000 | 0 | 0 | 0 | 2020-12-21 | PT.MITRA JANANG MANDIRI | 31.738.052.5-731.000 | 1,785,416 | 0.89 % | |
1175 | 2020 | Kecamatan Simpur | tambah daya dan instalasi listrik | Pengadaan Langsung | Jasa Lainnya | 4194282 | 26473444 | 71,415,400 | 68,479,554 | 68,397,054 | 0 | 68,397,054 | 68,397,054 | 0 | 0 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 3,018,346 | 4.23 % | |
1176 | 2020 | Kecamatan Simpur | tambah daya dan instalasi listrik | Pengadaan Langsung | Jasa Lainnya | 4194282 | 26473444 | 71,415,400 | 68,479,554 | 68,397,054 | 0 | 68,397,054 | 68,397,054 | 0 | 0 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 3,018,346 | 4.23 % | |
1177 | 2020 | Kecamatan Simpur | instalasi dan tambah daya listrik | Pengadaan Langsung | Jasa Lainnya | 4195282 | 26471230 | 70,000,000 | 69,570,270 | 69,020,270 | 0 | 69,020,270 | 69,020,270 | 0 | 0 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 979,730 | 1.4 % | |
1178 | 2020 | Kecamatan Simpur | instalasi dan tambah daya listrik | Pengadaan Langsung | Jasa Lainnya | 4195282 | 26471230 | 70,000,000 | 69,570,270 | 69,020,270 | 0 | 69,020,270 | 69,020,270 | 0 | 0 | 2020-12-23 | CV. Jambangan Bersinar | 92.311.866.5-733.000 | 979,730 | 1.4 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2020 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Terpadu | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3732282 | 26155218 | 18,800,000 | 18,791,829 | 18,417,829 | 0 | 18,417,800 | 18,417,800 | 0 | 0 | 2020-09-09 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,171 | 2.03 % | |
2 | 2020 | Dinas Perdagangan | Perencanaan Rehab Drainase Pasar Terpadu | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3732282 | 26155218 | 18,800,000 | 18,791,829 | 18,417,829 | 0 | 18,417,800 | 18,417,800 | 0 | 0 | 2020-09-09 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,171 | 2.03 % | |
3 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3733282 | 26155556 | 48,800,000 | 48,785,568 | 48,417,068 | 0 | 48,417,000 | 48,417,000 | 0 | 0 | 2020-09-09 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,932 | 0.78 % | |
4 | 2020 | Dinas Perdagangan | Perencanaan Pembuatan Kanopi, Pengurugan dan pembuatansiring pasang batu belakang Pasar Terpadu I | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 3733282 | 26155556 | 48,800,000 | 48,785,568 | 48,417,068 | 0 | 48,417,000 | 48,417,000 | 0 | 0 | 2020-09-09 | Cipta Mandiri Konsultan | 03.185.568.7-733.000 | 382,932 | 0.78 % | |
5 | 2020 | RSUD Brigjen H. Hasan Basry | Rehab Ruangan Laboratorium PCR (DID Tambahan) | Penunjukan Langsung | Pekerjaan Konstruksi | 3779282 | 26300516 | 218,500,000 | 199,997,102 | 199,951,427 | 199,951,427 | 199,951,000 | 199,951,000 | 0 | 0 | 2020-10-09 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 18,548,573 | 8.49 % | |
6 | 2020 | RSUD Brigjen H. Hasan Basry | Rehab Ruangan Laboratorium PCR (DID Tambahan) | Penunjukan Langsung | Pekerjaan Konstruksi | 3779282 | 26300516 | 218,500,000 | 199,997,102 | 199,951,427 | 199,951,427 | 199,951,000 | 199,951,000 | 0 | 0 | 2020-10-09 | CV. PUTERA PANGESTU | 94.361.002.2-733.000 | 18,548,573 | 8.49 % | |
7 | 2020 | Sekretariat DPRD | Rehab Ventilasi Ruang Rapat DPRD | Penunjukan Langsung | Pekerjaan Konstruksi | 4071282 | 26444288 | 51,900,000 | 51,899,629 | 51,499,646 | 0 | 51,499,600 | 51,499,600 | 0 | 0 | 2020-11-02 | CV. JAYA ABADI | 02.237.609.9-733.000 | 400,354 | 0.77 % | |
8 | 2020 | Sekretariat DPRD | Rehab Ventilasi Ruang Rapat DPRD | Penunjukan Langsung | Pekerjaan Konstruksi | 4071282 | 26444288 | 51,900,000 | 51,899,629 | 51,499,646 | 0 | 51,499,600 | 51,499,600 | 0 | 0 | 2020-11-02 | CV. JAYA ABADI | 02.237.609.9-733.000 | 400,354 | 0.77 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |